Vous êtes sur la page 1sur 278

MAHARASHTRA JEEVAN PRADHIKARAN

( Government of Maharashtr Undertaking )

SCHEDULE OF RATES
FOR THE YEAR - 2012-2013

NAGPUR & AMRAVATI REGION


(Effective from 24th Dec. 2012)
APPLICABLE FOR NAGPUR & AMRAVATI REGION
MAHARASHTRA JEEVAN PRADHIKARAN

Approved by the Chief Engineer , Maharashtra Jeevan Pradhikaran, Water management,


Thane vide L.No.TB-3/CR-46-C/3774 dated 31/12/2012

Countersigned For The Year 2012-2013

Sd/Superintending Engineer
Maharashtra Jeevan Pradhikaran (Urban & Rural), Cirlce
Nagpur

MAHARASHTRA JEEVAN PRADHIKARAN


Nagpur & Amravati Region
SCHEDULE OF RATES
FOR THE YEAR - 2012-2013
INDEX
Section No

Name of Section

Page Nos.
From

To

Government Resolutions for Hilly Areas

IX

General Notes

Materials

Labour and Machinery

10

Transportation & Standard weights of pipes

11

25

Cement Consumption

26

27

Excavation

28

32

Iron & Structural Steel Work

33

34

Plain Cement Concrete and Reinforced Cement Concrete

35

41

Misellaneous

42

46

Pipes and Specials


I

C.I. / D.I.Pipes

47

57

II

A.C. Pipes

58

62

III

P.V.C. Pipes

63

69

IV

G.I. Pipes

70

72

Stoneware Pipes

73

73

VI

R.C.C. Pipes

74

78

VII

P.S.C. Pipes

79

85

VIII

B.W.S.C. Pipes

86

92

IX

G.R.P. / F.R.P. Pipes

93

99

H.D.P.E. Pipes

100

106

XI

M.D.P.E. Pipes

107

116

P.C.C.P. Pipes

117

124

XIII Pipe Appurtenances

125

144

XIV Mechanical Joints / Fittings

145

153

XV

XII

154

176

XVI Fabrication of M.S. Pipes and Specials

177

185

XVII M.S. Pipes Laying

186

208

XVIII Treatment Plants (WTP / STP)

209

240

XIX R.C.C. G.S.R's and Sumps

241

243

XX

244

249

250

257

M.S. Pipes

R.C.C., E.S.R's

XXI Chambers, Manholes and Drainage Drops


J

Well Sinking and River Infiltration Works

258

262

Ancillary item for Reservoirs

263

266

Trial Run

267

267

Type Designs

268

293

, .
1090/-163/39-, . 7 1990

- 1

2.

3.



20

50


50

1.

(1)

2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.


-- " --- " --- " --- " --- " --- " --- " --- " --- " --- " --- " --- " --- " --- " --- " --- " --- " --- " --

Government Resolution Annex.I

(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)

(1)
(2)

(3)

(16)
(17)
Page I

4.

5.

6.
7.

[Type text]



20

50


50

21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
()

------------------

"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"

------------------

38.
39.
40.
41.

-- " --- " -

(18)
(19)
(20)
(21)
(22)
(23)
(24)
(25)
(27)
(28)
(29)
(30)
(31)
(32)
(32)

(4)

(5)

(33)
(34)
(35)
(36)

42.
43.
()

-- " --- " --

(37)
(38)

44.
45.
46.

-- " --- " --- " --

(39)
(40)
(41)
Page II

8.

9.
10.

[Type text]

47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.



20

50


50


-------------

"
"
"
"
"
"
"
"
"
"
"
"

-------------

60.

-- " --

61.
62.
63.
64.
65.
66.
67.

--------

"
"
"
"
"
"
"

--------

(42)
(43)
(44)
(45)
(46)
(47)
(48)
(49)
(50)
(51)
(52)

(6)

(7)


,

,

,

.

(8)

(53)
(54)
(55)
(56)
(57)
(58)
(59)
Page III

11.

12.

13.
14.

15.
16.

[Type text]

68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
81.
82.



20

50


50


-- " --- " --- " --- " --- " --- " -
-- " --- " --- " -------

"
"
"
"
"

(60)
(61)
(62)
(63)
(64)
(65)
(66)
(67)
(68)

------

83.
84.
85.

-- " --- " -

86.

-- " --

87.
88.

-- " -

(69)
(70)

(71)
-

(9)

(10)
(11)
(12)
(13)
(14)



-- " --- " -

(15)

(16)

(17)

Page IV

17.

89.

(18)

-- " --

(19)

-- " --

(20)

(72)

93.

-- " --

(21)

94.
95.

-- " --- " --

(22)
(23)

91.
92.

[Type text]

-- " --

18. 90.

19.



20

50


50

Page V

, .
1090/-163/39-, . 7 1990

- 2

1)

1) 2) 3) 4) 5) 6) 7) 8)
1) 9) 10) 11) 12) 13)
14) 15) 16) 17) 18) 19) 20)
21) 22) 23) 24) 25) 26) 27)
28) 29) 30) 31) 32) 33) 34)
35) 36) 37)

2)

1) 2) 3) 4) 5) 6)
7) 8) 9) 10) 11) 12)
13) 14) 15) 16) 17) 18)
19) 20) 21) 29) 30)
31) 32) 33) 35) 36) 37)
38) 39) 40)

3)

1) 2) 3) 4) 5) 6) 7)
8) 9) 10) 11) 12) 13)
14) 15) 16) 17) 18) 19)
20) 21) 22) 23) 24) 25) 26)
27) 28) 29)

4)

1) 2) 3) 4) 5) 6) 7) 8)
9) 10) 11) 12) 13) 14)
15) 16) 17) 18) 19) 20) 21)
22) 23) 24) 25) 26) 27) 28)
29) 30) 31) 32) 33) 34)
35) 36) 37) 38) 39) 40) 41)
42) 43)

Government Resolution Annex. II

Page VI

5)

1) 2) 3) 4) 5) 6) 7)
8) 9) 10) 11) 12) 13) 14)
15) 16) 17) 18) 19) 20) 21)
22) 23) 24) 25) 26) 27)
28)

6)

1) 2) 3) 4) 5) 6) 7) 8)
9) 10) 11) 12) 13) 14) 15)
16) 8) 19) 20) 21) 22)
23) 24) 25) 26) 27) 28)
29) 30) 31) 32) 33)
34) 35) 36) 37) 38) 39)
40) 41) 42) 43) 44) 45)
46) 47) 48) 49) 50) 51)
52) 53) 54) 55) 56) 66) 67) 68) 69) 70) 71) 72)
73) 74) 75) 76) 77) 78)
79) 80) 81) 82)

7)

1) 2) 3) 4) 5) 6) 7)
8) 9) 10) 11) 12) 13)
14) 15) 16) 17) 18) 19)
20) 21) .

8)

1) 2) 3) 4) 5) 6)
7) 8) 9) 10) 11) 12)
13) 14) 15) 16) 17) 18)
19) 20) 21) 22) 23)
24)
1) 2) 3) 4) 5) 6)
7) 8) 9) 10) 11) 12)
13) 14) 15) 16) 17)
18) 19) 20) 21) 22) 23) 24)
25) 26) 27)

9)

10)

1) 2) 3) 4) 5) 6) 7)
8) 9) 10) 11) 12) 13)
14) 15) 16) 17)

11)

1) 2) 3) 4) 5) 6) 7)
8) 9) 10) 11) 12)
13) 14) 15) 16) 17) 18)

Government Resolution Annex. II

Page VII

12)

1) 2) 3) 4) 5) 6)
7) 8) 9)

13)

1) 2) 3) 4) 5) 6)
7) 8) 9) 10) 11) 12)
13) 14)

14)

1) 2) 3) 4) 5) 6) 7)
8) 9) 10) 11) 12)

15)

1) 2) 3) 4) 5) 6)
7) 8) 9) 10) 11) 12) 13)
14) 15) 16) 17) 18) 19) 20) 21) 21) 22) 23)

16)

1) 2) 3) 4) 5) 6)
7) 8) 9) 10) 11) 12)
13) 14) 15) 16) 17)
18) 19) 20) 21) 22) 23) 24)
25) 26) 27) 28) 29)

17)

1) 2) 3) 4) 5) 6) 7)
8) 9) 10) 11) 12) 13) 14)
15) 16) 17) 18) 19)
20) 21) 22) 23) 24) 25)
26) 27) 28) 29) 30)

18)

1) 2) 3) 4) 5) 6) 7) 8)
9) 10) 11) 12) 13) 14) 15)
16) 17) 18) 19) 20) 21) 22)
23) 24) 25) 26) 27) 28)
29) 30) 31) 32) 33) 34) 35)
36) 37) 38) 39) 40) 41)
42) 43) 44) 45) . 46) 47)
48)
1) 2) 3) 4) 5) 6) 7)
. 8) 9) 10) 11) 12) 13) 14)
15) 16) 17) 18) 19) 20)
21) 22) 23) 24) 25) 26) 27)
28) 29)

19)

Government Resolution Annex. II

Page VIII

20)

1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14)


15) 16) 17) 18) 19) 20) 21) 22) 23) 24) 25) 26) 27) 28)
29) 30) 31) 32) 33) 34)
35) 36) 37) 38) 39) 40) 41)
42) 43) 44) 45) . 46) 47)
48) 49) 50) 51) 52) 53)
54) 55) 56) 57) 58) 59)
60) 61) 62) 63) 64) 65)
66)

21)

1) 2) 3) 4) 5) 6) 7)
8) 9) 10) 11) 12) 13) 14)
15) 16) 17) 18) 19) 20)
21) 22) 23) 24) 25) 26)
27) 28) . 29) 30) 31) 32)
33) 34) 35) 36) 37) 38)
39) . 40) 41) 42) 43) 44) 45)
46) 47) 48) 49) 50) 51)
52) 53) 54) 55) 56)

22)

1) 2) 3) . 4) 5) 6) 7)
8) 9) 10) . 11) 12) 13)
14) 15) 16) 17) 18) 19)
20) 21) 22) 23) 24) 25)
26) 27) 28) 29) 30) 31)
32)

23)

1) 2) 3) 4) 5) 6) 7)
8) 9) 10) 11) 12) 13)
14) 15) 16) 17) 18) 19)
20) 21) 22) 23) 24) 25)
26) 27) 28) 29) 30) 31)
32) 33) 34) 35) 36) 37)
38) 39) 40)

Government Resolution Annex. II

Page IX

MAHARASHTRA JEEVAN PRADHIKARAN NAGPUR & AMRAVATI REGION


SHEDULE OF RATES FOR THE YEAR 2012-2013
GENERAL NOTES
1 These rates are applicable to all MJP works in the NAGPUR AND AMRAVATI
REGION with effect from 24-12-2012.
2 Item of excavation is inclusive of normal manual dewatering, however,
seperate item for dewatering shall be proposed in the estimate where
underground water is anticipated in significant magnitude.
3 The rates of excavation for O & M
available and work is required to
the rate should be adopted as per
be approved by concerned S.E. for

works where limited working space is


be carried out on emergency basis,
the actual rate analysis which shall
that particular work only.

4 Rates for all items are inclusive of all taxes, levied by Central, state govt. and
local bodies. Labour rates are inclusive of EPF 12.5 % These rates are
applicable only for tendered works, these rates should be reduced by 12.50% of
labour part when works are to be carried out on piecemeal works and other
small works without tendering.
5 As per Govt. notification No.25/2012/service tax dt. 20 June 2012 point No.12E Service Tax is exempted for pipeline, conduit or plant for (i) water supply, (ii)
water treatment or (iii) sewage treatment or disposal. Hence service tax is not
considered in rate analysis.
6 For all completed items, initial lead of 5 kms. is considered for
collection of materials like sand, bricks, metal, stone etc. Appropriate
addition for lead charges excluding loading, unloading,for these materials
shall be done while estimation.
Following quantities shall be considered for additional lead charges beyond 5
km for material required for concrete and reinforcement for structures.
Capacity of ESR

20,000
30,000
40,000
50,000

General-Note

Staging (M) Quantity of


Concrete in
cum
12
27.40
12
32.70
12
37.80
12
41.90

Reinforcement Qty (MT


)
2.14
2.55
2.95
3.27

Capacity of ESR

Staging (M) Quantity of


Reinforcement Qty (MT
Concrete in
)
cum
60,000
12
46.40
3.62
70,000
12
51.20
3.99
75,000
12
53.00
4.13
80,000
12
56.00
4.37
90,000
12
62.40
4.87
125,000
25
107.40
8.38
150,000
12
89.80
7.00
160,000
12
94.30
7.36
175,000
16
117.60
9.17
200,000
20
143.60
11.20
200,000
25
157.00
12.25
250,000
25
177.00
13.81
300,000
25
206.00
16.07
Note: Spiral staircase not considered. Above quantities shall be considered for
all type of foundation (SBC) and all type of Seismic Zone.
For RCC GSR
Capacity ( Lit)
Concrete Qty
Reinforcement Qty (MT
25,000
13.58
0.945
50,000
18.45
1.586
75,000
30.45
2.095
1,00,000
39.31
2.707
1,50,000
54.699
3.778
2,00,000
73.313
11.900
3,00,000
95.092
6.577
5,00,000
143.277
9.874
10,00,000
222.441
15.418
(For WTP & STP works, the quantities of completed / ongoing works shall be
considred

All the concrete Items for water retaining structures are taken as M-300 grade.
Hence aggregate quantity shall be 0.90 cum/cum of concrete and sand
quantity shall be 0.45 cum/cum of concrete for RCC GSR, ESR, All Treatment
Plants
7 These rates are applicable to water supply and sewerage schemes
and its allied works only. Items required for general construction, buildings,
roads, Irrigation Works etc. shall be adopted from the current schedule of
rates of P.W.D. or Irrigation Deptt. in respective areas. For bore wells,
CSR. of GSDA shall be followed. Increase in percentage over normal
schedule of rates will also be as per norms of respective C.S.R.

General-Note

8 For mechanical and electrical items related to water supply and


sewerage schemes, CSR for 2012-2013 prepared by Superintending
Engineer (Mechanical), Maharashtra Jeevan Pradhikaran shall be adopted.
9 Following increase in % over normal schedule of rates of M.J.P. for 20122013 will be applicable. (Ref. PWD GR. No. DSR / 1091 / CR-6577 / Planning3, dated 08/07/2003)

a
b
c
d
e
f
g
h
i
j

Area
Works in Corporation area
Works in Municipal areas
Works in tribal area / hilly and inaccesible areas
Suger cane area
Prison / Jail area
Defence area
Rajbhavan
Excavation for pipeline work along National Highway
Excavation for Dist.system pipe lines, Sewerage
system in towns
For Naxalite Area (As listed below)
Naxalite Areas District wise

% Increase
5%
2%
10%
5%
15%
20%
20%
10%
10%
10%

1) GADCHIROLI
2) CHANDRAPUR

Whole
:
District.
:Chandrapur, Gondpipri, Rajura, Korapana, Jiwati,
Ballarpur, Pobhurna, Mul & Sawli Tahsil
Tiroda,
Goregaon, SadakArjuni, Salekasa, Deori,
3) GONDIA
:
Arjuni Morgaon, Amagaon, Gondia Tahsil
Sakoli,
Lakhani & Lakhandur Tahsil.
4) BHANDARA
:
Pandharkawda,
Wani, Zari, Zamani, Ghatanji &
5) YAVATMAL
:
Arni Tahsil.
NOTE: The 10% increase in rates for NAXAL affected areas will be the
additional rates applicable for that areas over and above 'a' to 'i' as applicable.
This additional percentage is only on completed item of work and not
applicable to items of providing of materials like steel, pipes, valves, specials
and other supply of materials etc.
10 In any case more than one percentage increase on basic rates becomes
admissible, instead of adding both, the higher percentage only be taken.
(e.g. if any Municipal Council falls in hilly area, then additional percentage
in rates will be with only 10 % and not with 2 % + 10 %). This additional
percentage is only on completed item of work and not applicable to
items of providing of materials likesteel, pipes, valves, specials etc.

General-Note

11 For hilly and inaccessible areas / Tribal areas approved by Government,


Planning
Department's
Circular
Nos.(1)1089/CR-66/Plan-19,
DT.
23/11/1990 and (2) 1094 / P-36 / K-1455 dt.02/09/1994, shall be followed
(refer pages 347 onwords). In addition to amendment notified by the planning
deptt. time to time.
12 For Action Plan Notified Area, Government's Circular in force from time
to time shall be followed.
13 Whenever basic rates of completed items are increaed by percentage given
at Sr. No. 9, the issue rates of materials to be supplied by the
Department (if any) for these items shall be increased by same percentage.
14 This schedule of rates is based on following basic rates for important
Material
Rate in Rs. Per MT.
a Cement
Rs. 6000.00
b Mild Steel
Rs. 46000.00
c Tor Steel/CTD bars
Rs. 46000.00
d Structural Steel
Rs. 47150.00
e Corrosion Resistant Steel (Fe 500)
Rs. 48350.00
15 Details of standard cement consumption and standard weight of various
pipes are incorporated in this CSR .
16 Rates for supply of various types of pipes, specials and valves are
inclusive of excise duty, central sales tax and VAT, third party inspection
charges, storage charges, overhead charges and transportation of materials
upto divisional stores, site and stacking.
17 Cost of carting of pipes and valves from departmental stores to site of
work is not considered in rate analysis, hence this item must be
incorporated in each scheme. While inviting tenders if supply is from
departmental store, then this item shall appear in the tender, and if
the supply is by contractor then this item shall not appear in the
tender, even though same is provided in sanctioned scheme, because
the contractor is supposed to bring the pipes and valves directly at site.
18 Though the contractor is required to do refilling before hydraulic testing
to avoid traffic hurdle, no payment for refilling of the trenches of
pipeline shall be payable till satisfactory hydraulic testing is given.
Re-excavation required if any, during testing, shall be done by the
contractor at his own cost.

General-Note

19 10 % of cost of items of water retaining structures, such as


GSR/ESR/MBR shall be retained till satisfactory hydraulic testing as per
IS code.
20 10 % of cost of total sub-work of pipeline work shall be retained till
satisfactory hydraulic testing is given as per IS code.
21 In

only 85%
payment shall be released after supply and 15% after satisfactory
hydraulic testing.
case

of

supply

of

pipes / valves

etc.

by

contractor,

22 AC / PVC pipes shall not to be used in Urban Areas with reference to the
Circular No. 130 dated 09/03/2009 of M.S., MJP. HDPE pipes may be used in
Distribution system of Urban areas with diameter restricted upto 300 mm dia
only, provided that the area where these pipes are to be laid shall not be a
rocky area.
23 Provision for octroi charges for pipes,specials and valves is not considered
in the CSR 2012-2013. Provision of 4 % of cost of pipes ,specials and
valves to be used in corporation area shall be made while framing the
estimate for works included in corporation limit. Octroi charges shall be
reimbursed to contractor on production of receipt for payment for
materials actully to be used in corporation area, if there specific
provision to that effect in the contract.
24 For use of ready mix cement concrete, prior permission of the Chief
Engineer must be obtained.
25 For Dams , Balancing Tanks , Aerated Lagoons and similar structures, the
rates for Film membranes as per prevailing rates for Irrigation
Department will be followed.
26 Capacity of ESR / GSR to be constructed shall be rounded to nearest
1000 litres always on higher side i.e. if required capacity is 1,23,570
litre, it shall be rounded to 1,24,000 litre. Similarly, if required capacity
is 8,26,070 litre, it shall be rounded to 8,27,000 litre.
27 Capacity of Unconventional / conventional Treatment Plants shall be
rounded to nearest 0.5 Mld- always on higher side i.e. if WTP of 2.37
Mld is required; it shall be rounded to 2.5 Mld. For WTP having
capacity less than 0.5 mld, package type WTP should be considered.

General-Note

28 Provision for insurance @ 1% is considered in Rate analysis of CSR 2012-2013.


These rates are applicable only for tendered work, these rates shall be reduced
by 1% of total rate when works are to be carried out on piecemeal works and
other small works without tendering.
29 Rates given in this CSR are for estimation purpose only.
30 The makes of Sluice / Butterfly valves etc. to be used for inlet / outlets of
ESRs / GSRs / MBRs / WTP Pumping main / Rising main shall be from
approved makes of M.J.P .
31 Excise duty is exempted for equipments (Gears, Motors, Tube settlers) used for
WTP as per Notification No. 26/2009 - Central Excise dated 4/12/2009.
a) Pipes needed for deliveray of water from its source to the plant (including the
clear treated water reservoir if any thereof) and from there to first storage
point.
b) Pipes of outer dimeter exceeding 100 mm when such pipes are internal part
of water supply projects.
c) All the items of machinary, including instruments, appertanances and
appliances auxillary equipments and their componenets / parts required for
setting up of water treatment plant.
32 As per Govt. circular No. DSR-1090 / CR- 6453 / PLN-3 dated 14/7/1993 1%
for labour amenities is not considered in the DSR except concrete items while
arriving the rates
33 The Royalty Charges are considered in the rate analysis of CSR 2012-13 as per
Govt. circular revenue & Forest Deptt. No. Gaukhani-10/1009/CR-309/ dt.
11/02/2010.

General-Note

SECTION - A : MATERIALS

Sr.No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

Description

Unit

Acetylene Gas
Nos
Alum Grade I Ex-factory
Mt
Binding Wire
Kg
Black enemal paint Anti corrosive
Ltr
Bricks
No
Bullies, Struts (125 mm dia 1.5 M long)
rmt
C.C.Teak wood planks(3" X 6")
Cum
Cement (Bags)
Bag
Cement (M.T.)
Mt
Cement Sulphar Resistant
M.T.
Charcoal
Kg
Coarse sand
Cum
Corrosion Resistant steel
Mt
Diesel
Lit
Epoxy paint
Kg
Fuse
No
Gun Powder
Kg
Kasarde sand (for mortar lining work) @ source
cum
Liquid chlorine 100 kg Deptt Containor .
No.
Liquid chlorine 900 kg Supplier Containor
No.
LubricantOil
lit
M.S.angle(50x50x6mm)
Kg
M.S.Bars (Delivery at site)
Mt
M.S.Bars (in kgs)
Kg
M.S.Flats (40 mm x 3 mm)
Kg
M.S.plate
Kg
Mild steelGrill ready
Kg
Mildsteel grill railing
mt
Mobile oil
Lit
Murum
cum
Nails
Kg
Nutbolts
Kg
Oxygen Gas (Refill)
Cylinder
Plywood Coomercial 12 mm thick Waterproof for
sqm
centering
Polling
board
cum
R.S.Joist channel etc
MT
Rapid sand Gravity filter Gravel At Source
Cum
Rapid sand Gravity filter Gravel At Source (Godhara, Cum
Gokak,
Vainganga,
Ready mix
oil paint Yesagi sand)
Ltr
Ready mix primer for steel
Ltr
Ready mix synthetic enamel paint
Lit
Ready mixed lead/zinc paint
Ltr
Rubber Gasket (8 mm thick)
Kg

Section-A-Material

Rate
(in Rs.)
2012-13

Rate
(in Rs.)
2013-2014

600.00
8200.00
60.00
200.00
4.25
180.00
72000.00
300.00
6000.00
6600.00
24.20
1100.00
48300.00
51.75
425.00
17.60
160.00
1092.00
2800.00
16000.00
224.25
47.15
46000.00
46.00
48.30
49.00
69.00
69.00
218.00
200.00
65.00
85.00
350.00
730.00
18500.00
47150.00
1500.00
1500.00
231.00
160.00
239.00
210.00
86.00

SECTION - A : MATERIALS

Sr.No.

44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

Description

Rubble
Sand
Spun Yarn
Stone Aggregate 10 mm
Stone Aggregate 20 mm
Stone Aggregate 40 mm
Structural Steel
T.C.L.(bleaching poweder Gr.I) (10kg pack)
T.C.L.(bleaching poweder Gr.I) (25kg pack)
T.C.L.(bleaching poweder Gr.I) (5kg pack)
Teak wood
Tor Steel
Walling ( 100x100mm)
Welding Rod Having weight 5.25 kg
White cement
White lead
Wire

Section-A-Material

Unit

Rate
(in Rs.)
2012-13

cum
cum
Kg
cum
cum
cum
M.T.
Kg
Kg
Kg
Cum
Mt
cum
Box
Kg
Kg
Kg

405.00
1150.00
100.00
850.00
800.00
750.00
47150.00
20.00
22.00
22.00
72000.00
46000.00
16500.00
1500.00
33.00
165.00
75.00

Rate
(in Rs.)
2013-2014

SECTION - B : LABOUR AND MACHINERY


Sr.No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

Description

Asst Fitter
Bhandhani
Bhisti with pakahal
Blacksmith IInd class
Breaker
Carpainter 1st class
Carpainter 2nd class
Chiseller
Excavator
Fitter 1st class
Glazier
Helper
Hole Driller
Mason 1st class
Mason 2nd class
MAZDOOR (FEMALE)
Mazdoor(Heavy)
Mazdoor (Light)
MAZDOOR (MALE)
Maistry
Mukadam
Painter (for coloring)
Painter
Polisher
Pump Driver
StoneCutter or dresser
Tile layer
Welder
Welder for pipe line
WhiteWasher
TileTurner
L.M.V. Driver
Electrician
Plumber (Building)
Mali
Wireman
Computer Operator (data entryoperator)

Section-B-Labour Machinery

Unit

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

Rate
(in Rs.)
2012-13

Rate
(in Rs.)
2013-2014

275.00
303.00
260.00
303.00
303.00
363.00
303.00
303.00
242.00
327.00
303.00
260.00
303.00
363.00
303.00
260.00
303.00
260.00
260.00
303.00
303.00
303.00
303.00
303.00
303.00
303.00
303.00
363.00
363.00
303.00
303.00
303.00
363.00
363.00
260.00
303.00
424.00

MACHINERY
Sr.No.

Description

Rent for chain pully block with tripod


Rent charges for pump excluding
operator & excluding fuel
Rent for Mech.Mixer with fuel & crew

4
5
6
7
8
9

1
2

Unit

Day
BHP-Day

Rate
(in Rs.)
2012-13

450.00
180.00

Day

2300.00

Rent for vibrator with fuel and crew


Plate Bender
Rent for welding set with Electric set
Rent for welding set with Generator
Rent for Compressor with fuel
Rent for Concrete breaker & Compressor

Day
Day
Day
Day
Day
Day

900.00
900.00
1100.00
2400.00
2500.00
2500.00

10
11
12
13
14

Rent for poclain


Rent for Crane
Rent for JCB
Truck hire charges upto 20 km
Truck hire charges for 20 km to 50 km

Hour
Hour
Hour
Day
Day

2000.00
1300.00
1000.00
2300.00
2100.00

15

Truck hire charges for 50 km & above

Day

1600.00

16
17
18

Pipe cutter with opertor


Desludging/ Desilting pump
Jeep hire charges with driver and fuel
(Upto 300 KM.)

Day
Day
Day

1250.00
2400
3000

Section-B-Labour Machinery

Rate
(in Rs.)
2013-2014

10

SECTION - C : TRANSPORTATION
STATEMENT -I

Sr.N
o.

Item of work

1
2
(A) MANUAL HANDLING
(Weight upto & including 300 kg.)
1 C.I. / D.I. /M.S./H.D.P.E. pipes of all
classes upto & including 200 mm dia.
Pipes of any length.

Unit

2012-2013

Collecting the
railway receipt
etc & unloading Lifting the
Unloading the
material
Loading the
the
material from
from
material into
consignment
truck including
railway
truck from
from railway
stacking in
platform,
departmental
wagon &
departmental
loading
store
or
site
of
keeping on
stores or site of
Unloading
work.
railway
work.
into
truck.
platform
consignment
booked in.
4
5
6
7

M.T.

276.70

337.60

88.00

88.00

R.C.C. pipes of all classes upto &


including 350 mm dia.

M.T.

276.70

337.60

88.00

88.00

A.C. pipes of all classes & dia.

M.T.

145.50

206.40

52.70

52.70

P.V.C. pipes of all classes & dia.

M.T.

145.50

206.40

52.70

52.70

M.T.

276.70

337.60

88.00

88.00

All other materials such as C.I.


Specials of individual weight upto 300
kg.
Mild steel / for steel / R.S.J.

M.T.

174.40

235.20

132.75

132.75

Cement / bleaching powder / alum.

M.T.

84.70

128.00

67.10

67.10

M.T.

195.10

247.90

177.50

177.50

(B) CRANE HANDLING


(Materials having individual weight above
300 kg.)
1

C.I./D.I./B.W.S.C./ M.S./ R.C.C. pipes of


all classes having individual weight more
than 300 kg. & alsoother heavy materials,
valves, machinery having individual
weight more than 300 kg.

1) The above rates in col. 1 to 5 are apploicable only for Railway clearence purpose and not for other carting.

2) The rates given in col. 6 to 7 shall be adopted for estimate purpose only, however actual quotations / D- tender will
prevail.
3) Irrespective of supply of C.I./D.I. Pipes as per rate contract when pipes are directly supplied by the firms by road
railway freight upto destination station and carting as per schedule from Railway Station to work site is allowed In
such cases rate of Mathadi Kamgar shall not be applicable for carting and normal loading, unloading carting shall be
allowed.

Section-C-Transportation

11

STATEMENT II
Including Loading, unloading and stacking

Lead in
kms. (L)

No.of
Average
Litres of
Trips N = kms.done
speed
diesel
8
(2NL + 6)
(S)
consumed
(2(L/S)+1)

Cost of
Cost of
Cost of 6
Litres of
diesel @
mobile oil mazd.@
mobile oil
Rs 51.75
@ Rs 218 Rs340.88
consumed
per lit.
per lit.
per day

10

11

12

Total
(11)+(12)

Cost per
trip (13)/(3)

13

14

0.50

15.00

7.50

13.50

4.50

232.88

0.10

20.93

2045.25 2300.00 4599.06 459.91

5058.97

674.53

1.00

16.00

7.11

20.22

6.74

348.80

0.14

31.39

2045.25 2300.00 4725.44 472.54

5197.98

731.08

1.50

16.50

6.77

26.31

8.77

453.85

0.19

40.98

2045.25 2300.00 4840.08 484.01

5324.09

786.42

2.00

17.00

6.48

31.92

10.64

550.62

0.23

49.70

2045.25 2300.00 4945.57 494.56

5440.13

839.53

2.50

17.25

6.20

37.00

12.33

638.08

0.26

57.55

2045.25 2300.00 5040.88 504.09

5544.97

894.35

3.00

17.50

5.96

41.76

13.92

720.36

0.30

64.96

2045.25 2300.00 5130.57 513.06

5643.63

946.92

3.50

17.75

5.74

46.18

15.39

796.43

0.33

71.94

2045.25 2300.00 5213.62 521.36

5734.98

999.13

4.00

18.00

5.54

50.32

16.77

867.85

0.36

78.26

2045.25 2300.00 5291.36 529.14

5820.50

1050.63

4.50

18.25

5.36

54.24

18.08

935.64

0.39

84.37

2045.25 2300.00 5365.26 536.53

5901.79

1101.08

5.00

18.50

5.19

57.90

19.30

998.78

0.41

90.25

2045.25 2300.00 5434.28 543.43

5977.71

1151.77

6.00

18.75

4.88

64.56

21.52

1113.66

0.46

100.50 2045.25 2300.00 5559.41 555.94

6115.35

1253.15

7.00

19.00

4.61

70.54

23.51

1216.64

0.50

109.87 2045.25 2300.00 5671.76 567.18

6238.94

1353.35

8.00

19.18

4.36

75.76

25.25

1306.69

0.54

117.94 2045.25 2300.00 5769.88 576.99

6346.87

1455.70

9.00

19.60

4.17

81.06

27.02

1398.29

0.58

126.22 2045.25 2300.00 5869.76 586.98

6456.74

1548.38

10.00

20.00

4.00

86.00

28.67

1483.67

0.61

133.85 2045.25 2300.00 5962.77 596.28

6559.05

1639.76

15.00

25.00

3.64

115.20

38.40

1987.20

0.82

179.41 2045.25 2300.00 6511.86 651.19

7163.05

1967.87

20.00

25.00

3.08

129.20

43.07

2228.87

0.92

201.21 2045.25 2300.00 6775.33 677.53

7452.86

2419.76

25.00

25.00

2.67

139.50

46.50

2406.38

1.00

217.13 2045.25 2100.00 6768.76 676.88

7445.64

2788.63

30.00

25.00

2.35

147.00

49.00

2535.75

1.05

228.90 2045.25 2100.00 6909.90 690.99

7600.89

3234.42

35.00

30.00

2.40

174.00

58.00

3001.50

1.24

270.97 2045.25 2100.00 7417.72 741.77

8159.49

3399.79

40.00

30.00

2.18

180.40

60.13

3111.73

1.29

281.00 2045.25 2100.00 7537.98 753.80

8291.78

3803.57

45.00

30.00

2.00

186.00

62.00

3208.50

1.33

289.72 2045.25 2100.00 7643.47 764.35

8407.82

4203.91

50.00

30.00

1.85

191.00

63.67

3294.92

1.36

297.35 2045.25 2100.00 7737.52 773.75

8511.27

4600.69

60.00

30.00

1.60

198.00

66.00

3415.50

1.41

308.25 2045.25 1600.00 7369.00 736.90

8105.90

5066.19

70.00

30.00

1.41

203.40

67.80

3508.65

1.45

316.75 2045.25 1600.00 7470.65 747.07

8217.72

5828.17

80.00

30.00

1.26

207.60

69.20

3581.10

1.48

323.29 2045.25 1600.00 7549.64 754.96

8304.60

6590.95

90.00

30.00

1.14

211.20

70.40

3643.20

1.51

328.96 2045.25 1600.00 7617.41 761.74

8379.15

7350.13

100.00

40.00

1.33

272.00

90.67

4692.17

1.94

423.57 2045.25 1600.00 8760.99 876.10

9637.09

7245.93

125.00

40.00

1.10

281.00

93.67

4847.42

2.01

437.53 2045.25 1600.00 8930.20 893.02

9823.22

8930.20

150.00

40.00

0.94

288.00

96.00

4968.00

2.06

448.43 1922.54 1600.00 8938.97 893.90

9832.87 10460.50

175.00

40.00

0.82

293.00

97.67

5054.42

2.09

456.27 1677.11 1600.00 8787.80 878.78

9666.58 11788.51

200.00

40.00

0.73

298.00

99.33

5140.33

2.13

464.12 1493.03 1600.00 8697.48 869.75

9567.23 13105.79

250.00

40.00

0.59

301.00

100.33

5192.08

2.15

468.70 1206.70 1600.00 8467.48 846.75

9314.23 15786.83

300.00

45.00

0.56

342.00

114.00

5899.50

2.44

532.57 1145.34 1600.00 9177.41 917.74 10095.15 18027.05

420.00

45.00

0.41

350.40

116.80

6044.40

2.50

545.65

838.55 1600.00 9028.60 902.86

9931.46 24223.07

540.00

45.00

0.32

351.60

117.20

6065.10

2.51

547.40

654.48 1600.00 8866.98 886.70

9753.68 30480.25

660.00

45.00

0.26

349.20

116.40

6023.70

2.49

543.69

531.77 1600.00 8699.16 869.92

9569.08 36804.15

780.00

45.00

0.22

349.20

116.40

6023.70

2.49

543.69

449.96 1600.00 8617.35 861.74

9479.09 43086.77

900.00

45.00

0.20

366.00

122.00

6313.50

2.61

569.85

409.05 1600.00 8892.40 889.24

9781.64 48908.20

1020.00 45.00

0.17

352.80

117.60

6085.80

2.52

549.36

347.69 1600.00 8582.85 858.29

9441.14 55536.12

1140.00 45.00

0.15

348.00

116.00

6003.00

2.49

541.95

306.79 1600.00 8451.74 845.17

9296.91 61979.40

SECTION-C : TRANSPORTATION

Hire
charges Total Cost Add 10%
of Truck = (6)+(8)+ overhead
Rs.per
(9)+(10)
charges
day

12

STATEMENT III
Excluding Loading, unloading and stacking
Lead in
kms. (L)

No.of
Average
Litres of
Trips N = kms.done
speed
diesel
8
(2NL + 6)
(S)
consumed
(2(L/S)+1)

Cost of
Cost of
Cost of 6
Litres of
diesel @
mobile oil mazd.@
mobile oil
Rs 51.75
@ Rs 218 Rs 0 per
consumed
per lit.
per lit.
day

0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
6.00
7.00
8.00
9.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
55.00
65.00
75.00
85.00
95.00
105.00
130.00
155.00
180.00
230.00
280.00
400.00
520.00
640.00
760.00
880.00
1000.00
1120.00

15.00
16.00
16.50
17.00
17.25
17.50
17.75
18.00
18.25
18.50
18.75
19.00
19.18
19.60
20.00
25.00
25.00
25.00
25.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
40.00
40.00
40.00
40.00
40.00
40.00
45.00
45.00
45.00
45.00
45.00
45.00
45.00
45.00

7.50
7.11
6.77
6.48
6.20
5.96
5.74
5.54
5.36
5.19
4.88
4.61
4.36
4.17
4.00
3.64
3.08
2.67
2.35
2.40
2.18
2.00
1.85
1.71
1.50
1.33
1.20
1.39
1.28
1.07
0.91
0.80
0.64
0.60
0.43
0.33
0.27
0.23
0.20
0.18
0.16

13.50
20.22
26.31
31.92
37.00
41.76
46.18
50.32
54.24
57.90
64.56
70.54
75.76
81.06
86.00
115.20
129.20
139.50
147.00
174.00
180.40
186.00
191.00
194.10
201.00
205.50
210.00
270.10
274.80
284.20
288.10
294.00
300.40
342.00
350.00
349.20
351.60
355.60
358.00
366.00
364.40

4.50
6.74
8.77
10.64
12.33
13.92
15.39
16.77
18.08
19.30
21.52
23.51
25.25
27.02
28.67
38.40
43.07
46.50
49.00
58.00
60.13
62.00
63.67
64.70
67.00
68.50
70.00
90.03
91.60
94.73
96.03
98.00
100.13
114.00
116.67
116.40
117.20
118.53
119.33
122.00
121.47

232.88
348.80
453.85
550.62
638.08
720.36
796.43
867.85
935.64
998.78
1113.66
1216.64
1306.69
1398.29
1483.67
1987.20
2228.87
2406.38
2535.75
3001.50
3111.73
3208.50
3294.92
3348.23
3467.25
3544.88
3622.50
4659.05
4740.30
4902.28
4969.55
5071.50
5181.73
5899.50
6037.67
6023.70
6065.10
6133.93
6175.33
6313.50
6286.07

0.10
0.14
0.19
0.23
0.26
0.30
0.33
0.36
0.39
0.41
0.46
0.50
0.54
0.58
0.61
0.82
0.92
1.00
1.05
1.24
1.29
1.33
1.36
1.39
1.44
1.47
1.50
1.93
1.96
2.03
2.06
2.10
2.15
2.44
2.50
2.49
2.51
2.54
2.56
2.61
2.60

20.93
31.39
40.98
49.70
57.55
64.96
71.94
78.26
84.37
90.25
100.50
109.87
117.94
126.22
133.85
179.41
201.21
217.13
228.90
270.97
281.00
289.72
297.35
302.15
313.05
320.02
327.00
420.52
427.93
442.54
448.64
457.80
467.83
532.57
545.00
543.69
547.40
553.72
557.43
569.85
567.45

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SECTION-C : TRANSPORTATION

Hire
charges Total Cost Add 10%
of Truck = (6)+(8)+ overhead
Rs.per
(9)+(10)
charges
day
10
11
12

2300.00
2300.00
2300.00
2300.00
2300.00
2300.00
2300.00
2300.00
2300.00
2300.00
2300.00
2300.00
2300.00
2300.00
2300.00
2300.00
2300.00
2100.00
2100.00
2100.00
2100.00
2100.00
2100.00
1600.00
1600.00
1600.00
1600.00
1600.00
1600.00
1600.00
1600.00
1600.00
1600.00
1600.00
1600.00
1600.00
1600.00
1600.00
1600.00
1600.00
1600.00

2553.81
2680.19
2794.83
2900.32
2995.63
3085.32
3168.37
3246.11
3320.01
3389.03
3514.16
3626.51
3724.63
3824.51
3917.52
4466.61
4730.08
4723.51
4864.65
5372.47
5492.73
5598.22
5692.27
5250.38
5380.30
5464.90
5549.50
6679.57
6768.23
6944.82
7018.19
7129.30
7249.56
8032.07
8182.67
8167.39
8212.50
8287.65
8332.76
8483.35
8453.52

255.38
268.02
279.48
290.03
299.56
308.53
316.84
324.61
332.00
338.90
351.42
362.65
372.46
382.45
391.75
446.66
473.01
472.35
486.47
537.25
549.27
559.82
569.23
525.04
538.03
546.49
554.95
667.96
676.82
694.48
701.82
712.93
724.96
803.21
818.27
816.74
821.25
828.77
833.28
848.34
845.35

Total
(11)+(12)

Cost per
trip (13)/(3)

13

14

2809.19
2948.21
3074.31
3190.35
3295.19
3393.85
3485.21
3570.72
3652.01
3727.93
3865.58
3989.16
4097.09
4206.96
4309.27
4913.27
5203.09
5195.86
5351.12
5909.72
6042.00
6158.04
6261.50
5775.42
5918.33
6011.39
6104.45
7347.53
7445.05
7639.30
7720.01
7842.23
7974.52
8835.28
9000.94
8984.13
9033.75
9116.42
9166.04
9331.69
9298.87

374.56
414.66
454.11
492.34
531.48
569.44
607.18
644.53
681.35
718.29
792.13
865.33
939.70
1008.86
1077.32
1349.80
1689.31
1946.01
2277.07
2462.38
2771.56
3079.02
3384.59
3377.44
3945.55
4519.84
5087.04
5285.99
5816.45
7139.53
8483.53
9802.79
12460.19
14725.47
20932.42
27224.64
33458.33
39636.61
45830.20
51842.72
58117.94

13

STATEMENT IV
Including loading, unloading and stacking

Lead in km

1
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
6
7
8
9
10
15
20
25
30
35
40
45
50
60
70
80
90
100
125
150
175
200
250
300
420
540
660
780
900
1020
1140

Cost per trip

2
674.53
731.08
786.42
839.53
894.35
946.92
999.13
1050.63
1101.08
1151.77
1253.15
1353.35
1455.7
1548.38
1639.76
1967.87
2419.76
2788.63
3234.42
3399.79
3803.57
4203.91
4600.69
5066.19
5828.17
6590.95
7350.13
7245.93
8930.2
10460.5
11788.51
13105.79
15786.83
18027.05
24223.07
30480.25
36804.15
43086.77
48908.2
55536.12
61979.4

SECTION-C: TRANSPORTATION

Cement pay Steel pay load Bulk Asphalt M.S.Bar


load 9.00 MT 9.00 MT
in Bouzer pay MT
load 4.50 MT
3
74.95
81.23
87.38
93.28
99.37
99.37
111.01
116.74
122.34
127.97
139.24
150.37
161.74
172.04
182.20
218.65
268.86
309.85
359.38
377.75
422.62
467.10
511.19
562.91
647.57
732.33
816.68
805.10
992.24
1162.28
1309.83
1456.20
1754.09
2003.01
2691.45
3386.69
4089.35
4787.42
5434.24
6170.68
6886.60

4
74.95
81.23
87.38
93.28
99.37
99.37
111.01
116.74
122.34
127.97
139.24
150.37
161.74
172.04
182.20
218.65
268.86
309.85
359.38
377.75
422.62
467.10
511.19
562.91
647.57
732.33
816.68
805.10
992.24
1162.28
1309.83
1456.20
1754.09
2003.01
2691.45
3386.69
4089.35
4787.42
5434.24
6170.68
6886.60

5
149.90
162.46
174.76
186.56
198.74
198.74
222.03
233.47
244.68
255.95
278.48
300.74
323.49
344.08
364.39
437.30
537.72
619.70
718.76
755.51
845.24
934.20
1022.38
1125.82
1295.15
1464.66
1633.36
1610.21
1984.49
2324.56
2619.67
2912.40
3508.18
4006.01
5382.90
6773.39
8178.70
9574.84
10868.49
12341.36
13773.20

9.0 Sand
cum

6
74.95
81.23
87.38
93.28
99.37
105.21
111.01
116.74
122.34
127.97
139.24
150.37
161.74
172.04
182.20
218.65
268.86
309.85
359.38
377.75
422.62
467.10
511.19
562.91
647.57
732.33
816.68
805.10
992.24
1162.28
1309.83
1456.20
1754.09
2003.01
2691.45
3386.69
4089.35
4787.42
5434.24
6170.68
6886.60

5.75

7
117.31
127.14
136.77
146.01
155.54
164.68
173.76
182.72
191.49
200.31
217.94
235.37
253.17
269.28
285.18
342.24
420.83
484.98
562.51
591.27
661.49
731.11
800.12
881.08
1013.59
1146.25
1278.28
1260.16
1553.08
1819.22
2050.18
2279.27
2745.54
3135.14
4212.71
5300.91
6400.72
7493.35
8505.77
9658.46
10779.03

14

STATEMENT V
Excluding loading, unloading and stacking

Lead in km

Cost per trip

1
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
6
7
8
9
10
15
20
25
30
35
40
45
50
55
65
75
85
95
105
130
155
180
230
280
400
520
640
760
880
1000
1120

SECTION-C: TRANSPORTATION

2
374.56
414.66
454.11
492.34
531.48
569.44
607.18
644.53
681.35
718.29
792.13
865.33
939.7
1008.86
1077.32
1349.8
1689.31
1946.01
2277.07
2462.38
2771.56
3079.02
3384.59
3377.44
3945.55
4519.84
5087.04
5285.99
5816.45
7139.53
8483.53
9802.79
12460.19
14725.47
20932.42
27224.64
33458.33
39636.61
45830.2
51842.72
58117.94

Cement pay
9.00 MT

3
41.62
46.07
50.46
54.70
59.05
59.05
67.46
71.61
75.71
79.81
88.01
96.15
104.41
112.10
119.70
149.98
187.70
216.22
253.01
273.60
307.95
342.11
376.07
375.27
438.39
502.20
565.23
587.33
646.27
793.28
942.61
1089.20
1384.47
1636.16
2325.82
3024.96
3717.59
4404.07
5092.24
5760.30
6457.55

load Steel pay load 9.00 Bulk


Asphalt
in
MT
Bouzer pay load
4.50 MT
4
41.62
46.07
50.46
54.70
59.05
59.05
67.46
71.61
75.71
79.81
88.01
96.15
104.41
112.10
119.70
149.98
187.70
216.22
253.01
273.60
307.95
342.11
376.07
375.27
438.39
502.20
565.23
587.33
646.27
793.28
942.61
1089.20
1384.47
1636.16
2325.82
3024.96
3717.59
4404.07
5092.24
5760.30
6457.55

5
83.24
92.15
100.91
109.41
118.11
118.11
134.93
143.23
151.41
159.62
176.03
192.30
208.82
224.19
239.40
299.96
375.40
432.45
506.02
547.20
615.90
684.23
752.13
750.54
876.79
1004.41
1130.45
1174.66
1292.54
1586.56
1885.23
2178.40
2768.93
3272.33
4651.65
6049.92
7435.18
8808.14
10184.49
11520.60
12915.10

15

Lead in Cost / trip Lime murum


km
building
rubbish

1
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
6
7
8
9
10
15
20
25
30
35
40
45
50
60
70
80
90
100
125
150
175
200
250
300
420
540
660
780
900
1020
1140

2
Pay load
674.53
731.08
786.42
839.53
894.35
946.92
999.13
1050.63
1101.08
1151.77
1253.15
1353.35
1455.7
1548.38
1639.76
1967.87
2419.76
2788.63
3234.42
3399.79
3803.57
4203.91
4600.69
5066.19
5828.17
6590.95
7350.13
7245.93
8930.2
10460.5
11788.51
13105.79
15786.83
18027.05
24223.07
30480.25
36804.15
43086.77
48908.2
55536.12
61979.4

3
6.0 cum
112.42
121.85
131.07
139.92
149.06
157.82
166.52
175.11
183.51
191.96
208.86
225.56
242.62
258.06
273.29
327.98
403.29
464.77
539.07
566.63
633.93
700.65
766.78
844.37
971.36
1098.49
1225.02
1207.66
1488.37
1743.42
1964.75
2184.3
2631.14
3004.51
4037.18
5080.04
6134.03
7181.13
8151.37
9256.02
10329.9

SECTION-C :TRANSPORTATION

STATEMENT VI
Including loading, unloading and stacking
Earth
Manure or Excavated Sand stone Aggregate Soling stone Concrete
sludge
rock
aggregate
40 mm &
block (form)
40 mm &
above
below

4
4.8 cum
140.53
152.31
163.84
174.9
186.32
197.28
208.15
218.88
229.39
239.95
261.07
281.95
303.27
322.58
341.62
409.97
504.12
580.96
673.84
708.29
792.41
875.81
958.48
1055.46
1214.2
1373.11
1531.28
1509.57
1860.46
2179.27
2455.94
2730.37
3288.92
3755.64
5046.47
6350.05
7667.53
8976.41
10189.21
11570.03
12912.38

5
5.52 cum
122.20
132.44
142.47
152.09
162.02
171.54
181.00
190.33
199.47
208.65
227.02
245.17
263.71
280.50
297.06
356.50
438.36
505.19
585.95
615.90
689.05
761.58
833.46
917.79
1055.83
1194.01
1331.55
1312.67
1617.79
1895.02
2135.60
2374.24
2859.93
3265.77
4388.24
5521.78
6667.42
7805.57
8860.18
10060.89
11228.15

6
3.0 cum
224.84
243.69
262.14
279.84
298.12
315.64
333.04
350.21
367.03
383.92
417.72
451.12
485.23
516.13
546.59
655.96
806.59
929.54
1078.14
1133.26
1267.86
1401.30
1533.56
1688.73
1942.72
2196.98
2450.04
2415.31
2976.73
3486.83
3929.50
4368.60
5262.28
6009.02
8074.36
10160.08
12268.05
14362.26
16302.73
18512.04
20659.80

7
5.75 cum
117.31
127.14
136.77
146.01
155.54
164.68
173.76
182.72
191.49
200.31
217.94
235.37
253.17
269.28
285.18
342.24
420.83
484.98
562.51
591.27
661.49
731.11
800.12
881.08
1013.59
1146.25
1278.28
1260.16
1553.08
1819.22
2050.18
2279.27
2745.54
3135.14
4212.71
5300.91
6400.72
7493.35
8505.77
9658.46
10779.03

8
5.5 cum
122.64
132.92
142.99
152.64
162.61
172.17
181.66
191.02
200.20
209.41
227.85
246.06
264.67
281.52
298.14
357.79
439.96
507.02
588.08
618.14
691.56
764.35
836.49
921.13
1059.67
1198.35
1336.39
1317.44
1623.67
1901.91
2143.37
2382.87
2870.33
3277.65
4404.19
5541.86
6691.66
7833.96
8892.40
10097.48
11268.98

9
4.7 cum
143.52
155.55
167.32
178.62
190.29
201.47
212.58
223.54
234.27
245.06
266.63
287.95
309.72
329.44
348.89
418.70
514.84
593.33
688.17
723.36
809.27
894.45
978.87
1077.91
1240.04
1402.33
1563.86
1541.69
1900.04
2225.64
2508.19
2788.47
3358.90
3835.54
5153.84
6485.16
7830.67
9167.40
10406.00
11816.20
13187.11

10
6.0 cum
112.42
121.85
131.07
139.92
149.06
157.82
166.52
175.11
183.51
191.96
208.86
225.56
242.62
258.06
273.29
327.98
403.29
464.77
539.07
566.63
633.93
700.65
766.78
844.37
971.36
1098.49
1225.02
1207.66
1488.37
1743.42
1964.75
2184.30
2631.14
3004.51
4037.18
5080.04
6134.03
7181.13
8151.37
9256.02
10329.90

Timber

11
5.0 cum
117.31
127.14
136.77
146.01
155.54
164.68
173.76
182.72
191.49
200.31
217.94
235.37
253.17
269.28
285.18
342.24
420.83
484.98
562.51
591.27
661.49
731.11
800.12
881.08
1013.59
1146.25
1278.28
1260.16
1553.08
1819.22
2050.18
2279.27
2745.54
3135.14
4212.71
5300.91
6400.72
7493.35
8505.77
9658.46
10779.03

16

Lead in Cost / trip


km

0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
6
7
8
9
10
15
20
25
30
35
40
45
50
60
70
80
90
100
125
150
175
200
250
300
420
540
660
780
900
1020
1140

2
Pay load
Unit
674.53
731.08
786.42
839.53
894.35
946.92
999.13
1050.63
1101.08
1151.77
1253.15
1353.35
1455.70
1548.38
1639.76
1967.87
2419.76
2788.63
3234.42
3399.79
3803.57
4203.91
4600.69
5066.19
5828.17
6590.95
7350.13
7245.93
8930.20
10460.50
11788.51
13105.79
15786.83
18027.05
24223.07
30480.25
36804.15
43086.77
48908.20
55536.12
61979.40

STATEMENT VII
Including loading, unloading and stacking
Cement
Tar
Steam coal Matting
Sheet & plate Bricks
stone
bitumenn
thatching
glass
in modular
block, GI CI Asphalt
bambu
packs Paints bricks
&
CC
AC roofing felt &
ceiling
& Distempers Traditional
Pipes
Flooring
board
AC Sheets & bricks
below 120 Asphalt etc.
rubber PVC fittings iron
mm dia
pipes fittings fittings and
iron sheets

3
7.0 Mt
per 1 M.T.
96.36
104.44
112.35
119.93
127.76
135.27
142.73
150.09
157.30
164.54
179.02
193.34
207.96
221.20
234.25
281.12
345.68
398.38
462.06
485.68
543.37
600.56
657.24
723.74
832.60
941.56
1050.02
1035.13
1275.74
1494.36
1684.07
1872.26
2255.26
2575.29
3460.44
4354.32
5257.74
6155.25
6986.89
7933.73
8854.20

SECTION-C :TRANSPORTATION

4
4.5 MT
per 1 M.T.
149.90
162.46
174.76
186.56
198.74
210.43
222.03
233.47
244.68
255.95
278.48
300.74
323.49
344.08
364.39
437.30
537.72
619.70
718.76
755.51
845.24
934.20
1022.38
1125.82
1295.15
1464.66
1633.36
1610.21
1984.49
2324.56
2619.67
2912.40
3508.18
4006.01
5382.90
6773.39
8178.70
9574.84
10868.49
12341.36
13773.20

5
5.5 MT
per 1 M.T.
122.64
132.92
142.99
152.64
162.61
172.17
181.66
191.02
200.20
209.41
227.85
246.06
264.67
281.52
298.14
357.79
439.96
507.02
588.08
618.14
691.56
764.35
836.49
921.13
1059.67
1198.35
1336.39
1317.44
1623.67
1901.91
2143.37
2382.87
2870.33
3277.65
4404.19
5541.86
6691.66
7833.96
8892.40
10097.48
11268.98

6
3.0 MT
per 1 M.T.
224.84
243.69
262.14
279.84
298.12
315.64
333.04
350.21
367.03
383.92
417.72
451.12
485.23
516.13
546.59
655.96
806.59
929.54
1078.14
1133.26
1267.86
1401.30
1533.56
1688.73
1942.72
2196.98
2450.04
2415.31
2976.73
3486.83
3929.50
4368.60
5262.28
6009.02
8074.36
10160.08
12268.05
14362.26
16302.73
18512.04
20659.80

Tiles
half
round tiles &
Roofing tiles
cement
flooring tiles

Glass
blocks
(hollow)
200x200
x120 mm

Empty
cement bags

7
8
9
10
11
7.0 MT
3500 No.
3200 No.
1000 No.
2000 No.
per 1 M.T. per 1000 Nos.per 1000 Nos.per 1000 Nos.per 1000 Nos.
96.36
192.72
210.79
67.45
337.27
104.44
208.88
228.46
73.11
365.54
112.35
224.69
245.76
78.64
393.21
119.93
239.87
262.35
83.95
419.77
127.76
255.53
279.48
89.44
447.18
135.27
270.55
295.91
94.69
473.46
142.73
285.47
312.23
99.91
499.57
150.09
300.18
328.32
105.06
525.32
157.30
314.59
344.09
110.11
550.54
164.54
329.08
359.93
115.18
575.89
179.02
358.04
391.61
125.32
626.58
193.34
386.67
422.92
135.34
676.68
207.96
415.91
454.91
145.57
727.85
221.20
442.39
483.87
154.84
774.19
234.25
468.50
512.43
163.98
819.88
281.12
562.25
614.96
196.79
983.94
345.68
691.36
756.18
241.98
1209.88
398.38
796.75
871.45
278.86
1394.32
462.06
924.12
1010.76
323.44
1617.21
485.68
971.37
1062.43
339.98
1699.90
543.37
1086.73
1188.62
380.36
1901.79
600.56
1201.12
1313.72
420.39
2101.96
657.24
1314.48
1437.72
460.07
2300.35
723.74
1447.48
1583.18
506.62
2533.10
832.60
1665.19
1821.30
582.82
2914.09
941.56
1883.13
2059.67
659.10
3295.48
1050.02
2100.04
2296.92
735.01
3675.07
1035.13
2070.27
2264.35
724.59
3622.97
1275.74
2551.49
2790.69
893.02
4465.10
1494.36
2988.71
3268.91
1046.05
5230.25
1684.07
3368.15
3683.91
1178.85
5894.26
1872.26
3744.51
4095.56
1310.58
6552.90
2255.26
4510.52
4933.38
1578.68
7893.42
2575.29
5150.59
5633.45
1802.71
9013.53
3460.44
6920.88
7569.71
2422.31
12111.54
4354.32
8708.64
9525.08
3048.03
15240.13
5257.74
10515.47
11501.30
3680.42
18402.08
6155.25
12310.51
13464.62
4308.68
21543.39
6986.89
13973.77
15283.81
4890.82
24454.10
7933.73
15867.46
17355.04
5553.61
27768.06
8854.20
17708.40
19368.56
6197.94
30989.70

17

STATEMENT VIII
Including loading, unloading and stacking
Lead in Cost / trip R.C.C. STEEL CYLINDER, R.C PIPES, C.I. PIPES,, UNREINFORCED CEMENT PIPES, PRECAST COCRETE PIPES
km
100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 300 & 400 450 & 500 600, 700 & 800, 900 & 1200 & 1800
mm
mm
750 mm 1000 mm MM
292.8

219.6

183

109.8

Pay load
in Rmt
2

0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
6
7
8
9
10
15
20
25
30
35
40
45
50
60
70
80
90
100
125
150
175
200
250
300
420
540
660
780
900
1020
1140

674.53
731.08
786.42
839.53
894.35
946.92
999.13
1050.63
1101.08
1151.77
1253.15
1353.35
1455.70
1548.38
1639.76
1967.87
2419.76
2788.63
3234.42
3399.79
3803.57
4203.91
4600.69
5066.19
5828.17
6590.95
7350.13
7245.93
8930.20
10460.50
11788.51
13105.79
15786.83
18027.05
24223.07
30480.25
36804.15
43086.77
48908.20
55536.12
61979.40

230.37
249.69
268.59
286.72
305.45
323.40
341.23
358.82
376.05
393.36
427.99
462.21
497.17
528.82
560.03
672.09
826.42
952.40
1104.65
1161.13
1299.03
1435.76
1571.27
1730.26
1990.50
2251.01
2510.29
2474.70
3049.93
3572.58
4026.13
4476.02
5391.68
6156.78
8272.91
10409.92
12569.72
14715.43
16703.62
18967.25
21167.83

307.16
332.91
358.11
382.30
407.26
431.20
454.98
478.43
501.40
524.49
570.65
616.28
662.89
705.09
746.70
896.12
1101.89
1269.87
1472.87
1548.17
1732.04
1914.35
2095.03
2307.01
2653.99
3001.34
3347.05
3299.60
4066.58
4763.43
5368.17
5968.03
7188.90
8209.04
11030.54
13879.90
16759.63
19620.57
22271.49
25289.67
28223.77

