SUPERVISOR:
RESIDENTE:
CORRESPONDIENTE AL MES DE
FECHA DE PRESENTACION
CREACION DEL CENTRO DE SERVICIOS - TAMBO EN EL CENTRO POBLADO CANCAHUANI, DISTRITO DE CAPACAMARCA, PROVINCIA DE CHUMBIVILCAS, DEPARTAMENTO CUSCO
CIP
CAP
MONTO FINANCIADO
FECHA DE INICIO DE OBRA
PLAZO DE EJECUCION
FECHA DE TERMINO PREVISTA
41762
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
PRESUPUESTO
01.01
01.01.01
CONSTRUCCIONES PROVISIONALES
01.01.01.01
und
1.00
9,894.66
9,894.66
0.80
7,915.73
0.2
1,978.93
01.01.01.02
und
2.00
652.41
1,304.82
2.00
1,304.82
0.00
01.01.01.03
und
1.00
1,134.34
1,134.34
1.00
1,134.34
0.00
gb
1.00
1,766.25
1,766.25
0.25
441.56
0.25
01.01.02
INSTALACIONES PROVISIONALES
01.01.02.01
441.56
01.01.03
TRABAJOS PRELIMINARES
01.01.03.01
m2
2,500.00
0.76
1,900.00
1750.00
1,330.00
750
570.00
01.01.03.02
HABILITACION DE ACCESO
m3
303.10
19.51
5,913.48
242.48
4,730.78
60.62
1,182.70
01.01.04
01.01.04.01
FLETE TERRESTRE
01.01.05
01.01.05.01
m2
800.00
0.89
712.00
800.00
712.00
0.00
01.01.05.02
m2
800.00
0.89
712.00
190.00
169.10
11.00
01.02
01.02.01
01.02.01.01
mes
4.00
100.00
400.00
01.02.01.02
mes
4.00
1,550.03
6,200.12
0
gb
1.00
39302.74
39,302.74
0.21
8,253.58
0.00
0.00
1.00
1,550.03
100.00
1,550.03
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
01.02.01.03
mes
4.00
113.17
452.68
1.00
113.17
113.17
01.02.01.04
mes
4.00
200.83
803.32
0.00
200.83
01.02.01.05
mes
4.00
100.00
400.00
0.00
100.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
01.02.02
01.02.02.01
glb
Metrado
ANTERIOR
P.Unit
1.00
Presup. S/.
77.00
Metrado
77.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
01.02.03
MITIGACION AMBIENTAL
01.02.03.01
tall
1.00
100.00
100.00
01.02.03.02
tall
4.00
100.00
400.00
0.00
0.00
0.00
01.02.03.03
und
30.00
2.80
84.00
0.00
0.00
0.00
01.02.03.04
tall
4.00
100.00
400.00
0.00
0.00
01.02.03.05
glb
1.00
509.08
509.08
0.00
0.00
01.02.03.06
mes
4.00
30.11
120.44
01.02.03.07
act
1.00
215.38
215.38
02
ESTRUCTURAS
02.01
EDIFICACION
02.01.01
MOVIMIENTO DE TIERRAS
02.01.01.01
EXCAVACIONES
02.01.01.01.01
m3
76.98
19.51
1,501.88
02.01.01.02
CORTES
02.01.01.02.01
m3
1,626.40
19.51
31,731.06
02.01.01.03
RELLENOS
02.01.01.03.01
m3
22.58
51.62
1,165.58
02.01.01.03.02
m2
473.90
21.14
10,018.25
0.00
0.00
0.00
0.00
53.88
975.84
15.80
1,051.20
19,038.64
815.60
0.00
0.50
107.69
23.1
450.68
650.56
6.78
12,692.43
349.98
236.50
4,999.61
0.00
02.01.01.04
02.01.01.04.01
02.01.01.05
02.01.01.05.01
02.01.02
02.01.02.01
SOLADOS
m2
553.07
2.33
1,288.65
0.00
120.00
279.60
m3
68.00
11.38
773.84
0.00
45.00
512.10
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.01.02.01.01
02.01.02.02
SOBRECIMIENTOS
02.01.02.02.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
m2
71.41
32.36
2,310.83
71.41
m3
9.22
304.76
2,809.89
0.00
02.01.02.02.02
m2
140.47
26.08
3,663.46
0.00
02.01.02.02.03
kg
90.05
4.53
407.93
90.05
ACTUAL
Valorizado
Metrado
2,310.83
Valorizado
0.00
0.00
9.22
2,809.89
140.47
3,663.46
0.00
0.00
407.93
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.01.02.03
SARDINELES EN SS.HH
02.01.02.03.01
m3
0.04
537.80
21.51
0.00
0.00
0.00
02.01.02.03.02
m2
1.93
26.08
50.33
0.00
0.00
0.00
02.01.02.04
VEREDAS
02.01.02.04.01
m3
18.14
500.73
9,083.24
0.00
0.00
0.00
02.01.02.04.02
m2
34.30
26.08
894.54
0.00
0.00
0.00
02.01.02.04.03
131.30
13.66
1,793.56
0.00
0.00
0.00
02.01.02.04.04
335.55
3.70
1,241.54
0.00
0.00
0.00
02.01.02.05
PATIO
02.01.02.05.01
m3
7.57
500.73
3,790.53
0.00
0.00
0.00
02.01.02.05.02
m2
11.26
26.08
293.66
0.00
0.00
0.00
02.01.02.05.03
54.43
13.66
743.51
0.00
0.00
0.00
02.01.02.05.04
181.88
3.70
672.96
0.00
0.00
0.00
02.01.02.06
RAMPAS
02.01.02.06.01
m3
1.17
500.73
585.85
0.00
0.00
0.00
02.01.02.06.02
m2
2.37
26.08
61.81
0.00
0.00
0.00
02.01.02.06.03
51.08
3.70
189.00
0.00
0.00
0.00
02.01.02.07
FALSO PISO
02.01.02.07.01
m2
252.74
35.50
8,972.27
0.00
0.00
0.00
02.01.03
02.01.03.01
ZAPATAS
02.01.03.01.01
m3
10.87
537.80
5,845.89
0.00
10.87
5,845.89
02.01.03.01.02
kg
354.52
4.55
1,613.07
354.52
0.00
0.00
02.01.03.02
VIGAS DE CIMENTACION
02.01.03.02.01
m3
17.96
537.80
9,658.89
0.00
17.96
9,658.89
02.01.03.02.02
m2
71.91
36.64
2,634.78
0.00
71.91
2,634.78
02.01.03.02.03
kg
1,824.37
4.55
8,300.88
02.01.03.02.04
TEKNOPORT 1"
m2
44.23
6.91
305.63
02.01.03.03
COLUMNAS
1824.37
0.00
1,613.07
8,300.88
-
44.23
0.00
305.63
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.01.03.03.01
m3
9.75
460.61
4,490.95
0.00
9.75
4,490.95
02.01.03.03.02
m2
118.45
36.93
4,374.36
0.00
118.45
4,374.36
02.01.03.03.03
m2
18.61
118.95
2,213.66
0.00
18.61
2,213.66
02.01.03.03.04
kg
1,736.75
4.55
7,902.21
1369.62
367.13
1,670.44
6,231.77
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.01.03.04
VIGAS
02.01.03.04.01
m3
12.39
460.61
5,706.96
0.00
0.00
0.00
02.01.03.04.02
m2
116.35
36.93
4,296.81
0.00
0.00
0.00
02.01.03.04.03
kg
1,586.15
4.55
7,216.98
0.00
1586.15
7,216.98
02.01.03.05
COLUMNETAS DE CONFINAMIENTO
02.01.03.05.01
m3
5.17
460.61
2,381.35
0.00
4.50
2,072.75
02.01.03.05.02
m2
79.74
36.93
2,944.80
60.00
2,215.80
02.01.03.05.03
kg
1,083.74
4.55
4,931.02
1083.74
4,931.02
02.01.03.06
VIGUETAS DE CONFINAMIENTO
02.01.03.06.01
m3
2.10
460.61
967.28
0.00
0.00
0.00
02.01.03.06.02
m2
23.19
36.93
856.41
0.00
0.00
0.00
02.01.03.06.03
kg
351.96
4.55
1,601.42
0.00
351.96
1,601.42
02.01.03.07
02.01.03.07.01
m3
0.59
460.61
271.76
0.00
0.59
271.76
02.01.03.07.02
m2
11.89
36.93
439.10
11.89
439.10
02.01.03.07.03
kg
35.45
4.55
161.30
35.45
161.30
02.01.03.08
02.01.03.08.01
m3
0.74
460.61
340.85
0.00
0.00
0.00
02.01.03.08.02
m2
10.72
36.93
395.89
0.00
0.00
0.00
02.01.03.08.03
kg
40.85
4.55
185.87
0.00
0.00
0.00
02.01.04
ESTRUCTURAS METALICAS
02.01.04.01
TIJERALES Y RETICULADOS
02.01.04.01.01
und
3.00
1,514.93
4,544.79
0.00
0.00
0.00
02.01.04.01.02
und
2.00
1,455.00
2,910.00
0.00
0.00
0.00
02.01.04.01.03
und
6.00
1,460.66
8,763.96
0.00
0.00
0.00
02.01.04.01.04
IZAJE DE TIJERALES
und
11.00
115.97
1,275.67
0.00
0.00
0.00
02.01.04.02
CORREAS
02.01.04.02.01
419.20
20.75
8,698.40
0.00
0.00
0.00
02.01.04.02.02
und
124.00
12.14
1,505.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.01.04.02.03
02.01.04.03
ANCLAJES
02.01.04.03.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
und
26.00
13.46
349.96
0.00
0.00
0.00
und
5.00
40.86
204.30
0.00
0.00
0.00
02.01.04.03.02
und
27.00
44.82
1,210.14
0.00
0.00
0.00
02.01.04.03.03
und
6.00
40.32
241.92
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
02.01.05
COBERTURA
02.01.05.01
m2
02.01.05.02
33.70
35.55
1,198.04
02.01.05.03
30.34
70.08
2,126.23
02.01.05.04
m2
18.96
59.41
1,126.41
02.01.06
02.01.06.01
67.40
112.76
7,600.02
02.01.07
VARIOS
02.01.07.01
65.50
15.07
987.09
02.02
02.02.01
MOVIMIENTO DE TIERRAS
02.02.01.01
EXCAVACIONES
02.02.01.01.01
m3
6.30
19.51
02.02.02
02.02.02.01
CONCRETO f'c=140kg/cm2-P/DADOS
m3
6.86
02.02.02.02
CONCRETO f'c=175kg/cm2-P/HITOS
m3
02.02.02.03
02.02.02.04
02.02.03
02.02.03.01
02.02.03.02
02.02.04
PINTURA
02.02.04.01
02.03
02.03.01
MOVIMIENTO DE TIERRAS
02.03.01.01
EXCAVACIONES
02.03.01.01.01
445.48
117.47
52,330.54
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
122.91
0.00
6.30
122.91
386.25
2,649.68
0.00
0.00
0.00
0.41
500.73
205.30
0.00
0.00
0.00
m2
12.71
26.08
331.48
0.00
0.00
kg
43.03
4.55
195.79
0.00
0.00
197.00
272.73
53,727.81
0.00
0.00
1.00
1,165.19
1,165.19
0.00
0.00
0.00
und
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m2
15.38
14.85
228.39
0.00
0.00
0.00
m3
0.28
19.51
5.46
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
02.03.02
02.03.02.01
CONCRETO f'c=140kg/cm2-P/DADOS
m3
0.34
386.25
131.33
02.03.02.02
m2
0.90
26.08
23.47
0.00
0.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.03.03
02.03.03.01
CERCO METALICO H=2.50M C/MALLA GALVANIZADA N10 2"X2" CON TUBO FG 3" INC. 3
HILERAS DE ALAMBRE DE PUAS EN PARTE SUPERIOR
PUERTA A=1.00M. H=2.00M. CON TUBOS FG 1.1/2" CON MALLA GALVANIZADA N10 2"X2"
DOBLE TORSION INC. CERROJO Y CANDADO (SEGUN DISEO)
und
02.03.03.02
Metrado
ANTERIOR
P.Unit
15.00
Presup. S/.
161.06
Metrado
2,415.90
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
649.34
649.34
0.00
02.03.04
PINTURA
02.03.04.01
m2
32.00
12.66
405.12
02.03.04.02
m2
32.00
12.66
405.12
02.04
ASTA DE BANDERA
02.04.01
MOVIMIENTO DE TIERRAS
02.04.01.01
EXCAVACIONES
02.04.01.01.01
m3
1.78
19.51
34.73
0.00
0.00
0.00
02.04.01.02
RELLENOS
02.04.01.02.01
m3
0.75
51.62
38.72
0.00
0.00
0.00
02.04.01.03
02.04.01.03.01
m3
1.24
11.38
14.11
0.00
0.00
0.00
02.04.02
02.04.02.01
SOLADOS
02.04.02.01.01
m2
1.76
32.36
56.95
0.00
0.00
0.00
02.04.02.02
VEREDAS
02.04.02.02.01
m3
0.72
500.73
360.53
0.00
0.00
0.00
02.04.02.02.02
m2
1.32
26.08
34.43
0.00
0.00
0.00
02.04.02.02.03
3.60
13.66
49.18
0.00
0.00
0.00
02.04.03
02.04.03.01
m3
0.78
460.61
359.28
0.00
0.00
0.00
02.04.03.02
m2
3.42
36.93
126.30
0.00
0.00
0.00
02.04.03.03
kg
37.86
4.55
172.26
0.00
0.00
0.00
02.04.04
CARPINTERIA METALICA
02.04.04.01
ASTA DE BANDERA CON TUBO FG DE 3" Y 2" H=6.20M HASTA ANCLAJE INC. RODON Y
MASTIL
und
1.00
583.33
583.33
0.00
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.04.04.02
ASTA DE BANDERA CON TUBO FG DE 3" Y 2" H=5.20M HASTA ANCLAJE INC. RODON Y
MASTIL
02.04.05
PINTURA
02.04.05.01
02.04.05.02
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
und
2.00
583.33
1,166.66
m2
3.08
10.95
33.73
m2
3.08
8.91
27.44
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.05
02.05.01
MOVIMIENTO DE TIERRAS
02.05.01.01
EXCAVACIONES
02.05.01.01.01
02.05.01.02
RELLENOS
02.05.01.02.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
m3
13.75
19.51
268.26
0.00
0.00
0.00
m2
6.25
2.33
14.56
0.00
0.00
0.00
02.05.01.02.02
m3
2.50
51.62
129.05
0.00
0.00
0.00
02.05.01.02.03
m2
6.25
21.14
132.13
0.00
0.00
02.05.01.03
02.05.01.03.01
m3
14.63
11.38
166.49
0.00
0.00
0.00
02.05.01.04
02.05.01.04.01
ENTIBADO DE ZAPATAS
m2
10.24
36.93
378.16
0.00
0.00
0.00
02.05.02
02.05.02.01
SOLADOS
02.05.02.01.01
m2
6.25
32.36
202.25
0.00
0.00
02.05.02.02
VEREDAS
02.05.02.02.01
m3
0.47
500.73
235.34
0.00
0.00
0.00
02.05.02.02.02
m2
2.71
26.08
70.68
0.00
0.00
0.00
02.05.02.02.03
2.35
13.66
32.10
0.00
0.00
0.00
02.05.03
02.05.03.01
CISTERNA
02.05.03.01.01
m3
5.14
537.80
2,764.29
0.00
0.00
0.00
02.05.03.01.02
m2
24.00
36.93
886.32
0.00
0.00
0.00
02.05.03.01.03
kg
160.52
4.55
730.37
0.00
0.00
0.00
02.05.03.02
COLUMNAS
02.05.03.02.01
m3
1.20
460.61
552.73
0.00
0.00
0.00
02.05.03.02.02
m2
20.48
36.93
756.33
0.00
0.00
0.00
02.05.03.02.03
kg
222.77
4.55
1,013.60
0.00
0.00
0.00
02.05.03.03
VIGAS
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.05.03.03.01
m3
2.00
460.61
921.22
0.00
0.00
0.00
02.05.03.03.02
m2
21.00
36.93
775.53
0.00
0.00
0.00
02.05.03.03.03
kg
248.11
4.55
1,128.90
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.05.03.04
LOSA MACIZAS
02.05.03.04.01
m3
1.48
460.61
681.70
0.00
0.00
0.00
02.05.03.04.02
m2
9.50
36.93
350.84
0.00
0.00
0.00
02.05.03.04.03
kg
67.16
4.55
305.58
0.00
0.00
0.00
02.05.03.05
02.05.03.05.01
CONCRETO f'c=210kg/cm2-P/TAPAS.
m3
0.05
516.22
25.81
0.00
0.00
0.00
02.05.03.05.02
m2
0.92
24.98
22.98
0.00
0.00
02.05.03.05.03
kg
9.05
4.55
41.18
0.00
0.00
0.00
02.05.04
02.05.04.01
m2
10.81
74.81
808.70
0.00
0.00
0.00
0.00
02.05.05
REVOQUES Y REVESTIMIENTO
02.05.05.01
m2
10.01
13.44
134.53
0.00
0.00
0.00
02.05.05.02
m2
7.21
13.44
96.90
0.00
0.00
0.00
02.05.05.03
m2
13.05
15.17
197.97
0.00
0.00
0.00
02.05.05.04
m2
13.20
17.72
233.90
0.00
0.00
02.05.05.05
m2
19.10
17.72
338.45
0.00
0.00
0.00
02.05.05.06
m2
0.17
17.72
3.01
0.00
0.00
0.00
02.05.06
CIELORRASO
02.05.06.01
02.05.06.01.01
m2
12.50
26.44
330.50
0.00
0.00
0.00
02.05.07
PISOS Y PAVIMENTOS
02.05.07.01
PISOS DE CONCRETO
02.05.07.01.01
m2
8.16
28.91
235.91
0.00
0.00
0.00
02.05.08
ZOCALOS Y CONTRAZOCALOS
02.05.08.01
CONTRAZOCALOS
02.05.08.01.01
m2
3.18
7.17
22.80
0.00
0.00
02.05.08.01.02
m2
0.73
7.17
5.23
0.00
0.00
02.05.09
CARPINTERIA DE MADERA
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.05.09.01
02.05.09.02
m2
m2
Metrado
ANTERIOR
P.Unit
1.54
Presup. S/.
451.98
Metrado
696.05
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.32
98.03
31.37
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.05.10
CERRAJERIA
02.05.10.01
und
3.00
23.52
70.56
0.00
0.00
0.00
02.05.10.02
und
1.00
61.14
61.14
0.00
0.00
0.00
02.05.10.03
pza
1.00
100.33
100.33
0.00
0.00
0.00
02.05.11
PINTURA
02.05.11.01
m2
10.01
11.30
113.11
0.00
0.00
02.05.11.02
m2
7.21
8.91
64.24
0.00
0.00
02.05.11.03
m2
16.15
11.30
182.50
0.00
0.00
02.05.11.04
m2
16.15
8.91
143.90
0.00
0.00
0.00
0.00
0.00
0.00
02.05.12
0.00
0.00
0.00
0.00
OTROS
02.05.12.01
TANQUE ELEVADO
02.05.12.01.01
und
1.00
933.70
933.70
02.05.12.01.02
ESCALERA DE GATO CON TUBO DE FIERRO D=1 1/2" Y BARANDA DE TUBO DE FIERRO D=1
1/2"
und
1.00
2,150.82
2,150.82
02.05.12.01.03
und
1.00
743.76
743.76
0.00
0.00
0.00
02.05.12.01.04
glb
1.00
125.89
125.89
0.00
0.00
0.00
02.05.12.02
02.05.12.02.01
9.30
7.44
69.19
0.00
0.00
0.00
02.05.12.02.02
10.50
6.43
67.52
0.00
0.00
0.00
02.05.12.03
02.05.12.03.01
pza
2.00
15.95
31.90
0.00
0.00
0.00
02.05.12.03.02
pza
7.00
9.22
64.54
0.00
0.00
0.00
02.05.12.03.03
pza
3.00
6.78
20.34
0.00
0.00
0.00
02.05.12.03.04
pza
1.00
13.28
13.28
0.00
0.00
0.00
02.05.12.03.05
pza
1.00
12.11
12.11
0.00
0.00
0.00
02.05.12.03.06
pza
4.00
2.85
11.40
0.00
0.00
0.00
02.05.12.03.07
pza
1.00
6.61
6.61
0.00
0.00
0.00
02.05.12.03.08
1.00
83.40
83.40
0.00
0.00
02.05.12.04
VALVULAS
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.05.12.04.01
und
1.00
82.94
82.94
0.00
0.00
0.00
02.05.12.04.02
und
2.00
45.84
91.68
0.00
0.00
0.00
02.05.12.04.03
und
1.00
104.10
104.10
0.00
0.00
0.00
02.05.12.04.04
und
1.00
84.67
84.67
0.00
0.00
0.00
02.05.12.04.05
und
1.00
102.70
102.70
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.05.12.05
ABRAZADERAS
02.05.12.05.01
und
14.00
2.39
33.46
0.00
0.00
0.00
02.05.12.05.02
und
7.00
2.51
17.57
0.00
0.00
0.00
02.05.12.05.03
und
7.00
9.20
64.40
0.00
0.00
0.00
02.06
02.06.01
MOVIMIENTO DE TIERRAS
02.06.01.01
EXCAVACIONES
02.06.01.01.01
m3
3.24
19.51
63.21
0.00
0.00
0.00
02.06.01.02
RELLENOS
02.06.01.02.01
m2
3.24
2.33
7.55
0.00
0.00
0.00
02.06.01.02.02
m3
0.43
51.62
22.20
0.00
0.00
0.00
02.06.01.02.03
m2
4.86
21.14
102.74
0.00
0.00
02.06.01.03
02.06.01.03.01
m3
3.65
13.66
49.86
0.00
0.00
0.00
02.06.02
02.06.02.01
CIMIENTOS CORRIDOS
02.06.02.01.01
m3
2.59
283.63
734.60
0.00
0.00
0.00
02.06.02.02
SOBRECIMIENTO
02.06.02.02.01
m3
0.60
304.76
182.86
0.00
0.00
0.00
02.06.02.02.02
m2
8.05
26.08
209.94
0.00
0.00
0.00
02.06.02.03
VEREDAS
02.06.02.03.01
m3
0.51
500.73
255.37
0.00
0.00
0.00
02.06.02.03.02
m2
2.77
26.08
72.24
0.00
0.00
0.00
02.06.02.03.03
2.35
13.66
32.10
0.00
0.00
0.00
02.06.02.04
FALSO PISO
02.06.02.04.01
m2
3.08
35.50
109.34
0.00
0.00
0.00
02.06.03
02.06.03.01
COLUMNAS
02.06.03.01.01
m3
0.26
460.61
119.76
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
02.06.03.01.02
m2
6.09
36.93
224.90
02.06.03.01.03
kg
37.76
4.55
171.81
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.06.03.02
VIGUETAS
02.06.03.02.01
m3
0.26
460.61
119.76
0.00
0.00
0.00
02.06.03.02.02
m2
3.08
36.93
113.74
0.00
0.00
0.00
02.06.03.02.03
kg
38.77
4.55
176.40
0.00
0.00
0.00
02.06.03.03
LOSA MACISAS
02.06.03.03.01
m3
0.63
460.61
290.18
0.00
0.00
0.00
02.06.03.03.02
m2
7.80
36.93
288.05
0.00
0.00
0.00
02.06.03.03.03
kg
38.37
4.55
174.58
0.00
0.00
0.00
02.06.03.04
LAVADERO
02.06.03.04.01
m3
0.35
460.61
161.21
0.00
0.00
0.00
02.06.03.04.02
m2
5.15
36.93
190.19
0.00
0.00
0.00
02.06.03.04.03
kg
13.80
4.55
62.79
0.00
0.00
0.00
02.06.04
02.06.04.01
m2
12.34
74.81
923.16
0.00
0.00
02.06.05
REVOQUES Y REVESTIMIENTO
02.06.05.01
m2
2.59
13.44
34.81
0.00
0.00
0.00
02.06.05.02
m2
9.10
13.44
122.30
0.00
0.00
0.00
02.06.05.03
m2
9.19
15.17
139.41
0.00
0.00
0.00
02.06.05.04
m2
6.09
17.72
107.91
0.00
0.00
0.00
02.06.05.05
m2
3.08
17.72
54.58
0.00
0.00
0.00
02.06.05.06
m2
1.23
17.72
21.80
0.00
0.00
0.00
02.06.06
CIELORRASO
02.06.06.01
02.06.06.01.01
m2
7.80
26.44
206.23
0.00
0.00
0.00
02.06.07
PISOS Y PAVIMENTOS
02.06.07.01
CONTRAPISOS
02.06.07.01.01
CONTRAPISO E=4 CM BASE 3 CM. MEZC. C:H 1:5 ACAB. 1 CM. PASTA C:A 1:2 (ACABADO SEMIP
m2
3.08
26.60
81.93
0.00
0.00
0.00
02.06.07.02
PISOS
02.06.07.02.01
m2
3.08
67.41
207.62
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.06.08
ZOCALOS Y CONTRAZOCALOS
02.06.08.01
ZOCALOS
02.06.08.01.01
m2
3.24
7.17
23.23
0.00
0.00
0.00
02.06.08.01.02
ZOCALO DE CERAMICO 30 X 30 cm
m2
3.33
72.76
242.29
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.06.08.02
CONTRAZOCALOS
02.06.08.02.01
02.06.09
CARPINTERIA DE MADERA
02.06.09.01
02.06.09.02
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
m2
0.56
72.76
40.75
m2
1.58
451.98
714.13
m2
0.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.44
98.03
43.13
0.00
02.06.10
CERRAJERIA
02.06.10.01
und
3.00
23.52
70.56
0.00
0.00
0.00
02.06.10.02
und
1.00
61.14
61.14
0.00
0.00
0.00
02.06.10.03
pza
1.00
100.33
100.33
0.00
0.00
0.00
02.06.11
PINTURA
02.06.11.01
m2
11.78
11.30
133.11
0.00
0.00
0.00
02.06.11.02
m2
9.10
8.91
81.08
0.00
0.00
0.00
02.06.11.03
PINTURA LATEX MATE - 2 MANOS EN COLUMNAS Y VIGAS INTERIORES COLOR BLANCO HUMO
m2
4.59
11.30
51.87
0.00
0.00
0.00
02.06.11.04
m2
4.59
8.91
40.90
0.00
0.00
0.00
02.06.12
02.06.12.01
02.06.12.01.01
und
1.00
322.88
322.88
0.00
0.00
0.00
02.06.12.01.02
und
1.00
142.95
142.95
0.00
0.00
0.00
02.06.12.02
02.06.12.02.01
pza
1.00
16.50
16.50
0.00
0.00
0.00
02.06.12.02.02
pza
1.00
16.71
16.71
0.00
0.00
0.00
02.06.12.02.03
pza
1.00
18.59
18.59
0.00
0.00
0.00
02.06.12.02.04
pza
1.00
53.00
53.00
0.00
0.00
0.00
02.06.12.02.05
pza
1.00
25.00
25.00
0.00
0.00
02.06.13
02.06.13.01
und
2.00
15.78
31.56
0.00
0.00
0.00
02.06.14
02.06.14.01
und
5.00
15.97
79.85
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.06.15
02.06.15.01
02.06.15.01.01
pto
Metrado
ANTERIOR
P.Unit
3.00
Presup. S/.
42.07
Metrado
126.21
0.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.06.15.02
02.06.15.02.01
3.63
10.45
37.93
0.00
0.00
0.00
02.06.15.02.02
9.95
3.85
38.31
0.00
0.00
0.00
02.06.15.03
02.06.15.03.01
pza
14.00
5.72
80.08
0.00
0.00
0.00
02.06.15.03.02
pza
1.00
12.54
12.54
0.00
0.00
0.00
02.06.15.03.03
pza
2.00
6.23
12.46
0.00
0.00
0.00
02.06.15.03.04
pza
1.00
8.93
8.93
0.00
0.00
0.00
02.06.15.03.05
pza
1.00
7.82
7.82
0.00
0.00
0.00
02.06.15.03.06
pza
2.00
5.95
11.90
0.00
0.00
0.00
02.06.15.03.07
pza
4.00
7.69
30.76
0.00
0.00
0.00
02.06.15.04
02.06.15.04.01
pza
2.00
40.49
80.98
0.00
0.00
0.00
02.06.16
DESAGE Y VENTILACION
02.06.16.01
SALIDAS DE DESAGUE
02.06.16.01.01
pto
5.00
8.42
42.10
0.00
0.00
0.00
02.06.16.01.02
pto
1.00
8.42
8.42
0.00
0.00
0.00
02.06.16.02
02.06.16.02.01
5.66
10.99
62.20
0.00
0.00
0.00
02.06.16.02.02
8.65
7.20
62.28
0.00
0.00
0.00
02.06.16.02.03
5.50
7.20
39.60
0.00
0.00
0.00
02.06.16.03
02.06.16.03.01
pza
2.00
34.17
68.34
0.00
0.00
0.00
02.06.16.03.02
pza
1.00
15.92
15.92
0.00
0.00
0.00
02.06.16.03.03
pza
4.00
6.18
24.72
0.00
0.00
0.00
02.06.16.03.04
pza
1.00
8.37
8.37
0.00
0.00
0.00
02.06.16.03.05
pza
4.00
6.98
27.92
0.00
0.00
0.00
02.06.16.03.06
pza
5.00
22.15
110.75
0.00
0.00
0.00
02.06.16.03.07
pza
2.00
8.49
16.98
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.06.17
INSTALACIONES ESPECIALES
02.06.17.01
pza
2.00
10.00
20.00
0.00
0.00
0.00
02.06.17.02
pza
1.00
7.47
7.47
0.00
0.00
0.00
02.06.17.03
pza
1.00
47.80
47.80
0.00
0.00
0.00
02.06.17.04
pza
1.00
18.56
18.56
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.07
TENDAL
02.07.01
MOVIMIENTO DE TIERRAS
02.07.01.01
EXCAVACIONES
02.07.01.01.01
02.07.02
02.07.02.01
BASES DE CONCRETO
02.07.02.01.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
m3
0.10
19.51
1.95
0.00
0.00
0.00
CONCRETO f'c=140kg/cm2-P/DADOS
m3
0.14
386.25
54.08
0.00
0.00
0.00
02.07.02.01.02
m2
0.60
36.93
22.16
0.00
0.00
0.00
02.07.03
ESTRUCTURA DE MADERA
02.07.03.01
COLUMNAS-VIGAS
02.07.03.01.01
und
1.00
212.01
212.01
0.00
0.00
0.00
02.08
02.08.01
MOVIMIENTO DE TIERRAS
02.08.01.01
EXCAVACIONES
02.08.01.01.01
m3
1.15
19.51
22.44
0.00
0.00
0.00
02.08.01.02
02.08.01.02.01
m3
1.38
13.66
18.85
0.00
0.00
0.00
02.08.02
02.08.02.01
BASES DE CONCRETO
02.08.02.01.01
CONCRETO f'c=140kg/cm2-P/DADOS
m3
1.23
386.25
475.09
0.00
0.00
0.00
02.08.02.01.02
m2
1.20
36.93
44.32
0.00
0.00
0.00
02.09
02.09.01
MOVIMIENTO DE TIERRAS
02.09.01.01
EXCAVACIONES
02.09.01.01.01
m3
12.58
19.51
245.44
0.00
0.00
0.00
02.09.01.02
02.09.01.02.01
m3
14.88
13.66
203.26
0.00
0.00
0.00
02.09.02
02.09.02.01
m3
8.39
500.73
4,201.12
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
02.09.02.02
m2
41.93
26.08
1,093.53
02.09.02.03
28.95
13.66
395.46
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.09.03
02.09.03.01
m3
0.28
500.73
140.20
0.00
0.00
0.00
02.09.03.02
m2
5.67
26.08
147.87
0.00
0.00
0.00
02.09.03.03
kg
42.28
4.55
192.37
0.00
0.00
0.00
m2
5.67
17.72
100.47
0.00
0.00
0.00
m2
5.67
8.91
50.52
0.00
0.00
02.09.04
REVOQUES Y REVESTIMIENTO
02.09.04.01
02.09.05
PINTURA
02.09.05.01
02.09.06
OTROS
02.09.06.01
REJILLAS
02.09.06.01.01
02.09.06.02
02.09.06.02.01
02.09.06.02.02
02.10
MUROS CORTAVIENTOS
02.10.01
MOVIMIENTO DE TIERRAS
02.10.01.01
EXCAVACIONES
02.10.01.01.01
02.10.01.02
RELLENOS
02.10.01.02.01
02.10.01.03
02.10.01.03.01
02.10.02
02.10.02.01
CIMIENTOS CORRIDOS
02.10.02.01.01
02.10.02.02
SOBRECIMIENTO
02.10.02.02.01
02.10.02.02.02
0.00
83.85
157.35
13,193.80
0.00
0.00
0.00
37.10
5.88
218.15
0.00
0.00
0.00
und
21.00
16.93
355.53
0.00
0.00
0.00
m3
3.56
19.51
69.46
0.00
0.00
0.00
m2
6.47
2.33
15.08
0.00
0.00
0.00
m3
4.63
13.66
63.25
0.00
0.00
0.00
m3
2.59
283.63
734.60
0.00
0.00
m3
0.88
304.76
268.19
0.00
0.00
0.00
m2
13.61
26.08
354.95
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.10.02.02.03
kg
Metrado
ANTERIOR
P.Unit
9.41
Presup. S/.
4.53
Metrado
42.63
0.00
ACTUAL
Valorizado
Metrado
-
Valorizado
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
02.10.03
02.10.03.01
COLUMNETAS DE CONFINAMIENTO
02.10.03.01.01
m3
0.26
460.61
119.76
02.10.03.01.02
m2
4.00
36.93
147.72
02.10.03.01.03
kg
66.56
4.55
302.85
02.10.03.02
VIGUETAS DE CONFINAMIENTO
02.10.03.02.01
m3
0.27
460.61
124.36
02.10.03.02.02
m2
4.08
36.93
150.67
02.10.03.02.03
kg
30.02
4.55
136.59
02.10.04
02.10.04.01
m2
11.57
74.81
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
865.55
0.00
0.00
0.00
0.00
0.00
0.00
02.10.05
REVOQUES Y REVESTIMIENTO
02.10.05.01
m2
23.14
13.44
311.00
0.00
0.00
0.00
02.10.05.02
m2
10.12
17.72
179.33
0.00
0.00
0.00
02.10.06
CONTRAZOCALOS
02.10.06.01
m2
5.44
7.17
39.00
0.00
0.00
0.00
02.10.07
PINTURA
02.10.07.01
m2
23.14
12.89
298.27
0.00
0.00
02.10.07.02
m2
10.12
13.91
140.77
0.00
0.00
02.10.07.03
m2
5.44
8.91
48.47
0.00
0.00
02.10.08
02.10.08.01
m3
0.94
460.61
432.97
0.00
0.00
0.00
02.10.08.02
m2
9.80
36.93
361.91
0.00
0.00
0.00
02.10.08.03
kg
35.58
4.55
161.89
0.00
0.00
0.00
03
ARQUITECTURA
03.01
EDIFICACION
03.01.01
03.01.01.01
m2
265.47
74.81
19,859.81
0.00
250.00
18,702.50
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
03.01.02
REVOQUES Y REVESTIMIENTO
03.01.02.01
m2
80.11
14.87
1,191.24
0.00
0.00
0.00
03.01.02.02
m2
386.71
13.44
5,197.38
0.00
0.00
0.00
03.01.02.03
m2
118.02
13.44
1,586.19
0.00
0.00
0.00
03.01.02.04
m2
24.49
17.72
433.96
0.00
0.00
0.00
03.01.02.05
m2
2.92
77.24
225.54
0.00
0.00
0.00
03.01.02.06
m2
1.42
65.81
93.45
0.00
0.00
0.00
03.01.02.07
m2
132.70
17.72
2,351.44
0.00
0.00
0.00
03.01.02.08
m2
111.95
17.72
1,983.75
0.00
0.00
0.00
03.01.03
CIELORRASOS
03.01.03.01
m2
248.27
65.51
16,264.17
0.00
0.00
0.00
03.01.03.02
m2
129.41
97.42
12,607.12
0.00
0.00
0.00
03.01.04
PISOS Y PAVIMENTOS
03.01.04.01
CONTRAPISOS
03.01.04.01.01
CONTRAPISO E=4 CM BASE 3 CM. MEZC. C:H 1:5 ACAB. 1 CM. PASTA C:A 1:2 (ACABADO SEMIP
m2
64.58
26.60
1,717.83
0.00
0.00
0.00
03.01.04.02
PISOS
03.01.04.02.01
m2
64.58
67.41
4,353.34
0.00
0.00
03.01.04.02.02
m2
156.42
140.75
22,016.12
0.00
0.00
03.01.05
ZOCALOS Y CONTRAZOCALOS
03.01.05.01
ZOCALOS
03.01.05.01.01
ZOCALO DE CERAMICO 30 X 30 cm
m2
80.11
72.76
5,828.80
0.00
0.00
0.00
03.01.05.01.02
m2
128.56
53.11
6,827.82
0.00
0.00
0.00
03.01.05.02
CONTRAZOCALOS
03.01.05.02.01
m2
3.14
7.17
22.51
0.00
0.00
0.00
03.01.05.02.02
m2
55.07
7.17
394.85
0.00
0.00
0.00
03.01.05.02.03
m2
3.85
72.76
280.13
0.00
0.00
0.00
03.01.05.02.04
11.96
8.85
105.85
0.00
0.00
0.00
03.01.06
CARPINTERIA DE MADERA
03.01.06.01
PUERTAS
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
03.01.06.01.01
03.01.06.01.02
m2
m2
Metrado
ANTERIOR
P.Unit
23.57
Presup. S/.
