QUANTITYSURVEYING(Q.S.)
-PREPAREDBYMANIRULISLAM
QuantitySurveyor(Civil),Teejan,Oman

1.UNITSOFMEASUREMENTS

SL.NO

ITEMS

UNIT
UNIT
FOR
FORCOMPLETED
LABOUR
ITEM
WORK (MATERIAL+LABOUR)

01

Excavation

cum/cft

cum/cft

02

Back filling /
soling

cum/cft

cum/cft

03

Footing
(Concreting)

No.

cum/cft

04

P.C.C

sqm/sft

cum/cft

05

Column
/
Beam
/
Lintel
Concreting

rm/rft

cum/cft

06

Slab
concreting

sqm/sft

cum/cft

07

Pardi
/
Chajja / Loft

sqm/sft

cum/cft

No.(perstep)

cum/cft

sqm/sft

sqm/sft

sqm/sft

cum/cft

cum/cft

cum/cft

cum/cft

cum/cft

Plastering / sqm/sft
Pointing
http://manirengineerdiary.blogspot.in/2012/04/usefuldataforestimationof.html

sqm/sft

Concreting
08

Staircase
Concreting

09

Brick
masonry
10cm
to
15cmthick

10

Brick
masonry
23cmthick

11

Brick
masonry
35cmthick

12

U.C.R.
masonry

13

1/13

11/30/2015

BASICCONCEPTOFQ.S.

Pointing
14

Flooring

sqm/sft

sqm/sft

rm/rft

rm/rft

rm/rft

rm/rft

No.orrm/rft

rm/rft

sqm/sft

sqm/sft

No. or sqm /

sqm/sft

Tiling
15
16

Skirting
Steps
SillPatti

17

Kitchenotta

18

Painting

19

Doors

Windows

sft

20

Plumbing
pipes

rm/rft

rm/rft

21

Plumbing
fitting
sanitary

No.

No.

ware
22

Watertanks

ltr.

ltr.

23

Septictanks

ltr.

No.ofusers

24

Road work

sqm/sft

sqm/sft

rm/rft

rm/rft

(asphalting)
25

Electrical
cabling
Wiring

26

Electrical
points

No.

No.

27

Water

sqm/sft

sqm/sft

No.

sqm/sft

sqm/sft

sqm/sft

No.

No.

proofing to
terrace
28

Water
proofing of
W.C

29

Gardening
(lawn)

30

Gardening
(trees
bushes)

2.CONVERSIONTABLE

SR.NO

UNIT

EQUIVALENTUNITS

01

1meter

100centimeter

02

1meter

3.28feet

04

1centimeter

0.393inch

05

1foot

0.305meter

07

1inch

2.54centimeter/25.4mm

08

1tone

1000kg

09

1kg

1000grams

http://manirengineerdiary.blogspot.in/2012/04/usefuldataforestimationof.html

2/13

11/30/2015

BASICCONCEPTOFQ.S.

10

1kg

0.001tone

11

1gram

0.001kg

13

1sqmeter

10.76sqfeet

14

1brass

100sqfeet

15

1brass

9.29sqmeter

16

1cumeter

35.28cufeet

17

1cumeter

1000liters

18

1cufeet

28.315liters

19

1brass

100cufeet

20

1cufeet

0.0283cumeter

21

1liter

0.001cumeter

22

1liter

0.0353cufeet

23

1cufeet

0.01brass

24

1cumeter

0.35brass

3.WEIGHTSOFBUILDINGMATERIAL

SR.NO

MATERIAL

THEORETICALWEIGHTIN
Kg/cum

01

Cement

1440

02

Steel

7850

03

Drysand

1600

04

Riversand

1840

05

Stone

2850to2960

06

Water

1000

07

P.C.C

2240

08

R.C.C.(2%steel)

2420

09

Bricks

1600to1920

10

Brickmasonry

1920

11

Soil

1760

12

Cementconcreteblock(solid)

1800

13

Cementmortar

2080

14

Limemortar

1760

15

Lime

640

16

Glass

2530

17

Teakwood

670to830

18

Salwood

990

19

Marblestone

2620

20

Granitestone

2460to2800

21

Cuddappa

2720

22

Bitumen

1040

RATE
ANALYSIS
1.P.C.C.FOOTING(1:3:6)

http://manirengineerdiary.blogspot.in/2012/04/usefuldataforestimationof.html

3/13

11/30/2015

BASICCONCEPTOFQ.S.