368.60
399.50
429.74
458.76
488.72
517.44
545.97
574.11
601.68
629.38
684.78
739.54
795.46
846.11
896.04
1075.34
1322.27
1523.84
1767.44
1857.81
2078.45
2297.22
2514.04
2768.41
3184.79
3601.61
4016.46
3959.52
4879.89
5716.12
6441.81
7161.63
8626.68
9850.85
13236.65
16655.87
20111.56
23544.68
26725.79
30347.61
33868.52

614.33
665.83
716.23
764.60
814.53
862.40
909.95
956.86
1002.81
1048.97
1141.30
1232.56
1325.77
1410.18
1493.41
1792.23
2203.79
2539.74
2945.74
3096.35
3464.09
3828.70
4190.06
4614.02
5307.99
6002.69
6694.11
6599.21
8133.15
9526.87
10736.35
11936.06
14377.81
16418.08
22061.08
27759.79
33519.26
39241.14
44542.99
50579.34
56447.54

SECTION-C :TRANSPORTATION

80.52

62.22

7
8
UNIT PER 100 RMT
837.72 1084.10
907.95 1174.99
976.68 1263.93
1042.64 1349.29
1110.72 1437.40
1176.01 1521.89
1240.85 1605.80
1304.81 1688.57
1367.46 1769.66
1430.41 1851.13
1556.32 2014.06
1680.76 2175.10
1807.87 2339.60
1922.98 2488.56
2036.46 2635.42
2443.95 3162.76
3005.17 3889.04
3463.28 4481.89
4016.92 5198.36
4222.29 5464.14
4723.76 6113.10
5220.95 6756.53
5713.72 7394.23
6291.84 8142.38
7238.16 9367.04
8185.48 10592.98
9128.33 11813.13
8998.92 11645.66
11090.66 14352.62
12991.18 16812.12
14640.47 18946.50
16276.44 21063.63
19606.10 25372.60
22388.29 28973.08
30083.30 38931.32
37854.26 48987.87
45708.08 59151.64
53510.64 69249.07
60740.44 78605.27
68971.83 89257.67
76973.92 99613.31

54.9

29.28

18.183

15

10

11

12

13

1228.65
1331.66
1432.46
1529.20
1629.05
1724.81
1819.91
1913.72
2005.61
2097.94
2282.60
2465.12
2651.55
2820.36
2986.81
3584.46
4407.58
5079.47
5891.48
6192.70
6928.18
7657.40
8380.13
9228.03
10615.97
12005.37
13388.21
13198.42
16266.30
19053.73
21472.70
23872.11
28755.61
32836.16
44122.17
55519.58
67038.52
78482.28
89085.97
101158.69
112895.08

2303.72
2496.86
2685.86
2867.25
3054.47
3234.02
3412.33
3588.22
3760.52
3933.64
4279.88
4622.10
4971.65
5288.18
5600.27
6720.87
8264.21
9524.01
11046.52
11611.30
12990.33
14357.62
15712.74
17302.56
19904.95
22510.08
25102.90
24747.03
30499.32
35725.75
40261.30
44760.21
53916.77
61567.79
82729.06
104099.21
125697.23
147154.27
167036.20
189672.54
211678.28

3685.96
3994.97
4297.38
4587.60
4887.16
5174.43
5459.73
5741.15
6016.83
6293.83
6847.81
7395.36
7954.64
8461.09
8960.44
10753.39
13222.73
15238.42
17674.43
18578.09
20784.54
22972.19
25140.38
27684.10
31847.92
36016.12
40164.64
39595.25
48798.91
57161.20
64418.09
71616.34
86266.83
98508.47
132366.50
166558.74
201115.57
235446.83
267257.92
303476.07
338685.25

4496.87
4873.87
5242.80
5596.87
5962.33
6312.80
6660.87
7004.20
7340.53
7678.47
8354.33
9022.33
9704.67
10322.53
10931.73
13119.13
16131.73
18590.87
21562.80
22665.27
25357.13
28026.07
30671.27
33774.60
38854.47
43939.67
49000.87
48306.20
59534.67
69736.67
78590.07
87371.93
105245.53
120180.33
161487.13
203201.67
245361.00
287245.13
326054.67
370240.80
413196.00

13490.60
14621.60
15728.40
16790.60
17887.00
18938.40
19982.60
21012.60
22021.60
23035.40
25063.00
27067.00
29114.00
30967.60
32795.20
39357.40
48395.20
55772.60
64688.40
67995.80
76071.40
84078.20
92013.80
101323.80
116563.40
131819.00
147002.60
144918.60
178604.00
209210.00
235770.20
262115.80
315736.60
360541.00
484461.40
609605.00
736083.00
861735.40
978164.00
1110722.40
1239588.00

18

STATEMENT IX
Including loading, unloading and stacking
STONEWARE PIPES
150 mm
200 mm
230 mm
250 mm
300 mm

Lead in Cost/trip
km

100 mm

Pay Load

480 m

240 m

135 m
5

0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
6
7
8
9
10
15
20
25
30
35
40
45
50
60
70
80
90
100
125
150
175
200
250
300
420
540
660
780
900
1020
1140

674.53
731.08
786.42
839.53
894.35
946.92
999.13
1050.6
1101.1
1151.8
1253.2
1353.4
1455.7
1548.4
1639.8
1967.9
2419.8
2788.6
3234.4
3399.8
3803.6
4203.9
4600.7
5066.2
5828.2
6591
7350.1
7245.9
8930.2
10461
11789
13106
15787
18027
24223
30480
36804
43087
48908
55536
61979

140.53
152.31
163.84
174.9
186.32
197.28
208.15
218.88
229.39
239.95
261.07
281.95
303.27
322.58
341.62
409.97
504.12
580.96
673.84
708.29
792.41
875.81
958.48
1055.46
1214.2
1373.11
1531.28
1509.57
1860.46
2179.27
2455.94
2730.37
3288.92
3755.64
5046.47
6350.05
7667.53
8976.41
10189.21
11570.03
12912.38

281.05
304.62
327.68
349.8
372.65
394.55
416.3
437.76
458.78
479.9
522.15
563.9
606.54
645.16
683.23
819.95
1008.23
1161.93
1347.68
1416.58
1584.82
1751.63
1916.95
2110.91
2428.4
2746.23
3062.55
3019.14
3720.92
4358.54
4911.88
5460.75
6577.85
7511.27
10092.95
12700.1
15335.06
17952.82
20378.42
23140.05
25824.75

SECTION-C :TRANSPORTATION

105 m

84 m

6
7
Unit Per 100 Rmt
499.65
642.41
803.01
541.54
696.27
870.33
582.53
748.97
936.21
621.87
799.55
999.44
662.48
851.76
1064.7
701.42
901.83
1127.29
740.1
951.55
1189.44
778.24
1000.6
1250.75
815.61
1048.65
1310.81
853.16
1096.92
1371.15
928.26
1193.48
1491.85
1002.48
1288.9
1611.13
1078.3
1386.38
1732.98
1146.95
1474.65
1843.31
1214.64
1561.68
1952.1
1457.68
1874.16
2342.7
1792.41
2304.53
2880.67
2065.65
2655.84
3319.8
2395.87
3080.4
3850.5
2518.36
3237.9
4047.37
2817.46
3622.45
4528.06
3114.01
4003.72
5004.65
3407.92
4381.61
5477.01
3752.73
4824.94
6031.18
4317.16
5550.64
6938.3
4882.19
6277.1
7846.37
5444.54
7000.12
8750.15
5367.36
6900.89
8626.11
6614.96
8504.95
10631.19
7748.52
9962.38
12452.98
8732.23 11227.15 14033.94
9707.99
12481.7
15602.13
11693.95 15035.08 18793.85
13353.37 17168.62 21460.77
17943.01 23069.59 28836.99
22577.96 29028.81 36286.01
27262.33 35051.57 43814.46
31916.13 41035.02 51293.77
36228.3 46579.24 58224.05
41137.87 52891.54 66114.43
45910.67
59028
73785

350 mm

400 mm

66 m

43 m

27 m

10

1022.02
1568.67
1107.7
1700.19
1191.55
1828.88
1272.02
1952.4
1355.08
2079.88
1434.73
2202.14
1513.83
2323.56
1591.86
2443.33
1668.3
2560.65
1745.11
2678.53
1898.71
2914.3
2050.53
3147.33
2205.61
3385.35
2346.03
3600.88
2484.48
3813.4
2981.62
4576.44
3666.3
5627.35
4225.2
6485.19
4900.64
7521.91
5151.2
7906.49
5762.98
8845.51
6369.56
9776.53
6970.74 10699.28
7676.05 11781.84
8830.56 13553.88
9986.29 15327.79
11136.56 17093.33
10978.68
16851
13530.61 20767.91
15849.24 24326.74
17861.38 27415.14
19857.26 30478.58
23919.44 36713.56
27313.71 41923.37
36701.62 56332.72
46182.2
70884.3
55763.86 85591.05
65282.98 100201.79
74103.33
113740
84145.64 129153.77
93908.18 144138.14

2498.26
2707.7
2912.67
3109.37
3312.41
3507.11
3700.48
3891.22
4078.07
4265.81
4641.3
5012.41
5391.48
5734.74
6073.19
7288.41
8962.07
10328.26
11979.33
12591.81
14087.3
15570.04
17039.59
18763.67
21585.81
24410.93
27222.7
26836.78
33074.81
38742.59
43661.15
48539.96
58469.74
66766.85
89715.07
112889.81
136311.67
159580.63
181141.48
205689.33
229553.33

19

STATEMENT SHOWING STANDARD WEIGHTS OF PIPES TO BE FOLLOWED FOR


CARTING OF VARIOUS DIAMETERS AND TYPES OF PIPES

I) C.I.Pipes (IS:1536-1989)
Diameter of pipes
in mm

Class of pipes and its weights in kg. per meter length


LA

80

16.00

17.38

18.46

100

19.82

21.82

23.27

125

25.82

28.18

30.36

150

32.10

35.27

38.00

200

47.09

51.09

55.27

250

63.45

69.09

74.73

300

81.82

89.45

96.91

350

103.09

111.82

121.27

400

125.45

137.09

140.00

450

151.27

166.10

179.27

500

177.09

192.91

208.73

600

236.00

257.64

335.01

700

304.55

335.73

359.45

750

341.09

372.91

404.55

800

381.00

416.00

450.00

900

465.09

507.45

549.80

1000

558.73

610.36

659.64

SECTION-C :tRANSPORTATION

20

STATEMENT SHOWING THE TOTAL WEIGHTS OF VARIOUS DIA D.I.K-9 PIPES


INCLUDING WEIGHT OF MORTER LINING PER LENGTH

II) D.I. PIPES


1) Barrel Mass as per IS : 8329-1994
2) Socket Mass as per IS : 8329-1994
3) Cement Mortar Lining Weights as per ISO : 4179-1985
Nominal dia meter

Weight / M Length of D.I. K-9 Pipes of


4M

5M

5.50M

6M

80 mm wt. of D.I. pipe / M

13.00

13.00

12.91

12.67

weight morter / m

1.56

1.56

1.56

1.56

Total wt. / M

14.56

14.56

10.47

14.23

100 mm wt. of D.I. pipe / M

16.25

16.00

16.00

15.86

weight morter / m

1.93

1.93

1.93

1.93

Total wt. / M

18.18

17.93

17.93

17.76

125 mm wt. of D.I. pipe / M

20.50

20.00

20.00

19.83

weight morter / m

2.45

2.42

2.42

2.42

Total wt. / M

22.92

22.42

22.42

22.25

150 mm wt. of D.I. pipe / M

24.75

24.20

24.18

24.00

weight morter / m

2.90

2.90

2.90

2.90

Total wt. / M

27.65

27.10

27.08

26.90

200 mm wt. of D.I. pipe / M

33.25

32.60

33.54

32.33

weight morter / m

3.88

3.88

3.88

3.88

Total wt. / M

37.13

36.48

36.42

36.21

250 mm wt. of D.I. pipe /

43.75

43.00

42.73

42.50

M weight morter / m

4.84

4.84

4.84

4.84

Total wt. / M

88.59

47.84

47.57

47.34

300 mm wt. of D.I. pipe / M

55.50

54.60

54.18

53.83

weight morter / m

5.80

5.80

5.80

5.80

Total wt. / M

61.30

60.40

59.98

59.63

350 mm wt. of D.I. pipe / M

69.25

68.00

67.45

67.17

weight morter / m

12.12

12.12

12.12

12.12

Total wt. / M

81.37

80.12

79.57

79.29

400 mm wt. of D.I. pipe / M

82.75

81.40

80.91

80.33

weight morter / m

13.82

13.82

13.82

13.82

SECTION-C :TRANSPORTATION

21

Nominal dia meter

Weight / M Length of D.I. K-9 Pipes of


4M

5M

5.50M

6M

Total wt. / M

96.57

95.22

94.73

94.15

450 mm wt. of D.I. pipe / M

98.75

97.00

96.36

95.83

weight morter / m

15.53

15.53

15.53

15.53

Total wt. / M

114.28

112.53

111.89

111.36

500 mm wt. of D.I. pipe / M

115.00

112.80

112.00

111.50

weight morter / m

17.26

17.26

17.26

17.26

Total wt. / M

132.26

130.06

129.26

128.76

600 mm wt. of D.I. pipe / M

152.00

149.00

147.82

147.00

weight morter / m

320.75

20.75

320.75

320.75

Total wt. / M

172.73

169.73

168.55

167.73

700 mm wt. of D.I. pipe / M

193.75

189.80

188.36

187.70

weight morter / m

29.45

29.45

29.45

29.45

Total wt. / M

223.20

219.25

217.81

217.25

750 mm wt. of D.I. pipe / M

217.50

213.00

211.45

210.00

weight morter / m

31.56

31.56

31.56

31.56

Total wt. / M

249.06

244.56

243.01

241.56

800 mm wt. of D.I. pipe / M

240.75

235.80

233.82

232.33

weight morter / m

33.69

33.69

33.69

33.69

Total wt. / M

274.44

269.49

267.51

265.92

900 mm wt. of D.I. pipe / M

292.75

286.20

283.82

281.83

weight morter / m

37.89

37.89

37.89

37.89

Total wt. / M

330.64

324.09

321.71

319.72

1000 mm wt. of D.I. pipe / M

3495.75

341.60

338.55

336.17

weight morter / m

42.08

42.08

42.08

42.08

Total wt. / M

391.83

383.68

380.63

378.25

Note:
These weights are as per the circular issued by Superintending Engineer, (HQ) vide

SECTION-C :TRANSPORTATION

22

STATEMENT SHOWING STANDARD WEIGHTS TO BE FOLLOWED FOR CARTING OF


VARIOUS DIAMETERS AND TYPES OF PIPES

III) M.S. Pipes


Note: Weight of M.S. pipes is to be computed by considering density of steel as 7850
kg/cum considering the diameter and thickness of plate used for manufacturing of M.S.
pipes
IV) A.C. Pressure Pipes (ISO-160)
Class of pipes and its weights in kg per meter length

Diameter of pipes in
mm

Class 5

Class 10

Class 15

Class 20

80

6.00

6.20

6.40

6.80

100

7.60

7.70

8.20

10.30

125

9.57

9.80

11.00

13.30

150

11.87

12.20

15.30

19.00

200

15.57

19.30

25.60

32.70

250

19.25

25.20

32.70

41.50

300

24.97

32.30

45.10

58.10

350

39.77

47.52

55.27

71.42

400

49.20

60.20

71.36

93.10

450

56.92

70.27

83.63

111.37

500

72.84

89.54

104.25

136.52

600

102.50

137.32

148.35

193.16

SECTION-C :TRANSPORTATION

23

V) P.V.C. Pipes (IS:4985-1988)


Diameter of pipe
in mm

Class of pipes and its weights in kg per meter length


4.00 sq.cm
6.00 sq.cm
10.00 sq.cm

63

0.47

0.67

1.01

75

0.67

0.93

1.44

90

0.92

1.33

2.05

110

1.32

1.89

3.08

140

2.13

3.10

4.99

160

2.78

3.92

6.56

180

3.56

5.07

8.10

200

4.26

7.00

10.20

225

5.48

7.84

12.56

250

6.63

10.19

15.31

280

8.34

12.16

19.80

315

10.55

15.37

25.00

VI) R.C.C. Pipes


Class of pipes and its weights in kg per meter length

Diameter of pipe
in mm

P-1

P-2

P-3

NP-2

NP-3

NP-4

100

23.56

23.56

23.56

21.20

21.20

21.20

150

33.00

33.00

33.00

29.40

29.40

29.40

200

42.10

42.10

42.10

37.90

37.90

37.90

250

51.84

63.40

75.18

57.10

67.60

77.20

300

74.64

102.50

117.10

92.25

105.40

119.10

350

92.28

134.30

168.10

120.80

151.30

170.20

400

104.16

169.60

208.10

152.60

187.30

212.40

450

127.92

188.70

235.23

169.90

211.70

240.80

500

141.36

229.90

261.37

206.90

235.23

270.50

600

192.96

305.70

313.64

275.10

282.27

320.20

700

225.59

325.80

365.92

293.20

329.32

370.90

800

257.82

345.19

418.19

310.60

376.30

425.40

900

290.00

389.58

470.47

350.60

423.00

482.30

1000

322.28

443.98

510.00

399.80

459.00

531.40

SECTION-C :tRANSPORTATION

24

VII) P.S.C. Pipes of all classes and B.W.S.C. Pipes of all classes
Diameter of pipes in mm

Weight of pipe per meter length for all classes

350
400
450
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800

197.50 kg/km
240.00 kg/km
257.50 kg/km
292.50 kg/km
375.00 kg/km
432.50 kg/km
582.50 kg/km
705.00 kg/km
825.00 kg/km
947.50 kg/km
1115.00 kg/km
1190.00 kg/km
1370.00 kg/km
1560.00 kg/km
1767.50 kg/km
1987.50 kg/km
2205.50 kg/km

VIII) Stoneware Pipes


Diameter of pipes in mm

Weight of 0.60 M long pipe in kg per pipe

100
150
200
225
250
300

8.70 kg/each
15.00 kg/each
20.85 kg/each
23.70 kg/each
27.57 kg/each
43.60 kg/each

IX) G.I. Pipes


Diameter of pipes in
mm
15
20
25
32
40
50
65
80
100
125
150

SECTION-C :tRANSPORTATION

Class of pipes and its weights in kg per meter length


Light (Blue)
Medium (Yellow)
Heavy (Red)
0.96
1.23
1.46
1.42
1.59
1.91
2.03
2.40
2.99
2.61
3.17
3.97
3.29
3.65
4.47
4.18
5.16
6.24
5.92
6.63
8.02
6.98
8.64
10.30
10.20
12.40
14.70
-16.70
18.30
-19.70
21.80

25

SECTION-D- CEMENT CONSUMPTION


STANDARD CEMENT CONSUMPTION TO BE FOLLOWED FOR VARIOUS ITEMS OF
WORKS

Sr. No.
A.

B.

C.

Item of Works

Cum
Cum
Cum
Cum
Cum
Cum

9.20
8.50
6.90
6.80
5.90
5.80

bags
bags
bags
bags
bags
bags

Brick Masonry Works


B.B. Masonry - IInd sort in CM 1:6 proportion
B.B. Masonry - IInd sort in CM 1:5 proportion
B.B. Masonry - IInd sort in CM 1:4 proportion
Half brick walls in CM 1:4 proportion

Cum
Cum
Cum
Cum

1.44
1.62
2.30
0.22

bags
bags
bags
bags

Cum
Cum

1.77 bags
2.65 bags

Cum

1.77 bags

Cum

2.65 bags

Cum
Cum

2.45 bags
1.50 bags

Half brick walls in CM 1:4 proportion


Stone Masonry Works
U.C.R. Masonry - IInd sort in CM 1:6 proportion
U.C.R. Masonry - IInd sort in CM 1:4 proportion
Ramdom Rubble Masonry - IInd sort in CM 1:6 proportion

C.R. Masonry - IInd sort in CM 1:4 proportion


C.R. Masonry - IInd sort in CM 1:6 proportion

Standard
Cement
Consumption

P.C.C. & R.C.C. Works


1::1 (M-300) with finishing in CM 1:3 proportion
1::2 (M-250) with finishing in CM 1:3 proportion
1:1:3 (M-200) with finishing in CM 1:3 proportion
1:1:3 (M-200) without finishing
1:2:4 (M-150) without finishing in CM 1:3 proportion
1:2:4 (M-150) without finishing

Ramdom Rubble Masonry - IInd sort in CM 1:4 proportion

D.

Unit

Water Proofing Works


Damp-proof course 50 mm thick in 1:2:4 proportion with
Sqm.
bituman layer W.P. compound
Integral finishing to newly laid slab in CM 1:3 proportion with
Sqm.
W.P. Compound
Water Proofing treatment over old slab with W.P. cement
slurry as tack coat 12 mm thick, W.P. plaster in CM 1:3
proportion, brick bat coba average 9.50 cm thick in CM 1:6
proportion and 20 mm thick W.P. cement plaster over it in CM Sqm.
1:3 proportion and finishing with cement slurry with novelling

Section-D-Cement Consumption

0.35 bags

0.06 bags

0.37 bags

26

Unit

Standard
Cement
Consumption

Sqm.
Sqm.
Sqm.

0.16 bags
0.12 bags
0.10 bags

Sqm.
Sqm.
Sqm.

0.27 bags
0.19 bags
0.15 bags

Sqm.
Sqm.
Sqm.
Sqm.
Sqm.

0.34
0.25
0.19
0.03
0.05

Sqm.

0.22 bags

Sqm.

0.22 bags

Sqm.
Sqm.

0.30 bags
0.37 bags

Sqm.

0.15 bags

Sqm.

0.18 bags

v) Glazed / Ceramic tiles flooring or skirting / dado fixed with


Sqm.
plain cement slurry

0.22 bags

Sr. No.

Item of Works

E.

Plastering and Pointing Works


i) 12 mm thick plaster
CM 1:2 proportion
CM 1:3 proportion
CM 1:4 proportion
ii) 20 mm thick plaster
CM 1:2 proportion
CM 1:3 proportion
CM 1:4 proportion
iii) 25 mm thick plaster
CM 1:2 proportion
CM 1:3 proportion
CM 1:4 proportion
iv) Cement pointing in CM 1:3 proportion
v) Tuck cement pointing in CM 1:3 proportion
vi) Sand faced plaster in CM 1:4 proportion including base
coat 15 mm thick in CM 1:4 proportion with W.P.
compound
vii) Rough cast cement plaster in CM1:4 proportion in two
coats.

F.

Flooring Works
i) I.P.S. flooring - 40 mm thick
i) I.P.S. flooring - 50 mm thick
i) Rough Shahabad - any other similar flooring in CM 1:4
proportion bedding
iv) All types of cement / kadappa / polished / mosaic tiles
flooring or skirting / dado set on CM 1:4 proportion bedding

Section-D-Cement Consumption

bags
bags
bags
bags
bags

27

Section - E- Excavation
Sr No

Item Description

Unit

Excavation for foundation / pipe trenches in


earth, soils of all types, sand, gravel and soft
murum, including removing the excavated
material upto a distance of 50 metres and lifts as
below, stacking and spreading as directed, manual
dewatering, preparing the bed for foundation and
excluding backfilling, etc. complete.

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

(Bd-A-1/259)
Lift 0 to 1.5 M

Cu.m

128.00

127.00

Cu.m

143.00

142.20

Cu.m

160.00

157.20

Cu.m

11.75

11.75

Cu.m

449.00

398.50

Excavation for foundation / pipe trenches in hard


murum including removing the excavated material
upto a distace of 50 M and lifts as below, stacking
and spreading as directed by Engineer-in-charge,
normal dewatering, preparing the bed for
foundation
and
excluding
backfilling,
etc.
complete.
(Bd-A2/259)
Lift 0 to 1.5 M

Excavation for foundation / pipe trenches in hard


murum and boulders, W.B.M. road including
removing the excavated material upto a distance of
50 M beyond the area and lifts as below, stacking
and spreading as directed by Engineer-in-charge,
normal dewatreing, preparing the bed for
foundation
and
excluding
backfilling,
etc.
complete.
(Bd-A-3/259)
Lift 0 to 1.5 M

4
5

Add for every additional lift of 1.5 M beyond initial


lift of 1.5 M for Item Nos. 1 to 3
Excavation for foundation / pipe trenches in soft
rock and old cement and lime masonry
foundation asphalt road by all means including
removing the excavated material upto a distance of
50 M beyond area and lifts as below, stacking as
directed
by
Engineer-in-charge,
normal
dewatering, preparing the bed for foundation and
excluding backfilling, etc. complete.
( Bd-A-4/259)
Lift 0 to 1.5 M

Section-E- Excavation

28

Sr No

Item Description

Unit

Excavation for foundation / pipe trenches in hard


rock by controlled blasting, including trimming
and levelling the bed by chiselling where necessary
and removing the excavated material and stacking
it in measurable heaps within a distance of 50
metres from the area and lifts as below, normal
dewatering, excluding backfilling, etc. complete.

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

(Bd-A-5/259)
Cu.m

599.00

501.80

Cu.m

838.00

829.60

Lift 0 to 1.5 M

Cu.m

320.00

187.60

Add for every additional lift of 1.5 M beyond initial


lift of 1.5 M for Item Nos 5 to 9
HEAD WORKS
Excavation in general in soft material comprising
of soft soil, soft murum, sand, hard murum with
boulders in wet or dry condition for Head Works
i.e. Intake Well, Connecting Pipe, Jack Well, Pump
House, Supply Well, etc. for lift 0 to 1.5 M and lead
of 150 M including baricating, gurading, disposing
off surplus excavated stuff within a radius of 0.5
km. as

Cu.m

21.40

21.40

Lift 0 to 1.5 M

Excavation for foundation / pipe trenches in hard


rock and concrete road by chiselling, wedging,
line drilling, by mechanical means or by all means
other than blasting including trimming and
levelling the bed, removing the excavated material
upto a distance of 50 metres beyond the area and
lifts as below, stacking as directed by Engineer-incharge, normal dewatering, excluding backfilling,
etc. complete by all means.
(Bd-A-1/259)
Lift 0 to 1.50 M

9
10

Excavation for foundation /pipe trenches in Slush


Muddy/ Marshy /Slushy /Soil including use of
poclain, labour for dewatering during execution
including removing the excavated material upto a
distance of 50 metres and lifts as below, stacking
and spreading as directed, preparing the bed by
cleaning the mud, labour required for execution for
shutterng item but excluding back filling etc.
complete. Providing and fixing shuttering shall be
paid separately.

Section-E- Excavation

29

Sr No

a)
b)
c)

11

a)
b)
c)

12

a)
b)

13

Item Description

directed by Engineer-in- charge, etc. complete


excluding refilling.
For Head Works on river or dam submergence for
initial lift of 0 to 1.5 M
For Head works on nalla or any other site of GSDA
for initial Lift of 0 to 1.5M
Add for every additional lift of 1.5 M beyond initial
lift of 1.5 M
Excavation in general in hard material comprising
of soft rock, hard rock, Manjara rock, etc, by
blasting / controlled blasting, chiselling as
required in wet or dry condition for Head Works
i.e. Intake Well, Connecting Pipe, Jack Well, Pump
House, supply Well, etc. for lift 0 to 1.5 M and lead
of 150 M including baricading, guarding, disposing
off surplus excavated stuff within a radius of 0.5
km. as directed by Engineer-in-charge, excluding
refilling.

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

Cu.m

369.00

364.20

Cum

259.00

256.10

Cu.m

21.40

21.40

Cu.m

790.00

618.80

Cum

545.00

397.40

Cu.m

21.40

21.40

Diameter upto and including 3 M


Cu.m
Diameter more than 3 M
Cu.m
Desilting the Supply Well, Intake Well / Head
Works, sump of water supply/ sewerage works etc.
in wet or dry condition including lifts upto 10.5 M
and lead upto 150 M as required beyond the work
site, stacking, spreading, including necessary
guarding, etc. complete, as directed by Engineer-incharge.
Cu.m
Add for every additional lift of 1.5 M beyond initial Cu.m
lift of 10.50 M

712.00
599.00

675.50
567.90

640.00
19.25

606.70
18.30

For Head Works on river or dam sub mergence for


initial lift of 0 to 1.5 M
For Head Works on nalla or any other site of GSDA
for initial lift of 0 to 1.5 M
Add for each additional lift to 1.5 M beyond initial
lift of 1.5 M
Excavation in general in soft material comprising
of soft soil, soft murum, sand, hard murum with
boulders in wet or dry condition for Head Works
and allied works by well sinking process for
average depth of 12 M and lead of 150 M including
shoring, barricading, guarding, refilling, disposing
of surplus excavated stuff as directed by Engineerin-charge, etc. complete.

Section-E- Excavation

30

Sr No

14

Item Description

Unit

Dewatering the excavated trenches and pools of


water in the building trenches / pipeline trenches,
well works by using pumps and other devices
including disposing off water to safe distance as
directed by Engineer-in-charge (including cost of
machinery, labour, fuel), etc. complete.
Bhp/Hr
i) The contractor at his request may allowed to
start construction of masonary steining so as not
to allow silting of well in oncoming mansoon and
while paying masonary, 25% amount shall be
withheld and released only when excavation to the
full depth is completed.

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

59.90

10.60

Cu.m

59.00

57.20

Cu.m

59.00

57.20

Cu.m

548.00

60.60

ii) Dewatering : Total dewatering charges are to be


proposed in tender as lumpsum amount and 75%
is payable for excavation and 25% is payable for
construction of well / gallery. Out of 75%
excavation breakup shall be as under
25% for
20% for
depth.
15% for
depth.
15% for

last 1 Mtr. Depth.


2 M depth which just above last 1 M
2 M depth which just above last 3 M
the rest of depth from water table level

The above conditions will restrict the tendancy of


agencies to avoid deeping of wells etc. to the
required depths.

15

16

17

Refilling the trenches with available excavated stuff


with soft material first over pipeline and then hard
material in 15 cm layers with all leads and lifts
including
consolidation,
surcharging,
etc.
complete.
Filling in plinth and floors murum bedding in
trenches with approved murum from excavated
materials from foundation 15cm to 20cm layers
including watering and compaction complete.
Filling in plinth and floors / trenches with
contractors murum for bedding in 15cm to 20cm
layers
including
watering
and compaction
complete.

Section-E- Excavation

31

Sr No

Item Description

Unit

18

Providing dry trap / granite / quartzite / gneiss,


rubble stone soling in 15cm to 20 cm thick layers
(including hand packing and compacting), etc.
complete.

Cu.m

838.00

185.90

Cu.m

875.00

146.20

19

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

Providing and filling in sand boxing in pipeline or


for foundation with sand of approved quality
including watering compaction, etc. complete.

20

Open timbering in trenches of depth more than 1.5


m for shoring and strutting including use of and
waste of all necessary timber works including
walling, strutts, open polling boards/ horizontal
sheeting, runners, etc. as may be necessary and
fixing and removal complete. (Measurements to be
taken of the face/area timbered)(NBO Item No. 415 page No.59 )

a)

Lift 0 to 1.5 M [ for non-water logged area ]

Sq.m

202.00

3.10

Additional per Sqm. for further lifts of 1.5M each.

Sq.m

27.00

12.00

Sq.m

208.00

10.30

Sq.m

20.30

5.80

b)

Lift for 0 to 1.5 M [ For water logged area.]


Additional per Sqm. for further lifts of 1.5M each
Note:- For the trenches with more than 1.5 M
depth shoring if required from G.L. is to be done
and is payable from GL.

Section-E- Excavation

32

Section - F- Iron And Structural Steel Work.


Sr No

Item Description

Unit

Providing and fixing mild steel grill work for


windows/ventilators of 20 Kg./Sqm. as per
drawings including necessary welding and painting
with one coat of anticorrosive paint and two coats
of oil painting, etc. complete.
(Bd-U-1/537)

Sq.m

1613.00

80.40

Sq.m

2355.00

218.50

M.T

59054.00

5471.80

M.T

57877.00

5087.60

Providing structural steel work in rolled


stanchions fixed with connecting plates or angle
cleats as in main and cross beams, hip and jack
rafters, purlins connecting to truss members and
like as per detailed desings and drawings or as
directed by Engineer-in-charge including cutting,
fabricating, hoisting, erecting, fixing in position,
making riveted / bolted /welded connections and
one coat of anticorrosive paints and over it two
coats of oil painting, etc. complete.

(Bd-C-3 /275)

LABOUR
INVOLVED

Providing and fixing mild steel grill railing of 20


Kg./Sqm. with teak wood hand railing, still and
newel posts for staircase and including fabricating,
fixtures, erecting, painting the grill work with
approved oil paint and polishing the hand rail and
newel posts with French polish two coats, etc.
complete.
(Bd-U-2 /537)

Rate
(in Rs.)
2012-2013

Providing stuctural steel work in single


stanchions composed of RSJ, channel, etc, with
caps, bases, mild steel plates, angles, brackets,
cleats, gusset plates, anchor bolts, etc. as per
detailed design and drawing or as directed by
Engineer-in-charge including cutting, fabrication,
hoisting, erecting, fixing in position, making
riveted/ bolted / welded connections and one coats
of anticorrosive paint and over it two coats of oil
painting, etc. complete.
(Bd-C-6 /277)

Section-F-Iron Structural Steel Work

33

Sr No

Item Description

Unit

Providing structural steel work in rolled sections


like joists, channels, angles, tees, etc. as per
detailed designs and drawings including fixing in
position without connecting plates, braces, etc.
and one coat of anticorrosive paint and over it two
coats of oil painting, of approved quality and
shade, etc. complete.
(Bd-C-2 /275)

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

M.T

60320.00

5652.40

M.T

71547.00

12801.10

Providing structural steel work in trusses, other


similar trussed purlins and members with all
bracing, gusset plates, etc. as per detailed design
and drawing or as directed by Engineer-in-charge
including cutting, fabricating, hoisting, erecting
and fixing in position, making reveted / bolted /
welded connections and one coat of anticorrosive
paint and over it two coat of oil painting, etc.
complete.
(Bd-C-8 /278)

Section-F-Iron Structural Steel Work

34

Section - G- Plain and Reinforced Cement Concrete


Sr No

Item Description

Providing and laying in situ following grades of


Plain Cement concrete of trap/ granite/
quartzite/ gneiss metal for foundation and
bedding including normal dewatering, form work,
compaction and curing, etc, complete. Use of L &
T, A.C.C., Ambuja, Birla Gold, Manikgad,
Rajashree, etc. cement is permitted.)

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

(Bd-E-1 /287)
a
b

a
b
c
d

a
b
c
d

In PCC M-100
In PCC M-150
Providing and laying in situ Cement concrete of
trap/granite/quartzite/ gneiss metal for RCC work
in foundation like raft, grillage, strip foundation
and footing of RCC columns and steel stanchions
including normal dewatering, 'plywood form work,
bully/steel propups, compaction, finishing and
curing, etc, complete. (By weigh batching and mix
design for M-250 and M-300 only. Use of L & T,
A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree,
etc. cement is permitted.) (excluding M.S. or Tor
In RCC M-150
In RCC M-200
In RCC M-250
In RCC M-300
Providing and casting in situ Cement Concrete of
trap/granite/quartzite/ gneiss metal of approved
quality for RCC work as per detailed drawings and
designs or as directed by Engineer-in-charge
including normal dewatering, centering, 'plywood
formwork, bully/steel prop-ups, compaction,
finishing the formed surfaces with CM 1:3 of
sufficient minimum thickness if special finish is to
be provided and curing, etc. complete. (By weigh
batching and mix design for M-250 and M-300
only. Use of L&T, A.C. C., Ambuja, Birla Gold,
Manikgad, Rajashree, etc. cement is permitted)
(excluding M.S, or Tor reinforcement)

Cu.m
Cu.m

3758.00
4233.00

801.30
802.50

Cu.m
Cu.m
Cu.m
Cu.m

5122.00
5214.00
5722.50
5951.40

979.40
972.80
965.50
963.80

For RCC M-150 grade - all types of columns


For RCC M-200 grade - all types of columns.
For RCC M-250 grade - all types of columns.
For RCC M-300 grade - all types of columns.
Providing and casting in situ Cement Concrete of
trap/granite/quartzite/ gneiss metal of approved
quality for RCC work as per detailed drawings and

Cu.m
Cu.m
Cu.m
Cu.m

6524.00
6867.00
7439.00
7668.00

963.40
968.60
972.00
970.90

Section-C-Plain and Reinforced Cement Concrete

35

Sr No

Item Description

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

designs or as directed by Engineer-in-charge


including normal dewatering, centering, 'plywood
formwork, bully/steel prop-ups, compaction,
finishing the formed surfaces with CM 1:3 of
sufficient minimum thickness if special finish is to
be provided and curing, etc. complete. (By weigh
batching and mix design for M-250 and M-300
only. Use of L&T, A.C. C., Ambuja, Birla Gold,
Manikgad, Rajashree, etc. cement is permitted)
(excluding M.S, or Tor reinforcement)
Cu.m
Cu.m
Cu.m
Cu.m

6558.00
6867.00
7325.00
7668.00

972.50
968.40
960.60
974.20

For RCC M-150 grade Slabs / Landings / Vertical Cu.m


Walls / Waist Slabs / Steps for Staircase

6981.00

928.80

For RCC M-200 grade Slabs / Landings / Vertical Cu.m


Walls / Waist Slabs / Steps for Staircase
For RCC M-250 grade Slabs / Landings / Vertical Cu.m
Walls / Waist Slabs / Steps for Staircase

7439.00

972.10

8012.00

975.20

For RCC M-300 grade Slabs / Landings / Vertical Cu.m


Walls / Waist Slabs / Steps for Staircase
Providing and casting in situ Cement Concrete of
trap/granite/quartzite/ gneiss metal of approved
quality for RCC work as per detailed drawings and
designs or as directed by Engineer-in-charge
including normal dewatering, centering, 'plywood
formwork, bully/steel prop-ups, compaction,
finishing the formed surfaces with CM 1:3 of
sufficient minimum thickness if special finish is to
be provided and curing, etc. complete. (By weigh
batching and mix design for M-250 and M-300

8240.00

974.00

a
b
c
d

c
d

For RCC M-150 grade Beams/Braces/Lintels


For RCC M-200 grade Beams/Braces/Lintels
For RCC M-250 grade Beams/Braces/Lintels
For RCC M-300 grade Beams/Braces/Lintels
Providing and casting in situ Cement Concrete of
trap/granite/quartzite/ gneiss metal of approved
quality for RCC work as per detailed drawings and
designs or as directed by Engineer-in-charge
including normal dewatering, centering, 'plywood
formwork, bully/steel prop-ups, compaction,
finishing the formed surfaces with CM 1:3 of
sufficient minimum thickness if special finish is to
be provided and curing, etc. complete. (By weigh
batching and mix design for M-250 and M-300
only. Use of L&T, A.C. C., Ambuja, Birla Gold,
Manikgad, Rajashree, etc. cement is permitted)
(excluding M.S, or Tor reinforcement)

Section-C-Plain and Reinforced Cement Concrete

36

Sr No

Item Description

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

only. Use of L&T, A.C. C., Ambuja, Birla Gold,


Manikgad, Rajashree, etc. cement is permitted)
(excluding M.S, or Tor reinforcement)
a
b
c
d

a
b
c
d

a
b
c
d

For RCC M-150 grade Chajjas / Parapets /


Curtain Walls / Partition Walls / Pardies
For RCC M-200 grade Chajjas / Parapets /
Curtain Walls / Partition Walls / Pardies
For RCC M-250 grade Chajjas / Parapets /
Curtain Walls / Partition Walls / Pardies
For RCC M-300 grade Chajjas / Parapets /
Curtain Walls / Partition Walls / Pardies
Providing and casting in situ Cement Concrete of
trap/granite/quartzite/ gneiss metal of approved
quality for RCC work as per detailed drawings and
designs or as directed by Engineer-in-charge
including normal dewatering, centering, 'plywood
formwork, bully/steel prop-ups, compaction,
finishing the formed surfaces with CM 1:3 of
sufficient minimum thickness if special finish is to
be provided and curing, etc. complete. (By weigh
batching and mix design for M-250 and M-300
only. Use of L&T, A.C. C., Ambuja, Birla Gold,
Manikgad, Rajashree, etc. cement is permitted)
(excluding M.S, or Tor reinforcement)

Cu.m

6981.00

938.10

Cu.m

7439.00

958.20

Cu.m

8012.00

962.40

Cum

8240.00

961.50

For RCC M-150 grade - Domes


For RCC M-200 grade - Domes
For RCC M-250 grade - Bottom Domes only
For RCC M-300 grade - Bottom Domes only
Providing and fixing in position steel bar
reinforcement of various diameters for RCC piles,
caps, footings,
foundations,
slabs, beams,
columns, canopies, staircases. newels, chajjas,
lintels, pardies, copings, fins, arches, etc. as per
detailed designs, drawings and schedules;
including cutting, bending, hooking the bars,
binding with wires or tack welding and supporting
as required, etc. complete.
(including cost of binding wire).

Cu.m
Cu.m
Cu.m
Cu.m

7554.00
7668.00
8355.00
8584.00

971.10
946.70
964.70
963.90

Mild Steel
Tor Steel
Corrosion Resistant steel (Fe 500)
Only Fabrication ( Labour ) For all types of steel
Providing fusion bonded epoxy coating to
reinforcement bars as per IS-13620-1993

M.T.
M.T
M.T
M.T

58568.00
58568.00
63558.00
7722.00

5321.00
5321.00
8140.20
7722.00

Section-C-Plain and Reinforced Cement Concrete

37

Sr No

Item Description

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

specificaion for a thickness of 175 (+50) microns


including extra cost on account of careful
handling, extra cost on account of using PVC
coated binding wire instead of G. I. wire, extra cost
on account of touch-up material supplied by
coating agency and repair work extra cost on
account of transportation , loading, unloading,
including all taxes (Central and Local), etc.
complete.

(a)
1
2
3
4
5
6
7
8

(b)
1
2

For reinforcement Diameterwise rates.


8 mm dia.
10 mm dia.
12 mm dia.
16 mm dia.
20 mm dia.
25 mm dia.
28 mm dia.
32 mm dia.
Average rates ( for estimation only)
For 8mm to 20mm dia
For above 20mm dia
Notes for Estimations
All the rates of Reinforced Cement Concrete Items
From 2 to 7 shall be increased by 10% for each
brace height
above 1st brace for R.C.C. E. S.
R.s.e.g. For a R.C.C. E.S. R. with 7 M staging and
first brace at 3.50 M above ground, the concrete
in columns above first
brace, concrete of ring
beam and bottom slab is entitled
for 10%
increase, concrete of vertical wall, roof slab and
roof beams, columns in container are entitled for
20% increase.

All the rates of Reinforced Cement Concete Items


from 2 to 7 shall be increased by 2% for every floor
height above ground floor for building works.

These rates are applicable for R. C. C. well works


also.These rates shall be increased by 10% for
every 5 M depth below initial 5 M depth.

Rates for Item Nos. 8 and 9 shall be increased by


5% for each brace height above first brace for
R.C.C.E.S.Rs. By 5% for every ring beam below
first ring beam for R. C. C. wells. By 1% building
works for every floor height.

Section-C-Plain and Reinforced Cement Concrete

M.T
M.T
M.T
M.T
M.T
M.T
M.T
M.T

18160.00
16022.00
14618.00
14084.00
12947.00
11744.00
11209.00
10407.00

M.T.
M.T.

15166.00
11120.00

38

Sr No

Item Description

Volumetric mix as per 1: 11/2 :3 shall be adopted


with 56.5 kg. of cement for RCC-250 and 59.5 kg.
of cement for RCC- 300, per load of mixer of 1bag
capacity.

Fusion bonded epoxy coating to be proposed only


in Coastal Area with prior approval of the Chief
Engineer.
For estimation purpose,average rates as per item
no. 8 b shall be considered wherever necessary.

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

READY MIX CONCRETE

10

11

12

Providing and laying in situ Ready Mix Cement


Concrete grade of trap/granite/quartzite/ gneiss
metal for RCC work in foundation like raft, grillage,
strip foundation and footing of RCC column and
steel stanchions including normal dewatering,
form work, compaction, finishing and curing
including transporting from mixing plant upto
distance of 25 km., pouring the concrete at work
site for 1.5 M lift above G. L. and 5.0 M lift below
G. L., etc. complete. (Excluding reinforcement and
structural steel)
a) In RCC M-200
Cu.m
b) In RCC M-250
Cu.m
c) In RCC M-300
Cu.m
Providing and casting in situ Ready Mix Cement
Concrete grade of trap/granite/quartzite/ gneiss
metal of approved quality for RCC work as per
detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering
centering, form work, compaction, finishing the
formed surfaces with CM 1:3 of sufficient
minimum thickness to give a smooth and even
surface wherever necessary or roughening if
special finish is to be provided and curing
including transporting from mixing plant upto
distance of 25 km., pouring the concrete at work
site for 1.5 M lift above G. L. and 5.0 M lift below
G. L., etc. complete.
(Excluding reinforcement and structural steel)
a) In RCC M-200 - all types of columns
Cu.m
b) In RCC M-250 - all types of columns
Cu.m
c) In RCC M-300 - all types of columns
Cu.m
Providing and casting in situ Ready Mix Cement
Concrete grade of trap/granite/quartzite/ gneiss
metal of approved quality for RCC work as per

Section-C-Plain and Reinforced Cement Concrete

6425.00
6712.00
6815.00

983.10
995.40
1001.50

7941.00
8212.00
8222.00

3599.00
3617.50
3547.10

39

Sr No

Item Description

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

detailed drawings and designs or as directed by


Engineer-in-charge including normal dewatering,
centering, form work compaction, finishing the
formed surfaces with CM 1:3 of sufficient
minimum thickness to give a smooth and even
surface wherever nesessary or roughening if
special finish is to be provided and curing
including transporting from mixing plant upto
distance of 25 km., pouring the concrete at work
site for 1.5 M lift above G. L. and 5.0 M lift below
G. L., etc. complete.

13

(Excluding reinforcement and structural steel)


a) In RCC M-200 - Beams / Braces / Lintels
Cu.m
b) In RCC M-250 - Beams / Braces / Lintels
Cu.m
c) In RCC M-300 - Beams / Braces / Lintels
Cu.m
Providing and casting in situ Ready Mix Cement
Concrete grade of trap/granite/quartzite/ gneiss
metal of approved quality for RCC work as per
detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering
centering, form work, compaction, finishing the
formed surfaces with CM 1:3 of sufficient
minimum thickness to give a smooth and even
surface wherever necessary or roughening if
special finish is to be provided and curing
including transporting from mixing plant upto
distance of 30 km., pouring the concrete at work
site for 1.5 M lift above G. L. and 5.0 M lift below
G. L., etc. complete.

7911.00
8183.00
8191.00

3174.80
3185.40
3107.70

8319.00

4262.40

b) In RCC M-250
Slabs / Landings / Vertical Cu.m
Walls / Waist Slabs / Steps for Staircase

8586.00

4286.90

c) In RCC M-300
Slabs / Landings / Vertical Cu.m
Walls / Waist Slabs / Steps for Staircase

8595.00

4221.80

(Excluding reinforcement and structural steel)


a) In RCC M-200
Slabs / Landings / Vertical Cu.m
Walls / Waist Slabs / Steps for Staircase

14

Providing and casting in situ Ready Mix Cement


Concrete grade of trap/granite/quartzite/ gneiss
metal of approved quality for RCC work as per
detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering,
centering, form work compaction, finishing the
formed surfaces with CM 1:3 of sufficient

Section-C-Plain and Reinforced Cement Concrete

40

Sr No

Item Description

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

minimum thickness to give a smooth and even


surface wherever nesessary or roughening if
special finish is to be provided and curing
including transporting from mixing plant upto
distance of 25 km., pouring the concrete at work
site for 1.5 M lift above G. L. and 5.0 M lift below
G. L., etc. complete.

15

(Excluding reinforcement and structural steel)


4192.90
a) For RCC M-200 Chajjas / Parapets / Curtain Cu.m
8551.00
Walls / Partition Walls / Pardies
4208.80
b) For RCC M-250 Chajjas / Parapets / Curtain Cu.m
8817.00
Walls / Partition Walls / Pardies
4223.50
c) For RCC M-300 Chajjas / Parapets / Curtain WallsCu.m
/ Partition8920.00
Walls / Pardies
Providing and casting in situ Ready Mix Cement
Concrete grade of trap/granite/quartzite/ gneiss
metal of approved quality for RCC work as per
detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering,
centering, form work compaction, finishing the
formed surfaces with CM 1:3 of sufficient
minimum thickness to give a smooth and even
surface wherever nesessary or roughening if
special finish is to be provided and curing
including transporting from mixing plant upto
distance of 25 km., pouring the concrete at work
site for 1.5 M lift above G. L. and 5.0 M lift below
G. L., etc. complete.
(Excluding reinforcement and structural steel)
a) For RCC M-200 - Domes
b) For RCC M-250 - Domes
c) For RCC M-300 - Domes

Cu.m
Cu.m
Cu.m

8862.00
9123.45
9132.90

4810.40
4832.90
4767.80

Note :

1) Add Rs.10/- per Cum for transportation beyond


25 km. for every additional lead of 1 km.
2) Beyond 1.5 M above G.L. and 5.0 M below G. L.,
concreting is to be done by pumping by the
Company.
3) Additional rate of pumping
a) Static pump Rs. 175/- per Cum
b) Mobile pump Rs. 250/- per Cum
4) For Ready Mix Concrete, prior permission from
Chief Engineer shall be obtained.

Section-C-Plain and Reinforced Cement Concrete

41

Section - H- Miscellaneous Works


Sr No

Item Description

Providing and fixing G.I. pipe railing having 1.0


M height consisting 50 x 50 x 6 mm thick M. S.
angles as verticals at 1.5 M c/c, and additional
posts at every corner with 3 rows of 25 mm dia G.I.
pipes of medium class variety as horizontal and
painting 3 coats of oil paint over 1 coat of
anticorrosive paint of approved colour and shade
including cost of all labour, transporting bends to
curved shape, etc. complete.

1A
2

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

RMT

918.00

52.00

RMT

698.00

35.00

i) conjusted area.

Litres

2.00

0.20

ii) Open Area

Litres

1.19

0.80

1.57

0.10

1.08

0.10

As above but with only 2 rows


Dismantling of ESRs of various capacities and
heights using crane (10 MT capacity) and handing
over M.S./ C.I./ G.I. pipes, valves, bends, etc. to
the
Department
However
taking
steel
reinforcement by the dismantling agency including
removing dismantled materials from site and
disposing them at suitable place as directed,
etc.complete.
Capacity of E.S.R. upto 2 lakh litres and stagging
upto 12.00 M height

Capacity of ESR above 2 lakh ltrs. and staging


upto 12 M hieght
i) Conjusted area
Litres
ii) Open Area
Litres

Providing and fixing M.S. gate 2.5 M wide for


compound with 40 mm dia M.S.black pipe medium
class, approved grill work, RCC M - 150 side pillars
of 25 cm x 40 cm x 2.5 M height, its foundation,
finishing, painting etc. complete.

No.

27324.0

3169.10

Proividing and fixing Wicket gate 1.0 M wide for


compound with 40 mm dia M.S.black pipe medium
class, approved grill work, RCC M-150 side pillars
of 25 cm x 40 cm x 2.5 M height, its foundiaion,
finishing painting, etc. complete.

No.

15954.00

2143.60

Taking Trial Bore (Core Bore Sampling) by Calyxe


machine with TCT/NX bits together undisturbed
strata samples for investigation in all types of
strata soft soil, murum, hard murum with

Section-H-Miscellaneous Works

42

Sr No

Item Description

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

boulders, soft rock hard rock & quartizite etc. The


item includes all Hire & running cost of Callyx
Machine conveying all materials to site of work
excluding conveyance of callyx, machine and back
sampling all over burden strata in glass jar and
core samples serially numbered at site in a wooden
Core Box, Samples to be taken at 1.0 m interval
and conveying to the place as directed by Engineerin-charge, The diameter of bore in overburden
shall be 100 mm and of NX size (50mm) in other
strata. The item shall also include M.S. casing pipe
of 2.5 mm thick plate in overburdern only and
shall be 1.0 m above GL with cap over it.
a
b
c
d
e

a
b

In Overburden (Soft soil, murum)


In Weathered rock with boulders
In Weathered rock / Soft rock
In Hard rock other than quartzite
In Hard rock quartzite
Providing pressure grouting at a pressure of
0.56 kg./sqcm in required row/zigzag fashion as
specified at 1.5 M interval as per site conditions to
stop leakages through water retaining structures
to the entire satisfaction of the Engineer-in-charge
including
material
compound,
hardening
materials,
compressor
equipment
including
scaffolding smooth finishing, etc. complete.

RMT
RMT
RMT
RMT
RMT

1614.00
4828.00
2480.00
3257.00
7781.00

210.30
1264.30
645.50
851.10
1976.60

For masonry structure


For Concrete strcture
Drilling 40 mm dia holes in masonry or
concrete structure with providing and fixing 0.5
M long G. I. pipe line for perssure grouting
including all Material labour cost and machinery
charges, etc. complete.

Bag
Bag

891.00
879.00

58.60
54.20

RMT

731.00

59.30

Providing and casting ferrocrate water tank at


site inculding all cost of labour and material, etc,
complete. upto 25,000 literes (for foundation and
providing and fixing taps, etc. shall be considered
spearately).

Litre

4.30

Providing and applying two coat of Gamma


coating or equivalent such as Dr. Bake, Krishna
conchem, Asian Paint, Atul ltd. Burger Paints,
Epoxy primer 50 to 60 microns thick and

Section-H-Miscellaneous Works

43

Sr No

Item Description

Unit

covering two coat of Gamma coating or equivalent


such as Dr. Bake, Krishna conchem, Asian Paint,
Atul ltd. Burger Paints, 30 micron thick is to new
M.S. pipe and structural steel or concrete surface
including preparing the surface by finishing by
solvent degreasing and derusting by applying
chemical method and sacffolding of necessary etc.
complete as manufcaturer's specifications.

sqm

cross
connection
to
existing
10 Making
distribution main of any type including
excavation, breaking and removing exiting pipes,
lowering, laying of specials and pipes in their
position, refilling, closing the water supply in that
area, dewatering and restarting the water supply,
etc. complete as directed by Engineer-in-charge for
following
diameters
of
existing
pipeline,
irrespective of diameter of branch line (the number
of joints involved will be paid separately depending
upon the nature of joints and required pipes,
valves and specials will be supplied free of cost at
stores).
80 mm
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
250 mm
No
300 mm
No
350 mm
No
400 mm
No
450 mm
No
500 mm
No
600 mm
No
700 mm
No
750 mm
No
800 mm
No
900 mm
No
1000 mm
No
Note : Only 75% rate shall be payable till satisfactory hydraulic testing
11 Dismantling dead pipeline of M.S./R.C.C./ C.I./
P.S.C. and G.I./ A. C. / P. V. C. / S. W. / H. D. P.
E. pipe including cost of necessary excavation and
refilling of trenches, breaking the joints, lifting the
pipes and stacking to the place as directed by
Engineer-in-

Section-H-Miscellaneous Works

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

291.60

144.80

1622.00
1837.00
2020.00
2272.00
2398.00
2883.00
3374.00
3970.00
4768.00
5343.00
6584.00
11694.00
14372.00
18126.00
23349.00
30467.00
42457.00
is given.

1378.80
1561.50
1716.70
1931.20
2038.30
2450.10
2867.90
3374.50
4052.80
4541.60
5596.40
9939.90
12216.20
15407.10
19847.00
25897.10
36088.70

44

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

Sr No

Item Description

charge with all leads and lifts including cleaning


the surface, etc. complete.
For M.S./R. C. C./ C.I./ P. S. C.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT

122.00
135.00
138.00
140.00
156.00
171.00
187.00
210.00
228.00
258.00
271.00
332.00
388.00
436.00

26.30
38.60
41.50
44.10
52.40
61.40
70.20
86.80
98.80
108.90
114.30
145.00
168.70
191.40

80 mm
100 mm
125 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
750 mm
For G.I./AC/PVC/S. W. / H.D.P.E.
80 mm
100 mm
125 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
750 mm
Providing and constructing two taps standpost
as per type design wih excavation 15 cm thick PCC
1:3:6 bedding 20 mm thick PCC 1:2:4 concrete for
platform of 1.75 M dia. with side curb and bucket
rest, 80 mm dia, heavy duty GI pipe central post
duly filled therein with C. C. 1:2:4, 5 M long, 20
mm dia. medium G.I. pipe from point of tapping to
standpost additional 20 mm dia G.I. pipe fixed
vertically upto 15 mm dia self closing water taps,
one brass ferrule etc. complete together with all
labour and material charges as per drawing and

RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT

73.00
81.00
83.00
84.00
94.00
104.00
111.00
126.00
137.00
154.00
163.00
199.00
233.00
261.00

15.90
23.00
25.10
26.50
31.60
37.50
41.80
52.50
59.40
64.90
68.70
86.90
101.70
114.40

12

Section-H-Miscellaneous Works

Unit

45

Sr No

Item Description
as directed by Engineer-in-charge when good
foundation is available. Rate includes draining
arrangemment by excavating open gutters.

a
13

a
14

As above but when R.C.C. platform or Precast


standpost issued free of cost.
Providing and constructing two taps standpost
as per type design wih excavation 15cm thick
boulder filling,15 cm thick PCC 1:3:6 bedding 20
mm thick PCC 1:2:4 concrete for platform of 1.75
M dia. with side curb and bucket rest, 80 mm dia,
heavy duty GI pipe central post duly filled therein
with C. C. 1:2:4, 5 M long, 20 mm dia. medium
G.I. pipe from point of tapping to standpost
additional 20 mm dia G.I. pipe fixed vertically upto
15 mm dia self closing water taps, one brass
ferrule etc. complete together with all labour and
material charges as per drawing and as directed by
Engineer-in-charge when B.C.Soil is available.
Rate
includes
draining
arrangemment
by
excavating open gutters.
As above but when R.C.C. platform or Precast
standpost issued free of cost.
Pushing of M.S. pipe of following dia for road
crossing and Railway crossing by push through
method in all types of strata by using hydraulic
jack and drilling machine of required diameter,
elow 3.0 m depth including lowering, laying,
jointing of M.S. casing pipe including cost of labour
fuels and material, required welding machinary,
tripod, chain pulley block, vrane, blower etc.
transportation and dewatering etc. complete as
diredeted by Engineer-in-charge but excluding cost
of M.S. pipe
a) 200 mm dia to 499 mm dia M.S. Pipe
b) 500 mm dia to 1000 mm dia M.S. Pipe

Section-H-Miscellaneous Works

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

No

7789.00

1035.40

No.

4310.00

455.80

No

7841.00

992.70

No

4871.00

541.80

Rmt
Rmt

22748.00
28435.00

---

46

Section - I- (I) - C.I. / D.I. PIPES


Sr No

Item Description

Providing and supplying ISI mark


C.I S&S pipes (push on joints
pressure pipes of C.I of following
class and diameters confirming to
the I.S.specification inclusive cost
of jointing materials(Rubber gasket
of EPDM Quality) including all
statutary duties and taxes levied
by GoI and GoM in all respect,
Education Cess, VAT, Third party
inspection charges of TPI Agency
approved by MJP including Transit
insurance,
Railway
Freight,
Unloading from railway wagon,
Loading into Truck, Transportation
to departmental
store/site of
work,unloading,
stacking
etc.
completed as directed by Engineer
in-charge (IS 1536/2001 for pipes
and
IS
158/1969
and
IS
12820/1989 or latest edition /
revision with amendments for
Rubber Gaskets.

Unit

Rate
(in
2012-2013

With E.D.

Rs.) Rate in
2014

Without
E.D. With E.D.

Rs.

2013-

Without
E.D.

a) Class "LA"
i) 80mm

Rmt.

900.00

844.00

ii) 100mm

Rmt.

1128.00

1058.00

iii) 125 mm

Rmt.

1425.00

1270.00

iii) 150mm

Rmt.