451.98
Metrado
10,653.17
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
28.43
172.82
4,913.27
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
03.01.06.02
VENTANAS
03.01.06.02.01
m2
2.55
78.03
198.98
03.01.06.02.02
m2
48.91
98.03
4,794.65
03.01.06.03
03.01.06.03.01
03.01.07
03.01.07.01
VENTANAS DE FIERRO
03.01.07.01.01
03.01.07.01.02
03.01.07.02
PUERTAS DE FIERRO
03.01.07.02.01
0.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
1.50
405.86
608.79
0.00
0.00
0.00
m2
2.30
238.99
549.68
0.00
0.00
0.00
m2
2.84
263.77
749.11
0.00
0.00
0.00
und
1.00
1,689.93
1,689.93
0.00
0.00
0.00
03.01.07.02.02
und
1.00
768.15
768.15
0.00
0.00
0.00
03.01.07.02.03
und
1.00
732.70
732.70
0.00
0.00
0.00
03.01.07.02.04
und
1.00
512.89
512.89
0.00
0.00
0.00
03.01.08
CERRAJERIA
03.01.08.01
BISAGRAS
03.01.08.01.01
und
82.00
31.32
2,568.24
0.00
0.00
0.00
03.01.08.01.02
und
40.00
14.06
562.40
0.00
0.00
0.00
03.01.08.01.03
und
12.00
23.52
282.24
0.00
0.00
0.00
03.01.08.02
CERRADURAS
03.01.08.02.01
und
9.00
61.14
550.26
0.00
0.00
0.00
03.01.08.02.02
und
11.00
35.27
387.97
0.00
0.00
0.00
03.01.08.02.03
und
128.00
5.44
696.32
0.00
0.00
03.01.08.02.04
und
3.00
92.13
276.39
0.00
0.00
0.00
03.01.08.02.05
und
20.00
9.34
186.80
0.00
0.00
0.00
03.01.08.03
ACCESORIOS DE CIERRE
03.01.08.03.01
und
2.00
100.33
200.66
0.00
0.00
0.00
03.01.09
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
03.01.09.01
und
2.00
238.51
477.02
0.00
0.00
0.00
03.01.09.02
und
2.00
124.44
248.88
0.00
0.00
0.00
03.01.09.03
und
2.00
172.83
345.66
0.00
0.00
0.00
03.01.09.04
m2
102.92
177.97
18,316.67
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
03.01.10
PINTURA
03.01.10.01
m2
407.44
10.24
4,172.19
03.01.10.02
m2
131.71
12.89
1,697.74
03.01.10.03
m2
129.51
12.80
1,657.73
03.01.10.04
m2
111.95
13.91
1,557.22
03.01.10.05
m2
55.07
8.91
490.67
03.01.10.06
m2
6.34
8.91
56.49
03.01.10.07
m2
232.02
10.78
2,501.18
03.01.10.08
m2
13.87
10.95
03.01.11
OTROS
03.01.11.01
PLACA DE OBRA
03.01.11.01.01
PLACA DE OBRA
und
1.00
03.01.11.02
SEALIZACION
03.01.11.02.01
und
12.00
03.01.11.02.02
und
53.00
40.07
2,123.71
03.01.11.02.03
und
24.00
39.18
940.32
03.01.11.02.04
PANEL DE SECTORES 0.90X1.10M. EN MADERA TIPO MDF 18MM (CON ETIQUETAS TIPO
GALLETA 0.10x0.40M EN DOBLE ACRILICO 3MM SEGUN MODELO)
und
1.00
1,506.74
1,506.74
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
151.88
0.00
0.00
0.00
320.00
320.00
0.00
0.00
0.00
31.74
380.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
03.01.11.02.05
03.01.11.03
MURAL
03.01.11.03.01
04
INSTALACIONES SANITARIAS
04.01
EDIFICACION
04.01.01
04.01.01.01
04.01.01.01.01
04.01.01.01.02
und
1.00
1,406.74
1,406.74
glb
1.00
550.00
550.00
0.00
0.00
0.00
und
8.00
322.88
2,583.04
0.00
0.00
0.00
und
3.00
142.95
428.85
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
04.01.01.01.03
und
4.00
167.15
668.60
0.00
0.00
0.00
04.01.01.01.04
pza
1.00
255.15
255.15
0.00
0.00
0.00
04.01.01.01.05
pza
2.00
225.71
451.42
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
04.01.01.02
SUMINISTRO DE ACCESORIOS
04.01.01.02.01
pza
4.00
16.50
66.00
0.00
0.00
0.00
04.01.01.02.02
pza
4.00
16.71
66.84
0.00
0.00
0.00
04.01.01.02.03
pza
8.00
18.59
148.72
0.00
0.00
0.00
04.01.01.02.04
pza
4.00
287.93
1,151.72
0.00
0.00
04.01.01.02.05
pza
1.00
177.15
177.15
0.00
0.00
04.01.01.02.06
pza
7.00
25.00
175.00
0.00
0.00
04.01.01.02.07
pza
4.00
287.39
1,149.56
0.00
0.00
0.00
04.01.01.02.08
pza
1.00
120.12
120.12
0.00
0.00
0.00
04.01.01.02.09
pza
2.00
93.56
187.12
0.00
0.00
0.00
04.01.01.02.10
pza
1.00
243.17
243.17
0.00
0.00
0.00
04.01.01.03
04.01.01.03.01
und
18.00
15.78
284.04
0.00
0.00
0.00
04.01.01.04
INSTALACION DE ACCESORIOS
04.01.01.04.01
und
36.00
15.97
574.92
0.00
0.00
04.01.02
04.01.02.01
04.01.02.01.01
pto
23.00
42.07
967.61
0.00
0.00
0.00
04.01.02.02
REDES DE DISTRIBUCION
04.01.02.02.01
18.90
7.44
140.62
0.00
0.00
0.00
04.01.02.02.02
24.80
7.40
183.52
0.00
0.00
0.00
04.01.02.02.03
33.89
4.77
161.66
0.00
0.00
0.00
04.01.02.02.04
68.69
3.85
264.46
0.00
0.00
0.00
67.55
7.40
499.87
0.00
0.00
0.00
1.00
15.95
15.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
04.01.02.03
REDES DE ALIMENTACION
04.01.02.03.01
04.01.02.04
04.01.02.04.01
pza
04.01.02.04.02
pza
6.00
9.22
55.32
04.01.02.04.03
pza
33.00
6.23
205.59
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
04.01.02.04.04
pza
57.00
5.72
326.04
0.00
0.00
0.00
04.01.02.04.05
pza
3.00
12.11
36.33
0.00
0.00
0.00
04.01.02.04.06
pza
6.00
2.85
17.10
0.00
0.00
0.00
04.01.02.04.07
pza
8.00
12.54
100.32
0.00
0.00
0.00
04.01.02.04.08
pza
7.00
6.23
43.61
0.00
0.00
0.00
04.01.02.04.09
pza
4.00
8.93
35.72
0.00
0.00
0.00
04.01.02.04.10
pza
9.00
7.82
70.38
0.00
0.00
0.00
04.01.02.04.11
pza
16.00
5.95
95.20
0.00
0.00
0.00
04.01.02.04.12
pza
2.00
14.31
28.62
0.00
0.00
0.00
04.01.02.04.13
pza
6.00
10.03
60.18
0.00
0.00
0.00
04.01.02.04.14
pza
12.00
8.75
105.00
0.00
0.00
0.00
04.01.02.04.15
pza
8.00
7.69
61.52
0.00
0.00
0.00
04.01.02.05
VALVULAS
04.01.02.05.01
pza
1.00
78.40
78.40
0.00
0.00
04.01.02.05.02
pza
3.00
51.98
155.94
0.00
0.00
0.00
04.01.02.05.03
pza
6.00
48.67
292.02
0.00
0.00
0.00
04.01.02.05.04
pza
4.00
40.49
161.96
0.00
0.00
0.00
04.01.02.05.05
pza
1.00
45.98
45.98
0.00
0.00
0.00
04.01.02.06
04.01.02.06.01
213.83
4.56
975.06
0.00
0.00
0.00
04.01.02.06.02
m2
85.53
2.33
199.28
0.00
0.00
0.00
04.01.02.06.03
m2
85.53
5.67
484.96
0.00
0.00
04.01.02.06.04
m3
42.77
54.98
2,351.49
0.00
0.00
04.01.02.07
CAJAS DE REGISTRO-CUERPO
04.01.02.07.01
m3
0.48
500.73
240.35
0.00
0.00
0.00
04.01.02.07.02
m2
4.00
26.08
104.32
0.00
0.00
0.00
04.01.02.08
04.01.02.08.01
m2
0.80
26.08
20.86
0.00
0.00
0.00
04.01.02.08.02
m3
0.31
500.73
155.23
0.00
0.00
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
04.01.02.08.03
04.01.03
04.01.03.01
04.01.03.01.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
und
4.00
16.42
65.68
0.00
0.00
0.00
pto
10.00
151.03
1,510.30
0.00
0.00
0.00
04.01.03.02
04.01.03.02.01
32.80
18.25
598.60
0.00
0.00
0.00
04.01.03.02.02
29.80
14.12
420.78
0.00
0.00
0.00
04.01.03.03
04.01.03.03.01
pza
19.00
3.29
62.51
0.00
0.00
0.00
04.01.03.03.02
pza
31.00
11.03
341.93
0.00
0.00
0.00
04.01.03.03.03
pza
9.00
3.42
30.78
0.00
0.00
0.00
04.01.03.03.04
pza
3.00
2.26
6.78
0.00
0.00
0.00
04.01.03.03.05
pza
8.00
4.02
32.16
0.00
0.00
0.00
04.01.03.03.06
pza
4.00
7.60
30.40
0.00
0.00
04.01.03.03.07
pza
8.00
10.00
80.00
0.00
0.00
0.00
04.01.03.03.08
pza
12.00
4.42
53.04
0.00
0.00
0.00
04.01.03.03.09
pza
6.00
2.62
15.72
0.00
0.00
0.00
04.01.03.04
VALVULAS
04.01.03.04.01
pza
4.00
48.67
194.68
0.00
0.00
0.00
04.01.03.04.02
pza
1.00
41.91
41.91
0.00
0.00
0.00
04.01.03.04.03
und
2.00
66.84
133.68
0.00
0.00
0.00
04.01.03.04.04
und
2.00
84.45
168.90
0.00
0.00
0.00
04.01.03.04.05
und
2.00
15.45
30.90
0.00
0.00
0.00
04.01.03.04.06
und
2.00
8.19
16.38
0.00
0.00
0.00
04.01.03.05
04.01.03.05.01
62.60
4.56
285.46
0.00
0.00
0.00
04.01.03.05.02
m2
25.04
2.33
58.34
0.00
0.00
0.00
04.01.03.05.03
m2
25.04
5.67
141.98
0.00
0.00
04.01.03.05.04
m3
12.52
54.98
688.35
0.00
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
04.01.04
DESAGUE Y VENTILACION
04.01.04.01
SALIDAS DE DESAGUE
04.01.04.01.01
pto
10.00
8.42
84.20
0.00
0.00
0.00
04.01.04.01.02
pto
27.00
8.42
227.34
0.00
0.00
0.00
04.01.04.01.03
pto
18.00
10.65
191.70
0.00
0.00
0.00
04.01.04.02
REDES DE DERIVACION
04.01.04.02.01
25.00
25.03
625.75
0.00
0.00
0.00
04.01.04.02.02
48.70
10.99
535.21
0.00
0.00
0.00
04.01.04.03
04.01.04.03.01
16.10
10.99
176.94
0.00
0.00
0.00
04.01.04.03.02
30.35
7.20
218.52
0.00
0.00
0.00
04.01.04.03.03
57.45
7.20
413.64
0.00
0.00
0.00
04.01.04.04
04.01.04.04.01
pza
7.00
34.17
239.19
0.00
0.00
04.01.04.04.02
pza
5.00
18.96
94.80
0.00
0.00
0.00
04.01.04.04.03
pza
1.00
15.92
15.92
0.00
0.00
0.00
04.01.04.04.04
pza
3.00
10.58
31.74
0.00
0.00
0.00
04.01.04.04.05
pza
46.00
6.18
284.28
0.00
0.00
0.00
04.01.04.04.06
pza
4.00
6.98
27.92
0.00
0.00
0.00
04.01.04.04.07
pza
5.00
32.90
164.50
0.00
0.00
0.00
04.01.04.04.08
pza
7.00
17.59
123.13
0.00
0.00
0.00
04.01.04.04.09
pza
21.00
8.49
178.29
0.00
0.00
0.00
04.01.04.04.10
pza
11.00
10.00
110.00
0.00
0.00
0.00
04.01.04.05
INSTALACIONES ESPECIALES
04.01.04.05.01
pza
8.00
7.47
59.76
0.00
0.00
0.00
04.01.04.05.02
pza
2.00
47.80
95.60
0.00
0.00
0.00
04.01.04.05.03
pza
5.00
14.85
74.25
0.00
0.00
0.00
04.01.04.05.04
pza
4.00
18.56
74.24
0.00
0.00
0.00
04.01.04.05.05
pza
8.00
22.34
178.72
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
04.01.04.06
04.01.04.06.01
177.60
4.56
809.86
0.00
0.00
0.00
04.01.04.06.02
m2
71.04
2.33
165.52
0.00
0.00
0.00
04.01.04.06.03
m2
71.04
5.67
402.80
0.00
0.00
04.01.04.06.04
m3
35.52
54.98
1,952.89
0.00
0.00
04.01.04.07
OBRAS DE CONCRETO
04.01.04.07.01
04.01.04.07.01.01
m3
3.65
386.25
1,409.81
0.00
0.00
04.01.04.07.01.02
m2
19.83
26.08
517.17
0.00
0.00
04.01.04.07.02
CAJAS DE INSPECCION-TAPAS
04.01.04.07.02.01
m3
0.36
386.25
139.05
0.00
0.00
04.01.04.07.02.02
m2
2.86
26.08
74.59
0.00
0.00
04.01.04.07.02.03
kg
13.00
4.55
59.15
0.00
0.00
0.00
04.02
04.02.01
MOVIMIENTO DE TIERRAS
04.02.01.01
EXCAVACIONES
04.02.01.01.01
m3
56.94
19.51
1,110.90
0.00
56.94
1,110.90
04.02.01.02
RELLENOS
04.02.01.02.01
m2
15.55
2.33
36.23
0.00
0.00
0.00
04.02.01.02.02
m3
20.96
51.62
1,081.96
0.00
0.00
0.00
04.02.01.02.03
m3
15.00
145.51
2,182.65
0.00
0.00
0.00
04.02.01.03
04.02.01.03.01
m3
43.18
11.38
491.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
04.02.02
04.02.02.01
SOLADOS
04.02.02.01.01
04.02.02.02
04.02.02.02.01
CONCRETO f'c=140kg/cm2-P/LOSAS
04.02.03
04.02.03.01
04.02.03.01.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
m2
7.17
32.36
232.02
0.00
0.00
0.00
m3
1.19
386.25
459.64
0.00
0.00
0.00
CONCRETO f'c=140kg/cm2-P/POZO
m3
1.10
386.25
424.88
0.00
0.00
0.00
04.02.03.01.02
m2
12.80
36.64
468.99
0.00
0.00
04.02.03.01.03
kg
40.60
4.55
184.73
0.00
0.00
0.00
04.02.03.02
04.02.03.02.01
CONCRETO f'c=140kg/cm2-P/POZO
m3
1.35
386.25
521.44
0.00
0.00
0.00
04.02.03.02.02
m2
10.90
36.64
399.38
0.00
0.00
04.02.03.02.03
kg
49.07
4.55
223.27
0.00
0.00
0.00
04.02.03.03
04.02.03.03.01
CONCRETO f'c=140kg/cm2-P/CAJA
m3
0.18
386.25
69.53
0.00
0.00
0.00
04.02.03.03.02
m2
3.27
36.64
119.81
0.00
0.00
04.02.03.03.03
kg
2.55
4.55
11.60
0.00
0.00
0.00
04.02.03.04
BIOFILTRO
04.02.03.04.01
CONCRETO f'c=140kg/cm2-P/BIOFILTRO
m3
1.25
386.25
482.81
0.00
0.00
0.00
04.02.03.04.02
m2
17.64
36.64
646.33
0.00
0.00
0.00
04.02.03.04.03
kg
62.47
4.55
284.24
0.00
0.00
0.00
04.02.03.05
TAPA DE BIODIGESTOR
04.02.03.05.01
CONCRETO f'c=140kg/cm2-P/TAPAS
m3
0.16
386.25
61.80
0.00
0.00
0.00
04.02.03.05.02
m2
1.50
36.64
54.96
0.00
0.00
0.00
04.02.03.05.03
kg
7.83
4.55
35.63
0.00
0.00
0.00
04.02.04
REVOQUES Y REVESTIMIENTOS
04.02.04.01
04.02.04.01.01
m2
8.89
17.85
158.69
0.00
0.00
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
04.02.04.02
04.02.04.02.01
04.02.04.03
BIOFILTRO
04.02.04.03.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
m2
6.16
15.17
93.45
m2
9.48
15.17
143.81
0.00
0.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
04.02.05
BIODIGESTOR
04.02.05.01
04.02.06
BIOFILTRO
04.02.06.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
und
1.00
5,374.45
5,374.45
0.00
0.00
0.00
und
1.00
300.51
300.51
0.00
0.00
0.00
04.02.07
TUBERIAS Y ACCESORIOS
04.02.07.01
7.90
14.63
115.58
0.00
0.00
0.00
04.02.07.02
30.00
15.13
453.90
0.00
0.00
0.00
04.02.07.03
5.00
9.97
49.85
0.00
0.00
0.00
04.02.07.04
glb
1.00
103.86
103.86
0.00
0.00
0.00
04.03
04.03.01
MOVIMIENTO DE TIERRAS
04.03.01.01
EXCAVACIONES
04.03.01.01.01
m3
280.00
19.51
5,462.80
0.00
280.00
5,462.80
04.03.01.02
RELLENOS
04.03.01.02.01
m2
280.00
2.33
652.40
0.00
280.00
652.40
04.03.01.02.02
m2
280.00
5.67
1,587.60
280.00
1,587.60
04.03.01.02.03
m3
112.00
54.98
6,157.76
112.00
6,157.76
04.03.01.02.04
m3
140.00
51.62
7,226.80
0.00
0.00
04.03.02
04.03.02.01
REDES DE DISTRIBUCION
04.03.02.01.01
360.00
9.98
3,592.80
0.00
0.00
0.00
04.03.02.01.02
200.00
12.25
2,450.00
0.00
0.00
0.00
04.03.02.02
04.03.02.02.01
pza
1.00
14.84
14.84
0.00
0.00
0.00
04.03.02.02.02
pza
1.00
5.48
5.48
0.00
0.00
0.00
04.04
04.04.01
836.43
1.50
1,254.65
0.00
0.00
0.00
04.04.02
177.60
0.79
140.30
0.00
0.00
0.00
05
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
05.01
05.01.01
05.01.01.01
m2
14.40
0.89
12.82
0.00
0.00
0.00
05.01.01.02
m3
8.64
19.51
168.57
0.00
0.00
0.00
05.01.01.03
36.00
11.98
431.28
0.00
0.00
05.01.01.04
36.00
9.15
329.40
0.00
0.00
05.01.02
05.01.02.01
m3
0.06
19.51
1.17
0.00
0.00
0.00
05.01.02.02
m3
0.09
306.13
27.55
0.00
0.00
0.00
05.01.02.03
m2
0.54
111.24
60.07
0.00
0.00
0.00
05.01.02.04
TARRAJEO MUROS EXT. FROTACHADO MEZ. C:A 1:5, E=1.0 CM MURETE PARA SUMINISTRO E
m2
2.10
17.18
36.08
0.00
0.00
0.00
05.01.02.05
und
1.00
127.30
127.30
0.00
0.00
0.00
05.01.02.06
m2
2.10
8.91
18.71
0.00
0.00
0.00
05.01.03
ACOMETIDA ELECTRICA
05.01.03.01
glb
1.00
38,500.00
38,500.00
0.00
0.00
05.02
05.02.01
SALIDA
05.02.01.01
pto
42.00
33.86
1,422.12
0.00
0.00
0.00
05.02.01.02
pto
50.00
38.36
1,918.00
0.00
0.00
0.00
05.02.01.03
pto
18.00
29.71
534.78
0.00
0.00
0.00
05.02.01.04
pto
4.00
33.20
132.80
0.00
0.00
0.00
05.02.01.05
pto
3.00
38.64
115.92
0.00
0.00
0.00
05.02.01.06
pto
1.00
30.83
30.83
0.00
0.00
0.00
05.02.01.07
pto
2.00
25.22
50.44
0.00
0.00
0.00
05.02.01.08
pto
2.00
57.34
114.68
0.00
0.00
0.00
05.02.01.09
pto
7.00
39.14
273.98
0.00
0.00
0.00
05.02.01.10
pto
12.00
39.68
476.16
0.00
0.00
0.00
05.02.01.11
pto
2.00
47.89
95.78
0.00
0.00
0.00
05.02.01.12
pto
2.00
62.65
125.30
0.00
0.00
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
05.02.02
05.02.02.01
05.02.02.02
05.02.02.03
05.02.03
05.02.03.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
20.00
5.55
111.00
50.00
7.34
367.00
586.40
5.37
3,148.97
316.00
4.52
05.02.03.02
270.40
05.02.03.03
82.00
05.02.03.04
10.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,428.32
0.00
0.00
0.00
5.82
1,573.73
0.00
0.00
0.00
8.03
658.46
0.00
0.00
0.00
12.91
129.10
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
05.02.04
TABLEROS DE DISTRIBUCION
05.02.04.01
und
1.00
2,296.61
2,296.61
0.00
0.00
0.00
05.02.04.02
und
1.00
1,033.40
1,033.40
0.00
0.00
0.00
05.02.04.03
und
1.00
1,014.20
1,014.20
0.00
0.00
0.00
05.02.04.04
und
1.00
1,014.20
1,014.20
0.00
0.00
0.00
05.02.04.05
und
1.00
1,304.26
1,304.26
0.00
0.00
0.00
05.02.04.06
und
1.00
1,061.41
1,061.41
0.00
0.00
0.00
05.02.04.07
und
1.00
975.73
975.73
0.00
0.00
0.00
05.03
INSTALACION DE PARARRAYOS
05.03.01
MOVIMIENTO DE TIERRAS
05.03.01.01
EXCAVACIONES
05.03.01.01.01
m3
1.33
19.51
25.95
0.00
0.00
0.00
05.03.01.02
RELLENOS
05.03.01.02.01
m2
1.39
2.33
3.24
0.00
0.00
05.03.01.02.02
m3
0.20
51.62
10.32
0.00
0.00
0.00
05.03.01.03
05.03.01.03.01
m3
1.36
11.38
15.48
0.00
0.00
0.00
05.03.02
05.03.02.01
SOLADOS
05.03.02.01.01
m2
0.64
32.36
20.71
0.00
0.00
0.00
05.03.02.02
05.03.02.02.01
CONCRETO f'c=140kg/cm2-P/DADOS
m3
0.75
386.25
289.69
0.00
0.00
0.00
05.03.03
05.03.03.01
ZAPATAS
05.03.03.01.01
m3
0.19
537.80
102.18
0.00
0.00
0.00
05.03.03.01.02
kg
2.91
4.55
13.24
0.00
0.00
0.00
05.03.03.02
COLUMNAS
05.03.03.02.01
m3
0.20
460.61
92.12
0.00
0.00
0.00
05.03.03.02.02
m2
1.60
36.93
59.09
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
05.03.03.02.03
05.03.04
ESTRUCTURAS METALICAS
05.03.04.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
kg
7.37
4.55
33.53
und
1.00
3,872.21
3,872.21
0.00
0.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
05.03.05
PINTURA
05.03.05.01
m2
1.02
8.19
8.35
05.03.05.02
m2
1.02
8.91
9.09
05.03.06
PARARRAYOS
05.03.06.01
und
1.00
5,234.35
5,234.35
05.04
05.04.01
m3
59.02
19.51
1,151.48
05.04.02
m2
59.02
2.33
137.52
05.04.03
m2
59.02
5.67
05.04.04
147.55
05.04.05
POZO DE TIERRA
05.04.06
05.04.07
BENTONITA Y SAL
05.04.08
ACCESORIOS DE TERMOFUSION
05.05
ARTEFACTOS
05.05.01
LAMPARAS
05.05.01.01
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
334.64
0.00
0.00
0.00
11.98
1,767.65
0.00
0.00
0.00
6.00
873.20
5,239.20
0.00
0.00
0.00
147.55
29.16
4,302.56
0.00
0.00
0.00
147.55
8.44
1,245.32
0.00
0.00
0.00
und
24.00
89.46
2,147.04
0.00
0.00
0.00
und
7.00
88.18
617.26
0.00
0.00
0.00
05.05.01.02
und
11.00
138.18
1,519.98
0.00
0.00
0.00
05.05.01.03
und
17.00
343.31
5,836.27
0.00
0.00
0.00
05.05.01.04
LUZ DE EMERGENCIA
und
4.00
149.08
596.32
0.00
0.00
0.00
05.05.02
REFLECTORES
05.05.02.01
und
8.00
213.18
1,705.44
0.00
0.00
0.00
05.06
05.06.01
05.06.01.01
SALIDA
05.06.01.01.01
pto
1.00
31.02
31.02
0.00
0.00
0.00
05.06.01.02
05.06.01.02.01
20.00
7.32
146.40
0.00
0.00
0.00
05.06.01.03
und
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
05.06.01.03.01
05.06.02
SISTEMAS DE SEGURIDAD
05.06.02.01
TRABAJOS PRELIMINARES
05.06.02.01.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
20.00
5.82
116.40
0.00
0.00
0.00
m2
54.40
0.89
48.42
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
05.06.02.02
MOVIMIENTO DE TIERRAS
05.06.02.02.01
m3
21.76
19.51
424.54
05.06.02.02.02
136.00
11.98
1,629.28
05.06.02.03
SISTEMAS ELECTROMECANICOS
05.06.02.03.01
glb
1.00
339.98
339.98
05.06.02.03.02
glb
1.00
346.58
346.58
05.06.02.03.03
glb
1.00
294.17
05.06.02.03.04
glb
1.00
05.06.02.04
TUBERIAS
05.06.02.04.01
05.06.02.04.02
05.06.02.04.03
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
294.17
0.00
0.00
0.00
294.17
294.17
0.00
0.00
0.00
136.00
8.64
1,175.04
0.00
0.00
0.00
120.00
8.64
1,036.80
0.00
0.00
85.00
8.64
734.40
0.00
0.00
0.00
05.06.02.04.04
12.00
7.32
87.84
0.00
0.00
0.00
05.06.02.05
SALIDAS
05.06.02.05.01
pto
4.00
22.72
90.88
0.00
0.00
0.00
05.06.02.06
CABLEADO DE DATA
05.06.02.06.01
136.00
1.46
198.56
0.00
0.00
0.00
05.06.02.06.02
120.00
2.25
270.00
0.00
0.00
0.00
05.06.02.06.03
85.00
2.25
191.25
0.00
0.00
0.00
05.06.02.07
05.06.02.07.01
und
1.00
273.40
273.40
0.00
0.00
0.00
05.07
VARIOS
05.07.01
PRUEBAS ELECTRICAS
05.07.01.01
und
1.00
1,000.00
1,000.00
0.00
0.00
0.00
05.07.02
05.07.02.01
mes
1.00
2,000.00
2,000.00
0.00
0.00
0.00
06
INSTALACIONES DE COMUNICACIONES
06.01
06.01.01
TRABAJOS PRELIMINARES
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
06.01.01.01
06.01.02
MOVIMIENTO DE TIERRAS
06.01.02.01
06.01.02.02
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
m2
30.60
0.89
27.23
0.00
0.00
0.00
m3
15.30
19.51
298.50
0.00
0.00
0.00
76.50
11.98
916.47
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
06.01.03
CABLEADO Y ACCESORIOS
06.01.03.01
580.00
1.51
875.80
0.00
0.00
0.00
06.01.03.02
glb
1.00
1,431.47
1,431.47
0.00
0.00
0.00
06.01.03.03
und
1.00
905.75
905.75
0.00
0.00
06.01.04
06.01.04.01
30.00
17.18
515.40
0.00
0.00
0.00
06.01.04.02
20.00
10.91
218.20
0.00
0.00
0.00
06.01.04.03
240.00
7.32
1,756.80
0.00
0.00
0.00
06.01.05
SALIDAS DE COMUNICACIONES
06.01.05.01
pto
4.00
62.65
250.60
0.00
0.00
0.00
06.01.05.02
pto
18.00
62.65
1,127.70
0.00
0.00
0.00
06.01.06
PATCH PANEL
06.01.06.01
und
1.00
64.32
64.32
0.00
0.00
0.00
06.01.07
RACK DE COMUNICACIONES
06.01.07.01
und
1.00
162.79
162.79
0.00
0.00
06.02
VARIOS
06.02.01
06.02.01.01
mes
1.00
2,000.00
2,000.00
0.00
0.00
0.00
07
EQUIPAMIENTO
07.01
MOBILIARIO BASICO
07.01.01
und
4.00
240.00
960.00
0.00
0.00
0.00
07.01.02
und
2.00
270.00
540.00
0.00
0.00
0.00
07.01.03
und
4.00
540.00
2,160.00
0.00
0.00
0.00
07.01.04
und
4.00
549.68
2,198.72
0.00
0.00
07.01.05
und
5.00
479.51
2,397.55
0.00
0.00
0.00
07.01.06
und
1.00
225.00
225.00
0.00
0.00
0.00
07.01.07
und
6.00
558.00
3,348.00
0.00
0.00
0.00
07.01.08
und
4.00
55.00
220.00
0.00
0.00
0.00
07.01.09
und
18.00
150.96
2,717.28
0.00
0.00
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
07.01.10
und
80.00
28.49
2,279.20
0.00
0.00
0.00
07.01.11
und
6.00
66.00
396.00
0.00
0.00
0.00
07.01.12
und
1.00
1,325.95
1,325.95
0.00
0.00
0.00
07.01.13
und
1.00
345.00
345.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
07.02
EQUIPAMIENTO BASICO
07.02.01
OFICINAS
07.02.01.01
CAMARA WEB 5MPX 1080P HD, CAP. VIDEO 720P, ZOOM DIGITAL 3X, MICROFONO INCORP.
und
2.00
99.00
198.00
07.02.01.02
CMARA DE FOTOS SEMI PROFESIONAL 12.1 MPX CMOS 1/1.7 " SX(28mm-140mm) 4.0X +
FILMADORA PANT. 3" LCD
und
1.00
649.00
649.00
07.02.01.03
und
1.00
120.00
120.00
07.02.01.04
und
1.00
840.00
840.00
0.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
07.02.01.05
MICROFONO DE PERIFONEO
und
1.00
50.00
50.00
0.00
0.00
0.00
07.02.01.06
und
1.00
540.00
540.00
0.00
0.00
0.00
07.02.01.07
und
1.00
189.90
189.90
0.00
0.00
und
0.00
0.00
07.02.01.09
und
1.00
2,846.00
2,846.00
0.00
0.00
07.02.01.10
COMPUTADORA PORTATIL, PROCES 4 NUCLEOS, RAM: 8GB (2X4GB), PANT: 15.6" LED,
C/SONIDO, CAMARA WEB, WIFI, BLUETOOTH, GRABADOR,LECTOR DVD+/-RW
und
2.00
3,100.00
6,200.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
07.02.01.08
0.00
1.00
1,200.00
1,200.00
0.00
0.00
0.00
IMPRESORA MULTIFUNCIONAL MONOCROMATICO -EN A3 EN RED/IMPRESORA, ESCANER,
COPIADORA - LASER, V 30PPM, 600X600DPI, MEMORIA 1GB
und
07.02.01.12
und
1.00
118.18
118.18
07.02.01.13
und
4.00
720.00
2,880.00
07.02.01.14
BANDERAS(03 UNIDADES)
glb
1.00
720.00
720.00
07.02.01.15
und
3.00
119.90
359.70
07.02.01.16
und
1.00
119.90
119.90
07.02.01.17
und
2.00
565.00
1,130.00
07.02.01.18
und
1.00
3,345.30
3,345.30
07.02.01.19
und
3.00
520.38
1,561.14
07.02.01.20
und
1.00
500.00
500.00
07.02.01.21
SWITCH DE 24P PoE/24 PUERTOS GI, RAQUEABLE CAP. 12Gbps FLASH 32 MB MIN. DRAM 128
MB
und
1.00
4,661.02
4,661.02
07.02.01.11
1.00
5,827.97
5,827.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
07.02.02
DORMITORIOS
07.02.02.01
und
10.00
27.50
275.00
07.02.02.02
und
20.00
65.78
1,315.60
07.02.02.03
und
40.00
85.00
3,400.00
07.02.02.04
und
10.00
82.39
823.90
07.02.02.05
und
10.00
240.90
2,409.00
07.02.02.06
und
3.00
209.73
629.19
07.02.02.07
und
2.00
225.73
07.02.02.08
und
4.00
07.02.02.09
und
07.02.02.10
und
07.02.02.11
07.02.02.12
07.02.03
COCINA
07.02.03.01
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
451.46
0.00
0.00
0.00
257.73
1,030.92
0.00
0.00
0.00
2.00
597.73
1,195.46
0.00
0.00
0.00
4.00
657.73
2,630.92
0.00
0.00
0.00
und
7.00
66.88
468.16
0.00
0.00
0.00
und
10.00
17.14
171.40
0.00
0.00
0.00
und
1.00
76.89
76.89
0.00
0.00
0.00
07.02.03.02
und
1.00
104.50
104.50
0.00
0.00
0.00
07.02.03.03
und
1.00
143.00
143.00
0.00
0.00
0.00
07.02.03.04
und
1.00
19.44
19.44
0.00
0.00
0.00
07.02.03.05
und
2.00
16.39
32.78
0.00
0.00
0.00
07.02.03.06
und
1.00
5.79
5.79
0.00
0.00
0.00
07.02.03.07
und
1.00
9.79
9.79
0.00
0.00
0.00
07.02.03.08
und
12.00
3.52
42.24
0.00
0.00
0.00
07.02.03.09
und
12.00
3.52
42.24
0.00
0.00
0.00
07.02.03.10
und
12.00
3.52
42.24
0.00
0.00
0.00
07.02.03.11
und
12.00
3.52
42.24
0.00
0.00
0.00
07.02.03.12
jgo
1.00
27.39
27.39
0.00
0.00
07.02.03.13
und
12.00
1.80
21.60
0.00
0.00
0.00
07.02.03.14
und
12.00
1.80
21.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
07.02.03.15
und
12.00
1.21
14.52
0.00
0.00
0.00
07.02.03.16
und
1.00
7.59
7.59
0.00
0.00
0.00
07.02.03.17
und
12.00
3.07
36.84
0.00
0.00
0.00
07.02.03.18
und
1.00
22.99
22.99
0.00
0.00
0.00
07.02.03.19
und
1.00
71.50
71.50
0.00
0.00
07.02.03.20
und
1.00
17.49
17.49
0.00
0.00
0.00
07.02.03.21
und
1.00
7.59
7.59
0.00
0.00
0.00
07.02.03.22
und
4.00
3.30
13.20
0.00
0.00
0.00
07.02.03.23
COCINA SEMIINDUSTRIAL ALTA 03 HORNILLAS LARGO 0.90M X ANCHO 55CM X ALTO 70CM
und
1.00
450.00
450.00
0.00
0.00
07.02.03.24
und
1.00
2,699.00
2,699.00
0.00
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
07.02.04
OFICINA 2
07.02.04.01
und
3.00
230.00
690.00
07.02.04.02
und
1.00
385.00
385.00
0.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
07.02.05
HERRAMIENTAS
07.02.05.01
und
2.00
7.94
15.88
0.00
0.00
0.00
07.02.05.02
und
2.00
17.38
34.76
0.00
0.00
0.00
07.02.05.03
und
5.00
32.90
164.50
0.00
0.00
07.02.05.04
und
2.00
59.90
119.80
0.00
0.00
07.02.05.05
und
1.00
1,023.41
1,023.41
0.00
0.00
und
0.00
0.00
07.02.05.07
und
3.00
13.09
39.27
0.00
0.00
07.02.05.08
und
2.00
57.39
114.78
0.00
0.00
07.02.05.09
und
2.00
35.00
70.00
0.00
0.00
und
0.00
0.00
07.02.05.11
und
1.00
43.89
43.89
0.00
0.00
07.02.05.12
und
3.00
235.00
705.00
0.00
0.00
07.02.05.13
und
1.00
188.97
188.97
0.00
0.00
07.02.05.14
und
9.00
19.87
178.83
0.00
0.00
07.02.06
SANITARIAS
07.02.06.01
und
1.00
751.25
751.25
0.00
0.00
07.02.06.02
und
1.00
2,529.89
2,529.89
0.00
0.00
0.00
07.02.06.03
und
1.00
1,263.85
1,263.85
0.00
0.00
0.00
07.02.07
ELECTRICOS
07.02.07.01
UPS TIPO TOWER POT. MIN. 2500 VA Ventrada=100-240V Vsalida= 220VAC, 10 MINUTOS
AUTONOMIA C/PUERTOS DE COM. RJ45,RS232
und
1.00
3,427.55
3,427.55
0.00
0.00
07.02.05.06
07.02.05.10
0.00
0.00
0.00
2.00
153.89
307.78
0.00
0.00
0.00
0.00
2.00
30.69
61.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
07.02.07.02
und
1.00
1,488.81
1,488.81
07.02.07.03
GENERADOR ELECTRICO 8HP 6kW prime 7.5kVA MONOFASICO 220V, 60HZ, 4T-REFRIGERADO
POR AIRE CIL. 150 A 250CM3 CAP. TANQ. 3.6 - 6.8 LT. GASOLINA
und
1.00
6,045.43
6,045.43
ACTUAL
Valorizado
0.00
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
07.02.07.04
und
6.00
204.44
1,226.64
0.00
0.00
0.00
07.02.07.05
und
1.00
474.30
474.30
0.00
0.00
0.00
07.02.07.06
PULSADOR DE EMERGENCIA
und
4.00
26.00
104.00
0.00
0.00
0.00
07.02.07.07
und
2.00
46.47
92.94
0.00
0.00
0.00
07.02.07.08
und
4.00
3,442.35
13,769.40
0.00
0.00
07.02.07.09
und
1.00
1,883.87
1,883.87
0.00
0.00
0.00
07.02.07.10
und
2.00
12.00
24.00
0.00
0.00
0.00
07.02.07.11
und
1.00
1,280.30
1,280.30
0.00
0.00
0.00
07.02.07.12
DETECTOR DE TEMPERATURA
und
1.00
216.00
216.00
0.00
0.00
0.00
07.02.07.13
und
1.00
2,383.90
2,383.90
0.00
0.00
0.00
07.02.07.14
und
1.00
465.00
465.00
0.00
0.00
0.00
07.02.08
MOVILIDAD
07.02.08.01
MOTO LINEAL CILIN. 124CC -140CC, 4 T, MONOCILINDRICO, OHC, POT. MAX. 11.13HP@7,000
RPM -12.0HP@ 7,500 RPM
und
1.00
6,690.00
6,690.00
0.00
0.00
12.27%
116,015.24
0.00
0.00
87.07%
945,284.35
GASTOS GENERALES
9.39%
101,916.00
96.46%
GASTOS DE SUPERVISION
3.54%
100.00%
AVANCE FISICO %
7.13%
67,425.02
1,047,200.35
38,432.00
1,085,632.35
100%
7.13%
12.27%
AVANCE
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
P.Unit
ANTERIOR
Presup. S/.
Metrado
Valorizado
ACTUAL
Metrado
RESIDENTE DE OBRA
NOMBRE:
DNI
DNI 29224670
Valorizado
RRESPONDIENTE AL MES DE
CHA DE PRESENTACION
:
:
SETIEMBRE-2015
NTO FINANCIADO
CHA DE INICIO DE OBRA
ZO DE EJECUCION
CHA DE TERMINO PREVISTA
:
:
:
:
1,085,632.44
8/17/2015
120 DIAS
12/18/2015
OCTUBRE-2015
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
1.00
9,894.660
100%
0.00
0.00
0%
2.00
1,304.820
100%
0.00
0.00
0%
1.00
1,134.340
100%
0.00
0.00
0%
0.50
883.125
50%
0.50
883.13
50%
2500.00
1,900.000
100%
0.00
0.00
0%
303.10
5,913.481
100%
0.00
0.00
0%
0.21
8,253.575
21%
0.79
31,049.16
79%
800.00
712.000
100%
0.00
0.00
0%
190.00
180.100
25%
610.00
542.90
76%
1.00
100.000
25%
3.00
300.00
75%
2.00
3,100.060
50%
2.00
3,100.06
50%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
2.00
226.340
50%
2.00
226.34
50%
1.00
200.830
25%
3.00
602.49
75%
1.00
100.000
25%
3.00
300.00
75%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
1.00
77.00
100%
0.00
0.000
0%
1.00
100.00
100%
0.00
0.000
0%
4.00
400.00
100%
0.00
0.000
0%
30.00
84.00
100%
0.00
0.000
0%
4.00
400.00
100%
0.00
0.000
0%
1.00
509.08
100%
0.00
0.000
0%
4.00
120.44
100%
0.50
107.690
50%
0.50
107.69
50%
76.98
1,501.880
100%
0.00
0.00
0%
1626.40
31,731.064
100%
0.00
0.00
0%
22.58
1,165.580
100%
0.00
0.00
0%
236.50
4,999.610
50%
237.40
5,018.64
50%
120.00
279.600
22%
433.07
1,009.05
78%
45.00
512.100
66%
23.00
261.74
34%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
71.41
2,310.828
100%
0.00
0.00
0%
9.22
2,809.887
100%
0.00
0.00
0%
140.47
3,663.458
100%
0.00
0.00
0%
90.05
407.927
100%
0.00
0.00
0%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
0.04
21.51
100%
0.00
0.000
0%
1.93
50.33
100%
0.00
0.000
0%
18.14
9,083.24
100%
0.00
0.000
0%
34.30
894.54
100%
0.00
0.000
0%
131.30
1,793.56
100%
0.00
0.000
0%
335.55
1,241.54
100%
0.00
0.000
0%
7.57
3,790.53
100%
0.00
0.000
0%
11.26
293.66
100%
0.00
0.000
0%
54.43
743.51
100%
0.00
0.000
0%
181.88
672.96
100%
0.00
0.000
0%
1.17
585.85
100%
0.00
0.000
0%
2.37
61.81
100%
0.00
0.000
0%
51.08
189.00
100%
0.00
0.000
0%
252.74
8,972.27
100%
10.87
5,845.886
100%
0.00
0.00
0%
354.52
1,613.066
100%
0.00
0.00
0%
17.96
9,658.888
100%
0.00
0.00
0%
71.91
2,634.782
100%
0.00
0.00
0%
1824.37
8,300.884
100%
0.00
0.00
0%
44.23
305.629
100%
0.00
0.00
0%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
9.75
4,490.948
100%
0.00
0.00
0%
118.45
4,374.359
100%
0.00
0.00
0%
18.61
2,213.660
100%
0.00
0.00
0%
1736.75
7,902.213
100%
0.00
0.00
0%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
12.39
5,706.96
100%
0.00
0.000
0%
116.35
4,296.81
100%
1586.15
7,216.983
100%
0.00
0.00
0%
4.50
2,072.745
87%
0.67
308.61
13%
60.00
2,215.800
75%
19.74
729.00
25%
1083.74
4,931.017
100%
0.00
0.00
0%
0.00
0.000
0%
2.10
967.28
100%
0.00
0.000
0%
23.19
856.41
100%
351.96
1,601.418
100%
0.00
0.00
0%
0.59
271.760
100%
0.00
0.00
0%
11.89
439.098
100%
0.00
0.00
0%
35.45
161.298
100%
0.00
0.00
0%
0.00
0.000
0%
0.74
340.85
100%
0.00
0.000
0%
10.72
395.89
100%
0.00
0.000
0%
40.85
185.87
100%
0.00
0.000
0%
3.00
4,544.79
100%
0.00
0.000
0%
2.00
2,910.00
100%
0.00
0.000
0%
6.00
8,763.96
100%
0.00
0.000
0%
11.00
1,275.67
100%
0.00
0.000
0%
419.20
8,698.40
100%
0.00
0.000
0%
124.00
1,505.36
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
26.00
349.96
100%
0.00
0.000
0%
5.00
204.30
100%
0.00
0.000
0%
27.00
1,210.14
100%
0.00
0.000
0%
6.00
241.92
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
445.48
52,330.54
100%
0.00
0.000
0%
33.70
1,198.04
100%
0.00
0.000
0%
30.34
2,126.23
100%
0.00
0.000
0%
18.96
1,126.41
100%
0.00
0.000
0%
67.40
7,600.02
100%
0.00
0.000
0%
65.50
987.09
100%
6.30
122.913
100%
0.00
0.00
0%
0.00
0.000
0%
6.86
2,649.68
100%
0.00
0.000
0%
0.41
205.30
100%
0.00
0.000
0%
12.71
331.48
100%
0.00
0.000
0%
43.03
195.79
100%
0.00
0.000
0%
197.00
53,727.81
100%
0.00
0.000
0%
1.00
1,165.19
100%
0.00
0.000
0%
15.38
228.39
100%
0.00
0.000
0%
0.28
5.46
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
0.34
131.33
100%
0.00
0.000
0%
0.90
23.47
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
15.00
2,415.90
100%
0.00
0.000
0%
1.00
649.34
100%
0.00
0.000
0%
32.00
405.12
100%
0.00
0.000
0%
32.00
405.12
100%
0.00
0.000
0%
1.78
34.73
100%
0.00
0.000
0%
0.75
38.72
100%
0.00
0.000
0%
1.24
14.11
100%
0.00
0.000
0%
1.76
56.95
100%
0.00
0.000
0%
0.72
360.53
100%
0.00
0.000
0%
1.32
34.43
100%
0.00
0.000
0%
3.60
49.18
100%
0.00
0.000
0%
0.78
359.28
100%
0.00
0.000
0%
3.42
126.30
100%
0.00
0.000
0%
37.86
172.26
100%
0.00
0.000
0%
1.00
583.33
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
2.00
1,166.66
100%
0.00
0.000
0%
3.08
33.73
100%
0.00
0.000
0%
3.08
27.44
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
13.75
268.26
100%
0.00
0.000
0%
6.25
14.56
100%
0.00
0.000
0%
2.50
129.05
100%
0.00
0.000
0%
6.25
132.13
100%
0.00
0.000
0%
14.63
166.49
100%
0.00
0.000
0%
10.24
378.16
100%
0.00
0.000
0%
6.25
202.25
100%
0.00
0.000
0%
0.47
235.34
100%
0.00
0.000
0%
2.71
70.68
100%
0.00
0.000
0%
2.35
32.10
100%
0.00
0.000
0%
5.14
2,764.29
100%
0.00
0.000
0%
24.00
886.32
100%
0.00
0.000
0%
160.52
730.37
100%
0.00
0.000
0%
1.20
552.73
100%
0.00
0.000
0%
20.48
756.33
100%
0.00
0.000
0%
222.77
1,013.60
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
2.00
921.22
100%
0.00
0.000
0%
21.00
775.53
100%
0.00
0.000
0%
248.11
1,128.90
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
1.48
681.70
100%
0.00
0.000
0%
9.50
350.84
100%
0.00
0.000
0%
67.16
305.58
100%
0.00
0.000
0%
0.05
25.81
100%
0.00
0.000
0%
0.92
22.98
100%
0.00
0.000
0%
9.05
41.18
100%
0.00
0.000
0%
10.81
808.70
100%
0.00
0.000
0%
10.01
134.53
100%
0.00
0.000
0%
7.21
96.90
100%
0.00
0.000
0%
13.05
197.97
100%
0.00
0.000
0%
13.20
233.90
100%
0.00
0.000
0%
19.10
338.45
100%
0.00
0.000
0%
0.17
3.01
100%
0.00
0.000
0%
12.50
330.50
100%
0.00
0.000
0%
8.16
235.91
100%
0.00
0.000
0%
3.18
22.80
100%
0.00
0.000
0%
0.73
5.23
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
1.54
696.05
100%
0.00
0.000
0%
0.32
31.37
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
3.00
70.56
100%
0.00
0.000
0%
1.00
61.14
100%
0.00
0.000
0%
1.00
100.33
100%
0.00
0.000
0%
10.01
113.11
100%
0.00
0.000
0%
7.21
64.24
100%
0.00
0.000
0%
16.15
182.50
100%
0.00
0.000
0%
16.15
143.90
100%
0.00
0.000
0%
1.00
933.70
100%
0.00
0.000
0%
1.00
2,150.82
100%
0.00
0.000
0%
1.00
743.76
100%
0.00
0.000
0%
1.00
125.89
100%
0.00
0.000
0%
9.30
69.19
100%
0.00
0.000
0%
10.50
67.52
100%
0.00
0.000
0%
2.00
31.90
100%
0.00
0.000
0%
7.00
64.54
100%
0.00
0.000
0%
3.00
20.34
100%
0.00
0.000
0%
1.00
13.28
100%
0.00
0.000
0%
1.00
12.11
100%
0.00
0.000
0%
4.00
11.40
100%
0.00
0.000
0%
1.00
6.61
100%
0.00
0.000
0%
1.00
83.40
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
1.00
82.94
100%
0.00
0.000
0%
2.00
91.68
100%
0.00
0.000
0%
1.00
104.10
100%
0.00
0.000
0%
1.00
84.67
100%
0.00
0.000
0%
1.00
102.70
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
14.00
33.46
100%
0.00
0.000
0%
7.00
17.57
100%
0.00
0.000
0%
7.00
64.40
100%
0.00
0.000
0%
3.24
63.21
100%
0.00
0.000
0%
3.24
7.55
100%
0.00
0.000
0%
0.43
22.20
100%
0.00
0.000
0%
4.86
102.74
100%
0.00
0.000
0%
3.65
49.86
100%
0.00
0.000
0%
2.59
734.60
100%
0.00
0.000
0%
0.60
182.86
100%
0.00
0.000
0%
8.05
209.94
100%
0.00
0.000
0%
0.51
255.37
100%
0.00
0.000
0%
2.77
72.24
100%
0.00
0.000
0%
2.35
32.10
100%
0.00
0.000
0%
3.08
109.34
100%
0.00
0.000
0%
0.26
119.76
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
6.09
224.90
100%
0.00
0.000
0%
37.76
171.81
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
0.26
119.76
100%
0.00
0.000
0%
3.08
113.74
100%
0.00
0.000
0%
38.77
176.40
100%
0.00
0.000
0%
0.63
290.18
100%
0.00
0.000
0%
7.80
288.05
100%
0.00
0.000
0%
38.37
174.58
100%
0.00
0.000
0%
0.35
161.21
100%
0.00
0.000
0%
5.15
190.19
100%
0.00
0.000
0%
13.80
62.79
100%
0.00
0.000
0%
12.34
923.16
100%
0.00
0.000
0%
2.59
34.81
100%
0.00
0.000
0%
9.10
122.30
100%
0.00
0.000
0%
9.19
139.41
100%
0.00
0.000
0%
6.09
107.91
100%
0.00
0.000
0%
3.08
54.58
100%
0.00
0.000
0%
1.23
21.80
100%
0.00
0.000
0%
7.80
206.23
100%
0.00
0.000
0%
3.08
81.93
100%
0.00
0.000
0%
3.08
207.62
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
3.24
23.23
100%
0.00
0.000
0%
3.33
242.29
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
0.56
40.75
100%
0.00
0.000
0%
1.58
714.13
100%
0.00
0.000
0%
0.44
43.13
100%
0.00
0.000
0%
3.00
70.56
100%
0.00
0.000
0%
1.00
61.14
100%
0.00
0.000
0%
1.00
100.33
100%
0.00
0.000
0%
11.78
133.11
100%
0.00
0.000
0%
9.10
81.08
100%
0.00
0.000
0%
4.59
51.87
100%
0.00
0.000
0%
4.59
40.90
100%
0.00
0.000
0%
1.00
322.88
100%
0.00
0.000
0%
1.00
142.95
100%
0.00
0.000
0%
1.00
16.50
100%
0.00
0.000
0%
1.00
16.71
100%
0.00
0.000
0%
1.00
18.59
100%
0.00
0.000
0%
1.00
53.00
100%
0.00
0.000
0%
1.00
25.00
100%
0.00
0.000
0%
2.00
31.56
100%
0.00
0.000
0%
5.00
79.85
100%
AVANCES
ACUMULADO
Metrado
Valorizado
0.00
SALDO
%
0.000
Metrado
0%
Valorizado
3.00
126.21
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
3.63
37.93
100%
0.00
0.000
0%
9.95
38.31
100%
0.00
0.000
0%
14.00
80.08
100%
0.00
0.000
0%
1.00
12.54
100%
0.00
0.000
0%
2.00
12.46
100%
0.00
0.000
0%
1.00
8.93
100%
0.00
0.000
0%
1.00
7.82
100%
0.00
0.000
0%
2.00
11.90
100%
0.00
0.000
0%
4.00
30.76
100%
0.00
0.000
0%
2.00
80.98
100%
0.00
0.000
0%
5.00
42.10
100%
0.00
0.000
0%
1.00
8.42
100%
0.00
0.000
0%
5.66
62.20
100%
0.00
0.000
0%
8.65
62.28
100%
0.00
0.000
0%
5.50
39.60
100%
0.00
0.000
0%
2.00
68.34
100%
0.00
0.000
0%
1.00
15.92
100%
0.00
0.000
0%
4.00
24.72
100%
0.00
0.000
0%
1.00
8.37
100%
0.00
0.000
0%
4.00
27.92
100%
0.00
0.000
0%
5.00
110.75
100%
0.00
0.000
0%
2.00
16.98
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
2.00
20.00
100%
0.00
0.000
0%
1.00
7.47
100%
0.00
0.000
0%
1.00
47.80
100%
0.00
0.000
0%
1.00
18.56
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
0.10
1.95
100%
0.00
0.000
0%
0.14
54.08
100%
0.00
0.000
0%
0.60
22.16
100%
0.00
0.000
0%
1.00
212.01
100%
0.00
0.000
0%
1.15
22.44
100%
0.00
0.000
0%
1.38
18.85
100%
0.00
0.000
0%
1.23
475.09
100%
0.00
0.000
0%
1.20
44.32
100%
0.00
0.000
0%
12.58
245.44
100%
0.00
0.000
0%
14.88
203.26
100%
0.00
0.000
0%
8.39
4,201.12
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
41.93
1,093.53
100%
0.00
0.000
0%
28.95
395.46
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
0.28
140.20
100%
0.00
0.000
0%
5.67
147.87
100%
0.00
0.000
0%
42.28
192.37
100%
0.00
0.000
0%
5.67
100.47
100%
0.00
0.000
0%
5.67
50.52
100%
0.00
0.000
0%
83.85
13,193.80
100%
0.00
0.000
0%
37.10
218.15
100%
0.00
0.000
0%
21.00
355.53
100%
0.00
0.000
0%
3.56
69.46
100%
0.00
0.000
0%
6.47
15.08
100%
0.00
0.000
0%
4.63
63.25
100%
0.00
0.000
0%
2.59
734.60
100%
0.00
0.000
0%
0.88
268.19