1.P.C.C.FOOTING(1:3:6)

Consider10cumvolume.
Volumeofdryconcrete=15.2cum.(Adding50to52%forcompaction,wastagesetc)
Proportion(1:3:6)=1+3+6=10
Volumeofcement=15.2/10=1.52cum.
=1.52/0.035=43.4bags~44bags.
Volumeofsand=1.52X3=4.56cum.
Volumeofmetal=1.52X6=9.12cum.
MATERIAL

QTY

RATE

PER

AMOUNT

CEMENT

44

265Rs.

Bag

11660.00

SAND

4.56

1270Rs.

Cum

5791.20

METAL

9.12

900Rs.

Cum

8208.00

LABOURS

NO.

RATE

PER

AMOUNT

HEADMASON

02

400Rs.

Day

800.00

MASON

04

250Rs.

Day

1000.00

MALECOOLIE

16

200Rs.

Day

3200.00

FEMALECOOLIE

07

150Rs.

Day

1050.00

TOTAL=31709.2
TOOLS&PLANTSL.S.1%=317.092
TOTAL=31709.2+317.092=32026.292
WATER&ELECTRICCHARGES2%=640.52
TOTAL=32026.292+640.52=32666.818
CONTRACTORSPROFIT25%=8166.705
GRANTTOTAL=3266.818+8166.705=40833.505

RATEFOR10CU.M=40833.505Rs.
http://manirengineerdiary.blogspot.in/2012/04/usefuldataforestimationof.html

4/13

11/30/2015

BASICCONCEPTOFQ.S.

RATEFOR10CU.M=40833.505Rs.
RATEFORPERCU.M=4083.350Rs.

2.BRICKWORK
Considering1:4ratiosforcementmortarin150mmthickbrickwork.
Calculationofquantityfor5cu.mvolumeinbrickworkasfollows:
Sizeofbrick=19cmx9cmx9cm.
Vol.ofbrick=(0.19x0.09x0.09)cu.m
=0.00154cu.m.
Vol.ofbrickwithcementmortar
=(0.2x0.1x0.1)cu.m
=0.002cu.m.
No.ofbricksin5cu.m
=5(vol.ofonebrickwithmortar).
=50.002
=2500
Vol.of2500bricks=2500xvol.ofonebrickwithoutmortar.
=2500x0.00154
=3.85cu.m.
Vol.ofmortar=53.85=1.15cu.m.
Add15%(Bulkage+wastage)
Vol.ofwetmortar=1.15+{1.15x(15100)}
=1.323cu.m
Vol.ofdrymortar=1.323+33%inwetmortarsforinterlocking=1.759cu.m
http://manirengineerdiary.blogspot.in/2012/04/usefuldataforestimationof.html

5/13

11/30/2015

BASICCONCEPTOFQ.S.

Vol.ofcement=1.759(1+4)=0.352cu.m
No.ofcementbags=0.3520.035
=10.057bags.
10.00bags
Vol.ofsand=0.352x4
=1.408cu.m.
ITEMDESCRIPTION

QUANTITY

RATERS.

AMOUNTRS.

a.Material

Cement

10bags

250/bag

2500.00

Sand

1.408cu.m

1270/cu.m

1788.16

Bricks

2500Nos.

4/no.

10000.00

Mason

250/day

1000.00

HeadMason

400/day

400.00

Malecoolie

10

200/day

2000.00

Total

17688.16

c.Tools&Plants

1%

0ftotal

176.88

Total

17865.04

d.Watercharges

2%

Oftotal

357.30

Total

18222.34

e.Supervisor,Overhead&

25%

Ofthetotal

4555.58

http://manirengineerdiary.blogspot.in/2012/04/usefuldataforestimationof.html

6/13

11/30/2015

BASICCONCEPTOFQ.S.

Profit

Total

22777.92

RATEFOR5CU.M=22777.92Rs.
RATEFORPERCU.M=4555.58Rs.