1831.00

1718.00

iv) 200mm

Rmt.

2636.00

2484.00

v) 250mm

Rmt.

3555.00

3348.00

vi) 300mm

Rmt.

4594.00

4317.00

vii) 350 mm

Rmt.

4537.00

3948.00

viii) 400 mm

Rmt.

5522.00

4806.00

ix) 450 mm

Rmt.

6658.00

5794.00

x) 500 mm

Rmt.

7696.00

6698.00

xi) 600 mm

Rmt.

10253.00

8921.00

xii) 700 mm

Rmt.

13232.00 11514.00

xiii) 750 mm

Rmt.

14820.00 12897.00

xiv) 800 mm

Rmt.

16589.00 14435.00

xv) 900 mm

Rmt.

20206.00 17582.00

xvi) 1000mm

Rmt.

24274.00 21122.00

Section-I-C.I./D.I. PIPES

47

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate in
2014

Rs.

2013-

b) Class "A"
i) 80mm

Rmt.

956.00

852.00

ii) 100mm

Rmt.

1193.00

1063.00

iii) 125mm

Rmt.

1552.00

1383.00

iv) 150mm

Rmt.

1912.00

1703.00

v) 200mm

Rmt.

2763.00

2461.00

vi) 250mm

Rmt.

3735.00

3327.00

vii) 300mm

Rmt.

4833.00

4306.00

viii) 350 mm

Rmt.

6043.00

5384.00

ix) 400 mm

Rmt.

7410.00

6602.00

x) 450 mm

Rmt.

8976.00

7998.00

xi) 500 mm

Rmt.

10292.00

9170.00

xii) 600 mm

Rmt.

13744.00 12245.00

xiii) 700 mm

Rmt.

17911.00 15958.00

xiv) 750 mm

Rmt.

19896.00 17725.00

xv) 800 mm

Rmt.

22241.00 19815.00

xvi) 900 mm

Rmt.

27072.00 24119.00

xvii) 1000mm

Rmt.

32562.00 29010.00

c) Class "B"
i) 80mm

Rmt.

1016.00

905.00

ii) 100mm

Rmt.

1272.00

1134.00

iii) 125mm
iv) 150mm

Rmt.
Rmt.

1670.00
2058.00

1489.00
1834.00

v) 200mm

Rmt.

2987.00

2661.00

vi) 250mm

Rmt.

4039.00

3598.00

vii) 300mm

Rmt.

5237.00

4666.00

viii) 350 mm

Rmt.

6554.00

5840.00

ix) 400 mm

Rmt.

7567.00

6742.00

x) 450 mm

Rmt.

9689.00

8631.00

xi) 500 mm

Rmt.

11136.00

9921.00

xii) 600 mm

Rmt.

14671.00 13070.00

xiii) 700 mm

Rmt.

19165.00 17085.00

xiv) 750 mm

Rmt.

21583.00 19229.00

xv) 800 mm

Rmt.

24058.00 21435.00

xvi) 900 mm

Rmt.

29330.00 26132.00

xvii) 1000mm

Rmt.

35189.00 31352.00

Section-I-C.I./D.I. PIPES

48

Item Description

Sr No

Unit

Rate
(in
2012-2013

Rs.) Rate in
2014

Rs.

2013-

Note: This pipe rates mentioned


here shall be used when supply is
from M.J.P. In case of Turnkey
Projects, the rates shall be
increased by 2.5%
2

Lowering laying and jointing with


SBR ruber gaskets C.I. S/S pipes/
D.I. K-7/ D.I. K-9 of various
classes with CI / MS specials of
following
diameter
in
proper
position, grade and alignment as
directed
by
Engineer-in-charge
including
conveyance of material from stores
to site of work, including cost of
jointing materials and rubber rings
labour, giving hydraulic testing
etc. complete.
Note : Only SBR Rubber gaskets to
be used as per IS-5382 and IS12820.
a) C.I. L.A. Class/ Mortar line D.I.K9/ K-7

Without
Rubber
Ring

With
Rubber
Ring

LABOUR
INVOLVED

i) 80 mm
ii) 100 mm

Rmt.

44.00

50.00

38.30

Rmt.

53.00

59.00

47.30

iii) 125 mm

Rmt.

66.00

73.00

58.50

iv) 150 mm

Rmt.

70.00

79.00

60.80

v) 200 mm

Rmt.

94.00

104.00

79.00

vi) 250 mm

Rmt.

123.00

135.00

104.10

vii) 300 mm

Rmt.

133.00

152.00

107.10

viii) 350 mm

Rmt.

166.00

186.00

134.60

ix) 400 mm

Rmt.

199.00

230.00

160.70

x) 450 mm

Rmt.

199.00

243.00

155.20

xi) 500 mm

Rmt.

230.00

280.00

178.30

xii) 600 mm

Rmt.

303.00

373.00

233.90

xiii) 700 mm

Rmt.

390.00

525.00

301.40

xiv) 750 mm

Rmt.

437.00

574.00

337.90

xv) 800 mm

Rmt.

535.00

674.00

420.70

xvi) 900 mm

Rmt.

639.00

846.00

507.80

xvii) 1000mm

Rmt.

756.00

1026.00

613.50

Section-I-C.I./D.I. PIPES

49

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate in
2014

Rs.

2013-

b) C.I. "A" Class


i) 80 mm

Rmt.

46.00

56.00

40.30

ii) 100 mm

Rmt.

56.00

66.00

48.50

iii) 125 mm

Rmt.

71.00

79.00

61.90

iv) 150 mm

Rmt.

78.00

86.00

66.90

v) 200 mm

Rmt.

102.00

110.00

85.00

vi) 250 mm

Rmt.

133.00

146.00

112.40

vii) 300 mm

Rmt.

145.00

163.00

117.10

viii) 350 mm

Rmt.

179.00

200.00

144.30

ix) 400 mm

Rmt.

201.00

231.00

162.20

x) 450 mm

Rmt.

211.00

245.00

160.50

xi) 500 mm

Rmt.

249.00

298.00

192.10

xii) 600 mm

Rmt.

329.00

398.00

254.70

xiii) 700 mm

Rmt.

423.00

556.00

326.10

xiv) 750 mm

Rmt.

475.00

610.00

367.30

xv) 800 mm

Rmt.

561.00

698.00

438.90

xvi) 900 mm

Rmt.

676.00

882.00

536.10

xvii) 1000mm

Rmt.

789.00

1058.00

633.10

i) 80 mm

Rmt.

50.00

59.00

44.20

ii) 100 mm

Rmt.

60.00

71.00

52.50

iii) 125 mm

Rmt.

77.00

86.00

67.60

iv) 150 mm

Rmt.

87.00

96.00

75.40

v) 200 mm

Rmt.

110.00

124.00

91.40

vi) 250 mm

Rmt.

144.00

164.00

121.60

vii) 300 mm

Rmt.

157.00

175.00

127.40

viii) 350 mm

Rmt.

193.00

225.00

156.20

ix) 400 mm

Rmt.

225.00

255.00

182.80

x) 450 mm

Rmt.

228.00

262.00

177.10

xi) 500 mm

Rmt.

268.00

316.00

205.90

c) C.I. "B" Class

xii) 600 mm

Rmt.

355.00

423.00

273.80

xiii) 700 mm

Rmt.

457.00

588.00

352.90

xiv) 750 mm

Rmt.

516.00

650.00

398.60

xv) 800 mm

Rmt.

602.00

737.00

467.80

xvi) 900 mm

Rmt.

714.00

918.00

569.30

xvii) 1000mm

Rmt.

814.00

1082.00

646.90

Section-I-C.I./D.I. PIPES

50

Sr No

Item Description

Providing and supplying ISI mark


DI S&S pipes (push on joints
pressure pipes of D.I of following
class and diameters confirming to
the I.S. specification inclusive cost
of jointing materials (Rubber
gasket of EPDM Quality) including
all statutary duties and taxes
levied by GOI and GOM in all
respect, Education Cess, VAT,
Third party inspection charges of
TPI Agency approved by MJP
including
Transit
insurance,
Railway Freight, Unloading from
railway wagon, Loading into Truck,
Transportation to departmental
store / site of work, unloading,
stacking etc. completed as directed
by Engineer in-charge (IS 1536 /
2001 for pipes and IS 158 / 1969
and IS 12820 / 1989

Unit

Rate
(in
2012-2013

or latest edition / revision with


amendments for Rubber Gaskets.
With E.D.

Rs.) Rate in
2014

Without
E.D. With E.D.

Rs.

2013-

Without
E.D.

D.I. K-9
i) 100 mm

Rmt.

1145.00

1041.00

ii) 150 mm

Rmt.

1670.00

1518.00

iii) 200 mm

Rmt.

2076.00

1888.00

iv) 250 mm

Rmt.

2768.00

2516.00

v) 300 mm

Rmt.

3519.00

3200.00

vi) 350 mm

Rmt.

4405.00

4010.00

vii) 400 mm

Rmt.

5208.00

4730.00

viii) 450 mm

Rmt.

6288.00

5716.00

ix) 500 mm

Rmt.

7308.00

6644.00

x) 600 mm

Rmt.

9664.00

8773.00

xi) 700 mm

Rmt.

12403.00 11276.00

xii) 750 mm

Rmt.

14102.00 12819.00

xiii) 800 mm

Rmt.

15339.00 13949.00

xiv) 900 mm

Rmt.

18933.00 17212.00

xv) 1000mm

Rmt.

22098.00 20089.00

Section-I-C.I./D.I. PIPES

51

Item Description

Sr No

Unit

Rate
(in
2012-2013

Rs.) Rate in
2014

Rs.

2013-

D.I. K-7
i) 100 mm

Rmt.

977.00

888.00

ii) 150 mm

Rmt.

1434.00

1304.00

iii) 200 mm

Rmt.

1692.00

1538.00

iv) 250 mm

Rmt.

2242.00

2038.00

v) 300 mm

Rmt.

2826.00

2569.00

vi) 350 mm .

Rmt.

3480.00

3164.00

vii) 400 mm

Rmt.

4143.00

3766.00

viii) 450 mm

Rmt.

5000.00

4545.00

ix) 500 mm

Rmt.

5859.00

5326.00

x) 600 mm

Rmt.

7717.00

7015.00

xi) 700 mm

Rmt.

10409.00

9463.00

xii) 750 mm

Rmt.

12097.00 10997.00

xiii) 800 mm

Rmt.

13989.00 12717.00

xiv) 900 mm

Rmt.

16779.00 15264.00

xv) 1000 mm

Rmt.

19646.00 17860.00

Providing and making lead caulked


joint with molten lead to Cast Iron
pipes and / or specials of all
classes and fitting of following dia
including cost of lead and all
jointing material, labour, hydraulic
testing etc. complete.
i) 80mm

LABOUR
INVOLVED

Rmt.

657.00

255.50

ii) 100 mm

Rmt.

812.00

319.00

iii) 125 mm

Rmt.

968.00

382.60

iv) 150 mm

Rmt.

1200.00

446.00

v) 200 mm

Rmt.

1750.00

637.00

vi) 250 mm

Rmt.

2126.00

764.60

vii) 300 mm

Rmt.

2564.00

955.80

viii) 350 mm

Rmt.

2906.00

1019.60

ix) 400 mm

Rmt.

3389.00

1243.40

x) 450 mm

Rmt.

4707.00

1592.30

xi) 500 mm

Rmt.

5060.00

1719.60

xii) 600 mm

Rmt.

6501.00

2230.50

xiii) 700 mm

Rmt.

7637.00

2677.40

xiv) 750 mm

Rmt.

8675.00

3059.20

xv) 800 mm

Rmt.

9316.00

3088.10

xvi) 900 mm

Rmt.

9936.00

3100.00

Section-I-C.I./D.I. PIPES

52

Item Description

Sr No

xvii) 1000 mm

Unit

Rate
(in
2012-2013

Rmt.

10594.00

Rs.) Rate in
2014

Rs.

2013-

3144.80

NOTE: Only 85%payment shall be payable till satisfactory hydraulic testing is given

Providing
and
supplying
ISI
standard CI double flanged pipes
including all taxes (Central and
local), railway freight, insurance,
unloading from railway wagon,
loading into truck transport to
stores / site, unloading etc.
complete as directed by Engneer-incharge.
i) 80mm

1419.00

ii) 100 mm

Rmt.

1753.00

iii) 125 mm

Rmt.

2284.00

iv) 150 mm

Rmt.

2849.00

v) 200 mm

Rmt.

4371.00

vi) 250 mm

Rmt.

5890.00

vii) 300 mm

Rmt.

7573.00

viii) 350 mm

Rmt.

9885.00

ix) 400 mm

Rmt.

12053.00

x) 450 mm

Rmt.

14473.00

xi) 500 mm

Rmt.

16986.00

xii) 600 mm

Rmt.

24162.00

xiii) 700 mm

Rmt.

32371.00

xiv) 750 mm

Rmt.

35221.00

a)

Rmt.

Providing
and
supplying
ISI
standard CI flanged / S& S
specials
including
all
taxes
(Central and local), railway freight,
insurance, unloading from railway
wagon,
loading
into
truck
transport to departmental store
/site, unloading stacking etc.
complete.
D/F Specials
i) 80 to 300 mm dia.

Kg.

73.60

ii) 350 to 600 mm dia

Kg.

78.20

Kg.

83.90

iii) above 600 mm dia

Section-I-C.I./D.I. PIPES

53

Sr No

b)

Item Description

Rate
(in
2012-2013

Rs.) Rate in
2014

Rs.

2013-

S/S Specials
i) 80 to 300 mm dia.

Kg.

71.30

ii) 350 to 600 mm dia

Kg.

75.90

Kg.

80.50

i) 80 to 300 mm dia.

Kg.

69.00

ii) 350 to 600 mm dia

Kg.

75.90

iii) above 600 mm dia


Kg.
7
Providing
and
supplying
ISI
standard MS specials of required
thickness with 3 coats of approved
make epoxy paint (Shalimar, Ciba
or Mahindra & Mahindra make)
from inside and outside including
all taxes (Central and local), octroi,
inspection charges, transportation
to stores / site, and stacking, etc.
complete.

80.50

iii) above 600 mm dia


c)

Unit

Plain ended

a) Machine endssuitable for PSCpipes


of all diameters as perdetailed
drawing with 10 mmthick x 0.7 M
long barrel
Kg.
b) Only
flanges
withmachining
anddrilling holes, etc. complete
more than40 mm thick
Kg.
c) Double flanged specials of all
Kg.
d) All socktted specialsor socketed
branchflanged
specials
ofall
diameters
Kg.
e) Plain endedspecials or plain ended
branchflanged
specials
ofall
diameters
Kg.
f) MS barrels (pipepieces) ocally
manufactured (forsmall quantities)
Kg.
8
Providing and making flanged
joints to flanged C.I./M.S. pipes of
all classes/specials etc. including
cost of all jointing materials
(rubber packing, nut bolts, etc.),
labour, hydraulic testing etc.

Section-I-C.I./D.I. PIPES

76.50

74.30
72.10

72.10

72.10

70.00

54

Item Description

Sr No

Unit

Rate
(in
2012-2013

complete.
i)
ii)
iii)
iv)

Rs.) Rate in
2014

Rs.

2013-

LABOUR
INVOLVED

80mm
100 mm
125 mm
150 mm

Joint
Joint
Joint
Joint

174.00
301.00
314.00
603.00

42.50
59.20
59.70
69.20

v) 200 mm

Joint

626.00

69.20

vi) 250 mm

Joint

897.00

85.80

vii) 300 mm

Joint

931.00

85.80

viii) 350 mm

Joint

1213.00

102.40

ix) 400 mm

Joint

1511.00

102.60

x) 450 mm

Joint

1848.00

119.10

xi) 500 mm

Joint

1912.00

127.30

xii) 600 mm

Joint

2052.00

143.70

xiii) 700 mm

Joint

3093.00

160.50

xiv) 750 mm

Joint

3179.00

168.70

xv) 800 mm

Joint

4398.00

177.30

xvi) 900 mm

Joint

4560.00

193.80

xvii) 1000 mm

Joint

4721.00

210.20

NOTE: Only 85%payment shall be payable till satisfactory hydraulic testing is given

Erecting and hoisting in position


and jointing, testing M.S./ C.I.
D/F pipes and specials in vertical
position including cost of all
jointing materials (rubber packing,
nut bolts, etc.) labour, scaffolding,
hydraulic testing etc. complete.
i) 80mm

LABOUR
INVOLVED

Joint

193.00

58.70

ii) 100 mm

Joint

326.00

82.70

iii) 125 mm

Joint

344.00

87.00

iv) 150 mm

Joint

640.00

105.80

v) 200 mm

Joint

680.00

116.80

vi) 250 mm

Joint

970.00

148.50

vii) 300 mm

Joint

1025.00

161.70

viii) 350 mm

Joint

1331.00

196.90

ix) 400 mm

Joint

1655.00

214.60

x) 450 mm

Joint

2022.00

253.80

xi) 500 mm

Joint

2115.00

281.50

xii) 600 mm

Joint

2323.00

343.20

Section-I-C.I./D.I. PIPES

55

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate in
2014

xiii) 700 mm

Joint

3445.00

417.20

xiv) 750 mm

Joint

3576.00

454.80

xv) 800 mm

Joint

4843.00

498.60

xvi) 900 mm

Joint

5098.00

577.40

xvii) 1000 mm

Joint

5373.00

668.00

Rs.

2013-

NOTE: Only 85%payment shall be payable till satisfactory hydraulic testing is given

10

Providing
and
supplying
ISI
standard D. I. specials & fitting
with sealing rubber gasket of
S.B.R,complete with cast iron
follower gland and M. S. nut bolts
coated or otherwise protected from
rusting and suitable for D.I.pipes
including
cost
of
labour
,materials, and transportation to
stores
/
site,
loading
and
unloading including all taxes etc.
complete as per IS-9523.
For all types of specials, bends
tees etc.

a) 80 to 300 mm dia.
b) 350 mm & above dia.
11 Providing
and
supplying
ISI
standard welded DI double flanged
pipe including all taxes (central &
local) railway freight, insurance,
unloading from railway wagon,
loading into truck transport to
store / site, unloading, stacking
etc. complete as directed by
Engineer -in- cahrge. (for 2.75 m
bare pipe)

Kg
Kg

107.00
130.00

i) 100 mm

Rmt.

1863.00

iii) 150 mm

Rmt.

2530.00

iv) 200 mm

Rmt.

3238.00

v) 250 mm

Rmt.

4394.00

vi) 300 mm

Rmt.

5531.00

vii) 350 mm

Rmt.

7203.00

viii) 400 mm

Rmt.

8720.00

ix) 450 mm

Rmt.

10419.00

Section-I-C.I./D.I. PIPES

56

Unit

Rate
(in
2012-2013

x) 500 mm

Rmt.

12110.00

xi) 600 mm

Rmt.

15946.00

xii) 700 mm

Rmt.

21457.00

xiv) 800 mm

Rmt.

26228.00

xv) 900 mm

Rmt.

32555.00

xvi) 1000 mm

Rmt.

38225.00

Sr No

Item Description

Section-I-C.I./D.I. PIPES

Rs.) Rate in
2014

Rs.

2013-

57

Section - I- (II) - A.C. PIPESS


Sr No

Item Description

Providing and supplying Asbestos


Cement
pressure
pipes
manufactured and tested as per
ISO-160 standards of following
class and diameter in standard
lengths including cost of all taxes
(Central and local) insurance,
railway fright, inspection charges,
unloading from railway wagon,
loading into truck, transporting to
departmental
stores
/
site,
unloading, stacking, etc. complete.

Unit

Rate
(in
2012-2013

With E.D.

Rs.) Rate in
2014

Without
E.D. With E.D.

Rs.

2013-

Without
E.D.

a) Class 15 (TestPressure 1.5 MPa)


i) 80 mm

Rmt

139.00

126.00

ii) 100 mm

Rmt

179.00

162.00

iii) 125 mm

Rmt

214.00

194.00

iv) 150 mm

Rmt

376.00

341.00

v) 200 mm

Rmt

0.00

497.00

vi) 250 mm

Rmt

0.00

719.00

vii) 300 mm

Rmt

0.00

1052.00

i) 80 mm

Rmt

153.00

139.00

ii) 100 mm

Rmt

229.00

208.00

iii) 125 mm

Rmt

269.00

244.00

iv) 150 mm

Rmt

475.00

431.00

v) 200 mm

Rmt

0.00

612.00

vi) 250 mm

Rmt

0.00

906.00

0.00

1119.00

b) Class 20 (TestPressure 2.0 MPa)

vii) 300 mm
c) Class 25 (TestPressure 2.5 MPa)
i) 80 mm

Rmt

173.00

190.00

ii) 100 mm

Rmt

288.00

317.00

iii) 125 mm

Rmt

334.00

367.00

iv) 150 mm

Rmt

598.00

658.00

v) 200 mm

Rmt

0.00

789.00

vi) 250 mm

Rmt

0.00

1184.00

vii) 300 mm

Rmt

0.00

1298.00

Section-I-(II)-A.C.PIPES

58

Sr No

Item Description

Providing and supplying C.I.


detachable joints suitable for A.C.
pressure pipes manufactured as
per IS-1538-1993 standards of
following class and diameter
including cost of all taxes (Central
and local), insurance, railway
freight,
inspection
charges,
unloading from railway wagon,
loading into truck, transporting to
departmental
store
/
site,
unloading, stacking and cost of
rubber rings, nut bolts, etc.
complete. ( IS-1538/1993)

Unit

Rate
(in
2012-2013

Rs.) Rate in
2014

Rs.

2013-

a) Class 10 (Test Pressure 1.0 MPa)


1 80 mm

No

255.00

2 100 mm

No

323.00

3 125 mm

No

408.00

4 150 mm

No

519.00

5 200 mm

No

790.50

6 250 mm

No

1079.50

7 300 mm

No

1360.00

8 350 mm

No

2338.00

9 400 mm

No

2678.00

10 450 mm

No

3655.00

11 500 mm

No

5185.00

12 600 mm

No

8840.00

1 80 mm

No

300.00

2 100 mm

No

380.00

3 125 mm

No

510.00

4 150 mm

No

636.00

5 200 mm

No

960.00

6 250 mm

No

1204.00

7 300 mm

No

1650.00

b) Class 15 (Test Pressure 1.5 MPa)

Section-I-(II)-A.C.PIPES

59

Item Description

Sr No

Unit

Rate
(in
2012-2013

Rs.) Rate in
2014

Rs.

2013-

c) Class 20 (Test Pressure 2.0 MPa)

1 80 mm

No

325.00

2 100 mm

No

425.00

3 125 mm

No

550.00

4 150 mm

No

659.00

200 mm

No

886.00

6 250 mm

No

1250.00

No

1790.00

i) 80 mm
ii) 100 mm

No

39.00

No

50.00

iii) 125 mm

No

69.00

iv) 150 mm

No

84.00

i) 80 mm

No

42.00

ii) 100 mm

No

56.00

iii) 125 mm

No

72.00

iv) 150 mm

No

98.00

300 mm
Providing and supplying A. C.
pressure coupler suitable for A.C.
pressure pipes manufactured as
per ISO-160 standards of following
class and diameter including cost
of all taxes (Central and local)
insurance,
railway
fright,
inspection charges, and cost of
rubber rings, nuts bolts, etc.
complete. (supply at stores / site)

a) Class 15 (Test Pressure 1.5 MPa)

b) Class 20 (Test Pressure 2.0 MPa)

Lowering, laying and jointing with


C.I.D. joints, A. C. pressure pipes
and C.I. or M. S. specials of
following class and diameters
including conveyance from stores
to site of works, cost of labour and
material, giving satisfactory

Section-I-(II)-A.C.PIPES

60

Item Description

Sr No

Unit

Rate
(in
2012-2013

Rs.) Rate in
2014

Rs.

2013-

hydraulic testing, etc. as per ISI


code, etc. complete but excluding
cost of C. I. D. joints nut bolts,
rubber rings.
a) Class 15 (Test Pressure 1.5 MPa)

LABOUR
INVOLVED

i) 80 mm

Rmt

31.00

29.50

ii) 100 mm

Rmt

43.00

40.90

iii) 125 mm

Rmt

46.00

43.30

iv) 150 mm

Rmt

57.00

53.40

73.00

67.00

v) 200 mm

Rmt

vi) 250 mm

Rmt

92.00

84.40

vii) 300 mm

Rmt

113.00

102.70

i) 80 mm

Rmt

32.00

30.30

ii) 100 mm

Rmt

46.00

43.50

iii) 125 mm

Rmt

50.00

46.80

b) Class 20 (Test Pressure 2.0 MPa)

iv) 150 mm

Rmt

63.00

58.50

v) 200 mm

Rmt

83.00

75.50

vi) 250 mm

Rmt

104.00

94.50

vii) 300 mm
Rmt
5
Lowering laying and jointing with
C. I. D. jointing with A. C. coupler
A.C. pressure pipes and C.I. or
M.S. specials of following class and
diameters including conveyance
from stores to site of works, cost of
labour
and
material,
giving
satisfactory hydraulic testing, etc.
as per ISI code, etc. complete but
excluding cost of A. C. couplers
and rubber rings.

129.00

115.90

a) Class 15 (Test Presure 1.5 Mpa)


i) 80 mm

Rmt

21.00

19.60

ii) 100 mm

Rmt

28.00

26.10

iii) 125 mm

Rmt

33.00

30.50

iv) 150 mm

Rmt

42.00

38.50

Section-I-(II)-A.C.PIPES

61

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate in
2014

v) 200 mm

Rmt

58.00

52.40

vi) 250 mm

Rmt

74.00

66.80

vii) 300 mm

Rmt

96.00

86.20

i) 80 mm

Rmt

22.00

20.50

ii) 100 mm

Rmt

33.00

30.70

iii) 125 mm

Rmt

37.00

34.10

iv) 150 mm

Rmt

48.00

43.90

v) 200 mm

Rmt

69.00

61.90

vi) 250 mm

Rmt

86.00

77.10

vii) 300 mm

Rmt

113.00

100.50

Rs.

2013-

b) Class 20 (Test Presure 2.0 Mpa)

Note :
1 85 % payment for lowering, laying, jointing shall be made till
satisfactory hydraulic testing is given.
2 Without any extra cost every pipe in the factory shall be
hydraulically tested for one higher class i.e. when Class-15 pipe is
ordered, every pipe shall be tested for 20 kg/cm2 at factory but
pipe shall be branded and paid as Class 15. This foot note shall
appear in tender conditions.
3 Whenever manufacturer is separate and contractor for lowering,
laying, jointing and testing is separate, the principal contractor
shall enter into an agreement with A.C. pipe manufacturer for
satisfactory manufacturing, transporting,
lowering, laying,
jointing and testing of pipes. This foot note shall appear in the
tender con ditions.

Section-I-(II)-A.C.PIPES

62

Section - I- (III) - P.V.C. PIPESS


Sr No

Item Description

Providing
and
supplying
in
standard lengths ISI mark rigid
unplasticised PVC pipes suitable
for potable water with solvent
cement joints including cost of
couplers, as per IS specification
no. 4985 / 1988 including all local
and central taxes, transportation,
freight
charges,
inspection
charges,
loading,
unloading,
conveyance to the departmental
stores / site and stacking the same
in closed shed duly protected from
sun rays and rains including cost
of jointing material i.e. solvent
cement, etc. complete (selffit type
to be jointed with cement solvent).

Unit

Rate
(in
2012-2013

With E.D.

Rs.) Rate in
2014

Without
E.D. With E.D.

Rs.

2013-

Without
E.D.

Note :
1) 10% of cost of pipes shall be
considered for cost of PVC specials
for estimate purpose only.
2) One coupler and required
cement solvent shall be provided
with each full length pipe cost of
which is
a) Working Pressure 4 Kg./Sq.cm.
63 mm

Rmt

46.00

41.00

75 mm

Rmt

65.00

58.00

90 mm

Rmt

91.00

81.00

110 mm

Rmt

124.00

110.00

140 mm

Rmt

208.00

184.00

160 mm

Rmt

274.00

243.00

180 mm

Rmt

372.00

331.00

200 mm

Rmt

460.00

408.00

225 mm

Rmt

589.00

522.00

250 mm

Rmt

719.00

638.00

280 mm

Rmt

953.00

847.00

Section-I-(III)-P.V.C.PIPES

63

Item Description

Sr No

Unit

Rate
(in
2012-2013

Rs.) Rate in
2014

315 mm

Rmt

1213.00

1078.00

355 mm

Rmt

1626.00

1445.00

400 mm

Rmt

2074.00

1844.00

63 mm

Rmt

66.00

58.00

75 mm

Rmt

93.00

83.00

90 mm

Rmt

133.00

119.00

110 mm

Rmt

185.00

164.00

140 mm

Rmt

307.00

273.00

160 mm

Rmt

397.00

353.00

180 mm

Rmt

528.00

469.00

200 mm

Rmt

673.00

599.00

225 mm

Rmt

851.00

755.00

250 mm

Rmt

1061.00

944.00

280 mm

Rmt

1401.00

1244.00

315 mm

Rmt

1786.00

1587.00

355 mm

Rmt

2384.00

2118.00

400 mm

Rmt

3046.00

2706.00

63 mm

Rmt

91.00

80.00

75 mm

Rmt

129.00

114.00

90 mm

Rmt

183.00

162.00

110 mm

Rmt

257.00

229.00

140 mm

Rmt

427.00

379.00

160 mm
180 mm

Rmt
Rmt

557.00
740.00

496.00
658.00

200 mm

Rmt

931.00

827.00

225 mm

Rmt

1181.00

1050.00

250 mm

Rmt

1478.00

1313.00

280 mm

Rmt

1946.00

1729.00

315 mm

Rmt

2464.00

2191.00

355 mm

Rmt

3315.00

2945.00

400 mm

Rmt

4293.00

3814.00

Rmt

108.00

96.00

Rs.

2013-

b) Working Pressure 6 Kg./Sq.cm.

c) Working Pressure 8 Kg./Sq.cm.

d) Working Pressure 10 Kg./Sq.cm.


63 mm

Section-I-(III)-P.V.C.PIPES

64

Item Description

Sr No

Unit

Rs.) Rate in
2014

75 mm

Rmt

154.00

138.00

90 mm

Rmt

223.00

197.00

110 mm

Rmt

315.00

278.00

140 mm

Rmt

508.00

452.00

160 mm

Rmt

666.00

590.00

180 mm

Rmt

915.00

813.00

200 mm

Rmt

1131.00

1005.00

225 mm

Rmt

1445.00

1283.00

250 mm

Rmt

280 mm

Rmt

2294.00

2039.00

315 mm

Rmt

2916.00

2590.00

355 mm

Rmt

3920.00

3484.00

400 mm

Rmt

4999.00

4442.00

Rmt

138.00

123.00

75 mm

Rmt

195.00

173.00

90 mm

Rmt

281.00

250.00

110 mm

Rmt

399.00

354.00

140 mm

Rmt

648.00

575.00

160 mm

Rmt

851.00

757.00

180 mm

Rmt

1164.00

1035.00

200 mm

Rmt

1446.00

1284.00

225 mm

Rmt

1837.00

1632.00

250 mm

Rmt

2322.00

2063.00

280 mm

Rmt

2920.00

2596.00

3724.00

3310.00

e) Working
Kg./Sq.cm.
63
mm

Pressure

1826.00

Rs.

2013-

1621.00

12.5

315 mm

Rate
(in
2012-2013

Rmt

355 mm

Rmt

4977.00

4423.00

400 mm

Rmt

6449.00

5730.00

Providing
and
supplying
in
standard lengths ISI mark rigid
unplastised PVC for patable water
with rubber ring joints including
cost of rubber ring as per IS-49851998, all local and central taxes,
transportation, freight charges,
transit
insurance,
inspection
charges, loading, unloading,

Section-I-(III)-P.V.C.PIPES

65

Item Description

Sr No

Unit

Rate
(in
2012-2013

Rs.) Rate in
2014

Rs.

2013-

conveyance to store/site and


stacking the same in closed shed
duly protected from sun rays and
rains, etc. complete ( with third
party inspection ) (socketed)
Note:- One Rubber rui\ng shall be
provided with full length pipe, cost
of which is included below.
a) Working Pressure 4 Kg./Sq.cm.
63 mm

Rmt

48.00

43.00

75 mm

Rmt

69.00

60.00

90 mm

Rmt

96.00

85.00

110 mm

Rmt

131.00

117.00

125 mm

Rmt

181.00

161.00

140 mm
160 mm

Rmt

219.00

195.00

291.00

257.00

180 mm

Rmt
Rmt

395.00

350.00

200 mm

Rmt

487.00

434.00

225 mm

Rmt

623.00

554.00

250 mm

Rmt

763.00

678.00

280 mm

Rmt

1011.00

899.00

315 mm

Rmt

1287.00

1142.00

63 mm

Rmt

69.00

61.00

75 mm

Rmt

98.00

88.00

90 mm

Rmt

142.00

126.00

110 mm

Rmt

197.00

173.00

125 mm

Rmt

271.00

239.00

140 mm

Rmt

325.00

290.00

160 mm

Rmt

421.00

373.00

180 mm

Rmt

560.00

498.00

200 mm

Rmt

714.00

634.00

225 mm

Rmt

902.00

800.00

250 mm

Rmt

1126.00

1001.00

280 mm

Rmt

1484.00

1319.00

315 mm

Rmt

1892.00

1682.00

b) Working Pressure 6 Kg./Sq.cm.

Section-I-(III)-P.V.C.PIPES

66

Item Description

Sr No

Unit

Rate
(in
2012-2013

Rs.) Rate in
2014

Rs.

2013-

c) Working Pressure 8 Kg./Sq.cm.


63 mm

Rmt

95.00

84.00

75 mm

Rmt

137.00

122.00

90 mm

Rmt

193.00

171.00

110 mm

Rmt

272.00

243.00

125 mm

Rmt

376.00

334.00

140 mm

Rmt

454.00

402.00

160 mm

Rmt

591.00

526.00

180 mm

Rmt

785.00

697.00

200 mm

Rmt

988.00

877.00

225 mm

Rmt

1252.00

1113.00

250 mm

Rmt

1565.00

1390.00

280 mm

Rmt

2063.00

1834.00

315 mm

Rmt

2613.00

2323.00

63 mm

Rmt

114.00

103.00

75 mm

Rmt

165.00

146.00

90 mm

Rmt

236.00

209.00

110 mm

Rmt

333.00

296.00

125 mm

Rmt

460.00

406.00

140 mm

Rmt

538.00

478.00

160 mm

Rmt

705.00

626.00

180 mm

Rmt

969.00

862.00

200 mm

Rmt

1199.00

1065.00

225 mm

Rmt

1531.00

1360.00

250 mm

Rmt

1935.00

1720.00

280 mm

Rmt

2432.00

2161.00

315 mm

Rmt

3090.00

2746.00

d) Working Pressure 10 Kg./Sq.cm.

e) Working Pressure 12.5 Kg./Sq.cm.


63 mm

Rmt

146.00

129.00

75 mm

Rmt

207.00

183.00

90 mm

Rmt

297.00

265.00

110 mm

Rmt

424.00

376.00

125 mm

Rmt

584.00

518.00

140 mm

Rmt

687.00

611.00

160 mm

Rmt

903.00

801.00

Section-I-(III)-P.V.C.PIPES

67

Item Description

Sr No

Unit

Rate
(in
2012-2013

Rs.) Rate in
2014

180 mm

Rmt

1235.00

1097.00

200 mm

Rmt

1531.00

1361.00

225 mm

Rmt

1946.00

1730.00

250 mm

Rmt

2462.00

2186.00

280 mm

Rmt

3096.00

2751.00

315 mm
Rmt
Lowering, laying and jointing with
P.V.C. pipes and specials of
following class and diameter
including cost of conveyance from
stores to site of works including
cost of all labour, material, except
cement solvent, rubber ring, giving
satisfactory hydraulic testing as
per IS code, etc. complete (with
cement solvent joint / ring fit
joint).

3946.00

3507.00

Rs.

2013-

LABOUR
INVOLVED

a) Working Pressure 4 Kg./Sq.cm.


i) 63 mm

Rmt

16.00

15.80

ii) 75 mm

Rmt

21.00

20.80

iii) 90 mm

Rmt

25.00

24.80

iv) 110 mm

Rmt

29.00

28.80

v) 140 mm

Rmt

34.00

33.70

vi) 160 mm

Rmt

38.00

37.70

vii) 180 mm

Rmt

42.00

41.60

viii) 200 mm

Rmt

46.00

45.60

ix) 225 mm

Rmt

53.00

52.50

x) 250 mm

Rmt

57.00

56.50

xi) 280 mm

Rmt

63.00

62.40

xii) 315 mm

Rmt

70.00

69.30

xiii) 355 mm

Rmt

77.00

76.20

xiv) 400 mm

Rmt

84.00

83.10

b) Working Pressure 6 & 12.5 Kg./Sq.cm.


i) 63 mm

Rmt

22.00

21.80

ii) 75 mm

Rmt

29.00

28.80

iii) 90 mm

Rmt

33.00

32.60

iv) 110 mm

Rmt

37.00

36.60

Section-I-(III)-P.V.C.PIPES

68

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate in
2014

v) 140 mm

Rmt

44.00

43.50

vi) 160 mm

Rmt

47.00

46.60

vii) 180 mm

Rmt

53.00

52.50

viii) 200 mm

Rmt

58.00

57.40

ix) 225 mm

Rmt

63.00

62.30

x) 250 mm

Rmt

69.00

68.30

xi) 280 mm

Rmt

78.00

77.20

xii) 315 mm

Rmt

87.00

86.20

xiii) 355 mm

Rmt

96.00

95.00

Rs.

2013-

xiv) 400 mm
Rmt
106.00
104.90
1)
Only 85% rate for lowering laying& jointing shall be payable till satisfactory
hydraulic testing is given.
2)

Third party inspecting agency shall invariably carry out.


I) Specific Gravity Test.
II) Weight / Rmt.

Ash Content Test and confirm in writing that those are within prescribed
III) limits. This condition shall appear in tender conditions.
3)
After receipt of pipes at site, concerned Deputy Engineer shall confirm that
weight of pipe for every class and diameter is not less than the prescribed
standard weight as per IS-4985/1988 (Which is given in CSR), Under weight
pipes shall be rejected. This condition shall appear in the tender conditions.
This conditions shall appear in tender conditions

Section-I-(III)-P.V.C.PIPES

69

Section - I- (IV) - G.I. PIPESS


Sr No

Item Description

Providing ISI mark G.I. pipe of


following class and dia. including
all local and central taxes, octroi,
inspection charges, transportation
to stores, etc. complete as per IS1239/2004.

Unit

Rate
(in
2012-2013

With E.D.

Rs.) Rate in
2014

Without
E.D. With E.D.

Rs.

2013-

Without
E.D.

Note :
One coupler shall be provided with
each full length of pipe cost of
which is included in rates below.

a) LIGHT
i) 15 mm

Rmt

71.00

65.00

ii) 20 mm

Rmt

106.00

95.00

iii) 25 mm

Rmt

146.00

131.00

iv) 32 mm

Rmt

183.00

166.00

v) 40 mm

Rmt

229.00

208.00

vi) 50 mm

Rmt

288.00

255.00

vii) 65 mm

Rmt

397.00

349.00

viii) 80 mm

Rmt

477.00

420.00

Rmt

680.00

596.00

i) 15 mm

Rmt

85.00

77.00

ii) 20 mm

Rmt

108.00

98.00

iii) 25 mm

Rmt

165.00

150.00

iv) 32 mm

Rmt

209.00

189.00

v) 40 mm

Rmt

240.00

218.00

vi) 50 mm

Rmt

342.00

301.00

vii) 65 mm

Rmt

424.00

384.00

viii) 80 mm

Rmt

556.00

503.00

ix) 100 mm
b) MEDIUM

ix) 100 mm

Rmt

820.00

719.00

x). 125 mm

Rmt

1097.00

978.00

xi) 150mm

Rmt

1311.00

1151.00

Rmt

96.00

87.00

c) HEAVY
i) 15 mm

Section-I-(IV)-G.I.PIPES

70

Item Description

Sr No

Unit

Rate
(in
2012-2013

Rs.) Rate in
2014

ii) 20 mm

Rmt

125.00

113.00

iii) 25 mm

Rmt

196.00

177.00

iv) 32 mm

Rmt

246.00

223.00

v) 40 mm

Rmt

285.00

259.00

vi) 50 mm

Rmt

395.00

359.00

vii) 65 mm

Rmt

508.00

461.00

viii) 80 mm

Rmt

649.00

589.00

ix) 100 mm

Rmt

936.00

849.00

x). 125 mm

Rmt

1159.00

1052.00

xi) 150mm

Rmt

1396.00

1266.00

i) 15 mm

Rmt

23.00

20.60

ii) 20 mm

Rmt

iii) 25 mm

Rmt

26.00
32.00

23.60
28.90

iv) 32 mm

Rmt

37.00

33.40

v) 40 mm

Rmt

46.00

42.30

vi) 50 mm

Rmt

55.00

50.50

vii) 65 mm

Rmt

80.00

72.50

viii) 80 mm

Rmt

89.00

81.00

Rmt

106.00

89.10

i) 15 mm

Rmt

25.00

22.20

ii) 20 mm

Rmt

28.00

25.20

iii) 25 mm

Rmt

34.00

30.50

iv) 32 mm

Rmt

39.00

35.00

v) 40 mm

Rmt

50.00

45.50

vi) 50 mm

Rmt

59.00

53.70

vii) 65 mm

Rmt

86.00

78.60

Rs.

2013-

Lowering, laying and jointing G. I.


pipes and specials of following
class and diameter including
conveyance from stores to site of
works,
all
labour,
giving
satisfactory hydraulic test, etc.
complete either underground or in
vertical position, as directed by
Engineer-in-charge.
a) LIGHT

ix) 100 mm
b) MEDIUM

Section-I-(IV)-G.I.PIPES

71

Sr No

Item Description

viii) 80 mm

Unit

Rate
(in
2012-2013

Rs.) Rate in
2014

Rmt

97.00

ix) 100 mm

Rmt

106.00

96.50

x) 125 mm

Rmt

113.00

103.10

xi) 150 mm

Rmt

119.00

107.60

i) 15 mm

Rmt

27.00

24.90

ii) 20 mm

Rmt

30.00

26.80

iii) 25 mm

Rmt

36.00

33.10

iv) 32 mm

Rmt

43.00

39.30

v) 40 mm

Rmt

54.00

48.70

vi) 50 mm

Rmt

67.00

61.20

vii) 65 mm

Rmt

94.00

85.10

viii) 80 mm

Rmt

113.00

102.20

ix) 100 mm

Rmt

106.00

96.10

x) 125 mm

Rmt

118.00

107.20

xi) 150 mm

Rmt

Rs.

2013-

88.00

c) HEAVY

128.00
116.60
Note: Only 85% Payment shall be payable till satisfactory hydraulic testing is given

Section-I-(IV)-G.I.PIPES

72

Section - I- (V) - STONEWARE PIPESS


Sr No

Item Description

Providing ISI standard Stoneware


pipes including all taxes (Central
and local), inspection charges,
railway freight, unloading from
railway wagons, loading into
trucks, transport to departmental
stores, unloading, stacking etc.
complete as per IS-651.

Unit

Rate
(in
2012-2013

With E.D.

Rs.) Rate in
2014

Without
E.D. With E.D.

i) 100 mm

Rmt

122.00

ii) 150 mm

Rmt

167.00

iii) 200 mm

Rmt

223.00

iv) 225 mm

Rmt

269.00

v) 250 mm

Rmt

300.00

vi) 300 mm

Rmt

352.00

i) 100 mm

Rmt

63.80

46.30

ii) 150 mm

Rmt

iii) 200 mm

Rmt

104.50
130.90

67.00
70.40

iv) 225 mm

Rmt

143.00

70.60

v) 250 mm

Rmt

156.20

70.40

vi) 300 mm

Rmt

Rs.

2013-

Without
E.D.

Lowering, laying and jointing in


proper
grade
and
alignment
Stoneware pipes with cement
joints in C. M. (1:1) proportion of
following diameters including cost
of conveyance from stores to site of
work jointing material, labour,
giving
satisfactory
hydraulic
testing etc. complete as per IS1742.

182.60
75.70
Note: Only 85% Payment shall be payable till satisfactory hydraulic testing is given

Section-I-(V)-STONEWARE PIPES

73

Section - I- (VI) - R.C.C. PIPESS


Rate
(in
2012-2013
Sr No

Item Description

Rs.) Rate in
2014

2013-

Unit

Collar Joints
1

Rs.

Rubber Ring Joints

Providing ISI standard R.C.C.


pipes in standard lengths of
following class and diameter
suitable for either collar joints or
rubber ring joints, including all
taxes
(Central
and
local),
inspection charges, transport to
departmental
stores/site,
unloading
and
stacking
etc.
complete as per IS-458/1988.
Note: One collar should be
supplied with each full length
plain ended RCC pipe, cost of
collar included in rates below. One
rubber ring should be supplied
with each full length of socketed
pipe, cost included in rates below.
With E.D.

Without
E.D. With E.D.

Without
E.D.

a) Class " P-I "


i) 80 mm

Rmt

309.00

281.00

273.00

247.00

ii) 100 mm

Rmt

324.00

294.00

293.00

267.00

iii) 150 mm

Rmt

339.00

309.00

304.00

275.00

iv) 200 mm

Rmt

396.00

360.00

355.00

322.00

v) 225 mm

Rmt

452.00

411.00

407.00

369.00

vi) 250 mm

Rmt
Rmt

494.00

449.00

443.00

403.00

vii) 300 mm

632.00

575.00

567.00

514.00

viii) 350 mm

Rmt

ix) 400 mm

Rmt

681.00
864.00

619.00
785.00

613.00
782.00

556.00
710.00

x) 450 mm

Rmt

1064.00

966.00

962.00

873.00

xi) 500 mm

Rmt

1280.00

1163.00

1153.00

1046.00

xii) 600 mm

Rmt

1615.00

1466.00

1456.00

1322.00

xiii) 700 mm

Rmt

2103.00

1910.00

1892.00

1719.00

xiv) 800 mm

Rmt

2428.00

2205.00

2184.00

1983.00

xv) 900 mm

Rmt

3056.00

2775.00

2751.00

2498.00

xvi) 1000 mm

Rmt

3580.00

3252.00

3225.00

2928.00

xvii) 1100 mm

Rmt

4068.00

3694.00

3662.00

3326.00

xviii) 1200 mm

Rmt

4887.00

4438.00

4402.00

3998.00

Section-I-(VI)-R.C.C. PIPES

74

Rate
(in
2012-2013
Sr No

Item Description

Rs.) Rate in
2014

Rs.

2013-

Unit

Collar Joints
b) Class " P-II "

Collar Joint

Rubber Ring Joints


Rubber Ring

i) 80 mm

Rmt

329.00

299.00

293.00

265.00

ii) 100 mm

Rmt

351.00

319.00

316.00

286.00

iii) 150 mm

Rmt

420.00

381.00

379.00

344.00

iv) 200 mm

Rmt

566.00

513.00

513.00

465.00

v) 225 mm

Rmt

670.00

608.00

604.00

547.00

vi) 250 mm

Rmt

725.00

659.00

658.00

598.00

vii) 300 mm

Rmt

956.00

869.00

914.00

829.00

viii) 350 mm

Rmt

1193.00

1084.00

1080.00

981.00

ix) 400 mm

Rmt

1332.00

1210.00

1213.00

1101.00

x) 450 mm

Rmt

1616.00

1467.00

1450.00

1317.00

xi) 500 mm

Rmt

2256.00

2049.00

2056.00

1867.00

xii) 600 mm

Rmt

2797.00

2541.00

2521.00

2290.00

xiii) 700 mm

Rmt

3811.00

3461.00

3466.00

3148.00

xiv) 800 mm

Rmt

4583.00

4163.00

4177.00

3794.00

xv) 900 mm

Rmt

5163.00

4689.00

5202.00

4724.00

xvi) 1000 mm

Rmt

6249.00

5675.00

5626.00

5109.00

c) Class " P-III "

Collar Joint

Rubber Ring

i) 80 mm

Rmt

355.00

322.00

351.00

318.00

ii) 100 mm

Rmt

383.00

348.00

379.00

343.00

iii) 150 mm

Rmt

437.00

397.00

438.00

397.00

iv) 200 mm

Rmt

594.00

540.00

595.00

540.00

v) 225 mm

Rmt

709.00

643.00

709.00

643.00

vi) 250 mm

Rmt

829.00

753.00

830.00

752.00

vii) 300 mm

Rmt

1151.00

1046.00

1151.00

1045.00

viii) 350 mm

Rmt

1502.00

1364.00

1502.00

1364.00

ix) 400 mm

Rmt

2067.00

1878.00

2067.00

1878.00

x) 450 mm

Rmt

2372.00

2155.00

2373.00

2156.00

xi) 500 mm

Rmt

2895.00

2630.00

2896.00

2629.00

xii) 600 mm

Rmt

3719.00

3378.00

3720.00

3378.00

xiii) 700 mm

Rmt

5305.00

4819.00

5305.00

4818.00

xiv) 800 mm

Rmt

6738.00

6119.00

6738.00

6119.00

Section-I-(VI)-R.C.C. PIPES

75

Rate
(in
2012-2013
Sr No

Item Description

Rs.) Rate in
2014

2013-

Unit

Collar Joints
d) Class " NP-II "

Collar Joint

Rubber Ring Joints


Rubber Ring

i) 80 mm

Rmt

290.00

293.00

ii) 100 mm

Rmt

298.00

304.00

iii) 150 mm

Rmt

348.00

354.00

iv) 200 mm

Rmt

407.00

415.00

v) 225 mm

Rmt

454.00

463.00

vi) 250 mm

Rmt

488.00

498.00

vii) 300 mm

Rmt

652.00

665.00

viii) 350 mm

Rmt

799.00

815.00

ix) 400 mm

Rmt

928.00

947.00

x) 450 mm

Rmt

1088.00

1110.00

xi) 500 mm

Rmt

1272.00

1297.00

xii) 600 mm

Rmt

1679.00

1713.00

xiii) 700 mm

Rmt

2422.00

2470.00

xiv) 800 mm

Rmt

2767.00

2822.00

xv) 900 mm

Rmt

3545.00

3616.00

xvi) 1000 mm

Rmt

4243.00

4328.00

xvii) 1100 mm

Rmt

5327.00

5434.00

xviii) 1200 mm

Rmt

5703.00

5817.00

xix) 1400 mm

Rmt

6778.00

6914.00

xx) 1600 mm

Rmt

7782.00

7938.00

xxi) 1800 mm

Rmt

10901.00

11119.00

e) Class " NP-III "

Collar Joint

Rubber Ring

i) 80 mm

Rmt

328.00

335.00

ii) 100 mm

Rmt

372.00

379.00

iii) 150 mm

Rmt

410.00

418.00

iv) 200 mm

Rmt

612.00

624.00

v) 225 mm

Rmt

713.00

727.00

vi) 250 mm

Rmt

763.00

778.00

vii) 300 mm

Rmt

868.00

885.00

viii) 350 mm

Rmt

1537.00

1568.00

ix) 400 mm

Rmt

1722.00

1756.00

x) 450 mm

Rmt

2047.00

2088.00

xi) 500 mm

Rmt

2274.00

2319.00

Section-I-(VI)-R.C.C. PIPES

Rs.

76

Rate
(in
2012-2013
Sr No

Item Description

Rs.) Rate in
2014

2013-

Unit

Collar Joints

Rubber Ring Joints

xii) 600 mm

Rmt

2996.00

3056.00

xiii) 700 mm

Rmt

4072.00

4153.00

xiv) 800 mm

Rmt

4851.00

4948.00

xv) 900 mm

Rmt

5603.00

5715.00

xvi) 1000 mm

Rmt

6855.00

6992.00

xvii) 1100 mm

Rmt

7930.00

8089.00

xviii) 1200 mm

Rmt

9304.00

9490.00

xix) 1400 mm

Rmt

11180.00

11404.00

xx) 1600 mm

Rmt

16292.00

16618.00

xxi) 1800 mm

Rmt

21550.00

21981.00

f) Class " NP-IV "

Collar Joint

Rubber Ring

i) 80 mm

Rmt

353.00

360.00

ii) 100 mm

Rmt

414.00

422.00

iii) 150 mm

Rmt

469.00

478.00

iv) 200 mm

Rmt

655.00

668.00

v) 225 mm

Rmt

774.00

789.00

vi) 250 mm

Rmt

872.00

889.00

vii) 300 mm

Rmt

1111.00

1133.00

viii) 350 mm

Rmt

1687.00

1721.00

ix) 400 mm

Rmt

1807.00

1843.00

x) 450 mm

Rmt

2131.00

2174.00

xi) 500 mm

Rmt

2604.00

2656.00

xii) 600 mm

Rmt

3185.00

3249.00

xiii) 700 mm

Rmt

4767.00

4862.00

xiv) 800 mm

Rmt

5444.00

5553.00

xv) 900 mm

Rmt

6376.00

6504.00

xvi) 1000 mm

Rmt

9026.00

9207.00

xvii) 1100 mm

Rmt

9792.00

9988.00

xviii) 1200 mm

Rmt

9836.00

10033.00

xix) 1400 mm

Rmt

15359.00

15666.00

xx) 1600 mm

Rmt

19148.00

19531.00

xxi) 1800 mm

Rmt

26249.00

26774.00

Section-I-(VI)-R.C.C. PIPES

Rs.

77

Rate
(in
2012-2013
Sr No

Item Description

Rs.) Rate in
2014

Lowering, laying and jointing in


proper grade and alignment R.C.C.
pipes with collar joints in C.M.1:1
proportion or socketed R.C.C.
pipes with rubber joints (excluding
cost of rubber ring or R.C.C.
collar,)
including
cost
of
conveyance from stores to site of
work, cost of jointing material,
labour, giving hydraulic testing
etc. complete as directed by
Engineer-in-charge (For all class of
pipes.) as per IS-783-1985.

Collar
Joint

Labour
Involved

Rubber Ring Joints

Rubber
ring
Joint

For All class of pipes


i) 80 mm
Rmt
44.00
28.70
31.00
ii) 100 mm
Rmt
52.80
35.20
37.00
iii) 150 mm
Rmt
80.30
54.00
56.00
iv) 200 mm
Rmt
105.60
71.60
75.00
v) 225 mm
Rmt
124.30
79.90
88.00
vi) 250 mm
Rmt
139.70
89.40
98.00
vii) 300 mm
Rmt
168.30
106.60
118.00
viii) 350 mm
Rmt
172.70
106.10
121.00
ix) 400 mm
Rmt
220.00
142.20
155.00
x) 450 mm
Rmt
266.20
159.60
185.00
xi) 500 mm
Rmt
290.40
177.40
203.00
xii) 600 mm
Rmt
367.40
212.60
254.00
xiii) 700 mm
Rmt
415.80
248.10
289.00
xiv) 800 mm
Rmt
481.80
283.90
334.00
xv) 900 mm
Rmt
530.20
319.30
369.00
xvi) 1000 mm
Rmt
579.70
355.50
404.00
xvii) 1100 mm
Rmt
806.30
386.00
547.00
xviii) 1200 mm
Rmt
855.80
421.90
582.00
xix) 1400 mm
Rmt
953.70
493.20
652.00
xx) 1600 mm
Rmt
1051.60
564.60
722.00
xxi) 1800 mm
Rmt
1149.50
636.00
792.00
Note: Only 85% rate shall be payable till satisfactory hydraulic testing is given.

Section-I-(VI)-R.C.C. PIPES

2013-

Unit

Collar Joints
2

Rs.

Labour
Involved

15.50
18.70
28.70
38.60
42.40
46.20
54.80
53.30
74.80
78.20
88.20
100.50
121.80
136.70
157.60
178.00
143.80
185.50
202.00
246.60
288.00

78

Section - I- (VII) - P.S.C. PIPES


Sr No

Item Description

Providing ISI standard Pre stressed Cement concrete pipes of


following class and diameter
including cost of all meterial and
labour required, cost of all
taxes(Central
and
local)
,
inspection charges, transportaion
to stores/ site, unloading and
stacking etc. complete as per IS784-2001.

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

Note: One rubber ring should be


supplied with
each pipe, cost
included in rates below.
i)Factory test pressurea)Site
test
pressure
+
0.1N/mm2,For working Pressure
upto 1 N/mm2
b)
Site
test
pressure
+
0.2N/mm2,For working Pressure
above 1 N/mm2

Site test pressure-1.5 times


working pressure pertaining to
the section or 1.1 times static
pressure,which ever is more
(such pressure is to be control
within 25% of pumphead incase
of pumping main)
ii)

Working
pressure-The
maximum sustained internal
pressure excluding surge to
which each portion of pipeline
may
be
subjected
when
installed.
iii)

With E.D.

Without
E.D.

Rmt

3400.00

3085.00

ii) 400 mm

Rmt

3657.00

3318.00

iii) 450 mm

Rmt

3837.00

3481.00

a) Factory
2kg/Sq.cm
i) 350 mm

Test

Section-I-(VII)-P.S.C. PIPES

Pressure

79

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

iv) 500 mm

Rmt

4225.00

3833.00

v) 600 mm

Rmt

5078.00

4608.00

vi) 700 mm

Rmt

5654.00

5130.00

vii) 800 mm

Rmt

6983.00

6335.00

viii) 900 mm

Rmt

8684.00

7878.00

ix) 1000 mm

Rmt

10121.00

9184.00

x) 1100 mm

Rmt

11560.00 10488.00

xi) 1200 mm

Rmt

13358.00 12119.00

xii) 1300 mm

Rmt

15447.00 14014.00

xiii) 1400 mm

Rmt

16996.00 15419.00

xiv) 1500 mm

Rmt

19452.00 17648.00

xv) 1600 mm

Rmt

21575.00 19574.00

xVi) 1700 mm

Rmt

23699.00 21501.00

xvii) 1800 mm

Rmt

25823.00 23427.00

b) Factory
Test
kg/Sq.cm
i) 350 mm

Pressure

4
Rmt

ii) 400 mm

Rmt

3400.00
3658.00

3085.00
3319.00

iii) 450 mm

Rmt

3837.00

3481.00

iv) 500 mm

Rmt

4225.00

3833.00

v) 600 mm

Rmt

5080.00

4609.00

vi) 700 mm

Rmt

5656.00

5131.00

vii) 800 mm

Rmt

6984.00

6336.00

viii) 900 mm

Rmt

8685.00

7879.00

ix) 1000 mm

Rmt

10124.00

9186.00

x) 1100 mm

Rmt

11562.00 10490.00

xi) 1200 mm

Rmt

13358.00 12120.00

xii) 1300 mm

Rmt

15451.00 14017.00

xiii) 1400 mm

Rmt

16998.00 15420.00

xiv) 1500 mm

Rmt

19455.00 17651.00

xv) 1600 mm

Rmt

21578.00 19577.00

xVi) 1700 mm

Rmt

23703.00 21504.00

xvii) 1800 mm

Rmt

25825.00 23430.00

c) Factory
Test
kg/Sq.cm
i) 350 mm

Section-I-(VII)-P.S.C. PIPES

Pressure

Rs.