100%
0.00
0.000
0%
13.61
354.95
100%
AVANCES
ACUMULADO
Metrado
Valorizado
0.00
SALDO
%
0.000
Metrado
0%
Valorizado
9.41
%
42.63
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
0.26
119.76
100%
0.00
0.000
0%
4.00
147.72
100%
0.00
0.000
0%
66.56
302.85
100%
0.00
0.000
0%
0.27
124.36
100%
0.00
0.000
0%
4.08
150.67
100%
0.00
0.000
0%
30.02
136.59
100%
0.00
0.000
0%
11.57
865.55
100%
0.00
0.000
0%
23.14
311.00
100%
0.00
0.000
0%
10.12
179.33
100%
0.00
0.000
0%
5.44
39.00
100%
0.00
0.000
0%
23.14
298.27
100%
0.00
0.000
0%
10.12
140.77
100%
0.00
0.000
0%
5.44
48.47
100%
0.00
0.000
0%
0.94
432.97
100%
0.00
0.000
0%
9.80
361.91
100%
0.00
0.000
0%
35.58
161.89
100%
250.00
18,702.500
94%
15.47
1,157.31
6%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
80.11
1,191.24
100%
0.00
0.000
0%
386.71
5,197.38
100%
0.00
0.000
0%
118.02
1,586.19
100%
0.00
0.000
0%
24.49
433.96
100%
0.00
0.000
0%
2.92
225.54
100%
0.00
0.000
0%
1.42
93.45
100%
0.00
0.000
0%
132.70
2,351.44
100%
0.00
0.000
0%
111.95
1,983.75
100%
0.00
0.000
0%
248.27
16,264.17
100%
0.00
0.000
0%
129.41
12,607.12
100%
0.00
0.000
0%
64.58
1,717.83
100%
0.00
0.000
0%
64.58
4,353.34
100%
0.00
0.000
0%
156.42
22,016.12
100%
0.00
0.000
0%
80.11
5,828.80
100%
0.00
0.000
0%
128.56
6,827.82
100%
0.00
0.000
0%
3.14
22.51
100%
0.00
0.000
0%
55.07
394.85
100%
0.00
0.000
0%
3.85
280.13
100%
0.00
0.000
0%
11.96
105.85
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
23.57
10,653.17
100%
0.00
0.000
0%
28.43
4,913.27
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
2.55
198.98
100%
0.00
0.000
0%
48.91
4,794.65
100%
0.00
0.000
0%
1.50
608.79
100%
0.00
0.000
0%
2.30
549.68
100%
0.00
0.000
0%
2.84
749.11
100%
0.00
0.000
0%
1.00
1,689.93
100%
0.00
0.000
0%
1.00
768.15
100%
0.00
0.000
0%
1.00
732.70
100%
0.00
0.000
0%
1.00
512.89
100%
0.00
0.000
0%
82.00
2,568.24
100%
0.00
0.000
0%
40.00
562.40
100%
0.00
0.000
0%
12.00
282.24
100%
0.00
0.000
0%
9.00
550.26
100%
0.00
0.000
0%
11.00
387.97
100%
0.00
0.000
0%
128.00
696.32
100%
0.00
0.000
0%
3.00
276.39
100%
0.00
0.000
0%
20.00
186.80
100%
0.00
0.000
0%
2.00
200.66
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
2.00
477.02
100%
0.00
0.000
0%
2.00
248.88
100%
0.00
0.000
0%
2.00
345.66
100%
0.00
0.000
0%
102.92
18,316.67
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
407.44
4,172.19
100%
0.00
0.000
0%
131.71
1,697.74
100%
0.00
0.000
0%
129.51
1,657.73
100%
0.00
0.000
0%
111.95
1,557.22
100%
0.00
0.000
0%
55.07
490.67
100%
0.00
0.000
0%
6.34
56.49
100%
0.00
0.000
0%
232.02
2,501.18
100%
0.00
0.000
0%
13.87
151.88
100%
0.00
0.000
0%
1.00
320.00
100%
0.00
0.000
0%
12.00
380.88
100%
0.00
0.000
0%
53.00
2,123.71
100%
0.00
0.000
0%
24.00
940.32
100%
0.00
0.000
0%
1.00
1,506.74
100%
0.00
0.000
0%
1.00
1,406.74
100%
0.00
0.000
0%
1.00
550.00
100%
0.00
0.000
0%
8.00
2,583.04
100%
0.00
0.000
0%
3.00
428.85
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
4.00
668.60
100%
0.00
0.000
0%
1.00
255.15
100%
0.00
0.000
0%
2.00
451.42
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
4.00
66.00
100%
0.00
0.000
0%
4.00
66.84
100%
0.00
0.000
0%
8.00
148.72
100%
0.00
0.000
0%
4.00
1,151.72
100%
0.00
0.000
0%
1.00
177.15
100%
0.00
0.000
0%
7.00
175.00
100%
0.00
0.000
0%
4.00
1,149.56
100%
0.00
0.000
0%
1.00
120.12
100%
0.00
0.000
0%
2.00
187.12
100%
0.00
0.000
0%
1.00
243.17
100%
0.00
0.000
0%
18.00
284.04
100%
0.00
0.000
0%
36.00
574.92
100%
0.00
0.000
0%
23.00
967.61
100%
0.00
0.000
0%
18.90
140.62
100%
0.00
0.000
0%
24.80
183.52
100%
0.00
0.000
0%
33.89
161.66
100%
0.00
0.000
0%
68.69
264.46
100%
0.00
0.000
0%
67.55
499.87
100%
0.00
0.000
0%
1.00
15.95
100%
0.00
0.000
0%
6.00
55.32
100%
0.00
0.000
0%
33.00
205.59
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
57.00
326.04
100%
0.00
0.000
0%
3.00
36.33
100%
0.00
0.000
0%
6.00
17.10
100%
0.00
0.000
0%
8.00
100.32
100%
0.00
0.000
0%
7.00
43.61
100%
0.00
0.000
0%
4.00
35.72
100%
0.00
0.000
0%
9.00
70.38
100%
0.00
0.000
0%
16.00
95.20
100%
0.00
0.000
0%
2.00
28.62
100%
0.00
0.000
0%
6.00
60.18
100%
0.00
0.000
0%
12.00
105.00
100%
0.00
0.000
0%
8.00
61.52
100%
0.00
0.000
0%
1.00
78.40
100%
0.00
0.000
0%
3.00
155.94
100%
0.00
0.000
0%
6.00
292.02
100%
0.00
0.000
0%
4.00
161.96
100%
0.00
0.000
0%
1.00
45.98
100%
0.00
0.000
0%
213.83
975.06
100%
0.00
0.000
0%
85.53
199.28
100%
0.00
0.000
0%
85.53
484.96
100%
0.00
0.000
0%
42.77
2,351.49
100%
0.00
0.000
0%
0.48
240.35
100%
0.00
0.000
0%
4.00
104.32
100%
0.00
0.000
0%
0.80
20.86
100%
0.00
0.000
0%
0.31
155.23
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
4.00
65.68
100%
0.00
0.000
0%
10.00
1,510.30
100%
0.00
0.000
0%
32.80
598.60
100%
0.00
0.000
0%
29.80
420.78
100%
0.00
0.000
0%
19.00
62.51
100%
0.00
0.000
0%
31.00
341.93
100%
0.00
0.000
0%
9.00
30.78
100%
0.00
0.000
0%
3.00
6.78
100%
0.00
0.000
0%
8.00
32.16
100%
0.00
0.000
0%
4.00
30.40
100%
0.00
0.000
0%
8.00
80.00
100%
0.00
0.000
0%
12.00
53.04
100%
0.00
0.000
0%
6.00
15.72
100%
0.00
0.000
0%
4.00
194.68
100%
0.00
0.000
0%
1.00
41.91
100%
0.00
0.000
0%
2.00
133.68
100%
0.00
0.000
0%
2.00
168.90
100%
0.00
0.000
0%
2.00
30.90
100%
0.00
0.000
0%
2.00
16.38
100%
0.00
0.000
0%
62.60
285.46
100%
0.00
0.000
0%
25.04
58.34
100%
0.00
0.000
0%
25.04
141.98
100%
0.00
0.000
0%
12.52
688.35
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
10.00
84.20
100%
0.00
0.000
0%
27.00
227.34
100%
0.00
0.000
0%
18.00
191.70
100%
0.00
0.000
0%
25.00
625.75
100%
0.00
0.000
0%
48.70
535.21
100%
0.00
0.000
0%
16.10
176.94
100%
0.00
0.000
0%
30.35
218.52
100%
0.00
0.000
0%
57.45
413.64
100%
0.00
0.000
0%
7.00
239.19
100%
0.00
0.000
0%
5.00
94.80
100%
0.00
0.000
0%
1.00
15.92
100%
0.00
0.000
0%
3.00
31.74
100%
0.00
0.000
0%
46.00
284.28
100%
0.00
0.000
0%
4.00
27.92
100%
0.00
0.000
0%
5.00
164.50
100%
0.00
0.000
0%
7.00
123.13
100%
0.00
0.000
0%
21.00
178.29
100%
0.00
0.000
0%
11.00
110.00
100%
0.00
0.000
0%
8.00
59.76
100%
0.00
0.000
0%
2.00
95.60
100%
0.00
0.000
0%
5.00
74.25
100%
0.00
0.000
0%
4.00
74.24
100%
0.00
0.000
0%
8.00
178.72
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
177.60
809.86
100%
0.00
0.000
0%
71.04
165.52
100%
0.00
0.000
0%
71.04
402.80
100%
0.00
0.000
0%
35.52
1,952.89
100%
0.00
0.000
0%
3.65
1,409.81
100%
0.00
0.000
0%
19.83
517.17
100%
0.00
0.000
0%
0.36
139.05
100%
0.00
0.000
0%
2.86
74.59
100%
0.00
0.000
0%
13.00
59.15
100%
56.94
1,110.899
100%
0.00
0.00
0%
0.00
0.000
0%
15.55
36.23
100%
0.00
0.000
0%
20.96
1,081.96
100%
0.00
0.000
0%
15.00
2,182.65
100%
0.00
0.000
0%
43.18
491.39
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
7.17
232.02
100%
0.00
0.000
0%
1.19
459.64
100%
0.00
0.000
0%
1.10
424.88
100%
0.00
0.000
0%
12.80
468.99
100%
0.00
0.000
0%
40.60
184.73
100%
0.00
0.000
0%
1.35
521.44
100%
0.00
0.000
0%
10.90
399.38
100%
0.00
0.000
0%
49.07
223.27
100%
0.00
0.000
0%
0.18
69.53
100%
0.00
0.000
0%
3.27
119.81
100%
0.00
0.000
0%
2.55
11.60
100%
0.00
0.000
0%
1.25
482.81
100%
0.00
0.000
0%
17.64
646.33
100%
0.00
0.000
0%
62.47
284.24
100%
0.00
0.000
0%
0.16
61.80
100%
0.00
0.000
0%
1.50
54.96
100%
0.00
0.000
0%
7.83
35.63
100%
0.00
0.000
0%
8.89
158.69
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
6.16
93.45
100%
0.00
0.000
0%
9.48
143.81
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
1.00
5,374.45
100%
0.00
0.000
0%
1.00
300.51
100%
0.00
0.000
0%
7.90
115.58
100%
0.00
0.000
0%
30.00
453.90
100%
0.00
0.000
0%
5.00
49.85
100%
0.00
0.000
0%
1.00
103.86
100%
280.00
5,462.800
100%
0.00
0.00
0%
280.00
652.400
100%
0.00
0.00
0%
280.00
1,587.600
100%
0.00
0.00
0%
112.00
6,157.760
100%
0.00
0.00
0%
0.00
0.000
0%
140.00
7,226.80
100%
0.00
0.000
0%
360.00
3,592.80
100%
0.00
0.000
0%
200.00
2,450.00
100%
0.00
0.000
0%
1.00
14.84
100%
0.00
0.000
0%
1.00
5.48
100%
0.00
0.000
0%
836.43
1,254.65
100%
0.00
0.000
0%
177.60
140.30
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
14.40
12.82
100%
0.00
0.000
0%
8.64
168.57
100%
0.00
0.000
0%
36.00
431.28
100%
0.00
0.000
0%
36.00
329.40
100%
0.00
0.000
0%
0.06
1.17
100%
0.00
0.000
0%
0.09
27.55
100%
0.00
0.000
0%
0.54
60.07
100%
0.00
0.000
0%
2.10
36.08
100%
0.00
0.000
0%
1.00
127.30
100%
0.00
0.000
0%
2.10
18.71
100%
0.00
0.000
0%
1.00
38,500.00
100%
0.00
0.000
0%
42.00
1,422.12
100%
0.00
0.000
0%
50.00
1,918.00
100%
0.00
0.000
0%
18.00
534.78
100%
0.00
0.000
0%
4.00
132.80
100%
0.00
0.000
0%
3.00
115.92
100%
0.00
0.000
0%
1.00
30.83
100%
0.00
0.000
0%
2.00
50.44
100%
0.00
0.000
0%
2.00
114.68
100%
0.00
0.000
0%
7.00
273.98
100%
0.00
0.000
0%
12.00
476.16
100%
0.00
0.000
0%
2.00
95.78
100%
0.00
0.000
0%
2.00
125.30
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
0.00
0.000
0%
0.00
0.000
0%
0.00
0.000
0%
0.00
0.000
0%
0.00
0.000
0.00
0.000
0.00
0.000
Valorizado
20.00
111.00
100%
50.00
367.00
100%
586.40
3,148.97
100%
316.00
1,428.32
100%
0%
270.40
1,573.73
100%
0%
82.00
658.46
100%
0%
10.00
129.10
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
1.00
2,296.61
100%
0.00
0.000
0%
1.00
1,033.40
100%
0.00
0.000
0%
1.00
1,014.20
100%
0.00
0.000
0%
1.00
1,014.20
100%
0.00
0.000
0%
1.00
1,304.26
100%
0.00
0.000
0%
1.00
1,061.41
100%
0.00
0.000
0%
1.00
975.73
100%
0.00
0.000
0%
1.33
25.95
100%
0.00
0.000
0%
1.39
3.24
100%
0.00
0.000
0%
0.20
10.32
100%
0.00
0.000
0%
1.36
15.48
100%
0.00
0.000
0%
0.64
20.71
100%
0.00
0.000
0%
0.75
289.69
100%
0.00
0.000
0%
0.19
102.18
100%
0.00
0.000
0%
2.91
13.24
100%
0.00
0.000
0%
0.20
92.12
100%
0.00
0.000
0%
1.60
59.09
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
7.37
33.53
100%
0.00
0.000
0%
1.00
3,872.21
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
1.02
8.35
100%
0.00
0.000
0%
1.02
9.09
100%
0.00
0.000
0%
1.00
5,234.35
100%
0.00
0.000
0%
59.02
1,151.48
100%
0.00
0.000
0%
59.02
137.52
100%
0.00
0.000
0%
59.02
334.64
100%
0.00
0.000
0%
147.55
1,767.65
100%
0.00
0.000
0%
6.00
5,239.20
100%
0.00
0.000
0%
147.55
4,302.56
100%
0.00
0.000
0%
147.55
1,245.32
100%
0.00
0.000
0%
24.00
2,147.04
100%
0.00
0.000
0%
7.00
617.26
100%
0.00
0.000
0%
11.00
1,519.98
100%
0.00
0.000
0%
17.00
5,836.27
100%
0.00
0.000
0%
4.00
596.32
100%
0.00
0.000
0%
8.00
1,705.44
100%
0.00
0.000
0%
1.00
31.02
100%
0.00
0.000
0%
20.00
146.40
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
20.00
116.40
100%
0.00
0.000
0%
54.40
48.42
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
21.76
424.54
100%
0.00
0.000
0%
136.00
1,629.28
100%
0.00
0.000
0%
1.00
339.98
100%
0.00
0.000
0%
1.00
346.58
100%
0.00
0.000
0%
1.00
294.17
100%
0.00
0.000
0%
1.00
294.17
100%
0.00
0.000
0%
136.00
1,175.04
100%
0.00
0.000
0%
120.00
1,036.80
100%
0.00
0.000
0%
85.00
734.40
100%
0.00
0.000
0%
12.00
87.84
100%
0.00
0.000
0%
4.00
90.88
100%
0.00
0.000
0%
136.00
198.56
100%
0.00
0.000
0%
120.00
270.00
100%
0.00
0.000
0%
85.00
191.25
100%
0.00
0.000
0%
1.00
273.40
100%
0.00
0.000
0%
1.00
1,000.00
100%
0.00
0.000
0%
1.00
2,000.00
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
30.60
27.23
100%
0.00
0.000
0%
15.30
298.50
100%
0.00
0.000
0%
76.50
916.47
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
580.00
875.80
100%
0.00
0.000
0%
1.00
1,431.47
100%
0.00
0.000
0%
1.00
905.75
100%
0.00
0.000
0%
30.00
515.40
100%
0.00
0.000
0%
20.00
218.20
100%
0.00
0.000
0%
240.00
1,756.80
100%
0.00
0.000
0%
4.00
250.60
100%
0.00
0.000
0%
18.00
1,127.70
100%
0.00
0.000
0%
1.00
64.32
100%
0.00
0.000
0%
1.00
162.79
100%
0.00
0.000
0%
1.00
2,000.00
100%
0.00
0.000
0%
4.00
960.00
100%
0.00
0.000
0%
2.00
540.00
100%
0.00
0.000
0%
4.00
2,160.00
100%
0.00
0.000
0%
4.00
2,198.72
100%
0.00
0.000
0%
5.00
2,397.55
100%
0.00
0.000
0%
1.00
225.00
100%
0.00
0.000
0%
6.00
3,348.00
100%
0.00
0.000
0%
4.00
220.00
100%
0.00
0.000
0%
18.00
2,717.28
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
80.00
2,279.20
100%
0.00
0.000
0%
6.00
396.00
100%
0.00
0.000
0%
1.00
1,325.95
100%
0.00
0.000
0%
1.00
345.00
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
2.00
198.00
100%
0.00
0.000
0%
1.00
649.00
100%
0.00
0.000
0%
1.00
120.00
100%
0.00
0.000
0%
1.00
840.00
100%
0.00
0.000
0%
1.00
50.00
100%
0.00
0.000
0%
1.00
540.00
100%
0.00
0.000
0%
1.00
189.90
100%
0.00
0.000
0%
1.00
1,200.00
100%
0.00
0.000
0%
1.00
2,846.00
100%
0.00
0.000
0%
2.00
6,200.00
100%
0.00
0.000
0%
1.00
5,827.97
100%
0.00
0.000
0%
1.00
118.18
100%
0.00
0.000
0%
4.00
2,880.00
100%
0.00
0.000
0%
1.00
720.00
100%
0.00
0.000
0%
3.00
359.70
100%
0.00
0.000
0%
1.00
119.90
100%
0.00
0.000
0%
2.00
1,130.00
100%
0.00
0.000
0%
1.00
3,345.30
100%
0.00
0.000
0%
3.00
1,561.14
100%
0.00
0.000
0%
1.00
500.00
100%
0.00
0.000
0%
1.00
4,661.02
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
10.00
275.00
100%
0.00
0.000
0%
20.00
1,315.60
100%
0.00
0.000
0%
40.00
3,400.00
100%
0.00
0.000
0%
10.00
823.90
100%
0.00
0.000
0%
10.00
2,409.00
100%
0.00
0.000
0%
3.00
629.19
100%
0.00
0.000
0%
2.00
451.46
100%
0.00
0.000
0%
4.00
1,030.92
100%
0.00
0.000
0%
2.00
1,195.46
100%
0.00
0.000
0%
4.00
2,630.92
100%
0.00
0.000
0%
7.00
468.16
100%
0.00
0.000
0%
10.00
171.40
100%
0.00
0.000
0%
1.00
76.89
100%
0.00
0.000
0%
1.00
104.50
100%
0.00
0.000
0%
1.00
143.00
100%
0.00
0.000
0%
1.00
19.44
100%
0.00
0.000
0%
2.00
32.78
100%
0.00
0.000
0%
1.00
5.79
100%
0.00
0.000
0%
1.00
9.79
100%
0.00
0.000
0%
12.00
42.24
100%
0.00
0.000
0%
12.00
42.24
100%
0.00
0.000
0%
12.00
42.24
100%
0.00
0.000
0%
12.00
42.24
100%
0.00
0.000
0%
1.00
27.39
100%
0.00
0.000
0%
12.00
21.60
100%
0.00
0.000
0%
12.00
21.60
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
12.00
14.52
100%
0.00
0.000
0%
1.00
7.59
100%
0.00
0.000
0%
12.00
36.84
100%
0.00
0.000
0%
1.00
22.99
100%
0.00
0.000
0%
1.00
71.50
100%
0.00
0.000
0%
1.00
17.49
100%
0.00
0.000
0%
1.00
7.59
100%
0.00
0.000
0%
4.00
13.20
100%
0.00
0.000
0%
1.00
450.00
100%
0.00
0.000
0%
1.00
2,699.00
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
3.00
690.00
100%
0.00
0.000
0%
1.00
385.00
100%
0.00
0.000
0%
2.00
15.88
100%
0.00
0.000
0%
2.00
34.76
100%
0.00
0.000
0%
5.00
164.50
100%
0.00
0.000
0%
2.00
119.80
100%
0.00
0.000
0%
1.00
1,023.41
100%
0.00
0.000
0%
2.00
307.78
100%
0.00
0.000
0%
3.00
39.27
100%
0.00
0.000
0%
2.00
114.78
100%
0.00
0.000
0%
2.00
70.00
100%
0.00
0.000
0%
2.00
61.38
100%
0.00
0.000
0%
1.00
43.89
100%
0.00
0.000
0%
3.00
705.00
100%
0.00
0.000
0%
1.00
188.97
100%
0.00
0.000
0%
9.00
178.83
100%
0.00
0.000
0%
1.00
751.25
100%
0.00
0.000
0%
1.00
2,529.89
100%
0.00
0.000
0%
1.00
1,263.85
100%
0.00
0.000
0%
1.00
3,427.55
100%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
0.00
0.000
0%
1.00
1,488.81
100%
0.00
0.000
0%
1.00
6,045.43
100%
0.00
0.000
0%
6.00
1,226.64
100%
0.00
0.000
0%
1.00
474.30
100%
0.00
0.000
0%
4.00
104.00
100%
0.00
0.000
0%
2.00
92.94
100%
0.00
0.000
0%
4.00
13,769.40
100%
0.00
0.000
0%
1.00
1,883.87
100%
0.00
0.000
0%
2.00
24.00
100%
0.00
0.000
0%
1.00
1,280.30
100%
0.00
0.000
0%
1.00
216.00
100%
0.00
0.000
0%
1.00
2,383.90
100%
0.00
0.000
0%
1.00
465.00
100%
0.00
0.000
0%
1.00
6,690.00
100%
183,440.26
19.41%
761,855.09
80.60%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
SUPERVISOR DE PROYECTOS
ROBERTO HUAMAN LACUTA
DNI 23833867
Valorizado
CORRESPONDIENTE AL MES DE
FECHA DE PRESENTACION
CREACION DEL CENTRO DE SERVICIOS - TAMBO EN EL CENTRO POBLADO CANCAHUANI, DISTRITO DE CAPACAMARCA, PROVINCIA DE CHUMBIVILCAS, DEPARTAMENTO CUSCO
MONTO FINANCIADO
SUPERVISOR:
CIP
41762
RESIDENTE:
CAP
3094
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
PRESUPUESTO
01.01
01.01.01
CONSTRUCCIONES PROVISIONALES
01.01.01.01
und
1.00
9,894.66
9,894.66
0.80
7,915.73
0.2
1,978.93
01.01.01.02
und
2.00
652.41
1,304.82
2.00
1,304.82
0.00
01.01.01.03
und
1.00
1,134.34
1,134.34
1.00
1,134.34
0.00
01.01.02
INSTALACIONES PROVISIONALES
01.01.02.01
0
gb
1.00
1,766.25
1,766.25
0.25
441.56
0.25
441.56
01.01.03
TRABAJOS PRELIMINARES
01.01.03.01
m2
2,500.00
0.76
1,900.00
1750.00
1,330.00
750
570.00
01.01.03.02
HABILITACION DE ACCESO
m3
303.10
19.51
5,913.48
242.48
4,730.78
60.62
1,182.70
01.01.04
01.01.04.01
FLETE TERRESTRE
01.01.05
01.01.05.01
m2
800.00
0.89
712.00
800.00
712.00
0.00
01.01.05.02
m2
800.00
0.89
712.00
190.00
169.10
190
169.10
01.02
01.02.01
01.02.01.01
4.00
100.00
400.00
100.00
0
gb
1.00
39302.74
39,302.74
0.21
8,253.58
0.25
9,825.69
mes
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
P.Unit
ANTERIOR
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
01.02.01.02
mes
4.00
1,550.03
6,200.12
1.00
1,550.03
1,550.03
01.02.01.03
mes
4.00
113.17
452.68
1.00
113.17
113.17
01.02.01.04
mes
4.00
200.83
803.32
0.00
200.83
01.02.01.05
mes
4.00
100.00
400.00
0.00
100.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
01.02.02
01.02.02.01
01.02.03
MITIGACION AMBIENTAL
01.02.03.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
glb
1.00
77.00
77.00
tall
1.00
100.00
100.00
01.02.03.02
tall
4.00
100.00
400.00
01.02.03.03
und
30.00
2.80
84.00
01.02.03.04
tall
4.00
100.00
400.00
01.02.03.05
glb
1.00
509.08
509.08
01.02.03.06
mes
4.00
30.11
120.44
01.02.03.07
act
1.00
215.38
215.38
02
ESTRUCTURAS
02.01
EDIFICACION
02.01.01
MOVIMIENTO DE TIERRAS
02.01.01.01
EXCAVACIONES
02.01.01.01.01
02.01.01.02
CORTES
02.01.01.02.01
02.01.01.03
RELLENOS
02.01.01.03.01
ACTUAL
Valorizado
Metrado
Valorizado
0.20
15.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.50
107.69
23.1
450.68
1,828.90
m3
76.98
19.51
1,501.88
m3
1,626.40
19.51
31,731.06
m3
22.58
51.62
1,165.58
02.01.01.03.02
m2
473.90
21.14
10,018.25
02.01.01.04
02.01.01.04.01
m2
553.07
2.33
1,288.65
02.01.01.05
02.01.01.05.01
m3
68.00
11.38
02.01.02
02.01.02.01
SOLADOS
02.01.02.01.01
m2
71.41
32.36
02.01.02.02
SOBRECIMIENTOS
53.88
975.84
15.80
1,051.20
19,038.64
815.60
650.56
6.78
12,692.43
349.98
473.90
10,018.25
0.00
553.07
1,288.65
773.84
0.00
68.00
773.84
2,310.83
71.41
0.00
0.00
0.00
2,310.83
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.01.02.02.01
m3
9.22
304.76
2,809.89
0.00
9.22
2,809.89
02.01.02.02.02
m2
140.47
26.08
3,663.46
0.00
140.47
3,663.46
02.01.02.02.03
kg
90.05
4.53
407.93
90.05
0.00
0.00
407.93
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.01.02.03
SARDINELES EN SS.HH
02.01.02.03.01
m3
0.04
537.80
21.51
0.00
0.00
0.00
02.01.02.03.02
m2
1.93
26.08
50.33
0.00
0.00
0.00
02.01.02.04
VEREDAS
02.01.02.04.01
m3
18.14
500.73
9,083.24
0.00
0.00
0.00
02.01.02.04.02
m2
34.30
26.08
894.54
0.00
0.00
0.00
02.01.02.04.03
131.30
13.66
1,793.56
0.00
0.00
0.00
02.01.02.04.04
335.55
3.70
1,241.54
0.00
0.00
0.00
02.01.02.05
PATIO
02.01.02.05.01
m3
7.57
500.73
3,790.53
0.00
0.00
0.00
02.01.02.05.02
m2
11.26
26.08
293.66
0.00
0.00
0.00
02.01.02.05.03
54.43
13.66
743.51
0.00
0.00
0.00
02.01.02.05.04
181.88
3.70
672.96
0.00
0.00
0.00
02.01.02.06
RAMPAS
02.01.02.06.01
m3
1.17
500.73
585.85
0.00
0.00
0.00
02.01.02.06.02
m2
2.37
26.08
61.81
0.00
0.00
0.00
02.01.02.06.03
51.08
3.70
189.00
0.00
0.00
0.00
02.01.02.07
FALSO PISO
02.01.02.07.01
m2
252.74
35.50
8,972.27
0.00
0.00
0.00
02.01.03
02.01.03.01
ZAPATAS
02.01.03.01.01
m3
10.87
537.80
5,845.89
0.00
10.87
5,845.89
02.01.03.01.02
kg
354.52
4.55
1,613.07
354.52
0.00
0.00
02.01.03.02
VIGAS DE CIMENTACION
02.01.03.02.01
m3
17.96
537.80
9,658.89
0.00
17.96
9,658.89
02.01.03.02.02
m2
71.91
36.64
2,634.78
0.00
71.91
2,634.78
02.01.03.02.03
kg
1,824.37
4.55
8,300.88
02.01.03.02.04
TEKNOPORT 1"
m2
44.23
6.91
305.63
02.01.03.03
COLUMNAS
1824.37
0.00
1,613.07
8,300.88
-
44.23
0.00
305.63
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.01.03.03.01
m3
9.75
460.61
4,490.95
0.00
9.75
4,490.95
02.01.03.03.02
m2
118.45
36.93
4,374.36
0.00
118.45
4,374.36
02.01.03.03.03
m2
18.61
118.95
2,213.66
0.00
18.61
2,213.66
02.01.03.03.04
kg
1,736.75
4.55
7,902.21
1369.62
367.13
1,670.44
6,231.77
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.01.03.04
VIGAS
02.01.03.04.01
m3
12.39
460.61
5,706.96
0.00
12.39
5,706.96
02.01.03.04.02
m2
116.35
36.93
4,296.81
0.00
116.35
4,296.81
02.01.03.04.03
kg
1,586.15
4.55
7,216.98
0.00
1586.15
7,216.98
02.01.03.05
COLUMNETAS DE CONFINAMIENTO
02.01.03.05.01
m3
5.17
460.61
2,381.35
0.00
5.17
2,381.35
02.01.03.05.02
m2
79.74
36.93
2,944.80
79.74
2,944.80
02.01.03.05.03
kg
1,083.74
4.55
4,931.02
1083.74
4,931.02
02.01.03.06
VIGUETAS DE CONFINAMIENTO
02.01.03.06.01
m3
2.10
460.61
967.28
0.00
2.10
967.28
02.01.03.06.02
m2
23.19
36.93
856.41
0.00
23.19
856.41
02.01.03.06.03
kg
351.96
4.55
1,601.42
0.00
351.96
1,601.42
02.01.03.07
02.01.03.07.01
m3
0.59
460.61
271.76
0.00
0.59
271.76
02.01.03.07.02
m2
11.89
36.93
439.10
11.89
439.10
02.01.03.07.03
kg
35.45
4.55
161.30
35.45
161.30
02.01.03.08
02.01.03.08.01
m3
0.74
460.61
340.85
0.00
0.00
0.00
02.01.03.08.02
m2
10.72
36.93
395.89
0.00
0.00
0.00
02.01.03.08.03
kg
40.85
4.55
185.87
0.00
0.00
0.00
02.01.04
ESTRUCTURAS METALICAS
02.01.04.01
TIJERALES Y RETICULADOS
02.01.04.01.01
und
3.00
1,514.93
4,544.79
0.00
3.00
4,544.79
02.01.04.01.02
und
2.00
1,455.00
2,910.00
0.00
2.00
2,910.00
02.01.04.01.03
und
6.00
1,460.66
8,763.96
0.00
6.00
8,763.96
02.01.04.01.04
IZAJE DE TIJERALES
und
11.00
115.97
1,275.67
0.00
0.00
0.00
02.01.04.02
CORREAS
02.01.04.02.01
419.20
20.75
8,698.40
0.00
419.20
8,698.40
02.01.04.02.02
und
124.00
12.14
1,505.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.01.04.02.03
und
Metrado
ANTERIOR
P.Unit
26.00
Presup. S/.
13.46
Metrado
349.96
0.00
ACTUAL
Valorizado
Metrado
-
Valorizado
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.01.04.03
ANCLAJES
02.01.04.03.01
und
5.00
40.86
204.30
0.00
0.00
0.00
02.01.04.03.02
und
27.00
44.82
1,210.14
0.00
0.00
0.00
02.01.04.03.03
und
6.00
40.32
241.92
0.00
0.00
0.00
02.01.05
COBERTURA
02.01.05.01
m2
445.48
117.47
52,330.54
0.00
0.00
02.01.05.02
33.70
35.55
1,198.04
0.00
0.00
0.00
02.01.05.03
30.34
70.08
2,126.23
0.00
0.00
0.00
02.01.05.04
m2
18.96
59.41
1,126.41
0.00
0.00
0.00
02.01.06
02.01.06.01
67.40
112.76
7,600.02
0.00
0.00
02.01.07
VARIOS
02.01.07.01
65.50
15.07
987.09
0.00
0.00
0.00
02.02
02.02.01
MOVIMIENTO DE TIERRAS
02.02.01.01
EXCAVACIONES
02.02.01.01.01
m3
6.30
19.51
122.91
0.00
6.30
122.91
02.02.02
02.02.02.01
CONCRETO f'c=140kg/cm2-P/DADOS
m3
6.86
386.25
2,649.68
0.00
0.00
0.00
02.02.02.02
CONCRETO f'c=175kg/cm2-P/HITOS
m3
0.41
500.73
205.30
0.00
0.00
0.00
02.02.02.03
m2
12.71
26.08
331.48
0.00
0.00
02.02.02.04
kg
43.03
4.55
195.79
0.00
0.00
02.02.03
02.02.03.01
197.00
272.73
53,727.81
0.00
0.00
02.02.03.02
1.00
1,165.19
1,165.19
0.00
0.00
0.00
0.00
02.02.04
PINTURA
02.02.04.01
0.00
und
0.00
0.00
0.00
0.00
0.00
m2
15.38
14.85
228.39
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.03
02.03.01
MOVIMIENTO DE TIERRAS
02.03.01.01
EXCAVACIONES
02.03.01.01.01
m3
Metrado
ANTERIOR
P.Unit
0.28
Presup. S/.
19.51
Metrado
5.46
0.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
02.03.02
02.03.02.01
CONCRETO f'c=140kg/cm2-P/DADOS
m3
0.34
386.25
131.33
02.03.02.02
m2
0.90
26.08
23.47
02.03.03
02.03.03.01
CERCO METALICO H=2.50M C/MALLA GALVANIZADA N10 2"X2" CON TUBO FG 3" INC. 3
HILERAS DE ALAMBRE DE PUAS EN PARTE SUPERIOR
15.00
161.06
2,415.90
PUERTA A=1.00M. H=2.00M. CON TUBOS FG 1.1/2" CON MALLA GALVANIZADA N10 2"X2"
DOBLE TORSION INC. CERROJO Y CANDADO (SEGUN DISEO)
und
02.03.03.02
0.00
0.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
649.34
649.34
0.00
02.03.04
PINTURA
02.03.04.01
m2
32.00
12.66
405.12
02.03.04.02
m2
32.00
12.66
405.12
02.04
ASTA DE BANDERA
02.04.01
MOVIMIENTO DE TIERRAS
02.04.01.01
EXCAVACIONES
02.04.01.01.01
m3
1.78
19.51
34.73
0.00
0.00
0.00
02.04.01.02
RELLENOS
02.04.01.02.01
m3
0.75
51.62
38.72
0.00
0.00
0.00
02.04.01.03
02.04.01.03.01
m3
1.24
11.38
14.11
0.00
0.00
0.00
02.04.02
02.04.02.01
SOLADOS
02.04.02.01.01
m2
1.76
32.36
56.95
0.00
0.00
0.00
02.04.02.02
VEREDAS
02.04.02.02.01
m3
0.72
500.73
360.53
0.00
0.00
0.00
02.04.02.02.02
m2
1.32
26.08
34.43
0.00
0.00
0.00
02.04.02.02.03
3.60
13.66
49.18
0.00
0.00
0.00
02.04.03
02.04.03.01
m3
0.78
460.61
359.28
0.00
0.00
0.00
02.04.03.02
m2
3.42
36.93
126.30
0.00
0.00
0.00
02.04.03.03
kg
37.86
4.55
172.26
0.00
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
P.Unit
ANTERIOR
Presup. S/.
Metrado
02.04.04
CARPINTERIA METALICA
02.04.04.01
ASTA DE BANDERA CON TUBO FG DE 3" Y 2" H=6.20M HASTA ANCLAJE INC. RODON Y
MASTIL
und
1.00
583.33
583.33
02.04.04.02
ASTA DE BANDERA CON TUBO FG DE 3" Y 2" H=5.20M HASTA ANCLAJE INC. RODON Y
MASTIL
und
2.00
583.33
1,166.66
0.00
0.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.04.05
PINTURA
02.04.05.01
m2
3.08
10.95
33.73
0.00
0.00
0.00
02.04.05.02
m2
3.08
8.91
27.44
0.00
0.00
0.00
02.05
02.05.01
MOVIMIENTO DE TIERRAS
02.05.01.01
EXCAVACIONES
02.05.01.01.01
m3
13.75
19.51
268.26
0.00
13.75
268.26
02.05.01.02
RELLENOS
02.05.01.02.01
m2
6.25
2.33
14.56
0.00
6.25
14.56
02.05.01.02.02
m3
2.50
51.62
129.05
0.00
2.50
129.05
02.05.01.02.03
m2
6.25
21.14
132.13
0.00
0.00
02.05.01.03
02.05.01.03.01
m3
14.63
11.38
166.49
7.30
83.07
02.05.01.04
02.05.01.04.01
ENTIBADO DE ZAPATAS
m2
10.24
36.93
378.16
0.00
0.00
02.05.02
02.05.02.01
SOLADOS
02.05.02.01.01
m2
6.25
32.36
202.25
0.00
6.25
202.25
02.05.02.02
VEREDAS
02.05.02.02.01
m3
0.47
500.73
235.34
0.00
0.00
0.00
02.05.02.02.02
m2
2.71
26.08
70.68
0.00
0.00
0.00
02.05.02.02.03
2.35
13.66
32.10
0.00
0.00
0.00
02.05.03
02.05.03.01
CISTERNA
02.05.03.01.01
m3
5.14
537.80
2,764.29
0.00
0.00
0.00
02.05.03.01.02
m2
24.00
36.93
886.32
0.00
0.00
0.00
02.05.03.01.03
kg
160.52
4.55
730.37
0.00
0.00
0.00
02.05.03.02
COLUMNAS
02.05.03.02.01
m3
1.20
460.61
552.73
0.00
0.00
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
02.05.03.02.02
m2
20.48
36.93
756.33
02.05.03.02.03
kg
222.77
4.55
1,013.60
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.05.03.03
VIGAS
02.05.03.03.01
m3
2.00
460.61
921.22
0.00
0.00
0.00
02.05.03.03.02
m2
21.00
36.93
775.53
0.00
0.00
0.00
02.05.03.03.03
kg
248.11
4.55
1,128.90
0.00
0.00
0.00
02.05.03.04
LOSA MACIZAS
02.05.03.04.01
m3
1.48
460.61
681.70
0.00
0.00
0.00
02.05.03.04.02
m2
9.50
36.93
350.84
0.00
0.00
0.00
02.05.03.04.03
kg
67.16
4.55
305.58
0.00
0.00
0.00
02.05.03.05
02.05.03.05.01
CONCRETO f'c=210kg/cm2-P/TAPAS.
m3
0.05
516.22
25.81
0.00
0.00
0.00
02.05.03.05.02
m2
0.92
24.98
22.98
0.00
0.00
02.05.03.05.03
kg
9.05
4.55
41.18
0.00
0.00
0.00
02.05.04
02.05.04.01
m2
10.81
74.81
808.70
0.00
0.00
0.00
02.05.05
REVOQUES Y REVESTIMIENTO
02.05.05.01
m2
10.01
13.44
134.53
0.00
0.00
0.00
02.05.05.02
m2
7.21
13.44
96.90
0.00
0.00
0.00
02.05.05.03
m2
13.05
15.17
197.97
0.00
0.00
0.00
02.05.05.04
m2
13.20
17.72
233.90
0.00
0.00
0.00
02.05.05.05
m2
19.10
17.72
338.45
0.00
0.00
0.00
02.05.05.06
m2
0.17
17.72
3.01
0.00
0.00
0.00
02.05.06
CIELORRASO
02.05.06.01
02.05.06.01.01
m2
12.50
26.44
330.50
0.00
0.00
0.00
02.05.07
PISOS Y PAVIMENTOS
02.05.07.01
PISOS DE CONCRETO
02.05.07.01.01
m2
8.16
28.91
235.91
0.00
0.00
0.00
02.05.08
ZOCALOS Y CONTRAZOCALOS
02.05.08.01
CONTRAZOCALOS
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
02.05.08.01.01
m2
3.18
7.17
22.80
02.05.08.01.02
m2
0.73
7.17
5.23
0.00
0.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.05.09
CARPINTERIA DE MADERA
02.05.09.01
m2
m2
02.05.09.02
Metrado
ANTERIOR
P.Unit
1.54
Presup. S/.
451.98
Metrado
696.05
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.32
98.03
31.37
0.00
02.05.10
CERRAJERIA
02.05.10.01
und
3.00
23.52
70.56
0.00
0.00
0.00
02.05.10.02
und
1.00
61.14
61.14
0.00
0.00
0.00
02.05.10.03
pza
1.00
100.33
100.33
0.00
0.00
0.00
02.05.11
PINTURA
02.05.11.01
m2
10.01
11.30
113.11
0.00
0.00
02.05.11.02
m2
7.21
8.91
64.24
0.00
0.00
02.05.11.03
m2
16.15
11.30
182.50
0.00
0.00
02.05.11.04
m2
16.15
8.91
143.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
02.05.12
OTROS
02.05.12.01
TANQUE ELEVADO
02.05.12.01.01
und
1.00
933.70
933.70
02.05.12.01.02
ESCALERA DE GATO CON TUBO DE FIERRO D=1 1/2" Y BARANDA DE TUBO DE FIERRO D=1
1/2"
und
1.00
2,150.82
2,150.82
02.05.12.01.03
und
1.00
743.76
743.76
0.00
0.00
0.00
02.05.12.01.04
glb
1.00
125.89
125.89
0.00
0.00
0.00
02.05.12.02
02.05.12.02.01
9.30
7.44
69.19
0.00
0.00
0.00
02.05.12.02.02
10.50
6.43
67.52
0.00
0.00
0.00
02.05.12.03
02.05.12.03.01
pza
2.00
15.95
31.90
0.00
0.00
0.00
02.05.12.03.02
pza
7.00
9.22
64.54
0.00
0.00
0.00
02.05.12.03.03
pza
3.00
6.78
20.34
0.00
0.00
0.00
02.05.12.03.04
pza
1.00
13.28
13.28
0.00
0.00
0.00
02.05.12.03.05
pza
1.00
12.11
12.11
0.00
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.05.12.03.06
pza
4.00
2.85
11.40
0.00
0.00
0.00
02.05.12.03.07
pza
1.00
6.61
6.61
0.00
0.00
0.00
02.05.12.03.08
1.00
83.40
83.40
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.05.12.04
VALVULAS
02.05.12.04.01
und
1.00
82.94
82.94
0.00
0.00
0.00
02.05.12.04.02
und
2.00
45.84
91.68
0.00
0.00
0.00
02.05.12.04.03
und
1.00
104.10
104.10
0.00
0.00
0.00
02.05.12.04.04
und
1.00
84.67
84.67
0.00
0.00
0.00
02.05.12.04.05
und
1.00
102.70
102.70
0.00
0.00
0.00
02.05.12.05
ABRAZADERAS
02.05.12.05.01
und
14.00
2.39
33.46
0.00
0.00
0.00
02.05.12.05.02
und
7.00
2.51
17.57
0.00
0.00
0.00
02.05.12.05.03
und
7.00
9.20
64.40
0.00
0.00
0.00
02.06
02.06.01
MOVIMIENTO DE TIERRAS
02.06.01.01
EXCAVACIONES
02.06.01.01.01
m3
3.24
19.51
63.21
0.00
0.00
02.06.01.02
RELLENOS
02.06.01.02.01
m2
3.24
2.33
7.55
0.00
0.00
0.00
02.06.01.02.02
m3
0.43
51.62
22.20
0.00
0.00
0.00
02.06.01.02.03
m2
4.86
21.14
102.74
0.00
0.00
02.06.01.03
02.06.01.03.01
m3
3.65
13.66
49.86
0.00
0.00
0.00
02.06.02
02.06.02.01
CIMIENTOS CORRIDOS
02.06.02.01.01
m3
2.59
283.63
734.60
0.00
0.00
0.00
02.06.02.02
SOBRECIMIENTO
02.06.02.02.01
m3
0.60
304.76
182.86
0.00
0.00
0.00
02.06.02.02.02
m2
8.05
26.08
209.94
0.00
0.00
0.00
02.06.02.03
VEREDAS
02.06.02.03.01
m3
0.51
500.73
255.37
0.00
0.00
0.00
02.06.02.03.02
m2
2.77
26.08
72.24
0.00
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.06.02.03.03
02.06.02.04
FALSO PISO
02.06.02.04.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
2.35
13.66
32.10
0.00
0.00
0.00
m2
3.08
35.50
109.34
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.06.03
02.06.03.01
COLUMNAS
02.06.03.01.01
m3
0.26
460.61
119.76
0.00
0.00
0.00
02.06.03.01.02
m2
6.09
36.93
224.90
0.00
0.00
0.00
02.06.03.01.03
kg
37.76
4.55
171.81
0.00
0.00
0.00
02.06.03.02
VIGUETAS
02.06.03.02.01
m3
0.26
460.61
119.76
0.00
0.00
0.00
02.06.03.02.02
m2
3.08
36.93
113.74
0.00
0.00
0.00
02.06.03.02.03
kg
38.77
4.55
176.40
0.00
0.00
0.00
02.06.03.03
LOSA MACISAS
02.06.03.03.01
m3
0.63
460.61
290.18
0.00
0.00
0.00
02.06.03.03.02
m2
7.80
36.93
288.05
0.00
0.00
0.00
02.06.03.03.03
kg
38.37
4.55
174.58
0.00
0.00
0.00
02.06.03.04
LAVADERO
02.06.03.04.01
m3
0.35
460.61
161.21
0.00
0.00
0.00
02.06.03.04.02
m2
5.15
36.93
190.19
0.00
0.00
0.00
02.06.03.04.03
kg
13.80
4.55
62.79
0.00
0.00
0.00
02.06.04
02.06.04.01
m2
12.34
74.81
923.16
0.00
0.00
0.00
02.06.05
REVOQUES Y REVESTIMIENTO
02.06.05.01
m2
2.59
13.44
34.81
0.00
0.00
0.00
02.06.05.02
m2
9.10
13.44
122.30
0.00
0.00
0.00
02.06.05.03
m2
9.19
15.17
139.41
0.00
0.00
0.00
02.06.05.04
m2
6.09
17.72
107.91
0.00
0.00
0.00
02.06.05.05
m2
3.08
17.72
54.58
0.00
0.00
0.00
02.06.05.06
m2
1.23
17.72
21.80
0.00
0.00
0.00
02.06.06
CIELORRASO
02.06.06.01
02.06.06.01.01
m2
7.80
26.44
206.23
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.06.07
PISOS Y PAVIMENTOS
02.06.07.01
CONTRAPISOS
02.06.07.01.01
CONTRAPISO E=4 CM BASE 3 CM. MEZC. C:H 1:5 ACAB. 1 CM. PASTA C:A 1:2 (ACABADO SEMIP
m2
Metrado
ANTERIOR
P.Unit
3.08
Presup. S/.
26.60
Metrado
81.93
0.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.06.07.02
PISOS
02.06.07.02.01
02.06.08
ZOCALOS Y CONTRAZOCALOS
02.06.08.01
ZOCALOS
02.06.08.01.01
02.06.08.01.02
02.06.08.02
CONTRAZOCALOS
02.06.08.02.01
02.06.09
CARPINTERIA DE MADERA
02.06.09.01
02.06.09.02
Metrado
ANTERIOR
P.Unit
m2
3.08
m2
3.24
ZOCALO DE CERAMICO 30 X 30 cm
m2
3.33
m2
0.56
m2
1.58
m2
Presup. S/.
67.41
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
207.62
0.00
0.00
0.00
7.17
23.23
0.00
0.00
0.00
72.76
242.29
0.00
0.00
0.00
72.76
40.75
0.00
0.00
0.00
451.98
714.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.44
98.03
43.13
0.00
02.06.10
CERRAJERIA
02.06.10.01
und
3.00
23.52
70.56
02.06.10.02
und
1.00
61.14
61.14
02.06.10.03
pza
1.00
100.33
100.33
02.06.11
PINTURA
02.06.11.01
m2
11.78
11.30
133.11
0.00
0.00
0.00
02.06.11.02
m2
9.10
8.91
81.08
0.00
0.00
0.00
02.06.11.03
PINTURA LATEX MATE - 2 MANOS EN COLUMNAS Y VIGAS INTERIORES COLOR BLANCO HUMO
m2
4.59
11.30
51.87
0.00
0.00
0.00
02.06.11.04
m2
4.59
8.91
40.90
0.00
0.00
0.00
02.06.12
02.06.12.01
02.06.12.01.01
und
1.00
322.88
322.88
0.00
0.00
0.00
02.06.12.01.02
und
1.00
142.95
142.95
0.00
0.00
0.00
02.06.12.02
02.06.12.02.01
pza
1.00
16.50
16.50
0.00
0.00
0.00
02.06.12.02.02
pza
1.00
16.71
16.71
0.00
0.00
0.00
02.06.12.02.03
pza
1.00
18.59
18.59
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
02.06.12.02.04
pza
1.00
53.00
53.00
02.06.12.02.05
pza
1.00
25.00
25.00
0.00
0.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.06.13
02.06.13.01
02.06.14
02.06.14.01
02.06.15
02.06.15.01
02.06.15.01.01
02.06.15.02
02.06.15.02.01
02.06.15.02.02
02.06.15.03
02.06.15.03.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
und
2.00
15.78
31.56
0.00
0.00
0.00
und
5.00
15.97
79.85
0.00
0.00
0.00
pto
3.00
42.07
126.21
0.00
0.00
0.00
3.63
10.45
37.93
0.00
0.00
0.00
9.95
3.85
38.31
0.00
0.00
0.00
pza
14.00
5.72
80.08
0.00
0.00
0.00
02.06.15.03.02
pza
1.00
12.54
12.54
0.00
0.00
0.00
02.06.15.03.03
pza
2.00
6.23
12.46
0.00
0.00
02.06.15.03.04
pza
1.00
8.93
8.93
0.00
0.00
0.00
02.06.15.03.05
pza
1.00
7.82
7.82
0.00
0.00
0.00
02.06.15.03.06
pza
2.00
5.95
11.90
0.00
0.00
0.00
02.06.15.03.07
pza
4.00
7.69
30.76
0.00
0.00
0.00
02.06.15.04
02.06.15.04.01
pza
2.00
40.49
80.98
0.00
0.00
0.00
02.06.16
DESAGE Y VENTILACION
02.06.16.01
SALIDAS DE DESAGUE
02.06.16.01.01
pto
5.00
8.42
42.10
0.00
0.00
0.00
02.06.16.01.02
pto
1.00
8.42
8.42
0.00
0.00
0.00
0.00
02.06.16.02
02.06.16.02.01
5.66
10.99
62.20
0.00
0.00
0.00
02.06.16.02.02
8.65
7.20
62.28
0.00
0.00
0.00
02.06.16.02.03
5.50
7.20
39.60
0.00
0.00
0.00
02.06.16.03
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.06.16.03.01
pza
2.00
34.17
68.34
0.00
0.00
0.00
02.06.16.03.02
pza
1.00
15.92
15.92
0.00
0.00
0.00
02.06.16.03.03
pza
4.00
6.18
24.72
0.00
0.00
0.00
02.06.16.03.04
pza
1.00
8.37
8.37
0.00
0.00
0.00
02.06.16.03.05
pza
4.00
6.98
27.92
0.00
0.00
0.00
02.06.16.03.06
pza
5.00
22.15
110.75
0.00
0.00
0.00
02.06.16.03.07
pza
2.00
8.49
16.98
0.00
0.00
0.00
02.06.17
INSTALACIONES ESPECIALES
02.06.17.01
pza
2.00
10.00
20.00
0.00
0.00
0.00
02.06.17.02
pza
1.00
7.47
7.47
0.00
0.00
0.00
02.06.17.03
pza
1.00
47.80
47.80
0.00
0.00
0.00
02.06.17.04
pza
1.00
18.56
18.56
0.00
0.00
0.00
02.07
TENDAL
02.07.01
MOVIMIENTO DE TIERRAS
02.07.01.01
EXCAVACIONES
02.07.01.01.01
m3
0.10
19.51
1.95
0.00
0.00
0.00
02.07.02
02.07.02.01
BASES DE CONCRETO
02.07.02.01.01
CONCRETO f'c=140kg/cm2-P/DADOS
m3
0.14
386.25
54.08
0.00
0.00
0.00
02.07.02.01.02
m2
0.60
36.93
22.16
0.00
0.00
0.00
02.07.03
ESTRUCTURA DE MADERA
02.07.03.01
COLUMNAS-VIGAS
02.07.03.01.01
und
1.00
212.01
212.01
0.00
0.00
0.00
02.08
02.08.01
MOVIMIENTO DE TIERRAS
02.08.01.01
EXCAVACIONES
02.08.01.01.01
m3
1.15
19.51
22.44
0.00
0.00
0.00
02.08.01.02
02.08.01.02.01
m3
1.38
13.66
18.85
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.08.02
02.08.02.01
BASES DE CONCRETO
02.08.02.01.01
CONCRETO f'c=140kg/cm2-P/DADOS
m3
1.23
386.25
475.09
0.00
0.00
0.00
02.08.02.01.02
m2
1.20
36.93
44.32
0.00
0.00
0.00
02.09
02.09.01
MOVIMIENTO DE TIERRAS
02.09.01.01
EXCAVACIONES
02.09.01.01.01
m3
12.58
19.51
245.44
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.09.01.02
02.09.01.02.01
02.09.02
02.09.02.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
m3
14.88
13.66
203.26
0.00
0.00
0.00
m3
8.39
500.73
4,201.12
0.00
0.00
0.00
02.09.02.02
m2
41.93
26.08
1,093.53
0.00
0.00
0.00
02.09.02.03
28.95
13.66
395.46
0.00
0.00
0.00
02.09.03
02.09.03.01
m3
0.28
500.73
140.20
0.00
0.00
0.00
02.09.03.02
m2
5.67
26.08
147.87
0.00
0.00
0.00
02.09.03.03
kg
42.28
4.55
192.37
0.00
0.00
0.00
02.09.04
REVOQUES Y REVESTIMIENTO
02.09.04.01
m2
5.67
17.72
100.47
0.00
0.00
0.00
02.09.05
PINTURA
02.09.05.01
m2
5.67
8.91
50.52
0.00
0.00
02.09.06
OTROS
02.09.06.01
REJILLAS
02.09.06.01.01
02.09.06.02
02.09.06.02.01
02.09.06.02.02
02.10
MUROS CORTAVIENTOS
02.10.01
MOVIMIENTO DE TIERRAS
02.10.01.01
EXCAVACIONES
02.10.01.01.01
02.10.01.02
RELLENOS
02.10.01.02.01
02.10.01.03
02.10.01.03.01
0.00
83.85
157.35
13,193.80
0.00
0.00
0.00
37.10
5.88
218.15
0.00
0.00
0.00
und
21.00
16.93
355.53
0.00
0.00
0.00
m3
3.56
19.51
69.46
0.00
0.00
0.00
m2
6.47
2.33
15.08
0.00
0.00
0.00
m3
4.63
13.66
63.25
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
02.10.02
02.10.02.01
CIMIENTOS CORRIDOS
02.10.02.01.01
m3
Metrado
P.Unit
2.59
ANTERIOR
Presup. S/.
