:10BT60101
Max. Marks: 70
Answer any FIVE questions
All questions carry equal marks
1.
What is the importance of estimating and explain different types of estimates. Write the standard
units for various items of works in a building and explain principles of working out quantities them.
2.
3.
Prepare the detailed estimate for the earthwork for a portion of a road from the
following data:
Distance (m)
:
0
100
200
300
400
500
R. L. of ground (m) :
114.5 114.7 115.2 115.2 116.1 116.8
R. L. of formation (m)
:
115.0 Upward gradient 1 in 200
Formation width of road is 10 m and side slopes in embankment are 2:1.
600
117.0
4.
Enumerate the quantity of materials required for the following items of work.
i) Brick work
ii) Random rubble masonry.
iii) Coursed rubble stone masonry.
iv) Brick on edge floor with cement mortar.
5.
Fig.2 shows the longitudinal section and cross section of a simple beam of clear span 5 m. The thickness
of supporting wall is 30 cm. Work out the total quantity of cement concrete and steel reinforcement
(mild steel)
Fig.2
6.
7.
8.
List and explain any four general items of work involved in the estimation for a building with its process
calculation.