6
Rmt

3404.00

3089.00

80

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

ii) 400 mm

Rmt

3678.00

3338.00

iii) 450 mm

Rmt

3847.00

3490.00

iv) 500 mm

Rmt

4255.00

3861.00

v) 600 mm

Rmt

5148.00

4670.00

vi) 700 mm

Rmt

5851.00

5310.00

vii) 800 mm

Rmt

7242.00

6570.00

viii) 900 mm

Rmt

9027.00

8189.00

ix) 1000 mm

Rmt

10529.00

9552.00

x) 1100 mm

Rmt

11988.00 10877.00

xi) 1200 mm

Rmt

13888.00 12599.00

xii) 1300 mm

Rmt

16044.00 14555.00

xiii) 1400 mm

Rmt

17652.00 16014.00

xiv) 1500 mm

Rmt

20220.00 18344.00

xv) 1600 mm

Rmt

22456.00 20373.00

xVi) 1700 mm

Rmt

24693.00 22402.00

xvii) 1800 mm

Rmt

26929.00 24432.00

d) Factory
Test
kg/Sq.cm

Pressure

i) 350 mm

Rmt

3411.00

3094.00

ii) 400 mm

Rmt

3705.00

3362.00

iii) 450 mm

Rmt

3871.00

3513.00

iv) 500 mm

Rmt

4315.00

3915.00

v) 600 mm

Rmt

5321.00

4827.00

vi) 700 mm

Rmt

6146.00

5577.00

vii) 800 mm

Rmt

7548.00

6848.00

viii) 900 mm

Rmt

9409.00

8537.00

ix) 1000 mm

Rmt

11004.00

9983.00

x) 1100 mm

Rmt

12590.00 11423.00

xi) 1200 mm

Rmt

14576.00 13226.00

xii) 1300 mm

Rmt

16861.00 15299.00

xiii) 1400 mm

Rmt

18637.00 16909.00

xiv) 1500 mm

Rmt

21355.00 19376.00

xv) 1600 mm

Rmt

24097.00 21861.00

xVi) 1700 mm

Rmt

26838.00 24348.00

xvii) 1800 mm

Rmt

29579.00 26836.00

Section-I-(VII)-P.S.C. PIPES

Rs.

81

Sr No

Item Description

e) Factory
Test
kg/Sq.cm

Pressure

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

10

i) 350 mm

Rmt

3428.00

3110.00

ii) 400 mm

Rmt

3757.00

3407.00

iii) 450 mm

Rmt

4007.00

3635.00

iv) 500 mm

Rmt

4489.00

4071.00

v) 600 mm

Rmt

5550.00

5035.00

vi) 700 mm

Rmt

6396.00

5802.00

vii) 800 mm

Rmt

7933.00

7197.00

viii) 900 mm

Rmt

9886.00

8969.00

ix) 1000 mm

Rmt

11577.00 10505.00

x) 1100 mm

Rmt

13285.00 12053.00

xi) 1200 mm

Rmt

15392.00 13964.00

xii) 1300 mm

Rmt

17821.00 16168.00

xiii) 1400 mm

Rmt

20144.00 18275.00

xiv) 1500 mm

Rmt

23092.00 20951.00

xv) 1600 mm

Rmt

25733.00 23347.00

xVi) 1700 mm

Rmt

28372.00 25742.00

xvii) 1800 mm

Rmt

31012.00 28138.00

f) Factory
Test
kg/Sq.cm

Pressure

12

i) 350 mm

Rmt

3512.00

3185.00

ii) 400 mm

Rmt

3855.00

3498.00

iii) 450 mm

Rmt

4134.00

3750.00

iv) 500 mm

Rmt

4642.00

4211.00

v) 600 mm

Rmt

5771.00

5235.00

vi) 700 mm

Rmt

6683.00

6064.00

vii) 800 mm

Rmt

8309.00

7539.00

viii) 900 mm

Rmt

10333.00

9375.00

ix) 1000 mm

Rmt

12105.00 10984.00

x) 1100 mm

Rmt

13879.00 12592.00

xi) 1200 mm

Rmt

16357.00 14842.00

xii) 1300 mm

Rmt

18944.00 17089.00

xiii) 1400 mm

Rmt

20960.00 19017.00

xiv) 1500 mm

Rmt

24004.00 21777.00

xv) 1600 mm

Rmt

26746.00 24266.00

xVi) 1700 mm

Rmt

29490.00 26754.00

Section-I-(VII)-P.S.C. PIPES

Rs.

82

Sr No

Item Description

Unit

xvii) 1800 mm
g) Factory
Test
kg/Sq.cm

Rmt
Pressure

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

32232.00 29243.00

14

i) 350 mm

Rmt

3598.00

3263.00

ii) 400 mm

Rmt

3957.00

3591.00

iii) 450 mm

Rmt

4262.00

3866.00

iv) 500 mm

Rmt

4792.00

4348.00

v) 600 mm

Rmt

5993.00

5437.00

vi) 700 mm

Rmt

6972.00

6326.00

vii) 800 mm

Rmt

8688.00

7882.00

viii) 900 mm

Rmt

10827.00

9823.00

ix) 1000 mm

Rmt

12915.00 11717.00

x) 1100 mm

Rmt

14840.00 13464.00

xi) 1200 mm

Rmt

17205.00 15610.00

xii) 1300 mm

Rmt

19860.00 18018.00

xiii) 1400 mm

Rmt

22633.00 20534.00

xiv) 1500 mm

Rmt

25936.00 23531.00

xv) 1600 mm

Rmt

29004.00 26315.00

xVi) 1700 mm
xvii) 1800 mm

Rmt

32072.00 29099.00
35141.00 31883.00

h) Factory
Test
kg/Sq.cm

Rmt
Pressure

16

i) 350 mm

Rmt

3675.00

3335.00

ii) 400 mm

Rmt

4064.00

3687.00

iii) 450 mm

Rmt

4391.00

3985.00

iv) 500 mm

Rmt

4950.00

4492.00

v) 600 mm

Rmt

6213.00

5637.00

vi) 700 mm

Rmt

7266.00

6592.00

vii) 800 mm

Rmt

9063.00

8222.00

viii) 900 mm

Rmt

12030.00 10915.00

ix) 1000 mm

Rmt

13539.00 12283.00

x) 1100 mm

Rmt

16249.00 14740.00

xi) 1200 mm

Rmt

18754.00 17015.00

xii) 1300 mm

Rmt

21585.00 19584.00

xiii) 1400 mm

Rmt

23826.00 21617.00

xiv) 1500 mm

Rmt

28302.00 25677.00

Section-I-(VII)-P.S.C. PIPES

Rs.

83

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

xv) 1600 mm

Rmt

31744.00 28800.00

xVi) 1700 mm

Rmt

35186.00 31923.00

xvii) 1800 mm

Rmt

38627.00 35044.00

i) Factory
Test
kg/Sq.cm

Pressure

18

i) 350 mm

Rmt

3761.00

3412.00

ii) 400 mm

Rmt

4176.00

3788.00

iii) 450 mm

Rmt

4518.00

4099.00

iv) 500 mm

Rmt

5105.00

4631.00

v) 600 mm

Rmt

6434.00

5837.00

vi) 700 mm

Rmt

7946.00

7210.00

vii) 800 mm

Rmt

9916.00

8996.00

viii) 900 mm

Rmt

12542.00 11378.00

ix) 1000 mm

Rmt

14738.00 13371.00

x) 1100 mm

Rmt

17008.00 15430.00

xi) 1200 mm

Rmt

19658.00 17835.00

xii) 1300 mm

Rmt

22642.00 20542.00

xiii) 1400 mm

Rmt

29877.00 27107.00

xiv) 1500 mm

Rmt

33689.00 30564.00

xv) 1600 mm

Rmt

37971.00 34450.00

xVi) 1700 mm

Rmt

42252.00 38334.00

xvii) 1800 mm

Rmt

46533.00 42218.00

j) Factory
Test
kg/Sq.cm

Pressure

20

i) 350 mm

Rmt

3849.00

3491.00

ii) 400 mm

Rmt

4277.00

3881.00

iii) 450 mm

Rmt

4649.00

4219.00

iv) 500 mm

Rmt

5265.00

4776.00

v) 600 mm

Rmt

6661.00

6044.00

vi) 700 mm

Rmt

8803.00

7986.00

vii) 800 mm

Rmt

11711.00 10624.00

viii) 900 mm

Rmt

13843.00 12559.00

ix) 1000 mm

Rmt

16654.00 15109.00

x) 1100 mm

Rmt

19796.00 17961.00

xi) 1200 mm

Rmt

24895.00 22588.00

xii) 1300 mm

Rmt

27394.00 24853.00

Section-I-(VII)-P.S.C. PIPES

Rs.

84

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

xiii) 1400 mm

Rmt

32000.00 29033.00

xiv) 1500 mm

Rmt

36169.00 32915.00

xv) 1600 mm

Rmt

40452.00 36812.00

xVi) 1700 mm

Rmt

44734.00 40708.00

xvii) 1800 mm
Rmt
2
Lowering, laying and jointing in
proper grade and alignment PreStressed Cement Concrete Pipes
with rubber ring joints including
cost of conveyance from stores to
site of works, all lablour involved,
giving hydraulic testing, etc.
complete buexcluding cost of
rubber rings (for all class of pipes)

49015.00 44605.00

i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
xiv)
xv)
xVi)
xvii)

350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
1300 mm
1400 mm
1500 mm
1600 mm
1700 mm
1800 mm

Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt

Rs.

LABOUR
INVOLVED

105.00
148.00
179.00
203.00
270.00
297.00
334.00
345.00
445.00
585.00
626.00
743.00
784.00
989.00
1112.00
1239.00
1310.00

46.10
71.40
74.80
87.90
105.10
123.40
134.90
145.90
194.20
191.70
210.40
227.50
261.50
253.20
467.00
520.40
550.20

1) Only 85% rate is payable till satisfactory hydraulic testing is given.


2) Whenever manufacturer is separated and contractor for lowering, laying,

jointing and testing is separate, the principal contractor shall enter into an
agreement with P.S.C. pipe manufacturer for satisfactory manufacturing,
transporting, lowering, laying jointing and testing of pipes.
3) This foot note shall appear into the tender conditions.

Section-I-(VII)-P.S.C. PIPES

85

Section - I- (VIII) - B.W.S.C. PIPES


Sr No

Item Description

Providing and supplying European


Standard EN 639/1994 and EN
641/1994
or
AWWA
C-303
standard and reinforced concrete
pressure pipes cylinder type as per
IS-15155-2002 (Bar wrapped steel
cylinder
pipes
suitable
for
overlaping steel welded joint or
butt welded steel joints) of
following class and diameter
including cost of all material and
labour required, cost of all taxes
(Central
and
State
Govt.),
inspection charges, transportation
to stores/ site, transit insurance,
loading and unloding and stacking
etc. complete.

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

Note: 1) Class mentioned below


represents the working pressure of
pipe.
2) For external coating at site to
the joints, necessary polythene
wrapping for pouring cement
slurry shall also be given free with
each pipe.
i)Factory test pressurea)Site
test
pressure
+
0.1N/mm2,For working Pressure
upto 1 N/mm2
b)
Site
test
pressure
+
0.2N/mm2,For working Pressure
above 1 N/mm2

Site test pressure-1.5 times


working pressure pertaining to
the section or 1.1 times static
pressure,which ever is
ii)

more (such pressure is to be


control within 25% of pumphead
incase of pumping main)

Section-I-(VIII)-B.W.S.C. PIPES

86

Sr No

Item Description

Unit

Rate
(in
2012-2013

Working
pressure-The
maximum sustained internal
pressure excluding surge to
which each portion of pipeline
may be subjected when installed

Rs.) Rate
in
2013-2014

Rs.

iii)

With E.D.

Without
E.D.

a) Facory Test Pressure 4 kg/Sqcm


i) 350 mm

Rmt

3706.00

3366.00

ii) 400 mm

Rmt

4064.00

3691.00

iii) 450 mm

Rmt

4499.00

4086.00

iv) 500 mm

Rmt

5006.00

4546.00

v) 600 mm

Rmt

6510.00

5912.00

vi) 700 mm

Rmt

7522.00

6831.00

vii) 800 mm

Rmt

8168.00

7418.00

viii) 900 mm

Rmt

11414.00 10367.00

ix) 1000mm

Rmt

13155.00 11947.00

x) 1100mm

Rmt

18907.00 17171.00

xi) 1200mm

Rmt

21085.00 19149.00

xii) 1300mm

Rmt

24621.00 22362.00

xiii) 1400mm

Rmt

26410.00 23986.00

xiv) 1500mm

Rmt

28184.00 25598.00

xv) 1600mm

Rmt

30364.00 27577.00

xvi) 1700mm

Rmt

32213.00 29256.00

xvii) 1800mm

Rmt

34393.00 31237.00

b)

Factory
kg/Sqcm
i) 350 mm

Test

Pressure

6
Rmt

3710.00

3369.00

ii) 400 mm

Rmt

4068.00

3694.00

iii) 450 mm

Rmt

4501.00

4089.00

iv) 500 mm

Rmt

5013.00

4554.00

v) 600 mm

Rmt

6517.00

5920.00

vi) 700 mm

Rmt

7528.00

6838.00

vii) 800 mm

Rmt

8175.00

7425.00

viii) 900 mm

Rmt

11421.00 10373.00

ix) 1000mm

Rmt

13160.00 11953.00

x) 1100mm

Rmt

18913.00 17179.00

Section-I-(VIII)-B.W.S.C. PIPES

87

Sr No

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

xi) 1200mm

Rmt

21090.00 19157.00

xii) 1300mm

Rmt

24627.00 22367.00

xiii) 1400mm

Rmt

26416.00 23992.00

xiv) 1500mm

Rmt

28192.00 25604.00

xv) 1600mm

Rmt

30370.00 27584.00

xvi) 1700mm

Rmt

32219.00 29262.00

xvii) 1800mm

Rmt

34399.00 31243.00

c)

d)

Item Description

FactoryTest
kg/Sqcm

Pressure

i) 350 mm

Rmt

3713.00

3373.00

ii) 400 mm

Rmt

4071.00

3698.00

iii) 450 mm

Rmt

4506.00

4092.00

iv) 500 mm

Rmt

5025.00

4564.00

v) 600 mm

Rmt

6528.00

5928.00

vi) 700 mm

Rmt

7540.00

6847.00

vii) 800 mm

Rmt

8186.00

7434.00

viii) 900 mm

Rmt

11432.00 10383.00

ix) 1000mm

Rmt

13172.00 11964.00

x) 1100mm

Rmt

18925.00 17187.00

xi) 1200mm

Rmt

21102.00 19165.00

xii) 1300mm

Rmt

24638.00 22378.00

xiii) 1400mm

Rmt

26427.00 24002.00

xiv) 1500mm

Rmt

28203.00 25614.00

xv) 1600mm

Rmt

30382.00 27594.00

xvi) 1700mm

Rmt

32230.00 29272.00

xvii) 1800mm

Rmt

34411.00 31253.00

Factory
kg/Sqcm

Test

Pressure

10

i) 350 mm

Rmt

3717.00

3375.00

ii) 400 mm

Rmt

4075.00

3702.00

iii) 450 mm

Rmt

4509.00

4095.00

iv) 500 mm

Rmt

5040.00

4577.00

v) 600 mm

Rmt

6544.00

5943.00

vi) 700 mm

Rmt

7555.00

6862.00

vii) 800 mm

Rmt

8202.00

7449.00

viii) 900 mm

Rmt

Section-I-(VIII)-B.W.S.C. PIPES

Rs.

11437.00 10398.00

88

Sr No

e)

f)

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

ix) 1000mm

Rmt

13187.00 11978.00

x) 1100mm

Rmt

18941.00 17202.00

xi) 1200mm

Rmt

21117.00 19180.00

xii) 1300mm

Rmt

24653.00 22392.00

xiii) 1400mm
xiv) 1500mm

Rmt

26443.00 24016.00

Rmt

28218.00 25629.00

xv) 1600mm

Rmt

30397.00 27608.00

xvi) 1700mm

Rmt

32245.00 29286.00

xvii) 1800mm

Rmt

34426.00 31268.00

Factory
kg/Sqcm

Test

Pressure

12

i) 350 mm

Rmt

3720.00

3379.00

ii) 400 mm

Rmt

4079.00

3704.00

iii) 450 mm

Rmt

4513.00

4099.00

iv) 500 mm

Rmt

5059.00

4597.00

v) 600 mm

Rmt

6564.00

5961.00

vi) 700 mm

Rmt

7575.00

6880.00

vii) 800 mm

Rmt

9368.00

8507.00

viii) 900 mm

Rmt

11448.00 10398.00

ix) 1000mm

Rmt

14231.00 12925.00

x) 1100mm

Rmt

18960.00 17221.00

xi) 1200mm

Rmt

21138.00 19200.00

xii) 1300mm

Rmt

24675.00 22411.00

xiii) 1400mm
xiv) 1500mm

Rmt

26464.00 24036.00

Rmt

28538.00 25921.00

xv) 1600mm

Rmt

31570.00 28673.00

xvi) 1700mm

Rmt

34171.00 31036.00

xvii) 1800mm

Rmt

38004.00 34516.00

Factory
kg/Sqcm

Test

Pressure

14

i) 350 mm

Rmt

3724.00

3383.00

ii) 400 mm

Rmt

4083.00

3707.00

iii) 450 mm

Rmt

4526.00

4110.00

iv) 500 mm

Rmt

5152.00

4679.00

v) 600 mm

Rmt

6683.00

6069.00

vi) 700 mm

Rmt

8695.00

7898.00

Section-I-(VIII)-B.W.S.C. PIPES

Rs.

89

Sr No

g)

h)

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

vii) 800 mm

Rmt

10196.00

viii) 900 mm

Rmt

12574.00 11420.00

ix) 1000mm

Rmt

15138.00 13750.00

x) 1100mm

Rmt

19037.00 17291.00

9259.00

xi) 1200mm

Rmt

21130.00 19191.00

xii) 1300mm

Rmt

25286.00 22965.00

xiii) 1400mm
xiv) 1500mm

Rmt

28572.00 25951.00

Rmt

31792.00 28874.00

xv) 1600mm

Rmt

35451.00 32197.00

xvi) 1700mm

Rmt

38923.00 35351.00

xvii) 1800mm

Rmt

42585.00 38678.00

Factory
kg/Sqcm

Test

Pressure

16

i) 350 mm

Rmt

3728.00

3386.00

ii) 400 mm

Rmt

4087.00

3712.00

iii) 450 mm

Rmt

4684.00

4255.00

iv) 500 mm

Rmt

5525.00

5018.00

v) 600 mm

Rmt

7173.00

6515.00

vi) 700 mm

Rmt

9254.00

8407.00

vii) 800 mm

Rmt

11090.00 10073.00

viii) 900 mm

Rmt

13717.00 12458.00

ix) 1000mm

Rmt

16673.00 15143.00

x) 1100mm

Rmt

20080.00 18238.00

xi) 1200mm
xii) 1300mm

Rmt
Rmt

23418.00 21269.00
27896.00 25337.00

xiii) 1400mm
xiv) 1500mm

Rmt

31490.00 28601.00

Rmt

35119.00 31896.00

xv) 1600mm

Rmt

39052.00 35470.00

xvi) 1700mm

Rmt

43349.00 39371.00

xvii) 1800mm

Rmt

48369.00 43932.00

Factory
kg/Sqcm

Test

Pressure

18

i) 350 mm

Rmt

3732.00

3391.00

ii) 400 mm

Rmt

4148.00

3767.00

iii) 450 mm

Rmt

4833.00

4389.00

iv) 500 mm

Rmt

5691.00

5168.00

Section-I-(VIII)-B.W.S.C. PIPES

Rs.

90

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

v) 600 mm

Rmt

7444.00

6761.00

vi) 700 mm

Rmt

9785.00

8888.00

vii) 800 mm

Rmt

11550.00 10491.00

viii) 900 mm

Rmt

14275.00 12966.00

ix) 1000mm

Rmt

17415.00 15817.00

x) 1100mm

Rmt

20957.00 19033.00

xi) 1200mm

Rmt

24417.00 22177.00

xii) 1300mm

Rmt

28992.00 26333.00

xiii) 1400mm
xiv) 1500mm

Rmt

33132.00 30092.00

Rmt

36595.00 33237.00

xv) 1600mm

Rmt

41512.00 37703.00

xvi) 1700mm

Rmt

46039.00 41816.00

xvii) 1800mm

Rmt

50958.00 46283.00

i)

Factory
kg/Sqcm

Test

Pressure

Rs.

20

i) 350 mm

Rmt

3719.00

3379.00

ii) 400 mm

Rmt

4380.00

3979.00

iii) 450 mm

Rmt

5004.00

4544.00

iv) 500 mm

Rmt

6065.00

5509.00

v) 600 mm

Rmt

7935.00

7207.00

vi) 700 mm

Rmt

10317.00

9371.00

vii) 800 mm

Rmt

12595.00 11439.00

viii) 900 mm

Rmt

15551.00 14125.00

ix) 1000mm

Rmt

19029.00 17282.00

x) 1100mm

Rmt

22835.00 20741.00

xi) 1200mm

Rmt

26549.00 24114.00

xii) 1300mm

Rmt

31538.00 28644.00

xiii) 1400mm
xiv) 1500mm

Rmt

36348.00 33012.00

Rmt

40934.00 37179.00

xv) 1600mm

Rmt

45721.00 41525.00

xvi) 1700mm

Rmt

51075.00 46389.00

xvii) 1800mm

Rmt

56537.00 51351.00

Notes:

1) For lowering, laying & pouring of cement mortar in the field on joints (
after laying and welding ), rates as per P. S. C. pipes lowering, laying and
jointing shall be adopted.

Section-I-(VIII)-B.W.S.C. PIPES

91

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

2) For field welding rates applicable for similar welding in M. S. pipes given in
that section shall be abopted.
3) Whenever manufacturer is separate and contractor for lowering laying,
jointing and testing is separate, the pricipal contractor shall be enter into an
agreement with B. W. S. C. pipe manufacturer for satisfactory manufacturing
transporting, lowering, laying, jointing and testing of pipes.
4) No negative tolerance shall be accepted for the M. S. Shell thickness of B.
W. S. C. pipes over the thickness mentioned in E. N. 641 of AWWA AC 303.

Section-I-(VIII)-B.W.S.C. PIPES

92

Section - I- (IX) - GRP PIPES


Sr No

Item Description

Providing and supplying Glass


fibre reinfor ced polyester pipes
conforming to BIS - 12709 / BIS
14402 with double bell REKA GRP
coupling EPDM rubber gaskets for
sealing of
following pressure
diameter
and
stiffness
class
including cost of all material and
labour required cost of all taxes
(Central
and
State
Govt.),
insurance, transportation to site of
work / store unloading and
stacking etc. complete.

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

With E.D.

Without
E.D.

Rs.

A Class(SN) 2500
a) 3 Kg/Sq.cm.
i) 300 mm

Rmt

1371.00

1229.00

ii) 350 mm

Rmt

1586.00

1422.00

iii) 400 mm

Rmt

1745.00

1565.00

iv) 450 mm

Rmt

1965.00

1761.00

v) 500 mm

Rmt

2222.00

1992.00

vi) 600 mm

Rmt

2855.00

2559.00

vii) 700 mm

Rmt

3548.00

3181.00

viii) 800 mm

Rmt

4357.00

3906.00

ix) 900 mm

Rmt

5324.00

4773.00

x) 1000mm

Rmt

6315.00

5662.00

xi) 1100mm

Rmt

7677.00

6883.00

xii) 1200mm

Rmt

8938.00

8013.00

xiii) 1300mm

Rmt

10121.00

9074.00

xiv) 1400mm

Rmt

11685.00 10477.00

xv) 1500mm

Rmt

13280.00 11907.00

xvi) 1600mm

15466.00 13867.00

xvii) 1700mm

Rmt
Rmt

xviii) 1800mm

Rmt

xviv) 1900mm

Rmt

19935.00 18085.00
22284.00 20216.00

xx 2000mm

Rmt

24092.00 21856.00

xxi) 2100mm

Rmt

26923.00 24424.00

xxii) 2200mm

Rmt

28899.00 26217.00

xxiii) 2300mm

Rmt

31232.00 28333.00

Section-I-(IX)-GRP PIPES

18269.00 16573.00

93

Sr No

Item Description

xxiv) 2400mm

Unit
Rmt

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

33384.00 30286.00

b) 6 kg/Sq.cm.
i) 300 mm

Rmt

1422.00

1275.00

ii) 350 mm

Rmt

1626.00

1458.00

iii) 400 mm

Rmt

1827.00

1638.00

iv) 450 mm

Rmt

2029.00

1819.00

v) 500 mm

Rmt

2307.00

2068.00

vi) 600 mm

Rmt

2988.00

2679.00

vii) 700 mm

Rmt

3715.00

3331.00

viii) 800 mm

Rmt

4552.00

4081.00

ix) 900 mm
x) 1000mm

Rmt

5545.00

4972.00

Rmt

6595.00

5913.00

xi) 1100mm

Rmt

7992.00

7166.00

xii) 1200mm

Rmt

9249.00

8293.00

xiii) 1300mm

Rmt

10583.00

9489.00

xiv) 1400mm

Rmt

12109.00 10857.00

xv) 1500mm

Rmt

13814.00 12385.00

xvi) 1600mm

Rmt

16111.00 14445.00

xvii) 1700mm

Rmt

19038.00 17271.00

xviii) 1800mm

Rmt

20715.00 18793.00

xviv) 1900mm

Rmt

23181.00 21029.00

xx 2000mm

Rmt

25033.00 22710.00

xxi) 2100mm

Rmt

27987.00 25389.00

xxii) 2200mm

Rmt

30159.00 27360.00

xxiii) 2300mm

Rmt

32504.00 29488.00

xxiv) 2400mm

Rmt

34710.00 31489.00

c) 9 kg/Sq.cm.
i) 300 mm

Rmt

1468.00

1316.00

ii) 350 mm
iii) 400 mm

Rmt

1706.00

1530.00

Rmt

1902.00

1705.00

iv) 450 mm

Rmt

2157.00

1933.00

v) 500 mm

Rmt

2445.00

2192.00

vi) 600 mm

Rmt

3171.00

2843.00

vii) 700 mm

Rmt

3949.00

3541.00

viii) 800 mm

Rmt

4919.00

4410.00

ix) 900 mm

Rmt

6009.00

5387.00

Section-I-(IX)-GRP PIPES

94

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

x) 1000mm

Rmt

7114.00

6378.00

xi) 1100mm

Rmt

8598.00

7708.00

xii) 1200mm

Rmt

9983.00

8950.00

xiii) 1300mm

Rmt

11527.00 10335.00

xiv) 1400mm

Rmt

13245.00 11875.00

xv) 1500mm

Rmt

15044.00 13488.00

xvi) 1600mm

Rmt

17564.00 15747.00

xvii) 1700mm
xviii) 1800mm

Rmt

20797.00 18867.00

Rmt

22744.00 20633.00

xviv) 1900mm

Rmt

25266.00 22921.00

xx 2000mm

Rmt

27416.00 24872.00

xxi) 2100mm

Rmt

30510.00 27678.00

xxii) 2200mm
xxiii) 2300mm

Rmt

32799.00 29755.00

Rmt

35415.00 32129.00

xxiv) 2400mm

Rmt

38193.00 34649.00

Rs.

d) 12 kg/Sq.cm.
i) 300 mm

Rmt

1556.00

1395.00

ii) 350 mm

Rmt

1796.00

1610.00

iii) 400 mm

Rmt

2000.00

1793.00

iv) 450 mm

Rmt

2613.00

2342.00

v) 500 mm

Rmt

2264.00

2029.00

vi) 600 mm

Rmt

3407.00

3054.00

vii) 700 mm

Rmt

4225.00

3788.00

viii) 800 mm

Rmt

5234.00

4693.00

ix) 900 mm

Rmt

6418.00

5754.00

x) 1000mm
xi) 1100mm

Rmt

7650.00

6859.00

Rmt

9377.00

8406.00

xii) 1200mm

Rmt

10936.00

9805.00

xiii) 1300mm

Rmt

12378.00 11097.00

xiv) 1400mm

Rmt

14246.00 12772.00

xv) 1500mm
xvi) 1600mm

Rmt

16289.00 14604.00

Rmt

18892.00 16938.00

xvii) 1700mm

Rmt

22414.00 20334.00

xviii) 1800mm

Rmt

24573.00 22293.00

xviv) 1900mm

Rmt

27200.00 24676.00

xx 2000mm

Rmt

29580.00 26835.00

xxi) 2100mm

Rmt

32976.00 29916.00

Section-I-(IX)-GRP PIPES

95

Sr No

Item Description

xxii) 2200mm

Unit
Rmt

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

35587.00 32284.00

e) 15 kg/Sq.cm.
i) 300 mm

Rmt

1620.00

1452.00

ii) 350 mm

Rmt

1871.00

1677.00

iii) 400 mm

Rmt

2080.00

1865.00

iv) 450 mm

Rmt

2398.00

2150.00

v) 500 mm
vi) 600 mm

Rmt

2756.00

2471.00

Rmt

3642.00

3265.00

vii) 700 mm

Rmt

4543.00

4073.00

viii) 800 mm

Rmt

5669.00

5082.00

ix) 900 mm

Rmt

6987.00

6264.00

x) 1000mm
xi) 1100mm

Rmt

8292.00

7434.00

Rmt

10173.00

9121.00

xii) 1200mm

Rmt

11804.00 10583.00

xiii) 1300mm

Rmt

13549.00 12147.00

xiv) 1400mm

Rmt

15595.00 13982.00

xv) 1500mm

Rmt

17692.00 15862.00

xvi) 1600mm

Rmt

20527.00 18404.00

xvii) 1700mm

Rmt

24695.00 22403.00

xviii) 1800mm

Rmt

26988.00 24483.00

xviv) 1900mm

Rmt

30134.00 27338.00

xx 2000mm

Rmt

32796.00 29752.00

B Class (SN) 5000


a) 3 Kg/Sq.cm.
i) 300 mm
ii) 350 mm

Rmt

1470.00

1317.00

Rmt

1724.00

1546.00

iii) 400 mm

Rmt

1965.00

1761.00

iv) 450 mm

Rmt

2234.00

2004.00

v) 500 mm

Rmt

2472.00

2216.00

vi) 600 mm
vii) 700 mm

Rmt

3222.00

2889.00

Rmt

4033.00

3616.00

viii) 800 mm

Rmt

4999.00

4482.00

ix) 900 mm

Rmt

6155.00

5519.00

x) 1000mm

Rmt

7321.00

6564.00

xi) 1100mm

Rmt

8874.00

7956.00

xii) 1200mm

Rmt

10401.00

9325.00

Section-I-(IX)-GRP PIPES

96

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

xiii) 1300mm

Rmt

11843.00 10618.00

xiv) 1400mm

Rmt

13612.00 12204.00

xv) 1500mm

Rmt

15533.00 13926.00

xvi) 1600mm

Rmt

18058.00 16190.00

xvii) 1700mm

Rmt

21385.00 19400.00

xviii) 1800mm

Rmt

23454.00 21277.00

xix) 1900mm

Rmt

26105.00 23682.00

xx) 2000mm
xxi) 2100mm

Rmt

28394.00 25758.00

Rmt

31611.00 28677.00

xxii) 2200mm

Rmt

34120.00 30954.00

Rs.

b) 6 Kg/Sq.cm.
i) 300 mm
ii) 350 mm

Rmt

1492.00

1338.00

Rmt

1753.00

1572.00

iii) 400 mm

Rmt

1938.00

1737.00

iv) 450 mm

Rmt

2209.00

1980.00

v) 500 mm

Rmt

2545.00

2282.00

vi) 600 mm

Rmt

3292.00

2952.00

vii) 700 mm

Rmt

4136.00

3708.00

viii) 800 mm

Rmt

5119.00

4589.00

ix) 900 mm

Rmt

6305.00

5653.00

x) 1000mm

Rmt

7485.00

6711.00

xi) 1100mm

Rmt

9154.00

8208.00

xii) 1200mm

Rmt

10641.00

9540.00

xiii) 1300mm

Rmt

12160.00 10902.00

xiv) 1400mm

Rmt

13952.00 12509.00

xv) 1500mm
xvi) 1600mm

Rmt

15896.00 14252.00

Rmt

18502.00 16589.00

xvii) 1700mm

Rmt

21907.00 19874.00

xviii) 1800mm

Rmt

24020.00 21791.00

xix) 1900mm

Rmt

26757.00 24274.00

xx) 2000mm

Rmt

29152.00 26446.00

xxi) 2100mm

Rmt

32429.00 29420.00

xxii) 2200mm

Rmt

35057.00 31804.00

c) 9 Kg/Sq.cm.
i) 300 mm

Rmt

1547.00

1387.00

ii) 350 mm

Rmt

1813.00

1625.00

Section-I-(IX)-GRP PIPES

97

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

iii) 400 mm

Rmt

2040.00

1829.00

iv) 450 mm

Rmt

2323.00

2082.00

v) 500 mm

Rmt

2657.00

2382.00

vi) 600 mm

Rmt

3650.00

3273.00

vii) 700 mm

Rmt

4334.00

3886.00

viii) 800 mm

Rmt

5582.00

5005.00

ix) 900 mm

Rmt

6590.00

5909.00

x) 1000mm

Rmt

7861.00

7049.00

xi) 1100mm

Rmt

12694.00 11381.00

xii) 1200mm

Rmt

14442.00 12948.00

xiii) 1300mm

Rmt

16271.00 14588.00

xiv) 1400mm

Rmt

18213.00 16330.00

xv) 1500mm

Rmt

20866.00 18707.00

xvi) 1600mm

Rmt

23703.00 21252.00

xvii) 1700mm

Rmt

28204.00 25586.00

xviii) 1800mm

Rmt

30732.00 27880.00

Rs.

d) 12 Kg/Sq.cm.
i) 300 mm

Rmt

1591.00

1426.00

ii) 350 mm

Rmt

1887.00

1692.00

iii) 400 mm

Rmt

2086.00

1870.00

iv) 450 mm

Rmt

2415.00

2165.00

v) 500 mm

Rmt

2758.00

2473.00

vi) 600 mm

Rmt

3642.00

3265.00

vii) 700 mm

Rmt

4591.00

4116.00

viii) 800 mm

Rmt

5666.00

5080.00

ix) 900 mm

Rmt

7076.00

6344.00

x) 1000mm

Rmt

8322.00

7461.00

xi) 1100mm

Rmt

10229.00

9170.00

xii) 1200mm

Rmt

11886.00 10657.00

xiii) 1300mm

Rmt

13623.00 12214.00

xiv) 1400mm

Rmt

15698.00 14074.00

xv) 1500mm

Rmt

17831.00 15986.00

xvi) 1600mm

Rmt

20607.00 18476.00

xvii) 1700mm

Rmt

24516.00 22241.00

xviii) 1800mm

Rmt

26951.00 24450.00

xix) 1900mm

Rmt

29866.00 27095.00

Section-I-(IX)-GRP PIPES

98

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

e) 15 Kg/Sq.cm.
i) 300 mm

Rmt

1647.00

1477.00

ii) 350 mm

Rmt

1962.00

1758.00

iii) 400 mm

Rmt

2193.00

1966.00

iv) 450 mm

Rmt

2533.00

2271.00

v) 500 mm

Rmt

2890.00

2591.00

vi) 600 mm

Rmt

3836.00

3439.00

vii) 700 mm

Rmt

4827.00

4328.00

viii) 800 mm

Rmt

6040.00

5415.00

ix) 900 mm

Rmt

7450.00

6679.00

x) 1000mm

Rmt

8882.00

7963.00

xi) 1100mm

Rmt

10802.00

9685.00

xii) 1200mm

Rmt

12657.00 11348.00

xiii) 1300mm

Rmt

14463.00 12967.00

xiv) 1400mm

Rmt

16688.00 14962.00

xv) 1500mm

Rmt

18981.00 17018.00

xvi) 1600mm

Rmt

21975.00 19703.00

xvii) 1700mm

Rmt

26079.00 23659.00

xviii) 1800mm

Rmt

28722.00 26057.00

Notes:

1) For lowering, laying & jointing rates of GRP pipes 50 % rates for lowering,
laying & jointing of PSC pipes of corresponding diameter shall be adopted.
2) Where manufacturer is seperate & contractor for lowering,laying jointing
&testing is seperate the principal controctor shall enter into an aggrement
with G.R.P. pipe manufacture for safisfactory manufacturing, transporiting,
lowering, laying, jointing & testing of pipe.
3) Only 85 % Payment shall be payable till satisfactory hydraulic testing is
given.
This foot Note shall appear in tender conditions.

Section-I-(IX)-GRP PIPES

99

Section - I- (X) - H.D.P.E. PIPES


Sr No

Item Description

Providing and supplying in


standard
lengths
Polyethelene
Pipes, confirming to IS 4984 /
14151 / 12786 / 13488 with
nesessary jointing material like
mechanical connector i. e. thread /
insert joint / quick release coupler
joint / compression fitting joint or
flanged joint, including all local &
central taxes, transportation and
fright charges inspection charges,
loading / unloading charges,
conveyance to the departmental
stores / site & stacking the same
in closed shade duly protecting
from sunrays & rains, etc.
complete.

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

With E.D.

Without
E.D.

Rs.

A) PE-100
a) 6kg/sq,cm
i) 63mm

Rmt

91.00

84.00

ii) 75mm

Rmt

132.00

119.00

iii) 90mm

Rmt

184.00

167.00

iv) 110mm

Rmt

267.00

242.00

v) 125mm

Rmt

364.00

330.00

vi) 140mm

Rmt

457.00

415.00

vii) 160mm

Rmt

592.00

538.00

viii) 180mm

Rmt

746.00

678.00

ix) 200mm

Rmt

876.00

794.00

x) 225mm

Rmt

1129.00

1024.00

xi) 250mm

Rmt

1385.00

1257.00

xii) 280mm

Rmt

1737.00

1576.00

xiii) 315mm

Rmt

2201.00

1997.00

xiv) 355mm

Rmt

2790.00

2531.00

xv) 400mm

Rmt

3654.00

3315.00

xvi) 450 mm

4814.00

4368.00

xvii) 500 mm

Rmt
Rmt

5953.00

5400.00

xviii) 560 mm

Rmt

7451.00

6760.00

Section-I-(X)-HDPE PIPES

100

Sr No

Item Description

Unit

Rate
(in
2012-2013
9385.00

Rs.) Rate
in
2013-2014

xix) 630 mm

Rmt

xx) 710 mm

Rmt

11891.00 10986.00

xix) 800 mm

Rmt

14336.00 13244.00

xx) 900 mm

Rmt

18161.00 16778.00

xix) 1000 mm

Rmt

22394.00 20690.00

Rs.

8509.00

b) 8kg/sq,cm
i) 63mm

Rmt

116.00

105.00

ii) 75mm
iii) 90mm

Rmt

172.00

156.00

Rmt

231.00

209.00

iv) 110mm

Rmt

340.00

308.00

v) 125mm

Rmt

461.00

418.00

vi) 140mm

Rmt

576.00

524.00

vii) 160mm

Rmt

750.00

680.00

viii) 180mm

Rmt

945.00

857.00

ix) 200mm

Rmt

1113.00

1010.00

x) 225mm

Rmt

1430.00

1297.00

xi) 250mm

Rmt

1762.00

1598.00

xii) 280mm
xiii) 315mm

Rmt

2210.00

2004.00

Rmt

2794.00

2536.00

xiv) 355mm

Rmt

3537.00

3209.00

xv) 400mm

Rmt

4645.00

4215.00

xvi) 450 mm

Rmt

6212.00

5635.00

xvii) 500 mm

Rmt

7663.00

6951.00

xviii) 560 mm

Rmt

9618.00

8725.00

xix) 630 mm

Rmt

12109.00 10978.00

xx) 710 mm

Rmt

15344.00 14176.00

xix) 800 mm

Rmt

18509.00 17100.00

xx) 900 mm

Rmt

23430.00 21646.00

xix) 1000 mm

Rmt

22868.00 21127.00

c) 10kg/sq,cm
i) 63mm

Rmt

145.00

131.00

ii) 75mm

Rmt

204.00

185.00

iii) 90mm
iv) 110mm

Rmt

290.00

264.00

Rmt

428.00

389.00

v) 125mm

Rmt

552.00

501.00

vi) 140mm

Rmt

690.00

625.00

Section-I-(X)-HDPE PIPES

101

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

vii) 160mm

Rmt

895.00

813.00

viii) 180mm

Rmt

1136.00

1031.00

ix) 200mm

Rmt

1331.00

1208.00

x) 225mm

Rmt

1704.00

1547.00

xi) 250mm

Rmt

2129.00

1931.00

xii) 280mm

Rmt

2628.00

2385.00

xiii) 315mm

Rmt

3376.00

3062.00

xiv) 355mm

Rmt

4236.00

3843.00

xv) 400mm

Rmt

5643.00

5118.00

xvi) 450 mm

Rmt

7509.00

6811.00

xvii) 500 mm

Rmt

9280.00

8418.00

xviii) 560 mm

Rmt

11161.00 10124.00

xix) 630 mm

Rmt

14659.00 13289.00

xx) 710 mm

Rmt

18618.00 16880.00

xix) 800 mm
xx) 900 mm

Rmt

22441.00 20346.00

Rmt

22710.00 20589.00

xix) 1000 mm

Rmt

28067.00 25445.00

Rs.

d) 12.5kg/sq,cm
i) 63mm
ii) 75mm

Rmt

169.00

154.00

Rmt

239.00

217.00

iii) 90mm

Rmt

345.00

314.00

iv) 110mm
v) 125mm

Rmt

508.00

461.00

Rmt

656.00

595.00

vi) 140mm

Rmt

822.00

746.00

vii) 160mm

Rmt

1070.00

971.00

viii) 180mm

Rmt

1354.00

1228.00

ix) 200mm

Rmt

1591.00

1443.00

x) 225mm

Rmt

2053.00

1862.00

ix) 250mm

Rmt

2525.00

2290.00

x) 280mm

Rmt

3166.00

2872.00

ix) 315mm

Rmt

4007.00

3636.00

x) 355mm

Rmt

5089.00

4617.00

ix) 400mm
x) 450 mm

Rmt

6688.00

6068.00

Rmt

8938.00

8108.00

ix) 500 mm

Rmt

11015.00

9994.00

x) 560 mm

Rmt

13808.00 12528.00

ix) 630 mm

Rmt

17623.00 15978.00

Section-I-(X)-HDPE PIPES

102

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

x) 710 mm
ix) 800 mm

Rmt

18175.00 16478.00

Rmt

21902.00 19857.00

x) 900 mm

Rmt

27748.00 25156.00

ix) 1000 mm

Rmt

33795.00 30639.00

Rs.

e) 16 kg/cm2
i) 63mm

Rmt

205.00

185.00

ii) 75mm

Rmt

288.00

262.00

iii) 90mm

Rmt

414.00

375.00

iv) 110mm

Rmt

612.00

554.00

v) 125mm
vi) 140mm

Rmt

790.00

717.00

Rmt

986.00

894.00

vii) 160mm

Rmt

1293.00

1173.00

viii) 180mm

Rmt

1627.00

1476.00

ix) 200mm

Rmt

2808.00

2549.00

x) 225mm

Rmt

3550.00

3221.00

xi) 250mm
xii) 280mm

Rmt

4379.00

3973.00

Rmt

5493.00

4983.00

xiii) 315mm

Rmt

6943.00

6300.00

xiv) 355mm

Rmt

8809.00

7990.00

xvii) 400mm

Rmt

11410.00 10352.00

xvi) 450 mm
xvii) 500 mm

Rmt

14463.00 13120.00

Rmt

17835.00 16180.00

xviii) 560 mm

Rmt

13650.00 12375.00

xix) 630 mm

Rmt

17294.00 15679.00

xx) 710 mm

Rmt

22006.00 19951.00

xix) 800 mm

Rmt

26511.00 24035.00

xx) 900 mm

Rmt

33558.00 30424.00

xix) 1000 mm
Rmt
2
Providing
and
Supplying
in
standard length Polyethylene (PE)
pipes
for
non
pressure
underground
drainage
and
sewerage with smooth internal and
corrugated
(profiled)
external
surface with Anti rodent property
confirming to ISO -21138- 3:2007

41199.00 37353.00

Section-I-(X)-HDPE PIPES

103

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

with ecessary jointing material like


mechanical connector i.e. thread/
insert joint/ quick release coupler/
compression
fitting joint/ or
flanged joint including all local and
central taxes, transportation and
freight
charges,
inspection
charges, loading and unloading
charges,
conveyance
to
the
departmental stores /site and
stacking the same in closed shade
duly protecting from sunrays and
rains etc complete

HDPE PIPES FOR DRAINAGE


Class SN4
Rmt

SN4
280.00

ii) 175 mm(OD)


iii) 200 mm(OD)

Rmt

320.00

Rmt

400.00

iv) 250 mm(OD)

Rmt

592.00

v) 315 mm(OD)

Rmt

840.00

i) 160 mm (OD)

Class SN8
i) 160 mm (OD)

SN8
Rmt

304.00

ii) 175 mm(OD)

Rmt

365.00

iii) 200 mm(OD)

Rmt

440.00

iv) 250 mm(OD)

Rmt

840.00

v) 315 mm(OD)
Rmt
3
Lowering laying and jointing HDPE
/MDPE pipes in proper position
including
all
specials
by
Compression fitting / Electrofusion
and But fusion jointing procedure
including hydraulic testing as per
relevent IS Code complete with all
materials for jointing procedures
like
Electrofusion
machine,
Electric mirror/

1056.00

Section-I-(X)-HDPE PIPES

104

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

heater
/ But fusion welding
machine with hydraulic jack, top
laoding clamp etc pump and
accessories for hydraulic testing
and all labours as directe by
engineer incharge as per IS - 7634
Part II.
i) 20mm

Rmt

10.00

ii) 25mm

Rmt

15.00

iii) 32mm

Rmt

20.00

iv) 40mm

Rmt

25.00

v) 50mm

Rmt

30.00

vi) 63mm

Rmt

37.00

vii) 75mm

Rmt

40.00

viii) 90mm
ix) 110mm

Rmt

55.00

Rmt

58.00

x) 125mm

Rmt

66.00

xi) 140mm
xii) 160mm

Rmt

89.00

Rmt

95.00

xiii) 180mm
xiv) 200mm

Rmt

95.00

Rmt

106.00

xv) 225mm

Rmt

136.00

xvi) 250mm

Rmt

141.00

xvii) 280mm

Rmt

174.00

xvi) 315mm

Rmt

191.00

xvii) 355mm

Rmt

209.00

xvi) 400mm

Rmt

211.00

xvii) 450mm

Rmt

238.00

xvi) 500mm

Rmt

308.00

xvii) 560mm

Rmt

345.00

xvi) 630mm
4
Lowering

Rmt

388.00

,Laying and jointing


HDPE Double Wall Corrugated
Pipes
for
non
pressure
Underground
drainage
and
Sewerage
applications
and
specials of following class and
diameter
including
cost
of
conveyance from stores to site of

Section-I-(X)-HDPE PIPES

105

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

works including cost of all labour


material except O ring coupler
giving satisfactory hydraulic testing
as per relevant ISO etc complete
i) 160MM (OD)

Rmt

32.00

ii) 175MM (OD)


iii) 200MM (OD)

Rmt

36.00

Rmt

39.00

iv) 250MM (OD)

Rmt

49.00

v) 315MM (OD)

Rmt

60.00

Section-I-(X)-HDPE PIPES

106

Section - I- (XI) - M.D.P.E. PIPES


Sr No

Item Description

Providing and Supplying Blue


MDPE pipes conforming to ISO
4427:1996 manufactured from
virgin resin PE 80 Food grade
compounded Raw Material having
Blue
Colour
only
assurance
certificate from quality agencies
like WRC / CIPET (India) / DVGM
/ KIWA / SPGN etc. for usage in
Drinking
Water
with
quality
system The cost shall include
testing of all materials, all taxes
Central,Sate
,
Municipal,
Inspection charges, transportation
up to site, transit insurance,
loading, as specified and directed.
unloading, stacking etc. complete
as specified and directed.

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

With E.D.

Without
E.D.

Rs.

A) PN 16 (SDR 9)
i) 20 mm

Rmt

28.00

26.00

ii) 25 mm

Rmt

40.00

36.00

iii) 32 mm

Rmt

66.00

59.00

iv) 40 mm

Rmt

97.00

87.00

v) 50 mm

Rmt

148.00

132.00

vi) 63 mm

Rmt

218.00

194.00

vii) 75 mm

Rmt

295.00

262.00

viii) 90 mm

Rmt

426.00

379.00

ix) 110 mm

Rmt

633.00

563.00

x) 125 mm

Rmt

817.00

727.00

xi) 140 mm

Rmt

1027.00

914.00

vii) 160 mm

Rmt

1361.00

1211.00

viii) 180 mm

Rmt

1722.00

1533.00

ix) 200 mm

Rmt

2129.00

1895.00

x) 225 mm

Rmt

2697.00

2400.00

xi) 250 mm

Rmt

3316.00

2952.00

xii) 280 mm

Rmt
Rmt

4169.00

3711.00

5362.00

4772.00

315 mm

Section-I-(XI)-MDPE PIPES

107

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

B) PN 12.5 (SDR 11)


i) 25 mm

Rmt

37.00

33.00

ii) 32 mm

Rmt

62.00

55.00

iii) 40 mm

Rmt

90.00

84.00

iv) 50 mm

Rmt

130.00

116.00

v) 63 mm

Rmt

175.00

158.00

vi) 75 mm

Rmt

245.00

219.00

vii) 90 mm

Rmt

359.00

316.00

viii) 110 mm
ix) 125 mm

Rmt

526.00

468.00

Rmt

684.00

609.00

x) 140 mm

Rmt

854.00

760.00

xi) 160 mm

Rmt

1118.00

995.00

xii) 180 mm

Rmt

1439.00

1291.00

vii) 200 mm

Rmt

1778.00

1581.00

viii) 225 mm

Rmt

2248.00

2001.00

ix) 250 mm

Rmt

2770.00

2479.00

x) 280 mm

Rmt

3471.00

3089.00

xi) 315 mm

Rmt

4400.00

3916.00

i) 63 mm

Rmt

150.00

134.00

ii) 75 mm

Rmt

212.00

189.00

iii) 90 mm

Rmt

305.00

272.00

iv) 110 mm

Rmt

450.00

401.00

v) 125 mm

Rmt

579.00

516.00

vi) 140 mm

Rmt

727.00

647.00

vii) 160 mm

Rmt

951.00

846.00

viii) 180 mm

Rmt

1205.00

1072.00

ix) 200 mm

Rmt

1483.00

1320.00

x) 225 mm

Rmt

1881.00

1673.00

C) PN 10 (SDR 13.6)

xi) 250 mm

Rmt

2315.00

2060.00

xii) 280 mm

Rmt

2900.00

2581.00

vii) 315 mm

Rmt

3662.00

3259.00

D) PN 8 (SDR 17)
i) 63 mm

Rmt

122.00

108.00

ii) 75 mm

Rmt

171.00

152.00

iii) 90 mm

Rmt

247.00

220.00

Section-I-(XI)-MDPE PIPES

108

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

iv) 110 mm

Rmt

367.00

327.00

v) 125 mm

Rmt

470.00

418.00

vi) 140 mm

Rmt

589.00

524.00

vii) 160 mm

Rmt

771.00

686.00

viii) 180 mm

Rmt

977.00

870.00

ix) 200 mm

Rmt

1203.00

1071.00

x) 225 mm

Rmt

1528.00

1360.00

xi) 250 mm

Rmt

1875.00

1705.00

xii) 280 mm

Rmt

2399.00

2135.00

xiii) 315 mm

Rmt

3040.00

2705.00

i) 63 mm

Rmt

94.00

84.00

ii) 75 mm

Rmt

136.00

121.00

iii) 90 mm

Rmt

190.00

169.00

iv) 110 mm

Rmt

284.00

258.00

v) 125 mm

Rmt

374.00

326.00

Rs.

E) PN 6 (SDR 21)

vi) 140 mm

Rmt

460.00

410.00

vii) 160 mm

Rmt

602.00

536.00

viii) 180 mm

Rmt

756.00

672.00

ix) 200 mm

Rmt

939.00

836.00

x) 225 mm

Rmt

1189.00

1058.00

xi) 250 mm

Rmt

1452.00

1293.00

xii) 280 mm

Rmt

1836.00

1634.00

xiii) 315 mm

Rmt

2309.00

2055.00

Providing & Supply of Electro


Fusion Fittings in accordance with
BS EN12201: Part-3 suitable for
drinking water with in black / blue
colour manufactured from compounded PE80 / PE100 virgin
polymer and compatible with PE80
/ PE100 pipes, in pressure rating
SDR11 with min PN12.5 rated for
water application and shall be
inclusive of all cost such as
testing, all taxes related to

Section-I-(XI)-MDPE PIPES

109

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

central,
state
&
municipal,
inspection charges, transportation up to site, transit insurance,
loading, unloading, stacking etc.
complete.
A) Couplers
i) Couplers 20

No.

100.00

ii) Couplers 25

No.

100.00

iii) Couplers 32

No.

100.00

iv) Couplers 40

No.

173.00

v) Couplers 50

No.

217.00

vi) Couplers 63

No.

257.00

vii) Couplers 75

No.

435.00

viii) Couplers 90

No.

476.00

ix) Couplers 110

No.

664.00

x) Couplers 125

No.

675.00

xi) Couplers 140

No.

1446.00

xii) Couplers 160

No.

1569.00

xiii) Couplers 180

No.

2254.00

xiv) Couplers 200

No.

2530.00

xv) Couplers 225

No.

3189.00

xvi) Couplers 250

No.

4973.00

xvii) Couplers 280

No.

5600.00

xviii) Couplers 315

No.

6116.00

i) Equal Tee 20

No.

210.00

ii) Equal Tee 25

No.

210.00

iii) Equal Tee 32

No.

210.00

iv) Equal Tee 40

No.

463.00

v) Equal Tee 50

No.

473.00

vi) Equal Tee 63

No.

775.00

vii) Equal Tee 75

No.

1135.00

viii) Equal Tee 90

No.

1620.00

ix) Equal Tee 110

No.

2250.00

B) Equal

Tee

x) Equal Tee 125

No.

3104.00

xi) Equal Tee 160

No.

5380.00

xii) Equal Tee 180

No.

6758.00

Section-I-(XI)-MDPE PIPES

110

Unit

Rate
(in
2012-2013

xiii) Equal Tee 200

No.

10832.00

xiv) Equal Tee 225

No.

12215.00

xv) Equal Tee 250

No.

17895.00

i) Elbow 90 Deg. 20

No.

112.00

ii) Elbow 90 Deg. 25

No.

112.00

iii) Elbow 90 Deg. 32


iv) Elbow 90 Deg. 40
v) Elbow 90 Deg. 50

No.
No.
No.

113.00
153.00
181.00

vi) Elbow 90 Deg. 63

No.

252.00

vii) Elbow 90 Deg. 75

No.

394.00

viii) Elbow 90 Deg. 90

No.

465.00

ix) Elbow 90 Deg. 110

No.

641.00

x) Elbow 90 Deg. 125

No.

816.00

xi) Elbow 90 Deg. 160

No.

1786.00

xii) Elbow 90 Deg. 180

No.

2070.00

xiii) Elbow 90 Deg. 200

No.

2679.00

xiv) Elbow 90 Deg. 225

No.

5840.00

xv) Elbow 90 Deg. 250

No.

10943.00

i) Elbow 45 Deg. 32

No.

120.00

ii) Elbow 45 Deg. 40


iii) Elbow 45 Deg. 50
iv) Elbow 45 Deg. 63

No.
No.
No.

145.00
172.00
240.00

v) Elbow 45 Deg. 75

No.

374.00

vi) Elbow 45 Deg. 90

No.

442.00

vii) Elbow 45 Deg. 110

No.

641.00

viii) Elbow 45 Deg. 125

No.

816.00

ix) Elbow 45 Deg. 160

No.

1503.00

x) Elbow 45 Deg. 180

No.

1970.00

xi) Elbow 45 Deg. 200

No.

2070.00

xii) Elbow 45 Deg. 225

No.

2679.00

xiii) Elbow 45 Deg. 250

No.

5840.00

No.

150.00

Sr No

Item Description

Rs.) Rate
in
2013-2014

Rs.

C) Elbow 90 Deg.

D) Elbow 45 Deg.

E) Reducer
i) Reducer 25X20

Section-I-(XI)-MDPE PIPES

111

Sr No

Item Description

Unit

Rate
(in
2012-2013

ii) Reducer 32X20

No.

158.00

iii) Reducer 32X25

No.

165.00

iv) Reducer 40X32

No.

179.00

v) Reducer 50X32

No.

179.00

vi) Reducer 50X40

No.

179.00

vii) Reducer 63X32

No.

217.00

viii) Reducer 63X40

No.

217.00

ix) Reducer 63X50

No.

217.00

x) Reducer 90X63

No.

536.00

xi) Reducer 110X75


No.

697.00

xiii) Reducer 125X90


xiv) Reducer 160X110
xv) Reducer 180X125

No.
No.
No.

774.00
1369.00
1705.00

xvi) Reducer 200X160

No.

2020.00

xvi) Reducer 225X160

No.

2955.00

xvii) Reducer 250X160

No.

4082.00

xviii) Reducer 250X200

No.

4465.00

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

40.00
40.00
55.00
60.00
64.00
84.00
308.00
351.00
493.00
624.00
1021.00
1106.00
1286.00
2055.00
3530.00
4550.00
7527.00

No.
No.
No.

757.00
757.00
757.00

H)
i)
ii)
iii)

End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap

20
25
32
40
50
63
75
90
110
125
140
160
180
200
225
250
315

Ferrule tapping tee


Ferrule tapping tee 63 x 1/2"
Ferrule tapping tee 63 x 3/4"
Ferrule tapping tee 63 x 1"

Section-I-(XI)-MDPE PIPES

Rs.

697.00

xii) Reducer 110X90

G)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
xiv)
xv)
xvi)
xvi)

Rs.) Rate
in
2013-2014

112

Sr No

Item Description

Unit

iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
xiv)
xv)
xvi)
xvi)
xvii)
xviii)
xix)
xxi)
xxii)
xxiii)
xxiv)
xxv)
xxvi)
xxvii)
xxviii)
xxix)
xxx)
xxxi)
xxxii)
xxxiii)
xxxiv)
xxxv)
xxxvi)
xxxvii)
xxxviii)
xxxix)
xxxx)
xxxxi)
xxxxii)
3

Ferrule tapping tee 75 x 1/2"


Ferrule tapping tee 75 x 3/4"
Ferrule tapping tee 75 x 1"
Ferrule tapping tee 90 x 1/2"
Ferrule tapping tee 90 x 3/4"
Ferrule tapping tee 90 x 1"
Ferrule tapping tee 90 x 11/4"
Ferrule tapping tee 90 x 11/2"
Ferrule tapping tee 90 x 2"
Ferrule tapping tee 110 x 1/2"
Ferrule tapping tee 110 x 3/4"
Ferrule tapping tee 110 x 1"
Ferrule tapping tee 110 x 11/4"
Ferrule tapping tee 110 x 11/2"
Ferrule tapping tee 110 x 2"
Ferrule tapping tee 160 x 1/2"
Ferrule tapping tee 160 x 3/4"
Ferrule tapping tee 160 x 1"
Ferrule tapping tee 160 x 11/4"
Ferrule tapping tee 160 x 11/2"
Ferrule tapping tee 160 x 2"
Ferrule tapping tee 200 x 1/2"
Ferrule tapping tee 200 x 3/4"
Ferrule tapping tee 200 x 1"
Ferrule tapping tee 200 x 11/4"
Ferrule tapping tee 200 x 11/2"
Ferrule tapping tee 200 x 2"
Ferrule tapping tee 250 x 1/2"
Ferrule tapping tee 250 x 3/4"
Ferrule tapping tee 250 x 1"
Ferrule tapping tee 250 x 11/4"
Ferrule tapping tee 250 x 11/2"
Ferrule tapping tee 250 x 2"
Ferrule tapping tee 315 x 1/2"
Ferrule tapping tee 315 x 3/4"
Ferrule tapping tee 315 x 1"
Ferrule tapping tee 315 x 11/4"
Ferrule tapping tee 315 x 11/2"
Ferrule tapping tee 315 x 2"
Providing & Supply of Compression
fittings,
PN16
rated
in
conformation to ISO:14236-2000
and shall be tested as per
ISO:3459,

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

Section-I-(XI)-MDPE PIPES

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

757.00
757.00
757.00
757.00
757.00
757.00
982.00
982.00
982.00
757.00
757.00
757.00
982.00
982.00
982.00
757.00
757.00
757.00
1070.00
1070.00
1070.00
1068.00
1068.00
1068.00
1540.00
1540.00
1540.00
1068.00
1068.00
1068.00
1540.00
1540.00
1540.00
1271.00
1271.00
1271.00
1726.00
1726.00
1726.00

113

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

ISO:3501 & ISO:3503, suitable for


drinking water & approved by
WRAS, UK/ KIWA etc, in food
grade polypropylene and shall be
inclusive of all cost such as
testing, all taxes related to central,
state
&
unicipal,
inspection
charges, transportation up to site,
transit
insurance,
loading,
unloading, stacking etc. complete.