283.63
Metrado
734.60
0.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
02.10.02.02
SOBRECIMIENTO
02.10.02.02.01
m3
0.88
304.76
268.19
0.00
0.00
0.00
02.10.02.02.02
m2
13.61
26.08
354.95
0.00
0.00
0.00
02.10.02.02.03
kg
9.41
4.53
42.63
0.00
0.00
0.00
02.10.03
02.10.03.01
COLUMNETAS DE CONFINAMIENTO
02.10.03.01.01
m3
0.26
460.61
119.76
0.00
0.00
0.00
02.10.03.01.02
m2
4.00
36.93
147.72
0.00
0.00
02.10.03.01.03
kg
66.56
4.55
302.85
0.00
0.00
02.10.03.02
VIGUETAS DE CONFINAMIENTO
02.10.03.02.01
m3
0.27
460.61
124.36
0.00
0.00
0.00
02.10.03.02.02
m2
4.08
36.93
150.67
0.00
0.00
0.00
02.10.03.02.03
kg
30.02
4.55
136.59
0.00
0.00
0.00
02.10.04
02.10.04.01
m2
11.57
74.81
865.55
0.00
0.00
0.00
0.00
0.00
02.10.05
REVOQUES Y REVESTIMIENTO
02.10.05.01
m2
23.14
13.44
311.00
0.00
0.00
0.00
02.10.05.02
m2
10.12
17.72
179.33
0.00
0.00
0.00
02.10.06
CONTRAZOCALOS
02.10.06.01
m2
5.44
7.17
39.00
0.00
0.00
0.00
02.10.07
PINTURA
02.10.07.01
m2
23.14
12.89
298.27
0.00
0.00
02.10.07.02
m2
10.12
13.91
140.77
0.00
0.00
02.10.07.03
m2
5.44
8.91
48.47
0.00
0.00
02.10.08
02.10.08.01
m3
0.94
460.61
432.97
0.00
0.00
0.00
02.10.08.02
m2
9.80
36.93
361.91
0.00
0.00
0.00
02.10.08.03
kg
35.58
4.55
161.89
0.00
0.00
0.00
03
ARQUITECTURA
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
03.01
EDIFICACION
03.01.01
03.01.01.01
m2
Metrado
ANTERIOR
P.Unit
265.47
Presup. S/.
74.81
Metrado
19,859.81
0.00
ACTUAL
Valorizado
Metrado
250.00
Valorizado
18,702.50
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
03.01.02
REVOQUES Y REVESTIMIENTO
03.01.02.01
m2
80.11
14.87
1,191.24
0.00
0.00
0.00
03.01.02.02
m2
386.71
13.44
5,197.38
0.00
0.00
0.00
03.01.02.03
m2
118.02
13.44
1,586.19
0.00
0.00
0.00
03.01.02.04
m2
24.49
17.72
433.96
0.00
0.00
0.00
03.01.02.05
m2
2.92
77.24
225.54
0.00
0.00
0.00
03.01.02.06
m2
1.42
65.81
93.45
0.00
0.00
0.00
03.01.02.07
m2
132.70
17.72
2,351.44
0.00
0.00
0.00
03.01.02.08
m2
111.95
17.72
1,983.75
0.00
0.00
0.00
03.01.03
CIELORRASOS
03.01.03.01
m2
248.27
65.51
16,264.17
0.00
0.00
0.00
03.01.03.02
m2
129.41
97.42
12,607.12
0.00
0.00
0.00
03.01.04
PISOS Y PAVIMENTOS
03.01.04.01
CONTRAPISOS
03.01.04.01.01
CONTRAPISO E=4 CM BASE 3 CM. MEZC. C:H 1:5 ACAB. 1 CM. PASTA C:A 1:2 (ACABADO SEMIP
m2
64.58
26.60
1,717.83
0.00
0.00
0.00
03.01.04.02
PISOS
03.01.04.02.01
m2
64.58
67.41
4,353.34
0.00
0.00
03.01.04.02.02
m2
156.42
140.75
22,016.12
0.00
0.00
03.01.05
ZOCALOS Y CONTRAZOCALOS
03.01.05.01
ZOCALOS
03.01.05.01.01
ZOCALO DE CERAMICO 30 X 30 cm
m2
80.11
72.76
5,828.80
0.00
0.00
0.00
03.01.05.01.02
m2
128.56
53.11
6,827.82
0.00
0.00
0.00
03.01.05.02
CONTRAZOCALOS
03.01.05.02.01
m2
3.14
7.17
22.51
0.00
0.00
0.00
03.01.05.02.02
m2
55.07
7.17
394.85
0.00
0.00
0.00
03.01.05.02.03
m2
3.85
72.76
280.13
0.00
0.00
0.00
03.01.05.02.04
11.96
8.85
105.85
0.00
0.00
0.00
03.01.06
CARPINTERIA DE MADERA
03.01.06.01
PUERTAS
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
03.01.06.01.01
03.01.06.01.02
m2
m2
Metrado
P.Unit
23.57
ANTERIOR
Presup. S/.
451.98
Metrado
10,653.17
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
28.43
172.82
4,913.27
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
03.01.06.02
VENTANAS
03.01.06.02.01
m2
2.55
78.03
198.98
03.01.06.02.02
m2
48.91
98.03
4,794.65
03.01.06.03
03.01.06.03.01
03.01.07
03.01.07.01
VENTANAS DE FIERRO
03.01.07.01.01
03.01.07.01.02
03.01.07.02
PUERTAS DE FIERRO
03.01.07.02.01
0.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
1.50
405.86
608.79
0.00
0.00
0.00
m2
2.30
238.99
549.68
0.00
0.00
0.00
m2
2.84
263.77
749.11
0.00
0.00
0.00
und
1.00
1,689.93
1,689.93
0.00
0.00
0.00
03.01.07.02.02
und
1.00
768.15
768.15
0.00
0.00
0.00
03.01.07.02.03
und
1.00
732.70
732.70
0.00
0.00
0.00
03.01.07.02.04
und
1.00
512.89
512.89
0.00
0.00
0.00
03.01.08
CERRAJERIA
03.01.08.01
BISAGRAS
03.01.08.01.01
und
82.00
31.32
2,568.24
0.00
0.00
0.00
03.01.08.01.02
und
40.00
14.06
562.40
0.00
0.00
0.00
03.01.08.01.03
und
12.00
23.52
282.24
0.00
0.00
0.00
03.01.08.02
CERRADURAS
03.01.08.02.01
und
9.00
61.14
550.26
0.00
0.00
0.00
03.01.08.02.02
und
11.00
35.27
387.97
0.00
0.00
0.00
03.01.08.02.03
und
128.00
5.44
696.32
0.00
0.00
03.01.08.02.04
und
3.00
92.13
276.39
0.00
0.00
0.00
03.01.08.02.05
und
20.00
9.34
186.80
0.00
0.00
0.00
03.01.08.03
ACCESORIOS DE CIERRE
03.01.08.03.01
und
2.00
100.33
200.66
0.00
0.00
0.00
03.01.09
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
P.Unit
ANTERIOR
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
03.01.09.01
und
2.00
238.51
477.02
0.00
0.00
0.00
03.01.09.02
und
2.00
124.44
248.88
0.00
0.00
0.00
03.01.09.03
und
2.00
172.83
345.66
0.00
0.00
0.00
03.01.09.04
m2
102.92
177.97
18,316.67
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
03.01.10
PINTURA
03.01.10.01
m2
407.44
10.24
4,172.19
03.01.10.02
m2
131.71
12.89
1,697.74
03.01.10.03
m2
129.51
12.80
1,657.73
03.01.10.04
m2
111.95
13.91
1,557.22
03.01.10.05
m2
55.07
8.91
490.67
03.01.10.06
m2
6.34
8.91
56.49
03.01.10.07
m2
232.02
10.78
2,501.18
03.01.10.08
m2
13.87
10.95
03.01.11
OTROS
03.01.11.01
PLACA DE OBRA
03.01.11.01.01
PLACA DE OBRA
und
1.00
03.01.11.02
SEALIZACION
03.01.11.02.01
und
12.00
03.01.11.02.02
und
53.00
40.07
2,123.71
03.01.11.02.03
und
24.00
39.18
940.32
03.01.11.02.04
PANEL DE SECTORES 0.90X1.10M. EN MADERA TIPO MDF 18MM (CON ETIQUETAS TIPO
GALLETA 0.10x0.40M EN DOBLE ACRILICO 3MM SEGUN MODELO)
und
1.00
1,506.74
1,506.74
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
151.88
0.00
0.00
0.00
320.00
320.00
0.00
0.00
0.00
31.74
380.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
03.01.11.02.05
03.01.11.03
MURAL
03.01.11.03.01
04
INSTALACIONES SANITARIAS
04.01
EDIFICACION
04.01.01
04.01.01.01
04.01.01.01.01
04.01.01.01.02
und
1.00
1,406.74
1,406.74
glb
1.00
550.00
550.00
0.00
0.00
0.00
und
8.00
322.88
2,583.04
0.00
0.00
0.00
und
3.00
142.95
428.85
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
P.Unit
ANTERIOR
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
04.01.01.01.03
und
4.00
167.15
668.60
0.00
0.00
0.00
04.01.01.01.04
pza
1.00
255.15
255.15
0.00
0.00
0.00
04.01.01.01.05
pza
2.00
225.71
451.42
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
04.01.01.02
SUMINISTRO DE ACCESORIOS
04.01.01.02.01
pza
4.00
16.50
66.00
0.00
0.00
0.00
04.01.01.02.02
pza
4.00
16.71
66.84
0.00
0.00
0.00
04.01.01.02.03
pza
8.00
18.59
148.72
0.00
0.00
0.00
04.01.01.02.04
pza
4.00
287.93
1,151.72
0.00
0.00
04.01.01.02.05
pza
1.00
177.15
177.15
0.00
0.00
04.01.01.02.06
pza
7.00
25.00
175.00
0.00
0.00
04.01.01.02.07
pza
4.00
287.39
1,149.56
0.00
0.00
0.00
04.01.01.02.08
pza
1.00
120.12
120.12
0.00
0.00
0.00
04.01.01.02.09
pza
2.00
93.56
187.12
0.00
0.00
0.00
04.01.01.02.10
pza
1.00
243.17
243.17
0.00
0.00
0.00
04.01.01.03
04.01.01.03.01
und
18.00
15.78
284.04
0.00
0.00
0.00
04.01.01.04
INSTALACION DE ACCESORIOS
04.01.01.04.01
und
36.00
15.97
574.92
0.00
0.00
04.01.02
04.01.02.01
04.01.02.01.01
pto
23.00
42.07
967.61
0.00
0.00
0.00
04.01.02.02
REDES DE DISTRIBUCION
04.01.02.02.01
18.90
7.44
140.62
0.00
0.00
0.00
04.01.02.02.02
24.80
7.40
183.52
0.00
0.00
0.00
04.01.02.02.03
33.89
4.77
161.66
0.00
0.00
0.00
04.01.02.02.04
68.69
3.85
264.46
0.00
0.00
0.00
67.55
7.40
499.87
0.00
0.00
0.00
1.00
15.95
15.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
04.01.02.03
REDES DE ALIMENTACION
04.01.02.03.01
04.01.02.04
04.01.02.04.01
pza
04.01.02.04.02
pza
6.00
9.22
55.32
04.01.02.04.03
pza
33.00
6.23
205.59
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
04.01.02.04.04
pza
57.00
5.72
326.04
0.00
0.00
0.00
04.01.02.04.05
pza
3.00
12.11
36.33
0.00
0.00
0.00
04.01.02.04.06
pza
6.00
2.85
17.10
0.00
0.00
0.00
04.01.02.04.07
pza
8.00
12.54
100.32
0.00
0.00
0.00
04.01.02.04.08
pza
7.00
6.23
43.61
0.00
0.00
0.00
04.01.02.04.09
pza
4.00
8.93
35.72
0.00
0.00
0.00
04.01.02.04.10
pza
9.00
7.82
70.38
0.00
0.00
0.00
04.01.02.04.11
pza
16.00
5.95
95.20
0.00
0.00
0.00
04.01.02.04.12
pza
2.00
14.31
28.62
0.00
0.00
0.00
04.01.02.04.13
pza
6.00
10.03
60.18
0.00
0.00
0.00
04.01.02.04.14
pza
12.00
8.75
105.00
0.00
0.00
0.00
04.01.02.04.15
pza
8.00
7.69
61.52
0.00
0.00
0.00
04.01.02.05
VALVULAS
04.01.02.05.01
pza
1.00
78.40
78.40
0.00
0.00
04.01.02.05.02
pza
3.00
51.98
155.94
0.00
0.00
0.00
04.01.02.05.03
pza
6.00
48.67
292.02
0.00
0.00
0.00
04.01.02.05.04
pza
4.00
40.49
161.96
0.00
0.00
0.00
04.01.02.05.05
pza
1.00
45.98
45.98
0.00
0.00
0.00
04.01.02.06
04.01.02.06.01
213.83
4.56
975.06
0.00
0.00
0.00
04.01.02.06.02
m2
85.53
2.33
199.28
0.00
0.00
0.00
04.01.02.06.03
m2
85.53
5.67
484.96
0.00
0.00
04.01.02.06.04
m3
42.77
54.98
2,351.49
0.00
0.00
04.01.02.07
CAJAS DE REGISTRO-CUERPO
04.01.02.07.01
m3
0.48
500.73
240.35
0.00
0.00
0.00
04.01.02.07.02
m2
4.00
26.08
104.32
0.00
0.00
0.00
04.01.02.08
04.01.02.08.01
m2
0.80
26.08
20.86
0.00
0.00
0.00
04.01.02.08.02
m3
0.31
500.73
155.23
0.00
0.00
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
04.01.02.08.03
04.01.03
04.01.03.01
04.01.03.01.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
und
4.00
16.42
65.68
0.00
0.00
0.00
pto
10.00
151.03
1,510.30
0.00
0.00
0.00
04.01.03.02
04.01.03.02.01
32.80
18.25
598.60
0.00
0.00
0.00
04.01.03.02.02
29.80
14.12
420.78
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
04.01.03.03
04.01.03.03.01
pza
19.00
3.29
62.51
0.00
0.00
0.00
04.01.03.03.02
pza
31.00
11.03
341.93
0.00
0.00
0.00
04.01.03.03.03
pza
9.00
3.42
30.78
0.00
0.00
0.00
04.01.03.03.04
pza
3.00
2.26
6.78
0.00
0.00
0.00
04.01.03.03.05
pza
8.00
4.02
32.16
0.00
0.00
0.00
04.01.03.03.06
pza
4.00
7.60
30.40
0.00
0.00
0.00
04.01.03.03.07
pza
8.00
10.00
80.00
0.00
0.00
0.00
04.01.03.03.08
pza
12.00
4.42
53.04
0.00
0.00
0.00
04.01.03.03.09
pza
6.00
2.62
15.72
0.00
0.00
0.00
04.01.03.04
VALVULAS
04.01.03.04.01
pza
4.00
48.67
194.68
0.00
0.00
0.00
04.01.03.04.02
pza
1.00
41.91
41.91
0.00
0.00
0.00
04.01.03.04.03
und
2.00
66.84
133.68
0.00
0.00
04.01.03.04.04
und
2.00
84.45
168.90
0.00
0.00
0.00
04.01.03.04.05
und
2.00
15.45
30.90
0.00
0.00
0.00
04.01.03.04.06
und
2.00
8.19
16.38
0.00
0.00
0.00
04.01.03.05
04.01.03.05.01
62.60
4.56
285.46
0.00
0.00
0.00
04.01.03.05.02
m2
25.04
2.33
58.34
0.00
0.00
0.00
04.01.03.05.03
m2
25.04
5.67
141.98
0.00
0.00
04.01.03.05.04
m3
12.52
54.98
688.35
0.00
0.00
04.01.04
DESAGUE Y VENTILACION
04.01.04.01
SALIDAS DE DESAGUE
04.01.04.01.01
pto
10.00
8.42
84.20
0.00
0.00
0.00
04.01.04.01.02
pto
27.00
8.42
227.34
0.00
0.00
0.00
04.01.04.01.03
pto
18.00
10.65
191.70
0.00
0.00
0.00
25.00
25.03
625.75
0.00
0.00
0.00
04.01.04.02
REDES DE DERIVACION
04.01.04.02.01
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
04.01.04.02.02
04.01.04.03
04.01.04.03.01
04.01.04.03.02
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
48.70
10.99
535.21
0.00
0.00
0.00
16.10
10.99
176.94
0.00
0.00
0.00
30.35
7.20
218.52
0.00
0.00
0.00
04.01.04.03.03
57.45
7.20
413.64
0.00
0.00
0.00
04.01.04.04
04.01.04.04.01
pza
7.00
34.17
239.19
0.00
0.00
0.00
04.01.04.04.02
pza
5.00
18.96
94.80
0.00
0.00
0.00
04.01.04.04.03
pza
1.00
15.92
15.92
0.00
0.00
0.00
04.01.04.04.04
pza
3.00
10.58
31.74
0.00
0.00
0.00
04.01.04.04.05
pza
46.00
6.18
284.28
0.00
0.00
0.00
04.01.04.04.06
pza
4.00
6.98
27.92
0.00
0.00
0.00
04.01.04.04.07
pza
5.00
32.90
164.50
0.00
0.00
0.00
04.01.04.04.08
pza
7.00
17.59
123.13
0.00
0.00
04.01.04.04.09
pza
21.00
8.49
178.29
0.00
0.00
0.00
04.01.04.04.10
pza
11.00
10.00
110.00
0.00
0.00
0.00
04.01.04.05
INSTALACIONES ESPECIALES
04.01.04.05.01
pza
8.00
7.47
59.76
0.00
0.00
0.00
04.01.04.05.02
pza
2.00
47.80
95.60
0.00
0.00
0.00
04.01.04.05.03
pza
5.00
14.85
74.25
0.00
0.00
0.00
04.01.04.05.04
pza
4.00
18.56
74.24
0.00
0.00
0.00
04.01.04.05.05
pza
8.00
22.34
178.72
0.00
0.00
0.00
04.01.04.06
04.01.04.06.01
177.60
4.56
809.86
0.00
0.00
0.00
04.01.04.06.02
m2
71.04
2.33
165.52
0.00
0.00
0.00
04.01.04.06.03
m2
71.04
5.67
402.80
0.00
0.00
04.01.04.06.04
m3
35.52
54.98
1,952.89
0.00
0.00
04.01.04.07
OBRAS DE CONCRETO
04.01.04.07.01
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
04.01.04.07.01.01
m3
3.65
386.25
1,409.81
04.01.04.07.01.02
m2
19.83
26.08
517.17
04.01.04.07.02
CAJAS DE INSPECCION-TAPAS
04.01.04.07.02.01
m3
0.36
386.25
139.05
04.01.04.07.02.02
m2
2.86
26.08
74.59
04.01.04.07.02.03
kg
13.00
4.55
59.15
0.00
0.00
0.00
0.00
0.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
04.02
04.02.01
MOVIMIENTO DE TIERRAS
04.02.01.01
EXCAVACIONES
04.02.01.01.01
04.02.01.02
RELLENOS
04.02.01.02.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
m3
56.94
19.51
1,110.90
0.00
56.94
1,110.90
m2
15.55
2.33
36.23
0.00
0.00
0.00
04.02.01.02.02
m3
20.96
51.62
1,081.96
0.00
0.00
0.00
04.02.01.02.03
m3
15.00
145.51
2,182.65
0.00
0.00
0.00
04.02.01.03
04.02.01.03.01
m3
43.18
11.38
491.39
0.00
0.00
04.02.02
04.02.02.01
SOLADOS
04.02.02.01.01
m2
7.17
32.36
232.02
0.00
0.00
04.02.02.02
04.02.02.02.01
CONCRETO f'c=140kg/cm2-P/LOSAS
m3
1.19
386.25
459.64
0.00
0.00
04.02.03
04.02.03.01
04.02.03.01.01
CONCRETO f'c=140kg/cm2-P/POZO
m3
1.10
386.25
424.88
0.00
0.00
04.02.03.01.02
m2
12.80
36.64
468.99
0.00
0.00
04.02.03.01.03
kg
40.60
4.55
184.73
0.00
0.00
0.00
04.02.03.02
04.02.03.02.01
CONCRETO f'c=140kg/cm2-P/POZO
m3
1.35
386.25
521.44
0.00
0.00
0.00
04.02.03.02.02
m2
10.90
36.64
399.38
0.00
0.00
04.02.03.02.03
kg
49.07
4.55
223.27
0.00
0.00
0.00
04.02.03.03
04.02.03.03.01
CONCRETO f'c=140kg/cm2-P/CAJA
m3
0.18
386.25
69.53
0.00
0.00
0.00
04.02.03.03.02
m2
3.27
36.64
119.81
0.00
0.00
04.02.03.03.03
kg
2.55
4.55
11.60
0.00
0.00
04.02.03.04
BIOFILTRO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
04.02.03.04.01
CONCRETO f'c=140kg/cm2-P/BIOFILTRO
m3
1.25
386.25
482.81
0.00
0.00
0.00
04.02.03.04.02
m2
17.64
36.64
646.33
0.00
0.00
0.00
04.02.03.04.03
kg
62.47
4.55
284.24
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
04.02.03.05
TAPA DE BIODIGESTOR
04.02.03.05.01
CONCRETO f'c=140kg/cm2-P/TAPAS
m3
0.16
386.25
61.80
0.00
0.00
0.00
04.02.03.05.02
m2
1.50
36.64
54.96
0.00
0.00
0.00
04.02.03.05.03
kg
7.83
4.55
35.63
0.00
0.00
0.00
04.02.04
REVOQUES Y REVESTIMIENTOS
04.02.04.01
04.02.04.01.01
m2
8.89
17.85
158.69
0.00
0.00
0.00
04.02.04.02
04.02.04.02.01
m2
6.16
15.17
93.45
0.00
0.00
04.02.04.03
BIOFILTRO
04.02.04.03.01
m2
9.48
15.17
143.81
0.00
0.00
0.00
04.02.05
BIODIGESTOR
04.02.05.01
und
1.00
5,374.45
5,374.45
0.00
0.00
0.00
04.02.06
BIOFILTRO
04.02.06.01
und
1.00
300.51
300.51
0.00
0.00
04.02.07
TUBERIAS Y ACCESORIOS
04.02.07.01
7.90
14.63
115.58
0.00
0.00
0.00
04.02.07.02
30.00
15.13
453.90
0.00
0.00
0.00
04.02.07.03
5.00
9.97
49.85
0.00
0.00
0.00
04.02.07.04
glb
1.00
103.86
103.86
0.00
0.00
0.00
04.03
04.03.01
MOVIMIENTO DE TIERRAS
04.03.01.01
EXCAVACIONES
04.03.01.01.01
m3
280.00
19.51
5,462.80
0.00
280.00
5,462.80
04.03.01.02
RELLENOS
04.03.01.02.01
m2
280.00
2.33
652.40
0.00
280.00
652.40
04.03.01.02.02
m2
280.00
5.67
1,587.60
280.00
1,587.60
04.03.01.02.03
m3
112.00
54.98
6,157.76
112.00
6,157.76
04.03.01.02.04
m3
140.00
51.62
7,226.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
04.03.02
04.03.02.01
REDES DE DISTRIBUCION
04.03.02.01.01
360.00
9.98
3,592.80
0.00
0.00
0.00
04.03.02.01.02
200.00
12.25
2,450.00
0.00
0.00
0.00
04.03.02.02
04.03.02.02.01
pza
1.00
14.84
14.84
0.00
0.00
0.00
04.03.02.02.02
pza
1.00
5.48
5.48
0.00
0.00
0.00
04.04
04.04.01
836.43
1.50
1,254.65
0.00
0.00
0.00
04.04.02
177.60
0.79
140.30
0.00
0.00
0.00
05
05.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05.01.01
05.01.01.01
m2
14.40
0.89
12.82
05.01.01.02
m3
8.64
19.51
168.57
05.01.01.03
36.00
11.98
431.28
05.01.01.04
36.00
9.15
329.40
05.01.02
05.01.02.01
m3
0.06
19.51
1.17
0.00
0.00
0.00
05.01.02.02
m3
0.09
306.13
27.55
0.00
0.00
0.00
05.01.02.03
m2
0.54
111.24
60.07
0.00
0.00
0.00
05.01.02.04
TARRAJEO MUROS EXT. FROTACHADO MEZ. C:A 1:5, E=1.0 CM MURETE PARA SUMINISTRO E
m2
2.10
17.18
36.08
0.00
0.00
0.00
05.01.02.05
und
1.00
127.30
127.30
0.00
0.00
0.00
05.01.02.06
m2
2.10
8.91
18.71
0.00
0.00
0.00
05.01.03
ACOMETIDA ELECTRICA
05.01.03.01
glb
1.00
38,500.00
38,500.00
0.00
0.00
0.00
05.02
05.02.01
SALIDA
05.02.01.01
pto
42.00
33.86
1,422.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
05.02.01.02
pto
50.00
38.36
1,918.00
0.00
0.00
0.00
05.02.01.03
pto
18.00
29.71
534.78
0.00
0.00
0.00
05.02.01.04
pto
4.00
33.20
132.80
0.00
0.00
0.00
05.02.01.05
pto
3.00
38.64
115.92
0.00
0.00
0.00
05.02.01.06
pto
1.00
30.83
30.83
0.00
0.00
0.00
05.02.01.07
pto
2.00
25.22
50.44
0.00
0.00
0.00
05.02.01.08
pto
2.00
57.34
114.68
0.00
0.00
0.00
05.02.01.09
pto
7.00
39.14
273.98
0.00
0.00
0.00
05.02.01.10
pto
12.00
39.68
476.16
0.00
0.00
0.00
05.02.01.11
pto
2.00
47.89
95.78
0.00
0.00
0.00
05.02.01.12
pto
2.00
62.65
125.30
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
05.02.02
05.02.02.01
05.02.02.02
05.02.02.03
05.02.03
05.02.03.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
20.00
5.55
111.00
50.00
7.34
367.00
586.40
5.37
3,148.97
316.00
4.52
05.02.03.02
270.40
05.02.03.03
82.00
05.02.03.04
05.02.04
TABLEROS DE DISTRIBUCION
05.02.04.01
05.02.04.02
05.02.04.03
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,428.32
0.00
0.00
0.00
5.82
1,573.73
0.00
0.00
0.00
8.03
658.46
0.00
0.00
0.00
10.00
12.91
129.10
0.00
0.00
und
1.00
2,296.61
2,296.61
0.00
0.00
0.00
und
1.00
1,033.40
1,033.40
0.00
0.00
0.00
und
1.00
1,014.20
1,014.20
0.00
0.00
0.00
05.02.04.04
und
1.00
1,014.20
1,014.20
0.00
0.00
0.00
05.02.04.05
und
1.00
1,304.26
1,304.26
0.00
0.00
05.02.04.06
und
1.00
1,061.41
1,061.41
0.00
0.00
0.00
05.02.04.07
und
1.00
975.73
975.73
0.00
0.00
0.00
05.03
INSTALACION DE PARARRAYOS
05.03.01
MOVIMIENTO DE TIERRAS
05.03.01.01
EXCAVACIONES
05.03.01.01.01
m3
1.33
19.51
25.95
0.00
0.00
0.00
05.03.01.02
RELLENOS
05.03.01.02.01
m2
1.39
2.33
3.24
0.00
0.00
0.00
05.03.01.02.02
m3
0.20
51.62
10.32
0.00
0.00
0.00
05.03.01.03
05.03.01.03.01
m3
1.36
11.38
15.48
0.00
0.00
0.00
05.03.02
05.03.02.01
SOLADOS
05.03.02.01.01
m2
0.64
32.36
20.71
0.00
0.00
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
05.03.02.02
05.03.02.02.01
CONCRETO f'c=140kg/cm2-P/DADOS
05.03.03
05.03.03.01
ZAPATAS
05.03.03.01.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
m3
0.75
386.25
289.69
0.00
0.00
0.00
m3
0.19
537.80
102.18
0.00
0.00
0.00
05.03.03.01.02
kg
2.91
4.55
13.24
0.00
0.00
0.00
05.03.03.02
COLUMNAS
05.03.03.02.01
m3
0.20
460.61
92.12
0.00
0.00
0.00
05.03.03.02.02
m2
1.60
36.93
59.09
0.00
0.00
0.00
05.03.03.02.03
kg
7.37
4.55
33.53
0.00
0.00
0.00
05.03.04
ESTRUCTURAS METALICAS
05.03.04.01
und
1.00
3,872.21
3,872.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05.03.05
PINTURA
05.03.05.01
m2
1.02
8.19
8.35
05.03.05.02
m2
1.02
8.91
9.09
05.03.06
PARARRAYOS
05.03.06.01
und
1.00
5,234.35
5,234.35
0.00
0.00
0.00
05.04
05.04.01
m3
59.02
19.51
1,151.48
0.00
0.00
0.00
05.04.02
m2
59.02
2.33
137.52
0.00
0.00
0.00
05.04.03
m2
59.02
5.67
334.64
0.00
0.00
0.00
05.04.04
147.55
11.98
1,767.65
0.00
0.00
0.00
05.04.05
POZO DE TIERRA
6.00
873.20
5,239.20
0.00
0.00
0.00
05.04.06
147.55
29.16
4,302.56
0.00
0.00
0.00
05.04.07
BENTONITA Y SAL
147.55
8.44
1,245.32
0.00
0.00
0.00
05.04.08
ACCESORIOS DE TERMOFUSION
und
24.00
89.46
2,147.04
0.00
0.00
05.05
ARTEFACTOS
05.05.01
LAMPARAS
und
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
05.05.01.01
und
7.00
88.18
617.26
0.00
0.00
0.00
05.05.01.02
und
11.00
138.18
1,519.98
0.00
0.00
0.00
05.05.01.03
und
17.00
343.31
5,836.27
0.00
0.00
0.00
05.05.01.04
LUZ DE EMERGENCIA
und
4.00
149.08
596.32
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
05.05.02
REFLECTORES
05.05.02.01
05.06
05.06.01
05.06.01.01
SALIDA
05.06.01.01.01
05.06.01.02
05.06.01.02.01
05.06.01.03
05.06.01.03.01
05.06.02
SISTEMAS DE SEGURIDAD
05.06.02.01
TRABAJOS PRELIMINARES
05.06.02.01.01
05.06.02.02
MOVIMIENTO DE TIERRAS
05.06.02.02.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
und
8.00
213.18
1,705.44
0.00
0.00
0.00
pto
1.00
31.02
31.02
0.00
0.00
0.00
20.00
7.32
146.40
0.00
0.00
0.00
20.00
5.82
116.40
0.00
0.00
0.00
m2
54.40
0.89
48.42
0.00
0.00
0.00
m3
21.76
19.51
424.54
0.00
0.00
0.00
05.06.02.02.02
136.00
11.98
1,629.28
0.00
0.00
05.06.02.03
SISTEMAS ELECTROMECANICOS
05.06.02.03.01
glb
1.00
339.98
339.98
0.00
0.00
05.06.02.03.02
glb
1.00
346.58
346.58
0.00
0.00
0.00
05.06.02.03.03
glb
1.00
294.17
294.17
0.00
0.00
0.00
05.06.02.03.04
glb
1.00
294.17
294.17
0.00
0.00
0.00
05.06.02.04
TUBERIAS
05.06.02.04.01
136.00
8.64
1,175.04
0.00
0.00
0.00
05.06.02.04.02
120.00
8.64
1,036.80
0.00
0.00
05.06.02.04.03
85.00
8.64
734.40
0.00
0.00
0.00
05.06.02.04.04
12.00
7.32
87.84
0.00
0.00
0.00
05.06.02.05
SALIDAS
05.06.02.05.01
pto
4.00
22.72
90.88
0.00
0.00
0.00
05.06.02.06
CABLEADO DE DATA
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
05.06.02.06.01
136.00
1.46
198.56
0.00
0.00
0.00
05.06.02.06.02
120.00
2.25
270.00
0.00
0.00
0.00
05.06.02.06.03
85.00
2.25
191.25
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
05.06.02.07
05.06.02.07.01
05.07
VARIOS
05.07.01
PRUEBAS ELECTRICAS
05.07.01.01
05.07.02
05.07.02.01
06
INSTALACIONES DE COMUNICACIONES
06.01
06.01.01
TRABAJOS PRELIMINARES
06.01.01.01
06.01.02
MOVIMIENTO DE TIERRAS
06.01.02.01
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
und
1.00
273.40
273.40
0.00
0.00
0.00
und
1.00
1,000.00
1,000.00
0.00
0.00
0.00
mes
1.00
2,000.00
2,000.00
0.00
0.00
0.00
m2
30.60
0.89
27.23
0.00
0.00
0.00
m3
15.30
19.51
298.50
0.00
0.00
0.00
06.01.02.02
76.50
11.98
916.47
0.00
0.00
06.01.03
CABLEADO Y ACCESORIOS
06.01.03.01
580.00
1.51
875.80
0.00
0.00
0.00
06.01.03.02
glb
1.00
1,431.47
1,431.47
0.00
0.00
0.00
06.01.03.03
und
1.00
905.75
905.75
0.00
0.00
06.01.04
06.01.04.01
30.00
17.18
515.40
0.00
0.00
0.00
06.01.04.02
20.00
10.91
218.20
0.00
0.00
0.00
06.01.04.03
240.00
7.32
1,756.80
0.00
0.00
0.00
06.01.05
SALIDAS DE COMUNICACIONES
06.01.05.01
pto
4.00
62.65
250.60
0.00
0.00
0.00
06.01.05.02
pto
18.00
62.65
1,127.70
0.00
0.00
0.00
06.01.06
PATCH PANEL
06.01.06.01
und
1.00
64.32
64.32
0.00
0.00
0.00
06.01.07
RACK DE COMUNICACIONES
06.01.07.01
und
1.00
162.79
162.79
0.00
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
06.02
VARIOS
06.02.01
06.02.01.01
mes
Metrado
P.Unit
1.00
ANTERIOR
Presup. S/.
2,000.00
Metrado
2,000.00
0.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
07
EQUIPAMIENTO
07.01
MOBILIARIO BASICO
07.01.01
und
4.00
240.00
960.00
0.00
0.00
0.00
07.01.02
und
2.00
270.00
540.00
0.00
0.00
0.00
07.01.03
und
4.00
540.00
2,160.00
0.00
0.00
0.00
07.01.04
und
4.00
549.68
2,198.72
0.00
0.00
07.01.05
und
5.00
479.51
2,397.55
0.00
0.00
0.00
07.01.06
und
1.00
225.00
225.00
0.00
0.00
0.00
07.01.07
und
6.00
558.00
3,348.00
0.00
0.00
0.00
07.01.08
und
4.00
55.00
220.00
0.00
0.00
0.00
07.01.09
und
18.00
150.96
2,717.28
0.00
0.00
0.00
07.01.10
und
80.00
28.49
2,279.20
0.00
0.00
0.00
07.01.11
und
6.00
66.00
396.00
0.00
0.00
0.00
07.01.12
und
1.00
1,325.95
1,325.95
0.00
0.00
0.00
07.01.13
und
1.00
345.00
345.00
0.00
0.00
07.02
EQUIPAMIENTO BASICO
07.02.01
OFICINAS
07.02.01.01
CAMARA WEB 5MPX 1080P HD, CAP. VIDEO 720P, ZOOM DIGITAL 3X, MICROFONO INCORP.
und
2.00
99.00
198.00
0.00
0.00
07.02.01.02
CMARA DE FOTOS SEMI PROFESIONAL 12.1 MPX CMOS 1/1.7 " SX(28mm-140mm) 4.0X +
FILMADORA PANT. 3" LCD
und
1.00
649.00
649.00
0.00
0.00
07.02.01.03
und
1.00
120.00
120.00
0.00
0.00
07.02.01.04
und
1.00
840.00
840.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
07.02.01.05
MICROFONO DE PERIFONEO
und
1.00
50.00
50.00
0.00
0.00
0.00
07.02.01.06
und
1.00
540.00
540.00
0.00
0.00
0.00
07.02.01.07
und
1.00
189.90
189.90
0.00
0.00
und
0.00
0.00
und
0.00
0.00
07.02.01.08
07.02.01.09
0.00
1.00
1,200.00
1,200.00
0.00
1.00
2,846.00
2,846.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
07.02.01.10
COMPUTADORA PORTATIL, PROCES 4 NUCLEOS, RAM: 8GB (2X4GB), PANT: 15.6" LED,
C/SONIDO, CAMARA WEB, WIFI, BLUETOOTH, GRABADOR,LECTOR DVD+/-RW
und
Metrado
ANTERIOR
P.Unit
2.00
Presup. S/.
3,100.00
Metrado
6,200.00
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
IMPRESORA MULTIFUNCIONAL MONOCROMATICO -EN A3 EN RED/IMPRESORA, ESCANER,
COPIADORA - LASER, V 30PPM, 600X600DPI, MEMORIA 1GB
und
07.02.01.12
und
1.00
118.18
118.18
07.02.01.13
und
4.00
720.00
2,880.00
07.02.01.14
BANDERAS(03 UNIDADES)
glb
1.00
720.00
720.00
0.00
0.00
0.00
07.02.01.15
und
3.00
119.90
359.70
0.00
0.00
0.00
07.02.01.16
und
1.00
119.90
119.90
0.00
0.00
0.00
07.02.01.17
und
2.00
565.00
1,130.00
0.00
0.00
07.02.01.18
und
1.00
3,345.30
3,345.30
0.00
0.00
07.02.01.19
und
3.00
520.38
1,561.14
0.00
0.00
07.02.01.20
und
1.00
500.00
500.00
0.00
0.00
07.02.01.21
SWITCH DE 24P PoE/24 PUERTOS GI, RAQUEABLE CAP. 12Gbps FLASH 32 MB MIN. DRAM 128
MB
und
1.00
4,661.02
4,661.02
0.00
0.00
07.02.02
DORMITORIOS
07.02.02.01
und
10.00
27.50
275.00
0.00
0.00
07.02.02.02
und
20.00
65.78
1,315.60
0.00
0.00
07.02.02.03
und
40.00
85.00
3,400.00
0.00
0.00
0.00
07.02.02.04
und
10.00
82.39
823.90
0.00
0.00
0.00
07.02.02.05
und
10.00
240.90
2,409.00
0.00
0.00
07.02.02.06
und
3.00
209.73
629.19
0.00
0.00
0.00
07.02.02.07
und
2.00
225.73
451.46
0.00
0.00
0.00
07.02.02.08
und
4.00
257.73
1,030.92
0.00
0.00
0.00
07.02.02.09
und
2.00
597.73
1,195.46
0.00
0.00
0.00
07.02.02.10
und
4.00
657.73
2,630.92
0.00
0.00
0.00
07.02.02.11
und
7.00
66.88
468.16
0.00
0.00
0.00
07.02.02.12
und
10.00
17.14
171.40
0.00
0.00
0.00
07.02.03
COCINA
07.02.01.11
1.00
5,827.97
5,827.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
07.02.03.01
und
1.00
76.89
76.89
0.00
0.00
0.00
07.02.03.02
und
1.00
104.50
104.50
0.00
0.00
0.00
07.02.03.03
und
1.00
143.00
143.00
0.00
0.00
0.00
07.02.03.04
und
1.00
19.44
19.44
0.00
0.00
0.00
07.02.03.05
und
2.00
16.39
32.78
0.00
0.00
0.00
07.02.03.06
und
1.00
5.79
5.79
0.00
0.00
0.00
07.02.03.07
und
1.00
9.79
9.79
0.00
0.00
0.00
07.02.03.08
und
12.00
3.52
42.24
0.00
0.00
0.00
07.02.03.09
und
12.00
3.52
42.24
0.00
0.00
0.00
07.02.03.10
und
12.00
3.52
42.24
0.00
0.00
0.00
07.02.03.11
und
12.00
3.52
42.24
0.00
0.00
0.00
07.02.03.12
jgo
1.00
27.39
27.39
0.00
0.00
0.00
07.02.03.13
und
12.00
1.80
21.60
0.00
0.00
0.00
07.02.03.14
und
12.00
1.80
21.60
0.00
0.00
07.02.03.15
und
12.00
1.21
14.52
0.00
0.00
0.00
07.02.03.16
und
1.00
7.59
7.59
0.00
0.00
0.00
07.02.03.17
und
12.00
3.07
36.84
0.00
0.00
0.00
07.02.03.18
und
1.00
22.99
22.99
0.00
0.00
0.00
07.02.03.19
und
1.00
71.50
71.50
0.00
0.00
07.02.03.20
und
1.00
17.49
17.49
0.00
0.00
0.00
07.02.03.21
und
1.00
7.59
7.59
0.00
0.00
0.00
07.02.03.22
und
4.00
3.30
13.20
0.00
0.00
0.00
07.02.03.23
COCINA SEMIINDUSTRIAL ALTA 03 HORNILLAS LARGO 0.90M X ANCHO 55CM X ALTO 70CM
und
1.00
450.00
450.00
0.00
0.00
07.02.03.24
und
1.00
2,699.00
2,699.00
0.00
0.00
0.00
07.02.04
OFICINA 2
07.02.04.01
und
3.00
230.00
690.00
0.00
0.00
0.00
07.02.04.02
und
1.00
385.00
385.00
0.00
0.00
07.02.05
HERRAMIENTAS
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
07.02.05.01
und
2.00
7.94
15.88
07.02.05.02
und
2.00
17.38
34.76
07.02.05.03
und
5.00
32.90
164.50
07.02.05.04
und
2.00
59.90
119.80
07.02.05.05
und
1.00
1,023.41
1,023.41
und
07.02.05.07
und
3.00
13.09
39.27
07.02.05.08
und
2.00
57.39
114.78
07.02.05.09
und
2.00
35.00
70.00
und
07.02.05.11
und
1.00
43.89
43.89
07.02.05.12
und
3.00
235.00
705.00
07.02.05.13
und
1.00
188.97
188.97
07.02.05.14
und
9.00
19.87
178.83
07.02.06
SANITARIAS
07.02.06.01
und
1.00
751.25
751.25
07.02.06.02
und
1.00
2,529.89
2,529.89
07.02.06.03
und
1.00
1,263.85
1,263.85
07.02.07
ELECTRICOS
07.02.07.01
UPS TIPO TOWER POT. MIN. 2500 VA Ventrada=100-240V Vsalida= 220VAC, 10 MINUTOS
AUTONOMIA C/PUERTOS DE COM. RJ45,RS232
und
1.00
3,427.55
3,427.55
07.02.07.02
und
1.00
1,488.81
1,488.81
07.02.07.03
GENERADOR ELECTRICO 8HP 6kW prime 7.5kVA MONOFASICO 220V, 60HZ, 4T-REFRIGERADO
POR AIRE CIL. 150 A 250CM3 CAP. TANQ. 3.6 - 6.8 LT. GASOLINA
und
1.00
6,045.43
6,045.43
07.02.05.06
07.02.05.10
ACTUAL
Valorizado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
153.89
307.78
0.00
0.00
0.00
0.00
2.00
30.69
61.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
07.02.07.04
und
6.00
204.44
1,226.64
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
ANTERIOR
P.Unit
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
Valorizado
07.02.07.05
und
1.00
474.30
474.30
0.00
0.00
0.00
07.02.07.06
PULSADOR DE EMERGENCIA
und
4.00
26.00
104.00
0.00
0.00
0.00
07.02.07.07
und
2.00
46.47
92.94
0.00
0.00
0.00
07.02.07.08
und
4.00
3,442.35
13,769.40
0.00
0.00
07.02.07.09
und
1.00
1,883.87
1,883.87
0.00
0.00
0.00
07.02.07.10
und
2.00
12.00
24.00
0.00
0.00
0.00
07.02.07.11
und
1.00
1,280.30
1,280.30
0.00
0.00
0.00
07.02.07.12
DETECTOR DE TEMPERATURA
und
1.00
216.00
216.00
0.00
0.00
0.00
07.02.07.13
und
1.00
2,383.90
2,383.90
0.00
0.00
0.00
07.02.07.14
und
1.00
465.00
465.00
0.00
0.00
0.00
0.00
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
07.02.08
MOVILIDAD
07.02.08.01
MOTO LINEAL CILIN. 124CC -140CC, 4 T, MONOCILINDRICO, OHC, POT. MAX. 11.13HP@7,000
RPM -12.0HP@ 7,500 RPM
und
Metrado
P.Unit
1.00
ANTERIOR
Presup. S/.