3.R.C.C.COLUMN
Consider10cumvolume.
GradeofconcreteM40
Proportion(1:1.808:1.616)1+1.808+1.616=4.424{aspermixdesign}
Volumeofdryconcrete=15.2cum.(52%forcompaction&wastages)
VolumeofCement=15.2/4.424=3.435cum.
Cementbags=3.435/0.035=98.12~99Bags.
Sand=3.435X1.808=6.21cum.
Metal=3.435X1.616=5.55cum.
MATERIAL

QTY

RATE

PER

AMOUNT

CEMENT

99

265Rs.

Bag

26235.00

SAND

6.21

1270Rs.

Cum

7886.70

METAL

5.55

900Rs.

Cum

4995.00

LABOURS

NO.

RATE

PER

AMOUNT

HEADMASON

400Rs.

Day

400.00

MASON
3
250Rs.
Day
http://manirengineerdiary.blogspot.in/2012/04/usefuldataforestimationof.html

750.00

7/13

11/30/2015

BASICCONCEPTOFQ.S.

MASON

250Rs.

Day

750.00

MALECOOLIE

16

200Rs.

Day

3200.00

BHISTI

150Rs.

Day

1050.00

CARPENTER

200Rs.

Day

800.00

HELPER

125Rs.

Day

1000.00

TOTAL=46316.7

Tools&Plantscharges1%=463.167
TOTAL=46316.7+463.167=46779.86
Watercharges2%=935.59
TOTAL=46779.86+935.59=47715.45

Contractorsprofit25%=11928.8
TOTAL=47715.45+11928.8=59644.31

RATEFOR10CUM=RS.59644.31/
RATEFORPERCU.M=RS.5964.43/

4.INTERNALPLASTER

12mmthickinternalplaster

Considering100sqmarea
ProportionofC:M=1:4
Summationofproportion=5
Quantityofonecementbag=0.035cum

http://manirengineerdiary.blogspot.in/2012/04/usefuldataforestimationof.html

8/13

11/30/2015

BASICCONCEPTOFQ.S.

Quantityofwetmortar=0.012x100=1.2cum
Adding15%wastage=1.2+(1.2x0.15)=1.38cum
Volumeofdrymix=1.38+(1.38x1/3)=1.84cum
Volumeofcement=(dryvolume/5)x1
=(1.84/5)x1
=0.368cum
=0.368/0.035
=10.5bags
Volumeofsand=(dryvolume/5)x4
=(1.84/5)x4
=1.472cum

MATERIALS

QUANTITY

RATE(RS)

AMOUNT(RS)

Sand

1.472cum

1300/cum

1913

Cement

10.5bags

250/bag

2625

Scaffolding

L.S

550

550

LABOURS

QUANTITY

RATE(RS)

AMOUNT(RS)

Mason

8nos

200

1600

Helper

12nos

90

1080

Total

7768

Tools&Plants

1%

0ftotal

77.68

Total

7845.68

Watercharges

2%

Oftotal

156.91

Total

8002.59

Supervisor,Overhead&

25%

Ofthetotal

2000.65

Total

10003.23

Profit

http://manirengineerdiary.blogspot.in/2012/04/usefuldataforestimationof.html

9/13

11/30/2015

BASICCONCEPTOFQ.S.

RATEFOR100m=10003.23Rs.
RATEFOR1m=100.03Rs.

5.EXTERNALPLASTER

20mmthickexternalplaster

Considering100sqmarea.
ProportionformixC:M=1:4.
Summationofproportion=5.
Quantityofonecementbag=0.035cum.
Quantityofwetmortar=0.02x100=2cum.
Adding20%wastage=2+(2x0.2)=2.4cum.
Volumeofdrymix=2.4+(2.4x1/3)=3.2cum.
Volumeofcement=(dryvolume/5)x1
=(3.2/5)x1
=0.64cum
=0.64/0.035
=18.3bags
=19bags
Volumeofsand=(drymix/5)x4
=(3.2/5)x4
=2.56cum.

PARTICULAR

QUANTITY

RATE(RS)

AMOUNT(RS)

Sand

2.56cum

1300

3328

Cement

19bags

250

4750

Scaffolding

L.S.