A)
i)
ii)
iii)
iv)
v)
vi)
i)
ii)
iii)
iv)
v)
vi)

Male Adaptor
Male Adaptor 20x1/2"
Male Adaptor 25x3/4"
Male Adaptor 32x1"
Male Adaptor 40x1 1/4"
Male Adaptor 50x1 1/2"
Male Adaptor 63x2"
Female Adaptor 20x1/2"
Female Adaptor 25x3/4"
Female Adaptor 32x1"
Female Adaptor 40x1 1/4"
Female Adaptor 50x1 1/2"
Female Adaptor 63x2"

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

68.00
78.00
100.00
184.00
241.00
344.00
73.00
86.00
108.00
202.00
259.00
365.00

B)
i)
ii)
iii)
iv)
v)
vi)

Coupling
Coupling 20x20
Coupling 25x25
Coupling 32x32
Coupling 40x40
Coupling 50x50
Coupling 63x63

No.
No.
No.
No.
No.
No.

70.00
77.00
98.00
187.00
240.00
347.00

Reducing Coupling
Reducing Coupling 25x20
Reducing Coupling 32x20
Reducing Coupling 32x25
Reducing Coupling 40x25
Reducing Coupling 40x32
Reducing Coupling 50x32
Reducing Coupling 50x40
Reducing Coupling 63x50

No.
No.
No.
No.
No.
No.
No.
No.

128.00
169.00
169.00
289.00
289.00
374.00
374.00
530.00

C)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)

Section-I-(XI)-MDPE PIPES

114

Sr No
D)
i)
ii)
iii)
iv)
v)
vi)

Item Description
90 Deg. Elbow
90 Deg. Elbow
90 Deg. Elbow
90 Deg. Elbow
90 Deg. Elbow
90 Deg. Elbow
90 Deg. Elbow

20
25
32
40
50
63

Unit
No.
No.
No.
No.
No.
No.

E) 90 Deg. Elbow threaded male off take


i) 90 Deg. Elbow threaded male off
No.
take 20x1/2"
ii) 90 Deg. Elbow threaded male off
No.
take 25x3/4"
iii) 90 Deg. Elbow threaded male off
No.
take 32x1"
iv) 90 Deg. Elbow threaded male off
No.
take 40x11/4"
v) 90 Deg. Elbow threaded male off
No.
take 50x11/2"
vi) 90 Deg. Elbow threaded male off
No.
take 63x2"
F) 90 Deg. Elbow threaded female off
i) 90 Deg. Elbow threaded female off
take 20x1/2"
ii) 90 Deg. Elbow threaded female off
take 25x3/4"
iii) 90 Deg. Elbow threaded female off
take 32x1"
iv) 90 Deg. Elbow threaded female off
take 40x11/4"
v) 90 Deg. Elbow threaded female off
take 50x11/2"
vi) 90 Deg. Elbow threaded female off
take 63x2"
G)
i)
ii)
iii)
iv)
v)
vi)

Equal Tee
Equal Tee 20x20x20
Equal Tee 25x25x25
Equal Tee 32x32x32
Equal Tee 40x40x40
Equal Tee 50x50x50
Equal Tee 63x63x63

Section-I-(XI)-MDPE PIPES

take
No.

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

130.00
155.00
190.00
312.00
443.00
600.00

78.00
95.00
123.00
197.00
269.00
374.00

0.00
89.00

No.

110.00

No.

132.00

No.

257.00

No.

337.00

No.

443.00

No.
No.
No.
No.
No.
No.

155.00
204.00
264.00
436.00
590.00
839.00

115

Sr No
H)
i)
ii)
iii)
iv)
v)
vi)

Item Description
End Cap
End Cap 20
End Cap 25
End Cap 32
End Cap 40
End Cap 50
End Cap 63

Section-I-(XI)-MDPE PIPES

Unit
No.
No.
No.
No.
No.
No.

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

40.00
40.00
55.00
60.00
64.00
84.00

116

Section - I- (XII) - P.C.C. PIPES


Sr No

Item Description

Providing
and
Supplying
Prestressed
Concrete
Cylinder
Pipes as per IS 784-2001 suitable
for sliding ovrelap weld joint or
confined rubber ring joint with
necessary rubber ring of following
class and diameter including cost
of all taxes (central & local)
transporatation,
inspection
charges to site of work / store,
transit insurance, unloading and
stacking etc. complete.

Unit

Rate
(in
2012-2013

With E.D.

Rs.) Rate
in
2013-2014

Rs.

Without
E.D.

Note: 1) Class mentioned below


represents the working pressure of
pipe.
2) For external coating at site to
the joints, necessary polythene
wrapping for pouring cement
slurry shall also be given free with
each pipe.
i)Factory test pressurea)Site
test
pressure
+
0.1N/mm2,For working Pressure
upto 1 N/mm2
b)
Site
test
pressure
+
0.2N/mm2,For working Pressure
above 1 N/mm2
ii) Site test pressure-1.5 times
working pressure pertaining to the
section or
1.1 times static
pressure,which ever is
more (such pressure is to be
control within 25% of pumphead
incase of pumping main)
iii)
Working
pressure-The
maximum
sustained
internal
pressure excluding surge to which
each portion of pipeline may be
subjected when installed

Section-I-(XII)-P.C.C. PIPES

117

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

a) Factory Test Pressure - 4 kg/Sq.cm.


i) 350 mm

Rmt

4464.00

4054.00

ii) 400 mm

Rmt

4909.00

4457.00

iii) 450 mm

Rmt

5390.00

4896.00

iv) 500 mm

Rmt

5965.00

5417.00

v) 600 mm

Rmt

7213.00

6551.00

vi) 700 mm

Rmt

8334.00

7569.00

vii) 800 mm

Rmt

9382.00

8522.00

viii) 900 mm

Rmt

11499.00 10445.00

ix) 1000 mm

Rmt

13280.00 12062.00

x) 1100 mm

Rmt

14870.00 13505.00

xi) 1200 mm

Rmt

16349.00 14849.00

xii) 1300 mm

Rmt

18890.00 17156.00

xiii) 1400 mm

Rmt

20511.00 18628.00

xiv) 1500 mm

Rmt

21993.00 19975.00

xv) 1600 mm

Rmt

23476.00 21321.00

xvii) 1700mm

Rmt

24958.00 22668.00

xviii) 1800mm

Rmt

26440.00 24014.00

b Factory Test Pressure - 5.5 kg/Sq.cm.


i) 350 mm

Rmt

4464.00

4054.00

ii) 400 mm

Rmt

4930.00

4479.00

iii) 450 mm

Rmt

5417.00

4923.00

iv) 500 mm

Rmt

6000.00

5449.00

v) 600 mm

Rmt

7262.00

6596.00

vi) 700 mm

Rmt

8400.00

7629.00

vii) 800 mm

Rmt

9493.00

8621.00

viii) 900 mm
ix) 1000 mm

Rmt

11606.00 10542.00

Rmt

13412.00 12181.00

x) 1100 mm

Rmt

15040.00 13661.00

xi) 1200 mm

Rmt

17157.00 15584.00

xii) 1300 mm

Rmt

19169.00 17409.00

xiii) 1400 mm

Rmt

20866.00 18952.00

xiv) 1500 mm

Rmt

22350.00 20298.00

xv) 1600 mm

Rmt

23832.00 21646.00

xvii) 1700mm

Rmt

25315.00 22992.00

xviii) 1800mm

Rmt

26797.00 24339.00

Section-I-(XII)-P.C.C. PIPES

118

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

c) Factory Test Pressure - 7.0 kg/Sq.cm.


i) 350 mm

Rmt

4475.00

4063.00

ii) 400 mm

Rmt

4951.00

4496.00

iii) 450 mm

Rmt

5445.00

4945.00

iv) 500 mm

Rmt

6032.00

5478.00

v) 600 mm

Rmt

7312.00

6641.00

vi) 700 mm

Rmt

8479.00

7701.00

vii) 800 mm

Rmt

9629.00

8745.00

viii) 900 mm

Rmt

11756.00 10677.00

ix) 1000 mm

Rmt

13613.00 12366.00

x) 1100 mm

Rmt

15289.00 13886.00

xi) 1200 mm

Rmt

17455.00 15853.00

xii) 1300 mm

Rmt

19518.00 17728.00

xiii) 1400 mm

Rmt

21450.00 19483.00

xiv) 1500 mm

Rmt

22384.00 20329.00

xv) 1600 mm
xvii) 1700mm

Rmt

23867.00 21676.00

Rmt

25349.00 23023.00

Rmt

26831.00 24369.00

xviii) 1800mm

d) Factory Test Pressure - 8.5 kg/Sq.cm.


i) 350 mm

Rmt

4492.00

4080.00

ii) 400 mm

Rmt

4976.00

4520.00

iii) 450 mm

Rmt

5473.00

4970.00

iv) 500 mm

Rmt

6067.00

5510.00

v) 600 mm

Rmt

7376.00

6700.00

vi) 700 mm

Rmt

8578.00

7790.00

vii) 800 mm

Rmt

9765.00

8869.00

viii) 900 mm

Rmt

11923.00 10828.00

ix) 1000 mm

Rmt

13819.00 12550.00

x) 1100 mm

Rmt
Rmt

15537.00 14112.00
17903.00 16261.00

Rmt

20032.00 18194.00

xiii) 1400 mm

Rmt

21859.00 19853.00

xiv) 1500 mm

Rmt

22789.00 20699.00

xv) 1600 mm

Rmt

24273.00 22045.00

xvii) 1700mm

Rmt

25755.00 23392.00

xviii) 1800mm

Rmt

27237.00 24738.00

xi) 1200 mm
xii) 1300 mm

Section-I-(XII)-P.C.C. PIPES

119

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

e) Factory Test Pressure - 10 kg/Sq.cm.


i) 350 mm

Rmt

4508.00

4095.00

ii) 400 mm

Rmt

4995.00

4539.00

iii) 450 mm

Rmt

5506.00

5002.00

iv) 500 mm

Rmt

6117.00

5555.00

v) 600 mm

Rmt

7449.00

6764.00

8677.00
9913.00

7880.00
9003.00

vi) 700 mm
vii) 800 mm
viii) 900 mm

Rmt
Rmt
Rmt

12087.00 10978.00

ix) 1000 mm

Rmt

14024.00 12736.00

x) 1100 mm

Rmt

15926.00 14465.00

xi) 1200 mm

Rmt

18207.00 16536.00

xii) 1300 mm

Rmt

20390.00 18520.00

xiii) 1400 mm

Rmt

22276.00 20233.00

xiv) 1500 mm

Rmt

23209.00 21079.00

xv) 1600 mm

Rmt

24692.00 22427.00

xvii) 1700mm

Rmt

26175.00 23773.00

xviii) 1800mm

Rmt

27657.00 25120.00

f) Factory Test Pressure - 11.5 kg/Sq.cm.


i) 350 mm

Rmt

4527.00

4111.00

ii) 400 mm

Rmt

5027.00

4567.00

iii) 450 mm

Rmt

5550.00

5039.00

iv) 500 mm

Rmt

6169.00

5602.00

v) 600 mm

Rmt

7523.00

6833.00

vi) 700 mm

Rmt

8774.00

7968.00

vii) 800 mm

Rmt

10188.00

9254.00

viii) 900 mm

Rmt

12254.00 11131.00

ix) 1000 mm

Rmt

14228.00 12922.00

x) 1100 mm

Rmt

16181.00 14696.00

xi) 1200 mm

Rmt

18513.00 16814.00

xii) 1300 mm

Rmt

20751.00 18848.00

xiii) 1400 mm

Rmt

22699.00 20617.00

xiv) 1500 mm

Rmt

23631.00 21462.00

xv) 1600 mm

Rmt

25113.00 22809.00

xvii) 1700mm

Rmt

26596.00 24155.00

xviii) 1800mm

Rmt

28078.00 25502.00

Section-I-(XII)-P.C.C. PIPES

120

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

g) Factory Test Pressure - 13.0 kg/Sq.cm.


i) 350 mm

Rmt

4562.00

4143.00

ii) 400 mm

Rmt

5069.00

4604.00

iii) 450 mm

Rmt

5594.00

5081.00

iv) 500 mm

Rmt

6220.00

5649.00

v) 600 mm

Rmt

7595.00

6898.00

vi) 700 mm

Rmt

8874.00

8058.00

vii) 800 mm

Rmt

10356.00

9407.00

viii) 900 mm

Rmt

12421.00 11281.00

ix) 1000 mm
x) 1100 mm
xi) 1200 mm

Rmt
Rmt
Rmt

14526.00 13193.00
16438.00 14930.00
18823.00 17095.00

xii) 1300 mm

Rmt

21120.00 19181.00

xiii) 1400 mm

Rmt

23116.00 20995.00

xiv) 1500 mm

Rmt

24047.00 21841.00

xv) 1600 mm

Rmt

25530.00 23188.00

xvii) 1700mm

Rmt

27012.00 24534.00

xviii) 1800mm

Rmt

28494.00 25871.00

h) Factory Test Pressure - 14.5 kg/Sq.cm.


i) 350 mm

Rmt

4601.00

4179.00

ii) 400 mm

Rmt

5116.00

4646.00

iii) 450 mm

Rmt

5649.00

5131.00

iv) 500 mm

Rmt

6279.00

5703.00

v) 600 mm

Rmt

7672.00

6968.00

vi) 700 mm
vii) 800 mm
viii) 900 mm

Rmt
Rmt
Rmt

9456.00
8588.00
10525.00
9559.00
12706.00 11541.00

ix) 1000 mm

Rmt

14739.00 13386.00

x) 1100 mm

Rmt

16696.00 15163.00

xi) 1200 mm

Rmt

19130.00 17374.00

xii) 1300 mm

Rmt

21479.00 19507.00

xiii) 1400 mm

Rmt

24161.00 21944.00

xiv) 1500 mm

Rmt

25092.00 22789.00

xv) 1600 mm

Rmt

26575.00 24137.00

xvii) 1700mm

Rmt

28057.00 25483.00

xviii) 1800mm

Rmt

29539.00 26830.00

Section-I-(XII)-P.C.C. PIPES

121

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

i) Factory Test Pressure - 17.0 kg/Sq.cm.


i) 350 mm

Rmt

4636.00

4212.00

ii) 400 mm

Rmt

5162.00

4689.00

iii) 450 mm

Rmt

5707.00

5183.00

iv) 500 mm

Rmt

6347.00

5765.00

v) 600 mm

Rmt

7771.00

7057.00

vi) 700 mm

Rmt

9076.00

8244.00

vii) 800 mm

Rmt

10728.00

9745.00

viii) 900 mm

Rmt

12889.00 11705.00

ix) 1000 mm

Rmt

14955.00 13581.00

x) 1100 mm

Rmt

16964.00 15408.00

xi) 1200 mm

Rmt

19440.00 17656.00

xii) 1300 mm

Rmt

21844.00 19840.00

xiii) 1400 mm
xiv) 1500 mm
xv) 1600 mm

Rmt
Rmt
Rmt

24628.00 22367.00
25558.00 23214.00
27041.00 24560.00

xvii) 1700mm

Rmt

28524.00 25907.00

xviii) 1800mm

Rmt

30006.00 27253.00

j) Factory Test Pressure - 18.5 kg/Sq.cm.


i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
xiv)
xv)
xvii)
xviii)

350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
1300 mm
1400 mm
1500 mm
1600 mm
1700mm
1800mm

Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt

5765.00
6417.00
7870.00
9189.00
11082.00
13113.00
15211.00
17231.00
19752.00
22892.00
25266.00
25671.00
27153.00
28635.00
30119.00

4245.00
4731.00
5236.00
5828.00
7148.00
8347.00
10064.00
11910.00
13814.00
15649.00
17940.00
20793.00
22948.00
23314.00
24662.00
26009.00
27355.00

k) Factory Test Pressure - 20 kg/Sq.cm.


i) 350 mm
Rmt
ii) 400 mm
Rmt

4711.00
5257.00

4278.00
4775.00

Section-I-(XII)-P.C.C. PIPES

4674.00
5209.00

122

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
xiv)
xv)
xvii)
xviii)

450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
1300 mm
1400 mm
1500 mm
1600 mm
1700mm
1800mm

Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt

5822.00
6489.00
7968.00
9416.00
11349.00
13415.00
15564.00
17638.00
20785.00
23387.00
25824.00
26227.00
27710.00
29192.00
30674.00

5288.00
5894.00
7237.00
8552.00
10306.00
12182.00
14135.00
16019.00
18878.00
21241.00
23453.00
23821.00
25168.00
26514.00
27861.00

l)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
xiv)
xv)
xvii)
xviii)

Factory Test Pressure - 21.5 kg/Sq.cm.


350 mm
Rmt
400 mm
Rmt
450 mm
Rmt
500 mm
Rmt
600 mm
Rmt
700 mm
Rmt
800 mm
Rmt
900 mm
Rmt
1000 mm
Rmt
1100 mm
Rmt
1200 mm
Rmt
1300 mm
Rmt
1400 mm
Rmt
1500 mm
Rmt
1600 mm
Rmt
1700mm
Rmt
1800mm
Rmt

4750.00
5302.00
5880.00
6559.00
8084.00
9879.00
11528.00
13711.00
15918.00
18527.00
21302.00
23929.00
27241.00
27647.00
29129.00
30611.00
32094.00

4316.00
4817.00
5340.00
5957.00
7342.00
8973.00
10469.00
12453.00
14457.00
16827.00
19347.00
21733.00
24741.00
25109.00
26457.00
27803.00
29150.00

m)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)

Factory Test Pressure - 23 kg/Sq.cm.


350 mm
Rmt
400 mm
Rmt
450 mm
Rmt
500 mm
Rmt
600 mm
Rmt
700 mm
Rmt
Rmt
800 mm
900 mm
Rmt
1000 mm
Rmt

4787.00
5350.00
5939.00
6628.00
8254.00
10190.00
11880.00
14008.00
16270.00

4349.00
4859.00
5394.00
6020.00
7497.00
9256.00

Section-I-(XII)-P.C.C. PIPES

Rs.

10790.00
12723.00
14778.00

123

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

x)
xi)
xii)
xiii)
xiv)
xv)
xvii)
xviii)

1100 mm
1200 mm
1300 mm
1400 mm
1500 mm
1600 mm
1700mm
1800mm

Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt

19017.00
21825.00
24612.00
27747.00
28150.00
29632.00
31116.00
32598.00

17272.00
19823.00
22353.00
25200.00
25567.00
26915.00
28261.00
29607.00

n)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
xiv)
xv)
xvii)
xviii)

Factory Test Pressure - 24.5 kg/Sq.cm.


350 mm
Rmt
400 mm
Rmt
450 mm
Rmt
500 mm
Rmt
600 mm
Rmt
700 mm
Rmt
800 mm
Rmt
900 mm
Rmt
1000 mm
Rmt
1100 mm
Rmt
1200 mm
Rmt
1300 mm
Rmt
1400 mm
Rmt
1500 mm
Rmt
1600 mm
Rmt
1700mm
Rmt
1800mm
Rmt

4825.00
5398.00
5997.00
6699.00
8586.00
10331.00
12097.00
14244.00
17036.00
19508.00
22354.00
26559.00
28276.00
28677.00
30159.00
31642.00
33124.00

4382.00
4902.00
5447.00
6084.00
7798.00
9383.00
10986.00
12938.00
15472.00
17718.00
20305.00
24122.00
25682.00
26045.00
27392.00
28738.00
30085.00

Rs.

Note :
1)

For PCCP pipes lowering, laying, and pouring of cement mortar in


the field on joints (after laying and welding), rates as per PSC
pipes lowering, laying and jointing shall be adopted.

2)

For field welding rates applicable for similar welding in MS pipes


given in that section shall be adopted.

3)

Whenever manufacturer is separate and contractor for lowering,


laying, jointing and testing is separate the principal contractor
shall enter into an agreement with PCCP pipe manufacturer for
satisfactory manufacturing transporting, lower-ing, laying,
jointing and testing of pipes.

This foot notes shall appear in the tender conditions.

Section-I-(XII)-P.C.C. PIPES

124

Section - I- (XIII) - PIPE APPURTENANCES


Sr No

Item Description

Providing and supplying ISI mark


CI D/F reflux valves (non-return
valves ) of following dia including
all taxes (Central and Local),
railway freight, inspection charges
unloding from railway wagon,
loading into truck, transportation
upto departmental stroes/ site,
unloading, stacking etc. complete.
Reflux valves as per I.S.5312 Part I
(1984)

Unit

Rate
(in
2012-2013

With E.D.

Rs.) Rate
in
2013-2014

Rs.

Without
E.D.

a) Without by pass arrangement -PN -1


i) 50 mm

No

3308.0

ii) 65 mm

No

3873.0

iii) 80 mm

No

4078.0

iv) 100 mm

No

5694.0

v) 125 mm

No

8130.0

vi) 150 mm

No

9844.0

vii) 200 mm

No

17694.0

viii) 250 mm

No

30194.0

ix) 300 mm

No

41374.0

x) 350 mm

No

68478.0

xi) 400 mm

No

94273.0

xii) 450 mm

No

111059.0

xiii) 500 mm

No

181880.0

xiv) 600 mm

No

266900.0

xv) 700 mm

No

468495.0

i) 80 mm

No

ii) 100 mm

No

4709.0
6708.0

iii) 125 mm

No

9134.0

iv) 150 mm

No

10848.0

v) 200 mm

No

20224.0

vi) 250 mm

No

33057.0

vii) 300 mm

No

44373.0

b) With by pass arrangement - PN-1

Section-I-(XIII)-PIPES APPURTENANCES

125

Sr No

Item Description

Unit

Rate
(in
2012-2013

viii) 350 mm

No

72752.0

ix) 400 mm

No

97627.0

x) 450 mm
xi) 500 mm

No

114222.0

No

185408.0

xii) 600 mm

No

270477.0

xiii) 700 mm

No

709220.0

xiv) 750 mm

No

776307.0

xv) 800 mm

No

843396.0

xvi) 900 mm

No

920068.0

xvii) 1000 mm

No

1073413.0

i) 50 mm

No

3227.0

ii) 65 mm

No

3486.0

iii) 80 mm

No

5718.0

iv) 100 mm

No

7323.0

v) 125 mm

No

10203.0

vi) 150 mm

No

11419.0

vii) 200 mm

No

24284.0

viii) 250 mm

No

38986.0

ix) 300 mm

No

54474.0

x) 350 mm

No

93820.0

xi) 400 mm

No

108424.0

xii) 450 mm

No

127927.0

xiii) 500 mm

No

207834.0

xiv) 600 mm

No

305384.0

xv) 700 mm

No

369010.0

xvi) 750 mm
xvii) 800 mm

No

423608.0

No

481972.0

xviii) 900 mm

Rs.) Rate
in
2013-2014

Rs.

c) Without by pass
arrangement - PN -1.6

No

609995.0

xix) 1000 mm
xx) 1100 mm

No

753081.0

No

911227.0

xxi) 1200 mm

No

1084436.0

i) 50 mm

No

3312.0

ii) 65 mm

No

3727.0

d) With by pass arrangement - PN-1.6

Section-I-(XIII)-PIPES APPURTENANCES

126

Sr No

Item Description

Unit

Rate
(in
2012-2013

iii) 80 mm

No

5484.0

iv) 100 mm

No

7092.0

v) 125 mm

No

9911.0

vi) 150 mm

No
No

12030.0
24298.0

No

36715.0

ix) 300 mm

No

51028.0

x) 350 mm

No

85713.0

xi) 400 mm

No

112272.0

xii) 450 mm

No

131355.0

xiii) 500 mm

No

213216.0

xiv) 600 mm

No

311049.0

xv) 700 mm

No

375853.0

xvi) 750 mm

No

431463.0

xvii) 800 mm

No

490910.0

xviii) 900 mm

No

621308.0

No

767046.0

vii) 200 mm
viii) 250 mm

xix) 1000 mm
xx) 1100 mm
xxi) 1200 mm
2
Providing double flange sluice
valve
confirming
for
IS2906/14846 including worn gear
arrangements as per test pressure
stainless
steel
spindle,
caps
including all taxes transportation
etc. complete.

No
No

Rs.) Rate
in
2013-2014

Rs.

928125.0
1104545.0

a) Sluice valves - PN -1 without byepass arrangement


i) 50 mm

No

4391

ii) 65 mm

No

4985

iii) 80 mm

No

5116

iv) 100 mm

No

6812

v) 125 mm

No

8521

vi) 150 mm

No

10217

vii) 200 mm

No

19333

viii) 250 mm

No

29913

ix) 300 mm

No

37695

x) 350 mm

No

53477

xi) 400 mm

No

72101

Section-I-(XIII)-PIPES APPURTENANCES

127

Sr No

Item Description

Unit

Rate
(in
2012-2013

xii) 450 mm

No

88187

xiii) 500 mm

No

113477

xiv) 600 mm

No

167606

xv) 700 mm

No

300430

xvi) 750 mm

No

342603

xvii) 800 mm

No

427239

xviii) 900 mm

No

550860

xix) 1000 mm

No

814189

xx) 1100 mm

No

1078533

xxi) 1200 mm

No

1280269

i) 50 mm

No

4391

ii) 65 mm

No

4985

iii) 80 mm

No

5116

iv) 100 mm

No

6812

Rs.) Rate
in
2013-2014

Rs.

With byepass arrangement


b) Sluice valves - PN -1.0

v) 125 mm

No

8521

vi) 150 mm

No

12374

vii) 200 mm

No

21854

viii) 250 mm

No

33263

ix) 300 mm

No

40982

x) 350 mm

No

58087

xi) 400 mm

No

77248

xii) 450 mm

No

93275

xiii) 500 mm

No

120104

xiv) 600 mm

No

174198

xv) 700 mm
xvi) 750 mm
xvii) 800 mm

No
No
No

310617
351996
437316

xviii) 900 mm

No

561585

xix) 1000 mm

No

826615

xx) 1100 mm

No

1093680

xxi) 1200 mm

No

1293675

No

5803

c) Sluice valve - PN - 1.6


without byepass arrangement
i) 50 mm

Section-I-(XIII)-PIPES APPURTENANCES

128

Sr No

Item Description

Unit

Rate
(in
2012-2013

ii) 65 mm

No

6371

iii) 80 mm

No

7265

iv) 100 mm

No

9636

v) 125 mm

No

12024

vi) 150 mm

No

11893

vii) 200 mm
viii) 250 mm
ix) 300 mm

No
No
No

24101
37382
49699

x) 350 mm

No

72811

xi) 400 mm

No

99720

xii) 450 mm

No

123737

xiii) 500 mm

No

160146

xiv) 600 mm

No

243982

xv) 700 mm

No

524772

xvi) 750 mm

No

579078

xvii) 800 mm

No

672599

xviii) 900 mm

No

813137

xix) 1000 mm

No

1183325

xx) 1100 mm

No

1285723

xxi) 1200 mm

No

1721030

i) 50 mm

No

5803

ii) 65 mm

No

6371

iii) 80 mm

No

7265

iv) 100 mm

No

9636

v) 125 mm

No

12024

vi) 150 mm

No

14014

vii) 200 mm

No

26755

viii) 250 mm

No

40969

ix) 300 mm
x) 350 mm
xi) 400 mm

No
No
No

53299
77866
105441

xii) 450 mm

No

129463

xiii) 500 mm

No

167602

xiv) 600 mm

No

251533

xv) 700 mm

No

538550

Rs.) Rate
in
2013-2014

Rs.

d) Sluice valve - PN - 1.6


with byepass arrangement

Section-I-(XIII)-PIPES APPURTENANCES

129

Sr No

Rate
(in
2012-2013

Item Description

Unit

xvi)
xvii)
xviii)
xix)
xx)
xxi)
3

750 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
Providing, double flanged short
body
pattern
type
manually
operated Butterfly Valve having
body, disc and end cover in graded
cast iron to IS-210 Gr.CF 200
generally confirming in to IS13095-1991,
Synthetic
rubber
faced ring secured on disc by
retaining ring with stainless steel
screw stub shaft of stainless steel
riding in teflon bearing excluding
C.C. foundation /structural steel
support.

No
No
No
No
No
No

a)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
xiv)
xv)
xvi)
xvii)
xviii)
xix)
xx)
xxi)
xxii)
xxiii)

Butterfly valves - PN -1 with byepass arrangement


80 mm
No
5808
100 mm
No
7424
125 mm
No
8467
150 mm
No
10944
200 mm
No
14586
250 mm
No
18230
300 mm
No
28844
350 mm
No
58665
400 mm
No
63023
450 mm
No
72811
500 mm
No
79947
600 mm
No
98727
700 mm
No
159784
750 mm
No
198334
800 mm
No
218214
900 mm
No
301378
1000 mm
No
358723
1100 mm
No
581758
1200 mm
No
550499
1400 mm
No
839367
1500 mm
No
1042954

Section-I-(XIII)-PIPES APPURTENANCES

Rs.) Rate
in
2013-2014

Rs.

589319
682470
823468
1195568
1297614
1734270

130

Sr No

Item Description

b) Butterfly valves - PN -1.6


Without byepass arrangement
iii) 80 mm
iv) 100 mm
v) 125 mm
vi) 150 mm
vii) 200 mm
viii) 250 mm
ix) 300 mm
x) 350 mm
xi) 400 mm
xii) 450 mm
xiii) 500 mm
xiv) 600 mm
xv) 700 mm
xvi) 750 mm
xvii) 800 mm
xviii) 900 mm
xix) 1000 mm
xx) 1100 mm
xxi) 1200 mm
xxii) 1400 mm
xxiii) 1500 mm
4
Lowering, laying and jointing in
position following C.I.D/F Reflex
valves, Butterfly valves and Sluice
valves including cost of all labour
jointing material, including nut
bolts
and
giving
satisfactory
hydraulic testing etc. complete.
(Rate for all class of valves.)

i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)

50 mm
65 mm
80 mm
100 mm
125 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm

Section-I-(XIII)-PIPES APPURTENANCES

Unit

Rate
(in
2012-2013

No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

6444
8537
9317
12585
16776
20965
33171
67464
72476
83733
91939
113537
183751
228084
249867
346586
448404
727199
688125
1049209
1294878

No
No
No
No
No
No
No
No
No
No
No
No

689.00
1036.00
1440.00
1881.00
2342.00
2957.00
3076.00
4008.00
4158.00
5124.00
6182.00
7354.00

Rs.) Rate
in
2013-2014

Rs.

131

Sr No
xiii)
xiv)
xv)
xvi)
xvii)
xviii)
xix)
xx)
xxi)
5

Item Description

Unit

Rate
(in
2012-2013

500 mm
600 mm
700 mm
750 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm to 1500 mm
Providing and supplying Air Valves
as per IS -14845 - 2000 and MJPs
standard specifications of approved
make and quality of following
diameters including all taxes
(Central and local), railway freight,
inspection charges, unloding from
railway wagons, loading into truck,
transportation upto departmental
stores / site, unloding and
stacking etc. complete.

No
No
No
No
No
No
No
No
No

7616.00
8083.00
8714.00
9598.00
11438.00
12136.00
14307.00
16521.00
18153.00

a)
i)
ii)
iii)
iv)
v)
vi)

Air Valve Single Ball Flanged / Screwed Type - PN -1


12/15 mm
No
615.00
20 mm
No
741.00
25 mm
No
1022.00
32 mm
No
1116.00
40 mm
No
1228.00
50 mm
No
1349.00

b)
i)
ii)
iii)
iv)
v)
vi)

Air Valve Single Ball Flanged /Screwed Type -PN -1.6


12/15 mm
No
719.00
20 mm
No
1022.00
25 mm
No
1228.00
32 mm
No
1324.00
40 mm
No
1418.00
50 mm
No
1851.00
Providing and supplying Air Valves
as per IS-10845 and MJPs
standard
specifications
double
orifice type combined with screw
down isolating valve, small orifice
elastic ball

Section-I-(XIII)-PIPES APPURTENANCES

Rs.) Rate
in
2013-2014

Rs.

132

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

resting on a gun metal orifice


nipple, large orifice vulcanite ball
seating on moulded seat ring, inlet
face and drilled, including all taxes
(Central and local), insurance,
third party inspection charges,
loading, unloding, transporta-toin
upto departmental stores / site,
etc. complete.
a) Double Ball Flanged Type 1 With small Orifice
i) 50 mm
ii) 65 mm
iii) 80 mm

PN -

b) Double Ball Flanged Type - PN 1.6 With small Orifice


i) 50 mm
ii) 65 mm
iii) 80 mm
7
Providing and supplying Air Valves
as per IS-14845-2000 and MJPs
standard
specifications
double
orifice type combined with isolating
sluice valve, mounted in horzontal
position and operated by wheel
gearing, small orifice elastic ball
resting on a gun metal orifice
nipple, large orifice vulcanite ball
seating on moulded seat ring, inlet
face and drilled, including all taxes
(Central and local), insurance,
third party inspection charges,
loading, unloading, transporta-tion
upto departmental storer / site,
etc. complete.

a) Double Ball Flanged Type - PN 1.0


i) 100 mm
ii) 150 mm
iii) 200 mm

Section-I-(XIII)-PIPES APPURTENANCES

No
No
No

5673
6619
7561

No
No
No

7515
8509
10530

No
No
No

9561
17425
29304

133

Sr No

Item Description

b) Double Ball Flanged Type - PN 1.6


i) 100 mm
ii) 150 mm
iii) 200 mm
8
Providing and supplying Kinetic
Double Orifice type Air Valves as
per MJPs standard specifications
combined
with
screw
down
isolating valve, small orifice elastic
ball resting on a gun metal orifice
nipple, large orifice vulcanite ball
seating on moulded seat ring, inlet
face and drilled, including all taxes
(Central and local), insurance,
third party inspection charges,
loading, unloading, transportation
upto departmental stores / site,
etc. complete.

a) Kinetic Air Valve Flanged Type P1


i) 40 mm
ii) 50 mm
iii) 80 mm
b) Kinetic Air Valve Flanged Type P1.6
i) 40 mm
ii) 50 mm
iii) 80 mm
9
Providing and supplying Kinetic
Double Orifice type Air Valves as
per MJPs standard specifications
having small orifice elastic ball
resting on a gun metal orifice
nipple, large orifice vulcanite ball
seating on moulded seat ring,with
built-in Kinetic features, isolatintg
sluice valve mounted in

Section-I-(XIII)-PIPES APPURTENANCES

Unit

Rate
(in
2012-2013

No
No
No

14617
20593
34633

No
No
No

9516
11729
15304

No
No
No

11280
13903
18176

Rs.) Rate
in
2013-2014

Rs.

134

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

horizontal position and operated


by wheel gearing, inlet face and
drilled, including all taxes (Central
and local), insurance, third party
inspection
charges,
loading,
unloding,
transportation
upto
departmental stores / site, etc.
complete.
a) Kinetic Air Valve Flanged Type P1
i) 100 mm
ii) 150 mm
iii) 200 mm
b) Kinetic Air Valve Flanged Type P1.6
i) 100 mm
ii) 150 mm
iii) 200 mm
10 Lowering, laying and fixing in
proper alignment and position all
types of C.I. air valves as directed
by Engineer-in-charge including
cost of conveyance from stores to
site of work, cost of all material
and giving satisfactory hydraulic
testing, etc. complete. (for all class
of valves).

a)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)

No
No
No

20610
38804
56659

No
No
No

24427
45993
67161

Air Valve Single Ball (PN-1 and PN - 1.6)


15 mm
No
20 mm
No
25 mm
No
32 mm
No
40 mm
No
50 mm
No
65 mm
No
80 mm
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No

Section-I-(XIII)-PIPES APPURTENANCES

110
140
180
199
213
231
243
255
285
345
383
421

135

Sr No
b)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
c)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
11

Item Description

Unit

Air Valve Double Ball (PN-1 and PN - 1.6)


15 mm
No
20 mm
No
25 mm
No
32 mm
No
40 mm
No
50 mm
No
65 mm
No
80 mm
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
Kinetic Air Valve (PN-1 and PN - 1.6)
40 mm
No
50 mm
No
65 mm
No
80 mm
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
Providing erecting Cast Steel/
Spheroidal Graphite (S.G) Iron D/F
Sluice Valves / Butterfly Valves
with
jointing
to
pipe
work
(including
all
hardware
and
packing) water works quality,
having non-rising spindle with
hand wheel and without bypass
arrangement, spindle of stainless
steel as per requirement, excluding
C. C. foundation / structural steel
support.

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

120
149
180
205
238
275
317
379
400
441
603
664

273
315
345
379
417
455
652
711

For Rating Class 150 (Working


Pressure 20 kg/cm2 and Test
Pressure 30 kg/cm2)
a)
i)
ii)
iii)

Sluice Valves.
80 mm
100 mm
150 mm

Section-I-(XIII)-PIPES APPURTENANCES

No
No
No

14656
19540
29311

136

Sr No
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
b)
i)
ii)
iii)
iv)
v)
vi)
12

Item Description
200
250
300
350
400
450
500
600

mm
mm
mm
mm
mm
mm
mm
mm

Butterfly Valves.
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
Providing erecting Cast Steel D/F
Sluice Valves / Butterfly Valves
with
jointing
to
pipe
work
(including
all
hardware
and
packing) water works quality
having non-rising spindle with
hand wheel and without bypass
arrangement, spindle of stainless
steel as per requirement, excluding
C. C. foundation / structural steel
support.

Unit

Rate
(in
2012-2013

No
No
No
No
No
No
No
No

45713
65786
84173
112230
187281
255524
300616
343203

No
No
No
No
No
No

105843
112835
126737
135014
156289
175884

No
No
No
No
No
No
No
No
No
No
No

15776
24908
37976
59558
64292
108382
182788
266657
321057
500178
756005

Rs.) Rate
in
2013-2014

Rs.

For Rating Class 300 (Working


Pressure 52 kg/cm2 and Test
Pressure 78 kg/cm2)
a)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)

Sluice Valves
80 mm
100 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm

Section-I-(XIII)-PIPES APPURTENANCES

137

Sr No
b)
i)
ii)
iii)
iv)
v)
vi)
13

Item Description
Butterfly Valves
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
Providing erecting Cast Steel
/Spheroidal Graphite (S.G.) Iron
D/F Reflux Valves Single Door
with
jointing
to
pipe
work
(including
all
hardware
and
packing) water works quality with
jointing to pipe without bypass
arrangement,
with
gunmental
seats excluding C. C. foundation /
structural steel support.

Unit

Rate
(in
2012-2013

No
No
No
No
No
No

129129
137659
154619
164717
190673
214579

No
No
No
No
No
No

10227
15661
26530
50442
87831
115713

No
No

15237
21477

Rs.) Rate
in
2013-2014

Rs.

For Rating Class 150 (Working


Pressure 20 kg/cm2 and Test
Pressure 30 kg/cm2)
i)
ii)
iii)
iv)
v)
vi)
14

80 mm
100 mm
150 mm
200 mm
250 mm
300 mm
Providing erecting Cast Steel D/F
Reflux Valves Single door with
jointing to pipe work (including all
hardware and packing) water
works quality with jointing to pipe
without bypass arrangement, with
gunmetal seat excluding C. C.
foundation / structural steel
support.
For Rating Class 300 (Working
Pressure 52 kg/cm2 and Test
Pressure 78 kg/cm2)

i) 80 mm
ii) 100 mm

Section-I-(XIII)-PIPES APPURTENANCES

138

Sr No

Rate
(in
2012-2013

Item Description

Unit

iii)
iv)
v)
vi)
15

150 mm
200 mm
250 mm
300 mm
Providing erecting Kinetic Double
Orifice Cast Steel Air Valves with
an isolating Sluice Valve mounted
in horizontal position operated by
wheel gear suitable for working
pressure of Class-150 rating (20
kg/cm2)

No
No
No
No

35717
63275
114555
139478

i)
ii)
iii)
iv)
16

80 mm
100 mm
150 mm
200 mm
Providing erecting Kinetic Double
Orifice Cast Steel Air Valves with
an isolating Sluice Valve mounted
in horizontal position operated by
wheel gear suitable for working
pressure of Class 300 rating (52
kg/cm2)

No
No
No
No

29546
41185
78920
102014

i)
ii)
iii)
iv)
17

80 mm
100 mm
150 mm
200 mm
Providing and fixing in position air
valve shaft including providing and
fixing GI Medium Class or 6 mm
thick M.S. pipe shaft 2.70 M long
over branch flange of air valve tee,
providing PCC block of M-150
concrete, 150 mm thick around
the air valve tee including encasing
of

No
No
No
No

35996
41148
96157
116071

Section-I-(XIII)-PIPES APPURTENANCES

Rs.) Rate
in
2013-2014

Rs.

139

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

vertical shaft in PCC M-150 as


shown in type design together with
providing and making flanged
joints wherever required and fixing
of air valve tee, etc. complete as
per type design and as directed by
Engineer -in- charge for following
diameters of pipe lines (type design
attached.)
a)
i)
ii)
iii)
iv)
b)
i)
ii)
iii)
iv)
18

a)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
b)
i)
ii)

Foundation on Murum and Harder Strata.


upto 150mm
No
200 to 400 mm
No
450 to 900mm
No
1000 to 1200 mm
No
Foundation in B. C. Soil or Any Other Soil.
upto 150 mm
No
200 to 400 mm
No
450 to 900 mm
No
1000 to 1200 mm
No
Providing and supplying C.I. D/F
angle type spring loaded pressure
relief valves of approved make and
quality including all taxes (Central
and local),
octroi,
inspection
charges,
transportatoin
to
departmental stores, etc. complete.

Type PN-1
25 mm
40 mm
50 mm
80 mm
100 mm
125 mm
150 mm
200 mm
250 mm
300 mm
Type PN-1.6
25 mm
40 mm

Section-I-(XIII)-PIPES APPURTENANCES

4636
5431
11045
13870

5492
6625
12616
15821

No
No
No
No
No
No
No
No
No
No

4234
5517
7145
10837
15170
20684
23635
52194
73367
96757

No
No

5294
6893

140

Sr No

Rate
(in
2012-2013

Item Description

Unit

iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
19

50 mm
80 mm
100 mm
125 mm
150 mm
200 mm
250 mm
300 mm
Lowering, laying and fixing in
proper alignment and position all
types of C.I. D/F angle type spring
loaded pressure
relief
valves
including cost of all material,
labour, cost of conveyance from
stores to site of work and giving
satisfactory hydraulic testing, etc.
complete. (For all class of valves.)

No
No
No
No
No
No
No
No

8914
13543
18958
25849
29544
65238
91707
121226

i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)

25 mm
40 mm
50 mm
80 mm
100 mm
125 mm
150 mm
200 mm
250 mm
300 mm
Note : Only 85% rate is payable till
satisfactory hydraulic testing is
given.

No
No
No
No
No
No
No
No
No
No

206
273
316
378
415
462
652
712
831
949

20

a)
i)
ii)
iii)

Rs.) Rate
in
2013-2014

Rs.

Cutting and champhering of pipes


of following diameters including
cost of all materials and labour
involved, etc. complete as directed
by Engineer-in-charge (for all class
of pipes).
C.I.Pipes
80 mm
100 mm
150 mm

Section-I-(XIII)-PIPES APPURTENANCES

1 cut
1 cut
1 cut

33
39
59

141

Sr No
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
xiv)
xv)
xvi)
b)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
21

a)
i)
ii)
III)
iv)
v)
vi)
vii)

Item Description
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
750 mm
800 mm
900 mm
1000 mm
A.C.Pipes
80 mm
100 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
Providing and supplying I.S.I.
mark rubber gasket suitable for
C.I. or D. I. pipe of all class for
tyton joints including all taxes
(Central and local) inspection
charges,
transportation
to
departmental stores / site, etc.
complete.

Unit
1
1
1
1
1
1
1
1
1
1
1
1
1

cut
cut
cut
cut
cut
cut
cut
cut
cut
cut
cut
cut
cut

76
109
129
131
167
194
232
283
333
398
435
479
521

1
1
1
1
1
1
1
1
1
1
1

cut
cut
cut
cut
cut
cut
cut
cut
cut
cut
cut

11
13
21
22
32
44
54
61
66
75
86

S.B.R. Gaskets for C. I. / D.I. Pipes


80 mm
No
100 mm
No
150 mm
No
200 mm
No
250 mm
No
300 mm
No
350 mm
No

Section-I-(XIII)-PIPES APPURTENANCES

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

39
43
60
102
133
187
214

142

Sr No
viii)
ix)
x)
xi)
xii)
xiii)
xiv)
xv)
xvi)
b)
i)
ii)
iii)
iv)

Item Description
400 mm
450 mm
500 mm
600 mm
700 mm
750 mm
800 mm
900 mm
1000 mm

Unit

Rate
(in
2012-2013

No
No
No
No
No
No
No
No
No

Sealing O Rings of SBR (for CID Joints)


80 mm
set
100 mm
set
125 mm
set
150 mm
set

Rs.) Rate
in
2013-2014

298
325
444
615
1095
1138
1179
1705
2190

45
53
64
75

c)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)

Flat Flanged Gaskets moulded out of SBR (ForFlanged Joints)


80 mm
set
82
100 mm
No
109
125 mm
No
129
150 mm
No
177
200 mm
No
219
250 mm
No
307
300 mm
No
326
350 mm
No
393
400 mm
No
487
450 mm
No
532
500 mm
No
623
600 mm
No
838

i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)

Providing Rubber Gasket EPDM Gaskets for C. I. / D.I. Pipes


80 mm.
No
100 mm.
No
150 mm.
No
200 mm.
No
250 mm.
No
300 mm.
No
350 mm.
No
400 mm.
No
450 mm.
No
500 mm.
No
600 mm.
No

Section-I-(XIII)-PIPES APPURTENANCES

Rs.

46
48
70
117
160
212
247
338
378
500
703

143

Sr No
xii)
xiii)
xiv)
xv)
xvi)
22

i)
ii)
iii)
iv)
v)

Rate
(in
2012-2013

Item Description

Unit

700 mm.
750 mm.
800 mm.
900 mm.
1000 mm
Providing and fixing in position
and jointing high performance C. I.
Air valves for water combination
type ( Kinetic air valve along with
automatic air valves ) double ball,
double orifice with stainless steel
ball, tamper proof air vents rolling
seal mechanism for air release and
anti vacuum application designed
for 16 Kg. Per sq. cm. working
pressure and tested for 20 for kg
per sq. cm. pressure. ( Rate to
include cost of gaskets, bolt, nut
and any other material required for
jointing and its transportation etc.
including all taxes and duties
except octroi )

No
No
No
No
No

1320
1383
1688
2178
2530

C. I. ARV FLFF PN 1.6 50mm Dia.

No
No
No
No
No

9513
13201
21226
35528
43035

2. C. I. ARV FLFF PN 1.6 80mm Dia.


3. C. I. ARV FLFF PN 1.6 100mm Dia.
4. C. I. ARV FLFF PN 1.6 150mm Dia.
5. C. I. ARV FLFF PN 1.6 200mm Dia.

Section-I-(XIII)-PIPES APPURTENANCES

Rs.) Rate
in
2013-2014

Rs.

144

Section - I- (XIV) - MECHANICAL JOINTS/FITTINGS


Sr No

Item Description

Supply of C. I. Mechanical
Compression Flanged / Socket
Tailpiece(Popularly known as I TM
Flanged
/
Socket
Tailpiece)
suitable
for
making
flanged
connection with the plain barrel of
C. I. Spun Pipes ( as per - IS 1536 /2001) and D. I. Pipes ( as
per IS: 8329 / 2000).The Tailpiec
to be supplied complete with
sealing
rubber
gasket
of
S.B.R,.C.I.. Follower Glands and
M.S. Nut Bolts.The whole assembly
should
be
mechanically
and
hydraulically
tested
to
the
provisions as laid down in IS:1538
/1993. The rates are inclusive of
cost
of
material,
forwarding
charges,
sales
tax,
loading,
transportation and unloading at
departemental store etc. complete
as
directed.
Consignee
but
exclusive of octroi.

Unit

Rate
(in
2012-2013

1 80 mm

No.

1302.00

2 100 mm

No.

1419.00

3 125 mm

No.

1786.00

4 150 mm

No.

2555.00

5 200 mm

No.

3310.00

6 250 mm

No.

4993.00

7 300 mm

No.

5589.00

8 350 mm

No.

7372.00

9 400 mm

No.

9623.00

10 450 mm

No.

11295.00

11 500 mm

No.

14193.00

12 600 mm

No.

18200.00

13 700 mm

No.

24823.00

14 750 mm

No.

30164.00

Section-I-(XIV)-MECHANICAL JOINTS / FITTINGS

Rs.) Rate
in
2013-2014

Rs.

145

Sr No

Item Description

Supply of C. I. Mechanical
Compression
Collar
Coupling
(Popularly known as Jiffy TM
Collar Coupling ) suitable for C. I.
Spun Pipes ( as per - IS - 1536
/2001) and D. I. Pipes ( as per IS:
8329 / 2000). complete with
sealing rubber gasket of SBR,.C.I..
Follower Glands and M.S. Nut
Bolts.The whole assembly should
be mechanically and hydraulically
tested to the provisions as laid
down in IS:1538 /1993. The rates
are inclusive of cost of material,
forwarding charges, sales tax,
loading,
transportation
and
unloading at departemental store
etc.
complete
as
directed.
Consignee but exclusive of octroi.

Unit

Rate
(in
2012-2013

1 80 mm No

No

784.00

2 100 mm

No.

841.00

3 125 mm

1121.00

4 150 mm

No.
No.

5 200 mm

No.

1512.00
1726.00

6 250 mm

No.

2767.00

7 300 mm

No.

3541.00

8 350 mm

No.

4364.00

9 400 mm

No.

6792.00

10 450 mm

No.

7626.00

11 500 mm

No.

10422.00

12 600 mm

No.

13000.00

13 700 mm
14 750 mm

No.

16984.00

No.

19928.00

Rs.) Rate
in
2013-2014

Rs.

Supply of C. I. Mechanical Joint


Double Socket 90 deg. (1/4) Bends
as dimensionally described in
Table-14 of
IS-

Section-I-(XIV)-MECHANICAL JOINTS / FITTINGS

146

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

13382/1992 complete with sealing


rubber
gasket
of
SBR
(dimensionally described in IS12820/1989)
with
cast
iron
follower gland and mild steel nut
bolts coated or otherwise protected
from rusting and suitable for C. I.
pipes.

1 80 mm

No.

2231.00

2 100 mm

No.

2587.00

3 125 mm

No.

3022.00

4 150 mm

No.

4751.00

5 200 mm
6 250 mm

No.

6305.00

No.

9385.00

7 300 mm

No.

11422.00

8 350 mm

No.

18911.00

9 400 mm

No.

25775.00

10 450 mm

No.

32899.00

11 500 mm

No.

40940.00

12 600 mm

No.

57862.00

13 700 mm

No.

91333.00

14 750 mm
Supply of CI Mechanical joint
Double Socket 45 deg. (1/8) Bends
as dimensionally described in
Table -15 of IS - 13382/1992
complete with sealing rubber
gasket
of
S.B.R.(dimensionally
described in IS-12820/1989) with
cast iron follower gland mild steel
nut bolts coated or otherwise
protected
from
rusting
and
suitable for C. I. pipes.

No.

103733.00

1 80 mm

No.

2071.00

2 100 mm

No.

2306.00

3 125 mm

No.

2914.00

4 150 mm

No.

4002.00

5 200 mm

No.

5271.00

6 250 mm

No.

7733.00

Section-I-(XIV)-MECHANICAL JOINTS / FITTINGS

147

Sr No

Item Description

Rate
(in
2012-2013

7 300 mm

No.

9330.00

8 350 mm
9 400 mm

No.

15564.00

No.

19205.00

10 450 mm

No.

26788.00

11 500 mm
12 600 mm

No.

29845.00

No.

41324.00

13 700 mm

No.

58888.00

No.

77879.00

1 80 mm

No.

1988.00

2 100 mm

No.

2213.00

3 125 mm

No.

2657.00

4 150 mm

No.

3757.00

5 200 mm

No.

4711.00

6 250 mm

No.
No.

7124.00
8599.00

No.

13576.00

9 400 mm

No.

17404.00

10 450 mm

No.

22017.00

11 500 mm

No.

25658.00

12 600 mm

No.

33998.00

13 700 mm

No.

51142.00

14 750 mm

No.

56318.00

14 750 mm
5
Supply of C. I. Mechanical Joint
Double Socket 22.50 deg. (1/6)
Bends as dimensionally described
in Table -16 of IS-13382/1992
complete with sealing rubber
gasket of SBR (dimensionally
described in IS-12820/1989) with
cast iron follower gland and mild
steel nut bolts coated or otherwise
protected
from
rusting
and
suitable for C. I. pipes.

7 300 mm
8 350 mm

Unit

Rs.) Rate
in
2013-2014

Rs.

Supply of CI Mechanical joint


Double Socket 11.25 deg. (1/32)
Bends as dimensionally described
in Table -17 of IS - 13382/1992
complete with

Section-I-(XIV)-MECHANICAL JOINTS / FITTINGS

148

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

sealing rubber gasket of S.B.R.(


dimensionally described in IS12820/1989)
with
cast
iron
follower gland and mild steel nut
bolts coated or otherwise protected
from rusting and suitable for C. I.
pipes.
1 80 mm

No.

1969.00

2 100 mm

No.

2162.00

3 125 mm

No.

2348.00

4 150 mm

No.

3672.00

5 200 mm
6 250 mm
7 300 mm

No.
No.
No.

4522.00
6685.00
7407.00

8 350 mm

No.

11689.00

9 400 mm

No.

15834.00

10 450 mm

No.

19985.00

11 500 mm

No.

21784.00

12 600 mm

No.

29863.00

13 700 mm

No.

40258.00

14 750 mm

No.

44912.00

1 80x80x80 mm dia

No.

3016.00

2 100x100x80 mm

No.

3243.00

3 100x100x100 mm

No.

3596.00

4 150x150x80 mm

No.

5037.00

5 150x150x100 mm

No.

5108.00

6 150x150x150 mm

No.

6335.00

7 200x200x80 mm

No.

6075.00

7 Supply of CI Mechanical joint All


Socket
Tees
as
dimenisonlly
described in Table -18 of IS 13382/1992 complete with sealing
rubber
gasket
of
S.B.R.
(dimensionally described in IS12820/1989)
with
cast
iron
follower gland and mild steel nut
bolts coated or otherwise protected
from rusting and suitable for C. I.
pipes.

Section-I-(XIV)-MECHANICAL JOINTS / FITTINGS

149

Sr No

Item Description

Unit

Rate
(in
2012-2013

8 200x200x100 mm

No.

6142.00

9 200x200x150 mm

No.

7316.00

10 200x200x200 mm

No.

8050.00

11 250x250x80 mm

No.

8555.00

12 250x250x100 mm

No.

8744.00

13 250x250x150 mm

No.

10435.00

14 250x250x200 mm

No.

11025.00

15 250x250x250 mm

No.

12366.00

16 300x300x80 mm

No.

9381.00

17 300x300x100 mm

No.

9591.00

18 300x300x150 mm

No.

12301.00

19 300x300x200 mm

No.

12708.00

20 300x300x250 mm

No.

13455.00

21 300x300x300 mm

No.

14849.00

1 80x80x80 mm dia

No.

2954.00

2 100x100x80 mm

No.

3241.00

3 100x100x100 mm

No.

3429.00

4 150x150x80 mm

No.

4892.00

5 150x150x100 mm

No.

5013.00

6 150x150x150 mm

No.

5970.00

7 200x200x80 mm

No.

5741.00

8 200x200x100 mm

No.

6124.00

9 200x200x150 mm
10 200x200x200 mm
11 250x250x80 mm

No.
No.
No.

7053.00
8087.00
8108.00

12 250x250x100 mm

No.

8532.00

Rs.) Rate
in
2013-2014

Rs.

8 Supply of CI Mechanical joint


Double
Socket
with
branch
Flanged
Tees
dimenisonlly
described in Table -19 of IS 13382/1992 complete with sealing
rubber
gasket
of
S.B.R.(
dimensionally described in IS12820/1989)
with
cast
iron
follower gland and mild steel nut
bolts
galvanised
coated
or
otherwise protected from rusting
and suitable for C. I. pipes.

Section-I-(XIV)-MECHANICAL JOINTS / FITTINGS

150

Unit

Rate
(in
2012-2013

13 250x250x150 mm

No.

10125.00

14 250x250x200 mm

No.

10595.00

15 250x250x250 mm

No.

10970.00

16 300x300x80 mm

No.

9519.00

17 300x300x100 mm

No.

9705.00

18 300x300x150 mm

No.

11205.00

19 300x300x200 mm

No.

11300.00

20 300x300x250 mm

No.

12470.00

21 300x300x300 mm

No.

15283.00

22 350x350x80 mm

No.

13314.00

23 350x350x100 mm

No.

14159.00

24 350x350x150 mm

No.

15234.00

25 350x350x200 mm
26 350x350x300 mm
27 350x350x350 mm

No.
No.
No.

17752.00
18187.00
20812.00

28 400x400x80 mm

No.

17404.00

29 400x400x100 mm

No.

18449.00

30 400x400x150 mm

No.

20541.00

31 400x400x200 mm

No.

20955.00

32 400x400x300 mm

No.

25253.00

33 400x400x400 mm

No.

28915.00

34 450x450x80 mm

No.

20758.00

35 450x450x100 mm

No.

21805.00

36 450x450x200 mm

No.

25573.00

37 450x450x300 mm

No.

32269.00

38 450x450x350 mm

No.

34049.00

39 450x450x450 mm

No.

36984.00

40 500x500x100 mm

No.

23355.00

41 500x500x250 mm

No.

31936.00

42 500x500x300 mm

No.

33086.00

43 500x500x400 mm

No.

39892.00

44 500x500x500 mm

No.

48162.00

45 600x600x100 mm

No.

33376.00

46 600x600x300 mm

No.

45831.00

47 600x600x400 mm

No.

52215.00

48 600x600x500 mm

No.

56505.00

49 600x600x600 mm

No.

69377.00

50 700x700x100 mm

No.

44235.00

Sr No

Item Description

Section-I-(XIV)-MECHANICAL JOINTS / FITTINGS

Rs.) Rate
in
2013-2014

Rs.

151

Unit

Rate
(in
2012-2013

51 700x700x200 mm
52 700x700x350 mm
53 700x700x400 mm

No.
No.
No.

51246.00
61922.00
66526.00

54 750x750x150 mm

No.

52759.00

55 750x750x250 mm

No.

60506.00

56 750x750x750 mm

No.

116081.00

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

2092.00
3292.00
3485.00
4011.00
4387.00
5994.00
5848.00
7372.00
7384.00
7510.00
10612.00
10646.00
10520.00
16029.00
14200.00
14295.00
17751.00
17740.00
17519.00
21339.00
21014.00
20483.00
30985.00
30156.00
28313.00
42533.00
38601.00

Sr No

Item Description

Rs.) Rate
in
2013-2014

Rs.

9 Supply of CI Mechaincal joint


Double
Socket
Reducers
as
described in Table -21 of IS 13382/1992 complete with sealing
rubber
gasket
of
SBR(
dimensionally described in IS12820/1989)
with
cast
iron
follower gland and mild steel nut
bolts coated or otherwise protected
from rusting and suitable for C. I.
pipes.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

100x80 mm dia
150x80 mm dia
150x100 mm dia
200x100 mm dia
200x150 mm dia
250x150 mm dia
250x200 mm dia
300x150 mm dia
300x200 mm dia
300x250 mm dia
350x200 mm dia
350x250 mm dia
350x300 mm dia
400x250 mm dia
400x300 mm dia
400x350 mm dia
450x400 mm dia
450x350 mm dia
450x400 mm dia
500x350 mm dia
500x400 mm dia
500x450 mm dia
600x400 mm dia
600x450 mm dia
600x500 mm dia
700x500 mm dia
700x600 mm dia

Section-I-(XIV)-MECHANICAL JOINTS / FITTINGS

152

Sr No
28
29
30
31

Item Description
750x600 mm dia
750x700 mm dia
800x450mm dia
800x700mm dia

Unit

Rate
(in
2012-2013

No.
No.
No.
No.