6,690.00
Metrado
Valorizado
6,690.00
Metrado
Valorizado
0.00
0.00
18.03%
170,783.26
0.00
87.09%
947,113.25
GASTOS GENERALES
9.37%
101,916.00
96.47%
GASTOS DE SUPERVISION
3.53%
100.00%
AVANCE FISICO %
ACTUAL
7.12%
67,425.02
1,049,029.25
38,432.00
1,087,461.25
100%
7.12%
RESIDENTE DE OBRA
NOMBRE:
DNI
DNI 29224670
18.03%
FECHA DE PRESENTACION
OCTUBRE-2015
1,085,632.44
8/17/2015
PLAZO DE EJECUCION
120 DIAS
12/18/2015
SALDO
Valorizado
Metrado
Valorizado
1.00
9,894.660
100%
0.00
0.00
0%
2.00
1,304.820
100%
0.00
0.00
0%
1.00
1,134.340
100%
0.00
0.00
0%
0.50
883.125
50%
0.50
883.13
50%
2500.00
1,900.000
100%
0.00
0.00
0%
303.10
5,913.481
100%
0.00
0.00
0%
0.46
18,079.260
46%
0.54
21,223.48
54%
800.00
712.000
100%
0.00
0.00
0%
380.00
338.200
48%
420.00
373.80
53%
1.00
100.000
25%
3.00
300.00
75%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
2.00
3,100.060
50%
2.00
3,100.06
50%
2.00
226.340
50%
2.00
226.34
50%
1.00
200.830
25%
3.00
602.49
75%
1.00
100.000
25%
3.00
300.00
75%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.20
15.400
20%
0.80
61.60
80%
0.00
0.000
0%
1.00
100.00
100%
0.00
0.000
0%
4.00
400.00
100%
0.00
0.000
0%
30.00
84.00
100%
0.00
0.000
0%
4.00
400.00
100%
0.00
0.000
0%
1.00
509.08
100%
0.00
0.000
0%
4.00
120.44
100%
0.50
107.690
50%
0.50
107.69
50%
76.98
1,501.880
100%
0.00
0.00
0%
1626.40
31,731.064
100%
0.00
0.00
0%
22.58
1,165.580
100%
0.00
0.00
0%
473.90
10,018.246
100%
0.00
0.00
0%
553.07
1,288.653
100%
0.00
0.00
0%
68.00
773.840
100%
0.00
0.00
0%
71.41
2,310.828
100%
0.00
0.00
0%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
9.22
2,809.887
100%
0.00
0.00
0%
140.47
3,663.458
100%
0.00
0.00
0%
90.05
407.927
100%
0.00
0.00
0%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
0.04
21.51
100%
0.00
0.000
0%
1.93
50.33
100%
0.00
0.000
0%
18.14
9,083.24
100%
0.00
0.000
0%
34.30
894.54
100%
0.00
0.000
0%
131.30
1,793.56
100%
0.00
0.000
0%
335.55
1,241.54
100%
0.00
0.000
0%
7.57
3,790.53
100%
0.00
0.000
0%
11.26
293.66
100%
0.00
0.000
0%
54.43
743.51
100%
0.00
0.000
0%
181.88
672.96
100%
0.00
0.000
0%
1.17
585.85
100%
0.00
0.000
0%
2.37
61.81
100%
0.00
0.000
0%
51.08
189.00
100%
0.00
0.000
0%
252.74
8,972.27
100%
10.87
5,845.886
100%
0.00
0.00
0%
354.52
1,613.066
100%
0.00
0.00
0%
17.96
9,658.888
100%
0.00
0.00
0%
71.91
2,634.782
100%
0.00
0.00
0%
1824.37
8,300.884
100%
0.00
0.00
0%
44.23
305.629
100%
0.00
0.00
0%
AVANCES
ACUMULADO
Metrado
Valorizado
SALDO
%
Metrado
Valorizado
9.75
4,490.948
100%
0.00
0.00
0%
118.45
4,374.359
100%
0.00
0.00
0%
18.61
2,213.660
100%
0.00
0.00
0%
1736.75
7,902.213
100%
0.00
0.00
0%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
12.39
5,706.958
100%
0.00
0.00
0%
116.35
4,296.806
100%
0.00
0.00
0%
1586.15
7,216.983
100%
0.00
0.00
0%
5.17
2,381.354
100%
0.00
0.00
0%
79.74
2,944.798
100%
0.00
0.00
0%
1083.74
4,931.017
100%
0.00
0.00
0%
2.10
967.281
100%
0.00
0.00
0%
23.19
856.407
100%
0.00
0.00
0%
351.96
1,601.418
100%
0.00
0.00
0%
0.59
271.760
100%
0.00
0.00
0%
11.89
439.098
100%
0.00
0.00
0%
35.45
161.298
100%
0.00
0.00
0%
0.00
0.000
0%
0.74
340.85
100%
0.00
0.000
0%
10.72
395.89
100%
0.00
0.000
0%
40.85
185.87
100%
3.00
4,544.790
100%
0.00
0.00
0%
2.00
2,910.000
100%
0.00
0.00
0%
6.00
8,763.960
100%
0.00
0.00
0%
0.00
0.000
0%
11.00
1,275.67
100%
419.20
8,698.400
100%
0.00
0.00
0%
0.00
0.000
0%
124.00
1,505.36
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
0.00
%
0.000
Metrado
0%
Valorizado
26.00
%
349.96
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
5.00
204.30
100%
0.00
0.000
0%
27.00
1,210.14
100%
0.00
0.000
0%
6.00
241.92
100%
0.00
0.000
0%
445.48
52,330.54
100%
0.00
0.000
0%
33.70
1,198.04
100%
0.00
0.000
0%
30.34
2,126.23
100%
0.00
0.000
0%
18.96
1,126.41
100%
0.00
0.000
0%
67.40
7,600.02
100%
0.00
0.000
0%
65.50
987.09
100%
6.30
122.913
100%
0.00
0.00
0%
0.00
0.000
0%
6.86
2,649.68
100%
0.00
0.000
0%
0.41
205.30
100%
0.00
0.000
0%
12.71
331.48
100%
0.00
0.000
0%
43.03
195.79
100%
0.00
0.000
0%
197.00
53,727.81
100%
0.00
0.000
0%
1.00
1,165.19
100%
0.00
0.000
0%
15.38
228.39
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
0.00
0.000
Metrado
0%
Valorizado
0.28
5.46
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
0.34
131.33
100%
0.00
0.000
0%
0.90
23.47
100%
0.00
0.000
0%
15.00
2,415.90
100%
0.00
0.000
0%
1.00
649.34
100%
0.00
0.000
0%
32.00
405.12
100%
0.00
0.000
0%
32.00
405.12
100%
0.00
0.000
0%
1.78
34.73
100%
0.00
0.000
0%
0.75
38.72
100%
0.00
0.000
0%
1.24
14.11
100%
0.00
0.000
0%
1.76
56.95
100%
0.00
0.000
0%
0.72
360.53
100%
0.00
0.000
0%
1.32
34.43
100%
0.00
0.000
0%
3.60
49.18
100%
0.00
0.000
0%
0.78
359.28
100%
0.00
0.000
0%
3.42
126.30
100%
0.00
0.000
0%
37.86
172.26
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
1.00
583.33
100%
0.00
0.000
0%
2.00
1,166.66
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
3.08
33.73
100%
0.00
0.000
0%
3.08
27.44
100%
13.75
268.263
100%
0.00
0.00
0%
6.25
14.563
100%
0.00
0.00
0%
2.50
129.050
100%
0.00
0.00
0%
0.00
0.000
0%
6.25
132.13
100%
7.30
83.074
50%
7.33
83.42
50%
0.00
0.000
0%
10.24
378.16
100%
6.25
202.250
100%
0.00
0.00
0%
0.00
0.000
0%
0.47
235.34
100%
0.00
0.000
0%
2.71
70.68
100%
0.00
0.000
0%
2.35
32.10
100%
0.00
0.000
0%
5.14
2,764.29
100%
0.00
0.000
0%
24.00
886.32
100%
0.00
0.000
0%
160.52
730.37
100%
0.00
0.000
0%
1.20
552.73
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
20.48
756.33
100%
0.00
0.000
0%
222.77
1,013.60
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
2.00
921.22
100%
0.00
0.000
0%
21.00
775.53
100%
0.00
0.000
0%
248.11
1,128.90
100%
0.00
0.000
0%
1.48
681.70
100%
0.00
0.000
0%
9.50
350.84
100%
0.00
0.000
0%
67.16
305.58
100%
0.00
0.000
0%
0.05
25.81
100%
0.00
0.000
0%
0.92
22.98
100%
0.00
0.000
0%
9.05
41.18
100%
0.00
0.000
0%
10.81
808.70
100%
0.00
0.000
0%
10.01
134.53
100%
0.00
0.000
0%
7.21
96.90
100%
0.00
0.000
0%
13.05
197.97
100%
0.00
0.000
0%
13.20
233.90
100%
0.00
0.000
0%
19.10
338.45
100%
0.00
0.000
0%
0.17
3.01
100%
0.00
0.000
0%
12.50
330.50
100%
0.00
0.000
0%
8.16
235.91
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
3.18
22.80
100%
0.00
0.000
0%
0.73
5.23
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
1.54
696.05
100%
0.00
0.000
0%
0.32
31.37
100%
0.00
0.000
0%
3.00
70.56
100%
0.00
0.000
0%
1.00
61.14
100%
0.00
0.000
0%
1.00
100.33
100%
0.00
0.000
0%
10.01
113.11
100%
0.00
0.000
0%
7.21
64.24
100%
0.00
0.000
0%
16.15
182.50
100%
0.00
0.000
0%
16.15
143.90
100%
0.00
0.000
0%
1.00
933.70
100%
0.00
0.000
0%
1.00
2,150.82
100%
0.00
0.000
0%
1.00
743.76
100%
0.00
0.000
0%
1.00
125.89
100%
0.00
0.000
0%
9.30
69.19
100%
0.00
0.000
0%
10.50
67.52
100%
0.00
0.000
0%
2.00
31.90
100%
0.00
0.000
0%
7.00
64.54
100%
0.00
0.000
0%
3.00
20.34
100%
0.00
0.000
0%
1.00
13.28
100%
0.00
0.000
0%
1.00
12.11
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
4.00
11.40
100%
0.00
0.000
0%
1.00
6.61
100%
0.00
0.000
0%
1.00
83.40
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
1.00
82.94
100%
0.00
0.000
0%
2.00
91.68
100%
0.00
0.000
0%
1.00
104.10
100%
0.00
0.000
0%
1.00
84.67
100%
0.00
0.000
0%
1.00
102.70
100%
0.00
0.000
0%
14.00
33.46
100%
0.00
0.000
0%
7.00
17.57
100%
0.00
0.000
0%
7.00
64.40
100%
0.00
0.000
0%
3.24
63.21
100%
0.00
0.000
0%
3.24
7.55
100%
0.00
0.000
0%
0.43
22.20
100%
0.00
0.000
0%
4.86
102.74
100%
0.00
0.000
0%
3.65
49.86
100%
0.00
0.000
0%
2.59
734.60
100%
0.00
0.000
0%
0.60
182.86
100%
0.00
0.000
0%
8.05
209.94
100%
0.00
0.000
0%
0.51
255.37
100%
0.00
0.000
0%
2.77
72.24
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
2.35
32.10
100%
0.00
0.000
0%
3.08
109.34
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
0.26
119.76
100%
0.00
0.000
0%
6.09
224.90
100%
0.00
0.000
0%
37.76
171.81
100%
0.00
0.000
0%
0.26
119.76
100%
0.00
0.000
0%
3.08
113.74
100%
0.00
0.000
0%
38.77
176.40
100%
0.00
0.000
0%
0.63
290.18
100%
0.00
0.000
0%
7.80
288.05
100%
0.00
0.000
0%
38.37
174.58
100%
0.00
0.000
0%
0.35
161.21
100%
0.00
0.000
0%
5.15
190.19
100%
0.00
0.000
0%
13.80
62.79
100%
0.00
0.000
0%
12.34
923.16
100%
0.00
0.000
0%
2.59
34.81
100%
0.00
0.000
0%
9.10
122.30
100%
0.00
0.000
0%
9.19
139.41
100%
0.00
0.000
0%
6.09
107.91
100%
0.00
0.000
0%
3.08
54.58
100%
0.00
0.000
0%
1.23
21.80
100%
0.00
0.000
0%
7.80
206.23
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
0.00
0.000
Metrado
0%
Valorizado
3.08
81.93
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
3.08
0.00
0.000
0%
0.00
0.000
0%
0.00
0.000
0.00
207.62
100%
3.24
23.23
100%
3.33
242.29
100%
0%
0.56
40.75
100%
0.000
0%
1.58
714.13
100%
0.00
0.000
0%
0.44
43.13
100%
0.00
0.000
0%
3.00
70.56
100%
0.00
0.000
0%
1.00
61.14
100%
0.00
0.000
0%
1.00
100.33
100%
0.00
0.000
0%
11.78
133.11
100%
0.00
0.000
0%
9.10
81.08
100%
0.00
0.000
0%
4.59
51.87
100%
0.00
0.000
0%
4.59
40.90
100%
0.00
0.000
0%
1.00
322.88
100%
0.00
0.000
0%
1.00
142.95
100%
0.00
0.000
0%
1.00
16.50
100%
0.00
0.000
0%
1.00
16.71
100%
0.00
0.000
0%
1.00
18.59
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
1.00
53.00
100%
0.00
0.000
0%
1.00
25.00
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
2.00
31.56
100%
0.00
0.000
0%
5.00
79.85
100%
0.00
0.000
0%
3.00
126.21
100%
0.00
0.000
0%
3.63
37.93
100%
0.00
0.000
0%
9.95
38.31
100%
0.00
0.000
0%
14.00
80.08
100%
0.00
0.000
0%
1.00
12.54
100%
0.00
0.000
0%
2.00
12.46
100%
0.00
0.000
0%
1.00
8.93
100%
0.00
0.000
0%
1.00
7.82
100%
0.00
0.000
0%
2.00
11.90
100%
0.00
0.000
0%
4.00
30.76
100%
0.00
0.000
0%
2.00
80.98
100%
0.00
0.000
0%
5.00
42.10
100%
0.00
0.000
0%
1.00
8.42
100%
0.00
0.000
0%
5.66
62.20
100%
0.00
0.000
0%
8.65
62.28
100%
0.00
0.000
0%
5.50
39.60
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
2.00
68.34
100%
0.00
0.000
0%
1.00
15.92
100%
0.00
0.000
0%
4.00
24.72
100%
0.00
0.000
0%
1.00
8.37
100%
0.00
0.000
0%
4.00
27.92
100%
0.00
0.000
0%
5.00
110.75
100%
0.00
0.000
0%
2.00
16.98
100%
0.00
0.000
0%
2.00
20.00
100%
0.00
0.000
0%
1.00
7.47
100%
0.00
0.000
0%
1.00
47.80
100%
0.00
0.000
0%
1.00
18.56
100%
0.00
0.000
0%
0.10
1.95
100%
0.00
0.000
0%
0.14
54.08
100%
0.00
0.000
0%
0.60
22.16
100%
0.00
0.000
0%
1.00
212.01
100%
0.00
0.000
0%
1.15
22.44
100%
0.00
0.000
0%
1.38
18.85
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
1.23
475.09
100%
0.00
0.000
0%
1.20
44.32
100%
0.00
0.000
0%
12.58
245.44
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
14.88
203.26
100%
0.00
0.000
0%
8.39
4,201.12
100%
0.00
0.000
0%
41.93
1,093.53
100%
0.00
0.000
0%
28.95
395.46
100%
0.00
0.000
0%
0.28
140.20
100%
0.00
0.000
0%
5.67
147.87
100%
0.00
0.000
0%
42.28
192.37
100%
0.00
0.000
0%
5.67
100.47
100%
0.00
0.000
0%
5.67
50.52
100%
0.00
0.000
0%
83.85
13,193.80
100%
0.00
0.000
0%
37.10
218.15
100%
0.00
0.000
0%
21.00
355.53
100%
0.00
0.000
0%
3.56
69.46
100%
0.00
0.000
0%
6.47
15.08
100%
0.00
0.000
0%
4.63
63.25
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
0.00
0.000
Metrado
0%
Valorizado
2.59
734.60
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
0.88
268.19
100%
0.00
0.000
0%
13.61
354.95
100%
0.00
0.000
0%
9.41
42.63
100%
0.00
0.000
0%
0.26
119.76
100%
0.00
0.000
0%
4.00
147.72
100%
0.00
0.000
0%
66.56
302.85
100%
0.00
0.000
0%
0.27
124.36
100%
0.00
0.000
0%
4.08
150.67
100%
0.00
0.000
0%
30.02
136.59
100%
0.00
0.000
0%
11.57
865.55
100%
0.00
0.000
0%
23.14
311.00
100%
0.00
0.000
0%
10.12
179.33
100%
0.00
0.000
0%
5.44
39.00
100%
0.00
0.000
0%
23.14
298.27
100%
0.00
0.000
0%
10.12
140.77
100%
0.00
0.000
0%
5.44
48.47
100%
0.00
0.000
0%
0.94
432.97
100%
0.00
0.000
0%
9.80
361.91
100%
0.00
0.000
0%
35.58
161.89
100%
AVANCES
ACUMULADO
Metrado
Valorizado
250.00
SALDO
%
18,702.500
Metrado
94%
Valorizado
15.47
1,157.31
6%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
80.11
1,191.24
100%
0.00
0.000
0%
386.71
5,197.38
100%
0.00
0.000
0%
118.02
1,586.19
100%
0.00
0.000
0%
24.49
433.96
100%
0.00
0.000
0%
2.92
225.54
100%
0.00
0.000
0%
1.42
93.45
100%
0.00
0.000
0%
132.70
2,351.44
100%
0.00
0.000
0%
111.95
1,983.75
100%
0.00
0.000
0%
248.27
16,264.17
100%
0.00
0.000
0%
129.41
12,607.12
100%
0.00
0.000
0%
64.58
1,717.83
100%
0.00
0.000
0%
64.58
4,353.34
100%
0.00
0.000
0%
156.42
22,016.12
100%
0.00
0.000
0%
80.11
5,828.80
100%
0.00
0.000
0%
128.56
6,827.82
100%
0.00
0.000
0%
3.14
22.51
100%
0.00
0.000
0%
55.07
394.85
100%
0.00
0.000
0%
3.85
280.13
100%
0.00
0.000
0%
11.96
105.85
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
23.57
10,653.17
100%
0.00
0.000
0%
28.43
4,913.27
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
2.55
198.98
100%
0.00
0.000
0%
48.91
4,794.65
100%
0.00
0.000
0%
1.50
608.79
100%
0.00
0.000
0%
2.30
549.68
100%
0.00
0.000
0%
2.84
749.11
100%
0.00
0.000
0%
1.00
1,689.93
100%
0.00
0.000
0%
1.00
768.15
100%
0.00
0.000
0%
1.00
732.70
100%
0.00
0.000
0%
1.00
512.89
100%
0.00
0.000
0%
82.00
2,568.24
100%
0.00
0.000
0%
40.00
562.40
100%
0.00
0.000
0%
12.00
282.24
100%
0.00
0.000
0%
9.00
550.26
100%
0.00
0.000
0%
11.00
387.97
100%
0.00
0.000
0%
128.00
696.32
100%
0.00
0.000
0%
3.00
276.39
100%
0.00
0.000
0%
20.00
186.80
100%
0.00
0.000
0%
2.00
200.66
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
2.00
477.02
100%
0.00
0.000
0%
2.00
248.88
100%
0.00
0.000
0%
2.00
345.66
100%
0.00
0.000
0%
102.92
18,316.67
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
407.44
4,172.19
100%
0.00
0.000
0%
131.71
1,697.74
100%
0.00
0.000
0%
129.51
1,657.73
100%
0.00
0.000
0%
111.95
1,557.22
100%
0.00
0.000
0%
55.07
490.67
100%
0.00
0.000
0%
6.34
56.49
100%
0.00
0.000
0%
232.02
2,501.18
100%
0.00
0.000
0%
13.87
151.88
100%
0.00
0.000
0%
1.00
320.00
100%
0.00
0.000
0%
12.00
380.88
100%
0.00
0.000
0%
53.00
2,123.71
100%
0.00
0.000
0%
24.00
940.32
100%
0.00
0.000
0%
1.00
1,506.74
100%
0.00
0.000
0%
1.00
1,406.74
100%
0.00
0.000
0%
1.00
550.00
100%
0.00
0.000
0%
8.00
2,583.04
100%
0.00
0.000
0%
3.00
428.85
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
4.00
668.60
100%
0.00
0.000
0%
1.00
255.15
100%
0.00
0.000
0%
2.00
451.42
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
4.00
66.00
100%
0.00
0.000
0%
4.00
66.84
100%
0.00
0.000
0%
8.00
148.72
100%
0.00
0.000
0%
4.00
1,151.72
100%
0.00
0.000
0%
1.00
177.15
100%
0.00
0.000
0%
7.00
175.00
100%
0.00
0.000
0%
4.00
1,149.56
100%
0.00
0.000
0%
1.00
120.12
100%
0.00
0.000
0%
2.00
187.12
100%
0.00
0.000
0%
1.00
243.17
100%
0.00
0.000
0%
18.00
284.04
100%
0.00
0.000
0%
36.00
574.92
100%
0.00
0.000
0%
23.00
967.61
100%
0.00
0.000
0%
18.90
140.62
100%
0.00
0.000
0%
24.80
183.52
100%
0.00
0.000
0%
33.89
161.66
100%
0.00
0.000
0%
68.69
264.46
100%
0.00
0.000
0%
67.55
499.87
100%
0.00
0.000
0%
1.00
15.95
100%
0.00
0.000
0%
6.00
55.32
100%
0.00
0.000
0%
33.00
205.59
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
57.00
326.04
100%
0.00
0.000
0%
3.00
36.33
100%
0.00
0.000
0%
6.00
17.10
100%
0.00
0.000
0%
8.00
100.32
100%
0.00
0.000
0%
7.00
43.61
100%
0.00
0.000
0%
4.00
35.72
100%
0.00
0.000
0%
9.00
70.38
100%
0.00
0.000
0%
16.00
95.20
100%
0.00
0.000
0%
2.00
28.62
100%
0.00
0.000
0%
6.00
60.18
100%
0.00
0.000
0%
12.00
105.00
100%
0.00
0.000
0%
8.00
61.52
100%
0.00
0.000
0%
1.00
78.40
100%
0.00
0.000
0%
3.00
155.94
100%
0.00
0.000
0%
6.00
292.02
100%
0.00
0.000
0%
4.00
161.96
100%
0.00
0.000
0%
1.00
45.98
100%
0.00
0.000
0%
213.83
975.06
100%
0.00
0.000
0%
85.53
199.28
100%
0.00
0.000
0%
85.53
484.96
100%
0.00
0.000
0%
42.77
2,351.49
100%
0.00
0.000
0%
0.48
240.35
100%
0.00
0.000
0%
4.00
104.32
100%
0.00
0.000
0%
0.80
20.86
100%
0.00
0.000
0%
0.31
155.23
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
4.00
65.68
100%
0.00
0.000
0%
10.00
1,510.30
100%
0.00
0.000
0%
32.80
598.60
100%
0.00
0.000
0%
29.80
420.78
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
19.00
62.51
100%
0.00
0.000
0%
31.00
341.93
100%
0.00
0.000
0%
9.00
30.78
100%
0.00
0.000
0%
3.00
6.78
100%
0.00
0.000
0%
8.00
32.16
100%
0.00
0.000
0%
4.00
30.40
100%
0.00
0.000
0%
8.00
80.00
100%
0.00
0.000
0%
12.00
53.04
100%
0.00
0.000
0%
6.00
15.72
100%
0.00
0.000
0%
4.00
194.68
100%
0.00
0.000
0%
1.00
41.91
100%
0.00
0.000
0%
2.00
133.68
100%
0.00
0.000
0%
2.00
168.90
100%
0.00
0.000
0%
2.00
30.90
100%
0.00
0.000
0%
2.00
16.38
100%
0.00
0.000
0%
62.60
285.46
100%
0.00
0.000
0%
25.04
58.34
100%
0.00
0.000
0%
25.04
141.98
100%
0.00
0.000
0%
12.52
688.35
100%
0.00
0.000
0%
10.00
84.20
100%
0.00
0.000
0%
27.00
227.34
100%
0.00
0.000
0%
18.00
191.70
100%
0.00
0.000
0%
25.00
625.75
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
48.70
535.21
100%
0.00
0.000
0%
16.10
176.94
100%
0.00
0.000
0%
30.35
218.52
100%
0.00
0.000
0%
57.45
413.64
100%
0.00
0.000
0%
7.00
239.19
100%
0.00
0.000
0%
5.00
94.80
100%
0.00
0.000
0%
1.00
15.92
100%
0.00
0.000
0%
3.00
31.74
100%
0.00
0.000
0%
46.00
284.28
100%
0.00
0.000
0%
4.00
27.92
100%
0.00
0.000
0%
5.00
164.50
100%
0.00
0.000
0%
7.00
123.13
100%
0.00
0.000
0%
21.00
178.29
100%
0.00
0.000
0%
11.00
110.00
100%
0.00
0.000
0%
8.00
59.76
100%
0.00
0.000
0%
2.00
95.60
100%
0.00
0.000
0%
5.00
74.25
100%
0.00
0.000
0%
4.00
74.24
100%
0.00
0.000
0%
8.00
178.72
100%
0.00
0.000
0%
177.60
809.86
100%
0.00
0.000
0%
71.04
165.52
100%
0.00
0.000
0%
71.04
402.80
100%
0.00
0.000
0%
35.52
1,952.89
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
3.65
1,409.81
100%
0.00
0.000
0%
19.83
517.17
100%
0.00
0.000
0%
0.36
139.05
100%
0.00
0.000
0%
2.86
74.59
100%
0.00
0.000
0%
13.00
59.15
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
56.94
1,110.899
100%
0.00
0.00
0%
0.00
0.000
0%
15.55
36.23
100%
0.00
0.000
0%
20.96
1,081.96
100%
0.00
0.000
0%
15.00
2,182.65
100%
0.00
0.000
0%
43.18
491.39
100%
0.00
0.000
0%
7.17
232.02
100%
0.00
0.000
0%
1.19
459.64
100%
0.00
0.000
0%
1.10
424.88
100%
0.00
0.000
0%
12.80
468.99
100%
0.00
0.000
0%
40.60
184.73
100%
0.00
0.000
0%
1.35
521.44
100%
0.00
0.000
0%
10.90
399.38
100%
0.00
0.000
0%
49.07
223.27
100%
0.00
0.000
0%
0.18
69.53
100%
0.00
0.000
0%
3.27
119.81
100%
0.00
0.000
0%
2.55
11.60
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
1.25
482.81
100%
0.00
0.000
0%
17.64
646.33
100%
0.00
0.000
0%
62.47
284.24
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
0.16
61.80
100%
0.00
0.000
0%
1.50
54.96
100%
0.00
0.000
0%
7.83
35.63
100%
0.00
0.000
0%
8.89
158.69
100%
0.00
0.000
0%
6.16
93.45
100%
0.00
0.000
0%
9.48
143.81
100%
0.00
0.000
0%
1.00
5,374.45
100%
0.00
0.000
0%
1.00
300.51
100%
0.00
0.000
0%
7.90
115.58
100%
0.00
0.000
0%
30.00
453.90
100%
0.00
0.000
0%
5.00
49.85
100%
0.00
0.000
0%
1.00
103.86
100%
280.00
5,462.800
100%
0.00
0.00
0%
280.00
652.400
100%
0.00
0.00
0%
280.00
1,587.600
100%
0.00
0.00
0%
112.00
6,157.760
100%
0.00
0.00
0%
0.00
0.000
0%
140.00
7,226.80
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
360.00
3,592.80
100%
0.00
0.000
0%
200.00
2,450.00
100%
0.00
0.000
0%
1.00
14.84
100%
0.00
0.000
0%
1.00
5.48
100%
0.00
0.000
0%
836.43
1,254.65
100%
0.00
0.000
0%
177.60
140.30
100%
0.00
0.000
0%
14.40
12.82
100%
0.00
0.000
0%
8.64
168.57
100%
0.00
0.000
0%
36.00
431.28
100%
0.00
0.000
0%
36.00
329.40
100%
0.00
0.000
0%
0.06
1.17
100%
0.00
0.000
0%
0.09
27.55
100%
0.00
0.000
0%
0.54
60.07
100%
0.00
0.000
0%
2.10
36.08
100%
0.00
0.000
0%
1.00
127.30
100%
0.00
0.000
0%
2.10
18.71
100%
0.00
0.000
0%
1.00
38,500.00
100%
0.00
0.000
0%
42.00
1,422.12
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
50.00
1,918.00
100%
0.00
0.000
0%
18.00
534.78
100%
0.00
0.000
0%
4.00
132.80
100%
0.00
0.000
0%
3.00
115.92
100%
0.00
0.000
0%
1.00
30.83
100%
0.00
0.000
0%
2.00
50.44
100%
0.00
0.000
0%
2.00
114.68
100%
0.00
0.000
0%
7.00
273.98
100%
0.00
0.000
0%
12.00
476.16
100%
0.00
0.000
0%
2.00
95.78
100%
0.00
0.000
0%
2.00
125.30
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
0.00
0.000
0%
0.00
0.000
0%
0.00
0.000
0%
0.00
0.000
0%
0.00
0.000
0.00
0.000
0.00
Valorizado
20.00
111.00
100%
50.00
367.00
100%
586.40
3,148.97
100%
316.00
1,428.32
100%
0%
270.40
1,573.73
100%
0%
82.00
658.46
100%
0.000
0%
10.00
129.10
100%
0.00
0.000
0%
1.00
2,296.61
100%
0.00
0.000
0%
1.00
1,033.40
100%
0.00
0.000
0%
1.00
1,014.20
100%
0.00
0.000
0%
1.00
1,014.20
100%
0.00
0.000
0%
1.00
1,304.26
100%
0.00
0.000
0%
1.00
1,061.41
100%
0.00
0.000
0%
1.00
975.73
100%
0.00
0.000
0%
1.33
25.95
100%
0.00
0.000
0%
1.39
3.24
100%
0.00
0.000
0%
0.20
10.32
100%
0.00
0.000
0%
1.36
15.48
100%
0.00
0.000
0%
0.64
20.71
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
0.75
289.69
100%
0.00
0.000
0%
0.19
102.18
100%
0.00
0.000
0%
2.91
13.24
100%
0.00
0.000
0%
0.20
92.12
100%
0.00
0.000
0%
1.60
59.09
100%
0.00
0.000
0%
7.37
33.53
100%
0.00
0.000
0%
1.00
3,872.21
100%
0.00
0.000
0%
1.02
8.35
100%
0.00
0.000
0%
1.02
9.09
100%
0.00
0.000
0%
1.00
5,234.35
100%
0.00
0.000
0%
59.02
1,151.48
100%
0.00
0.000
0%
59.02
137.52
100%
0.00
0.000
0%
59.02
334.64
100%
0.00
0.000
0%
147.55
1,767.65
100%
0.00
0.000
0%
6.00
5,239.20
100%
0.00
0.000
0%
147.55
4,302.56
100%
0.00
0.000
0%
147.55
1,245.32
100%
0.00
0.000
0%
24.00
2,147.04
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
7.00
617.26
100%
0.00
0.000
0%
11.00
1,519.98
100%
0.00
0.000
0%
17.00
5,836.27
100%
0.00
0.000
0%
4.00
596.32
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
8.00
1,705.44
100%
0.00
0.000
0%
1.00
31.02
100%
0.00
0.000
0%
20.00
146.40
100%
0.00
0.000
0%
20.00
116.40
100%
0.00
0.000
0%
54.40
48.42
100%
0.00
0.000
0%
21.76
424.54
100%
0.00
0.000
0%
136.00
1,629.28
100%
0.00
0.000
0%
1.00
339.98
100%
0.00
0.000
0%
1.00
346.58
100%
0.00
0.000
0%
1.00
294.17
100%
0.00
0.000
0%
1.00
294.17
100%
0.00
0.000
0%
136.00
1,175.04
100%
0.00
0.000
0%
120.00
1,036.80
100%
0.00
0.000
0%
85.00
734.40
100%
0.00
0.000
0%
12.00
87.84
100%
0.00
0.000
0%
4.00
90.88
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
136.00
198.56
100%
0.00
0.000
0%
120.00
270.00
100%
0.00
0.000
0%
85.00
191.25
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
1.00
273.40
100%
0.00
0.000
0%
1.00
1,000.00
100%
0.00
0.000
0%
1.00
2,000.00
100%
0.00
0.000
0%
30.60
27.23
100%
0.00
0.000
0%
15.30
298.50
100%
0.00
0.000
0%
76.50
916.47
100%
0.00
0.000
0%
580.00
875.80
100%
0.00
0.000
0%
1.00
1,431.47
100%
0.00
0.000
0%
1.00
905.75
100%
0.00
0.000
0%
30.00
515.40
100%
0.00
0.000
0%
20.00
218.20
100%
0.00
0.000
0%
240.00
1,756.80
100%
0.00
0.000
0%
4.00
250.60
100%
0.00
0.000
0%
18.00
1,127.70
100%
0.00
0.000
0%
1.00
64.32
100%
0.00
0.000
0%
1.00
162.79
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
0.00
0.000
Metrado
0%
Valorizado
1.00
2,000.00
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
4.00
960.00
100%
0.00
0.000
0%
2.00
540.00
100%
0.00
0.000
0%
4.00
2,160.00
100%
0.00
0.000
0%
4.00
2,198.72
100%
0.00
0.000
0%
5.00
2,397.55
100%
0.00
0.000
0%
1.00
225.00
100%
0.00
0.000
0%
6.00
3,348.00
100%
0.00
0.000
0%
4.00
220.00
100%
0.00
0.000
0%
18.00
2,717.28
100%
0.00
0.000
0%
80.00
2,279.20
100%
0.00
0.000
0%
6.00
396.00
100%
0.00
0.000
0%
1.00
1,325.95
100%
0.00
0.000
0%
1.00
345.00
100%
0.00
0.000
0%
2.00
198.00
100%
0.00
0.000
0%
1.00
649.00
100%
0.00
0.000
0%
1.00
120.00
100%
0.00
0.000
0%
1.00
840.00
100%
0.00
0.000
0%
1.00
50.00
100%
0.00
0.000
0%
1.00
540.00
100%
0.00
0.000
0%
1.00
189.90
100%
0.00
0.000
0%
1.00
1,200.00
100%
0.00
0.000
0%
1.00
2,846.00
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
2.00
6,200.00
100%
0.00
0.000
0%
1.00
5,827.97
100%
0.00
0.000
0%
1.00
118.18
100%
0.00
0.000
0%
4.00
2,880.00
100%
0.00
0.000
0%
1.00
720.00
100%
0.00
0.000
0%
3.00
359.70
100%
0.00
0.000
0%
1.00
119.90
100%
0.00
0.000
0%
2.00
1,130.00
100%
0.00
0.000
0%
1.00
3,345.30
100%
0.00
0.000
0%
3.00
1,561.14
100%
0.00
0.000
0%
1.00
500.00
100%
0.00
0.000
0%
1.00
4,661.02
100%
0.00
0.000
0%
10.00
275.00
100%
0.00
0.000
0%
20.00
1,315.60
100%
0.00
0.000
0%
40.00
3,400.00
100%
0.00
0.000
0%
10.00
823.90
100%
0.00
0.000
0%
10.00
2,409.00
100%
0.00
0.000
0%
3.00
629.19
100%
0.00
0.000
0%
2.00
451.46
100%
0.00
0.000
0%
4.00
1,030.92
100%
0.00
0.000
0%
2.00
1,195.46
100%
0.00
0.000
0%
4.00
2,630.92
100%
0.00
0.000
0%
7.00
468.16
100%
0.00
0.000
0%
10.00
171.40
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
1.00
76.89
100%
0.00
0.000
0%
1.00
104.50
100%
0.00
0.000
0%
1.00
143.00
100%
0.00
0.000
0%
1.00
19.44
100%
0.00
0.000
0%
2.00
32.78
100%
0.00
0.000
0%
1.00
5.79
100%
0.00
0.000
0%
1.00
9.79
100%
0.00
0.000
0%
12.00
42.24
100%
0.00
0.000
0%
12.00
42.24
100%
0.00
0.000
0%
12.00
42.24
100%
0.00
0.000
0%
12.00
42.24
100%
0.00
0.000
0%
1.00
27.39
100%
0.00
0.000
0%
12.00
21.60
100%
0.00
0.000
0%
12.00
21.60
100%
0.00
0.000
0%
12.00
14.52
100%
0.00
0.000
0%
1.00
7.59
100%
0.00
0.000
0%
12.00
36.84
100%
0.00
0.000
0%
1.00
22.99
100%
0.00
0.000
0%
1.00
71.50
100%
0.00
0.000
0%
1.00
17.49
100%
0.00
0.000
0%
1.00
7.59
100%
0.00
0.000
0%
4.00
13.20
100%
0.00
0.000
0%
1.00
450.00
100%
0.00
0.000
0%
1.00
2,699.00
100%
0.00
0.000
0%
3.00
690.00
100%
0.00
0.000
0%
1.00
385.00
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
2.00
15.88
100%
0.00
0.000
0%
2.00
34.76
100%
0.00
0.000
0%
5.00
164.50
100%
0.00
0.000
0%
2.00
119.80
100%
0.00
0.000
0%
1.00
1,023.41
100%
0.00
0.000
0%
2.00
307.78
100%
0.00
0.000
0%
3.00
39.27
100%
0.00
0.000
0%
2.00
114.78
100%
0.00
0.000
0%
2.00
70.00
100%
0.00
0.000
0%
2.00
61.38
100%
0.00
0.000
0%
1.00
43.89
100%
0.00
0.000
0%
3.00
705.00
100%
0.00
0.000
0%
1.00
188.97
100%
0.00
0.000
0%
9.00
178.83
100%
0.00
0.000
0%
1.00
751.25
100%
0.00
0.000
0%
1.00
2,529.89
100%
0.00
0.000
0%
1.00
1,263.85
100%
0.00
0.000
0%
1.00
3,427.55
100%
0.00
0.000
0%
1.00
1,488.81
100%
0.00
0.000
0%
1.00
6,045.43
100%
0.00
0.000
0%
6.00
1,226.64
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
Metrado
Valorizado
0.00
0.000
0%
1.00
474.30
100%
0.00
0.000
0%
4.00
104.00
100%
0.00
0.000
0%
2.00
92.94
100%
0.00
0.000
0%
4.00
13,769.40
100%
0.00
0.000
0%
1.00
1,883.87
100%
0.00
0.000
0%
2.00
24.00
100%
0.00
0.000
0%
1.00
1,280.30
100%
0.00
0.000
0%
1.00
216.00
100%
0.00
0.000
0%
1.00
2,383.90
100%
0.00
0.000
0%
1.00
465.00
100%
AVANCES
ACUMULADO
Metrado
SALDO
Valorizado
0.00
0.000
Metrado
0%
238,208.28
Valorizado
1.00
6,690.00
707,076.07
25.15%
74.66%
SUPERVISOR DE PROYECTOS
ROBERTO HUAMAN LACUTA
DNI 23833867
100%
VALORIZACION DE AVANC
SUPERVISOR:
RESIDENTE:
CREACION DEL CENTRO DE SERVICIOS - TAMBO EN EL CENTRO POBLADO CANCAHUANI, DISTRITO DE CAPACAMARCA, PROVINCIA DE CHUMBIVILCAS, D
CIP
41762
CAP
3094
PARTIDA
DESCRIPCION
PRESUPUESTO
Unid.
Metrado
P.Unit
PRESUPUESTO
01.01
01.01.01
CONSTRUCCIONES PROVISIONALES
01.01.01.01
und
1.00
9,894.66
01.01.01.02
und
2.00
652.41
01.01.01.03
und
1.00
1,134.34
gb
1.00
1,766.25
01.01.02
INSTALACIONES PROVISIONALES
01.01.02.01
01.01.03
TRABAJOS PRELIMINARES
01.01.03.01
m2
2,500.00
0.76
01.01.03.02
HABILITACION DE ACCESO
m3
303.10
19.51
01.01.04
01.01.04.01
FLETE TERRESTRE
gb
1.00
39302.74
01.01.05
01.01.05.01
m2
800.00
0.89
01.01.05.02
m2
800.00
0.89
01.02
01.02.01
01.02.01.01
mes
4.00
100.00
01.02.01.02
mes
4.00
1,550.03
01.02.01.03
mes
4.00
113.17
01.02.01.04
mes
4.00
200.83
01.02.01.05
mes
4.00
100.00
01.02.02
01.02.02.01
glb
1.00
77.00
01.02.03
MITIGACION AMBIENTAL
01.02.03.01
tall
1.00
100.00
01.02.03.02
tall
4.00
100.00
01.02.03.03
und
30.00
2.80
01.02.03.04
tall
4.00
100.00
01.02.03.05
glb
1.00
509.08
01.02.03.06
mes
4.00
30.11
01.02.03.07
act
1.00
215.38
02
ESTRUCTURAS
02.01
EDIFICACION
02.01.01
MOVIMIENTO DE TIERRAS
02.01.01.01
EXCAVACIONES
02.01.01.01.01
m3
76.98
19.51
02.01.01.02
CORTES
02.01.01.02.01
m3
1,626.40
19.51
02.01.01.03
RELLENOS
02.01.01.03.01
m3
22.58
51.62
02.01.01.03.02
m2
473.90
21.14
02.01.01.04
02.01.01.04.01
m2
553.07
2.33
02.01.01.05
02.01.01.05.01
m3
68.00
11.38
02.01.02
02.01.02.01
SOLADOS
02.01.02.01.01
m2
71.41
32.36
02.01.02.02
SOBRECIMIENTOS
02.01.02.02.01
m3
9.22
304.76
02.01.02.02.02
m2
140.47
26.08
02.01.02.02.03
kg
90.05
4.53
02.01.02.03
SARDINELES EN SS.HH
02.01.02.03.01
m3
0.04
537.80
02.01.02.03.02
m2
1.93
26.08
02.01.02.04
VEREDAS
02.01.02.04.01
m3
18.14
500.73
02.01.02.04.02
m2
34.30
26.08
02.01.02.04.03
131.30
13.66
02.01.02.04.04
335.55
3.70
02.01.02.05
PATIO
02.01.02.05.01
m3
7.57
500.73
02.01.02.05.02
m2
11.26
26.08
02.01.02.05.03
54.43
13.66
02.01.02.05.04
181.88
3.70
02.01.02.06
RAMPAS
02.01.02.06.01
m3
1.17
500.73
02.01.02.06.02
m2
2.37
26.08
02.01.02.06.03
51.08
3.70
02.01.02.07
FALSO PISO
02.01.02.07.01
m2
252.74
35.50
02.01.03
02.01.03.01
ZAPATAS
02.01.03.01.01
m3
10.87
537.80
02.01.03.01.02
kg
354.52
4.55
02.01.03.02
VIGAS DE CIMENTACION
02.01.03.02.01
m3
17.96
537.80
02.01.03.02.02
m2
71.91
36.64
02.01.03.02.03
kg
1,824.37
4.55
02.01.03.02.04
TEKNOPORT 1"
m2
44.23
6.91
02.01.03.03
COLUMNAS
02.01.03.03.01
m3
9.75
460.61
02.01.03.03.02
m2
118.45
36.93
02.01.03.03.03
m2
18.61
118.95
02.01.03.03.04
kg
1,736.75
4.55
02.01.03.04
VIGAS
02.01.03.04.01
m3
12.39
460.61
02.01.03.04.02
m2
116.35
36.93
02.01.03.04.03
kg
1,586.15
4.55
02.01.03.05
COLUMNETAS DE CONFINAMIENTO
02.01.03.05.01
m3
5.17
460.61
02.01.03.05.02
m2
79.74
36.93
02.01.03.05.03
kg
1,083.74
4.55
02.01.03.06
VIGUETAS DE CONFINAMIENTO
02.01.03.06.01
m3
2.10
460.61
02.01.03.06.02
m2
23.19
36.93
02.01.03.06.03
kg
351.96
4.55
02.01.03.07
02.01.03.07.01
m3
0.59
460.61
02.01.03.07.02
m2
11.89
36.93
02.01.03.07.03
kg
35.45
4.55
02.01.03.08
02.01.03.08.01
m3
0.74
460.61
02.01.03.08.02
m2
10.72
36.93
02.01.03.08.03
kg
40.85
4.55
02.01.04
ESTRUCTURAS METALICAS
02.01.04.01
TIJERALES Y RETICULADOS
02.01.04.01.01
und
3.00
1,514.93
02.01.04.01.02
und
2.00
1,455.00
02.01.04.01.03
und
6.00
1,460.66
02.01.04.01.04
IZAJE DE TIJERALES
und
11.00
115.97
02.01.04.02
CORREAS
02.01.04.02.01
419.20
20.75
02.01.04.02.02
und
124.00
12.14
02.01.04.02.03
und
26.00
13.46
02.01.04.03
ANCLAJES
02.01.04.03.01
und
5.00
40.86
02.01.04.03.02
und
27.00
44.82
02.01.04.03.03
und
6.00
40.32
02.01.05
COBERTURA
02.01.05.01
m2
445.48
117.47
02.01.05.02
33.70
35.55
02.01.05.03
30.34
70.08
02.01.05.04
m2
18.96
59.41
02.01.06
02.01.06.01
67.40
112.76
02.01.07
VARIOS
02.01.07.01
65.50
15.07
02.02
02.02.01
MOVIMIENTO DE TIERRAS
02.02.01.01
EXCAVACIONES
02.02.01.01.01
m3
6.30
19.51
02.02.02
02.02.02.01
CONCRETO f'c=140kg/cm2-P/DADOS
m3
6.86
386.25
02.02.02.02
CONCRETO f'c=175kg/cm2-P/HITOS
m3
0.41
500.73
02.02.02.03
m2
12.71
26.08
02.02.02.04
kg
43.03
4.55
02.02.03
02.02.03.01
197.00
272.73
02.02.03.02
und
1.00
1,165.19
02.02.04
PINTURA
02.02.04.01
m2
15.38
14.85
02.03
02.03.01
MOVIMIENTO DE TIERRAS
02.03.01.01
EXCAVACIONES
02.03.01.01.01
m3
0.28
19.51
02.03.02
02.03.02.01
CONCRETO f'c=140kg/cm2-P/DADOS
m3
0.34
386.25
02.03.02.02
m2
0.90
26.08
02.03.03
02.03.03.01
CERCO METALICO H=2.50M C/MALLA GALVANIZADA N10 2"X2" CON TUBO FG 3" INC. 3
HILERAS DE ALAMBRE DE PUAS EN PARTE SUPERIOR
15.00
161.06
02.03.03.02
PUERTA A=1.00M. H=2.00M. CON TUBOS FG 1.1/2" CON MALLA GALVANIZADA N10 2"X2"
DOBLE TORSION INC. CERROJO Y CANDADO (SEGUN DISEO)
und
1.00
649.34
02.03.04
PINTURA
02.03.04.01
m2
32.00
12.66
02.03.04.02
m2
32.00
12.66
02.04
ASTA DE BANDERA
02.04.01
MOVIMIENTO DE TIERRAS
02.04.01.01
EXCAVACIONES
02.04.01.01.01
m3
1.78
19.51
02.04.01.02
RELLENOS
02.04.01.02.01
m3
0.75
51.62
02.04.01.03
02.04.01.03.01
02.04.02
02.04.02.01
SOLADOS
02.04.02.01.01
02.04.02.02
VEREDAS
02.04.02.02.01
m3
1.24
11.38
m2
1.76
32.36
m3
0.72
500.73
02.04.02.02.02
m2
1.32
26.08
02.04.02.02.03
3.60
13.66
02.04.03
02.04.03.01
m3
0.78
460.61
02.04.03.02
m2
3.42
36.93
02.04.03.03
kg
37.86
4.55
02.04.04
CARPINTERIA METALICA
02.04.04.01
ASTA DE BANDERA CON TUBO FG DE 3" Y 2" H=6.20M HASTA ANCLAJE INC. RODON Y
MASTIL
und
1.00
583.33
02.04.04.02
ASTA DE BANDERA CON TUBO FG DE 3" Y 2" H=5.20M HASTA ANCLAJE INC. RODON Y
MASTIL
und
2.00
583.33
02.04.05
PINTURA
02.04.05.01
m2
3.08
10.95
02.04.05.02
m2
3.08
8.91
02.05
02.05.01
MOVIMIENTO DE TIERRAS
02.05.01.01
EXCAVACIONES
02.05.01.01.01
m3
13.75
19.51
02.05.01.02
RELLENOS
02.05.01.02.01
m2
6.25
2.33
02.05.01.02.02
m3
2.50
51.62
02.05.01.02.03
m2
6.25
21.14
02.05.01.03
02.05.01.03.01
m3
14.63
11.38
02.05.01.04
02.05.01.04.01
ENTIBADO DE ZAPATAS
m2
10.24
36.93
02.05.02
02.05.02.01
SOLADOS
02.05.02.01.01
m2
6.25
32.36
02.05.02.02
VEREDAS
02.05.02.02.01
m3
0.47
500.73
02.05.02.02.02
m2
2.71
26.08
02.05.02.02.03
2.35
13.66
02.05.03
02.05.03.01
CISTERNA
02.05.03.01.01
m3
5.14
537.80
02.05.03.01.02
m2
24.00
36.93
02.05.03.01.03
kg
160.52
4.55
02.05.03.02
COLUMNAS
02.05.03.02.01
m3
1.20
460.61
02.05.03.02.02
m2
20.48
36.93
02.05.03.02.03
kg
222.77
4.55
02.05.03.03
VIGAS
02.05.03.03.01
m3
2.00
460.61
02.05.03.03.02
m2
21.00
36.93
02.05.03.03.03
kg
248.11
4.55
02.05.03.04
LOSA MACIZAS
02.05.03.04.01
m3
1.48
460.61
02.05.03.04.02
m2
9.50
36.93
02.05.03.04.03
kg
67.16
4.55
02.05.03.05
02.05.03.05.01
CONCRETO f'c=210kg/cm2-P/TAPAS.