550

550

Mason

8nos

200

1600

Helper

12nos

90

1080

Total

11708.5

Materials

Labors

Tools&Plants

1%

http://manirengineerdiary.blogspot.in/2012/04/usefuldataforestimationof.html

0ftotal

117.08
10/13

11/30/2015

BASICCONCEPTOFQ.S.

Total

11825.60

Watercharges

2%

Oftotal

236.512

Total

12062.112

Supervisor,Overhead&

25%

Ofthetotal

3015.53

GrandTotal

15077.64

Profit

RATEFOR100m=15077.64Rs.
RATEFOR1m=150.77Rs.

USEFULLDATAFORESTIMATION
[] Mixer Machine Capacity:
[http://www.blogger.com/blogger.g?
blogID=1059917570796814997]

Sr.No: Capacity
1

6'/'4'

7'/'5'

10'/'7'

Dry volume in Wet volumeOutput perPetrol consumption


Remarks
cum
incum
hour
perhourinlitre
0.170
0.113
2.266
1.000
Each batch of concrete
0.198
0.142
2.832
1.400
requires about 3 minutes
ofmixing
0.283
0.198
3.965
1.700

CementMortar:
Sr.No: Ratio

CementinKg

Cement
bag

in Sand
'cum'.

1:1'

1054

21.08

0.73

1:2'

686

13.72

0.96

1:3'

491

9.82

1.02

1:4'

380

7.60

1.05

1:6'

253

5.06

1.05

1:8'

192

3.84

1.06

http://manirengineerdiary.blogspot.in/2012/04/usefuldataforestimationof.html

in

Remarks

50kg.cementbagsizeis
Water may be(400mm x 350mm x
generally taken as 250mm
internally.
140litresper'cum'. Volume per is = 0.035
'cum'.

11/13

11/30/2015

BASICCONCEPTOFQ.S.

CementConcrete:
Sr.No: Ratio
1
2
3
4
5

CementinKg

1 : 4 : 8'
Nominal
161
Mix
1 : 3 : 6'
Nominal
212
Mix
1 : 2 : 4'
317
M15
1 : 1.5 : 3'
403
M20
1 : 1 : 2'
555
M25

Cement
bag

in Sand
'cum'.

in

Aggregatein'cum'. Remarks

3.22

0.45

0.89

4.24

0.44

0.88

6.34

0.44

0.88

8.06

0.42

0.84

11.10

0.385

0.77

Remarks
Consideringdrydensityofconcreteis1.54'cum'.
Aggregatemaybeused60%:40%ratioof20mmand10mmdownrespectively.
Waterrequiredforconcretevariesfrom28to35litresperbagof(50kg)cementdependingonthemixand
proportion.

Reinforcement(Steel)works:
Reinforcement usually required in various situation is as
follows:
Culvertandfoundaion=0.5%to1%
Slabandlanding=0.5%to1.5%
Arch,wal,floorandflateroof=1%to2%
Columnandbrace=2%to3%
Columnandbrace=2%to3%
Pile=2%to5%
Remarks
Bindingortyingwireforreinforcementmaybetakenas0.9to1.3kgperquintalofreinforcement.

One50kg.bagofcementwillmakeapproximatelyfollowingvolumeofconcrete:
The equivalent size of a box for 50 kg. cement bag is 400mmx350mmx250mm
internally.
0.133'cum'of1:1.5:3concrete.
0.166'cum'of1:2:4concrete.
http://manirengineerdiary.blogspot.in/2012/04/usefuldataforestimationof.html

12/13

11/30/2015

BASICCONCEPTOFQ.S.

0.140'cum'of1:1:2concrete.
0.250'cum'of1:3:6concrete.
0.333'cum'of1:4:8concrete.
0.400'cum'of1:5:10concrete.
0.500'cum'of1:6:12concrete.

Posted22ndApril2012byManirulIslam
0 Addacomment

Enteryourcomment...

Commentas:

Publish

GoogleAccount

Preview

http://manirengineerdiary.blogspot.in/2012/04/usefuldataforestimationof.html

13/13

Vous aimerez peut-être aussi