45846.00
42377.00
63072.00
54144.00

Section-I-(XIV)-MECHANICAL JOINTS / FITTINGS

Rs.) Rate
in
2013-2014

Rs.

153

Section - I- (XV) - M.S.PIPES


Sr No

Item Description

Manufacturing,
providing
and
supplying spirally welded / ERW/
SAW / fabricated M. S. pipes
including procurements of plates,
gas cutting to requried size rolling,
tack
welding
assembling
in
suitable lengths to form pipes,
welding on automatic welding
machine and forming V edge on
both ends of pipes including all
taxes (Central and local), railway
freight, insurance unloading from
railway wagon, loading into truck,
transport
to
stores
/
site,
unloading, stacking, etc, complete
as per IS - 3589 and IS-5504 as
applicable as per specifications (No
negative tolerance in thickness is
permissible).

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

Without
E.D.
a) Dia. of pipe 219.10 mm (O.D)
Thickness of pipe :
i) 4.80 mm

Rmt

1527.00

ii) 5.60 mm

Rmt

1775.00

iii) 6.40 mm

Rmt

2021.00

iv) 7.00 mm

Rmt

2204.00

v) 7.90 mm

Rmt

2477.00

vi) 8.20 mm

Rmt

2567.00

vii) 8.70 mm

Rmt

2717.00

viii) 9.50 mm

Rmt

2955.00

i) 4.80 mm

Rmt

1912.00

ii) 5.60 mm

Rmt

2224.00

iii) 6.40 mm

Rmt

2533.00

iv) 7.20 mm

Rmt

2842.00

v) 7.80 mm

Rmt

3071.00

b) Dia. of pipe 273.10 mm (O.D)


Thickness of pipe :

Section-I-(XV)-M.S.PIPES

154

Sr No

Item Description

Unit

Rate
(in
2012-2013

vi) 8.70 mm

Rmt

3414.00

vii) 9.30 mm

Rmt

3641.00

i) 5.60 mm

Rmt

2646.00

ii) 6.40 mm

Rmt

3016.00

iii) 7.10 mm

Rmt

3339.00

iv) 7.90 mm

Rmt

3706.00

v) 8.40 mm

Rmt

3934.00

vi) 8.70 mm

Rmt

4071.00

vii) 9.50 mm

Rmt

4433.00

i) 5.60 mm

Rmt

2909.00

ii) 6.40 mm

Rmt

3317.00

iii) 7.10 mm

Rmt

3672.00

iv) 7.90 mm

Rmt

4077.00

v) 8.70 mm

Rmt

4480.00

vi) 9.50 mm

Rmt

4880.00

i) 5.60 mm

Rmt

3327.00

ii) 6.40 mm

Rmt

3796.00

iii) 7.10 mm

Rmt

4203.00

iv) 7.90 mm

Rmt

4668.00

v) 8.70 mm

Rmt

5130.00

vi) 9.50 mm

Rmt

5590.00

vii) 10.00 mm

Rmt

5878.00

i) 5.60 mm

Rmt

3751.00

ii) 6.40 mm

Rmt

4280.00

iii) 7.10 mm

Rmt

4741.00

iv) 7.90 mm

Rmt

5267.00

Rs.) Rate
in
2013-2014

Rs.

c) Dia. of pipe 323.9 mm (O.D)


Thickness of pipe :

d) Dia. of pipe 355.7 mm (O.D)


Thickness of pipe :

e) Dia. of pipe 406.0 mm (O.D)


Thickness of pipe :

f) Dia. of pipe 457.0 mm (O.D)


Thickness of pipe :

Section-I-(XV)-M.S.PIPES

155

Sr No

Item Description

Unit

Rate
(in
2012-2013

v) 8.70 mm

Rmt

5788.00

vi) 9.50 mm

Rmt

6310.00

vii) 10.00 mm

Rmt

6635.00

i) 5.60 mm

Rmt

4177.00

ii) 6.40 mm

Rmt

4765.00

iii) 7.10 mm

Rmt

5278.00

iv) 7.90 mm

Rmt

5864.00

v) 8.70 mm

Rmt

6447.00

vi) 9.50 mm

Rmt

7030.00

vii) 10.00 mm

Rmt

7392.00

i) 5.60 mm

Rmt

4600.00

ii) 6.40 mm

Rmt

5248.00

iii) 7.10 mm

Rmt

5816.00

iv) 7.90 mm

Rmt

6462.00

v) 8.70 mm

Rmt

7105.00

vi) 9.50 mm

Rmt

7748.00

vii) 10.00 mm

Rmt

8148.00

i) 5.60 mm

Rmt

5024.00

ii) 6.40 mm

Rmt

5734.00

iii) 7.10 mm

Rmt

6353.00

iv) 7.90 mm

Rmt

7059.00

v) 8.70 mm

Rmt

7764.00

vi) 9.50 mm

Rmt

8468.00

vii) 10.00 mm

Rmt

8906.00

viii) 12.00 mm

Rmt

10651.00

Rmt

5439.00

Rs.) Rate
in
2013-2014

Rs.

g) Dia. of pipe 508.0 mm (O.D)


Thickness of pipe :

h) Dia. of pipe 559.0 mm (O.D)


Thickness of pipe :

i) Dia. of pipe 610.0 mm (O.D)


Thickness of pipe :

j) Dia. of pipe 660.0 mm (O.D)


Thickness of pipe :
i) 5.60 mm

Section-I-(XV)-M.S.PIPES

156

Sr No

Item Description

Unit

Rate
(in
2012-2013

ii) 6.40 mm

Rmt

6209.00

iii) 7.10 mm

Rmt

6881.00

iv) 7.90 mm

Rmt

7646.00

v) 8.70 mm

Rmt

8411.00

vi) 9.50 mm

Rmt

9172.00

vii) 10.00 mm

Rmt

9648.00

i) 5.60 mm

Rmt

5863.00

ii) 6.40 mm

Rmt

6693.00

iii) 7.10 mm

Rmt

7417.00

iv) 7.90 mm

Rmt

8244.00

v) 8.70 mm

Rmt

9069.00

vi) 9.50 mm

Rmt

9892.00

vii) 10.00 mm

Rmt

10405.00

viii) 12.00 mm

Rmt

12449.00

i) 5.60 mm

Rmt

6288.00

ii) 6.40 mm

Rmt

7178.00

iii) 7.10 mm

Rmt

7955.00

iv) 7.90 mm

Rmt

8842.00

v) 8.70 mm

Rmt

9727.00

vi) 9.50 mm

Rmt

10610.00

vii) 10.00 mm

Rmt

11161.00

i) 5.60 mm

Rmt

6711.00

ii) 6.40 mm

Rmt

7662.00

iii) 7.10 mm

Rmt

8492.00

iv) 7.90 mm

Rmt

9440.00

v) 8.70 mm

Rmt

10387.00

vi) 9.50 mm

Rmt

11330.00

vii) 10.00 mm

Rmt

11919.00

viii) 12.00 mm

Rmt

14266.00

Rs.) Rate
in
2013-2014

Rs.

k) Dia. of pipe 711.0 mm (O.D)


Thickness of pipe :

l) Dia. of pipe 762.00. mm (O. D.)


Thickness of pipe :

m) Dia. of pipe 813.00. mm (O.D.)


Thickness of pipe :

Section-I-(XV)-M.S.PIPES

157

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

n) Dia. of pipe 864.00. mm (O. D.)


Thickness of pipe :
i) 5.60 mm

Rmt

7135.00

ii) 6.40 mm

Rmt

8146.00

iii) 7.10 mm

Rmt

9030.00

iv) 7.90 mm

Rmt

10038.00

v) 8.70 mm

Rmt

11045.00

vi) 9.50 mm

Rmt

12048.00

vii) 10.00 mm

Rmt

12675.00

i) 5.60 mm

Rmt

7550.00

ii) 6.40 mm

Rmt

8622.00

iii) 7.10 mm

Rmt

9558.00

iv) 7.90 mm

Rmt

10624.00

v) 8.70 mm

Rmt

11690.00

vi) 9.50 mm

Rmt

12754.00

vii) 10.00 mm

Rmt

13418.00

i) 5.60 mm

Rmt

7975.00

ii) 6.40 mm

Rmt

9107.00

iii) 7.10 mm

Rmt

10095.00

iv) 7.90 mm

Rmt

11223.00

v) 8.70 mm

Rmt

12348.00

vi) 9.50 mm

Rmt

13473.00

vii) 10.00 mm

Rmt

14175.00

i) 5.60 mm

Rmt

8398.00

ii) 6.40 mm

Rmt

9590.00

iii) 7.10 mm

Rmt

10632.00

iv) 7.90 mm

Rmt

11821.00

v) 8.70 mm

Rmt

13008.00

vi) 9.50 mm

Rmt

14193.00

o) Dia. of pipe 914.00 mm (O. D.)


Thickness of pipe :

p) Dia. of pipe 965.00 mm (O. D.)


Thickness of pipe :

q) Dia. of pipe 1016.00 mm (O. D.)


Thickness of pipe :

Section-I-(XV)-M.S.PIPES

158

Unit

Rate
(in
2012-2013

vii) 10.00 mm

Rmt

14932.00

viii) 12.00 mm

Rmt

17883.00

i) 5.60 mm

Rmt

8822.00

ii) 6.40 mm

Rmt

10075.00

iii) 7.10 mm

Rmt

11170.00

iv) 7.90 mm

Rmt

12419.00

v) 8.70 mm

Rmt

13666.00

vi) 9.50 mm

Rmt

14911.00

vii) 10.00 mm

Rmt

15689.00

i) 5.60 mm

Rmt

9247.00

ii) 6.40 mm

Rmt

10559.00

iii) 7.10 mm

Rmt

11706.00

iv) 7.90 mm

Rmt

13016.00

v) 8.70 mm

Rmt

14325.00

vi) 9.50 mm

Rmt

15631.00

vii) 10.00 mm

Rmt

16446.00

i) 5.60 mm

Rmt

9661.00

ii) 6.40 mm

Rmt

11034.00

iii) 7.10 mm

Rmt

12234.00

iv) 7.90 mm

Rmt

13603.00

v) 8.70 mm

Rmt

14970.00

vi) 9.50 mm

Rmt

16335.00

vii) 10.00 mm

Rmt

17188.00

i) 6.40 mm

Rmt

11519.00

ii) 7.10 mm

Rmt

12772.00

iii) 7.90 mm

Rmt

14201.00

Sr No

Item Description

Rs.) Rate
in
2013-2014

Rs.

r) Dia. of pipe 1067.00 mm (O. D.)


Thickness of pipe :

s) Dia. of pipe 1118.00. mm (O. D.)


Thickness of pipe :

t) Dia. of pipe 1168.00. mm (O. D.)


Thickness of pipe :

u) Dia. of pipe 1219.00. mm (O. D.)


Thickness of pipe :

Section-I-(XV)-M.S.PIPES

159

Unit

Rate
(in
2012-2013

iv) 8.70 mm

Rmt

15629.00

v) 9.50 mm

Rmt

17055.00

vi) 10.00 mm

Rmt

17945.00

vii) 12.00 mm

Rmt

21498.00

Rmt

18141.00

ii) 9.98 mm

Rmt

19049.00

iii) 10.00 mm

Rmt

19087.00

i) 6.40 mm

Rmt

12487.00

ii) 7.10 mm

Rmt

13846.00

iii) 7.90 mm

Rmt

15397.00

iv) 8.70 mm

Rmt

16946.00

v) 9.50 mm

Rmt

18492.00

vi) 10.00 mm

Rmt

19459.00

i) 7.10 mm

Rmt

14910.00

ii) 7.90 mm

Rmt

16581.00

iii) 8.70 mm

Rmt

18250.00

iv) 9.50 mm

Rmt

19917.00

v) 10.00 mm

Rmt

20957.00

vi) 12.00 mm

Rmt

25114.00

Rmt

20637.00

Rmt

21672.00

Rmt

15986.00

Sr No

Item Description

Rs.) Rate
in
2013-2014

Rs.

v) Dia. of pipe 1296.00. mm (O. D.)


Thickness of pipe :
i) 9.50 mm

w) Dia. of pipe 1321.00. mm (O. D.)


Thickness of pipe :

x) Dia. of pipe 1422.00. mm (O. D.)


Thickness of pipe :

y) Dia. of pipe 1473.00. mm (O. D.)


Thickness of pipe :
i) 9.50 mm
ii) 9.98 mm
z) Dia. of pipe 1524.00. mm (O. D.)
Thickness of pipe :
i) 7.10 mm

Section-I-(XV)-M.S.PIPES

160

Unit

Rate
(in
2012-2013

ii) 7.90 mm

Rmt

17777.00

iii) 8.70 mm

Rmt

19567.00

iv) 9.50 mm

Rmt

21355.00

v) 10.00 mm

Rmt

22472.00

vi) 11.90 mm

Rmt

26708.00

vii) 12.00 mm

Rmt

26930.00

i) 10.00 mm

Rmt

22858.00

ii) 11.00 mm

Rmt

25127.00

i) 9.50 mm

Rmt

22089.00

ii) 10.00 mm

Rmt

23243.00

Sr No

Item Description

Rs.) Rate
in
2013-2014

Rs.

aa) Dia. of pipe 1550.00. mm (O. D.)


Thickness of pipe :

ab) Dia. of pipe 1576.00. mm (O. D.)


Thickness of pipe :

ac) Dia. of pipe 1626.00. mm (O. D.)


Thickness of pipe :
i) 7.10 mm

Rmt

17060.00

ii) 7.90 mm

Rmt

18973.00

iii) 8.70 mm

Rmt

20885.00

iv) 9.50 mm

Rmt

22793.00

v) 10.00 mm

Rmt

23985.00

vi) 12.00 mm

Rmt

28748.00

i) 7.90 mm

Rmt

19254.00

ii) 8.70 mm

Rmt

21194.00

iii) 9.50 mm

Rmt

23132.00

iv) 10.00 mm

Rmt

24342.00

v) 12.00 mm

Rmt

29175.00

i) 7.90 mm

Rmt

19841.00

ii) 8.70 mm

Rmt

21840.00

ad) Dia. of pipe 1650.00. mm (O. D.)


Thickness of pipe :

ae) Dia. of pipe 1700.00. mm (O. D.)


Thickness of pipe :

Section-I-(XV)-M.S.PIPES

161

Unit

Rate
(in
2012-2013

iii) 9.50 mm

Rmt

23837.00

iv) 10.00 mm

Rmt

25084.00

v) 12.00 mm

Rmt

30065.00

i) 7.90 mm

Rmt

20427.00

ii) 8.70 mm

Rmt

22485.00

iii) 9.50 mm

Rmt

24542.00

iv) 10.00 mm

Rmt

25826.00

v) 12.00 mm

Rmt

30956.00

i) 7.90 mm

Rmt

21013.00

ii) 8.70 mm

Rmt

23131.00

iii) 9.50 mm

Rmt

25247.00

iv) 10.00 mm

Rmt

26569.00

v) 12.00 mm

Rmt

31846.00

i) 7.90 mm

Rmt

21599.00

ii) 8.70 mm

Rmt

23777.00

iii) 9.50 mm

Rmt

25951.00

iv) 10.00 mm

Rmt

27310.00

v) 12.00 mm

Rmt

32737.00

i) 7.90 mm

Rmt

22186.00

ii) 8.70 mm

Rmt

24422.00

iii) 9.50 mm

Rmt

26658.00

iv) 10.00 mm

Rmt

28053.00

v) 12.00 mm

Rmt

33627.00

Sr No

Item Description

Rs.) Rate
in
2013-2014

Rs.

af) Dia. of pipe 1750.00. mm (O. D.)


Thickness of pipe :

ag) Dia. of pipe 1800.00. mm (O. D.)


Thickness of pipe :

ah Dia. of pipe 1850.00. mm (O. D.)


Thickness of pipe :

ai) Dia. of pipe 1900.00. mm (O. D.)


Thickness of pipe :

aj) Dia. of pipe 1950.00. mm (O. D.)


Thickness of pipe :

Section-I-(XV)-M.S.PIPES

162

Unit

Rate
(in
2012-2013

i) 7.90 mm

Rmt

22773.00

ii) 8.70 mm

Rmt

25068.00

iii) 9.50 mm

Rmt

27362.00

iv) 10.00 mm

Rmt

28795.00

v) 12.00 mm

Rmt

34517.00

i) 7.90 mm

Rmt

23359.00

ii) 8.70 mm

Rmt

25713.00

iii) 9.50 mm

Rmt

28067.00

iv) 10.00 mm

Rmt

29537.00

v) 12.00 mm

Rmt

35408.00

i) 7.90 mm

Rmt

23946.00

ii) 8.70 mm

Rmt

26359.00

iii) 9.50 mm

Rmt

28771.00

iv) 10.00 mm

Rmt

30279.00

v) 12.00 mm

Rmt

36299.00

i) 7.90 mm

Rmt

24530.00

ii) 8.70 mm

Rmt

27005.00

iii) 9.50 mm

Rmt

29477.00

iv) 10.00 mm

Rmt

31021.00

v) 12.00 mm

Rmt

37190.00

i) 7.90 mm

Rmt

25117.00

ii) 8.70 mm

Rmt

27651.00

iii) 9.50 mm

Rmt

30181.00

iv) 10.00 mm

Rmt

31763.00

v) 12.00 mm

Rmt

38080.00

Sr No

Item Description

Rs.) Rate
in
2013-2014

Rs.

ak) Dia. of pipe 2000.00. mm (O. D.)


Thickness of pipe :

al) Dia. of pipe 2050.00. mm (O. D.)


Thickness of pipe :

am) Dia. of pipe 2100.00. mm (O. D.)


Thickness of pipe :

an) Dia. of pipe 2150.00. mm (O. D.)


Thickness of pipe :

ao) Dia. of pipe 2200.00. mm (O. D.)


Thickness of pipe :

Section-I-(XV)-M.S.PIPES

163

Unit

Rate
(in
2012-2013

i) 7.90 mm

Rmt

25703.00

ii) 8.70 mm

Rmt

28297.00

iii) 9.50 mm

Rmt

30887.00

iv) 10.00 mm

Rmt

32505.00

v) 12.00 mm

Rmt

38970.00

i) 7.90 mm

Rmt

26290.00

ii) 8.70 mm

Rmt

28942.00

iii) 9.50 mm

Rmt

31592.00

iv) 10.00 mm

Rmt

33247.00

v) 12.00 mm

Rmt

39861.00

i) 7.90 mm

Rmt

26877.00

ii) 8.70 mm

Rmt

29587.00

iii) 9.50 mm

Rmt

32297.00

iv) 10.00 mm

Rmt

33990.00

v) 12.00 mm

Rmt

40751.00

i) 7.90 mm

Rmt

27462.00

ii) 8.70 mm

Rmt

30233.00

iii) 9.50 mm

Rmt

33002.00

iv) 10.00 mm

Rmt

34731.00

v) 12.00 mm

Rmt

41643.00

i) 7.90 mm

Rmt

28049.00

ii) 8.70 mm

Rmt

30879.00

iii) 9.50 mm

Rmt

33707.00

iv) 10.00 mm

Rmt

35474.00

v) 12.00 mm

Rmt

42533.00

Sr No

Item Description

Rs.) Rate
in
2013-2014

Rs.

ap) Dia. of pipe 2250.00. mm (O. D.)


Thickness of pipe :

aq) Dia. of pipe 2300.00. mm (O. D.)


Thickness of pipe :

ar) Dia. of pipe 2350.00. mm (O. D.)


Thickness of pipe :

as) Dia. of pipe 2400.00. mm (O. D.)


Thickness of pipe :

Section-I-(XV)-M.S.PIPES

164

Unit

Rate
(in
2012-2013

i) 7.90 mm

Rmt

28635.00

ii) 8.70 mm

Rmt

31525.00

iii) 9.50 mm

Rmt

34413.00

iv) 10.00 mm

Rmt

36215.00

v) 12.00 mm

Rmt

43424.00

i) 7.90 mm

Rmt

29222.00

ii) 8.70 mm

Rmt

32170.00

iii) 9.50 mm

Rmt

35117.00

iv) 10.00 mm

Rmt

36959.00

v) 12.00 mm

Rmt

44314.00

vi) 16.00 mm

Rmt

58990.00

Rmt

1522.00

Sr No

Item Description

Rs.) Rate
in
2013-2014

Rs.

at) Dia. of pipe 2450.00. mm (O. D.)


Thickness of pipe :

au) Dia. of pipe 2500.00. mm (O. D.)


Thickness of pipe :

Manufacturing,
providing
and
supplying spirally welded / ERW/
SAW / fabricated M. S. pipes
(Commercial Quality) including
procurements of plates, gas cutting
to required size rolling, tack
welding assembling in suitable
lengths to form pipes, welding on
automatic welding machine and
forming V edge on both ends of
pipes including all taxes (Central
and
local),
railway
freight,
insurance unloading from railway
wagon,
loading
into
truck,
transport
to
stores
/
site,
unloading, stacking, etc, complete
as per IS - 3589 and IS-5504 as
applicable as per specifications (No
negative tolerance in thickness is
permissible).

a) Dia. of pipe 200.00 mm (I. D.)


Thickness of pipe :
i) 5.00 mm

Section-I-(XV)-M.S.PIPES

165

Sr No

Item Description

Unit

Rate
(in
2012-2013

ii) 6.00 mm

Rmt

1829.00

iii) 7.00 mm

Rmt

2151.00

iv) 8.00 mm

Rmt

2470.00

v) 9.00 mm

Rmt

2792.00

vi) 10.00 mm

Rmt

3117.00

i) 5.00 mm

Rmt

1892.00

ii) 6.00 mm

Rmt

2280.00

iii) 7.00 mm

Rmt

2670.00

iv) 8.00 mm

Rmt

3063.00

v) 9.00 mm

Rmt

3460.00

vi) 10.00 mm

Rmt

3859.00

i) 5.00 mm

Rmt

2264.00

Rs.) Rate
in
2013-2014

Rs.

b) Dia. of pipe 250.00 mm (I. D.)


Thickness of pipe :

c) Dia. of pipe 300.00 mm (I. D.)


Thickness of pipe :
ii) 6.00 mm

Rmt

2725.00

iii) 7.00 mm

Rmt

3190.00

iv) 8.00 mm

Rmt

3657.00

v) 9.00 mm

Rmt

4129.00

vi) 10.00 mm

Rmt

4601.00

i) 5.00 mm

Rmt

2634.00

ii) 6.00 mm

Rmt

3170.00

iii) 7.00 mm

Rmt

3709.00

iv) 8.00 mm

Rmt

4250.00

v) 9.00 mm

Rmt

4795.00

vi) 10.00 mm

Rmt

5344.00

i) 5.00 mm

Rmt

3006.00

ii) 6.00 mm

Rmt

3616.00

iii) 7.00 mm

Rmt

4229.00

d) Dia. of pipe 350.00 mm (I. D.)


Thickness of pipe :

e) Dia. of pipe 400.00 mm (I. D.)


Thickness of pipe :

Section-I-(XV)-M.S.PIPES

166

Sr No

Item Description

Unit

Rate
(in
2012-2013

iv) 8.00 mm

Rmt

4845.00

v) 9.00 mm

Rmt

5464.00

vi) 10.00 mm

Rmt

6085.00

i) 5.00 mm

Rmt

3376.00

ii) 6.00 mm

Rmt

4060.00

iii) 7.00 mm

Rmt

4748.00

iv) 8.00 mm

Rmt

5439.00

v) 9.00 mm

Rmt

6131.00

vi) 10.00 mm

Rmt

6828.00

i) 5.00 mm

Rmt

3748.00

ii) 6.00 mm

Rmt

4506.00

iii) 7.00 mm

Rmt

5268.00

iv) 8.00 mm

Rmt

6032.00

v) 9.00 mm

Rmt

6800.00

vi) 10.00 mm

Rmt

7570.00

i) 5.00 mm

Rmt

4119.00

ii) 6.00 mm

Rmt

4951.00

iii) 7.00 mm

Rmt

5787.00

iv) 8.00 mm

Rmt

6626.00

v) 9.00 mm

Rmt

7468.00

vi) 10.00 mm

Rmt

8313.00

i) 5.00 mm

Rmt

4490.00

ii) 6.00 mm

Rmt

5397.00

iii) 7.00 mm

Rmt

6307.00

iv) 8.00 mm

Rmt

7220.00

v) 9.00 mm

Rmt

8135.00

Rs.) Rate
in
2013-2014

Rs.

f) Dia. of pipe 450.00 mm (I. D.)


Thickness of pipe :

g) Dia. of pipe 500.00 mm (I. D.)


Thickness of pipe :

h) Dia. of pipe 550.00 mm (I. D.)


Thickness of pipe :

i) Dia. of pipe 600.00 mm (I. D.)


Thickness of pipe :

Section-I-(XV)-M.S.PIPES

167

Sr No

Item Description

Unit

Rate
(in
2012-2013

vi) 10.00 mm

Rmt

9054.00

vii) 12.00 mm

Rmt

10901.00

i) 5.00 mm

Rmt

4862.00

ii) 6.00 mm

Rmt

5841.00

iii) 7.00 mm

Rmt

6826.00

iv) 8.00 mm

Rmt

7813.00

v) 9.00 mm

Rmt

8804.00

vi) 10.00 mm

Rmt

9797.00

vii) 12.00 mm

Rmt

11792.00

i) 5.00 mm

Rmt

5232.00

ii) 6.00 mm

Rmt

6288.00

iii) 7.00 mm

Rmt

7346.00

iv) 8.00 mm

Rmt

8408.00

v) 9.00 mm

Rmt

9471.00

vi) 10.00 mm

Rmt

10538.00

vii) 12.00 mm

Rmt

12682.00

i) 5.00 mm

Rmt

5604.00

ii) 6.00 mm

Rmt

6734.00

iii) 7.00 mm

Rmt

7866.00

iv) 8.00 mm

Rmt

9001.00

v) 9.00 mm

Rmt

10140.00

vi) 10.00 mm

Rmt

11281.00

vii) 12.00 mm

Rmt

13572.00

i) 5.00 mm

Rmt

5974.00

ii) 6.00 mm

Rmt

7179.00

iii) 7.00 mm

Rmt

8384.00

Rs.) Rate
in
2013-2014

Rs.

j) Dia. of pipe 650.00 mm (I. D.)


Thickness of pipe :

k) Dia. of pipe 700.00 mm (I. D.)


Thickness of pipe :

l) Dia. of pipe 750.00 mm (I. D.)


Thickness of pipe :

m) Dia. of pipe 800.00 mm (I. D.)


Thickness of pipe :

Section-I-(XV)-M.S.PIPES

168

Sr No

Item Description

Unit

Rate
(in
2012-2013

iv) 8.00 mm

Rmt

9595.00

v) 9.00 mm

Rmt

10807.00

vi) 10.00 mm

Rmt

12024.00

vii) 12.00 mm

Rmt

14463.00

i) 5.00 mm

Rmt

6346.00

ii) 6.00 mm

Rmt

7624.00

iii) 7.00 mm

Rmt

8905.00

iv) 8.00 mm

Rmt

10189.00

v) 9.00 mm

Rmt

11475.00

vi) 10.00 mm

Rmt

12765.00

vii) 12.00 mm

Rmt

15353.00

i) 5.00 mm

Rmt

6717.00

Rs.) Rate
in
2013-2014

Rs.

n) Dia. of pipe 850.00 mm (I. D.)


Thickness of pipe :

o) Dia. of pipe 900.00 mm (I. D.)


Thickness of pipe :
ii) 6.00 mm

Rmt

8069.00

iii) 7.00 mm

Rmt

9424.00

iv) 8.00 mm

Rmt

10782.00

v) 9.00 mm

Rmt

12143.00

vi) 10.00 mm

Rmt

13508.00

vii) 12.00 mm

Rmt

16244.00

i) 5.00 mm

Rmt

7088.00

ii) 6.00 mm

Rmt

8515.00

iii) 7.00 mm

Rmt

9943.00

iv) 8.00 mm

Rmt

11376.00

v) 9.00 mm

Rmt

12811.00

vi) 10.00 mm

Rmt

14249.00

vii) 12.00 mm

Rmt

17134.00

Rmt

7458.00

p) Dia. of pipe 950.00 mm (I. D.)


Thickness of pipe :

q) Dia. of pipe 1000.00 mm (I. D.)


Thickness of pipe :
i) 5.00 mm

Section-I-(XV)-M.S.PIPES

169

Sr No

Item Description

Unit

Rate
(in
2012-2013

ii) 6.00 mm

Rmt

8959.00

iii) 7.00 mm

Rmt

10463.00

iv) 8.00 mm

Rmt

11970.00

v) 9.00 mm

Rmt

13479.00

vi) 10.00 mm

Rmt

14992.00

vii) 12.00 mm

Rmt

18026.00

i) 5.00 mm

Rmt

7830.00

ii) 6.00 mm

Rmt

9405.00

iii) 7.00 mm

Rmt

10983.00

iv) 8.00 mm

Rmt

12563.00

v) 9.00 mm

Rmt

14147.00

vi) 10.00 mm

Rmt

15733.00

vii) 12.00 mm

Rmt

18916.00

i) 5.00 mm

Rmt

8201.00

ii) 6.00 mm

Rmt

9850.00

iii) 7.00 mm

Rmt

11501.00

iv) 8.00 mm

Rmt

13157.00

v) 9.00 mm

Rmt

14815.00

vi) 10.00 mm

Rmt

16476.00

vii) 12.00 mm

Rmt

19808.00

i) 5.00 mm

Rmt

8572.00

ii) 6.00 mm

Rmt

10296.00

iii) 7.00 mm

Rmt

12021.00

iv) 8.00 mm

Rmt

13751.00

v) 9.00 mm

Rmt

15483.00

vi) 10.00 mm

Rmt

17218.00

vii) 12.00 mm

Rmt

20698.00

Rs.) Rate
in
2013-2014

Rs.

r) Dia. of pipe 1050.00 mm (I. D.)


Thickness of pipe :

s) Dia. of pipe 1100.00 mm (I. D.)


Thickness of pipe :

t) Dia. of pipe 1150.00 mm (I. D.)


Thickness of pipe :

Section-I-(XV)-M.S.PIPES

170

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

u) Dia. of pipe 1200.00 mm (I. D.)


Thickness of pipe :
i) 5.00 mm

Rmt

8942.00

ii) 6.00 mm

Rmt

10740.00

iii) 7.00 mm

Rmt

12541.00

iv) 8.00 mm

Rmt

14344.00

v) 9.00 mm

Rmt

16151.00

vi) 10.00 mm

Rmt

17960.00

vii) 12.00 mm

Rmt

21588.00

i) 6.00 mm

Rmt

11186.00

ii) 7.00 mm

Rmt

13061.00

iii) 8.00 mm

Rmt

14938.00

iv) 9.00 mm

Rmt

16819.00

v) 10.00 mm

Rmt

18702.00

vi) 12.00 mm

Rmt

22479.00

i) 6.00 mm

Rmt

11632.00

ii) 7.00 mm

Rmt

13579.00

iii) 8.00 mm

Rmt

15531.00

iv) 9.00 mm

Rmt

17487.00

v) 10.00 mm

Rmt

19444.00

vi) 12.00 mm

Rmt

23369.00

i) 7.00 mm

Rmt

14100.00

ii) 8.00 mm

Rmt

16126.00

iii) 9.00 mm

Rmt

18155.00

iv) 10.00 mm

Rmt

20186.00

v) 12.00 mm

Rmt

24260.00

v) Dia. of pipe 1250.00 mm (I. D.)


Thickness of pipe :

w) Dia. of pipe 1300.00 mm (I. D.)


Thickness of pipe :

x) Dia. of pipe 1350.00 mm (I. D.)


Thickness of pipe :

Section-I-(XV)-M.S.PIPES

171

Unit

Rate
(in
2012-2013

i) 7.00 mm

Rmt

14619.00

ii) 8.00 mm

Rmt

16720.00

iii) 9.00 mm

Rmt

18822.00

iv) 10.00 mm

Rmt

20928.00

v) 12.00 mm

Rmt

25150.00

i) 7.00 mm

Rmt

15138.00

ii) 8.00 mm

Rmt

17313.00

iii) 9.00 mm

Rmt

19490.00

iv) 10.00 mm

Rmt

21672.00

v) 12.00 mm

Rmt

26041.00

Sr No

Item Description

Rs.) Rate
in
2013-2014

Rs.

y) Dia. of pipe 1400.00 mm (I. D.)


Thickness of pipe :

z) Dia. of pipe 1450.00 mm (I. D.)


Thickness of pipe :

aa) Dia. of pipe 1500.00 mm (I. D.)


Thickness of pipe :
i) 7.00 mm

Rmt

15659.00

ii) 8.00 mm

Rmt

17907.00

iii) 9.00 mm

Rmt

20159.00

iv) 10.00 mm

Rmt

22414.00

v) 12.00 mm

Rmt

26931.00

i) 7.00 mm

Rmt

16178.00

ii) 8.00 mm

Rmt

18501.00

iii) 9.00 mm

Rmt

20826.00

iv) 10.00 mm

Rmt

23156.00

v) 12.00 mm

Rmt

27822.00

i) 7.00 mm

Rmt

16697.00

ii) 8.00 mm

Rmt

19094.00

iii) 9.00 mm

Rmt

21495.00

iv) 10.00 mm

Rmt

23898.00

v) 12.00 mm

Rmt

28712.00

ab) Dia. of pipe 1550.00 mm (I. D.)


Thickness of pipe :

ac) Dia. of pipe 1600.00 mm (I. D.)


Thickness of pipe :

Section-I-(XV)-M.S.PIPES

172

Unit

Rate
(in
2012-2013

i) 8.00 mm

Rmt

19688.00

ii) 9.00 mm

Rmt

22161.00

iii) 10.00 mm

Rmt

24640.00

iv) 12.00 mm

Rmt

29602.00

i) 8.00 mm

Rmt

20281.00

ii) 9.00 mm

Rmt

22830.00

iii) 10.00 mm

Rmt

25382.00

iv) 12.00 mm

Rmt

30493.00

i) 8.00 mm

Rmt

20875.00

ii) 9.00 mm

Rmt

23499.00

iii) 10.00 mm

Rmt

26124.00

iv) 12.00 mm

Rmt

31384.00

i) 8.00 mm

Rmt

21469.00

ii) 9.00 mm

Rmt

24166.00

iii) 10.00 mm

Rmt

26866.00

iv) 12.00 mm

Rmt

32276.00

i) 8.00 mm

Rmt

22062.00

ii) 9.00 mm

Rmt

24835.00

iii) 10.00 mm

Rmt

27609.00

iv) 12.00 mm

Rmt

33166.00

Rmt

22656.00

Sr No

Item Description

Rs.) Rate
in
2013-2014

Rs.

ad) Dia. of pipe 1650.00 mm (I. D.)


Thickness of pipe :

ae) Dia. of pipe 1700.00 mm (I. D.)


Thickness of pipe :

af) Dia. of pipe 1750.00 mm (I. D.)


Thickness of pipe :

ag) Dia. of pipe 1800.00 mm (I. D.)


Thickness of pipe :

ah) Dia. of pipe 1850.00 mm (I. D.)


Thickness of pipe :

ai) Dia. of pipe 1900.00 mm (I. D.)


Thickness of pipe :
i) 8.00 mm

Section-I-(XV)-M.S.PIPES

173

Unit

Rate
(in
2012-2013

ii) 9.00 mm

Rmt

25502.00

iii) 10.00 mm

Rmt

28350.00

iv) 12.00 mm

Rmt

34057.00

i) 8.00 mm

Rmt

23251.00

ii) 9.00 mm

Rmt

26170.00

iii) 10.00 mm

Rmt

29093.00

iv) 12.00 mm

Rmt

34947.00

i) 8.00 mm

Rmt

23844.00

ii) 9.00 mm

Rmt

26837.00

iii) 10.00 mm

Rmt

29834.00

iv) 12.00 mm

Rmt

35838.00

v) 16.00 mm

Rmt

47878.00

i) 8.00 mm

Rmt

24438.00

ii) 9.00 mm

Rmt

27506.00

iii) 10.00 mm

Rmt

30577.00

iv) 12.00 mm

Rmt

36728.00

v) 16.00 mm

Rmt

49066.00

i) 8.00 mm

Rmt

25032.00

ii) 9.00 mm

Rmt

28174.00

iii) 10.00 mm

Rmt

31319.00

iv) 12.00 mm

Rmt

37618.00

v) 16.00 mm

Rmt

50253.00

Rmt

25625.00

Sr No

Item Description

Rs.) Rate
in
2013-2014

Rs.

aj) Dia. of pipe 1950.00 mm (I. D.)


Thickness of pipe :

ak) Dia. of pipe 2000.00 mm (I. D.)


Thickness of pipe :

al) Dia. of pipe 2050.00 mm (I. D.)


Thickness of pipe :

am) Dia. of pipe 2100.00 mm (I. D.)


Thickness of pipe :

an) Dia. of pipe 2150.00 mm (I. D.)


Thickness of pipe :
i) 8.00 mm

Section-I-(XV)-M.S.PIPES

174

Unit

Rate
(in
2012-2013

ii) 9.00 mm

Rmt

28842.00

iii) 10.00 mm

Rmt

32061.00

iv) 12.00 mm

Rmt

38509.00

v) 16.00 mm

Rmt

51440.00

i) 8.00 mm

Rmt

26219.00

ii) 9.00 mm

Rmt

29509.00

iii) 10.00 mm

Rmt

32804.00

iv) 12.00 mm

Rmt

39399.00

v) 16.00 mm

Rmt

52627.00

i) 8.00 mm

Rmt

26813.00

ii) 9.00 mm

Rmt

30177.00

iii) 10.00 mm

Rmt

33545.00

iv) 12.00 mm

Rmt

40290.00

v) 16.00 mm

Rmt

53815.00

i) 8.00 mm

Rmt

27407.00

ii) 9.00 mm

Rmt

30846.00

iii) 10.00 mm

Rmt

34288.00

iv) 12.00 mm

Rmt

41180.00

v) 16.00 mm

Rmt

55002.00

i) 8.00 mm

Rmt

28001.00

ii) 9.00 mm

Rmt

31514.00

iii) 10.00 mm

Rmt

35029.00

iv) 12.00 mm

Rmt

42072.00

v) 16.00 mm

Rmt

56190.00

Sr No

Item Description

Rs.) Rate
in
2013-2014

Rs.

ao) Dia. of pipe 2200.00 mm (I. D.)


Thickness of pipe :

ap) Dia. of pipe 2250.00 mm (I. D.)


Thickness of pipe :

aq) Dia. of pipe 2300.00 mm (I. D.)


Thickness of pipe :

ar) Dia. of pipe 2350.00 mm (I. D.)


Thickness of pipe :

Section-I-(XV)-M.S.PIPES

175

Unit

Rate
(in
2012-2013

i) 8.00 mm

Rmt

28594.00

ii) 9.00 mm

Rmt

32182.00

iii) 10.00 mm

Rmt

35772.00

iv) 12.00 mm

Rmt

42962.00

v) 16.00 mm

Rmt

57379.00

i) 8.00 mm

Rmt

29188.00

ii) 9.00 mm

Rmt

32849.00

iii) 10.00 mm

Rmt

36514.00

iv) 12.00 mm

Rmt

43853.00

v) 16.00 mm

Rmt

58566.00

Sr No

Item Description

Rs.) Rate
in
2013-2014

Rs.

as) Dia. of pipe 2400.00 mm (I. D.)


Thickness of pipe :

at) Dia. of pipe 2450.00 mm (I. D.)


Thickness of pipe :

au) Dia. of pipe 2500.00 mm (I. D.)


Thickness of pipe :
i) 8.00 mm

Rmt

29782.00

ii) 9.00 mm

Rmt

33517.00

iii) 10.00 mm

Rmt

37257.00

iv) 12.00 mm

Rmt

44743.00

v) 16.00 mm

Rmt

59753.00

Section-I-(XV)-M.S.PIPES

176

Section - I- (XVI) - FABRICATION OF M.S.PIPES & SPECIALS


Sr No
1

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

Major Works
Fabricating pipes from steel plates
supplied free of cost and stacking
the same in the fabricators yard.
The rate to include cutting the
plate,
rolling,
tack
welding,
assembling in suitable lengths to
form pipes, welding on automatic
welding machines and forming V
edge for both ends of pipe.
Without
E.D.

5 to 8 mm

MT

9005.00

8 to 12 mm

MT

7062.00

12 to 16 mm

MT

5297.00

16 to 20 mm

MT

4767.00

20 to 25 mm

MT

4590.00

5 to 8 mm

MT

12359.00

8 to 12 mm

MT

8121.00

12 to 25 mm

MT

5827.00

Fabricating one piece cants, short


pipes (shorter than one strake
length) from the steel plates
supplied free of cost and stacking
the same in fabricators yard. The
rate to include cutting the plates,
rolling, tack welding either on
automatic welding machine or
manually and forming V edge to
both ends of pipes :

Fabricating composite bends from


steel plates supplied free of cost
and stacking the same in the
fabricators yard. The rate to
include cutting the plates, rolling,
tacking drums, assembling the
same form bend of suitable length,
welding
either
on
automatic
welding machine or manually and

Section-I-(XVI)-FABRICATION OF M.S.PIPES AND SPECIALS

177

Sr No

Unit

Rate
(in
2012-2013

5 to 8 mm

MT

14830.00

8 to 12 mm

MT

9887.00

12 to 16mm

MT

7768.00

16 to 25 mm

MT

7239.00

MT

11476.00

Item Description

Rs.) Rate
in
2013-2014

Rs.

forming V edge to both ends of


bend but the rate excluding the
circumferential
butt
welding
required for assembling cants to
form necessary composite bend.
Circumferential butt welding will
be paid seperately under section
XVI of Item No. 7-A. However, the
rate under this item will include
the cost of longitudinal butt
welding of pipes strakes.

Fabricating tapers from the steel


plates, supplied free of cost and
stacking
the
same
in
the
fabricators yard. The rate to
include cutting the plates, rolling,
tack welding, welding either on
automatic welding machine or
manually and forming V edge to
both ends of tapers but the rate
excludes
circumferential
butt
welding required for assembling
drums to form necessary tapers.
Circumferential butt welding will
be paid for under section XVI of
Item No. 7-A. Howerver, the rate
under
this
includes
the
longitudinal butt welding to form
drums The rate shall also include
the cost of fabrication of stifferner
rings and gussets and mounting
the same on tapers, tack and
chain welding, etc. as directed by
Engineer-in-charge.

Section-I-(XVI)-FABRICATION OF M.S.PIPES AND SPECIALS

178

Sr No

Item Description

Fabricating specials and fixtures


from steel materials supplied free
of cost (welding will be paid
separately except for category vi (a)
and (b) below. The weight for
payment under this item shall be
calculated on the basis of finished
material neglecting the bolt holes
wherever provided.)

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

i) Saddle pieces, loose stiffener rings,


pressure type blank
flanges,
ladders, platforms, and any other
minor fixtures. The rate to include
cutting, bending, tack welding, etc.
complete
MT

4590.00

MT

9711.00

MT

15007.00

MT

16067.00

ii) Y branches, T branches. The rate


to include cutting, bending, tack
welding etc. complete.

iii) Dished closures such as domes.


The rate to include cutting, cold
pressing and tack welding etc.
complete
iv) Dished closures such as manhole
cover. The rate to include cutting
cold pressing and tack welding
only. The rate also to include
drilling holes including grinding
wherever nesessary, with supply of
bolts, nuts, washers, etc. complete
as per drawing

v) Flat manhole covers. The rate to


include cutting, tack welding. The
rate also to include drilling holes
including grinding

Section-I-(XVI)-FABRICATION OF M.S.PIPES AND SPECIALS

179

Sr No

Item Description

Unit

Rate
(in
2012-2013

MT

10417.00

MT

16949.00

MT

22069.00

sqm

971.00

sqm

1483.00

sqm

741.00

sqm

3531.00

Rs.) Rate
in
2013-2014

Rs.

wherever necessary with supply of


bolts, nuts, washers, etc.complete
as per drawing.
vi) a) Flange rings below 40 mm. thick.
The rate to include gas cutting,
tack welding to form ring, drilling
holes including grinding wherever
necessary etc. complete.

b) Flange rings 40 mm and above


thick. The rate to in clude gas
cutting, tack welding to form ring,
drilling holes including grinding
wherever necessary etc. complete.

vii) a) Machining of flange ring for cut


upto 2 mm.including handling,
assembling, alignment the ring on
machine, etc. complete as directed
by Engineer-in-charge

i) for thickness of flange ring below


40 mm.
ii) for thickness of flange ring 40 mm.
and above.
b) Machining
offlange
ringe
for
cutupto 2 mm. : Extraover and
above (vii)(a) for machining beyond
2 mm. forevery additional cutof 2
mm. or partthereof.

i) Machining
offlange
ringe
for
cutupto 2 mm. : Extraover and
above (vii)(a) for machining

Section-I-(XVI)-FABRICATION OF M.S.PIPES AND SPECIALS

180

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

ii) Machining
offlange
ringe
for
cutupto 2 mm. : Extraover and
above (vii)(a) for machining
6

Each

67.00

i) 300mm. dia.

each

21887.00

Providing, fabricating and fixing


expansion joints for pipelines as
per the drawing. The rate to
include machining the strakes and
steel ring as shown in the drawing
and welding on either automatic
welding machine or manually, Rate
includes plates and flats required
for expansion joint and all other
materials
such
as
synthetic
rubber, rubber ring, etc. complete.
including
packing
as
per
specifications, grease, bolts and
nuts, etc. including local handling,
all types of taxes and duties etc.
complete.

Expansion joints suitable for pipe


diameters.
ii) 400 mm. dia.

each

31585.00

iii) 450 mm. dia.

each

41085.00

iv) 500 mm. Dia

each

55084.00

v) 600 mm. dia.

each

64711.00

vi) 700 mm. dia.

each

80556.00

vii) 750 mm. dia.

each

88773.00

viii) 800 mm. dia.

each

103312.00

ix) 900 mm. dia.

each

119952.00

each

143629.00

each

190757.00

x) 1000 mm. dia.


xi) 1200mm. dia.
7

Fabricating ring girder as per


drawing and specifications from
M.S. channels, flats, plates, etc.
supplied
free
of
cost
and
assembling the same on the ring
girder strake and tack

Section-I-(XVI)-FABRICATION OF M.S.PIPES AND SPECIALS

181

Sr No

Item Description

Unit

Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

welding as per directions.


8

Fabricating ring girder supports


(stools) as per drawing and
specifications complete with top
plates, base plates, side flats for
fixing rollers wherever nescessary,
grease box covers, rag bolts, grid
road etc. from steel material
supplied free of cost and stacking
the same in fabricators yard.

Fabricating and assembling M.S.


roller as per drawing. The rate to
include machining, assembling
and fixing the same to the side
flats provided below the top plates
of R.C. supports (stools) greasing
including
providing
anti-theft
measures M.S. rounds will be
supplied free of cost. All other
materials such as bright stainless
steel pins etc. shall be supplied by
the fabricator at his cost.

10

MT

5827.00

MT

7945.00

MT

17293.00

sqm

77.00

Blast cleaning the surface of the


old or new pipeline
internally to
remove all rust etc. complete,
including
providing
sand,
machinery, labour, cutting of pipes
at required places and rewelding
the same etc, complete as directed
by
Engineer-in-charge.
(Pipes
pieces if required for rewelding of
old
pipeline
shall
be
paid
separately.)

Section-I-(XVI)-FABRICATION OF M.S.PIPES AND SPECIALS

182

Sr No

Item Description

11

Blast Cleaning of old or new


pipeline surface internally with
mechanical
cleaning
machine
having steel scraper blades with
required
passes
including
removing all rust, scaling etc.
including cutting of pipes at
required places, rewelding the
same incuding cost of all materials
and labour, etc, complete (Pipes
pieces if required for rewelding of
old
pipeline
shall
be
paid
separately.)

12

Blast Cleaning of old pipeline


surface
internally
by
using
swabbing method by passing
polyurethane foam Pig with
required
hydraulic
pressure,
cutting of pipes at required places,
rewelding the same including cost
of all materials and labour, etc.
complete. (Pipe pieces if required
for rewelding of old pipeline shall
be paid separately.)

Unit

Rate
(in
2012-2013

MT

77.00

Sqm

91.00

Sqm

91.00

Rs.) Rate
in
2013-2014

Rs.

Note:- Water for this purpose shall


be supplied by the department free
of cost at fixed point within 5 km
lead and all arrangements for
filling
section
and
creating
hydraulic pressure on polyrethene
pig shall be done by contractor at
his own cost.

13

Blast cleaning the surface of the


old or new pipeline externally to
remove all rust including providing
sand machinery. etc. complete as
directed by Engineer-in-charge.

Section-I-(XVI)-FABRICATION OF M.S.PIPES AND SPECIALS

183

Sr No

Item Description

14

Providing and applying primer and


one coat of red oxide of iron paint,
internally, to blast cleaned surface
of the pipes.

15

Providing and applying primer and


one coat of red oxide of iron paint,
internally, including cleaning the
surface of the pipes with steel
scrappers, wire brushes, and metal
cleaning solution, etc.

Unit

Rate
(in
2012-2013

Sqm

25.00

Sqm

43.00

Each

2138.00

Each

4155.00

iii) Above 750 mm.Upto 1000 mm. Each


dia.

6184.00

iv) Above 1000 mm.Upto 1250 mm. Each


dia.

10817.00

v) Above 1250 mm.Upto 1500 mm. Each


dia.

14722.00

vi) Above 1750 mm.Upto 2000 mm. Each


dia.

17999.00

16

Rs.) Rate
in
2013-2014

Rs.

Fabricating and fixing insulated


flange rings assembly as per
drawing
from
steel
material,
supplied free of cost. The rate to
include fabrication of tail pipe
(about 0.6 M long) fabrications of
flange rings, machining, drilling
holes, including grinding wherever
necessary and welding, The rate
above to include nuts, bolts,
washers, etc. but shall not include
supply and fixing of backbite/PVC
rings,
cylinders
and
rubber
packing.

i) From 300mm.Upto 450mm. dia.


ii) Above 450 mm.Upto 750 mm. dia.

Section-I-(XVI)-FABRICATION OF M.S.PIPES AND SPECIALS

184

Sr No

Item Description

17

Providing and applying primer and


one coat of red oxide of iron paint,
externally, to blast cleaned surface
of the pipes.

18

Providing and applying primer and


one coat of red oxide of iron paint,
externally, including cleaning the
surface of the pipes with steel
scrappers, wire brushes, and metal
cleaning solution, etc.

19

20

21

Unit

Rate
(in
2012-2013

Sqm

27.50

Sqm

60.00

Sqm

31.00

Sqm

66.00

Sqm

50.00

b) Second coat

Sqm

41.00

c)Third coat

Sqm

40.00

Rs.) Rate
in
2013-2014

Rs.

Providing and applying covering


coat of grey graphite of approved
quality including dusting the
surface etc. complete.

Providing and applying one coat of


zinc rich epoxy primer to the
internal surface of pipe line at site.

Providing and applying primer first


coat of intertol 49 W emaline
05/58 pipe coat or any other
equivalent approved paint to the
internal surface of pipe line at site.

Section-I-(XVI)-FABRICATION OF M.S.PIPES AND SPECIALS

185

Section - I- (XVII) - M.S.PIPES LAYING


Sr No

Item Description

Lowering laying in position to


correct line and level including M.
S. pipes with / without any
outcoating on pedestals or chairs
upon prepared formation. The rate
to include loading, unloading
hoisting,
marginal
cutting
wherever required, assembling and
tack welding, and transporatation
upto 500 M. etc. completed as
specified.

Unit Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

5 mm to 8 mmthick.
i) Upto 250 mm. dia.

Rmt

282.00

ii) Above 250 mm.Upto 500 mm. dia.

Rmt

332.00

iii) Above 500 mm.Upto 750 mm. dia.

Rmt

381.00

iv) Above 750 mm.Upto 1000 mm. dia

Rmt

431.00

v) Above 1000 mm.Upto 1250 mm. Rmt


dia.

482.00

8 mm to 12 mm thick.
i) From 750 mm. Upto1000 mm. dia.
ii) Above
dia
iii) Above
Dia
iv) Above
dia
v) Above
dia
vi) Above

Rmt

574.00

1000 mm.Upto l250 mm. Rmt

640.00

1250 mm.Upto 1500 mm. Rmt

706.00

1500 mmUpto 1750 mm. Rmt

774.00

1750 mm.Upto 2000 mm Rmt

840.00

2000 mm.upto 2250 mm dia

Rmt

906.00

vii) Above 2250 mm.upto 2500 mm dia

Rmt

974.00

Rmt

864.00

12 mm to 16 mm thick.
i) From 2000 mm Upto2250 mm dia

Section-I-(XVII)-M.S.PIPES LAYING

186

Sr No

Item Description

Unit Rate
(in
2012-2013

ii) Above 2250 rnm.Uplo 2500 mm Rmt


dia.
iii) Above 2500 mmUpto 2750 mm dia Rmt

932.00

iv) Above 2750 mm.Upto 3000 mm. Rmt


dia.
v) Above 3000 mm.upto 3250 mm Rmt
dia.
vi) Above 3250 mm.Upto 3500 mm Rmt
dia

1060.00

Rs.) Rate
in
2013-2014

Rs.

996.00

1124.00
1189.00

16 mm to 20 mm thick.
i) From 2500 mm Upto 2750 mm dia

Rmt

1306.00

ii) Above 2750 mmUpto 3000 mm dia

Rmt

1378.00

iii) Above 3000 mmupto 3250 mm dia

Rmt

1450.00

iv) Above 3250 mmUpto 3500 mm did

Rmt

1522.00

v) Above 3500 mmUpto 3750 mm dia

Rmt

1595.00

vi) Above 3750 mmupto 4000 mm dia

Rmt

1668.00

i) Above 3500 mmUpto 3750 mm dia

Rmt

1778.00

ii) Above 3750 mmupto 4000 mm dia

Rmt

1880.00

20 mm to 25 mm thick.

Lowering laying in position to


correct line and level including M.
S. specials with / without any
outcoating such as distance pieces,
straps, bends, tapers, etc. on
pedestals
or
chairs
upon
formation. The rate to include
loading,
unloading
hoisting,
marginal
cutting
wherever
required, assembling and tack
welding, and transportation upto
500M etc. complete.

Section-I-(XVII)-M.S.PIPES LAYING

187

Sr No

Item Description

Unit Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

a) 5 mm to 8 mm thick.
i) Upto 250 mm. dia.

Rmt

394.00

ii) Above 250 mm.Upto 500 mm. dia.

Rmt

462.00

iii) Above 500 mm.Upto 750 mm. dia.

Rmt

534.00

iv) Above 750 mm.Upto 1000 mm. Rmt


dia.
v) Above 1000 mm.Upto 1250 mm. Rmt
dia.

603.00
673.00

8 mm to 12 mm thick.
i) From 750 mm.Upto1000 mm. dia.
ii) Above
dia.
iii) Above
dia.
iv) Above
dia.
v) Above
dia.
vi) Above
dia.
vii) Above
dia.

Rmt

804.00

1000 mm.Upto 1250 mm. Rmt

897.00

1250 mm.Upto 1500 mm. Rmt

989.00

1500 mm.Upto 1750 mm. Rmt

1082.00

1750 mm.Upto 2000 mm. Rmt

1177.00

2000 mm.Upto 2250 mm. Rmt

1269.00

2250 mm.Upto 2500 mm. Rmt

1362.00

12 mm to 16 mm thick.
i) From
dia.
ii) Above
dia.
iii) Above
dia.
iv) Above
dia.
v) Above
dia.
vi) Above
dia.

2000 mm.Upto 2250 mm. Rmt

1252.00

2250 mm.Upto 2500 mm. Rmt

1304.00

2500 mm.Upto 2750 mm. Rmt

1394.00

2750 mm.Upto 3000 mm. Rmt

1483.00

3000 mm.Upto 3250 mm. Rmt

1574.00

3250 mm.Upto 3500 mm. Rmt

1664.00

Section-I-(XVII)-M.S.PIPES LAYING

188

Sr No

Item Description

Unit Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

16 mm to 20 mm thick.
i) From
dia.
ii) Above
dia.
iii) Above
dia.
iv) Above
dia.
v) Above
dia.
vi) Above
dia.

2500 mm.Upto 2750 mm. Rmt

1796.00

2750 mm.Upto 3000 mm. Rmt

1877.00

3000 mm.Upto 3250 mm. Rmt

2031.00

3250 mm.Upto 3500 mm. Rmt

2132.00

3500 mm.Upto 3750 mm. Rmt

2232.00

3750 mm.Upto 4000 mm. Rmt

2333.00

Above 20 mm to upto 25mm


thick. 3500 mmUpto 3750 mm. Rmt
i) From
dia.
ii) Above 3750 mm.Upto 4000 mm. Rmt
dia.
3
Lowering laying in position to
correct line and level including M.
S. pipes with / without any
outcoating, on pedestals or chairs
upon piers, trestles etc. The rate to
include
loading,
unloading
hoisting,
marginal
cutting
wherever required, assembling and
tack welding, transportaion upto
500 m. etc. complete.

2488.00
2631.00

a) 5 mm to 8 mm thick.
i) Upto 250 mm. dia.

Rmt

337.00

ii) Above 250 mm.Upto 500 mm. dia.

Rmt

396.00

iii) Above 500 mm.Upto 750 mm. dia.

Rmt

457.00

iv) Above 750 mm. Upto1000 mm. Rmt


dia.
v) Above 1000 mm.Upto 1250 mm. Rmt
dia.

517.00

Section-I-(XVII)-M.S.PIPES LAYING

578.00

189

Sr No

Item Description

Unit Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

b) 8 mm to 12 mm thick.
i) From 750 mm.Upto1 000 mm. dia.
ii) Above
dia.
iii) Above
dia.
iv) Above
dia.
v) Above
dia.
vi) Above
dia.
vii) Above
dia.

Rmt

689.00

1000 mm.Upto 1250 mm. Rmt

768.00

1250 mm.Upto 1500 mm. Rmt

848.00

1500 mm.Upto 1750 mm. Rmt

928.00

1750 mm.Upto 2000 mm. Rmt

1009.00

2000 mm.Upto 2250 mm. Rmt

1089.00

2250 mm.Upto 2500 mm. Rmt

1167.00

c) 12 mm to 16 mm thick.
From 2000
dia.
Above 2250
dia.
Above 2500
dia.
Above 2750
dia.
Above
3000

mm.Upto 2250 mm. Rmt

994.00

mm.Upto 2500 mm. Rmt

1042.00

mm.Upto 2750 mm. Rmt

1194.00

mm.Upto 3000 mm. Rmt

1273.00

mm.Upto 3250 mm. Rmt


dia.
Above 3250 mm.Upto 3500 mm. Rmt
dia.

1350.00
1416.00

d) 16 mm to 20 mm thick.
Above
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.

2500 mm.Upto 2750 mm. Rmt

1566.00

2750 mm.Upto 3000 mm. Rmt

1653.00

3000 mm.Upto 3250 mm. Rmt

1740.00

3250 mm.Upto 3500 mm. Rmt

1826.00

3500 mm.Upto 3750 mm. Rmt

1913.00

3750 mm.Upto 4000 mm. Rmt

2001.00

Section-I-(XVII)-M.S.PIPES LAYING

190

Sr No

Item Description

Unit Rate
(in
2012-2013

e) 20 mm to 25 mm thick.
from 3500 mm. Upto3750 mm. Rmt
dia.
Above 3750 mm.Upto 4000 mm. Rmt
dia.
4
Lowering and laying in position to
correct line and level including M.
S. specials such as distance
pieces, straps,

Rs.) Rate
in
2013-2014

Rs.