m3
0.05
516.22
02.05.03.05.02
m2
0.92
24.98
02.05.03.05.03
kg
9.05
4.55
02.05.04
02.05.04.01
m2
10.81
74.81
02.05.05
REVOQUES Y REVESTIMIENTO
02.05.05.01
m2
10.01
13.44
02.05.05.02
m2
7.21
13.44
02.05.05.03
m2
13.05
15.17
02.05.05.04
m2
13.20
17.72
02.05.05.05
m2
19.10
17.72
02.05.05.06
m2
0.17
17.72
02.05.06
CIELORRASO
02.05.06.01
02.05.06.01.01
m2
12.50
26.44
02.05.07
PISOS Y PAVIMENTOS
02.05.07.01
PISOS DE CONCRETO
02.05.07.01.01
m2
8.16
28.91
02.05.08
ZOCALOS Y CONTRAZOCALOS
02.05.08.01
CONTRAZOCALOS
02.05.08.01.01
m2
3.18
7.17
02.05.08.01.02
m2
0.73
7.17
02.05.09
CARPINTERIA DE MADERA
02.05.09.01
m2
1.54
451.98
02.05.09.02
m2
0.32
98.03
02.05.10
CERRAJERIA
02.05.10.01
und
3.00
23.52
02.05.10.02
und
1.00
61.14
02.05.10.03
pza
1.00
100.33
02.05.11
PINTURA
02.05.11.01
m2
10.01
11.30
02.05.11.02
m2
7.21
8.91
02.05.11.03
m2
16.15
11.30
02.05.11.04
m2
16.15
8.91
02.05.12
OTROS
02.05.12.01
TANQUE ELEVADO
02.05.12.01.01
und
1.00
933.70
02.05.12.01.02
ESCALERA DE GATO CON TUBO DE FIERRO D=1 1/2" Y BARANDA DE TUBO DE FIERRO D=1
1/2"
und
1.00
2,150.82
02.05.12.01.03
und
1.00
743.76
02.05.12.01.04
glb
1.00
125.89
02.05.12.02
02.05.12.02.01
9.30
7.44
02.05.12.02.02
10.50
6.43
02.05.12.03
02.05.12.03.01
pza
2.00
15.95
02.05.12.03.02
pza
7.00
9.22
02.05.12.03.03
pza
3.00
6.78
02.05.12.03.04
pza
1.00
13.28
02.05.12.03.05
pza
1.00
12.11
02.05.12.03.06
pza
4.00
2.85
02.05.12.03.07
pza
1.00
6.61
02.05.12.03.08
1.00
83.40
02.05.12.04
VALVULAS
02.05.12.04.01
und
1.00
82.94
02.05.12.04.02
und
2.00
45.84
02.05.12.04.03
und
1.00
104.10
02.05.12.04.04
und
1.00
84.67
02.05.12.04.05
und
1.00
102.70
02.05.12.05
ABRAZADERAS
02.05.12.05.01
und
14.00
2.39
02.05.12.05.02
und
7.00
2.51
02.05.12.05.03
und
7.00
9.20
02.06
02.06.01
MOVIMIENTO DE TIERRAS
02.06.01.01
EXCAVACIONES
02.06.01.01.01
m3
3.24
19.51
02.06.01.02
RELLENOS
02.06.01.02.01
m2
3.24
2.33
02.06.01.02.02
m3
0.43
51.62
02.06.01.02.03
m2
4.86
21.14
02.06.01.03
02.06.01.03.01
m3
3.65
13.66
02.06.02
02.06.02.01
CIMIENTOS CORRIDOS
02.06.02.01.01
m3
2.59
283.63
02.06.02.02
SOBRECIMIENTO
02.06.02.02.01
m3
0.60
304.76
02.06.02.02.02
m2
8.05
26.08
02.06.02.03
VEREDAS
02.06.02.03.01
m3
0.51
500.73
02.06.02.03.02
m2
2.77
26.08
02.06.02.03.03
2.35
13.66
02.06.02.04
FALSO PISO
02.06.02.04.01
m2
3.08
35.50
02.06.03
02.06.03.01
COLUMNAS
02.06.03.01.01
m3
0.26
460.61
02.06.03.01.02
m2
6.09
36.93
02.06.03.01.03
kg
37.76
4.55
02.06.03.02
VIGUETAS
02.06.03.02.01
m3
0.26
460.61
02.06.03.02.02
m2
3.08
36.93
02.06.03.02.03
kg
38.77
4.55
02.06.03.03
LOSA MACISAS
02.06.03.03.01
m3
0.63
460.61
02.06.03.03.02
m2
7.80
36.93
02.06.03.03.03
kg
38.37
4.55
02.06.03.04
LAVADERO
02.06.03.04.01
m3
0.35
460.61
02.06.03.04.02
m2
5.15
36.93
02.06.03.04.03
kg
13.80
4.55
02.06.04
02.06.04.01
m2
12.34
74.81
02.06.05
REVOQUES Y REVESTIMIENTO
02.06.05.01
m2
2.59
13.44
02.06.05.02
m2
9.10
13.44
02.06.05.03
m2
9.19
15.17
02.06.05.04
m2
6.09
17.72
02.06.05.05
m2
3.08
17.72
02.06.05.06
m2
1.23
17.72
02.06.06
CIELORRASO
02.06.06.01
02.06.06.01.01
m2
7.80
26.44
02.06.07
PISOS Y PAVIMENTOS
02.06.07.01
CONTRAPISOS
02.06.07.01.01
CONTRAPISO E=4 CM BASE 3 CM. MEZC. C:H 1:5 ACAB. 1 CM. PASTA C:A 1:2 (ACABADO SEMIP
m2
3.08
26.60
02.06.07.02
PISOS
02.06.07.02.01
m2
3.08
67.41
02.06.08
ZOCALOS Y CONTRAZOCALOS
02.06.08.01
ZOCALOS
02.06.08.01.01
m2
3.24
7.17
02.06.08.01.02
ZOCALO DE CERAMICO 30 X 30 cm
m2
3.33
72.76
02.06.08.02
CONTRAZOCALOS
02.06.08.02.01
m2
0.56
72.76
02.06.09
CARPINTERIA DE MADERA
02.06.09.01
m2
1.58
451.98
02.06.09.02
m2
0.44
98.03
02.06.10
CERRAJERIA
02.06.10.01
und
3.00
23.52
02.06.10.02
und
1.00
61.14
02.06.10.03
pza
1.00
100.33
02.06.11
PINTURA
02.06.11.01
m2
11.78
11.30
02.06.11.02
m2
9.10
8.91
02.06.11.03
PINTURA LATEX MATE - 2 MANOS EN COLUMNAS Y VIGAS INTERIORES COLOR BLANCO HUMO
m2
4.59
11.30
02.06.11.04
m2
4.59
8.91
02.06.12
02.06.12.01
02.06.12.01.01
und
1.00
322.88
02.06.12.01.02
und
1.00
142.95
02.06.12.02
02.06.12.02.01
pza
1.00
16.50
02.06.12.02.02
pza
1.00
16.71
02.06.12.02.03
pza
1.00
18.59
02.06.12.02.04
pza
1.00
53.00
02.06.12.02.05
pza
1.00
25.00
02.06.13
02.06.13.01
und
2.00
15.78
02.06.14
02.06.14.01
und
5.00
15.97
02.06.15
02.06.15.01
02.06.15.01.01
pto
3.00
42.07
02.06.15.02
02.06.15.02.01
3.63
10.45
02.06.15.02.02
9.95
3.85
02.06.15.03
02.06.15.03.01
pza
14.00
5.72
02.06.15.03.02
pza
1.00
12.54
02.06.15.03.03
pza
2.00
6.23
02.06.15.03.04
pza
1.00
8.93
02.06.15.03.05
pza
1.00
7.82
02.06.15.03.06
pza
2.00
5.95
02.06.15.03.07
pza
4.00
7.69
02.06.15.04
02.06.15.04.01
pza
2.00
40.49
02.06.16
DESAGE Y VENTILACION
02.06.16.01
SALIDAS DE DESAGUE
02.06.16.01.01
02.06.16.01.02
pto
5.00
8.42
pto
1.00
8.42
02.06.16.02
02.06.16.02.01
5.66
10.99
02.06.16.02.02
8.65
7.20
02.06.16.02.03
5.50
7.20
02.06.16.03
02.06.16.03.01
pza
2.00
34.17
02.06.16.03.02
pza
1.00
15.92
02.06.16.03.03
pza
4.00
6.18
02.06.16.03.04
pza
1.00
8.37
02.06.16.03.05
pza
4.00
6.98
02.06.16.03.06
pza
5.00
22.15
02.06.16.03.07
pza
2.00
8.49
02.06.17
INSTALACIONES ESPECIALES
02.06.17.01
pza
2.00
10.00
02.06.17.02
pza
1.00
7.47
02.06.17.03
pza
1.00
47.80
02.06.17.04
pza
1.00
18.56
02.07
TENDAL
02.07.01
MOVIMIENTO DE TIERRAS
02.07.01.01
EXCAVACIONES
02.07.01.01.01
m3
0.10
19.51
02.07.02
02.07.02.01
BASES DE CONCRETO
02.07.02.01.01
CONCRETO f'c=140kg/cm2-P/DADOS
m3
0.14
386.25
02.07.02.01.02
m2
0.60
36.93
02.07.03
ESTRUCTURA DE MADERA
02.07.03.01
COLUMNAS-VIGAS
02.07.03.01.01
und
1.00
212.01
02.08
02.08.01
MOVIMIENTO DE TIERRAS
02.08.01.01
EXCAVACIONES
02.08.01.01.01
m3
1.15
19.51
02.08.01.02
02.08.01.02.01
m3
1.38
13.66
02.08.02
02.08.02.01
BASES DE CONCRETO
02.08.02.01.01
CONCRETO f'c=140kg/cm2-P/DADOS
m3
1.23
386.25
02.08.02.01.02
m2
1.20
36.93
02.09
02.09.01
MOVIMIENTO DE TIERRAS
02.09.01.01
EXCAVACIONES
02.09.01.01.01
02.09.01.02
02.09.01.02.01
02.09.02
02.09.02.01
m3
12.58
19.51
m3
14.88
13.66
m3
8.39
500.73
02.09.02.02
m2
41.93
26.08
02.09.02.03
28.95
13.66
02.09.03
02.09.03.01
m3
0.28
500.73
02.09.03.02
m2
5.67
26.08
02.09.03.03
kg
42.28
4.55
02.09.04
REVOQUES Y REVESTIMIENTO
02.09.04.01
m2
5.67
17.72
02.09.05
PINTURA
02.09.05.01
m2
5.67
8.91
02.09.06
OTROS
02.09.06.01
REJILLAS
02.09.06.01.01
83.85
157.35
02.09.06.02
02.09.06.02.01
37.10
5.88
02.09.06.02.02
und
21.00
16.93
02.10
MUROS CORTAVIENTOS
02.10.01
MOVIMIENTO DE TIERRAS
02.10.01.01
EXCAVACIONES
02.10.01.01.01
m3
3.56
19.51
02.10.01.02
RELLENOS
02.10.01.02.01
m2
6.47
2.33
02.10.01.03
02.10.01.03.01
m3
4.63
13.66
02.10.02
02.10.02.01
CIMIENTOS CORRIDOS
02.10.02.01.01
m3
2.59
283.63
02.10.02.02
SOBRECIMIENTO
02.10.02.02.01
m3
0.88
304.76
02.10.02.02.02
m2
13.61
26.08
02.10.02.02.03
kg
9.41
4.53
02.10.03
02.10.03.01
COLUMNETAS DE CONFINAMIENTO
02.10.03.01.01
m3
0.26
460.61
02.10.03.01.02
m2
4.00
36.93
02.10.03.01.03
kg
66.56
4.55
02.10.03.02
VIGUETAS DE CONFINAMIENTO
02.10.03.02.01
m3
0.27
460.61
02.10.03.02.02
m2
4.08
36.93
02.10.03.02.03
kg
30.02
4.55
02.10.04
02.10.04.01
m2
11.57
74.81
02.10.05
REVOQUES Y REVESTIMIENTO
02.10.05.01
m2
23.14
13.44
02.10.05.02
m2
10.12
17.72
02.10.06
CONTRAZOCALOS
02.10.06.01
m2
5.44
7.17
02.10.07
PINTURA
02.10.07.01
m2
23.14
12.89
02.10.07.02
m2
10.12
13.91
02.10.07.03
m2
5.44
8.91
02.10.08
02.10.08.01
m3
0.94
460.61
02.10.08.02
m2
9.80
36.93
02.10.08.03
kg
35.58
4.55
03
ARQUITECTURA
03.01
EDIFICACION
03.01.01
03.01.01.01
m2
265.47
74.81
03.01.02
REVOQUES Y REVESTIMIENTO
03.01.02.01
m2
80.11
14.87
03.01.02.02
m2
386.71
13.44
03.01.02.03
m2
118.02
13.44
03.01.02.04
m2
24.49
17.72
03.01.02.05
m2
2.92
77.24
03.01.02.06
m2
1.42
65.81
03.01.02.07
m2
132.70
17.72
03.01.02.08
m2
111.95
17.72
03.01.03
CIELORRASOS
03.01.03.01
m2
248.27
65.51
03.01.03.02
m2
129.41
97.42
03.01.04
PISOS Y PAVIMENTOS
03.01.04.01
CONTRAPISOS
03.01.04.01.01
CONTRAPISO E=4 CM BASE 3 CM. MEZC. C:H 1:5 ACAB. 1 CM. PASTA C:A 1:2 (ACABADO SEMIP
m2
64.58
26.60
03.01.04.02
PISOS
03.01.04.02.01
m2
64.58
67.41
03.01.04.02.02
m2
156.42
140.75
03.01.05
ZOCALOS Y CONTRAZOCALOS
03.01.05.01
ZOCALOS
03.01.05.01.01
ZOCALO DE CERAMICO 30 X 30 cm
m2
80.11
72.76
03.01.05.01.02
m2
128.56
53.11
03.01.05.02
CONTRAZOCALOS
03.01.05.02.01
m2
3.14
7.17
03.01.05.02.02
m2
55.07
7.17
03.01.05.02.03
m2
3.85
72.76
03.01.05.02.04
11.96
8.85
03.01.06
CARPINTERIA DE MADERA
03.01.06.01
PUERTAS
03.01.06.01.01
m2
23.57
451.98
03.01.06.01.02
m2
28.43
172.82
03.01.06.02
VENTANAS
03.01.06.02.01
m2
2.55
78.03
03.01.06.02.02
m2
48.91
98.03
03.01.06.03
03.01.06.03.01
1.50
405.86
03.01.07
03.01.07.01
VENTANAS DE FIERRO
03.01.07.01.01
m2
2.30
238.99
03.01.07.01.02
m2
2.84
263.77
03.01.07.02
PUERTAS DE FIERRO
03.01.07.02.01
und
1.00
1,689.93
03.01.07.02.02
und
1.00
768.15
03.01.07.02.03
und
1.00
732.70
03.01.07.02.04
und
1.00
512.89
03.01.08
CERRAJERIA
03.01.08.01
BISAGRAS
03.01.08.01.01
und
82.00
31.32
03.01.08.01.02
und
40.00
14.06
03.01.08.01.03
und
12.00
23.52
03.01.08.02
CERRADURAS
03.01.08.02.01
und
9.00
61.14
03.01.08.02.02
und
11.00
35.27
03.01.08.02.03
und
128.00
5.44
03.01.08.02.04
und
3.00
92.13
03.01.08.02.05
und
20.00
9.34
03.01.08.03
ACCESORIOS DE CIERRE
03.01.08.03.01
und
2.00
100.33
03.01.09
03.01.09.01
und
2.00
238.51
03.01.09.02
und
2.00
124.44
03.01.09.03
und
2.00
172.83
03.01.09.04
m2
102.92
177.97
03.01.10
PINTURA
03.01.10.01
m2
407.44
10.24
03.01.10.02
m2
131.71
12.89
03.01.10.03
m2
129.51
12.80
03.01.10.04
m2
111.95
13.91
03.01.10.05
m2
55.07
8.91
03.01.10.06
m2
6.34
8.91
03.01.10.07
m2
232.02
10.78
03.01.10.08
m2
13.87
10.95
03.01.11
OTROS
03.01.11.01
PLACA DE OBRA
03.01.11.01.01
PLACA DE OBRA
und
1.00
320.00
03.01.11.02
SEALIZACION
03.01.11.02.01
und
12.00
31.74
03.01.11.02.02
und
53.00
40.07
03.01.11.02.03
und
24.00
39.18
03.01.11.02.04
PANEL DE SECTORES 0.90X1.10M. EN MADERA TIPO MDF 18MM (CON ETIQUETAS TIPO
GALLETA 0.10x0.40M EN DOBLE ACRILICO 3MM SEGUN MODELO)
und
1.00
1,506.74
03.01.11.02.05
und
1.00
1,406.74
03.01.11.03
MURAL
03.01.11.03.01
glb
1.00
550.00
04
INSTALACIONES SANITARIAS
04.01
EDIFICACION
04.01.01
04.01.01.01
04.01.01.01.01
und
8.00
322.88
04.01.01.01.02
und
3.00
142.95
04.01.01.01.03
und
4.00
167.15
04.01.01.01.04
pza
1.00
255.15
04.01.01.01.05
pza
2.00
225.71
04.01.01.02
SUMINISTRO DE ACCESORIOS
04.01.01.02.01
pza
4.00
16.50
04.01.01.02.02
pza
4.00
16.71
04.01.01.02.03
pza
8.00
18.59
04.01.01.02.04
pza
4.00
287.93
04.01.01.02.05
pza
1.00
177.15
04.01.01.02.06
pza
7.00
25.00
04.01.01.02.07
pza
4.00
287.39
04.01.01.02.08
pza
1.00
120.12
04.01.01.02.09
pza
2.00
93.56
04.01.01.02.10
pza
1.00
243.17
04.01.01.03
04.01.01.03.01
und
18.00
15.78
04.01.01.04
INSTALACION DE ACCESORIOS
04.01.01.04.01
und
36.00
15.97
04.01.02
04.01.02.01
04.01.02.01.01
pto
23.00
42.07
04.01.02.02
REDES DE DISTRIBUCION
04.01.02.02.01
18.90
7.44
04.01.02.02.02
24.80
7.40
04.01.02.02.03
33.89
4.77
04.01.02.02.04
68.69
3.85
04.01.02.03
REDES DE ALIMENTACION
04.01.02.03.01
67.55
7.40
04.01.02.04
04.01.02.04.01
pza
1.00
15.95
04.01.02.04.02
pza
6.00
9.22
04.01.02.04.03
pza
33.00
6.23
04.01.02.04.04
pza
57.00
5.72
04.01.02.04.05
pza
3.00
12.11
04.01.02.04.06
pza
6.00
2.85
04.01.02.04.07
pza
8.00
12.54
04.01.02.04.08
pza
7.00
6.23
04.01.02.04.09
pza
4.00
8.93
04.01.02.04.10
pza
9.00
7.82
04.01.02.04.11
pza
16.00
5.95
04.01.02.04.12
pza
2.00
14.31
04.01.02.04.13
pza
6.00
10.03
04.01.02.04.14
pza
12.00
8.75
04.01.02.04.15
pza
8.00
7.69
04.01.02.05
VALVULAS
04.01.02.05.01
pza
1.00
78.40
04.01.02.05.02
pza
3.00
51.98
04.01.02.05.03
pza
6.00
48.67
04.01.02.05.04
pza
4.00
40.49
04.01.02.05.05
pza
1.00
45.98
04.01.02.06
04.01.02.06.01
213.83
4.56
04.01.02.06.02
m2
85.53
2.33
04.01.02.06.03
m2
85.53
5.67
04.01.02.06.04
m3
42.77
54.98
04.01.02.07
CAJAS DE REGISTRO-CUERPO
04.01.02.07.01
m3
0.48
500.73
04.01.02.07.02
m2
4.00
26.08
04.01.02.08
04.01.02.08.01
m2
0.80
26.08
04.01.02.08.02
m3
0.31
500.73
04.01.02.08.03
und
4.00
16.42
04.01.03
04.01.03.01
04.01.03.01.01
pto
10.00
151.03
04.01.03.02
04.01.03.02.01
32.80
18.25
04.01.03.02.02
29.80
14.12
04.01.03.03
04.01.03.03.01
pza
19.00
3.29
04.01.03.03.02
pza
31.00
11.03
04.01.03.03.03
pza
9.00
3.42
04.01.03.03.04
pza
3.00
2.26
04.01.03.03.05
pza
8.00
4.02
04.01.03.03.06
pza
4.00
7.60
04.01.03.03.07
pza
8.00
10.00
04.01.03.03.08
pza
12.00
4.42
04.01.03.03.09
pza
6.00
2.62
04.01.03.04
VALVULAS
04.01.03.04.01
pza
4.00
48.67
04.01.03.04.02
pza
1.00
41.91
04.01.03.04.03
und
2.00
66.84
04.01.03.04.04
und
2.00
84.45
04.01.03.04.05
und
2.00
15.45
04.01.03.04.06
und
2.00
8.19
04.01.03.05
04.01.03.05.01
62.60
4.56
04.01.03.05.02
m2
25.04
2.33
04.01.03.05.03
m2
25.04
5.67
04.01.03.05.04
m3
12.52
54.98
04.01.04
DESAGUE Y VENTILACION
04.01.04.01
SALIDAS DE DESAGUE
04.01.04.01.01
pto
10.00
8.42
04.01.04.01.02
pto
27.00
8.42
04.01.04.01.03
pto
18.00
10.65
04.01.04.02
REDES DE DERIVACION
04.01.04.02.01
25.00
25.03
04.01.04.02.02
48.70
10.99
04.01.04.03
04.01.04.03.01
16.10
10.99
04.01.04.03.02
30.35
7.20
04.01.04.03.03
57.45
7.20
04.01.04.04
04.01.04.04.01
pza
7.00
34.17
04.01.04.04.02
pza
5.00
18.96
04.01.04.04.03
pza
1.00
15.92
04.01.04.04.04
pza
3.00
10.58
04.01.04.04.05
pza
46.00
6.18
04.01.04.04.06
pza
4.00
6.98
04.01.04.04.07
pza
5.00
32.90
04.01.04.04.08
pza
7.00
17.59
04.01.04.04.09
pza
21.00
8.49
04.01.04.04.10
pza
11.00
10.00
04.01.04.05
INSTALACIONES ESPECIALES
04.01.04.05.01
pza
8.00
7.47
04.01.04.05.02
pza
2.00
47.80
04.01.04.05.03
pza
5.00
14.85
04.01.04.05.04
pza
4.00
18.56
04.01.04.05.05
pza
8.00
22.34
04.01.04.06
04.01.04.06.01
177.60
4.56
04.01.04.06.02
m2
71.04
2.33
04.01.04.06.03
m2
71.04
5.67
04.01.04.06.04
m3
35.52
54.98
04.01.04.07
OBRAS DE CONCRETO
04.01.04.07.01
04.01.04.07.01.01
m3
3.65
386.25
04.01.04.07.01.02
m2
19.83
26.08
04.01.04.07.02
CAJAS DE INSPECCION-TAPAS
04.01.04.07.02.01
m3
0.36
386.25
04.01.04.07.02.02
m2
2.86
26.08
04.01.04.07.02.03
kg
13.00
4.55
04.02
04.02.01
MOVIMIENTO DE TIERRAS
04.02.01.01
EXCAVACIONES
04.02.01.01.01
m3
56.94
19.51
04.02.01.02
RELLENOS
04.02.01.02.01
m2
15.55
2.33
04.02.01.02.02
m3
20.96
51.62
04.02.01.02.03
m3
15.00
145.51
04.02.01.03
04.02.01.03.01
m3
43.18
11.38
04.02.02
04.02.02.01
SOLADOS
04.02.02.01.01
m2
7.17
32.36
04.02.02.02
04.02.02.02.01
CONCRETO f'c=140kg/cm2-P/LOSAS
m3
1.19
386.25
04.02.03
04.02.03.01
04.02.03.01.01
CONCRETO f'c=140kg/cm2-P/POZO
m3
1.10
386.25
04.02.03.01.02
m2
12.80
36.64
04.02.03.01.03
kg
40.60
4.55
04.02.03.02
04.02.03.02.01
CONCRETO f'c=140kg/cm2-P/POZO
m3
1.35
386.25
04.02.03.02.02
m2
10.90
36.64
04.02.03.02.03
kg
49.07
4.55
04.02.03.03
04.02.03.03.01
CONCRETO f'c=140kg/cm2-P/CAJA
m3
0.18
386.25
04.02.03.03.02
m2
3.27
36.64
04.02.03.03.03
kg
2.55
4.55
04.02.03.04
BIOFILTRO
04.02.03.04.01
CONCRETO f'c=140kg/cm2-P/BIOFILTRO
m3
1.25
386.25
04.02.03.04.02
m2
17.64
36.64
04.02.03.04.03
kg
62.47
4.55
04.02.03.05
TAPA DE BIODIGESTOR
04.02.03.05.01
CONCRETO f'c=140kg/cm2-P/TAPAS
m3
0.16
386.25
04.02.03.05.02
m2
1.50
36.64
04.02.03.05.03
kg
7.83
4.55
04.02.04
REVOQUES Y REVESTIMIENTOS
04.02.04.01
04.02.04.01.01
m2
8.89
17.85
04.02.04.02
04.02.04.02.01
m2
6.16
15.17
m2
9.48
15.17
und
1.00
5,374.45
und
1.00
300.51
04.02.04.03
BIOFILTRO
04.02.04.03.01
04.02.05
BIODIGESTOR
04.02.05.01
04.02.06
BIOFILTRO
04.02.06.01
04.02.07
TUBERIAS Y ACCESORIOS
04.02.07.01
7.90
14.63
04.02.07.02
30.00
15.13
04.02.07.03
5.00
9.97
04.02.07.04
glb
1.00
103.86
04.03
04.03.01
MOVIMIENTO DE TIERRAS
04.03.01.01
EXCAVACIONES
04.03.01.01.01
m3
280.00
19.51
04.03.01.02
RELLENOS
04.03.01.02.01
m2
280.00
2.33
04.03.01.02.02
m2
280.00
5.67
04.03.01.02.03
m3
112.00
54.98
04.03.01.02.04
m3
140.00
51.62
04.03.02
04.03.02.01
REDES DE DISTRIBUCION
04.03.02.01.01
360.00
9.98
04.03.02.01.02
200.00
12.25
04.03.02.02
04.03.02.02.01
pza
1.00
14.84
04.03.02.02.02
pza
1.00
5.48
04.04
04.04.01
836.43
1.50
04.04.02
177.60
0.79
05
05.01
05.01.01
05.01.01.01
m2
14.40
0.89
05.01.01.02
m3
8.64
19.51
05.01.01.03
36.00
11.98
05.01.01.04
36.00
9.15
05.01.02
05.01.02.01
m3
0.06
19.51
05.01.02.02
m3
0.09
306.13
05.01.02.03
m2
0.54
111.24
05.01.02.04
TARRAJEO MUROS EXT. FROTACHADO MEZ. C:A 1:5, E=1.0 CM MURETE PARA SUMINISTRO E
m2
2.10
17.18
05.01.02.05
und
1.00
127.30
05.01.02.06
m2
2.10
8.91
05.01.03
ACOMETIDA ELECTRICA
05.01.03.01
glb
1.00
38,500.00
05.02
05.02.01
SALIDA
05.02.01.01
pto
42.00
33.86
05.02.01.02
pto
50.00
38.36
05.02.01.03
pto
18.00
29.71
05.02.01.04
pto
4.00
33.20
05.02.01.05
pto
3.00
38.64
05.02.01.06
pto
1.00
30.83
05.02.01.07
pto
2.00
25.22
05.02.01.08
pto
2.00
57.34
05.02.01.09
pto
7.00
39.14
05.02.01.10
pto
12.00
39.68
05.02.01.11
pto
2.00
47.89
05.02.01.12
pto
2.00
62.65
05.02.02
05.02.02.01
20.00
5.55
05.02.02.02
50.00
7.34
05.02.02.03
586.40
5.37
05.02.03
05.02.03.01
316.00
4.52
05.02.03.02
270.40
5.82
05.02.03.03
82.00
8.03
05.02.03.04
10.00
12.91
05.02.04
TABLEROS DE DISTRIBUCION
05.02.04.01
und
1.00
2,296.61
05.02.04.02
und
1.00
1,033.40
05.02.04.03
und
1.00
1,014.20
05.02.04.04
und
1.00
1,014.20
05.02.04.05
und
1.00
1,304.26
05.02.04.06
und
1.00
1,061.41
05.02.04.07
und
1.00
975.73
05.03
INSTALACION DE PARARRAYOS
05.03.01
MOVIMIENTO DE TIERRAS
05.03.01.01
EXCAVACIONES
05.03.01.01.01
m3
1.33
19.51
05.03.01.02
RELLENOS
05.03.01.02.01
m2
1.39
2.33
05.03.01.02.02
m3
0.20
51.62
05.03.01.03
05.03.01.03.01
m3
1.36
11.38
05.03.02
05.03.02.01
SOLADOS
05.03.02.01.01
m2
0.64
32.36
05.03.02.02
05.03.02.02.01
CONCRETO f'c=140kg/cm2-P/DADOS
m3
0.75
386.25
05.03.03
05.03.03.01
ZAPATAS
05.03.03.01.01
m3
0.19
537.80
05.03.03.01.02
kg
2.91
4.55
05.03.03.02
COLUMNAS
05.03.03.02.01
m3
0.20
460.61
05.03.03.02.02
m2
1.60
36.93
05.03.03.02.03
kg
7.37
4.55
05.03.04
ESTRUCTURAS METALICAS
05.03.04.01
und
1.00
3,872.21
05.03.05
PINTURA
05.03.05.01
m2
1.02
8.19
05.03.05.02
m2
1.02
8.91
05.03.06
PARARRAYOS
05.03.06.01
und
1.00
5,234.35
05.04
05.04.01
m3
59.02
19.51
05.04.02
m2
59.02
2.33
05.04.03
m2
59.02
5.67
05.04.04
147.55
11.98
05.04.05
POZO DE TIERRA
6.00
873.20
05.04.06
147.55
29.16
05.04.07
BENTONITA Y SAL
147.55
8.44
05.04.08
ACCESORIOS DE TERMOFUSION
und
24.00
89.46
05.05
ARTEFACTOS
und
05.05.01
LAMPARAS
05.05.01.01
und
7.00
88.18
05.05.01.02
und
11.00
138.18
05.05.01.03
und
17.00
343.31
05.05.01.04
LUZ DE EMERGENCIA
und
4.00
149.08
05.05.02
REFLECTORES
05.05.02.01
und
8.00
213.18
05.06
05.06.01
05.06.01.01
SALIDA
05.06.01.01.01
pto
1.00
31.02
20.00
7.32
20.00
5.82
m2
54.40
0.89
05.06.01.02
05.06.01.02.01
05.06.01.03
05.06.01.03.01
05.06.02
SISTEMAS DE SEGURIDAD
05.06.02.01
TRABAJOS PRELIMINARES
05.06.02.01.01
05.06.02.02
MOVIMIENTO DE TIERRAS
05.06.02.02.01
m3
21.76
19.51
05.06.02.02.02
136.00
11.98
05.06.02.03
SISTEMAS ELECTROMECANICOS
05.06.02.03.01
glb
1.00
339.98
05.06.02.03.02
glb
1.00
346.58
05.06.02.03.03
glb
1.00
294.17
05.06.02.03.04
glb
1.00
294.17
05.06.02.04
TUBERIAS
05.06.02.04.01
136.00
8.64
05.06.02.04.02
120.00
8.64
05.06.02.04.03
85.00
8.64
05.06.02.04.04
12.00
7.32
05.06.02.05
SALIDAS
05.06.02.05.01
pto
4.00
22.72
05.06.02.06
CABLEADO DE DATA
05.06.02.06.01
136.00
1.46
05.06.02.06.02
120.00
2.25
05.06.02.06.03
85.00
2.25
05.06.02.07
05.06.02.07.01
und
1.00
273.40
05.07
VARIOS
05.07.01
PRUEBAS ELECTRICAS
05.07.01.01
und
1.00
1,000.00
05.07.02
05.07.02.01
mes
1.00
2,000.00
06
INSTALACIONES DE COMUNICACIONES
06.01
06.01.01
TRABAJOS PRELIMINARES
06.01.01.01
06.01.02
MOVIMIENTO DE TIERRAS
06.01.02.01
m2
30.60
0.89
m3
15.30
19.51
06.01.02.02
76.50
11.98
06.01.03
CABLEADO Y ACCESORIOS
06.01.03.01
580.00
1.51
06.01.03.02
glb
1.00
1,431.47
06.01.03.03
und
1.00
905.75
06.01.04
06.01.04.01
30.00
17.18
06.01.04.02
20.00
10.91
06.01.04.03
240.00
7.32
06.01.05
SALIDAS DE COMUNICACIONES
06.01.05.01
pto
4.00
62.65
06.01.05.02
pto
18.00
62.65
06.01.06
PATCH PANEL
06.01.06.01
und
1.00
64.32
06.01.07
RACK DE COMUNICACIONES
06.01.07.01
und
1.00
162.79
06.02
VARIOS
06.02.01
06.02.01.01
mes
1.00
2,000.00
07
EQUIPAMIENTO
07.01
MOBILIARIO BASICO
07.01.01
und
4.00
240.00
07.01.02
und
2.00
270.00
07.01.03
und
4.00
540.00
07.01.04
und
4.00
549.68
07.01.05
und
5.00
479.51
07.01.06
und
1.00
225.00
07.01.07
und
6.00
558.00
07.01.08
und
4.00
55.00
07.01.09
und
18.00
150.96
07.01.10
und
80.00
28.49
07.01.11
und
6.00
66.00
07.01.12
und
1.00
1,325.95
07.01.13
und
1.00
345.00
07.02
EQUIPAMIENTO BASICO
07.02.01
OFICINAS
07.02.01.01
CAMARA WEB 5MPX 1080P HD, CAP. VIDEO 720P, ZOOM DIGITAL 3X, MICROFONO INCORP.
und
2.00
99.00
07.02.01.02
CMARA DE FOTOS SEMI PROFESIONAL 12.1 MPX CMOS 1/1.7 " SX(28mm-140mm) 4.0X +
FILMADORA PANT. 3" LCD
und
1.00
649.00
07.02.01.03
und
1.00
120.00
07.02.01.04
und
1.00
07.02.01.05
MICROFONO DE PERIFONEO
und
1.00
50.00
07.02.01.06
und
1.00
540.00
07.02.01.07
und
1.00
189.90
07.02.01.08
und
1.00
1,200.00
07.02.01.09
und
1.00
2,846.00
07.02.01.10
COMPUTADORA PORTATIL, PROCES 4 NUCLEOS, RAM: 8GB (2X4GB), PANT: 15.6" LED,
C/SONIDO, CAMARA WEB, WIFI, BLUETOOTH, GRABADOR,LECTOR DVD+/-RW
und
2.00
3,100.00
07.02.01.11
und
1.00
5,827.97
07.02.01.12
und
1.00
118.18
07.02.01.13
und
4.00
720.00
07.02.01.14
BANDERAS(03 UNIDADES)
glb
1.00
720.00
07.02.01.15
und
3.00
119.90
07.02.01.16
und
1.00
119.90
07.02.01.17
und
2.00
565.00
07.02.01.18
und
1.00
3,345.30
07.02.01.19
und
3.00
520.38
07.02.01.20
und
1.00
500.00
07.02.01.21
SWITCH DE 24P PoE/24 PUERTOS GI, RAQUEABLE CAP. 12Gbps FLASH 32 MB MIN. DRAM 128
MB
und
1.00
4,661.02
07.02.02
DORMITORIOS
07.02.02.01
und
10.00
27.50
07.02.02.02
und
20.00
65.78
07.02.02.03
und
40.00
85.00
07.02.02.04
und
10.00
82.39
07.02.02.05
und
10.00
240.90
07.02.02.06
und
3.00
209.73
07.02.02.07
und
2.00
225.73
07.02.02.08
und
4.00
257.73
07.02.02.09
und
2.00
597.73
07.02.02.10
und
4.00
657.73
07.02.02.11
und
7.00
66.88
07.02.02.12
und
10.00
17.14
07.02.03
COCINA
07.02.03.01
und
1.00
76.89
07.02.03.02
und
1.00
104.50
07.02.03.03
und
1.00
143.00
07.02.03.04
und
1.00
19.44
07.02.03.05
und
2.00
16.39
07.02.03.06
und
1.00
5.79
07.02.03.07
und
1.00
9.79
840.00
07.02.03.08
und
12.00
3.52
07.02.03.09
und
12.00
3.52
07.02.03.10
und
12.00
3.52
07.02.03.11
und
12.00
3.52
07.02.03.12
jgo
1.00
27.39
07.02.03.13
und
12.00
1.80
07.02.03.14
und
12.00
1.80
07.02.03.15
und
12.00
1.21
07.02.03.16
und
1.00
7.59
07.02.03.17
und
12.00
3.07
07.02.03.18
und
1.00
22.99
07.02.03.19
und
1.00
71.50
07.02.03.20
und
1.00
17.49
07.02.03.21
und
1.00
7.59
07.02.03.22
und
4.00
3.30
07.02.03.23
COCINA SEMIINDUSTRIAL ALTA 03 HORNILLAS LARGO 0.90M X ANCHO 55CM X ALTO 70CM
und
1.00
450.00
07.02.03.24
und
1.00
2,699.00
07.02.04
OFICINA 2
07.02.04.01
und
3.00
230.00
07.02.04.02
und
1.00
385.00
07.02.05
HERRAMIENTAS
07.02.05.01
und
2.00
7.94
07.02.05.02
und
2.00
17.38
07.02.05.03
und
5.00
32.90
07.02.05.04
und
2.00
59.90
07.02.05.05
und
1.00
1,023.41
07.02.05.06
und
2.00
153.89
07.02.05.07
und
3.00
13.09
07.02.05.08
und
2.00
57.39
07.02.05.09
und
2.00
35.00
07.02.05.10
und
2.00
30.69
07.02.05.11
und
1.00
43.89
07.02.05.12
und
3.00
235.00
07.02.05.13
und
1.00
188.97
07.02.05.14
und
9.00
19.87
07.02.06
SANITARIAS
07.02.06.01
und
1.00
751.25
07.02.06.02
und
1.00
2,529.89
07.02.06.03
und
1.00
1,263.85
07.02.07
ELECTRICOS
07.02.07.01
UPS TIPO TOWER POT. MIN. 2500 VA Ventrada=100-240V Vsalida= 220VAC, 10 MINUTOS
AUTONOMIA C/PUERTOS DE COM. RJ45,RS232
und
1.00
3,427.55
07.02.07.02
und
1.00
1,488.81
07.02.07.03
GENERADOR ELECTRICO 8HP 6kW prime 7.5kVA MONOFASICO 220V, 60HZ, 4T-REFRIGERADO
POR AIRE CIL. 150 A 250CM3 CAP. TANQ. 3.6 - 6.8 LT. GASOLINA
und
1.00
6,045.43
07.02.07.04
und
6.00
204.44
07.02.07.05
und
1.00
474.30
07.02.07.06
PULSADOR DE EMERGENCIA
und
4.00
26.00
07.02.07.07
und
2.00
46.47
07.02.07.08
und
4.00
3,442.35
07.02.07.09
und
1.00
1,883.87
07.02.07.10
und
2.00
12.00
07.02.07.11
und
1.00
1,280.30
07.02.07.12
DETECTOR DE TEMPERATURA
und
1.00
216.00
07.02.07.13
und
1.00
2,383.90
07.02.07.14
und
1.00
465.00
07.02.08
MOVILIDAD
07.02.08.01
MOTO LINEAL CILIN. 124CC -140CC, 4 T, MONOCILINDRICO, OHC, POT. MAX. 11.13HP@7,000
RPM -12.0HP@ 7,500 RPM
und
1.00
6,690.00
87.09%
GASTOS GENERALES
9.37%
96.47%
GASTOS DE SUPERVISION
3.53%
100.00%
AVANCE FISICO %
GO SNIP N 289371
CORRESPONDIENTE AL MES DE
FECHA DE PRESENTACION
MONTO FINANCIADO
PLAZO DE EJECUCION
:
AVANCES
PRESUPUESTO
ANTERIOR
Presup. S/.
