CODE No.

:10BT60101

SREE VIDYANIKETHAN ENGINEERING COLLEGE


(An Autonomous Institution, Affiliated to JNTUA, Anantapur)

III B.Tech II Semester (SVEC10) Supplementary Examinations December - 2014


ESTIMATION AND QUANTITY SURVEYING
[ Civil Engineering ]
Time: 3 hours

Max. Marks: 70
Answer any FIVE questions
All questions carry equal marks

1.

What is the importance of estimating and explain different types of estimates. Write the standard
units for various items of works in a building and explain principles of working out quantities them.

2.

Estimate the following quantities for the Fig.1 given below:


i) Earth work excavation
ii) Brick work in foundation and plinth
iii) 12 mm thick inside plastering iv) White washing three coats.

3.

Prepare the detailed estimate for the earthwork for a portion of a road from the
following data:
Distance (m)
:
0
100
200
300
400
500
R. L. of ground (m) :
114.5 114.7 115.2 115.2 116.1 116.8
R. L. of formation (m)
:
115.0 Upward gradient 1 in 200
Formation width of road is 10 m and side slopes in embankment are 2:1.

600
117.0

4.

Enumerate the quantity of materials required for the following items of work.
i) Brick work
ii) Random rubble masonry.
iii) Coursed rubble stone masonry.
iv) Brick on edge floor with cement mortar.

5.

Fig.2 shows the longitudinal section and cross section of a simple beam of clear span 5 m. The thickness
of supporting wall is 30 cm. Work out the total quantity of cement concrete and steel reinforcement
(mild steel)

Fig.2
6.

Explain the following clauses used in conditions of contract.


i) Maintenance period
ii) Arbitration
iii) Supply of water
iv) Security deposit

7.

a) Differentiate between the following.


i) Salvage value and Scrap value. ii) Free hold and Lease hold properties.
b) A building constructed on a site measuring 20m 30m is fetching a gross rent of Rs. 2,500/- per
month. The plinth area of the building is 140 Sq.m. and the cost of construction is Rs. 2,000/-per
Sq.m. of plinth area. The estimate life of the building is 70 years. Determine the present value of the
property based on rental income assuming a net yield of 9% for sinking fund accumulation, a
compound interest of 5% may be assumed. Taxes, annual repairs and all other outgoings may be
taken as 32% of the gross income, and the cost of land as Rs. 80/- per Sq.m.

8.

List and explain any four general items of work involved in the estimation for a building with its process
calculation.