2133.00
2256.00

bends, tapers, etc. on pedestals or


chairs upon piers or trestles. The
rate to include loading, unloading
hoisting,
marginal
cutting
wherever required, assembling and
tack
welding,
and
including
transportation upto 500 m. etc.
complete as specified.

a) 5 mm to 8 mm thick.
Upto 250 mm. dia.

Rmt

472.00

Above 250 mm.Upto 500 mm. dia.

Rmt

556.00

Above 500 mm.Upto 750 mm. dia.

Rmt

639.00

Above 750 mm.Upto 1000 mm. Rmt


dia.
Above 1000 mm.Upto 1250 mm. Rmt
dia.

724.00
807.00

b) 8 mm to 12 mm thick.
From 750 mm.Upto1000 mm. dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.

Rmt

965.00

1000 mm.Upto 1250 mm. Rmt

1076.00

1250 mm.Upto 1500 mm. Rmt

1188.00

1500 mm.Upto 1750 mm. Rmt

1299.00

1750 mm.Upto 2000 mm. Rmt

1412.00

2000 mm.Upto 2250 mm. Rmt

1525.00

Section-I-(XVII)-M.S.PIPES LAYING

191

Sr No

Item Description

Unit Rate
(in
2012-2013

Above 2250 mm.Upto 2500 mm. Rmt


dia.

Rs.) Rate
in
2013-2014

Rs.

1635.00

c) 12 mm to 16 mm thick.
From
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.

2000 mm.Upto 2250 mm. Rmt

1503.00

2250 mm.Upto 2500 mm. Rmt

1563.00

2500 mm.Upto 2750 mm. Rmt

1672.00

2750 mm.Upto 3 000 mm. Rmt

1781.00

3000 mm.Upto 3250 mm. Rmt

1889.00

3250 mm.Upto 3500 mm. Rmt

1998.00

d) 16 mm to 20 mm thick.
From
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.

2500 mm.Upto 2750 mm. Rmt

2195.00

275Omm.Upto 3000 mm. Rmt

2314.00

3000 mm.Upto 3250 mm. Rmt

2437.00

3250 mm.Upto 3500 mm. Rmt

2555.00

3500 mm.Upto 3750 mm. Rmt

2679.00

3750 mm.Upto 4000 mm. Rmt

2802.00

e) 20 mm to 25 mm thick.
From 3500 mm.Upto 3750 mm. Rmt
dia.
Above 3750 mm.Upto 4000 mm. Rmt
dia.

Section-I-(XVII)-M.S.PIPES LAYING

2988.00
3157.00

192

Sr No

Item Description

Transporting
within
500
meters,laying in position to correct
line and level M. S. pipes with /
without
any
outcoating,
on
prepared bedding in trenches
including
marginal
cutting
wherever
required,
assembling
tack welding the same. The rate to
include
loading,
unloading,
hoisting, etc. complete as specified.

Unit Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

a) 5 mm to 8 mm thick
Upto 250 mm. dia.

Rmt

289.00

Above 250 mm.Upto 500 mm. dia.

Rmt

340.00

Above 500 mm.Upto 750 mm. dia.

Rmt

391.00

Above 750 mm.Upto 1000 mm. Rmt


dia.
Above 1000 mm.Upto 1250 mm. Rmt
dia.

442.00
493.00

b) 8 mm to 12 mm thick
From 750 mm.Upto1000 mm. dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.

Rmt

589.00

1000 mm.Upto 1250 mm. Rmt

656.00

1250 mm.Upto 1500 mm. Rmt

724.00

1500 mm.Upto 1750 mm. Rmt

793.00

1750 mm.Upto 2000 mm. Rmt

860.00

2000 mm.Upto 2250 mm. Rmt

928.00

2250 mm.Upto 2500 mm. Rmt

996.00

c) 12 mm to 16 mm thick
From 2000 mm.Upto 2250 mm. Rmt
dia.
Above 2250 mm.Upto 2500 mm. Rmt
dia.

Section-I-(XVII)-M.S.PIPES LAYING

915.00
955.00

193

Sr No

Item Description
Above
dia.
Above
dia.
Above
dia.
Above
dia.

Unit Rate
(in
2012-2013

2500 mm.Upto 2750 mm. Rmt

1021.00

2750 mm.Upto 3000 mm. Rmt

1087.00

3000 mm.Upto 3250 mm. Rmt

1153.00

3250 mm.Upto 3500 mm. Rmt

1219.00

Rs.) Rate
in
2013-2014

Rs.

d) 16 mm to 20 mm thick
From
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.

2500 mm.Upto 2750 mm. Rmt

1334.00

2750 mm.Upto 3000 mm. Rmt

1408.00

3000 mm.Upto 3250 mm. Rmt

1483.00

3250 mm.Upto 3500 mm. Rmt

1558.00

3500 mrn.Upto 3750 mm. Rmt

1632.00

3750 mm.Upto 4000 mm. Rmt

1708.00

e) 20 mm to 25 mm thick
From 3500 mm.Upto 3750 mm. Rmt
dia.
Above 3750 mm.Upto 4000 mm. Rmt
dia.
6

1817.00
1922.00

Transporting
within
500
meters,laying in position to correct
line and level M. S. specials pipes
with / without any outcoating,
such as distance pieces, straps,
bends, tapers, etc. on prepared
bedding in trenches including
marginal
cutting
wherever
required, assembling tack welding,
the same. The rate to including
loading, unloading, hoisting, etc.
complete as specified.

Section-I-(XVII)-M.S.PIPES LAYING

194

Sr No

Item Description

Unit Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

a) 5 mm to 8 mm thick
Upto 250 mm. dia.

Rmt

406.00

Above 250 mm.Upto 500 mm.dia.

Rmt

475.00

Above 500 mm.Upto 750 mm. dia.

Rmt

548.00

Above 750 mm.Upto 1000 mm. Rmt


dia.
Above 1000 mm.Upto 1250 mm. Rmt
dia.

618.00
691.00

b) 8 mm to 12 mm thick
From 750 mm.Upto1000 mm. dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.

Rmt

824.00

1000 mm.Upto 1250 mm. Rmt

919.00

1250 mm.Upto 1500 mm. Rmt

1013.00

1500 mm.Upto 1750 mm. Rmt

1109.00

1750 mm.Upto 2000 mm. Rmt

1288.00

2000 mm.Upto 2250 mm. Rmt

1345.00

2250 mm.Upto 2500 mm. Rmt

1394.00

c) 12 mm to 16 mm thick
From
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.

2000 mm.Upto 2250 mm. Rmt

1282.00

2250 mm.Upto 2500 mm. Rmt

1387.00

2500 mm.Upto 2750 mm. Rmt

1428.00

2750 mm.Upto 3000 mm. Rmt

1521.00

3000 mm.Upto 3250 mm. Rmt

1616.00

3250 mm.Upto 3500 mm. Rmt

1708.00

Section-I-(XVII)-M.S.PIPES LAYING

195

Sr No

Item Description

Unit Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

d) 16 mm to 20 mm thick
From
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.

2500 mm.Upto 2750 mm. Rmt

1855.00

2750 mm.Upto 3000 mm. Rmt

1972.00

3000 mm.Upto 3250 mm. Rmt

2078.00

3250 mm.Upto 3500 mm. Rmt

2181.00

3500 mm.Upto 3750 mm. Rmt

2286.00

3750 mm.Upto 4000 mm. Rmt

2391.00

e) 20 mm to 25 mm thick

From 3500 mm.Upto 3750 mm. Rmt


dia.
Above 3750 mm.Upto 4000 mm. Rmt
dia.
Welding in all positions with
required number of runs, for M. S.
pipes internally and / or externally
including
gauging
wherever
necessary, fixing appurtenances
and
other
accessories
in
connection with pipe laying work
as per specification.

2543.00
2692.00

a) Butt Joints : Plat Thickness


4 mm.

Rmt

131.00

5 mm.

Rmt

198.00

6 mm.

Rmt

465.00

7 mm.

Rmt

519.00

8 mm.

Rmt

651.00

10mm.

Rmt

798.00

12mm.

Rmt

854.00

14mm.

Rmt

1018.00

16mm.

Rmt

1232.00

18mm.

Rmt

1334.00

20 mm.

Rmt

1599.00

22 mm.

Rmt

2008.00

25 mm.

Rmt

2725.00

Section-I-(XVII)-M.S.PIPES LAYING

196

Sr No

Item Description

Unit Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

b) Lap joints with convex fillet welds Lag Lengths


Lengths:

5 mm.

Rmt

183.00

6 mm.

Rmt

234.00

8 mm.

Rmt

310.00

10mm.

Rmt

347.00

12mm.

Rmt

519.00

14mm.

Rmt

705.00

16mm.

Rmt

776.00

18mm.

Rmt

941.00

20 mm.

Rmt

1062.00

22 mm.

Rmt

1419.00

25 mm.

Rmt

1723.00

From
dia.
Above
dia.
Above
dia.
Above
dia.

1000 mm,Upto 1250 mm. Rmt

355.00

1250 mm.Upto 1500 mm. Rmt

435.00

1500 mm.Upto 1750 mm. Rmt

513.00

1750 mm.Upto 2200 mm. Rmt

592.00

Above
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.

2000 mm.Upto 2250 mm. Rmt

670.00

2250 mm.Upto 2500 mm. Rmt

749.00

2500 mm.Upto 2750 mm. Rmt

827.00

2750 mm.Upto 3000 mm. Rmt

908.00

3000 mm.Upto 3250 mm. Rmt

987.00

3250 mm.Upto 3500 mm. Rmt

1065.00

Shifting and aligning ring girders


including removing tack welds
and re-tacking in the correct
position etc. complete as per
specification for the pipes of
following diameter.

Section-I-(XVII)-M.S.PIPES LAYING

197

Sr No

Item Description

Unit Rate
(in
2012-2013

Above 3500 mm.Upto 3750 mm. Rmt


dia.
Above 3750 mm.Upto 4000 mm. Rmt
dia.
Transporting within 500 meters
and fixing in position stools, base
plates, roller sets, grease box
covers, etc. including welding
wherever necessary. The rate also
to include fixing stools, base
plates, etc. in true line and level,
connecting the base plate to
anchor bolts by flush welding
including cutting the bolts, if
required, assembling and aligning
C. I. or M. S. roller sets of any size
including oiling, greasing, etc. The
rate also to include grouting
anchor bolts, welding of two halves
of grease box covers as directed by
Engineer-in-charge, for pipes of
following dia.

1144.00

From
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.
Above
dia.

1000 mm,Upto 1250 mm. each

1299.00

1250 mm.Upto 1500 mm. each

1405.00

1500 mm.Upto 1750 mm. each

1511.00

1750 mm.Upto 2200 mm. each

1617.00

2000 mm.Upto 2250 mm. each

1723.00

2250 mm.Upto 2500 mm. each

1829.00

Above 2500 mm.Upto 2750 mm. each


dia.
Above 2750 mm.Upto 3000 mm. each
dia.
Above 3000 mm.Upto 3250 mm. each
dia.

1935.00

Section-I-(XVII)-M.S.PIPES LAYING

Rs.) Rate
in
2013-2014

Rs.

1229.00

2041.00
2147.00

198

Sr No

10

11

Item Description

Unit Rate
(in
2012-2013

Above 3250 mm.Upto 3500 mm. each


dia.
Above 3500 mm.Upto 3750 mm. each
dia.
Above 3750 mm.Upto 4000 mm. each
dia.
Transporting within 500 meters
and aligning, fixing in position and
tack welding expansion joints
suitable for pipeline of diameters.

2253.00

From 1000 mm,Upto 1250 mm.


dia.
Above 1250 mm.Upto 1500 mm.
dia.
Above 1500 mm.Upto 1750 mm.
dia.
Above 1750 mm.Upto 2200 mm.
dia.
Above 2000 mm.Upto 2250 mm.
dia.
Above 2250 mm.Upto 2500 mm.
dia.
Above 2500 mm.Upto 2750 mm.
dia.
Above 2750 mm.Upto 3000 mm.
dia.
Above 3000 mm.Upto 3250 mm.
dia.
Above 3250 mm.Upto 3500 mm.
dia.
Above 3500 mm.Upto 3750 mm.
dia.
Above 3750 mm.Upto 4000 mm.
dia.
Transporting within 500 meters
aligning and fixing in position and
tack
welding
only,
including
marginal cutting, supplying and
providing rubber packing etc.
where necessary.

each

4395.00

each

4558.00

each

4723.00

each

4887.00

each

9238.00

each

9445.00

each

9650.00

each

9793.00

each

10063.00

eacj

10270.00

each

10474.00

each

10682.00

Section-I-(XVII)-M.S.PIPES LAYING

Rs.) Rate
in
2013-2014

Rs.

2378.00
2463.00

199

Sr No

Item Description

Unit Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

A) Minor fixtures such as manhole


cover, pressure and non-pressure
type blank
flanges, loose rings, small pipes to
form saddle bypass arrangement,
plug plates, ladders, platform,
stiffener rings, etc.
MT

7868.00

MT

3997.00

Upto 5 mm.

Rmt

59.00

Above 5 mm. Upto10 mm.

Rmt

84.00

Above 10 mm. Upto14 mm.

Rmt

109.00

Above 14 mm. Upto18 mm.

Rmt

124.00

Above 18 mm. Upto22 mm.

Rmt

172.00

Above 22 mm.

Rmt

230.00

B) Minor fixtures such as tees,


domes, Y branches, insulating
flange ring assembly, etc.

12

13

14

Gas cutting (either square cut or V


cut) pipes, plates, etc. of thickness.

Gas cutting holes upto50mm dia


(for plugs)
Thickness of shell :
5 mm. to 12 mm

No

65.00

Above 12 mm

No

90.00

Providing M.S. bar mesh prepared


out of 16 mm dia M.S. bar at 15
cm. c/c both ways, welded to
flanged ring including tack welding
of bars and fixing the same with
nuts and bolts on open faces of
outlet/inlet pipes in the sump or
reservoir, etc. complete as directed
by Engineer-in-charge.

Sq.m

Section-I-(XVII)-M.S.PIPES LAYING

1192.00

200

Sr No

Item Description

15

Providing permanent test points on


the pipe line as per drawing and as
directed by Engineer-in-charge
including providing and fixing
sluice

Unit Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

valves, road boxes for sluice valves


of size 80 mm to 250 mm in one
brick masonry chamber 300 mm x
300 mm clear C. M. 1:5 with 12
mm thick 1:3 cement plaster both
inside and outside on M-100 c.c.
150 mm thick etc. complete as
specified and directed.

16

Supplying transporting, the S.P.


fire hydrants including duck foot
bend, S.V. and S.V. road box,
painting the hydrant,fixing the
saddle piece, supplying, and laying
required length of C.I. pipeline and
jointing the same spun yarn,
molten lead including caulking,
fixing the S.V. road box in one
brick masonry chamber in 1:5
C.M. with 12 mm thick 1:3 cement
plaster both inside and outside on
1:3:6: C.C.150 mm thick etc,
complete specified and directed.
[As per I.S.900/1965 Revised]

17

Hydraulic testing of M.S. pipeline


to specified pressure including cost
of all materials and labour and
water for testing for the length
upto 1km., using reciprocating
type pumps which should be able
to provide specified test pressure

Section-I-(XVII)-M.S.PIPES LAYING

No

2675.00

No

13090.00

201

Sr No

Item Description

Unit Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

gauges
and
other
necessary
equipments,
labour,
operation
charges, etc. required for testing.
The rate under this item shall also
include cost of retesting, if
necessary.
Upto 600mm. dia.(I.D.)
Above 600 mm.upto 750
dia.(l.D.)
Above 750 mm.upto 900
dia.(l.D.)
Above 900 mm.upto 1050
dia.(l.D.)
Above 1050 mm.upto 1200
dia.(l.D.)
Above 1200 mm.upto 1500
dia.(l.D.)
Above 1500 mm.upto 1800
dia.(l.D.)
Above 1800 mm.upto 2250
dia.(l.D.)
Above 2250 mm.upto 2500
dia.(l.D.),
Above 2500 mm.dia. (l.D.)

km

37248.00

mm.

km

37303.00

mm.

km

37389.00

mm.

km

37518.00

mm.

km

37646.00

mm.

km

37899.00

mm.

km

38272.00

mm.

km

38898.00

mm.

km

39354.00

km

39809.00

km

189.00

Extra over initial KM


Upto600mm. dia.(I.D.)
Above 600
dia.(l.D.)
Above 750
dia.(l.D.)
Above 900
dia.(l.D.)
Above 1050
dia.(l.D.)
Above 1200
dia.(l.D.)
Above 1500
dia.(l.D.)
Above 1800
dia.(l.D.)
Above 2250
dia.(l.D.),

mm.upto

750

mm.

km

270.00

mm.upto

900

mm.

km

402.00

mm.upto 1050 mm.

km

531.00

mm.upto 1200 mm.

km

684.00

mm.upto 1500 mm.

km

1010.00

mm.upto 1800 mm.

km

1528.00

mm.upto 2250 mm.

km

2344.00

mm.upto 2500 mm.

km

2919.00

Section-I-(XVII)-M.S.PIPES LAYING

202

Sr No

Item Description
Above 2500 mm.dia.upto 2750 mm
dia
Above 2750 mm dia (I.D)

18

Providing
and
applying
with
mechanical
arrangement
1:3
proportion cement sand gunite, 40
to 50 mm thick to M. S. pipe
surface under 2.1 kg. per sqcm. to
2.80 kg. per sqcm. pressure
including removing the loose
materials as directed by Engineer in- charge and including scrapping
the surface with wire brushes,
degreasing,
cleaning
by
compressed air and providing
fixing BRC fabric no.14 as
reinforcement, curing for 21 days,
disposing
off
the
rebound
materials within a lead of 50 M,
etc. complete as directed by
Engineer-in-charge.

19

Providing
and
applying
pipe
coating of fibres, coaltar and
solvent based rubber modified
bituminous primer of density 0.92
gms/cu cm and viscosity of 10002000 cps @ 150 gms/sqm followed
by seven layers(4mm thick) of
polythene polymerised bitumen
and polyester of local 7 layers)
pipe coat 4 mm should conform to
requirement of IS-10221 and
AWWA C-203 for per-fabricated
tapes including covering cost on
pipe coating. Rates shall include
cost of material coating and
wrapping over the pipes, handling
charges,
preparation
of
pipe
surface, all labour, material, etc.
complete.

Section-I-(XVII)-M.S.PIPES LAYING

Unit Rate
(in
2012-2013
km

3530.00

km

4167.00

Sq.m

416.00

Sq.m

448.00

Rs.) Rate
in
2013-2014

Rs.

203

Sr No

Item Description

Unit Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

Note : Pipe coating is to be done at laying work site only.


20

21

Providing
and
applying
with
mechanical arrangement cement
sand gunite of 50 mm thickness to
floors, walls, floor slabs or any
other structure under 2.1 kg. per
sqcm. to 2.80 kg. per sqcm.
pressure including removing the
loose
materials
on
surface,
cleaning with comperssed air,
degreasing,
etc.
including
scaffolding and curing for 21 days,
providing and fixing BRC fabric no.
14
but
excluding
cost
of
reinforcement, if any and removing
rebound materials within a lead of
50 M, etc. complete as directed by
Engineer-in-charge (for GSRs and
buildings.)

Sq.m

363.00

Sq.m

476.00

Providing
and
applying
with
mechanical arrangement cement
sand gunite of 50 mm thickness to
floors, walls, roof slabs or any
other structure under 2.1 kg. per
sqcm. to 2.80 kg. per sqcm.
pressure including removing the
loose
materials
on
surface,
cleaning with compressed air,
degreasing,
etc.
including
scaffolding and curing for 21 days,
providing and fixing BRC fabric no.
14
but
excluding
cost
of
reinforcement, if any and removing
rebound materials within a lead of
50 M, for staging and bottom of
bottom slab, etc. complete as
directed by Engineer-in-charge (for
RCC ESRs)

Section-I-(XVII)-M.S.PIPES LAYING

204

Sr No

Item Description

Unit Rate
(in
2012-2013

Providing
and
making
inner
cement mortar lining to M.S. pipes
with mechanical devices in cement
mortar 1:1 proportion, including
cost of all materials, labour,
special sand required, machinery,
power generation, all equipments
and taking necessary access
openings and manholes, cuts at
suitable intervals as directed by
Engineer-in-charge and rewelding
the same after done with doubler
plates pipes including necessary
excavation,
refilling
concerte
breaking and remaking if any,
breaking guniting and remaking
the same, repainting whereven
required with epoxy paint in 3
coats, all dewatering including
emptying the pipeline and refilling
the same after done with (water to
be supplied by department free of
cost within 5 km. lead at fixed
point and all other arrangements
to be done by agency), including
carrying out C value performance
test of pipeline, complete job as per
the directions of the Engineer-incharge.
I 9 mm thick for pipesupto 700 mm
dia.
(Increase 25% for alignment in sq.m
hilly area)
ii 12 mm thick forpipes upto 700 sq.m
mm dia.
23 Providing
and
applying
of
elastomeric
(450%
elongation),
thermoplastic,
fire
retardant,
coating skin tensile strength 18 to
21
kg/cm2,
antifungal
antibacterial anticorrosive, graft copolymer
Coating
on
smooth
plastered surface. 100 Micron
dyufilm thickness of self bonding
with plastered surface and 100
Micron of top cost. For sewage
treatment

Rs.) Rate
in
2013-2014

Rs.

22

Section-I-(XVII)-M.S.PIPES LAYING

326.00
377.00

205

Sr No

Item Description

Unit Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

plant (R. C. C. Tank inside coating)


and water treatment plant.

24

25

sq.m

1057.00

sq.m

618.00

sq.m

647.00

sq.m

663.00

Providing and applying external


and internal coating for steel
structures in sewage treatement
plant/water treatement plant with
elastomeric
(450%
elongation),
thermoplastic,
fire
retardant,
coating skin tensile strength 18 to
21
kg/cm2,
antifungal
antibacterial, anticorrosive, graft
co-polymer. 50 Micron DFT. of self
bonding with steel, 50 Micron DFT.
of inner coat and 50 Micron DFT of
top coat.

Providing
and
applying
of
elastomeric
(450%
elongation),
thermoplastic,
fire
retardant,
coating skin tencile strength 18 to
21
kg/cm2,
antifungal,
antibacterial anticorrosive, graft copolymer coating on external pipe
lines in un laid/laid condition after
proper cleaning. 50 micron DFT of
self bonding grade with metal
surface, 50 Micron DFT of self
bonding grade with metal surface,
50 Micron DFT inner coat and 50
Micron DFT of top coat.

1) water and sewage pipelines


(external) in unlaid condition.
2) water and sewage pipelines
(external) in laid condition.
26

Providing
and
applying
of
elastomeric
(450%
elongation),
thermoplastic,
fire
retardant,
coating skin tensile strength 18 to

Section-I-(XVII)-M.S.PIPES LAYING

206

Sr No

Item Description

Unit Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

21
Kg/cm2,
antifungal,
antibacterial anticorrosive, graft copolymer
coating
on
internal
surface of pipe lines. 100 Micron
DFT of site bonding grade with
steel surface and 100 Micron DFT
of top coat.
1) Pipe lines (external) in unlaid
condition.
sq.m

814.00

sq.m

869.00

1) 6mm dia

M.T.

29598.00

2) 8mm dia

M.T.

22648.00

3) 10mm dia

M.T.

17947.00

4) 12mm dia

M.T.

14933.00

5) 16mm dia

M.T.

11182.00

6) 20mm dia

M.T.

9100.00

7) 25mm dia

M.T.

7187.00

8) 32mm dia

M.T.

5759.00

9) 40mm dia

M.T.

4373.00

2) Pipe lines (external) in laid


condition.
27

28

Providing
and
applying
of
elastomeric
(450%
elongation),
thermoplastic,
fire
retardant,
coating skin tensile strength 18 to
21
kg/cm2,
antifungal,
antibacterial anticorrosive, graft copolymer coating on cleaned steel
reinforcement bars. 80 to 100
micron DFT With self bonding
trade of bar coating.

Providing and applying of H D P E


coating for MS pipe internally as
well as externally including cost of
H D P E powder moulding pipe
grade, labour, scrapping the pipe
surface
with
wire
brushes,
degreasing, cleaning by

Section-I-(XVII)-M.S.PIPES LAYING

207

Sr No

Item Description

Unit Rate
(in
2012-2013

Rs.) Rate
in
2013-2014

Rs.

compressed
air
and
surface
grinding and finishing including
cost of loading , unloading and
handling of pipe at factory etc.
complete as directed by Engineer in -charge.
HDPE Coating
Thickness in micron
External
Internal
Total
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,coating ---------,,--------------------thick
1) 0 micron

Without
E.D.

2000

2000

sq.m

1508.00

2) 2000 micron 1000

3000

sq.m

1893.00

3) 3000 micron 1000

4000

sq.m

2176.00

4) 3000 micron 2000

5000

sq.m

2501.00

Section-I-(XVII)-M.S.PIPES LAYING

208

Section - I- (XVIII) - TREATMENT PLANT (W.T.P. S.T.P.)


Sr No

Item Description

Designing
(aesthetically),
providing
and
constructing high rate Unconventional Water
Treatment Plant i.e. Simplified Water Treatment
Plants consisting of Civil works including cost of
Providing and applying Epoxy paint to inside
surface of water retaining structures in contact
with chlorine and providing anti - termite treatment
to entire structure below Ground level, Mechanical
and Electrical components of variours sub-works as
given below : including necessary hydraulic testing,
structural testing and trial run for 3 months, etc.
complete as directed by Engineer-in-charge (turnkey job) works.

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

1) Aeration Fountain
2) Inlet arrangements
3) Mixing channel with ventury flume and flow
measuing arrangement
4) Inlet channel
5) Flocculator Confirming to I.S. 7208-1974 (Type - C) with
detention period of 30 minutes
6) Tube Settlers Designing, fabricate and construct Tube Settlers
with square or any other shaped tube like Circular,
Cheveron,
Hexagonal
etc.
having
proven
performance.
7) Rapid sand gravity filters
8) Filter house
9) Chemical house
10) Alum tanks 2 Nos. with mixing carrying and
dosing arrangements with piping.
11) Gravity feed gas chlorinator with 100% standby.
12) TCL solution tank with mixing, carrying and
dosing arrangement with piping
13) Bye-pass arrangement
14) External and internal electrification
15) Laboratory equipments

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

209

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

16) Wash water tanks of capacity equal to 12 minutes


to wash specified number of filter beds at time at
600 lit/m2/m under head of 12 m at under drain
17) Wash water pumps with 100% standby
18) Air blowers capable of delivering 600 LPM per
square metre of free air of filter area at 0.4
Kg/sqcm at the under drains (100%standby)
19) Pure water sump capacity equal to 1 hour
pumping capacity
20) Pure water pump house over the sump / by the
side of sump
21) Drainage arrangements
22) Alum store
23) Sanitary block with necessary water supply and
drainage arrangement and internal WBM roads
24) These rates are applicable for seismic zones 2,3
and 4
25) Rates given below are inclusive of uplift pressure if
any and dewatering during the entire work
26) All RCC structures shall be constructed in M-250.
Structures in contact with water shall be in M-300.
27) Unconventoinal Treatment Plants less than 1 MLD
capacity shall not be constructed.
Note: Conditions from Sr. No. 1 to 27 shall form a part
and parcel of the tender and must be included in
draft tender papers for the work of unconventional
treatment plants.
UnconventionalWaterTreatmentPlant
S.No.

Capacity in Mld

LABOUR

1 Fixed cost for 1 MLD

Job

in Rate
in
Lakhs
21.40
53.00

2 Add for capacity above 1 MLD upto 2 MLD

MLD

24.00

9.50

3 Cost of 2 MLD Treatment Plant

Job

77.00

30.90

4 Add for capacity above 2 MLD upto 5 MLD

MLD

18.00

7.10

5 Cost of 5 MLD Treatment Plant

Job

131.00

52.30

6 Add for capacity above 5 MLD


7 Cost of 10 MLD Treatment Plant

MLD
Job

14.00
201.00

5.70
80.40

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

Unit

Rate
Lakhs

210

Sr No

Item Description

Designing
(aesthetically),
providing
and
constructing and commissioning Conventionl Water
Treatment Plant consisting of all Civil, works
including cost of Providing and applying Epoxy
paint to inside surface of water retaining structures
in contact with chlorine and providing anti termite treatment to entire structure below Ground
level, Mechanical and Electrical components of
variours sub-works as given below : including
necessary hydraculic testing, structural testing
equipment testing, trial run for a period of 3
months, etc. complete as directed by Engineer-incharge (turn-key job).

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

1) Aeration Fountain
Plan area not less than 0.625 square metre per
MLD
2) Ventury Flume
With necessary devices, consisting of simple
mechanical indicator. ( Pedestal type gauge)
3) Flash Mixer
Rapid mixing device, detention time 60 seconds to
give velocity gradient 300 to 400 sec-1 vane mixer
type confirming to I.S. 7090 of 1985.
4) Flocculator
Confirming to I.S. 7208 of 1974 (Type-C) with
detention period of 30 minutes.
5) Clarifier
Horizontal flow circular tank, detention period 2-5
hours, overflow rate 30 cubic metre per square
metre per day (to be specified), Weir loading not
more than 300 cubic metre per metre per day, with
mechanical sludge scraper conforming to I.S. No.
10313 -1982 with necessary inlet arrangements.

6) Rapid Sand Filters and Filter House


Filter designed for filteration rate of 5,000 liters per
square metre per hour, minimum 2 beds for plant
upto 10 MLD, for larger plants as specified, filters

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

211

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

to be located in filter house with roof slab, pipe


gallery and platform minimum 5.5 metre in width
with constant rate filtration or declining rate
filtration.
a) Filter Sand
Effective size 0.45 to 0.70 mm, uniformity
coefficient not more than 1.7, nor less than 1.3,
depth of water over sand 0.75 M, free board 50 cm,
gravel 0.45 M in depth, sand and gravel confirming
to I.S. 849 (i)-77, back wash by air wash, standard
appurtenances
b)Wash Water Tank
Capacity to be specified and suitable to supply
water to wash specified number of filter beds at a
time 12 minutes @ 600 lit/sqm/min. under a head
of 12 m at under drain.
c)Wash Water Pumps
Capacity to fill water tank in 1 hour with 100 %
standby.
d)Air Blowers
Capable of delivering 600 LMP per square metre of
free air, of filter area at 0.4 kg/square cm at the
underdrains (100% stand by) for period of 5 min.
7) Chemical House in Two Storeys
a)Ground floor to accommodate 7 days alum
requirement and sundry storage (Minimum 4 m
height)
b)First floor to accommodate alum and lime tanks.
chain pulley block etc. (min. 5 m height)
c) Solution tanks
Minimum 3 tanks (one for preparation. second for
dosing and third as standby), each tank capable of
giving 8 hours maximum dose without interruption,
minimum free board 0.30 M, trays for dissolving,
level indicator, mechanical agitation devices,
solution feed and drain lines, solution feed device
(constant head device,strength of solution upto
10% only) conforming to I.S. 9222 part-I/1979.

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

212

Sr No

a)

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

8) Pure Water Sump and Pump House


Capacity of sump
One hour of designed flow.

b)

Pump House
Pump house of required size over the sump or by
the side.
9) Store House
Suitable for alum storage of three months and 7
days temporary storage, 7 days TCL requirement in
mansoon with 20 % extra capacity for other sundry
articles.

10) Vacuum feed type chlorinators - make to be


approved by MJP.
a) Confirming to I.S. 10533 - A Part-II 1983.
b) Rate of withdrawal.
Temperature Kg.of Chlorine discharge per day
Degree C

Cylinders
45

67

10

6.35

9.50

110

15

10.75

16.10

130

20

14.50

21.24

254

27 & above

18.70

28.12

315

Tonners

c) Chlorinator equipment and container room: to


confirm to I.S. 10553 Part - I 1983.
d) 100% Standbye shall be provided
11) By pass arrangements - C.I. pipes.
i) By passing all units of T.P.
ii) By passing flash mixer, clariflocculator.
iii) By passing flash mixer, clariflocculator & filter
units
12) Disposal of waste from WTP : Safe disposal
arrangement to nearby nalla including cost of pipe
13) For WTP of capacity 30 mld and more additional
arrangement for backwash water recycle shall be
provided, including sump, pumping machinary,
rising main etc. complete.

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

213

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

14) Drainage arrangements To decant all units of WTP


with CI pipes upto boundary of each unit and
further extension with RCC pipes to nearby nalla.
15) Electrical installation.
Both internal and external including entire plant
area.
16) Laboratory equipment.
As per requirement
tendering.)
17) Sanitary blocks.

(to

be

specified

during

Carpet area-15 square metre minimum upto 25 Mld


and 25 square metre above 25 Mld.
18) Administrative block and internal road.
To accommodate office room. chlorine room,
laboratory room, panel board room, blower room
etc. and WBM road to connect all units from main
gate of plot.
19) Rates given below are inclusive of uplift pressure
if any and dewatering during entire work.
20) Disposal of waste from WTP: Safe disposal
arrangement to nearby nalla including cost of
pipes.
21) For WTP of capacity 30 mld and more additional
arrangement for backwash water recycle shall be
provided, including sump, pumping machinary,
rising main etc. complete.
22) All pipes conduits channel with 20% overloading.
23) These rates are applicable for seismic zones-2,3
and 4.
24) All RCC structures shall be constructed in M-300.
25) All pipes and conduits channel with 20%
overloading capacity.
Note: Conditions from Sr. No. 1 to 19 shall form a part
and parcel of the tender and must be incorporated
in draft tender papers of conventional treatment
plants.

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

214

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014
LABOUR

Rates for Conventional Treatment Plants (proposed)


S.No.

Capacity in Mld
1 Upto 5 MLD
2 Cost of 5 MLD Treatment Plant
3 Add for capacity above 5 MLD upto 10 MLD
4 Cost of 10 MLD Treatment Plant
5 Add for capacity above 10 MLD upto 20 MLD
6 Cost of 20 MLD Treatment Plant
7 Add for capacity above 20 MLD upto 50 MLD
8 Cost of 50 MLD Treatment Plant
9 Add for capacity above 50 MLD upto 100 MLD

10 Cost of 100 MLD Treatment Plant


11 Add for capacity above 100 MLD

Unit
MLD

Rate
Lakhs

in Rate
Lakhs
33.00

in
13.3

Job

166.00

66.5

MLD

24.00

9.5

Job

285.00

114.0

MLD

15.00

6.2

Job

440.00

175.8

MLD

14.00

5.7

Job

867.00

346.8

MLD

12.00

4.8

Job

1461.00

584.4

MLD

9.50

3.8

Designing (aesthetically), providing, fabricating,


Package Water Treatment Plant. At the shop,
transporting to site, installing, testing and
commissioning at the site, giving necessary one
months free test and trial run with guarantee for
one year, etc. complete.
Prefabricated Package Water Treatment Plant
comprising following
1 Rapid mixing channel in M.S. sheets and M. S.
baffle.
2 Flocculator not less than 10 minutes detention, in
M.S. prefabricated box, flocculation being achived
either by glass pebbles of graded size or PVC
tetrapod or equivalent arrangement to ensure good
flocformation.

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

215

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

3 Plate or tube settlers of not less than 30 minutes


detention, in M.S. prefabricated box, plates / tubes
mounted in the settler basin with inclination of not
less than 60 degree to horizontal.
4 Rapid sand gravity filter in M. S. prefabricated
box with filter sand not less than 500 mm thick,
supported on false floor below with polypropylene
nozzles spaced at not more than 500 mm centres
in either direction
5 Backwashing, inlet facilities only shall be
provided. Department shall provide either ESR
giving 8 to 10 M head at filter nozzles or backwash
pump, having flow rate of 0.6 Cum per minute per
square metre of filter bed. (Limit upto 5.0 M. from
W.T.P. face)
6 All civil works for foundation, consisting of raised
RCC platform above G.L. or walls in B.B. masonry
or UCR masonry shall be provided as per needs at
site.
7 Bypass in the form of pipes or M.S. channels
included in the design, effecting bypass of such
new tank and filter individually or both. (Limit upto
5.0 M. from W.T.P. face)
8 The entire M.S. fabricated tank provided with FRP
lining (5 mm thick) to inside face in contact with
water epoxy painting- two coats with one coat of
primer on outside. The thickness of plates
employed shall not be less than 6 mm
9 Alum dosing and mixing arrangements to be
provided in twin tanks, each of 8 hours capacity,
capable of importing does of 20 ppm with 5%
solution. The alum tanks provided with a dose in
steps of 5 ppm and entire unit mounted on the top
of flocculator / settler box, in the form of
prefabricated structure, with access platform and
ladder. Alum boxes with FRP lining (5 mm thick)
inside and epoxy paint two coats with one coat of
primer on outside.

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

216

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

10 Both flocculator and settling basins provided


with hopper bottom with slope not less than 45
degrees to the horizontal drain pipes and valves
provided to both flocculator and settling basin.
11 Flow ratings to conform following parameters :
a) Velocities in channels not to exceed 0.6 M./Second.
b) Velocities in filter outlet pipes and valves not to
exceed 1 M./Second.
c) Velocities in interconnecting pipe and controls not
to exceed 1M./Second.
d) Backwash with air : Not required.
e) Backwash with water : Not less than 0.6 M./ Sqm.
of filter bed area in filter box.
12 Free board for all units not less than 300 mm
13 Rates as above include all taxes, octroi and duties
which would be specific to the site locations.
Rates for Package Water Treatment Plant
S.No.

Capacity in Mld

LABOUR

Unit

Rate
Lakhs

1 21 Cum / Hr. (0.50 MLD)

Each

in Rate
in
Lakhs
27.40
11.10

2 34 Cum / Hr. (0.80 MLD)

Each

33.70

13.50

3 42 Cum / Hr. (1.00 MLD)

Each

37.80

15.10

4 63 Cum / Hr. (1.50 MLD)

Each

47.40

19.00

5 83 Cum / Hr. (2.00 MLD)

Each

56.20

22.50

6 125 Cum / Hr. (3.00 MLD)

Each

72.40

28.90

Note : Depending upon the capacity required for the scheme,one of the above capacity
should be choiced.

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

217

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

SEWAGE TREATMENT PLANT (STP )


A)
Designing (aesthetically), providing, and
constructing and giving satisfactory trials of
modernised Sewage Treatment Plant consisting of
receiving chamber, screen chamber, grit chamber,
measuring flume, distribution chamber with
primary and secondary treatment, etc. as detailed
below, administration block of suitable size
including allied units for waste disposal with all
civil and mechanical works involved, etc. complete
(Turn key job).
LABOUR

A) Primary and Secondary Treatment (Extended


Aeration Process)
S.No. Capacity of Plant

Unit

Rate
Lakhs

in Rate
in
Lakhs
48.00
19.00

1)

1. Upto 10 MLD

MLD

2)

2. Cost of 10 MLD Plant

Job

475.00

190.10

3)

3. Add for capacity above 10 MLD upto 20 MLD

MLD

42.00

16.60

4)

4. Cost of 20 MLD Plant

Job

891.00

356.40

5)

5. Add for capacity above 20 MLD

MLD

36.00

14.30

6)

6. Cost of 50 MLD Plant

Job

1960.00

784.10

7)

7. Add for capacity above 50 MLD

MLD

30.00

11.90

8)

8. Cost of 100 MLD Plant

Job

3445.00

1378.10

B) Designing
(Aesthetically)
Providing
and
constructing, hydraulic testing commissioning and
giving satisfactory trials of modernised sewage
treatment plant consisting of inlet chamber,
screen chamber, Detritus tanks, Parshall flume,
primary settling tanks, Aeration tanks, Secondary
settling tanks, Sludge Sump and Pump House
,Sludge Thickner, Primary digester , Secondary
digester, SST Sump and Pump house, Chlorine
contact tank, Chlorinators, Chlorinator room, sump
cum blending tank, PST sludge sump cum blending
tank,Pump house, Sludge Centrifuge, gas holder,
necessary piping work with required valves, gates,
drains, pathways, Administrative Building cum
Laboratory, Laboratory equipments, tools and
plants, Spare parts etc. complete as turnkey job
with all involved civil electrical and

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

218

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

mechanical works inclusive of following items,


units as per detailed specification for civil,
Electrical and Mechanical Components with all
duties and taxes etc.complete.
1 Inlet Chamber:
Designing, providing and constructing R.C.C.
(M:250) Inlet chamber designed for the peak flow 2
DWF including necessary excavation in all types of
strata including walkway around the periphery.
Each compartment will have phosper bronze, steel
gate with extension rod, head stock, opreating
wheel, G.I. Pipe railing etc. The work includes
providing and making necessary arrangements to
connect the flow to screen chamber by approach
channel as directed and as per specifications.
2 Screen Chambers:
Designing, providing and constructing and testing
commissioning screen chamber, designed for
average 1DWF & maximum 2 DWF in RCC (M-250),
including inlet pipe/Channel from inlet chamber
outlet, pipe/channel to detritus tank, free board of
0.50 m minimum, RCC walkway 1.2M wide with
G.I. Pipe railing. RCC stair case of 1.2 m width
from G.L. to screen chamber.
3 Detritus Tank :
Designing, providing and constructing continuously
grit removal type of Detritus Tank, mechanically
operated in RCC (M-250) capable of removing 100%
0.20mm size particle and above, having specific
gravity 2.30, designed for one peak 2 DWF with
suitable arrangement of separation of grit from
putrescible solids including providing and making
necessary arrangement of JB-1. inlet and outlet
channels of required sizes as may be required to
connect the flow to parshall flume etc. complete
including hydraulic testing for water tightness of
the structure having minimum free board of 0.30
m, washout arrangement to grit chamber and
platform 1.20m wide RCC walkway with G.I. pipe
hand railing shall be provided. A pit for collecting
grit conveyed by conveyor shall be provided It
should be suitable to handle the grit for carting. All
arrangments shall be as per detailed spaecifications
and as directed.

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

219

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

4 Parshall Flume:
Designing, Providing and constructing Parshall
Flume Channel in RCC(M:250) for
5 measuring quantity of sewage received at the
treatment works, max flow of 2 DWF and minimum
flow of 1/2 DWF including providing and making
necessary arrangment of approch channel as may
be required to connect the flow having minimum
velocity of 0.3m per second to Distribution Box (DB1) The unit shall be provided with walkway & RCC
staircase having width of 1.20 m each etc.
complete, including hydraulic testing for water
tightness of the civil structure having free board of
0.6 m including electrically operated, flow
indicating and flow integrating devices having a
standby of float operated ROF meter. All
arrangments as per specifications.
Primary Settling Tanks With Equipments :
Designing, providing, constructing and hydraulic
testing in RCC (M-250) water tight Primary Settling
Tanks of 1 DWF capaicty with feed chamber sludge
and effluent chamber, base adequately supported
providing 1.20m wide clear peripherial and
appraoch walkway interconnecting C.I. double
flanged pipes from feed chamber of the clarifier
distribution well grouting wherever necessary,
including foundation etc. as per speicifications
water depth at outer side shall be minimum 3.0
meters, weir loading shall not be greater than 125
cum DMF for average flow Bottom slope shall be
1:12
The floor of clarifier shall have 40 mm thick (min.)
screed course of cement grout of mix in C.M. 1:2
Detention period shall be 2.25 hrs. dispersion box
and stiffened weir plate made of mild steel plate not
less than 8 mm thick, aniticorrosive epoxy paint on
both faces shall be provided Minimum free board of
0.50 m. be provided it includes inlet pipe from
distribution chamber, central shaft inlet baffle
outlet chamber, Scum remover, skimming device,
scum chamber, connecting channel from PST outlet
chamber to DB-2 as per detailed specifications.

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

220

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

6 Aeration Tank (AT) :


Designing, providing and constructing in RCC mix
(M-250) Aeration Tank in compartments to handle
combined flow of 1 DWF, incoming flow and
recirculation flow including construction of inlet,
outlet and distrbution chamber DB-3 and providing
1.20m wide clear peripherial and approach walk
ways, expansion joints wherever necessary,
including foundation etc. as per specifications.
Peak factor shall be 2, F/M ratio shall be 0.40, low
speed aerator speed between 20 to 100 RPM
recirculation flow @ 50% and free board 0.60 m
Depth, (SWD) 3.50 m minimum D.O. level at A.T. 2
Mg/Lit, MLVSS concentration shall be 2500 Mg/Lit
and MLVSS concentration shall be 2000 Mg/Lit,
HRT shall be 4 to 6 hours and STR 6-8 days. It
should have compartents for washing, oxygen
transfer capacity of mechanical aerator shall not be
less than 1.5 Kg/KWH, BOD of effluent 20 mg/lit
with input to aerator 0.15 to 0.30 Kwh/1000 Cum
of Aeratoin tank. All related works shall be as per
detailed specifications.
7 Secondary Settling Tanks with equipments :
Designing, providing & constructing in RCC
(M:250) water tight secondary settling tank having
detention period 2 hours and SWD shall be 4.20
meter. The effluent BOD & SS from the secondary
clarrifier shall not be more then 20 Mg/lit and 30
mg/lit respectively. It should be hydraulically
tested, bottom floor slope of 1:12 and free board of
0.60 m minimum Dispersion box shall be made of
Mild Steel plate not less then 8 mm thick with
anticorrosive epoxy paint from both faces and well
stiffened The sewage admitted at the centre flowing
upward and outwards towards periphery be slowly
and continuously collected towards a convenient
discharge point near centre by a rotating wheel
arm. The Clarifier will be completed with end drive
half rotating bridge, structural steel rake, over flow
weir, walkway diffuser, over load alarms, having
push bottons, starters for the clarifier, walkway
and the suitable sludge withdrawing arrangement
with flush valve capable of withdrawing moisture
content not more then 97% to 98%, slote.oil and
Grease < 10 ppm recyclable qaulity of water for
industrial / agricultural

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

221

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

rotating sludge scrapper mechanism fitted with


squeezes including providing and making necessary
arrangement to connect the flow to outlet chamber
(DB-4) then the gravity mains for final diaposal and
as per detailed specifications and obligatory
provision. All other arrangements shall be as per
detailed specifications.
8 Sludge Thickner with equipments:
Designing providing and constructing water tight of
Sludge Thickner (Gravity type) including foundation
in RCC (M-250) with inlet and outlet chamber
influent well, inlet and outlet pipes, with sludge pit
and sludge removal arrangment, grouting wherever
necessary with walkway all around of 1.20 m width
G.I. pipe railing interconnecting CI pipes all
complete as per specifications Detention time 24
hours. SWD shall be 4.25 metre with necessary
fixed bridge scraper arrangment as per detailed
speicifications and necessary inlet and outlet
arrangement. All other arrangement as per detailed
specifications.
9 Primary Digester with mixer equipment (Fixed
Cover)
Designing, providing and constructing unit of water
tight and gas tight Primary Digester suitable for 1
DWF plant and complete with pipe gallery,
building, staircase for access from dome of digester
into inside staircase, walkways at springing levels
etc. walls and base slab being in RCC M:250,
domes in stucutural concrete including providing
burners and civil works for gas collection, grouting
wherever
necessary etc. complete as per
specifications. It should be designed for min 90 C
and max. 450C. and minimum detention time of 30
days, water depth shall not be more then 8.5m free
board shall be 0.6m with inlet and outlet
arrangement of C.I. flanged pipes including giving
hydraulic testing and air tightness testing. The item
includes providing works for collecting Gas and Gas
burner as per specification.
10 Secondary Digester with equipment (Fixed cover)
Designing, providing and constructing including
foudation unit of watertight and gastight Secondary
Digester to deal with 1 DWF complete

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

222

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

with pipe gallery, building, staircase for access from


dome of digester into inside, staircase to walkways
at springing levels etc., Walls and base slab and
domes being in RCC M:250, providing arrangement
for digested sludge from digesters to centrifuge,
providing burners and civil works for gas collection
grouting wherever necessary etc. complete. as per
specifications and obligatory provision All other
arrangements as per detailed specifications.
11 S.S.T. Sump & Pump House with recirculation
Pumps and Sludge Pumps to Digester:
Designing, providing & constructing Sump & Pump
house of requisite capacity with ceiling height not
less then 6.M., Sludge stream for recirculation to
aeration tank & excess sludge to SCBT, including
C.I. Piping to carry this flow to sump as per
detailed specification & as directed by Engineer-incharge.
12 Chlorine Contact Tank :
Designing, providing and constructing Chlorine
Contact chamber of adequate capacity to deal with
1 DWF. Average flow. The chlorine contact tank
should be of 30 minutes capacity during average
flow to achieve 99.99% coliform reduction. Chlorine
dose shall be maintained as per standard
provisions including provisions including designing,
providing
and
constructing
water
supply
arrangment for chlorination, including providing
dewatering and by-pass arrangements jointing to
final effluent main and outlet weir etc complete.
The effluent quality should match with the
standards laid down by Maharashtra Water
pollution Control Board and as per the obligatary
provision and detailed specifications and as
directed by Engineer-in- charge.
13 Chlorinator and chlorinator Room/Tonner
Room.
Designing, providing and constructing chlorinators
vaccum type 2 Nos each having capacity of 10
Kg/Hr as per obligatory provisions and detailed
sprcifications
with
necessary
provision
of
chlorinator room having floor area not less then 30
Sqmt including automatic residual chiorine

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

223

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

controller with actuator and residual chlorine


analyser including cost of chlorine cylinder, piping,
valves, measuring and controlling equipments,
safty devices, lifting equipments, etc. complete as
per I.S - 10553 (Part-II) 1982.The tonner room
should have 3 MT capacity crane for loading and
unloading facility. Tonner storage should distincitly
isolated and should be for minumum 10 Tonners
space and arrangements as per gas laws 1981 and
factory act shall be provided. and all other
matching amenities be provided, 5 MT gantry shall
be provded for full length of Tonner room at 6 m
height from floor level, with /outlet chember and
treated effluet outlet channel etc. complete as per
detailed specicifications.
14 Sump cum Blending Tank (SCBT)
Designing providing and constructing sump cum
blending tank of appropiate size and detention time
with free board of 0.60 m. The slope of floor 1:4
with suction pit at the centre as per detailed
specicfications and obligatory requirements.
15 P.S.T. Sump Cum Blending Tank, Pump House
with recirculation pumps:
Designing providing and constructing pump house
of appropriate size with pumps, ceiling height
minimum 6m over the circular sump for
discharging the sludge to thickner and recycling of
flow for blending with C.I. piping etc. complete as
per detailed specifications.
16 Sludge Centrifuge Room with Centrifuges.:
Designing, providing constructing and installing
including foundation etc. Sludge Centrifuge to
handle the sludge flow of one day in one hour per
unit with sludge dewatering unit drain etc.
Complete as per specifications. sludge centrifuge
with all necessary arrangements as per detailed
specifications mentioned in Volume -II and Volume III of tender and obligatory provisions, be provided
with satisfactory functioning.
17 Gas Holder:
Designing, providing and constructing gas holder
having gas collection system, gas flow meter and
gas burner with floating dome arrangement and

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

224

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

storage time 6 hrs. to be constructed in M-250


having appropriate diameter as per detailed
specifications and obligatory provisions. The
floating dome shall be of 8mm thick M.S. Plate
minimum and shall be provided with two coats of
anticorrosive epoxy coating from both faces.
18

Outfall Sewer :
Designing providing and constructing appropriate
Outfall Sewer of R.C.C. NP-2 pipe, to discharge
treated effluent, untreated effluent form outlet
chamber (after secondery clarifier) to the local
nallah at a point shown on the drawing including
necessary chambers for inspection / cleaning
including
necessary
excavation
dewatering,
refilling, concrete encasing/bedding concrete steps
to reach the nallah bed level. pitching and energy
dissipation chamber in the nallah portion etc.
complete.

19 Piping work in C.I.-LA Class including Sluice


Valve, Reflux Valve, M. S. Gate.
Providing laying and jointing pipes other than those
already included in the above items for
interconnection by-pass drains etc. of all units
including adequate numbers of manhole chambers.
The item includes excavations, refilling and
hydraullic testing
of pipes,valves , gates
,accessiories and cost of jointing materials The item
includes required channels with gates for
interconnection of units by pass drains etc. for all
units and as directed etc. complete as per detailed
specifications.
20 Administrative Building Cum Laboratory (G+1)
Designing
providing
and
constructing
Adminisrative Building, Office Cum Laboratory
including stores. This shall be a building having
appropriate Carpet area at ground floor and at first
floor complete as per specifications including
necessary excavation, foundation in RCC M-200
framed structure B. B. masonry (II-Class in C. M.
1:6) 20 mm cement plaster in C. M. 1:3 inside and
outside painting. Alluminum door and window with
glass pannels, mosaic tile flooring and

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

225

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

skirting and all other allied items, fixtures fastening


electrification
arrangement
water
supply
arrangment etc. complete. The building will have
laboratory on upper floor of administrative building
and should be so centralised that it should not be
attached with any unit but should have complete
control of every unit as per Laboratory Equipment,
beautification,
telephone
and
intercom
arrangement and Wireless system etc. complete
21 Primary
and
secondary
treatment-with
digesters, sludge drying beds etc. complete.
S.No. Capacity of Plant

LABOUR

Unit

Rate
Lakhs

in Rate
Lakhs
57

in

1 Upto 10 MLD

MLD

2 Cost of 10 MLD Plant

Job

570

228.10

3 Add for capacity above 10 MLD upto 20 MLD

MLD

50

20.00

4 Cost of 20 MLD Plant

Job

1069

427.70

5 Add for capacity above 20 MLD

MLD

43

17.10

6 Cost of 50 MLD Plant

Job

2352

940.90

7 Add for capacity above 50 MLD

MLD

36

14.30

8 Cost of 100 MLD Plant

Job

4134

1653.70

22.80

5 Moving Media Bio Reactor (MMBR) / FAB


(Fluidised Aerated Bed) Process

Designing, providing, construction, hydraulic


testing, commissioning and giving satisfactorily
trials of STP consisting of Inlet Chamber, screen
chamber, Grit Separator, MMBR / FAB (Based on
technologies providing attached growth on plastic
meddi kept suspended in the waste water due to
low density of plastic & provided with compressed
air for aeration with very high MLSS of greater than
15,000 mg/lit.) tank, Secondary Clari settler,
Sludge sump, Sludge Thickener, Chlorine Contact
Tank, Chlorinator room/Shed, sludge Centrifuge,
associated piping work with required valves,
gates, drains, pathways, Administration Block
cum Laboratory, Laboratory Equipments, spares
parts for 2 years of operation, etc. complete as
turnkey job with all involved civil, electrical

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

226

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

and mechanical works inclusive of following items,


units as per detailed specifications for civil,
electrical and mechanical components with all
duties and taxes etc. complete to acheive BOD < 10
ppm, COD < 50 ppm, TSS < 10 ppm Ph between 7
to 8.5, oil and Grease < 10 ppm recyclable qaulity
of water for industrial / agricultural purpose
FOLLOWING UNITS ARE INCLUDED
1. Inlet Chamber
Designing, providing and constructing RCC (M:25)
inlet chamber designed for the peak flow including
necessary excavation in all types of strata including
walkway
all
around
the
periphery.
Each
compartment will have CI gates with extension rod.
Head stock, operating wheels, GI pipe railing etc.
The work includes providing and making necessary
arrangements to connect the flow to screen
chamber by approach channel as directed and as
per specifications.
2. Screen Chamber
Designing, providing, constructing, testing and
commissioning of screen chamber, designed for
peak flow in RCC (M-25), including walkway 1.2 m
wide with GI pipe.
3. Grit Separator
Designing, providing & constructing detritor type
grit removal mechanism in RCC (M-25) capable of
removing 100% 0.2 mm size particle & above
having specific gravity 2.30 designed for peak flow
with suitable arrangement of separation of grit from
putrescible solids including providing & making
necessary arrangements of Jb-1. Inlet & outlet
channels of required sizes as make be required to
connect the flow to connecting unit etc. complete
including hydraulic testing for water tightness of
structure having minimum FB of 0.3 m, wash out
arrangement to grit chamber & platform 1.2 m wide
RCC walkway with GI pipe handling shall be
provided. A pit for collecting grit conveyed by
conveyor shall be provided.

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

227

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

It should be suitable to handle the grit for carting.


All arrangements shall be as detailed specifications
and as directed.
4. MMBR / FAB Tank
Designing, providing & constructing in RCC (M-25)
biological reactor tank for removal of BOD along
with nutrient removal to handle the average flow &
having hydraulics suitable to handle peak flow
conditions with suitable 1.2 m wide walk way,
expansion joints as required, including foundation
etc as per specifications. The tank shall be
equipped with inlet & outlet arrangement, air
blowers for supply of air, coarse bubble diffusers &
aeration grid in SS 304, PP carrier bio media etc.
FB of 0.5 m & SWD as required should be complete
as per detailed specifications.

5. Secondary Clarisettler
Designing, providing & constructing in RCC (M-25)
water tight secondary clarisettler having SWD of
3.75 m + 0.5 m FB & has tube media in the
clarification zone to provide additional surface area
for settling. The settler shall be provided with a
scraper mechanism in MS with epoxy painting for
collecting the settled solids at the bottom (bottom
slope 1:12). The central feed well shall be made of
MS with epoxy painting from both faces & well
stiffened. The sewage will be admitted in the feed
well & then will move outwards towards periphery
slowly & continuously over a weir & will be
collected in a launder.

6. Chlorine Contact Tank


Designing, providing & constructing chlorine
contact tank of adequate capacity to deal with
average flow. The contact time provided is 30 mm
to achieve 99.99 % reduction in coliform during
average flow condition. Chlorine dosage will be as
per standard provisions including designing,
providing & constructing water supply provisi9n for
chlorination, including providing dewatering &

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

228

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

by pass arrangement for joining to final effluent


mains & outlet weir etc complete. The effluent
quality should match with the standards laid down
by Maharashtra Pollution Control Boars & as per
obligatory provision & as detailed specification & as
directed by engineer in charge.
7. Chlorinator & Chlorinator Room / Tonner
Room
Designing, providing & constructing vacuum type
chlorinators having adequate capacity for dosage of
adequate chlorine to ensure 99.99% coliform
reduction as per obligatory provisions detailed
specifications with necessary provision of having
chlorinator room of adequate size. The chlorinator
equipment shall include chlorine cylinders I
tonners, piping, valves, measuring controlling
equipments, safety devises, lifting equipment etc.
complete as per IS 10553 (Part II) 1982. The tonner
room should have mm 3 MT capacity crane for
loading & unloading facility. Tonner storage should
be distinctly isolated and should have min. storage
space as per the detailed specifications & as per gas
law 1981 & factory act shall be provided. All other
matching amenities shall be provided, 5 MT gantry
rail shall be provided for full length of tonner room
a 6 m Ht from level of tonner room with outlet.

8. Sludge Sump
Designing, providing & constructing of sludge sump
and pump for discharging sludge to sludge
thickener using MS pipe complete as per detailed
specification.
9. SIudge Thickener
Designing, providing & constructing water tight of
sludge thickener - gravity type in RCC (M-25) with
inlet & outlet pipes, central feed well, sludge it &
sludge removal arrangement, grouting wherever
necessary with walkway all around of 1.20 m with
GI pipe railing interconnecting CI pipes all complete
as per specifications, having bottom slope 1:8 & 3
m SWD with necessary fixed bridge scraper

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

229

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

arrangement as per detailed specifications &


necessary inlet & outlet arrangement. All other
arrangement as per detailed specifications.
10. Sludge Centrifuge Platform with Centrifuge
Designing, providing, constructing & installing
including foundation etc. Sludge centrifuge to
handle the sludge flow of 1 day in 18 hrs per unit
with sludge dewatering unit drain etc complete is
per specification. Sludge centrifuge with necessary
arrangements
as
per
detailed
specification
mentioned in tender and obligatory provisions to be
provided with satisfactory functioning.