Metrado
ACTUAL
Valorizado
Metrado
ACUMULADO
Valorizado
Metrado
Valorizado
9,894.66
1.00
9,894.66
0.00
1.00
9,894.660
100%
1,304.82
2.00
1,304.82
0.00
2.00
1,304.820
100%
1,134.34
1.00
1,134.34
0.00
1.00
1,134.340
100%
1,766.25
0.50
883.13
0.00
0.50
883.125
50%
1,900.00
2500.00
1,900.00
0.00
2500.00
1,900.000
100%
5,913.48
303.10
5,913.48
0.00
303.10
5,913.481
100%
39,302.74
0.46
18,079.26
0.30
11,790.82
0.76
29,870.082
76%
712.00
800.00
712.00
0.00
0.00
800.00
712.000
100%
712.00
380.00
338.20
0.00
0.00
380.00
338.200
48%
100.00
1.00
100.00
2.00
200.000
50%
3,100.06
2.00
3,100.06
4.00
6,200.120
100%
226.34
2.00
226.34
4.00
452.680
100%
1.00
200.83
2.00
401.660
50%
400.00
6,200.12
452.68
1.00
2.00
2.00
803.32
1.00
200.83
400.00
1.00
100.00
1.00
100.00
2.00
200.000
50%
15.40
0.20
15.40
0.40
30.800
40%
0.20
20.00
0.20
20.000
20%
77.00
100.00
400.00
84.00
400.00
0.20
0.00
0.00
1.00
100.00
1.00
100.000
25%
0.00
10.00
28.00
10.00
28.000
33%
1.00
100.00
1.00
100.000
25%
0.20
101.82
0.20
101.816
20%
0.00
509.08
0.00
120.44
215.38
0.00
0.50
1.00
30.11
1.00
30.110
25%
107.69
0.00
0.00
0.50
107.690
50%
1,501.88
0.00
0.00
76.98
1,501.880
100%
31,731.06
0.00
0.00
1626.40
31,731.064
100%
1,165.58
0.00
0.00
22.58
1,165.580
100%
10,018.25
0.00
0.00
473.90
10,018.246
100%
1,828.90
1,501.88
31,731.06
1,165.58
10,018.25
76.98
1626.40
22.58
473.90
1,288.65
553.07
1,288.65
0.00
0.00
553.07
1,288.653
100%
773.84
68.00
773.84
0.00
0.00
68.00
773.840
100%
2,310.83
71.41
2,310.83
0.00
0.00
71.41
2,310.828
100%
2,809.89
9.22
2,809.89
0.00
0.00
9.22
2,809.887
100%
3,663.46
140.47
3,663.46
0.00
0.00
140.47
3,663.458
100%
407.93
90.05
407.93
0.00
0.00
90.05
407.927
100%
21.51
0.00
0.00
0.00
0.00
0.000
0%
50.33
0.00
0.00
0.00
0.00
0.000
0%
9,083.24
0.00
0.00
0.00
0.00
0.000
0%
894.54
0.00
0.00
0.00
0.00
0.000
0%
1,793.56
0.00
0.00
0.00
0.00
0.000
0%
1,241.54
0.00
0.00
0.00
0.00
0.000
0%
3,790.53
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
293.66
0.00
743.51
0.00
672.96
0.00
0.00
0.00
0.00
0.000
0%
585.85
0.00
0.00
0.00
0.00
0.000
0%
61.81
0.00
0.00
0.00
0.00
0.000
0%
189.00
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
10.87
5,845.886
100%
0.00
8,972.27
0.00
5,845.89
10.87
5,845.89
1,613.07
354.52
1,613.07
0.00
0.00
354.52
1,613.066
100%
9,658.89
17.96
9,658.89
0.00
0.00
17.96
9,658.888
100%
2,634.78
71.91
2,634.78
0.00
0.00
71.91
2,634.782
100%
8,300.88
0.00
0.00
1824.37
8,300.884
100%
8,300.88
1824.37
305.63
44.23
305.63
0.00
0.00
44.23
305.629
100%
4,490.95
9.75
4,490.95
0.00
0.00
9.75
4,490.948
100%
4,374.36
118.45
4,374.36
0.00
0.00
118.45
4,374.359
100%
2,213.66
18.61
2,213.66
0.00
0.00
18.61
2,213.660
100%
7,902.21
0.00
0.00
1736.75
7,902.213
100%
12.39
5,706.958
100%
7,902.21
1736.75
5,706.96
12.39
5,706.96
0.00
0.00
4,296.81
116.35
4,296.81
0.00
0.00
116.35
4,296.806
100%
7,216.98
1586.15
7,216.98
0.00
0.00
1586.15
7,216.983
100%
2,381.35
5.17
2,381.35
0.00
0.00
5.17
2,381.354
100%
2,944.80
0.00
0.00
79.74
2,944.798
100%
4,931.02
0.00
0.00
1083.74
4,931.017
100%
2,944.80
4,931.02
967.28
79.74
1083.74
2.10
967.28
0.00
0.00
2.10
967.281
100%
856.41
23.19
856.41
0.00
0.00
23.19
856.407
100%
1,601.42
351.96
1,601.42
0.00
0.00
351.96
1,601.418
100%
271.76
0.00
0.00
0.59
271.760
100%
439.10
0.00
0.00
11.89
439.098
100%
161.30
0.00
0.00
35.45
161.298
100%
271.76
439.10
161.30
0.59
11.89
35.45
340.85
0.00
0.00
0.00
0.00
0.000
0%
395.89
0.00
0.00
0.00
0.00
0.000
0%
185.87
0.00
0.00
0.00
0.00
0.000
0%
4,544.79
3.00
4,544.79
0.00
0.00
3.00
4,544.790
100%
2,910.00
0.00
0.00
2.00
2,910.000
100%
8,763.96
0.00
0.00
6.00
8,763.960
100%
0.00
0.00
0.00
0.000
0%
0.00
0.00
419.20
8,698.400
100%
2,910.00
8,763.96
2.00
6.00
1,275.67
0.00
8,698.40
419.20
1,505.36
8,698.40
0.00
0.00
0.00
0.00
0.000
0%
349.96
0.00
0.00
0.00
0.00
0.000
0%
204.30
0.00
0.00
0.00
0.00
0.000
0%
1,210.14
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.00
0.000
0%
241.92
52,330.54
0.00
0.00
0.00
0.000
0%
0.00
1,198.04
0.00
0.00
0.00
0.00
0.000
0%
2,126.23
0.00
0.00
0.00
0.00
0.000
0%
1,126.41
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
6.30
122.913
100%
7,600.02
0.00
987.09
0.00
122.91
6.30
2,649.68
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
205.30
331.48
195.79
53,727.81
0.00
0.00
0.00
1,165.19
122.91
0.00
228.39
0.00
0.00
0.00
0.00
0.000
0%
5.46
0.00
0.00
0.00
0.00
0.000
0%
131.33
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
23.47
0.00
2,415.90
0.00
649.34
0.00
405.12
405.12
0.00
0.00
34.73
0.00
0.00
0.00
0.00
0.000
0%
38.72
0.00
0.00
0.00
0.00
0.000
0%
14.11
0.00
0.00
0.00
0.00
0.000
0%
56.95
0.00
0.00
0.00
0.00
0.000
0%
360.53
0.00
0.00
0.00
0.00
0.000
0%
34.43
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
49.18
359.28
126.30
172.26
583.33
1,166.66
0.00
0.00
0.00
33.73
0.00
0.00
0.00
0.00
0.000
0%
27.44
0.00
0.00
0.00
0.00
0.000
0%
268.26
13.75
268.26
0.00
0.00
13.75
268.263
100%
14.56
6.25
14.56
0.00
0.00
6.25
14.563
100%
129.05
2.50
129.05
0.00
0.00
2.50
129.050
100%
6.25
132.13
6.25
132.125
100%
7.33
83.42
14.63
166.489
100%
0.00
0.00
0.00
0.000
0%
0.00
0.00
6.25
202.250
100%
132.13
0.00
166.49
7.30
378.16
0.00
202.25
6.25
83.07
202.25
235.34
0.00
0.00
0.00
0.00
0.000
0%
70.68
0.00
0.00
0.00
0.00
0.000
0%
32.10
0.00
0.00
0.00
0.00
0.000
0%
2,764.29
0.00
0.00
0.00
0.00
0.000
0%
886.32
0.00
0.00
0.00
0.00
0.000
0%
730.37
0.00
0.00
0.00
0.00
0.000
0%
552.73
0.00
1.20
552.73
1.20
552.732
100%
756.33
0.00
20.48
756.33
20.48
756.326
100%
1,013.60
0.00
222.77
1,013.60
222.77
1,013.604
100%
921.22
0.00
2.00
921.22
2.00
921.220
100%
775.53
0.00
21.00
775.53
21.00
775.530
100%
1,128.90
0.00
248.11
1,128.90
248.11
1,128.901
100%
681.70
0.00
1.48
681.70
1.48
681.703
100%
350.84
0.00
9.50
350.84
9.50
350.835
100%
305.58
0.00
67.16
305.58
67.16
305.578
100%
25.81
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
22.98
0.00
41.18
0.00
0.00
0.00
0.00
0.000
0%
808.70
0.00
10.81
808.70
10.81
808.696
100%
134.53
0.00
10.01
134.53
10.01
134.534
100%
96.90
0.00
7.21
96.90
7.21
96.902
100%
197.97
0.00
13.05
197.97
13.05
197.969
100%
233.90
0.00
13.20
233.90
13.20
233.904
100%
338.45
0.00
19.10
338.45
19.10
338.452
100%
3.01
0.00
0.17
3.01
0.17
3.012
100%
330.50
0.00
12.50
330.50
12.50
330.500
100%
235.91
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
22.80
5.23
0.00
0.00
696.05
0.00
31.37
0.00
70.56
0.00
0.00
0.00
0.00
0.000
0%
61.14
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
100.33
113.11
64.24
0.00
0.00
182.50
0.00
143.90
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
933.70
2,150.82
0.00
0.00
743.76
0.00
0.00
0.00
0.00
0.000
0%
125.89
0.00
0.00
0.00
0.00
0.000
0%
69.19
0.00
9.30
69.19
9.30
69.192
100%
67.52
0.00
10.50
67.52
10.50
67.515
100%
31.90
0.00
2.00
31.90
2.00
31.900
100%
64.54
0.00
7.00
64.54
7.00
64.540
100%
20.34
0.00
3.00
20.34
3.00
20.340
100%
13.28
0.00
1.00
13.28
1.00
13.280
100%
12.11
0.00
1.00
12.11
1.00
12.110
100%
11.40
0.00
4.00
11.40
4.00
11.400
100%
6.61
0.00
1.00
6.61
1.00
6.610
100%
83.40
0.00
1.00
83.40
1.00
83.400
100%
82.94
0.00
1.00
82.94
1.00
82.940
100%
2.00
91.68
2.00
91.680
100%
104.10
1.00
104.100
100%
91.68
0.00
104.10
0.00
1.00
84.67
0.00
1.00
84.67
1.00
84.670
100%
102.70
0.00
1.00
102.70
1.00
102.700
100%
33.46
0.00
0.00
0.00
0.00
0.000
0%
17.57
0.00
0.00
0.00
0.00
0.000
0%
64.40
0.00
0.00
0.00
0.00
0.000
0%
63.21
0.00
3.24
63.21
3.24
63.212
100%
7.55
0.00
3.24
7.55
3.24
7.549
100%
22.20
0.00
0.43
22.20
0.43
22.197
100%
4.86
102.74
4.86
102.740
100%
102.74
0.00
49.86
0.00
3.65
49.86
3.65
49.859
100%
734.60
0.00
2.59
734.60
2.59
734.602
100%
182.86
0.00
0.60
182.86
0.60
182.856
100%
209.94
0.00
8.05
209.94
8.05
209.944
100%
255.37
0.00
0.00
0.00
0.00
0.000
0%
72.24
0.00
0.00
0.00
0.00
0.000
0%
32.10
0.00
0.00
0.00
0.00
0.000
0%
109.34
0.00
0.00
0.00
0.00
0.000
0%
0.26
119.76
0.26
119.759
100%
119.76
224.90
0.00
0.00
6.09
224.90
6.09
224.904
100%
171.81
0.00
37.16
169.08
37.16
169.078
98%
119.76
0.00
0.26
119.76
0.26
119.759
100%
113.74
0.00
3.08
113.74
3.08
113.744
100%
176.40
0.00
38.77
176.40
38.77
176.404
100%
290.18
0.00
0.63
290.18
0.63
290.184
100%
288.05
0.00
7.80
288.05
7.80
288.054
100%
174.58
0.00
38.37
174.58
38.37
174.584
100%
161.21
0.00
0.00
0.00
0.00
0.000
0%
190.19
0.00
0.00
0.00
0.00
0.000
0%
62.79
0.00
0.00
0.00
0.00
0.000
0%
923.16
0.00
12.34
923.16
12.34
923.155
100%
34.81
0.00
2.59
34.81
2.59
34.810
100%
122.30
0.00
9.10
122.30
9.10
122.304
100%
139.41
0.00
9.19
139.41
9.19
139.412
100%
6.09
107.91
6.09
107.915
100%
3.08
54.58
3.08
54.578
100%
107.91
0.00
54.58
0.00
21.80
0.00
1.23
21.80
1.23
21.796
100%
206.23
0.00
0.00
0.00
0.00
0.000
0%
81.93
0.00
0.00
0.00
0.00
0.000
0%
207.62
0.00
0.00
0.00
0.00
0.000
0%
23.23
0.00
0.00
0.00
0.00
0.000
0%
242.29
0.00
0.00
0.00
0.00
0.000
0%
40.75
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
714.13
0.00
43.13
0.00
70.56
0.00
0.00
0.00
0.00
0.000
0%
61.14
0.00
0.00
0.00
0.00
0.000
0%
100.33
0.00
0.00
0.00
0.00
0.000
0%
133.11
0.00
0.00
0.00
0.00
0.000
0%
81.08
0.00
0.00
0.00
0.00
0.000
0%
51.87
0.00
0.00
0.00
0.00
0.000
0%
40.90
0.00
0.00
0.00
0.00
0.000
0%
322.88
0.00
0.00
0.00
0.00
0.000
0%
142.95
0.00
0.00
0.00
0.00
0.000
0%
16.50
0.00
0.00
0.00
0.00
0.000
0%
16.71
0.00
0.00
0.00
0.00
0.000
0%
18.59
0.00
0.00
0.00
0.00
0.000
0%
53.00
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
25.00
0.00
31.56
0.00
0.00
0.00
0.00
0.000
0%
79.85
0.00
0.00
0.00
0.00
0.000
0%
126.21
0.00
3.00
126.21
3.00
126.210
100%
37.93
0.00
3.63
37.93
3.63
37.934
100%
38.31
0.00
9.95
38.31
9.95
38.308
100%
80.08
0.00
14.00
80.08
14.00
80.080
100%
12.54
0.00
1.00
12.54
1.00
12.540
100%
12.46
0.00
2.00
12.46
2.00
12.460
100%
8.93
0.00
1.00
8.93
1.00
8.930
100%
7.82
0.00
1.00
7.82
1.00
7.820
100%
11.90
0.00
2.00
11.90
2.00
11.900
100%
30.76
0.00
4.00
30.76
4.00
30.760
100%
80.98
0.00
2.00
80.98
2.00
80.980
100%
42.10
0.00
5.00
42.10
5.00
42.100
100%
8.42
0.00
1.00
8.42
1.00
8.420
100%
62.20
0.00
5.66
62.20
5.66
62.203
100%
62.28
0.00
8.65
62.28
8.65
62.280
100%
0.00
5.50
39.60
5.50
39.600
100%
2.00
68.34
2.00
68.340
100%
39.60
68.34
15.92
0.00
0.00
1.00
15.92
1.00
15.920
100%
24.72
0.00
4.00
24.72
4.00
24.720
100%
8.37
0.00
1.00
8.37
1.00
8.370
100%
27.92
0.00
4.00
27.92
4.00
27.920
100%
110.75
0.00
5.00
110.75
5.00
110.750
100%
16.98
0.00
2.00
16.98
2.00
16.980
100%
20.00
0.00
0.00
0.00
0.00
0.000
0%
7.47
0.00
0.00
0.00
0.00
0.000
0%
47.80
0.00
0.00
0.00
0.00
0.000
0%
18.56
0.00
0.00
0.00
0.00
0.000
0%
1.95
0.00
0.00
0.00
0.00
0.000
0%
54.08
0.00
0.00
0.00
0.00
0.000
0%
22.16
0.00
0.00
0.00
0.00
0.000
0%
212.01
0.00
0.00
0.00
0.00
0.000
0%
22.44
0.00
0.00
0.00
0.00
0.000
0%
18.85
0.00
0.00
0.00
0.00
0.000
0%
475.09
0.00
0.00
0.00
0.00
0.000
0%
44.32
0.00
0.00
0.00
0.00
0.000
0%
245.44
0.00
0.00
0.00
0.00
0.000
0%
203.26
0.00
0.00
0.00
0.00
0.000
0%
4,201.12
0.00
0.00
0.00
0.00
0.000
0%
1,093.53
0.00
0.00
0.00
0.00
0.000
0%
395.46
0.00
0.00
0.00
0.00
0.000
0%
140.20
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
147.87
0.00
192.37
0.00
0.00
0.00
0.00
0.000
0%
100.47
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
50.52
0.00
13,193.80
0.00
0.00
0.00
0.00
0.000
0%
218.15
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
355.53
0.00
69.46
0.00
3.56
69.46
3.56
69.456
100%
15.08
0.00
6.47
15.08
6.47
15.075
100%
63.25
0.00
4.63
63.25
4.63
63.246
100%
734.60
0.00
2.59
734.60
2.59
734.602
100%
268.19
0.00
0.88
268.19
0.88
268.189
100%
354.95
0.00
13.61
354.95
13.61
354.949
100%
42.63
0.00
9.41
42.63
9.41
42.627
100%
119.76
0.00
0.26
119.76
0.26
119.759
100%
4.00
147.72
4.00
147.720
100%
66.56
302.85
66.56
302.848
100%
0.27
124.36
0.27
124.365
100%
147.72
302.85
124.36
0.00
0.00
0.00
150.67
0.00
4.08
150.67
4.08
150.674
100%
136.59
0.00
30.02
136.59
30.02
136.591
100%
865.55
0.00
11.57
865.55
11.57
865.552
100%
311.00
0.00
23.14
311.00
23.14
311.002
100%
179.33
0.00
10.12
179.33
10.12
179.326
100%
39.00
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
298.27
140.77
48.47
0.00
0.00
0.00
432.97
0.00
0.00
0.00
0.00
0.000
0%
361.91
0.00
0.00
0.00
0.00
0.000
0%
161.89
0.00
0.00
0.00
0.00
0.000
0%
15.47
1,157.31
265.47
19,859.811
100%
19,859.81
250.00
18,702.50
1,191.24
0.00
80.11
1,191.24
80.11
1,191.236
100%
5,197.38
0.00
386.71
5,197.38
386.71
5,197.382
100%
1,586.19
0.00
118.02
1,586.19
118.02
1,586.189
100%
433.96
0.00
24.49
433.96
24.49
433.963
100%
225.54
0.00
2.92
225.54
2.92
225.541
100%
93.45
0.00
1.42
93.45
1.42
93.450
100%
2,351.44
0.00
132.70
2,351.44
132.70
2,351.444
100%
1,983.75
0.00
111.95
1,983.75
111.95
1,983.754
100%
16,264.17
0.00
0.00
0.00
0.00
0.000
0%
12,607.12
0.00
0.00
0.00
0.00
0.000
0%
1,717.83
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
4,353.34
22,016.12
0.00
0.00
5,828.80
0.00
0.00
0.00
0.00
0.000
0%
6,827.82
0.00
0.00
0.00
0.00
0.000
0%
22.51
0.00
0.00
0.00
0.00
0.000
0%
394.85
0.00
0.00
0.00
0.00
0.000
0%
280.13
0.00
0.00
0.00
0.00
0.000
0%
105.85
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
10,653.17
0.00
4,913.27
0.00
198.98
0.00
4,794.65
0.00
608.79
0.00
0.00
0.00
0.00
0.000
0%
549.68
0.00
0.00
0.00
0.00
0.000
0%
749.11
0.00
0.00
0.00
0.00
0.000
0%
1,689.93
0.00
0.00
0.00
0.00
0.000
0%
768.15
0.00
0.00
0.00
0.00
0.000
0%
732.70
0.00
0.00
0.00
0.00
0.000
0%
512.89
0.00
0.00
0.00
0.00
0.000
0%
2,568.24
0.00
0.00
0.00
0.00
0.000
0%
562.40
0.00
0.00
0.00
0.00
0.000
0%
282.24
0.00
0.00
0.00
0.00
0.000
0%
550.26
0.00
0.00
0.00
0.00
0.000
0%
387.97
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
696.32
0.00
276.39
0.00
0.00
0.00
0.00
0.000
0%
186.80
0.00
0.00
0.00
0.00
0.000
0%
200.66
0.00
0.00
0.00
0.00
0.000
0%
477.02
0.00
0.00
0.00
0.00
0.000
0%
248.88
0.00
0.00
0.00
0.00
0.000
0%
345.66
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
18,316.67
4,172.19
1,697.74
1,657.73
0.00
0.00
0.00
0.00
1,557.22
490.67
56.49
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
2,501.18
0.00
0.00
0.00
0.00
0.000
0%
151.88
0.00
0.00
0.00
0.00
0.000
0%
320.00
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
380.88
0.00
2,123.71
940.32
0.00
0.00
1,506.74
0.00
1,406.74
0.00
550.00
0.00
0.00
0.00
0.00
0.000
0%
2,583.04
0.00
0.00
0.00
0.00
0.000
0%
428.85
0.00
0.00
0.00
0.00
0.000
0%
668.60
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
255.15
0.00
451.42
0.00
0.00
0.00
0.00
0.000
0%
66.00
0.00
0.00
0.00
0.00
0.000
0%
66.84
0.00
0.00
0.00
0.00
0.000
0%
148.72
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
1,151.72
177.15
175.00
0.00
0.00
0.00
1,149.56
0.00
0.00
0.00
0.00
0.000
0%
120.12
0.00
0.00
0.00
0.00
0.000
0%
187.12
0.00
0.00
0.00
0.00
0.000
0%
243.17
0.00
0.00
0.00
0.00
0.000
0%
284.04
0.00
0.00
0.00
0.00
0.000
0%
574.92
0.00
0.00
0.00
0.00
0.000
0%
967.61
0.00
23.00
967.61
23.00
967.610
100%
140.62
0.00
18.90
140.62
18.90
140.616
100%
183.52
0.00
24.80
183.52
24.80
183.520
100%
161.66
0.00
33.89
161.66
33.89
161.655
100%
264.46
0.00
68.69
264.46
68.69
264.457
100%
499.87
0.00
67.55
499.87
67.55
499.870
100%
15.95
0.00
1.00
15.95
1.00
15.950
100%
55.32
0.00
6.00
55.32
6.00
55.320
100%
33.00
205.59
33.00
205.590
100%
205.59
326.04
0.00
0.00
57.00
326.04
57.00
326.040
100%
36.33
0.00
3.00
36.33
3.00
36.330
100%
17.10
0.00
6.00
17.10
6.00
17.100
100%
100.32
0.00
8.00
100.32
8.00
100.320
100%
43.61
0.00
7.00
43.61
7.00
43.610
100%
35.72
0.00
4.00
35.72
4.00
35.720
100%
70.38
0.00
9.00
70.38
9.00
70.380
100%
95.20
0.00
16.00
95.20
16.00
95.200
100%
28.62
0.00
2.00
28.62
2.00
28.620
100%
60.18
0.00
6.00
60.18
6.00
60.180
100%
105.00
0.00
12.00
105.00
12.00
105.000
100%
61.52
0.00
8.00
61.52
8.00
61.520
100%
78.40
0.00
1.00
78.40
1.00
78.400
100%
155.94
0.00
3.00
155.94
3.00
155.940
100%
292.02
0.00
6.00
292.02
6.00
292.020
100%
161.96
0.00
4.00
161.96
4.00
161.960
100%
45.98
0.00
1.00
45.98
1.00
45.980
100%
975.06
0.00
213.83
975.06
213.83
975.065
100%
85.53
199.28
85.53
199.285
100%
85.53
484.96
85.53
484.955
100%
42.77
2,351.49
42.77
2,351.495
100%
199.28
484.96
2,351.49
0.00
0.00
0.00
240.35
0.00
0.00
0.00
0.00
0.000
0%
104.32
0.00
0.00
0.00
0.00
0.000
0%
20.86
0.00
0.00
0.00
0.00
0.000
0%
155.23
0.00
0.00
0.00
0.00
0.000
0%
65.68
0.00
0.00
0.00
0.00
0.000
0%
1,510.30
0.00
10.00
1,510.30
10.00
1,510.300
100%
598.60
0.00
32.80
598.60
32.80
598.600
100%
420.78
0.00
29.80
420.78
29.80
420.776
100%
62.51
0.00
19.00
62.51
19.00
62.510
100%
341.93
0.00
31.00
341.93
31.00
341.930
100%
30.78
0.00
9.00
30.78
9.00
30.780
100%
6.78
0.00
3.00
6.78
3.00
6.780
100%
32.16
0.00
8.00
32.16
8.00
32.160
100%
30.40
0.00
4.00
30.40
4.00
30.400
100%
80.00
0.00
8.00
80.00
8.00
80.000
100%
12.00
53.04
12.00
53.040
100%
53.04
0.00
15.72
0.00
6.00
15.72
6.00
15.720
100%
194.68
0.00
4.00
194.68
4.00
194.680
100%
41.91
0.00
1.00
41.91
1.00
41.910
100%
133.68
0.00
2.00
133.68
2.00
133.680
100%
168.90
0.00
2.00
168.90
2.00
168.900
100%
30.90
0.00
2.00
30.90
2.00
30.900
100%
16.38
0.00
2.00
16.38
2.00
16.380
100%
285.46
0.00
62.60
285.46
62.60
285.456
100%
58.34
0.00
25.04
58.34
25.04
58.343
100%
25.04
141.98
25.04
141.977
100%
12.52
688.35
12.52
688.350
100%
141.98
688.35
84.20
0.00
0.00
0.00
10.00
84.20
10.00
84.200
100%
227.34
0.00
27.00
227.34
27.00
227.340
100%
191.70
0.00
18.00
191.70
18.00
191.700
100%
625.75
0.00
25.00
625.75
25.00
625.750
100%
535.21
0.00
48.70
535.21
48.70
535.213
100%
176.94
0.00
16.10
176.94
16.10
176.939
100%
218.52
0.00
30.35
218.52
30.35
218.520
100%
413.64
0.00
57.45
413.64
57.45
413.640
100%
239.19
0.00
7.00
239.19
7.00
239.190
100%
94.80
0.00
5.00
94.80
5.00
94.800
100%
15.92
0.00
1.00
15.92
1.00
15.920
100%
31.74
0.00
3.00
31.74
3.00
31.740
100%
284.28
0.00
46.00
284.28
46.00
284.280
100%
27.92
0.00
4.00
27.92
4.00
27.920
100%
164.50
0.00
5.00
164.50
5.00
164.500
100%
123.13
0.00
7.00
123.13
7.00
123.130
100%
178.29
0.00
21.00
178.29
21.00
178.290
100%
110.00
0.00
11.00
110.00
11.00
110.000
100%
59.76
0.00
0.00
0.00
0.00
0.000
0%
95.60
0.00
0.00
0.00
0.00
0.000
0%
74.25
0.00
0.00
0.00
0.00
0.000
0%
74.24
0.00
0.00
0.00
0.00
0.000
0%
178.72
0.00
0.00
0.00
0.00
0.000
0%
809.86
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
165.52
402.80
1,952.89
1,409.81
517.17
139.05
74.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59.15
0.00
0.00
0.00
0.00
0.000
0%
1,110.90
56.94
1,110.90
0.00
0.00
56.94
1,110.899
100%
36.23
0.00
0.00
0.00
0.00
0.000
0%
1,081.96
0.00
0.00
0.00
0.00
0.000
0%
2,182.65
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
491.39
0.00
232.02
0.00
0.00
0.00
0.00
0.000
0%
459.64
0.00
0.00
0.00
0.00
0.000
0%
424.88
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
468.99
0.00
184.73
0.00
0.00
0.00
0.00
0.000
0%
521.44
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
399.38
0.00
223.27
0.00
0.00
0.00
0.00
0.000
0%
69.53
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
119.81
0.00
11.60
0.00
0.00
0.00
0.00
0.000
0%
482.81
0.00
0.00
0.00
0.00
0.000
0%
646.33
0.00
0.00
0.00
0.00
0.000
0%
284.24
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
61.80
0.00
54.96
0.00
0.00
0.00
0.00
0.000
0%
35.63
0.00
0.00
0.00
0.00
0.000
0%
158.69
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
93.45
0.00
143.81
0.00
0.00
0.00
0.00
0.000
0%
5,374.45
0.00
0.00
0.00
0.00
0.000
0%
300.51
0.00
0.00
0.00
0.00
0.000
0%
115.58
0.00
0.00
0.00
0.00
0.000
0%
453.90
0.00
0.00
0.00
0.00
0.000
0%
49.85
0.00
0.00
0.00
0.00
0.000
0%
103.86
0.00
0.00
0.00
0.00
0.000
0%
5,462.80
0.00
0.00
280.00
5,462.800
100%
652.40
0.00
0.00
280.00
652.400
100%
1,587.60
0.00
0.00
280.00
1,587.600
100%
6,157.76
0.00
0.00
112.00
6,157.760
100%
0.00
0.00
0.00
0.000
0%
5,462.80
652.40
1,587.60
6,157.76
7,226.80
280.00
280.00
280.00
112.00
0.00
3,592.80
0.00
360.00
3,592.80
360.00
3,592.800
100%
2,450.00
0.00
200.00
2,450.00
200.00
2,450.000
100%
14.84
0.00
1.00
14.84
1.00
14.840
100%
0.00
1.00
5.48
1.00
5.480
100%
5.48
1,254.65
0.00
0.00
0.00
0.00
0.000
0%
140.30
0.00
0.00
0.00
0.00
0.000
0%
12.82
0.00
14.40
12.82
14.40
12.816
100%
168.57
0.00
8.64
168.57
8.64
168.566
100%
36.00
431.28
36.00
431.280
100%
36.00
329.40
36.00
329.400
100%
0.00
0.00
0.00
0.000
0%
431.28
329.40
1.17
0.00
0.00
0.00
27.55
0.00
0.00
0.00
0.00
0.000
0%
60.07
0.00
0.00
0.00
0.00
0.000
0%
36.08
0.00
0.00
0.00
0.00
0.000
0%
127.30
0.00
0.00
0.00
0.00
0.000
0%
18.71
0.00
0.00
0.00
0.00
0.000
0%
38,500.00
0.00
0.00
0.00
0.00
0.000
0%
1,422.12
0.00
42.00
1,422.12
42.00
1,422.120
100%
1,918.00
0.00
50.00
1,918.00
50.00
1,918.000
100%
534.78
0.00
18.00
534.78
18.00
534.780
100%
132.80
0.00
4.00
132.80
4.00
132.800
100%
115.92
0.00
3.00
115.92
3.00
115.920
100%
30.83
0.00
1.00
30.83
1.00
30.830
100%
50.44
0.00
2.00
50.44
2.00
50.440
100%
114.68
0.00
2.00
114.68
2.00
114.680
100%
273.98
0.00
7.00
273.98
7.00
273.980
100%
476.16
0.00
12.00
476.16
12.00
476.160
100%
0.00
2.00
95.78
2.00
95.780
100%
2.00
125.30
2.00
125.300
100%
20.00
111.00
20.00
111.000
100%
95.78
125.30
111.00
0.00
0.00
367.00
0.00
50.00
367.00
50.00
367.000
100%
3,148.97
0.00
586.40
3,148.97
586.40
3,148.968
100%
1,428.32
0.00
0.00
0.00
0.00
0.000
0%
1,573.73
0.00
0.00
0.00
0.00
0.000
0%
658.46
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
129.10
0.00
2,296.61
0.00
0.00
0.00
0.00
0.000
0%
1,033.40
0.00
0.00
0.00
0.00
0.000
0%
1,014.20
0.00
0.00
0.00
0.00
0.000
0%
1,014.20
0.00
0.00
0.00
0.00
0.000
0%
1,304.26
0.00
0.00
0.00
0.00
0.000
0%
1,061.41
0.00
0.00
0.00
0.00
0.000
0%
975.73
0.00
0.00
0.00
0.00
0.000
0%
25.95
0.00
1.33
25.95
1.33
25.948
100%
1.39
3.24
1.39
3.239
100%
3.24
0.00
10.32
0.00
0.20
10.32
0.20
10.324
100%
15.48
0.00
1.36
15.48
1.36
15.477
100%
20.71
0.00
0.00
0.00
0.00
0.000
0%
289.69
0.00
0.00
0.00
0.00
0.000
0%
102.18
0.00
0.00
0.00
0.00
0.000
0%
13.24
0.00
0.00
0.00
0.00
0.000
0%
92.12
0.00
0.00
0.00
0.00
0.000
0%
59.09
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
33.53
3,872.21
0.00
8.35
9.09
0.00
0.00
5,234.35
0.00
0.00
0.00
0.00
0.000
0%
1,151.48
0.00
59.02
1,151.48
59.02
1,151.480
100%
137.52
0.00
59.02
137.52
59.02
137.517
100%
334.64
0.00
59.02
334.64
59.02
334.643
100%
1,767.65
0.00
147.55
1,767.65
147.55
1,767.649
100%
5,239.20
0.00
6.00
5,239.20
6.00
5,239.200
100%
4,302.56
0.00
147.55
4,302.56
147.55
4,302.558
100%
1,245.32
0.00
147.55
1,245.32
147.55
1,245.322
100%
2,147.04
0.00
24.00
2,147.04
24.00
2,147.040
100%
617.26
0.00
0.00
0.00
0.00
0.000
0%
1,519.98
0.00
0.00
0.00
0.00
0.000
0%
5,836.27
0.00
0.00
0.00
0.00
0.000
0%
596.32
0.00
0.00
0.00
0.00
0.000
0%
1,705.44
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
31.02
0.00
146.40
0.00
0.00
0.00
0.00
0.000
0%
116.40
0.00
0.00
0.00
0.00
0.000
0%
48.42
0.00
0.00
0.00
0.00
0.000
0%
424.54
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
1,629.28
339.98
0.00
0.00
346.58
0.00
0.00
0.00
0.00
0.000
0%
294.17
0.00
0.00
0.00
0.00
0.000
0%
294.17
0.00
0.00
0.00
0.00
0.000
0%
1,175.04
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
1,036.80
0.00
734.40
0.00
0.00
0.00
0.00
0.000
0%
87.84
0.00
0.00
0.00
0.00
0.000
0%
90.88
0.00
0.00
0.00
0.00
0.000
0%
198.56
0.00
0.00
0.00
0.00
0.000
0%
270.00
0.00
0.00
0.00
0.00
0.000
0%
191.25
0.00
0.00
0.00
0.00
0.000
0%
273.40
0.00
0.00
0.00
0.00
0.000
0%
1,000.00
0.00
0.00
0.00
0.00
0.000
0%
2,000.00
0.00
0.00
0.00
0.00
0.000
0%
27.23
0.00
0.00
0.00
0.00
0.000
0%
298.50
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
916.47
0.00
875.80
0.00
0.00
0.00
0.00
0.000
0%
1,431.47
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
905.75
515.40
0.00
0.00
218.20
0.00
0.00
0.00
0.00
0.000
0%
1,756.80
0.00
0.00
0.00
0.00
0.000
0%
250.60
0.00
0.00
0.00
0.00
0.000
0%
1,127.70
0.00
0.00
0.00
0.00
0.000
0%
64.32
0.00
0.00
0.00
0.00
0.000
0%
162.79
0.00
0.00
0.00
0.00
0.000
0%
2,000.00
0.00
0.00
0.00
0.00
0.000
0%
960.00
0.00
0.00
0.00
0.00
0.000
0%
540.00
0.00
0.00
0.00
0.00
0.000
0%
2,160.00
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
2,198.72
0.00
2,397.55
0.00
0.00
0.00
0.00
0.000
0%
225.00
0.00
0.00
0.00
0.00
0.000
0%
3,348.00
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
220.00
0.00
2,717.28
0.00
2,279.20
0.00
0.00
0.00
0.00
0.000
0%
396.00
0.00
0.00
0.00
0.00
0.000
0%
1,325.95
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
345.00
198.00
0.00
649.00
0.00
120.00
0.00
840.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
50.00
540.00
189.90
0.00
1,200.00
0.00
2,846.00
0.00
6,200.00
0.00
5,827.97
0.00
118.18
2,880.00
0.00
0.00
720.00
0.00
0.00
0.00
0.00
0.000
0%
359.70
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
119.90
1,130.00
3,345.30
1,561.14
500.00
4,661.02
275.00
1,315.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,400.00
0.00
0.00
0.00
0.00
0.000
0%
823.90
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
2,409.00
0.00
629.19
0.00
0.00
0.00
0.00
0.000
0%
451.46
0.00
0.00
0.00
0.00
0.000
0%
1,030.92
0.00
0.00
0.00
0.00
0.000
0%
1,195.46
0.00
0.00
0.00
0.00
0.000
0%
2,630.92
0.00
0.00
0.00
0.00
0.000
0%
468.16
0.00
0.00
0.00
0.00
0.000
0%
171.40
0.00
0.00
0.00
0.00
0.000
0%
76.89
0.00
0.00
0.00
0.00
0.000
0%
104.50
0.00
0.00
0.00
0.00
0.000
0%
143.00
0.00
0.00
0.00
0.00
0.000
0%
19.44
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.00
0.000
0%
32.78
5.79
9.79
0.00
42.24
0.00
0.00
0.00
0.00
0.000
0%
42.24
0.00
0.00
0.00
0.00
0.000
0%
42.24
0.00
0.00
0.00
0.00
0.000
0%
42.24
0.00
0.00
0.00
0.00
0.000
0%
27.39
0.00
0.00
0.00
0.00
0.000
0%
21.60
0.00
0.00
0.00
0.00
0.000
0%
21.60
0.00
0.00
0.00
0.00
0.000
0%
14.52
0.00
0.00
0.00
0.00
0.000
0%
7.59
0.00
0.00
0.00
0.00
0.000
0%
36.84
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
22.99
71.50
0.00
0.00
17.49
0.00
0.00
0.00
0.00
0.000
0%
7.59
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
13.20
450.00
0.00
2,699.00
0.00
0.00
0.00
0.00
0.000
0%
690.00
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
385.00
0.00
15.88
34.76
164.50
119.80
0.00
0.00
0.00
0.00
1,023.41
0.00
307.78
0.00
39.27
114.78
0.00
0.00
70.00
0.00
61.38
0.00
43.89
0.00
705.00
0.00
188.97
178.83
751.25
2,529.89
1,263.85
0.00
0.00
0.00
0.00
0.00
3,427.55
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
0.00
1,488.81
0.00
6,045.43
0.00
1,226.64
0.00
0.00
0.00
0.00
0.000
0%
474.30
0.00
0.00
0.00
0.00
0.000
0%
104.00
0.00
0.00
0.00
0.00
0.000
0%
92.94
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
13,769.40
0.00
1,883.87
0.00
0.00
0.00
0.00
0.000
0%
24.00
0.00
0.00
0.00
0.00
0.000
0%
1,280.30
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
216.00
0.00
2,383.90
0.00
0.00
0.00
0.00
0.000
0%
465.00
0.00
0.00
0.00
0.00
0.000
0%
0.00
0.00
0.00
0.000
0%
10.38%
98,310.55
6,690.00
0.00
947,113.25
238,208.28
336,518.83
101,916.00
1,049,029.25
38,432.00
1,087,461.25
100%
25.15%
10.38%
35.53%
RESIDENTE DE OBRA
SUPERVISOR DE PROYECTOS
DNI 29224670
DNI 23833867
NOVIEMBRE
DICIEMBRE -2015
1,085,632.44
8/17/2015
120 DIAS
12/18/2015
SALDO
Metrado
Valorizado
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.50
883.13
50%
0.00
0.00
0%
0.00
0.00
0%
0.24
9,432.66
24%
0.00
0.00
0%
420.00
373.80
53%
2.00
200.00
50%
0.00
0.00
0%
0.00
0.00
0%
2.00
401.66
50%
2.00
200.00
50%
0.60
46.20
60%
0.80
80.00
80%
3.00
300.00
75%
20.00
56.00
67%
3.00
300.00
75%
0.80
407.26
80%
3.00
90.33
75%
0.50
107.69
50%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.04
21.51
100%
1.93
50.33
100%
18.14
9,083.24
100%
34.30
894.54
100%
131.30
1,793.56
100%
335.55
1,241.54
100%
7.57
3,790.53
100%
11.26
293.66
100%
54.43
743.51
100%
181.88
672.96
100%
1.17
585.85
100%
2.37
61.81
100%
51.08
189.00
100%
252.74
8,972.27
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.74
340.85
100%
10.72
395.89
100%
40.85
185.87
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
11.00
1,275.67
100%
0.00
0.00
0%
124.00
1,505.36
100%
26.00
349.96
100%
5.00
204.30
100%
27.00
1,210.14
100%
6.00
241.92
100%
445.48
52,330.54
100%
33.70
1,198.04
100%
30.34
2,126.23
100%
18.96
1,126.41
100%
67.40
7,600.02
100%
65.50
987.09
100%
0.00
0.00
0%
6.86
2,649.68
100%
0.41
205.30
100%
12.71
331.48
100%
43.03
195.79
100%
197.00
53,727.81
100%
1.00
1,165.19
100%
15.38
228.39
100%
0.28
5.46
100%
0.34
131.33
100%
0.90
23.47
100%
15.00
2,415.90
100%
1.00
649.34
100%
32.00
405.12
100%
32.00
405.12
100%
1.78
34.73
100%
0.75
38.72
100%
1.24
14.11
100%
1.76
56.95
100%
0.72
360.53
100%
1.32
34.43
100%
3.60
49.18
100%
0.78
359.28
100%
3.42
126.30
100%
37.86
172.26
100%
1.00
583.33
100%
2.00
1,166.66
100%
3.08
33.73
100%
3.08
27.44
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
10.24
378.16
100%
0.00
0.00
0%
0.47
235.34
100%
2.71
70.68
100%
2.35
32.10
100%
5.14
2,764.29
100%
24.00
886.32
100%
160.52
730.37
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.05
25.81
100%
0.92
22.98
100%
9.05
41.18
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
8.16
235.91
100%
3.18
22.80
100%
0.73
5.23
100%
1.54
696.05
100%
0.32
31.37
100%
3.00
70.56
100%
1.00
61.14
100%
1.00
100.33
100%
10.01
113.11
100%
7.21
64.24
100%
16.15
182.50
100%
16.15
143.90
100%
1.00
933.70
100%
1.00
2,150.82
100%
1.00
743.76
100%
1.00
125.89
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
14.00
33.46
100%
7.00
17.57
100%
7.00
64.40
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.51
255.37
100%
2.77
72.24
100%
2.35
32.10
100%
3.08
109.34
100%
0.00
0.00
0%
0.00
0.00
0%
0.60
2.73
2%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.35
161.21
100%
5.15
190.19
100%
13.80
62.79
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
7.80
206.23
100%
3.08
81.93
100%
3.08
207.62
100%
3.24
23.23
100%
3.33
242.29
100%
0.56
40.75
100%
1.58
714.13
100%
0.44
43.13
100%
3.00
70.56
100%
1.00
61.14
100%
1.00
100.33
100%
11.78
133.11
100%
9.10
81.08
100%
4.59
51.87
100%
4.59
40.90
100%
1.00
322.88
100%
1.00
142.95
100%
1.00
16.50
100%
1.00
16.71
100%
1.00
18.59
100%
1.00
53.00
100%
1.00
25.00
100%
2.00
31.56
100%
5.00
79.85
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
2.00
20.00
100%
1.00
7.47
100%
1.00
47.80
100%
1.00
18.56
100%
0.10
1.95
100%
0.14
54.08
100%
0.60
22.16
100%
1.00
212.01
100%
1.15
22.44
100%
1.38
18.85
100%
1.23
475.09
100%
1.20
44.32
100%
12.58
245.44
100%
14.88
203.26
100%
8.39
4,201.12
100%
41.93
1,093.53
100%
28.95
395.46
100%
0.28
140.20
100%
5.67
147.87
100%
42.28
192.37
100%
5.67
100.47
100%
5.67
50.52
100%
83.85
13,193.80
100%
37.10
218.15
100%
21.00
355.53
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
5.44
39.00
100%
23.14
298.27
100%
10.12
140.77
100%
5.44
48.47
100%
0.94
432.97
100%
9.80
361.91
100%
35.58
161.89
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
248.27
16,264.17
100%
129.41
12,607.12
100%
64.58
1,717.83
100%
64.58
4,353.34
100%
156.42
22,016.12
100%
80.11
5,828.80
100%
128.56
6,827.82
100%
3.14
22.51
100%
55.07
394.85
100%
3.85
280.13
100%
11.96
105.85
100%
23.57
10,653.17
100%
28.43
4,913.27
100%
2.55
198.98
100%
48.91
4,794.65
100%
1.50
608.79
100%
2.30
549.68
100%
2.84
749.11
100%
1.00
1,689.93
100%
1.00
768.15
100%
1.00
732.70
100%
1.00
512.89
100%
82.00
2,568.24
100%
40.00
562.40
100%
12.00
282.24
100%
9.00
550.26
100%
11.00
387.97
100%
128.00
696.32
100%
3.00
276.39
100%
20.00
186.80
100%
2.00
200.66
100%
2.00
477.02
100%
2.00
248.88
100%
2.00
345.66
100%
102.92
18,316.67
100%
407.44
4,172.19
100%
131.71
1,697.74
100%
129.51
1,657.73
100%
111.95
1,557.22
100%
55.07
490.67
100%
6.34
56.49
100%
232.02
2,501.18
100%
13.87
151.88
100%
1.00
320.00
100%
12.00
380.88
100%
53.00
2,123.71
100%
24.00
940.32
100%
1.00
1,506.74
100%
1.00
1,406.74
100%
1.00
550.00
100%
8.00
2,583.04
100%
3.00
428.85
100%
4.00
668.60
100%
1.00
255.15
100%
2.00
451.42
100%
4.00
66.00
100%
4.00
66.84
100%
8.00
148.72
100%
4.00
1,151.72
100%
1.00
177.15
100%
7.00
175.00
100%
4.00
1,149.56
100%
1.00
120.12
100%
2.00
187.12
100%
1.00
243.17
100%
18.00
284.04
100%
36.00
574.92
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.48
240.35
100%
4.00
104.32
100%
0.80
20.86
100%
0.31
155.23
100%
4.00
65.68
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
8.00
59.76
100%
2.00
95.60
100%
5.00
74.25
100%
4.00
74.24
100%
8.00
178.72
100%
177.60
809.86
100%
71.04
165.52
100%
71.04
402.80
100%
35.52
1,952.89
100%
3.65
1,409.81
100%
19.83
517.17
100%
0.36
139.05
100%
2.86
74.59
100%
13.00
59.15
100%
0.00
0.00
0%
15.55
36.23
100%
20.96
1,081.96
100%
15.00
2,182.65
100%
43.18
491.39
100%
7.17
232.02
100%
1.19
459.64
100%
1.10
424.88
100%
12.80
468.99
100%
40.60
184.73
100%
1.35
521.44
100%
10.90
399.38
100%
49.07
223.27
100%
0.18
69.53
100%
3.27
119.81
100%
2.55
11.60
100%
1.25
482.81
100%
17.64
646.33
100%
62.47
284.24
100%
0.16
61.80
100%
1.50
54.96
100%
7.83
35.63
100%
8.89
158.69
100%
6.16
93.45
100%
9.48
143.81
100%
1.00
5,374.45
100%
1.00
300.51
100%
7.90
115.58
100%
30.00
453.90
100%
5.00
49.85
100%
1.00
103.86
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
140.00
7,226.80
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
836.43
1,254.65
100%
177.60
140.30
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.06
1.17
100%
0.09
27.55
100%
0.54
60.07
100%
2.10
36.08
100%
1.00
127.30
100%
2.10
18.71
100%
1.00
38,500.00
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
316.00
1,428.32
100%
270.40
1,573.73
100%
82.00
658.46
100%
10.00
129.10
100%
1.00
2,296.61
100%
1.00
1,033.40
100%
1.00
1,014.20
100%
1.00
1,014.20
100%
1.00
1,304.26
100%
1.00
1,061.41
100%
1.00
975.73
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.64
20.71
100%
0.75
289.69
100%
0.19
102.18
100%
2.91
13.24
100%
0.20
92.12
100%
1.60
59.09
100%
7.37
33.53
100%
1.00
3,872.21
100%
1.02
8.35
100%
1.02
9.09
100%
1.00
5,234.35
100%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
0.00
0.00
0%
7.00
617.26
100%
11.00
1,519.98
100%
17.00
5,836.27
100%
4.00
596.32
100%
8.00
1,705.44
100%
1.00
31.02
100%
20.00
146.40
100%
20.00
116.40
100%
54.40
48.42
100%
21.76
424.54
100%
136.00
1,629.28
100%
1.00
339.98
100%
1.00
346.58
100%
1.00
294.17
100%
1.00
294.17
100%
136.00
1,175.04
100%
120.00
1,036.80
100%
85.00
734.40
100%
12.00
87.84
100%
4.00
90.88
100%
136.00
198.56
100%
120.00
270.00
100%
85.00
191.25
100%
1.00
273.40
100%
1.00
1,000.00
100%
1.00
2,000.00
100%
30.60
27.23
100%
15.30
298.50
100%
76.50
916.47
100%
580.00
875.80
100%
1.00
1,431.47
100%
1.00
905.75
100%
30.00
515.40
100%
20.00
218.20
100%
240.00
1,756.80
100%
4.00
250.60
100%
18.00
1,127.70
100%
1.00
64.32
100%
1.00
162.79
100%
1.00
2,000.00
100%
4.00
960.00
100%
2.00
540.00
100%
4.00
2,160.00
100%
4.00
2,198.72
100%
5.00
2,397.55
100%
1.00
225.00
100%
6.00
3,348.00
100%
4.00
220.00
100%
18.00
2,717.28
100%
80.00
2,279.20
100%
6.00
396.00
100%
1.00
1,325.95
100%
1.00
345.00
100%
2.00
198.00
100%
1.00
649.00
100%
1.00
120.00
100%
1.00
840.00
100%
1.00
50.00
100%
1.00
540.00
100%
1.00
189.90
100%
1.00
1,200.00
100%
1.00
2,846.00
100%
2.00
6,200.00
100%
1.00
5,827.97
100%
1.00
118.18
100%
4.00
2,880.00
100%
1.00
720.00
100%
3.00
359.70
100%
1.00
119.90
100%
2.00
1,130.00
100%
1.00
3,345.30
100%
3.00
1,561.14
100%
1.00
500.00
100%
1.00
4,661.02
100%
10.00
275.00
100%
20.00
1,315.60
100%
40.00
3,400.00
100%
10.00
823.90
100%
10.00
2,409.00
100%
3.00
629.19
100%
2.00
451.46
100%
4.00
1,030.92
100%
2.00
1,195.46
100%
4.00
2,630.92
100%
7.00
468.16
100%
10.00
171.40
100%
1.00
76.89
100%
1.00
104.50
100%
1.00
143.00
100%
1.00
19.44
100%
2.00
32.78
100%
1.00
5.79
100%
1.00
9.79
100%
12.00
42.24
100%
12.00
42.24
100%
12.00
42.24
100%
12.00
42.24
100%
1.00
27.39
100%
12.00
21.60
100%
12.00
21.60
100%
12.00
14.52
100%
1.00
7.59
100%
12.00
36.84
100%
1.00
22.99
100%
1.00
71.50
100%
1.00
17.49
100%
1.00
7.59
100%
4.00
13.20
100%
1.00
450.00
100%
1.00
2,699.00
100%
3.00
690.00
100%
1.00
385.00
100%
2.00
15.88
100%
2.00
34.76
100%
5.00
164.50
100%
2.00
119.80
100%
1.00
1,023.41
100%
2.00
307.78
100%
3.00
39.27
100%
2.00
114.78
100%
2.00
70.00
100%
2.00
61.38
100%
1.00
43.89
100%
3.00
705.00
100%
1.00
188.97
100%
9.00
178.83
100%
1.00
751.25
100%
1.00
2,529.89
100%
1.00
1,263.85
100%
1.00
3,427.55
100%
1.00
1,488.81
100%
1.00
6,045.43
100%
6.00
1,226.64
100%
1.00
474.30
100%
4.00
104.00
100%
2.00
92.94
100%
4.00
13,769.40
100%
1.00
1,883.87
100%
2.00
24.00
100%
1.00
1,280.30
100%
1.00
216.00
100%
1.00
2,383.90
100%
1.00
465.00
100%
1.00
6,690.00
100%
608,765.52
64.28%
SUPERVISOR DE PROYECTOS
ROBERTO HUAMAN LACUTA
DNI 23833867
SNIP N
289371
PROYECTO: "CREACION DEL CENTRO DE SERVICIOS TAMBO CENTRO DE SERVICIOS TAMBO EN EL CENTRO
CENTRO POBLADO CANCAHUANI, CAPACMARCA, CHUMBIVILCAS, CUSCO"
FECHA
: 31 DE OCTUBRE DE 2015
PARTIDAS
Mes
01
TOTAL
1 MES
01.01
01.01.01
CONSTRUCCIONES PROVISIONALES
01.01.01.01
9,894.66
9,894.66
1,304.82
1,304.82
7915.73
E
01.01.01.02
1,134.34
01.01.02.01
INSTALACIONES PROVISIONALES
AGUA PARA LA CONSTRUCCION
1,766.25
01.01.03.02
HABILITACION DE ACCESO
1,900.00
5,913.48
FLETE TERRESTRE
01.01.05
01.01.05.01
39,302.74
712.00
712.00
168.95
169.1
01.02.01.03
114.29
6,200.12
1,653.37
1,771.46
1,550.03
1,550.03
120.71
129.34
113.17
113.17
214.22
229.52
100.00
452.68
E
SEALIZACION TEMPORAL DE SEGURIDAD
803.32
200.83
E
CAPACITACION EN SEGURIDAD Y SALUD
400.00
400.00
100.00
E
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y
SALUD DURANTE EL TRABAJO
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD
DURANTE EL TRABAJO
01.02.03
MITIGACION AMBIENTAL
01.02.03.01
77.00
19.25
01.02.03.02
CAPACITACION EN TEMAS AMBIENTALES, EN SEGURIDAD Y SALUD EN OBRA
100.00
100.00
400.00
400.00
84.00
84.00
E
RESTITUCION DE AREAS VERDES AFECTADOS POR TRABAJOS(PLANTAS)
P
E
19.25
15.40
01.02.03.03
169.10
106.67
01.02.02.01
181.02
400.00
01.02.02.01
9,825.69
01.02.01.05
7,860.55
01.02.01.02
01.02.01.04
1,182.70
712.00
712.00
01.02.01.01
15,721.09
8,253.58
01.02.01
570.00
1,612.77
01.02
1,612.77
4,730.78
01.01.05.02
1,900.00
1,330
01.01.04.01
441.56
TRABAJOS PRELIMINARES
01.01.03.01
01.01.04
1,766.25
441.56
E
01.01.03
1,134.34
1,134.34
E
01.01.02
1978.93
1,304.82
E
01.01.01.03
2 MES
PERIODO
N
PARTIDAS
Mes
01.02.03.04
TOTAL
1 MES
2 MES
400.00
400.00
509.08
509.08
P
E
01.02.03.05
01.02.03.06
P
E
P
120.44
E
01.02.03.07
02
ESTRUCTURAS
02.01
EDIFICACION
02.01.01
MOVIMIENTO DE TIERRAS
02.01.01.01
EXCAVACIONES
02.01.01.01.01
215.38
107.69
1,501.88
1,051.20
E
02.01.01.02
CORTES
02.01.01.02.01
31,731.06
RELLENOS
02.01.01.03.01
1,165.58
1,165.58
10,018.25
10,018.25
815.60
E
02.01.01.03.02
17,934.95
19038.64
E
02.01.01.03
1,259.64
02.01.01.04.01
02.01.01.05
1,288.65
02.01.02
02.01.02.01.01
773.84
651.65
02.01.02.02.02
2,310.83
2,310.83
2,310.83
2,809.89
2,809.89
3,663.46
3,663.46
407.93
407.93
2809.89
E
P
3663.46
E
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 P/SOBRECIMIENTO (MECHAS)
407.93
E
02.01.02.03
02.01.02.03.01
122.19
SOBRECIMIENTOS
02.01.02.02.01
02.01.02.02.03
349.98
773.84
E
02.01.02.02
12692.43
1,288.65
13,796.11
1,288.65
02.01.01.05.01
450.68
10018.25
E
02.01.01.04
242.24
SARDINELES EN SS.HH
CONCRETO f'c=210kg/cm2 P/SARDINELES
21.51
E
02.01.02.03.02
50.33
E
02.01.02.04
VEREDAS
02.01.02.04.01
9,083.24
9,083.24
894.54
894.54
1,793.56
1,793.56
1,241.54
1,241.54
3,790.53
3,790.53
293.66
293.66
E
02.01.02.04.02
02.01.02.04.03
02.01.02.04.04
02.01.02.05
PATIO
02.01.02.05.01
P
E
P
E
P
E
P
E
02.01.02.05.02
P
E
PERIODO
N
PARTIDAS
Mes
02.01.02.05.03
TOTAL
1 MES
2 MES
743.51
743.51
672.96
672.96
E
02.01.02.05.04
P
E
PERIODO
N
PARTIDAS
Mes
02.01.02.06
RAMPAS
02.01.02.06.01
02.01.02.06.02
02.01.02.06.03
02.01.02.07
FALSO PISO
02.01.02.07.01
02.01.03
02.01.03.01
ZAPATAS
02.01.03.01.01
02.01.03.01.02
TOTAL
1 MES
2 MES
585.85
585.85
61.81
61.81
189.00
189.00
8,972.27
8,972.27
E
P
E
P
E
P
E
5,845.89
5,845.89
1,613.07
1,613.07
5845.89
E
P
1,613.07
E
02.01.03.02
VIGAS DE CIMENTACION
02.01.03.02.01
02.01.03.02.02
9,658.89
9,658.89
2,634.78
2,634.78
8,300.88
8,300.88
9658.89
E
P
2,634.78
E
02.01.03.02.03
8,300.88
E
02.01.03.02.04
TEKNOPORT 1"
305.63
305.63
305.63
E
02.01.03.03
COLUMNAS
02.01.03.03.01
02.01.03.03.02
4,490.95
4,490.95
4,374.36
4,374.36
2,213.66
2,213.66
7,902.21
7,902.21
4490.95
E
P
4,374.36
E
02.01.03.03.03
2,213.66
E
02.01.03.03.04
6231.77
E
02.01.03.04
VIGAS
02.01.03.04.01
02.01.03.04.02
02.01.03.04.03
5,706.96
3,511.98
4,296.81
4,296.81
4,296.81
E
P
7,216.98
COLUMNETAS DE CONFINAMIENTO
02.01.03.05.01
02.01.03.05.02
2,381.35
02.01.03.06
VIGUETAS DE CONFINAMIENTO
02.01.03.06.01
2,944.80
4,931.02
4,931.02
2944.80
4931.02
967.28
856.41
856.41
1,601.42
1,601.42
856.41
E
02.01.03.06.03
02.01.03.07
02.01.03.07.01
1,601.42
P
E
967.28
967.28
E
02.01.03.06.02
2,381.35
2,944.80
E
02.01.03.05.03
2,775.76
2,381.35
E
P
4,441.22
7216.98
E
02.01.03.05
2,194.98
5,706.96
E
P
1670.44
271.76
271.76
271.76
PERIODO
N
PARTIDAS
Mes
02.01.03.07.02
02.01.03.07.03
02.01.03.08
02.01.03.08.01
02.01.03.08.02
02.01.03.08.03
02.01.04
ESTRUCTURAS METALICAS
02.01.04.01
TIJERALES Y RETICULADOS
02.01.04.01.01
02.01.04.01.02
TOTAL
1 MES
2 MES
439.10
439.10
439.10
E
P
161.30
161.30
161.30
340.85
340.85
395.89
395.89
185.87
185.87
4,544.79
4,544.79
2,910.00
2,910.00
E
P
E
P
E
4544.79
E
P
2910.00
E
02.01.04.01.03
8,763.96
8,763.96
8763.96
E
02.01.04.01.04
IZAJE DE TIJERALES
1,275.67
1,275.67
E
02.01.04.02
CORREAS
02.01.04.03
02.01.04.04
8,698.40
8,698.40
8698.40
E
P
1,505.36
1,505.36
349.96
349.96
204.30
204.30
E
02.01.04.05
P
E
02.01.04.06
ANCLAJES
02.01.04.06.01
02.01.04.06.02
P
E
P
1,210.14
1,210.14
241.92
241.92
52,330.54
24,420.92
1,198.04
645.10
E
02.01.04.06.03
P
E
02.01.05
02.01.05.01
COBERTURA
COBERTURA CON PANEL TERMO-AISLANTE TAT-1060 DE E=35MM, CON ALUZINC 0.5
P
E
02.01.05.02
02.01.05.03
P
E
P
2,126.23
E
02.01.05.04
1,126.41
E
02.01.06
02.01.06.01
7,600.02
E
02.01.07
VARIOS
02.01.07.01
987.09
E
02.02
02.02.01
02.02.01.01
EXCAVACIONES
02.02.01.01.01
122.91
E
02.02.02
02.02.02.01
2,649.68
987.09
PERIODO
N
PARTIDAS
Mes
TOTAL
1 MES
2 MES
E
02.02.02.02
CONCRETO f'c=175kg/cm2-P/HITOS
02.02.02.03
02.02.02.04
205.30
E
P
331.48
E
P
195.79
E
02.02.03
02.02.03.01
02.02.03.02
02.02.04
PINTURA
02.02.04.01
53,727.81
E
P
1,165.19
228.39
E
02.03
02.03.01
MOVIMIENTO DE TIERRAS
02.03.01.01
EXCAVACIONES
02.03.01.01.01
5.46
E
02.03.02
02.03.02.01
CONCRETO f'c=140kg/cm2-P/DADOS
131.33
E
02.03.02.02
23.47
E
02.03.03
02.03.03.01
02.03.03.02
02.03.04
PINTURA
02.03.04.01
2,415.90
E
P
649.34
405.12
E
02.03.04.02
PINTURA ESMALTE SINTENTICO BLANCO PARA CARPINTERIA METALICA EN CERCO
405.12
E
02.04
02.04.01
ASTA DE BANDERA
MOVIMIENTO DE TIERRAS
02.04.01.01
EXCAVACIONES
02.04.01.01.01
34.73
E
02.04.01.02
RELLENOS
02.04.01.02.01
RELLENO COMPACTADO CON MATERIAL PROPIO Y EQUIPO MENOR
38.72
E
02.04.01.03
02.04.01.03.01
14.11
E
02.04.02
02.04.02.01
SOLADOS
02.04.02.01.01
56.95
E
02.04.02.02
VEREDAS
02.04.02.02.01
360.53
E
02.04.02.02.02
34.43
E
02.04.02.02.03
JUNTA ASFALTICA DE DILATACION Y CONTRACCION 1/2" P/VEREDAS
P
E
02.04.03
49.18
97.97
117.56
PERIODO
N
PARTIDAS
Mes
02.04.03.01
02.04.03.02
02.04.03.03
TOTAL
1 MES
359.28
E
P
126.30
E
P
E
172.26
2 MES
PERIODO
N
PARTIDAS
Mes
02.04.04
02.04.04.01
02.04.04.02
02.04.05
02.04.05.01
TOTAL
1 MES
2 MES
CARPINTERIA METALICA
ASTA DE BANDERA CON TUBO FG DE 3" Y 2" H=6.20M HASTA ANCLAJE INC.