11. Outfall sewer


Designing, providing, constructing appropriate
outfall sewer of RCC NP2 pipe to discharge treated
effluent, untreated effluent from outlet chamber
(after basin / chlorination tank) to the local Nallah
at the point shown on the drawing including
necessary chambers for inspection & cleaning
including excavation, dewatering, refilling, concrete
encasing I bedding concrete.
12. Pining work in CI- LA class including sluice
valves, reflux valves, MS Gates
Providing, laying & jointing pipes other than hose
already included in the above items for
interconnection by pass drains etc. of all units
including adequate numbers of manhole chambers.
The item includes excavations, refilling & hydraulic
testing of pipes, valves, gates, accessories & cost of
jointing materials. The item includes required
channels with gates or interconnection of units, by
pass drains etc. for ill units as directed etc
complete as per detailed specifications.
13. Administrative Building cum Laboratory
(G+1)
Designing, providing & constructing administrative
building, office cum laboratory including stores.
This shall be building having appropriate carpet

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

230

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

area & ground floor & at first floor complete as per


specifications including necessary excavation,
foundation in RCC M 20 framed structure, BB
masonry (II class in CM 1:6) 20 mm cement plaster
in CM 1:3 inside & outside painting, aluminum
door & window with glass panels, mosaic tile
flooring & skirting & all other allied items, fixtures,
fastening, electrification arrangement, water supply
arrangement etc complete. The building will have
laboratory on upper floor of administrative building
& should have complete control of every unit as per
laboratory equipment, beautification, telephone &
intercom arrangement & wireless system etc.
complete.

Capacity of Plant

Rate in lakh

Area Required

01

0450

MLD

130.84

03

0650

MLD

77.04

05

1000

MLD

66.41

08

1500

MLD

60.31

10

1800

MLD

58.97

13

2300

MLD

53.36

15

2650

MLD

48.53

18

3250

MLD

47.89

20

3500

MLD

46.24

25

4350

MLD

44.47

NOTES
1 Screen chamber & grit separator up to 5 MLD
Capacity are manual type.
2 Up to 5 MLD Capacity STP chlorination is done
by using sodium hypochlorite solution. Above 5
MLD capacity gas chlorinator is provided.
3 Sludge thickener is not provided up to 3 MLD
capacity STP. Sludge will be collected into sludge
sump & pumped directly to sludge dewatering
system
4 For all STP sludge dewatering is using solid bowl
centrifuge.

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

231

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

5 Chlorinator room not provided for STP up to 3


MLD. For STP up to 3 MLD laboratory I
administration building is not provided. Only a
room for operator is provided.
6 Boundary wall, fencing, gate, storm water drains,
site clearance is not considered in scope.
7 All water retaining structures are in M 25 grade
of concrete.
8 Water table is considered 5 m below GL for
design.
9 Soil bearing capacity is considered as 20 TIm2 at
1.5 m below GL.
10 Lead for excavation is considered as 0.5 km.
11 Grade of cement used is OPC 43 grade.
12 Grade of steel used is Fe 415.
13 Peak factor considered for design for plants up
to 3 MLD is 3, 4 to 15 MLD is 2.5,16 to 20 MLD is
2.0.
14 Chemicals required during trial run &
commissioning is not considered.
15 Water & power during construction, trial run &
commissioning shall be provided by client.
16 Power available at STP location is assumed as
LT power supply.
IV MAKES OF EQUIPMENT
S.No. Description

Make

Kirloskar /

Centrifugal Pumps

Jhonson /Kishor
/ Eqv.
2

Screw Pumps

Roto/Tushaco/Eqv.

Air Blower

Usha/Swam/Kay/
Kulkarni / Eqv.

Dosing Pumps

Milton Roy/VK
Pumps/Positive/
Minimax / Eqv.

5
6

Agitators/

Pavan/Fibre&Fibre

Flocculators

/ Ceecons

Clarifier/Thickener Mechanism To be

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

232

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

fabricated as per
MJP approved
design / make
7

Screens

To be fabricated as
per MJP approved
design / make

Grit Separator

To be fabricated as
per MJP approved
design / make

Chlorinator

Toshcon Jesco /
Banaco/Perfect
Chloro/Chlorocontrol/Metito/Eqv.

10

Chlorine Tonner

Meenakshi / Eqv.

11

Solid Bowl Cent-

Alfa Laval/Humbolt

rifuge

/Wedag/Hiller/Eqv.

Motors

Crompton/Siemens

12

/Lakshmi
13

Cables

Finolex/ Polycab

14

MS pipes

Mahalakshmi
Seamless/ Maharashtra Seamless/
Suryaroshni/Jindal
/Eqv.

15

CI Pipes

Truform/Electrosteel
/Kejriwal/Eqv.

16

Valves

Intervalve/BDK/
Procon/Tyco/AV
valves/Eqv.

17

Clarisettler

Media Cooldeck/
Munters

18

Bio Reactor

As per MJP approved

Carrier Media

design /make

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

233

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

6 CYCLIC ACTIVATED SLUDGE PROCESS


Designing , providing, constructing, hydraulic
testing, commissioning and giving satisfactory
trials of Syaclic Activeted Flushe Procesess Based
on SBR Technology STP consisting of Inlet
Chamber, Screen Chamber, Detritus Tanks,
Distribution Chamber and Biological CASP Basins,
Sludge Sump, Chlorine Contact Tank, Chlorinator
Room/Shed, Sludge Centrifuge necessary piping
work with required valves, gates, drains, pathways
administration Block cum Laboratory, Laboratory
Equipments, Tools and Plants, Spare Parts, etc.
complete as turnkey job with all involved civil,
electrical and mechanical works inclusive of
following items, units as per detailed specification
for civil, electrical and mechanical components with
all duties and taxes etc. complete to achieve BOD <
5 ppm, COD < 100 ppm, TSS < 10 ppm, to get
recyclable quality of water for industrial /
agricultural purposes. (In Case Cyclic activated
sludge plant is designed for N, P outlet parameters
shall also include TN < 10 ppm, Nh3N < 2 ppm and
TP < 1 ppm)

UNITS INCLUDED
1. Inlet Chamber
Designing, providing, and constructing RCC
(M:250) inlet chamber for the peak low of 2 DWF
including necessary excavation in all types of strata
including walkway all around the periphery. Each
compartment will have phosphor bronze steel gates
with extension rod, head stock, operating wheels.
GI pipe railing etc. The work includes providing and
making necessary arrangements to connect the
flow to screen chamber by approach channel as
directed and as per specifications.

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

234

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

2. Screen Chamber
Designing, providing, constructing, testing and
commissioning of screen chamber, designed for
average 1 DWF and maximum peak flow of 2 DWF
in RCC (M -250), including inlet pipe / channel
from inlet chamber, outlet pipe channel to detritus
tank, free board of 0.5 m minimum, RCC walkway
1.2 m wide with GI pipe railing, RCC stair case of
1.2 m width from GL to screen chamber.

3. Detritus Tank
Designing, providing and constructing continuous
grit removal type of Detritus Tank, mechanically
operated in RCC (M 250) capable of removing
100% of 0.2 mm size particle and above, having
specific gravity 2.30 designed for one peak 2 DWF
with suitable arrangement of separation of grit from
putrescible solids. Inlet and outlet channels of
required sizes as may be required to connect the
flow to connecting unit etc. Complete including
hydraulic testing for water tightness of structure
having minimum FB of 0.3 m, wash out
arrangement to Grit chamber and platform 1.2 m
wide RCC walkway with GI pipe handling shall be
provided. A pit for collecting grit conveyed by
conveyor shall be provided. It should be suitable to
handle the grit for carting. All arrangements shall
be as detailed specifications and as directed.

4. CASP Basins
Designing, providing and constructing in RCC
(M:250), CASP basins for biological removal of BOD
along with nitrification, denitrification, Bio-P
removal in compartments to handle combine flow of
1 DWF incoming flow and recirculation flow
including construction of selector compartments
and providing 1.2 m wide clear approach walkways,
expansion joints wherever necessary, including
foundations etc as per specifications. Peak factor
shall be 2, F/M ration shall be 0.15,

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

235

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

complete with air blowers, fine diffused aeration


grid / equipment and FB 0.5 m and SWD as
required. DO level in basin to be minimum 2 mg/l
complete with Oxygen Uptake Rate control system
and all related instruments. Stainless steel
decanters
and
automation
works.
MLSS
concentrations shall be 2000-5500 mg/l or more,
MLVSS to MLSS ratio to be 0.8. HRT shall be
between 12 to 13 hrs and SRT suitable for fully
disgested sludge. It should have all other related
works as per detailed specification. In Case CASP is
designed to achieve N, P removal HRT

5. Chlorine Contact Tank


Designing providing and constructing chlorine
contact chamber of adequate capacity to deal with
1 DWF average flow. The chlorine contact tank
should be 30 min capacity, during average flow to
achieve 99.99% coliform reduction. Chlorine dose
shall be maintained as per standard provisions,
including designing, providing and constructing
water supply provision for chlorination including
providing dewatering and by pass arrangement
jointing to final effluent mains and outlet weir, etc
complete. The effluent quality should match with
the standards laid down by Maharashtra water
pollution control board and as per obligatory
provision and as detailed specification and as
directed by Engineer-in-charge.

6. Chlorinator and Chlorinator Room / Tonner


Room
Designing, providing and constructing chlorinators
vacuum type 2 Nos. with auto switchover facility
and having capacity for dosage of adequate chlorine
to ensure 99.99% coliform reduction as

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

236

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

per obligatory provisions and detailed specifications


with necessary provision of having chlorinator room
of adequate size. The chlorinator equipment shall
include cost of chlorine cylinders / tonner piping,
valves, measuring and controlling equipments,
safety devices, lifting euipments, etc. complete as
per IS-10553 (part II) 1982. The tonner room
should have minimum 3 MTcapacity Hoist for
loading and unloading facility. Tonner storage
should be distinctly isolated and should be for
minimum storage space as directed in the design
specification and as per gas laws 1981 and factory
act shall be provided. All other matching amenities
shall be provided, 5 MT gantry rail shall be
provided for full length of tonner room at 6 m
height from level of tonner room, with outlet
chamber and treated effluent outlet channel etc.
complete.

7. Sludge Sump
Designing, providing and constructing of sludge
sump and pump house of appropriate size with
pumps, ceiling height minimum 6 m over sump for
discharging sludge to centrifuge using CI pipe
complete as per detailed specification.
8. Sludge Centrifuge Platform with Centrifuges
Designing, providing, constructing and installing
including foundation etc., sludge centrifuge to
handle the sludge flow of 1 day in 20 hours per
unit with sludge dewatering unit drain etc complete
as per specification. Sludge centrifuges with the
necessary
arrangement,
as
per
detailed
specification mentioned in tender and obligatory
provisions to be provided with satisfactory
functioning.
9. OutfaIl Sewer
Designing, providing and constructing appropriate
outfall sewer of RCC NP2 pipe, to discharge treated
effluent from outlet chamber after chlorination

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

237

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

tank to the local Nallah at the point shown on the


drawing
including
necessary
chamber
for
inspection and cleaning including necessary
excavation, dewatering, refilling concrete encasing
/ bedding concrete steps to reach the nallah bed
level, pitching and energy dissipation chamber in
nallah portion etc. complete upto 50 m length RCC
NP2 pipe line and including all above items.
10. Piping work in CI-LA Class including Sluice
valves, Reflux Valves, MS gates
Providing laying and jointing pipes other than those
already included in the above items for
interconnection by - pass drains etc. of all units
including adequate numbers of manhole chambers.
The item includes excavations, refilling and
hydraulic testing of pipes, valves, gates, accessories
and cost of jointing materials. The items includes
required channels with gates for interconnection of
units by pass drains etc for all units as directed etc
complete as per detailed specifications.

11. Administrative Building cum Laboratory


(G+1)
Designing,
providing
and
constructing
administrative building, office cum laboratory
including stores. This shall be a building having
appropriate carpet area and ground floor and at
first floor complete as per specifications including
necessary excavation, foundation in RCC M 200
framed structure B. B masonry (11- class in C.M.
1:6) 20 mm cement plaster in CM 1:3 inside and
outside painting. Aluminium door and window with
glass panels, mosaic tile flooring and skirting and
all
other
allied
items,
fixtures
fastening
electrification
arrangement
water
supply
arrangement etc complete. The building will have
laboratory on upper floor of administrative building
and should be so centralized that it should not be
attached with any unit but should have complete
control of every unit

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

238

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

as per laboratory euipment, beautification,


telephone and intercom arrangement and wireless
system.
Capacity of
Area required
No. of
the Plant in

in Ha

Rate in

Basins

Lakh

MLD
1

0.5

MLD

299.67

0.6

MLD

200.37

0.65

MLD

125.89

10

0.70

MLD

102.85

15

0.75

MLD

92.09

20

0.80

MLD

87.16

25

1.00

MLD

83.87

30

1.20

MLD

78.94

40

1.60

MLD

74.00

50

1.75

MLD

72.36

60

1.90

MLD

70.71

75

2.25

MLD

69.07

100

2.40

MLD

65.78

125

3.00

MLD

62.49

150

3.50

MLD

60.85

NOTES

a. These Rates are for Civil Works, in M25 grade RCC.


b. Water Table is considered at 5 m below ground level.
c. Soil bearing capacity considered as 20 T/m at
1.5 m below ground level.
d. OPC has been considered for costing purposes.
e. All civil items, electrical, piping, valves, pumps,
motors, blowers, etc. are considered as per MJP
Schedule of Rates.
f. I. No.1,2 includes sludge drying beds instead of
sludge
centrifuge includes
and DWPENaOCI
dosing Dosing
system. System
g I. No.1,2,3
instead of Gas Chlorination.
h. I. No.1,2,3 do not includes Lab and Lab Equipments.
i. O&M shall be added extra
j. No piling, dewatering, soil improvent, desilting
considered in the cost.
k. Site is cleared flat and levelled. No site
development works filling dewatering considered.

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

239

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

l. Peak factor considered as 2.0 times average flow.


For every 25% increase in peak factor, 10% extra
cost shall be added over the above rates.
m. OPC TOR steel considered.
n. Treated water disposal upto 50 m considered.
o. N&P reduction not considered.
p. HT electrical works shall be added as per case
specific conditions.
q. Raw sewage pumping shall be added as per case
specific conditions.
r. In case TN<10 & TP<1 quality is required, above
rates shall be increased by 10%
s. Cost of I.No. 1 to 5 do not include HT station,
Lab and Mechanical dewatering of sludge.

Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.)

240

Section - I- (XIX) - R.C.C. G.S.Rs AND SUMPS


Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

Designing (aesthetically), and constructing RCC


ground service reservoirs / RCC sumps in M-300
mix. of required capacity including excavation in
all types of strata, foundation concrete, container
walls, bottom slab top RCC roof slab / or dome, 20
mm thick cement plaster with water proofing
compound in CM 1:3 proportion. to inside face of
the container,including epoxy paint from inside
including refilling and disposing of surplus stuff
within lead of 50 M, all labour and material
charges, for laying and jointing of pipe assembly
for inlet, outlet washout, over flow and bye-pass
arrangement consisting of C.I./ M.S. D/F. pipes,
specials and valves of given diameters, providing
and fixing accessories such as M.S. ladder inside
and outside, C.I. Manhole frame and cover, water
top slab, B.B. masonry chamber for all valves,
ventilating shafts, including giving satisfactory
hydraulic test and water tightness test as per IS
code and providing three coat of cement paints to
all expose surface of structure including roof
surface etc. complete as per design data, criteria,
obligatory
requirements
and
detailed
specifications.Anti terminite treatment shall be
given for under ground portion of the structure.
Note :
1

The designing shall be in accordance with


various rel evant I.S. specification (I.S.
456/2000, I.S. 875 - 1987, I.S.3370-1965
or revised.)

Only M.S. bars grade I confirming to I.S.


432 part-I or high yield strength deformed
bars confirming to I.S. 1786 or I.S.1139
shall be used grade II M.S. bars shall not
be used.

Entire structure shall be in M - 300 only.

The scope of pipe assembly work shall be


upto 5 metre beyond outside face of the
wall, cost of pipes valves and specials is
not included in the rate but labour cost for
laying and jointing is included.

The G.S.R. / Sump above 15 lakh litres


capacity shall

Section-I-(XIX)-R.C.C. G.S.Rs AND SUMPS

241

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

be in two compartment
6

The job includes designing the structure


for uplift pressure and dewatering if
required using entire execution and
disposal of surplus excavated stuff with in
lead of 50 metres as directed by Engineerin-charge. If up lifts considered in design
then these rate shall be increased by 7.5%.

G.S.R. outlets shall be with bell mouth of


approved partern in bottom slab and cost
of designing bell mouth is included in the
rate. Sump well includes cost of suction pit
required at bottom.

For pipe diameters upto 300 mm only CI


pipes and CI specials shall be used. For
pipe diameters above 300mm, M.S. pipes
and specials minimum 10 mm thick shall
be used with proper anticorrosive epoxy
treatment from in side and outside.

Cost of pump house is not included in


these rates.
Above rates are applicable for seismic
zones-2,3 and 4
75% part rate shall be payable for
reinforcement,concrete
and
plastering
items of all types of G.S.R.s. and sumps
till satisfactory hydraulic testing for water
tightness test is given and till that work
shall be treated as incomplete

10
11

12

10% shall be added for sump if overhead


pump house is proposed
Note: Condition from Sr. No. 1 to 11 shall
form a part and parcel of tender and
must be included in the Draft tender
papers for work of R.C.C. GSRs and
sump. Rates for R.C.C.G.S.Rs or Sumps

Section-I-(XIX)-R.C.C. G.S.Rs AND SUMPS

242

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

Rates for R.C.C. G.S.Rs and Sumps


S.No.

Capacity in Litres

Upto 250000 lit

Cost of 25000 lit capacity

Add for capacity above 25000 to 50000 lit


Cost of 50000 lit capacity

Add for capacity above 50000 to 75000 lit

Cost of 75000 lit capacity


Add for capacity above 75000 to 100000 lit

Cost of 100000 lit capacity

Add for capacity above 100000 to 150000


lit
Cost of 150000 lit capacity

8
9

Add for capacity above 150000 to 200000


lit
Cost of 200000 lit capacity

10

Add for capacity above 200000 to 300000


lit
Cost of 300000 lit capacity

11

12
13

14
15

Add for capacity above 300000 to 500000


lit
Cost of 500000 lit capacity
Add for capacity above 500000 to 1000000
lit
Cost of 1000000 lit capacity
Add for capacity above 1000000 to
1500000 lit
Cost of 1500000 lit capacity
Add for capacity above 1500000

Section-I-(XIX)-R.C.C. G.S.Rs AND SUMPS

Unit

Rate is Rs.

Rates in Rs.

12.36

4.90

308880.00

123552.00

7.30

2.90

491380.00

196552.00

6.00

2.40

641380.00

256552.00

5.35

2.40

775130.00

310052.00

5.05

2.00

1027630.00

411052.00

4.32

1.70

1243630.00

497452.00

4.16

1.70

1659630.00

663852.00

3.24

1.30

2307630.00

923052.00

2.97

1.20

3792630.00

1517052.00

2.38

1.00

4982630.00

1993052.00

1.78

0.70

243

Section - I- (XX) - R.C.C. E.S.Rs


Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

Designing (aesthetically), and constructing RCC


elevated service reservoirs of following capacity
with RCC staging consisting of columns, internal
and external bracings spaced vertically not more
than 4.5 meters centre to centre for ESR having
Capacity upto 500 Cum. and not more than 6 m
c/c for ESRs having capacity above 500 cum
including excavation in all types of strata,
foundation concrete, cement plaster with water
proofing compound to the inside face of the
container including refilling disposing of the
surplus stuff within a lead of 50 meters, all labour
and material charges including lowering, laying,
erecting, hoisting and jointing of pipe assembly of
inlet, outlet, washout, overflow and bypass
arrangements as per departmental design,
providing and fixing accessories such as M.S.
ladder, C. I. manhole frame and covers water level
indicatiors, lightening conductor, G. I. pipe railing
around walk way and top slab, providing spiral
staire case from ground level to roof level,M.S.grill
gate of 2 mtr.height with locking arrangement of
approved design. B.B. masonry chambers for all
valves, ventilating shafts, providing and applying
three coats of cement paint to the structure
including roof slab epoxy painting to internal
surface & anti termite treatment for underground
parts of the structure. and giving satisfactory
water tightness test as per I.S. code, The job to
include painting the name of the scheme and other
details on the reservoir as per the directions of
Engineer-in-charge.

The design of the structure be in


accordance with relevent (I.S.3370 - 2009
or revised)
The design shall satisfy the stipulation as
per IS 1893-1984 and I.S. 13920/1993 for
seismic focrce and I.S.- 11682/1985 for
R.C.C. staging of overhead tanks.

Section-I-(XX)-R.C.C. E.S.Rs

244

Sr No

Item Description

For design having more than 6 columns,


Providing of internal bracing is obligatory,.
External bracking is also obligatory.

The entire structure shall be in M/250 mix


only. However concrete in contact with
water such as container, base slab, wall,
roof slab & footing in water borne area
shall be in M-300

Plain round mild steel bars grade - I


confirming to I.S:432 Part-I or high yield
strengh deformed bars confirming to I.S.
1786 or I.S. 1139 shall be used, grade-II
mild steel bars will not be allowed.

Irrespective of the type of foundation


proposed in the design, one set of bracing
be provided at the gound level.

These rates include providing, M.S. ladder


for E.S.R's upto 2 lakhs liters capacity and
providing sprial staircase for E.S.R. above
2 lakhs liters capacity.

Stagging shall have to be designed with


stresses of M-200 for ESR. However all
RCC construction should be done in M-250
except concrete in contact with water shall
be designed & constructed in M-300

These rates are including the cost of uplift


pressure if any and entire dewatering
during execution. In case of water logging
area where water is struck at shallow
depth extra provision of dewatering shall
be made as per site condition.

10

All condition given in the Member


Secretary"s
Circular
No.MJP/TSI/350/1668 dt. 2.8.97 and MJP/SI/350/2127 dt. 13.7.99 shall be strictly
followed and additional cost, if any due to
these conditions is included in the rates

Section-I-(XX)-R.C.C. E.S.Rs

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

245

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

mentioned below.
11

75% part rate shall be payable for


reinforced cocnrete and plastering items of
containers of E.S.R. till satisfactory
hydraulic testing for water tightness is
given ; and till that work shall be treated
as incomplete.

12

The rates indicated in the table are


excluding the cost of pipes, specials and
valves required for inlet, outlet washout
overflow and by-pass arrangement. The
scope of work, however inclueds cost of
erecting, laying and jointing of pipes and
valvews including cost of jointing materials
upto 5M beyond outer face of outermost
column.

13

For ESR upto 500cum capacity C.I.D.


double flanged pipes upto 300mm dia shall
be provided and C.I.Specials shall be
used.For ESR above 500 cum capacity
C.I./M.S. pipes assembly with minimum
8mm thick ness up to 500mm dia. And
minimum 10mm thickness above 500mm
dia can be used with proper anti-corrosive
epoxy teratment from inside and outside.

14

Below mentioned rates are for foundation,


with individuals footing with bearing
capacity of 30 tonnes per square metre.
For raft foundations, these rates shall be
increased
by
7.5%
wheresafebearing
capacity ( SBC) is 5 M.T. per Sq.m and by
5% where SBC is more than 5 MT/Sqm.
and upto 10MT/Sq.m. This percentage of
5% or 7,5% is applicable for estimation of
amount of L.S. items ESR for Extra item
due to change from individual footing
foundation to raft actual increase in
concrete and steel quantities be paid as per
relevent DSR Item.

Section-I-(XX)-R.C.C. E.S.Rs

246

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

15

The rates shall be increase by 30% for


brearing piles upto depth of 10m and for
further increased in depth by 5M each it
shall be increased by another 10% These
rates are applicable where raft is not
reasible for pile foundation sulfate
resistant cement shall only be used. Single
pile for the column is not permitted Group
of piles shall be designed with pile cap for
each column of ESR.

16

These rates are applicable for staging


height of 12 M These rates shall be
increased or decreased for per metre
variation in the staging height as below
12 to 16 M staging

2% per metre

16 to 20m staging

3% per meter

20 M and abovd

4% per metre

i.e. for 17m stagging height


percentage calculation will be like below
12 to16m

=4x2

= 8%

16 to 17 m x 1 x 3

= 3%

Total

= 11 %

For 21 m stagging height


Percentage calculation will be like below

17

12 to 16m = 4 x 2

= 8%

16 to 20m = 4 x 3

= 12%

20 to 21m = 1 x 4

= 4%

Total

= 24%

Following rates are for seismic zone-III for


Zone-IV these rates shall be increased by
5% and for Zone-II, these rates shall be
decreased by 5% concerned Executive
Engineer shall confirm the seismic zone for
the scheme from seismic zones plan before
estimation and adopt appropriate rates as
per actual seismic zones( Seismic maps
attached in this C.S.R.)

Section-I-(XX)-R.C.C. E.S.Rs

247

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

Note:
1) Conditin from Sr.No.1 to 11 shall form a
part and parcel of the tender papers and
shall be included in the DTP for works of
R.C.C.E.S.R.

S.No.

2) Condition from Sr.No.12 to 17 are for


estimation purpose only and shall not be
Capacity in Litres
Unit

for Seismic
LABOUR
Zone-III Rate Rate in Lakh
in Lakh Rs.
Rs.

Upto 250000 lit

Litre

26.14

7.20

Cost of 25000 lit capacity

Job

653500.00

180000.00

Add for capacity above 25000 to 50000 lit

Litre

13.06

3.60

Cost of 50000 lit capacity

Job

980000.00

270000.00

Add for capacity above 50000 to 75000 lit

Litre

9.50

2.60

Cost of 75000 lit capacity

Job

1217500.00

335000.00

Add for capacity above 75000 to 100000 lit

Litre

8.30

2.50

Cost of 100000 lit capacity

Job

1425000.00

570000.00

Add for capacity above 100000 to 150000 lit

Litre

7.14

2.90

10

Cost of 150000 lit capacity

Job

1782000.00

712800.00

11

Add for capacity above 150000 to 200000 lit

Litre

5.94

2.40

12

Cost of 200000 lit capacity

Job

2079000.00

831600.00

13

Add for capacity above 200000 to 250000 lit

Litre

5.65

2.30

14

Cost of 250000 lit capacity

Job

2361500.00

944600.00

15

Add for capacity above 250000 to 300000 lit

Litre

5.34

2.10

16

Cost of 300000 lit capacity

Job

2628500.00

1051400.00

Section-I-(XX)-R.C.C. E.S.Rs

248

Sr No

Item Description

Unit Rate (in Rs.) Rate in Rs.


2012-2013
2013-2014

S.No.

Capacity in Litres

Unit

for Seismic
LABOUR
Zone-III Rate Rate in Lakh
in Lakh Rs.
Rs.

17

Add for capacity above 300000 to 400000 lit

Litre

5.05

2.00

18

Cost of 400000 lit capacity

Job

3133500.00

1253400.00

19

Add for capacity above 400000 to 500000 lit

Litre

4.75

1.90

20

Cost of 500000 lit capacity

Job

3608500.00

1443400.00

21

Add for capacity above 500000 to 750000 lit

Litre

4.45

1.80

22

Cost of 750000 lit capacity

Job

4721000.00

1888400.00

23

Add for capacity above 750000 to 1000000 lit

Litre

4.16

1.70

24

Cost of 1000000 lit capacity

Job

5761000.00

2304400.00

25

Add for capacity above 1000000 to 1500000 lit

Litre

3.86

1.50

26

Cost of 1500000 lit capacity

Job

7691000.00

3076400.00

27

Add for capacity above 1500000 to 2000000 lit

Litre

3.57

1.40

28

Cost of 2000000 lit capacity

Job

9476000.00

3790400.00

Section-I-(XX)-R.C.C. E.S.Rs

249

Section -I (XXI)- CHAMBERS, MANHOLES and DRAINAGE DROPS


Sr No

Item Description

Providing and constructing B.B. masonry valve


chamber with 15 cm thick 1:3:6 proportion PCC
bedding, excluding excavation, B.B. masonry in
C.M. 1:5 Proportion precast RCC frame and cover,
etc. complete as directed by Engineer-in-charge.

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

Note:
Wall thickness : 0.23 M for depth of 1.2 M and
0.35 M for balance depth exceeding 1.2 M)
A.

B.

C.

D.

E.

F.

G.

As above of 60 x 45 cm internal size and depth


upto 0.9M .
a). Add for every increase of depth of 30cm or part
thereof.
As above of 95 x 45 cm internal size and depth
upto 1.2M .
a). Add for every increase of depth of 30cm or part
thereof.
As above of 90 x 60 cm internal size and depth
upto 1.2M .
a). Add for every increase of depth of 30cm or part
thereof.
As above of 90 x 90 cm internal size and depth
upto 1.2M .
a). Add for every increase of depth of 30cm or part
thereof.
As above of 1.2 x 1.2 M internal size and depth
upto 1.2M .
a). Add for every increase of depth of 30cm or part
thereof.
As above of 1.5 x 1.5M internal size and depth
upto 1.5M .
a). Add for every increase of depth of 30cm or part
thereof.
As above of 90 cm internal dia size and depth upto
1.2 M .

Section-I-(XXI)CHAMBERS, MANHOLES and DRAINAGE DROPS

No

4621.00

1161.00

30cm
depth

1005.00

276.10

No

6839.00

1745.30

30cm
depth

1202.00

331.40

No

7435.00

1908.30

30cm
depth

1300.00

361.10

No

8898.00

2288.00

30cm
depth

1500.00

422.80

No

6735.30

1751.00

30cm
depth

1168.00

329.80

11926.00

3069.00

1905.00

547.90

17449.00

4596.30

No
30cm
depth
No

250

Sr No

Item Description

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

a). Add for every increase of depth of 30cm or part


thereof.
Providing and constructing B.B. masonry valve
chamber with 15 cm thick 1:3:6 proportion PCC
bedding, excluding excavation, B.B. masonry in
C.M. 1:5 proportion 12 mm thick cement plaster in
cm 1:4 proportion on both sides with providing
and fixing C.I. manhole frame and cover in RCC
1:2:4 coping or RCC 1:2:4 proportion 15 cm thick
slab, etc.complete as directed by Engineer-incharge.

30cm
depth

2345.00

684.50

No

7211.00

1094.00

30cm
depth

1005.00

275.10

No

9388.00

1646.90

30cm
depth

1148.00

315.70

10709.00

1806.00

1244.00

344.70

14830.00

2140.90

1500.00

420.80

17368.00

2818.00

Note:
Wall thickness : 0.23 M for depth of 1.2 M and
0.35 M for balance depth exceeding 1.2 M
Valve Chamber with Cast iron frame & covers.
A.

B.

C.

D.

E.

As above of 60x45 cm internal size and depth upto


0.9 M with 60 x 45 cm size CI manhole frame and
cover of 40 kg
a). Add for every increase in depth of 30cm or part
thereof
As above of 90x45 cm internal size and depth upto
1.2 M with 90 x 45 cm size CI manhole frame and
cover of 40 kg
a). Add for every increase in depth of 30cm or part
thereof
As above of 90x60 cm internal size and depth upto
1.2 M with 90 x 60 cm size CI manhole frame and
cover of 50 kg
a). Add for every increase in depth of 30cm or part
thereof
As above of 90x90 cm internal size and depth upto
1.2 M with 53 cm dia CI manhole frame and cover
of 90 kg fixed in R.C.C. Slab
a). Add for every increase in depth of 30cm or part
thereof
As above of 1.2 x 1.2M internal size and depth
upto 1.2 M with 53 cm dia CI manhole frame and
cover of 90 kg fixed in R.C.C. Slab

Section-I-(XXI)CHAMBERS, MANHOLES and DRAINAGE DROPS

No

30cm
depth
No

30cm
depth
No

251

Sr No

F.

Item Description

Unit

a). Add for every increase in depth of 30cm or part


thereof

30cm
depth

As above of 1.5 x 1.5 M internal size and depth


upto 1.5 M with 53 cm dia CI manhole frame and
cover of 90 kg fixed in R.C.C. Slab
a). Add for every increase in depth of 30cm or part
thereof
Providing and constructing B.B. masonry valve
chamber with 15 cm thick 1:3:6 proportion PCC
bedding, excluding excavation, B.B. masonry in
C.M. 1:5 Proportion precast S. F. R. C.frame and
cover,etc.complete as directed by Engineer-incharge.

No

30cm
depth

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

1904.00

545.90

22412.00

4238.80

2303.00

670.20

Note:
Wall thickness : 0.23 M for depth of 1.2 M and
0.35 M for balance depth exceeding 1.2 M
Valve Chamber with Precast steel fibre
reinforced concrete ( S.F.R.C.) frame & covers.
A.

B.

C.

D.

E.

As above of 60x45 cm internal size and depth upto


0.9 M .
a). Add for every increase in depth of 30cm or part
thereof
As above of 90x45 cm internal size and depth upto
1.2 M .
a). Add for every increase in depth of 30cm or part
thereof

6708.00

1240.90

No
30cm
depth

1005

185.90

No

9663

1787.60

30cm
depth

1148

212.40

10636

1967.70

1244.00

230.20

12515.00

2315.30

1436.00

265.70

15525.00

2872.20

As above of 90x60 cm internal size and depth upto


1.2 M .
a). Add for every increase in depth of 30cm or part
thereof

30cm
depth

As above of 90x90 cm internal size and depth upto


1.2 M .
a). Add for every increase in depth of 30cm or part
thereof

No
30cm
depth

As above of 1.2 x 1.2M internal size and depth


upto 1.2 M with S.F.R.C. frame and cover of size
540 mm dia fixed in R.C.C. Slab

Section-I-(XXI)CHAMBERS, MANHOLES and DRAINAGE DROPS

No

No

252

Sr No

F.

Item Description

Unit

a). Add for every increase in depth of 30cm or part


thereof

30cm
depth

As above of 1.5 x 1.5 M internal size and depth


No
upto 1.2 M with S.F.R.C. frame and cover of size
540 mm dia fixed in R.C.C. Slab
a). Add for every increase in depth of 30cm or part 30cm
thereof
depth
Providing and fixing in position M.S. Air valve
boxes fabricated with 2 mm thick M.S. plate, 30 x
30 x3 mm size M.S. angle frame, concre- ting in M150 for fixing the box in position,applying two
coats of oil paint, painting chainage, locking
arrangement, etc. complete as directed by Engineerin-charge.

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

1904.00

352.20

20812.00

3850.20

2301.00

425.80

a)
b)
5

For single ball air valve


For Double ball air valve
Providing and fixing C.I. road box including
loading, unloading and carting to site of work
including all necessary excavation in all types of
strata and fixing in murum packing, etc. complete.

No
No

2121.00
2933.00

81.10
208.40

a)
b)
6

100 mm x 225 mm (20 kg)


225 mm x 300 mm (40 kg)
Providing and constructing on sewer, B.B.
masonry circular manhole concentric cone 1.2 M
dia. at bottom and 0.5 M dia. at top and upto a
depth of 2.00 M with 23 cm brick work in CM 1:4
proportion
excluding
excavation
including
foundation concrete 250 mm thick and haunches
and channels in c.c.1:2:4 proportion, finishing
channels in smooth rendering, providing C.I.
dapuri type steps each weighing 5.5 kg., 1:2:4
coping and providing and fixing approved make
and quality S.F.R.C. frame and cover of 56 cm.dia.
etc. complete as directed by Engineer-in-charge.

No
No

1449.00
2898.00

268.10
536.13

No
a) Rebate for every decrease in depth of 50 cm or 50cm
part thereof
depth

18156.00
2415.00

3106.00
1159.00

Section-I-(XXI)CHAMBERS, MANHOLES and DRAINAGE DROPS

253

Sr No

Item Description

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

7 Providing

and constructing on sewer, B.B.


masonry circular manhole concentric cone 1.5 M
dia. at bottom and 0.5 M dia. at top and upto a
depth of 5.00 M with 23 cm brick work up to depth
of 2 M from top and 35 cm thick brick work for
balance depth in CM 1:4 proportion with 20 mm
thick smooth plaster on both side in cm 1:2
proportion
excluding
excavation
including
foundation concrete 250 mm thick and haunches
and channels in c.c.1:2:4 proportion, finishing
channels in smooth rendering, providing C.I.
dapuri type steps each weighting 5.5 kg., 1:2:4
coping and providing and fixing approved make
and quality S.F.R.C. frame and cover of 56 cm.dia.
etc. complete as directed by Engineer-in-charge.

No
a)
Rebate for every decrease in depth of 50 cm 50cm
or part thereof
depth
8 Providing and constructing on sewer, B.B.
masonry circular manhole with concentric cone
1.5 M dia. at bottom and 0.5 M dia. at top and
upto a depth of 9.00 M with 23 cm brick work,
upto depth of 2 M from top and 35 cm thick brick
work for depth of 2 M and 45 cm thick brick work
for remaining depth upto 9 M in CM 1:4
proporpion with 20 mm thick smooth plaster on
both sides in CM 1:2 proportion excluding
excavation, including foundation concrete 250 mm
thick and haunches and channels in c.c.1:2:4
proportion,
finishing
channels
in
smooth
rendering, providing C.I. dapuri type steps each
weighing 5.5 kg., 1:2:4 coping and providing and
fixing approved make and quality S.F.R.C. frame
and cover of 56 cm.dia. etc. complete as directed
by Engineer-in-charge.

49685.00
4822.00

3106.00
3224.00

No
a)
Rebate for every decrease in depth of 50 cm 50cm
or part thereof
depth
9 Providing and constructing B.B. masonry circular
manhole without conical shape excluding

104073.00
5989.00

3090.30
4307.70

Section-I-(XXI)CHAMBERS, MANHOLES and DRAINAGE DROPS

254

Sr No

Item Description

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

excavation, RCC 1:2:4 proportion, 20 cm bedding


brick masonry in CM 1:4 proportion,23 cm thick
for 2 M depth from top35 cm thick for 2 M below it
and 45 cm thick for balance depth, RCC slab at
top and at 2 M depth from top for supporting brick
masonry above it, plastering with smooth finish in
CM 1:2 proportion C.C.1:2:4 finishing channels in
smooth rendering, providing C.I. dapuri type steps
each weighing 5.5 kg., providing and fixing
S.F.R.C. frame and cover of 56 cm.dia. at top
including cost of all materials and labour,
etc.complete.

A. 1.00 M dia x 2 M Depth

16632.00
2438.00

2808.90
571.50

B. 1.00 M dia x 3 M Depth

23907.00
3407.00

4478.90
754.30

C. 1.00 M dia x 4.5 M Depth

36242.00
4216.00

7335.20
937.10

D. 1.50 M dia x 2 M Depth

24814.00
2922.00

4347.50
747.90

31730.00
4372.00

6374.30
1038.70

47432.00
5404.00

10217.90
1272.10

No
a). Rebate for every decrease in depth of 50 cm or 50cm
part thereof
depth
No
a). Rebate for every decrease in depth of 50 cm or 50cm
part thereof
depth
No
a). Rebate for every decrease in depth of 50 cm or 50cm
part thereof
depth
No
a). Rebate for every decrease in depth of 50 cm or 50cm
part thereof
depth

E. 1.50 M dia x 3 M Depth

No

a). Rebate for every decrease in depth of 50 cm or 50cm


part thereof
depth
F. 1.50 M dia x 4.5 M Depth

10

No

a). Rebate for every decrease in depth of 50 cm or 50cm


part thereof
depth
Drainage Drops
Providing 150 mm dia S.W. or R.C.C.pipes in
vertical drop arrangement including providing 150
mm dia S.W.and R.C.C. pipe fixed in B.B. masonry
of manhole at the required level including
providing 150 mm dia double tee, 150 mm dia
right angled bend, encasing in B.B. masonry 1:4
proportion all around the pipe,double tee, bend

Section-I-(XXI)CHAMBERS, MANHOLES and DRAINAGE DROPS

255

Sr No

Item Description

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

upto the foundation of manhole, jointing, cutting,


filleting including neat cement rendering, plugging
the opening with jungle wood knob complete as
directed by Engineer-in-charge (0.60M depth)
excluding cost of chamber.

11

12

13

14

15

16

17

No
a). Extra for every 0.5 M depth beyond initial depth 50cm
of o.60 M
depth

1824.00
660.00

341.40
90.00

As above but for 200 mm dia. Pipes & depth 0.60 No


M
a). Extra for every 0.5 M depth beyond initial depth 50cm
of o.60 M
depth

2478.00

451.30

788.00

109.50

As above but for 250 mm dia. Pipes & depth 0.60 No


M
a). Extra for every 0.5 M depth beyond initial depth 50cm
of o.60 M
depth

2930.00

546.30

981.00

139.20

As above but for 300 mm dia. Pipes & depth 0.60 No


M
a). Extra for every 0.5 M depth beyond initial depth 50cm
of o.60 M
depth

3580.00

649.80

1068.00

136.90

As above but for 400 mm dia. Pipes & depth 0.60 No


M
a). Extra for every 0.5 M depth beyond initial depth 50cm
of o.60 M
depth

5017.00

869.10

1585.00

170.60

As above but for 500 mm dia. Pipes & depth 0.60 No


M
a). Extra for every 0.5 M depth beyond initial depth 50cm
of o.60 M
depth

6765.00

1152.30

1928.00

187.90

As above but for 600 mm dia. Pipes & depth 0.60 No


M
a). Extra for every 0.5 M depth beyond initial depth 50cm
of o.60 M
depth
Providing and fixing in position steel fibre
reinforced concrete (S.F.R.C.) frame and covers of
approved make including loading, unloading,
transportation, all taxes, etc. complete as directed
by Engineer-in-charge (20 tonnes capacity)

8831.00

1514.10

2124.00

201.00

2633.00

487.10

a) 540 mm dia
Section-I-(XXI)CHAMBERS, MANHOLES and DRAINAGE DROPS

No

256

Sr No

b)
c)
d)
e)
f)

Item Description

Unit

LABOUR
INVOLVED

3754.00
2633.00
2853.00
2606.00
2258.00

694.50
487.11
527.87
482.12
417.78

431.00
312.00

43.50
28.80

138.00
164.00

11.60
13.90

152.00
183.00
216.00
183.00

12.50
16.20
19.20
16.20

a) 80 mm
No
b) 100 mm
No
c) 150 mm
No
22
Providing and fixing A.C. soil pipe or downtake
pipe with all required fittings, taking hole, etc.
complete (as per manufacturers code of practice).

152.00
183.00
260.00

12.18
14.60
20.82

a) 80 mm
b) 100 mm
c) 150 mm
23
Providing and fixing Cast Iron soil pipe of 1.8 M
length including taking out holes and all required
fittings, etc. complete.
S/S
a) 80 mm
b) 100 mm
D/S
a) 80 mm
b) 100 mm

No
No
No

261.00
316.00
475.00

20.91
25.32
38.02

No
No

895.00
1026.00

71.63
82.08

No
No

973.00
1123.00

77.85
89.86

18
a)
b)
19
a)
b)
20
a)
b)
c)
d)
21

560 mm dia
No
90 x 45 cm size
No
90 x 60 cm size
No
60 x 60 cm size
No
60 x 45 cm size
No
Providing and fixing intercepting sewer trap
including concrete bedding, etc. complete.
150 x 100 mm
No
100 x 100 mm
No
Providing and fixing in position S.W. bends of
various size,etc. complete.
100 mm
No
150 mm
No
Providing and fixing Y junction and labour, etc.
complete.
Saddle junction 100 x 100 mm
No
"Y" junction 150 x 150 x 100 mm
No
"Y" junction 300 x 300 x 300 mm
No
"Y" junction 300 x 300 x 100 mm
No
Providing and fixing in position A.C. soil ventilators
/ slotted as necessary and as directed by Engimeerin-charge etc. complete.

Rate
(in Rs.)
2012-2013

Section-I-(XXI)CHAMBERS, MANHOLES and DRAINAGE DROPS

257

Section -J - WELL SINKING AND RIVER INFILTRATION WORKS


Sr No

Item Description

Providing, constructing coffer dam in river basin /


dam storages as per type design including
excavation, filling, the middle portion with B. C.
soil (in gunny bags if requried). Providing
impervious / semipervious materials on both side
of B.C. soil (in gunny bags if required) including
ramming, compacting to the satisfaction of
Engineer-in-charge, till the complection of work
including dismantling coffer dam after completion
of works and disposing off the material as directed
by the Engineer-in-charge.

Unit

Cum

Rate
(in Rs.)
2012-2013

535.00

LABOUR
INVOLVED

15.10

Note : Pay line maximum- Top width payable shall


be 2 mtr. And maximum payable side slopes shall
be 1.5 Horizontal to 1 vertical, if the constructed
top width of the side slopes are less, then the
measurements at actual are payable. Extra top
width or flatter slopes are not payabale Contractor
is free to use ballies, plastic sheets, piles, pipes,
CGI sheets for supporting hearting materials
instead of impervious/semipervious hearting
materials for which no extra payments shall be
payable. 30% payment shall be withheld for
dismantling of coffer dam. This foot note shall
appear in tender condition. (type section is shown
on last page of type design section of CSR)

Providing and fabricating at work shop, carting to


site of work, including transport, loading,
unloading, hoisting, lowering and setting out at
actual site of well, sinking M.S. plate cutting edge.
for R.C.C. well curb consisting of 350 mm M.S.
plate, 10 mm thick, champhering at bottom.
Cutting edge should be provided in pieces not less
than 2 M in length. Each joint should be plain
from outside and jointed by gusset plate 400 x 200
x 12 mm thick M. S. plate with 12 nos. of 20 mm
dia. crurshank headed bolts (gusset plates from
inside) with unequal angle of 90 x 60 x 10 mm
should be welded from top of chamfered portion at

Section-J-WELL SINKING RIVER INFILTRATION WORKS

258

Sr No

Item Description

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

14mm from bottom so that 15mm side should be


in contact with cutting edge with overlap of 300
mm joints. 16 mm dia bar should be welded to
M.S. plate 200 mm below the top surface and
length should be 1.8 M above plate with a bend
300 mm from plate surface including 3 coats of
anticorrosive paint as directed by Engineer-inchage.
Kg
3

81.00

12.20

Cum

221.00

95.60

Cum

808.00

178.90

Rmt

168.00

32.70

a) 6 mm thick
b) 8 mm thick
Providing at site of works ISI standard RCC slotted
pipes of NP-3 class including cost of all central and
local taxes, octroi, inspection, transportation, etc.
complete including cost of RCC collar, etc.
complete.

Sqm
Sqm

3623.00
4633.00

329.90
330.60

450 mm dia
600 mm dia

RMT
RMT

3623.00
5619.00

Providing and filling puddle (selected good


impervious clay) in Kolhapur type weirs in proper
layers of 15 cm including watering, ramming and
compaction, etc. complete with all leads and lifts.

Providing and filling around the well boulders


filling of selected variety and size of boulders
including
cost
of
all
materials,
labour,
transportation, etc. complete with all leads and
lifts.

Providing, and fixing 80 mm dia A.C./P.V.C. pipe


weep holes at 1.5 M c/c staggered including cost of
all materials and labour involved with all leads and
lifts.etc. complete with all leads and lifts.

Providing and fixing M.S. chaquerred plate flooring


of following thickness supported on M.S.angles (25
x 25 x 5 mm size) including welding, cutting and
fabricating the plate to the required square or
rounding shape, making holes in the plate,
including providing and applying 3 coats of
anticorrosive paint, etc. complete as directed by
Engineer-in-charge.

Section-J-WELL SINKING RIVER INFILTRATION WORKS

259

Sr No

Item Description

Lowering, laying and jointing RCC slotted pipes of


following diameters including all leads and lifts,
cost of jointing material, labour, etc. complete as
directed by Engineer-in-charge.

10

11

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

450 mm dia
600 mm dia
Lowering, laying and jointing CI B class
connecting mains with rubber gaskets including
transportation of pipes from stores to site of works,
cost of jointing materials, cost of rubber gasket
with all leads and lifts, etc. complete.

RMT
RMT

178.00
238.00

116.90
151.20

300
350
400
450

dia
dia
dia
dia

RMT
RMT
RMT
RMT

222.00
269.00
333.00
336.00

244.90
299.20
362.50
354.60

500 mm dia
600 mm dia

RMT
RMT

398.00
561.00

408.70
570.60

700 mm dia

RMT

748.00

708.90

750 mm dia

RMT

847.00

819.60

Cu.m
Cu.m
Cu.m
Cu.m
Cu.m

1129.00
1366.00
1557.00
772.00

173.30
196.70
224.20
111.20

356.00

48.60

mm
mm
mm
mm

Providing, lowering, laying and placing in position,


shrouding material for porous pipe gallery / slotted
pipe gallery/ trench gallery with all leads and lifts
involved including transportation of materials to
site of works, screening and washing of materials
and placing in position with given section, etc.
complete as directed by Engineer-in-charge.
40 mm pebbles
12 mm to 20 mm pebbles
6 mm to 12 mm pebbles
Coarse Sand (from river sand at site)
Fine sand (from river sand at site)
Providing and fixing in position C.I. Type dapuri
steps of 22 mm dia. M.S. bar step with proper
anchorage, etc. and providing and applying 3 coats
of ant-corrosive paint, etc complete as directed by
Engineer-in-charge.

No

Section-J-WELL SINKING RIVER INFILTRATION WORKS

260

Sr No

Item Description

12

Providing and fixing M.S. sluice gates in position


as per detailed drawing and specification including
cost of all materials, labour, operating pedestal,
connecting rod, painting with three coats of anticorrosive paint, etc. complete as directed by
Engineer-in-charge.

13

14

15

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

Kg

88.00

33.50

Kg
Sq.m

87.00
22.60

12.80
2.92

RMT

5203.00

676.10

Providing and fixing in position C.I. /M.S. rose


pieces in intake wells including cost of all
materials and labour, painting with three coats of
anti-corrosive oil paint, etc.complete as directed by
Engineer-in-charge.
Providing and spreading around the well 1 mm
thick polyethylene sheet complete as directed by
Engineer-in-charge.
Dewatering charges for estimation purpose for
head works in river basin or dam
Approach channel
Intake well of 3 M dia

No

69391.00

9011.90

Inspection well of 2 M dia

No

44681.00

6784.30

4170.00

648.20

208161.00

20968.90

701.00

127.90

Connecting main
Jack well of 6 M dia
Approach Bridge

RMT
No
RMT

Notes

1) The Contractor at his request may be allowed to


start construction of masonry steining so as not to
allow silting of well inoncoming monsoon and while
paying masonry, 25% amount shall be
withheld and released only when excavation to the
full depth is completed.
2) Dewatering: Total dewatering charges are to be
proposed in the tender as lumpsum amount and
75% is payable for excavation and 25% is payable
for construction of well / gallery. Out of 75%
excavation, break-up shall be as under:
25% for last 1 M depth.
20%for2Mdepthwhichjustabovelast1M depth.
15%for2Mdepthwhichjustabovelast3M depth.
15%fortherestofdepthfromwatertablelevel.

Section-J-WELL SINKING RIVER INFILTRATION WORKS

261

Sr No

Item Description

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

3) The provisions made for dewatering in the tender


being on lumpsum basis, the same shall have to be
reduced / increased proportionately as the length
of approach channel, connecting main or approach
bridge reduces / increases during actual
execution.
Condition No. 1 and 2 shall appear in Tender
condition
16
Carrying out recuparation / Yield test for
ascertaining the discharge of constructed well /
excavated profile as directed by Engineer - In Charge. The test carried out by drawing down
water from the well / profile below normal /
subsoil water level upto full depth rise is recorded.
The normal water level / subsoil water level /
subsoil water level in the well / profile as well as
strainer / suction level at pump as per design of
W.S. Scheme shall be recorded prior to the test
including cost of all materials, overload, labours
etc. complete as directed.
The test shall be carried out as per technical
circular No. 2597 dt. 20.11.1997 and shall be
carried out for 7 days.
a) Lps more than 25000
b) Lps less than 25000

Section-J-WELL SINKING RIVER INFILTRATION WORKS

Day
Day

3231.00

2034.70

3214.00

2126.30

262

Section -K - ANCILLARY ITEMS FOR RESERVOIRS


Sr No

Item Description

Providing and fixing in position copper lightening


conductor including copper rod of 20 mm dia as
per upper terminal 1.5 M long with a knob at end
and with conical spike at top, copper tape
conductor 20 x 3 mm size, copper earth plate of 3
mm thick and 0.81 sqm. in area, clamps at 1 M
centre to centre including, necessary excavation,
laying and fixing the conductor, providing and
fixing 40 mm G.I pipe upto 3 M height from ground
and 0.5 M below ground including making all
connections, filling the earthing pit with charcoal,
salt, etc. and refilling and watering, etc. complete
as per specifications laid down in relevent I.S.
codes.

i)

For Tape of 10M length

No

10227.00

909.00

ii)

Rebate / Extra rate per metre length or part


thereof over and above initial length of 10M
Providing and fixing in position copper lightening
conductor including copper rod of 20 mm dia as
per upper terminal 1.5M long with a knob at end
and with conical spike at top, aluminium tape
conductor 20 x 3 mm size copper earth plate of 3
mm thick and 0.81 sqm. in area, clamps at 1 M
centre to centre including, necessary excavation,
laying and fixing the conductor, providing & fixing
40 mm G.I pipe upto 3 M height from ground and
0.5 M below ground including making all
connections, filling the earthing pit with charcoal,
salt, etc. and refilling and watering, etc. complete
as per specifications laid down in relevent I.S.
codes.

Mtr

267.00

10.00

i)

For Tape of 10M length

No

9328.00

912.00

ii)

Rebate / Extra rate per metre length or part


thereof over and above initial length of 10M
Providing, hoisting and fixing in position inverted
J type 100 mm dia. C.I. cowl type ventilators with
mosquitoproof aluminium mesh at top including

Mtr

117.00

4.70

No

1722.00

827.00

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

applying 2 coats of anti-corrosive paint, etc.


complete as directed by Engineer-in-charge,
weighing not less than 35 kg.

Section-K-ANCILLARY ITEMS FOR RESERVOIRS

263

Sr No

Item Description

Providing, hoisting and fixing in position C.I.


manhole, frame and cover of best quality and of
required size and shape with locking arrangements
including applying 2 coats of anti-corrosive paint,
etc. complete

i)

90 x 60 cm size and weight 35 kg

No

2658.00

200.10

ii)

Rate on weight basis for any size and type of frame


and cover
Providing and fixing in position M.S. ladder 0.50 M
wide consisting of 75 x 10 mm M.S. flats as
stringers and 16 mm dia M.S. bars in double rows
as steps placed at 25 cm c/c including cost of
material and labour involved, welding, anchoring
and applying 3 coat of anti-corrosive paint, etc.
complete as directed by Engineer-in-charge.

Kg

76.00

6.00

RMT

1400.00

200.90

Sq.m
Sq.m

571.00
642.00

299.60
360.60

RMT

6415.00

434.30

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

Providing and applying epoxy paint of approved


make (Shalimar, Ciba or Mahindra & Mahindra) to
concrete surface of RCC ESR or GSR or any other
structure including cleaning the surface by
scrapping and air blowers to the satisfaction of
Engineer-in-charge, necessary scaffolding, etc
complete with all leads and lifts and giving
satisfactory hydraulic test for water tightness as
per I.S. codes
a)
For new surfaces - Two coats.
b)
For old surfaces - Two coats.
Providing and constructing RCC spiral staircase in
M-150 mix concrete at site of work and consisting
of central vertical column of 400 mm dia and steps
in RCC M-150, tie members at each brace level,
RCC parapet wall 80 cm high including cost of all
labour and material involved, cost of scaffolding,
centering, shuttering, curing, finishing in CM 1:3
proportion
including
RCC
M-150
footing
foundation, its excavation, refilling and cleaning
the site, etc. complete as per type design, with 3
coats of cement paint.

Section-K-ANCILLARY ITEMS FOR RESERVOIRS

264

Sr No

Item Description

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

Providing and constructing RCC ventilating shaft


of diameters and height mentioned below with
required number of RCC 15 x 15 cm size columns
and RCC circular slab or dome over the pillars in
M-150 including cost of all material and labour,
providing and fixing steel or wooden frame &
providing & fixing G.I. flyproof mesh of 26 gauge
and providing and applying in 3 coats of oil paint
to wooden or steel frame and cement paint to
concrete structure. etc. complete as directed by
Engineer-in-charge.

i)

0.9 M dia x 1.35 M height

No

6882.00

782.30

ii)
iii)
9

1.2 M dia x 1.80 M height


1.5 M dia x 2.25 M height
Providing and installing mercury water level
indicator for RCC ESR and wash water tank site as
per instructions of Engneer-in-charge at ground
level of the tank or nearing pump house or room
for RCC ESR having 15 mtrs. staging height and 5
mtrs. water storage height with indication of water
height in storage tank in metre and 1/10th of
meter including providing and installing 15 mm
dia class B G.I. piping with necessary accessories
from bottom of the tank upto the instrument as
per instructions of Engineer-in-charge.

No
No

8748.00
13997.00

1000.00
1623.00

No

17496.00

2920.20

Mtr

933.00

155.70

For Extra stage height over 15M or part thereof


and water depth over 5 M or part thereof
10

Providing
and
Erecting,
installing
and
commissioning
Barometric
Leg
Chlorination
system for water treatment plant upto 5 MLD.
capacity as per manufacturers specifications with
all required materials viz. 15 Kg. pressure yellow
PVC pipe, specially prepared chamber, mixing
chamber, scrubber unit, gas pressure flexible pipe,
brass nozzle nipple, electronic alarm unit, PPM
dose, indicator of 25 mm dia. 4mm thick glass
tube (Borosil), gas ubit opening spanner 3 hole
type, instruction board, aluminium pipe upto
sump ( Maximum length 15 Mtr.) etc. including
civil works wherever required for above material

Section-K-ANCILLARY ITEMS FOR RESERVOIRS

265

Sr No

Item Description

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

fittings, including satisfactory test and trial at


work site etc. complete. ( Item do not include
construction of chlorine Gas Room of 3.0 x 3.0
Mtr. or adequate size).
For 5 MLD Capacity

Add/Deduct per MLD or part of per MLD capacity.


11

Providing and fixing water level indicator upto 5 M


height including M.S. enamelled gauge plate 300
mm wide 3 mm thick, P.V.C. float, providing and
fixing required accessories such as pointer,
pulleys, nylon thread including cost of all material,
labour, etc. complete.

12

Providing and fixing water level indicator upto 5 M


height including M.S. enamelled gauge plate 150
mm wide 3 mm thick, P.V.C.float, providing and
fixing required accessories such as pointer,
pulleys, nylon thread including cost of all material,
labour, etc. complete.

Section-K-ANCILLARY ITEMS FOR RESERVOIRS

116640.00

11243.70

per
MLD

4082.00

400.80

No

8686.00

1549.00

No

5249.00

1547.80

1No. per
unit

266

Section -L - TRIAL RUN


Sr No

Item Description

Commisioning running and maintaining the


scheme to quantites, rated capacity, including
manning necessary personnel such as operator,
valveman, etc. as per requirements of the scheme
and who should also administer chemical dose for
a period of 1 month for individual scheme and 3
months for regional scheme, together with training
of personnel spared by MJP/ Local Body and
handing over the scheme to Local Body after
completion of the above period as directed by
Engineer-in-charge.

Unit

Rate
(in Rs.)
2012-2013

LABOUR
INVOLVED

Note:
Required chemicals to be supplied by Department
free of cost and electricity bill will also be paid by
the Depertment.
a) For single village ( 3 months)
b) For regional scheme upto 3 villages with raw
water pumping, one treatment plant with pumps,
raw water pumping main, leading main, ESR, BPT
and distribution system etc.
(
6 months)

Job

48572.00

33489.40

Job

201115.00

166988.40

Job

130081.00

108007.10

Job

407997.00

338764.80

Add for every additional village

Job
Month

264105.00
5996.00

219289.90
4428.00

g) Add for every pumping station.

Month

9867.00

9192.40

c) For regional scheme upto 3 villages with


pumping, pumping main, leading main, ESR, BPT
and distribution system etc. ( 6 months) (Without
WTP).
d) For regional schemes upto 3 villages, trial
period shall be one year with raw water pumping
, one treatment plant with pumps,raw water
pumping main, leading main,ESR, BPT and
distribution system etc. ( for One year)
e) For regional schemes upto 3 villages, trial
period shall be one year with raw water pumping
, pumps , raw water pumping main, leading
main,ESR, BPT and distribution system etc. (
Without WTP) ( for One year )
f)

Section-L-TRIAL RUN

267

Vous aimerez peut-être aussi