RODON Y MASTIL
ASTA DE BANDERA CON TUBO FG DE 3" Y 2" H=5.20M HASTA ANCLAJE INC.
RODON Y MASTIL
583.33
E
P
1,166.66
PINTURA
PINTURA ANTICORROSIVA EN ASTA
33.73
E
02.04.05.02
PINTURA ESMALTE SINTETICO BLANCO PARA PEDESTAL DE ASTA
27.44
E
02.05
02.05.01
02.05.01.01
02.05.01.01.01
02.05.01.02
RELLENOS
268.26
268.26
02.05.01.02.01
14.56
14.56
129.05
129.05
14.56
E
02.05.01.02.02
RELLENO COMPACTADO CON MATERIAL PROPIO Y EQUIPO MENOR
129.05
E
02.05.01.02.03
BASE GRANULAR COMPACTADO DESDE NIVELES DE FONDO HASTA FALSO PISO
132.13
132.13
166.49
166.49
E
02.05.01.03
02.05.01.03.01
83.07
E
02.05.01.04
02.05.01.04.01
378.16
378.16
202.25
202.25
E
02.05.02
02.05.02.01
02.05.02.01.01
202.25
E
02.05.02.02
VEREDAS
02.05.02.02.01
235.34
191.21
E
02.05.02.02.02
70.68
70.68
32.10
32.10
E
02.05.02.02.03
P
E
02.05.03
02.05.03.01
02.05.03.01.01
02.05.03.01.02
02.05.03.01.03
02.05.03.02
COLUMNAS
02.05.03.02.01
02.05.03.02.02
02.05.03.02.03
02.05.03.03
VIGAS
02.05.03.03.01
2,764.29
E
P
886.32
E
P
730.37
730.37
552.73
552.73
756.33
756.33
1,013.60
1,013.60
921.22
921.22
P
E
P
E
P
E
P
E
PERIODO
N
PARTIDAS
Mes
02.05.03.03.02
P
E
TOTAL
1 MES
775.53
2 MES
775.53
PERIODO
N
PARTIDAS
Mes
02.05.03.03.03
02.05.03.04
LOSA MACIZAS
TOTAL
1 MES
2 MES
1,128.90
1,128.90
681.70
681.70
350.84
350.84
305.58
305.58
25.81
25.81
22.98
22.98
41.18
41.18
808.70
808.70
134.53
134.53
02.05.03.04.01
02.05.03.04.02
P
E
P
E
02.05.03.04.03
P
E
02.05.03.05
02.05.03.05.01
P
E
02.05.03.05.02
P
E
02.05.03.05.03
P
E
02.05.04
02.05.04.01
02.05.05
REVOQUES Y REVESTIMIENTO
P
E
02.05.05.01
02.05.05.02
02.05.05.03
02.05.05.04
02.05.05.05
02.05.05.06
P
E
P
96.90
64.60
197.97
131.98
E
P
E
P
233.90
E
P
338.45
E
P
3.01
E
02.05.06
CIELORRASO
02.05.06.01
02.05.06.01.01
02.05.07
PISOS Y PAVIMENTOS
02.05.07.01
PISOS DE CONCRETO
330.50
02.05.07.01.01
235.91
E
02.05.08
ZOCALOS Y CONTRAZOCALOS
02.05.08.01
CONTRAZOCALOS
02.05.08.01.01
02.05.08.01.02
22.80
E
P
5.23
E
02.05.09.01
02.05.09.02
02.05.10
CERRAJERIA
02.05.10.01
696.05
E
P
31.37
70.56
E
02.05.10.02
CERRADURA 3 GOLPES DE ACERO INOXIDABLE PARA PUERTA EXTERIOR
61.14
E
02.05.10.03
P
E
100.33
PERIODO
N
PARTIDAS
Mes
02.05.11
02.05.11.01
TOTAL
1 MES
2 MES
PINTURA
PINTURA MUROS INTERIORES LATEX MATE - 2 MANOS COLOR BLANCO HUMO
113.11
E
02.05.11.02
PINTURA MUROS EXTERIORES ESMALTE SINTETICO COLOR AMARILLO MARACUYA
64.24
E
02.05.11.03
02.05.11.04
02.05.12
OTROS
02.05.12.01
TANQUE ELEVADO
02.05.12.01.01
TANQUE DE AGUA PREFABRICADO POLIETILENO 2.5 M3 INC. ACCESORIOS
182.50
E
P
143.90
933.70
E
02.05.12.01.02
02.05.12.01.03
2,150.82
E
P
743.76
E
02.05.12.01.04
ACCESORIOS DE SUJECION DE TANQUE CON TENSORES Y FAJAS/CABLES
125.89
35.97
E
02.05.12.02
02.05.12.02.01
69.19
E
02.05.12.02.02
02.05.12.03
02.05.12.03.01
67.52
31.90
E
02.05.12.03.02
02.05.12.03.03
64.54
64.54
20.34
20.34
13.28
13.28
12.11
12.11
11.40
11.40
6.61
6.61
83.40
83.40
82.94
82.94
91.68
91.68
104.10
104.10
84.67
84.67
102.70
102.70
33.46
33.46
17.57
17.57
64.40
64.40
E
P
E
02.05.12.03.04
P
E
02.05.12.03.05
P
E
02.05.12.03.06
02.05.12.03.07
P
E
P
E
02.05.12.03.08
02.05.12.04
VALVULAS
02.05.12.04.01
P
E
P
E
02.05.12.04.02
P
E
02.05.12.04.03
P
E
02.05.12.04.04
P
E
02.05.12.04.05
P
E
02.05.12.05
02.05.12.05.01
ABRAZADERAS
ABRAZADERA DE FO. GDO. DE 1"
P
E
02.05.12.05.02
P
E
02.05.12.05.03
PERIODO
N
PARTIDAS
Mes
E
02.06
02.06.01
MOVIMIENTO DE TIERRAS
02.06.01.01
EXCAVACIONES
TOTAL
1 MES
2 MES
PERIODO
N
PARTIDAS
Mes
02.06.01.01.01
02.06.01.02
RELLENOS
02.06.01.02.01
TOTAL
1 MES
63.21
7.55
E
02.06.01.02.02
02.06.01.02.03
02.06.01.03
02.06.01.03.01
22.20
E
P
102.74
49.86
E
02.06.02
02.06.02.01
CIMIENTOS CORRIDOS
02.06.02.01.01
734.60
E
02.06.02.02
SOBRECIMIENTO
02.06.02.02.01
02.06.02.02.02
02.06.02.03
VEREDAS
02.06.02.03.01
02.06.02.03.02
182.86
E
P
209.94
255.37
E
P
72.24
E
02.06.02.03.03
JUNTA ASFALTICA DE DILATACION Y CONTRACCION 1/2" P/VEREDAS
32.10
E
02.06.02.04
FALSO PISO
02.06.02.04.01
02.06.03
02.06.03.01
COLUMNAS
109.34
02.06.03.01.01
119.76
E
02.06.03.01.02
02.06.03.01.03
224.90
E
P
171.81
E
02.06.03.02
02.06.03.02.01
VIGUETAS
CONCRETO f'c=210kg/cm2 P/VIGUETAS
119.76
E
02.06.03.02.02
02.06.03.02.03
113.74
E
P
176.40
E
02.06.03.03
02.06.03.03.01
LOSA MACISAS
CONCRETO f'c=210kg/cm2 P/LOSA MACIZA
290.18
E
02.06.03.03.02
02.06.03.03.03
02.06.03.04
LAVADERO
02.06.03.04.01
02.06.03.04.02
288.05
E
P
174.58
161.21
E
P
190.19
2 MES
PERIODO
N
PARTIDAS
Mes
TOTAL
1 MES
E
02.06.03.04.03
02.06.04
62.79
02.06.04.01
02.06.05
REVOQUES Y REVESTIMIENTO
923.16
02.06.05.01
02.06.05.02
34.81
E
P
122.30
E
02.06.05.03
02.06.05.04
02.06.05.05
02.06.05.06
02.06.06
CIELORRASO
02.06.06.01
139.41
E
P
107.91
E
P
54.58
E
P
21.80
02.06.06.01.01
206.23
E
02.06.07
PISOS Y PAVIMENTOS
02.06.07.01
CONTRAPISOS
02.06.07.01.01
CONTRAPISO E=4 CM BASE 3 CM. MEZC. C:H 1:5 ACAB. 1 CM. PASTA C:A 1:2 (ACABA
02.06.07.02
PISOS
81.93
02.06.07.02.01
PISO CERAMICO 30x30cm ANTIDESLIZANTE DE ALTO TRANSITO E=7.2mm
207.62
E
02.06.08
ZOCALOS Y CONTRAZOCALOS
02.06.08.01
ZOCALOS
02.06.08.01.01
02.06.08.01.02
ZOCALO DE CERAMICO 30 X 30 cm
23.23
E
P
242.29
E
02.06.08.02
CONTRAZOCALOS
02.06.08.02.01
02.06.09
CARPINTERIA DE MADERA
40.75
02.06.09.01
02.06.09.02
02.06.10
CERRAJERIA
02.06.10.01
714.13
E
P
43.13
70.56
E
02.06.10.02
61.14
E
02.06.10.03
100.33
E
02.06.11
PINTURA
02.06.11.01
PINTURA MUROS INTERIORES LATEX MATE - 2 MANOS COLOR BLANCO HUMO
133.11
E
02.06.11.02
PINTURA MUROS EXTERIORES ESMALTE SINTETICO COLOR AMARILLO MARACUYA
81.08
E
02.06.11.03
51.87
2 MES
PERIODO
N
PARTIDAS
Mes
02.06.11.04
P
E
TOTAL
1 MES
40.90
2 MES
PERIODO
N
PARTIDAS
Mes
02.06.12
02.06.12.01
02.06.12.01.01
02.06.12.01.02
02.06.12.02
02.06.12.02.01
02.06.12.02.02
02.06.12.02.03
TOTAL
1 MES
322.88
E
P
142.95
16.50
E
P
16.71
E
P
18.59
E
02.06.12.02.04
53.00
E
02.06.12.02.05
02.06.13
25.00
02.06.13.01
02.06.14
31.56
02.06.14.01
02.06.15
02.06.15.01
02.06.15.01.01
02.06.15.02
02.06.15.02.01
02.06.15.02.02
79.85
126.21
37.93
E
P
38.31
E
02.06.15.03
02.06.15.03.01
02.06.15.03.02
02.06.15.03.03
02.06.15.03.04
02.06.15.03.05
02.06.15.03.06
80.08
E
P
12.54
E
P
12.46
E
P
8.93
E
P
7.82
E
P
11.90
E
02.06.15.03.07
30.76
E
02.06.15.04
80.98
E
02.06.16
DESAGE Y VENTILACION
02.06.16.01
SALIDAS DE DESAGUE
02.06.16.01.01
42.10
E
02.06.16.01.02
8.42
E
02.06.16.02
02.06.16.02.01
62.20
2 MES
PERIODO
N
PARTIDAS
Mes
E
TOTAL
1 MES
2 MES
PERIODO
N
PARTIDAS
Mes
02.06.16.02.02
02.06.16.02.03
02.06.16.03
02.06.16.03.01
02.06.16.03.02
02.06.16.03.03
02.06.16.03.04
02.06.16.03.05
02.06.16.03.06
02.06.16.03.07
TOTAL
1 MES
62.28
E
P
39.60
68.34
E
P
15.92
E
P
24.72
E
P
8.37
E
P
27.92
E
P
110.75
E
P
16.98
E
02.06.17
INSTALACIONES ESPECIALES
02.06.17.01
02.06.17.02
02.06.17.03
02.06.17.04
02.07
TENDAL
02.07.01
MOVIMIENTO DE TIERRAS
02.07.01.01
EXCAVACIONES
02.07.01.01.01
02.07.02
02.07.02.01
BASES DE CONCRETO
02.07.02.01.01
CONCRETO f'c=140kg/cm2-P/DADOS
02.07.02.01.02
02.07.03
ESTRUCTURA DE MADERA
02.07.03.01
COLUMNAS-VIGAS
02.07.03.01.01
02.08
02.08.01
MOVIMIENTO DE TIERRAS
02.08.01.01
EXCAVACIONES
20.00
E
P
7.47
E
P
47.80
E
P
18.56
1.95
54.08
E
P
22.16
212.01
02.08.01.01.01
22.44
E
02.08.01.02
02.08.01.02.01
18.85
E
02.08.02
02.08.02.01
BASES DE CONCRETO
02.08.02.01.01
CONCRETO f'c=140kg/cm2-P/DADOS
475.09
E
02.08.02.01.02
P
E
02.09
44.32
2 MES
PERIODO
N
PARTIDAS
Mes
02.09.01
MOVIMIENTO DE TIERRAS
02.09.01.01
EXCAVACIONES
02.09.01.01.01
02.09.01.02
02.09.01.02.01
02.09.02
02.09.02.01
TOTAL
1 MES
245.44
203.26
4,201.12
E
02.09.02.02
1,093.53
E
02.09.02.03
02.09.03
02.09.03.01
02.09.03.02
02.09.03.03
395.46
140.20
E
P
147.87
E
P
192.37
E
02.09.04
REVOQUES Y REVESTIMIENTO
02.09.04.01
02.09.05
PINTURA
100.47
02.09.05.01
02.09.06
50.52
OTROS
02.09.06.01
REJILLAS
02.09.06.01.01
02.09.06.02
13,193.80
02.09.06.02.01
218.15
E
02.09.06.02.02
02.10
MUROS CORTAVIENTOS
02.10.01
MOVIMIENTO DE TIERRAS
02.10.01.01
EXCAVACIONES
355.53
02.10.01.01.01
69.46
E
02.10.01.02
RELLENOS
02.10.01.02.01
02.10.01.03
02.10.01.03.01
15.08
63.25
E
02.10.02
02.10.02.01
CIMIENTOS CORRIDOS
02.10.02.01.01
734.60
E
02.10.02.02
SOBRECIMIENTO
02.10.02.02.01
268.19
E
02.10.02.02.02
354.95
E
02.10.02.02.03
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 P/SOBRECIMIENTO (MECHAS)
P
E
42.63
2 MES
PERIODO
N
PARTIDAS
Mes
02.10.03
TOTAL
1 MES
2 MES
02.10.03.01
COLUMNETAS DE CONFINAMIENTO
02.10.03.01.01
119.76
E
02.10.03.01.02
02.10.03.01.03
147.72
E
P
302.85
E
02.10.03.02
VIGUETAS DE CONFINAMIENTO
02.10.03.02.01
124.36
E
02.10.03.02.02
ENCOFRADO Y DESENCOFRADO NORMAL P/COLUMNETAS DE CONFINAMIENTO
150.67
E
02.10.03.02.03
ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60-P/VIGUETAS DE CONFINAMIENTO
136.59
E
02.10.04
02.10.04.01
02.10.05
REVOQUES Y REVESTIMIENTO
02.10.05.01
865.55
311.00
E
02.10.05.02
179.33
E
02.10.06
CONTRAZOCALOS
02.10.06.01
02.10.07
PINTURA
39.00
02.10.07.01
PINTURA MUROS EXTERIORES OLEO MATE - 2 MANOS COLOR AMARILLO MARACUYA
298.27
E
02.10.07.02
02.10.07.03
02.10.08
140.77
E
P
48.47
02.10.08.01
02.10.08.02
02.10.08.03
03
ARQUITECTURA
03.01
EDIFICACION
03.01.01
03.01.01.01
432.97
E
P
361.91
E
P
161.89
19,859.81
E
03.01.02
REVOQUES Y REVESTIMIENTO
03.01.02.01
5,674.23
18,702.50
1,191.24
1,099.61
5,197.38
4,797.58
E
03.01.02.02
P
E
03.01.02.03
1,586.19
E
03.01.02.04
433.96
E
03.01.02.05
225.54
E
03.01.02.06
P
E
93.45
PERIODO
N
PARTIDAS
Mes
03.01.02.07
03.01.02.08
TOTAL
2,351.44
E
P
E
1,983.75
1 MES
2 MES
PERIODO
N
PARTIDAS
Mes
03.01.03
TOTAL
1 MES
CIELORRASOS
03.01.03.01
CIELO RASO DE LAMINA MACHIHEMBRADA DE PVC 250X8MM BISELADA
16,264.17
E
03.01.03.02
FALSO CIELORASO CON ALUZINC TIPO CLIP 0.5MM PREPINTADO (EXTERIOR)
12,607.12
E
03.01.04
03.01.04.01
03.01.04.01.01
03.01.04.02
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO E=4 CM BASE 3 CM. MEZC. C:H 1:5 ACAB. 1 CM. PASTA C:A 1:2
(ACABADO SEMIPULIDO)
1,717.83
PISOS
03.01.04.02.01
PISO CERAMICO 30x30cm ANTIDESLIZANTE DE ALTO TRANSITO E=7.2mm
4,353.34
E
03.01.04.02.02
PISO DE MADERA TORNILLO MACHIHEMBRADA DE 3/4", INC DURMIENTES
22,016.12
E
03.01.05
ZOCALOS Y CONTRAZOCALOS
03.01.05.01
ZOCALOS
03.01.05.01.01
ZOCALO DE CERAMICO 30 X 30 cm
03.01.05.01.02
5,828.80
E
P
6,827.82
E
03.01.05.02
03.01.05.02.01
CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO SEMIPULIDO h=0.10m
22.51
E
03.01.05.02.02
394.85
E
03.01.05.02.03
03.01.05.02.04
03.01.06
CARPINTERIA DE MADERA
03.01.06.01
PUERTAS
280.13
E
P
105.85
03.01.06.01.01
03.01.06.01.02
03.01.06.02
VENTANAS
03.01.06.02.01
10,653.17
E
P
4,913.27
198.98
E
03.01.06.02.02
03.01.06.03
03.01.06.03.01
03.01.07
03.01.07.01
VENTANAS DE FIERRO
03.01.07.01.01
4,794.65
608.79
549.68
E
03.01.07.01.02
749.11
E
03.01.07.02
03.01.07.02.01
PUERTAS DE FIERRO
PUERTA METALICA PR-01 (3.45x2.55m) INCL. INSTALACION
1,689.93
E
03.01.07.01.02
749.11
E
03.01.07.02.03
732.70
E
03.01.07.02.04
P
E
512.89
2 MES
PERIODO
N
PARTIDAS
Mes
03.01.08
CERRAJERIA
03.01.08.01
BISAGRAS
03.01.08.01.01
BISAGRA CAPUCHINAS ALUMINIZADA DE 4" PARA PUERTAS DE MADERA
TOTAL
1 MES
2,568.24
E
03.01.08.01.02
BISAGRAS CAPUCHINAS ALUMINIZADA PARA VENTANAS 2 1/2" x 2 1/2"
562.40
E
03.01.08.01.03
282.24
E
03.01.08.02
CERRADURAS
03.01.08.02.01
CERRADURA 3 GOLPES DE ACERO INOXIDABLE PARA PUERTA EXTERIOR
550.26
E
03.01.08.02.02
CERRADURA DE POMO DE ACERO INOXIDABLE PARA PUERTA INTERIOR
387.97
E
03.01.08.02.03
CERROJO TIPO SAPITO DE ACERO INOXIDABLE C/CADENA L=1.20m. (VENTANAS)
696.32
E
03.01.08.02.04
276.39
E
03.01.08.02.05
186.80
E
03.01.08.03
ACCESORIOS DE CIERRE
03.01.08.03.01
03.01.09
03.01.09.01
03.01.09.02
03.01.09.03
200.66
477.02
E
P
248.88
E
P
345.66
E
03.01.09.04
03.01.10
VIDRIO CRUDO DE 8mm. INC. LAMINA DE SEGURIDAD P/VENTANA (TIPO INSULADODOBLE VIDRIO)
18,316.67
PINTURA
03.01.10.01
PINTURA MUROS INTERIORES LATEX MATE - 2 MANOS COLOR BLANCO HUMO
4,172.19
E
03.01.10.02
PINTURA MUROS EXTERIORES OLEO MATE - 2 MANOS COLOR AMARILLO MARACUYA
1,697.74
E
03.01.10.03
03.01.10.04
03.01.10.05
03.01.10.06
03.01.10.07
1,657.73
E
P
1,557.22
E
P
490.67
E
P
56.49
E
P
2,501.18
E
03.01.10.08
151.88
E
03.01.11
OTROS
03.01.11
OTROS
03.01.11.01.01
PLACA DE OBRA
320.00
E
03.01.11.02
03.01.11.02.01
03.01.11.02.02
03.01.11.02.03
SEALIZACION
SEALETICA DE NOMBRES DE AMBIENTES 0.10Mx0.30M (ADHESIVO+DOBLE
ACRILICO CRISTAL 3mm)
SEALETICA DE SEGURIDAD 0.20Mx0.30M (ADHESIVO+DOBLE ACRILICO CRISTAL
3mm)
SEALETICA DE AVISOS (ADHESIVOS+DOBLE ACRILICO 3MM)
380.88
E
P
2,123.71
E
P
940.32
2 MES
PERIODO
N
PARTIDAS
Mes
E
TOTAL
1 MES
2 MES
PERIODO
N
PARTIDAS
Mes
03.01.11.02.04
03.01.11.02.05
03.01.11.03
TOTAL
1 MES
2 MES
1,506.74
E
P
1,406.74
MURAL
03.01.11.03.01
MURAL CON PINTURA LATEX SATINADO 2.85X8.35M (SEGUN MODELO)
550.00
E
04
INSTALACIONES SANITARIAS
04.01
EDIFICACION
04.01.01
04.01.01.01
04.01.01.01.01
2,583.04
2,583.04
E
04.01.01.01.02
04.01.01.01.03
04.01.01.01.04
04.01.01.01.05
04.01.01.02
SUMINISTRO DE ACCESORIOS
04.01.01.02.01
04.01.01.02.02
04.01.01.02.03
428.85
146.57
668.60
228.51
E
P
E
P
255.15
E
P
451.42
66.00
E
P
66.84
E
P
148.72
E
04.01.01.02.04
GRIFERIA PARA DUCHA CROMADA CON MEZCLADORA, INCL. ACCESORIOS
1,151.72
E
04.01.01.02.05
GRIFERIA PARA DUCHA CROMADA TIPO TELEFONO, INCL. ACCESORIOS
177.15
E
04.01.01.02.06
GRIFERIA DE BRONCE PESADO CROMADO SIMPLE TIPO ESFERICA P/LAVATORIO
175.00
E
04.01.01.02.07
1,149.56
E
04.01.01.02.08
GRIFERIA CROMADA TIPO CUELLO DE GANSO PARA LAVADERO COCINA
120.12
E
04.01.01.02.09
04.01.01.02.10
04.01.01.03
04.01.01.03.01
04.01.01.04
INSTALACION DE ACCESORIOS
04.01.01.04.01
187.12
E
P
243.17
284.04
574.92
E
04.01.02
04.01.02.01
04.01.02.01.01
967.61
E
04.01.02.02
04.01.02.02.01
REDES DE DISTRIBUCION
TUBERIA PVC SAP C-10 1.1/2"
140.62
140.62
183.52
183.52
161.66
161.66
E
04.01.02.02.02
P
E
04.01.02.02.03
PERIODO
N
PARTIDAS
Mes
E
TOTAL
1 MES
2 MES
PERIODO
N
PARTIDAS
Mes
04.01.02.02.04
TOTAL
1 MES
2 MES
264.46
264.46
499.87
499.87
15.95
15.95
55.32
55.32
205.59
205.59
326.04
326.04
36.33
36.33
17.10
17.10
100.32
100.32
43.61
43.61
35.72
35.72
70.38
70.38
95.20
95.20
28.62
28.62
60.18
60.18
105.00
105.00
61.52
61.52
78.40
78.40
155.94
155.94
292.02
292.02
161.96
161.96
45.98
45.98
975.06
975.06
199.28
199.28
484.96
484.96
2,351.49
2,351.49
240.35
240.35
E
04.01.02.03
REDES DE ALIMENTACION
04.01.02.03.01
04.01.02.04
04.01.02.04.01
04.01.02.04.02
04.01.02.04.03
P
E
P
E
P
E
P
E
04.01.02.04.04
P
E
04.01.02.04.05
P
E
04.01.02.04.06
04.01.02.04.07
04.01.02.04.08
04.01.02.04.09
04.01.02.04.10
04.01.02.04.11
04.01.02.04.12
04.01.02.04.13
04.01.02.04.14
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
04.01.02.04.15
P
E
04.01.02.05
04.01.02.05.01
VALVULAS
VALVULA DE PASO 1.1/2"
P
E
04.01.02.05.02
P
E
04.01.02.05.03
04.01.02.05.04
04.01.02.05.05
P
E
P
E
P
E
04.01.02.06
04.01.02.06.01
P
E
04.01.02.06.02
P
E
04.01.02.06.03
P
E
04.01.02.06.04
P
E
04.01.02.07
04.01.02.07.01
CAJAS DE REGISTRO-CUERPO
CONCRETO f'c=175kg/cm2 P/CAJAS DE REGISTRO
PERIODO
N
PARTIDAS
Mes
E
TOTAL
1 MES
2 MES
PERIODO
N
PARTIDAS
Mes
04.01.02.07.02
04.01.02.08
TOTAL
1 MES
2 MES
104.32
104.32
20.86
20.86
155.23
155.23
65.68
65.68
1,510.30
1,510.30
04.01.02.08.01
P
E
04.01.02.08.02
04.01.02.08.03
04.01.03
P
E
P
E
04.01.03.01
04.01.03.01.01
04.01.03.02
04.01.03.02.01
04.01.03.02.02
04.01.03.03
04.01.03.03.01
04.01.03.03.02
04.01.03.03.03
04.01.03.03.04
04.01.03.03.05
04.01.03.03.06
04.01.03.03.07
04.01.03.03.08
04.01.03.03.09
04.01.03.04
VALVULAS
04.01.03.04.01
04.01.03.04.02
04.01.03.04.03
04.01.03.04.04
P
E
598.60
171.03
E
P
420.78
420.78
62.51
62.51
341.93
341.93
30.78
30.78
P
E
P
E
P
E
P
6.78
1.70
E
P
32.16
32.16
30.40
30.40
80.00
80.00
53.04
53.04
15.72
15.72
E
P
E
P
E
P
E
P
E
194.68
E
P
41.91
41.91
133.68
133.68
168.90
42.76
E
P
E
P
E
04.01.03.04.05
30.90
30.90
16.38
16.38
E
04.01.03.04.06
P
E
04.01.03.05
04.01.03.05.01
285.46
E
04.01.03.05.02
58.34
E
04.01.03.05.03
CAMA DE APOYO E=0.10M CON MATERIAL SELECCIONADO ZARANDEADO
141.98
E
04.01.03.05.04
688.35
688.35
PERIODO
N
PARTIDAS
PRIMER RELLENO COMPACTADO CON MATERIAL SELECCIONADO Y ZARANDEADO
E=0.50M
Mes
E
TOTAL
1 MES
2 MES
PERIODO
N
PARTIDAS
Mes
04.01.04
DESAGUE Y VENTILACION
04.01.04.01
SALIDAS DE DESAGUE
04.01.04.01.01
04.01.04.01.02
04.01.04.01.03
04.01.04.02
REDES DE DERIVACION
04.01.04.02.01
04.01.04.02.02
04.01.04.03
04.01.04.03.01
04.01.04.03.02
TOTAL
1 MES
2 MES
84.20
84.20
227.34
227.34
191.70
191.70
625.75
625.75
535.21
535.21
176.94
176.94
218.52
218.52
413.64
413.64
239.19
239.19
94.80
94.80
15.92
15.92
31.74
31.74
284.28
284.28
27.92
27.92
164.50
164.50
123.13
123.13
178.29
178.29
110.00
110.00
59.76
59.76
95.60
95.60
74.25
74.25
74.24
74.24
178.72
178.72
809.86
809.86
165.52
165.52
402.80
402.80
E
P
E
P
E
P
E
P
E
P
E
P
E
04.01.04.03.03
TUBERIA DE VENTILACION PVC SAL 2"
P
E
04.01.04.04
04.01.04.04.01
P
E
04.01.04.04.02
04.01.04.04.03
04.01.04.04.04
04.01.04.04.05
P
E
P
E
P
E
P
E
04.01.04.04.06
04.01.04.04.07
P
E
P
E
04.01.04.04.08
04.01.04.04.09
04.01.04.04.10
04.01.04.05
INSTALACIONES ESPECIALES
04.01.04.05.01
P
E
P
E
P
E
P
E
04.01.04.05.02
P
E
04.01.04.05.03
P
E
04.01.04.05.04
P
E
04.01.04.05.05
P
E
04.01.04.06
04.01.04.06.01
P
E
04.01.04.06.02
P
E
04.01.04.06.03
PERIODO
N
PARTIDAS
Mes
E
TOTAL
1 MES
2 MES
PERIODO
N
PARTIDAS
Mes
04.01.04.06.04
04.01.04.07
OBRAS DE CONCRETO
04.01.04.07.01
04.01.04.07.01.01
04.01.04.07.01.02
04.01.04.07.02
CAJAS DE INSPECCION-TAPAS
04.01.04.07.02.01
04.01.04.07.02.02
04.01.04.07.02.03
04.02
04.02.01
MOVIMIENTO DE TIERRAS
TOTAL
1 MES
2 MES
1,952.89
1,952.89
1,409.81
1,409.81
517.17
517.17
139.05
139.05
74.59
74.59
59.15
59.15
1,110.90
1,110.90
36.23
36.23
1,081.96
1,081.96
2,182.65
2,182.65
491.39
491.39
232.02
232.02
459.64
459.64
424.88
424.88
468.99
468.99
184.73
184.73
521.44
521.44
399.38
399.38
223.27
223.27
69.53
69.53
119.81
119.81
11.60
11.60
P
E
P
E
P
E
P
E
P
E
04.02.01.01
EXCAVACIONES
04.02.01.01.01
04.02.01.02
RELLENOS
04.02.01.02.01
04.02.01.02.02
04.02.01.02.03
04.02.01.03
04.02.01.03.01
04.02.02
04.02.02.01
SOLADOS
P
E
P
E
P
E
P
E
P
E
04.02.02.01.01
04.02.02.02
P
E
04.02.02.02.01
CONCRETO f'c=140kg/cm2-P/LOSAS
04.02.03
04.02.03.01
04.02.03.01.01
CONCRETO f'c=140kg/cm2-P/POZO
04.02.03.01.02
04.02.03.01.03
04.02.03.02
04.02.03.02.01
CONCRETO f'c=140kg/cm2-P/POZO
P
P
E
P
E
P
E
P
E
P
E
04.02.03.02.02
P
E
P
E
04.02.03.03
04.02.03.03.01
P
E
04.02.03.03.02
P
E
04.02.03.03.03
PERIODO
N
PARTIDAS
Mes
E
TOTAL
1 MES
2 MES
PERIODO
N
PARTIDAS
Mes
04.02.03.04
TOTAL
1 MES
2 MES
BIOFILTRO
04.02.03.04.01
CONCRETO f'c=140kg/cm2-P/BIOFILTRO
04.02.03.04.02
04.02.03.04.03
04.02.03.05
TAPA DE BIODIGESTOR
04.02.03.05.01
CONCRETO f'c=140kg/cm2-P/TAPAS
482.81
482.81
E
P
646.33
646.33
E
P
284.24
284.24
61.80
61.80
54.96
54.96
35.63
35.63
158.69
158.69
93.45
93.45
143.81
143.81
5,374.45
5,374.45
300.51
300.51
115.58
115.58
453.90
453.90
49.85
49.85
103.86
103.86
5,462.80
5,462.80
P
E
04.02.03.05.02
P
E
04.02.03.05.03
04.02.04
REVOQUES Y REVESTIMIENTOS
04.02.04.01
P
E
04.02.04.01.01
P
E
04.02.04.02
04.02.04.02.01
P
E
04.02.04.03
04.02.04.03.01
BIOFILTRO
TARRAJEO IMPERMEABILIZADO EN SUPERFICIES INTERIORES C:A 1:5 E=1.0CM
P
E
04.02.05
BIODIGESTOR
04.02.05.01
04.02.06
BIOFILTRO
04.02.06.01
04.02.07
TUBERIAS Y ACCESORIOS
P
E
P
E
04.02.07.01
P
E
04.02.07.02
04.02.07.03
04.02.07.04
04.03
04.03.01
MOVIMIENTO DE TIERRAS
P
E
P
E
P
E
04.03.01.01
EXCAVACIONES
04.03.01.01.01
5,462.80
E
04.03.01.02
RELLENOS
04.03.01.02.01
652.40
652.40
1,587.60
1,587.60
652.40
E
04.03.01.02.02
CAMA DE APOYO E=0.10M CON MATERIAL SELECCIONADO ZARANDEADO
1,587.60
E
04.03.01.02.03
04.03.01.02.04
04.03.02
6,157.76
6,157.76
6,157.76
E
7,226.80
7,226.80
3,592.80
3,592.80
2,450.00
2,450.00
04.03.02.01
REDES DE DISTRIBUCION
04.03.02.01.01
P
E
04.03.02.01.02
PERIODO
N
PARTIDAS
Mes
E
TOTAL
1 MES
2 MES
PERIODO
N
PARTIDAS
Mes
04.03.02.02
04.03.02.02.01
04.03.02.02.02
04.04
04.04.01
04.04.02
05
05.01
05.01.01
05.01.01.01
05.01.01.02
05.01.01.03
05.01.01.04
05.01.02
05.01.02.01
05.01.02.02
05.01.02.03
05.01.02.04
05.01.02.05
05.01.02.06
05.01.03
ACOMETIDA ELECTRICA
05.01.03.01
05.02
05.02.01
SALIDA
05.02.01.01
05.02.01.02
TOTAL
1 MES
2 MES
14.84
14.84
5.48
5.48
1,254.65
1,254.65
140.30
140.30
E
P
E
P
E
P
E
12.82
E
P
168.57
168.57
E
P
431.28
150.69
E
P
329.40
329.40
1.17
1.17
27.55
27.55
60.07
60.07
36.08
36.08
127.30
127.30
18.71
18.71
38,500.00
38,500.00
1,422.12
1,422.12
1,918.00
1,918.00
534.78
534.78
132.80
34.56
115.92
115.92
30.83
30.83
50.44
50.44
114.68
114.68
273.98
273.98
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
05.02.01.03
P
E
05.02.01.04
05.02.01.05
05.02.01.06
05.02.01.07
05.02.01.08
05.02.01.09
P
E
P
E
P
E
P
E
P
E
P
E
PERIODO
N
PARTIDAS
Mes
05.02.01.10
P
E
TOTAL
1 MES
476.16
2 MES
476.16
PERIODO
N
PARTIDAS
Mes
05.02.01.11
05.02.01.12
TOTAL
1 MES
2 MES
95.78
95.78
125.30
125.30
111.00
111.00
367.00
367.00
3,148.97
3,148.97
1,428.32
1,428.32
1,573.73
1,573.73
658.46
658.46
129.10
129.10
2,296.61
2,296.61
1,033.40
1,033.40
1,014.20
1,014.20
1,014.20
1,014.20
E
P
E
05.02.02
05.02.02.01
TUBERIA PVC-SAP ELECTRICA DE 25 mm (TABLERO GENERAL-T. DISTRIBUCION)
P
E
05.02.02.02
P
E
05.02.02.03
TUBERIA PVC-SAP ELECTRICA DE 20mm (ALUMBRADO Y TOMACORRIENTE)
P
E
05.02.03
05.02.03.01
CABLE ELECTRICO 2-1x2.5mm2 NH + 1x2.5mm2 LSOH(T) - ALUMBRADO
P
E
05.02.03.02
CABLE ELECTRICO 2-1x4mm2 NH+ 1x2.5mm2 LSOH (T) - TOMACORRIENTE
P
E
05.02.03.03
05.02.03.04
P
E
P
E
05.02.04
TABLEROS DE DISTRIBUCION
05.02.04.01
05.02.04.02
05.02.04.03
05.02.04.04
05.02.04.05
05.02.04.06
05.02.04.07
P
E
P
E
P
E
P
E
P
1,304.26
E
P
1,061.41
E
P
975.73
E
05.03
INSTALACION DE PARARRAYOS
05.03.01
MOVIMIENTO DE TIERRAS
05.03.01.01
EXCAVACIONES
05.03.01.01.01
25.95
E
05.03.01.02
RELLENOS
05.03.01.02.01
05.03.01.02.02
3.24
E
P
10.32
E
05.03.01.03
05.03.01.03.01
15.48
E
05.03.02
05.03.02.01
SOLADOS
05.03.02.01.01
20.71
E
05.03.02.02
05.03.02.02.01
P
E
05.03.03
05.03.03.01
289.69
PERIODO
N
PARTIDAS
Mes
05.03.03.01.01
P
E
TOTAL
1 MES
102.18
2 MES
PERIODO
N
PARTIDAS
Mes
05.03.03.01.02
TOTAL
1 MES
2 MES
13.24
E
05.03.03.02
COLUMNAS
05.03.03.02.01
05.03.03.02.02
05.03.03.02.03
92.12
E
P
59.09
E
P
33.53
E
05.03.04
05.03.04.01
ESTRUCTURAS METALICAS
TORRE VENTADA DE ESTRUCTURA METALICA H=9M. INC. TEMPLADORES DE CABLE
DE RETENIDA 1/4" ASTM A416
05.03.05
PINTURA
05.03.05.01
05.03.05.02
05.03.06
PARARRAYOS
3,872.21
8.35
E
P
9.09
05.03.06.01
5,234.35
E
05.04
05.04.01
1,151.48
E
05.04.02
05.04.03
05.04.04
05.04.05
POZO DE TIERRA
05.04.06
05.04.07
BENTONITA Y SAL
05.04.08
ACCESORIOS DE TERMOFUSION
137.52
E
P
334.64
E
P
1,767.65
E
P
5,239.20
E
P
4,302.56
E
P
1,245.32
E
P
2,147.04
E
05.05
ARTEFACTOS
05.05.01
LAMPARAS
05.05.01.01
05.05.01.02
05.05.01.03
05.05.01.04
LUZ DE EMERGENCIA
05.05.02
REFLECTORES
05.05.02.01
05.06
05.06.01
05.06.01.01
SALIDA
05.06.01.01.01
05.06.01.02
617.26
E
P
1,519.98
E
P
5,836.27
E
P
596.32
1,705.44
31.02
05.06.01.02.01
P
E
146.40
117.12
PERIODO
N
PARTIDAS
Mes
05.06.01.03
TOTAL
1 MES
2 MES
05.06.01.03.01
CABLE ELECTRICO 2-1x4mm2 NH+ 1x2.5mm2 LSOH (T) - TOMACORRIENTE
116.40
116.40
48.42
48.42
424.54
424.54
E
05.06.02
SISTEMAS DE SEGURIDAD
05.06.02.01
TRABAJOS PRELIMINARES
05.06.02.01.01
05.06.02.02
MOVIMIENTO DE TIERRAS
P
E
05.06.02.02.01
P
E
05.06.02.02.02
05.06.02.03
05.06.02.03.01
1,629.28
1,303.42
SISTEMAS ELECTROMECANICOS
OBRAS PARA SISTEMA DE VIDEO VIGILANCIA (3 CAMARAS FIJAS Y 1 DOMO
PTZ180/360)
05.06.02.03.02
05.06.02.03.03
339.98
339.98
E
P
346.58
297.07
E
P
294.17
294.17
E
05.06.02.03.04
05.06.02.04
TUBERIAS
294.17
245.14
1,175.04
587.52
1,036.80
518.40
734.40
367.20
87.84
43.92
90.88
68.16
198.56
132.37
270.00
135.00
191.25
191.25
273.40
273.40
1,000.00
1,000.00
P
E
05.06.02.04.01
TUBERIA CONDUIT EMT DE 3/4" X 3M(SISTEMA DE VIDEO VIGILANCIA)
P
4
05.06.02.04.02
TUBERIA CONDUIT EMT DE 3/4" X 3M(SISTEMA DE ALARMA CONTRA ROBO)
P
E
05.06.02.04.03
05.06.02.04.04
05.06.02.05
SALIDAS
P
E
P
E
05.06.02.05.01
P
E
05.06.02.06
CABLEADO DE DATA
05.06.02.06.01
05.06.02.06.02
05.06.02.06.03
05.06.02.07
05.06.02.07.01
P
E
P
E
P
E
05.07
05.07.01
05.07.01.01
VARIOS
PRUEBAS ELECTRICAS
PRUEBA DE RESISTIVIDAD DE POZO A TIERRA
E
05.07.02
05.07.02.01
2,000.00
E
06
INSTALACIONES DE COMUNICACIONES
06.01
06.01.01
TRABAJOS PRELIMINARES
06.01.01.01
27.23
E
06.01.02
MOVIMIENTO DE TIERRAS
06.01.02.01
P
E
298.50
36.18
PERIODO
N
PARTIDAS
Mes
06.01.02.02
06.01.03
CABLEADO Y ACCESORIOS
TOTAL
1 MES
916.47
2 MES
111.09
06.01.03.01
06.01.03.02
875.80
875.80
E
P
1,431.47
1,041.07
E
06.01.03.03
905.75
905.75
E
06.01.04
06.01.04.01
06.01.04.02
06.01.04.03
06.01.05
SALIDAS DE COMUNICACIONES
515.40
386.55
218.20
163.65
1,756.80
878.40
250.60
250.60
E
P
E
P
E
06.01.05.01
P
E
06.01.05.02
06.01.06
PATCH PANEL
06.01.06.01
06.01.07
RACK DE COMUNICACIONES
1,127.70
0.00
64.32
06.01.07.01
162.79
E
06.02
VARIOS
06.02.01
06.02.01.01
SERVICIO DE CONTROL DE CALIDAD DEL SISTEMA DE COMUNICACION
2,000.00
E
07
EQUIPAMIENTO
07.01
MOBILIARIO BASICO
07.01.01
07.01.02
07.01.03
960.00
E
P
540.00
E
P
2,160.00
E
07.01.04
07.01.05
07.01.06
07.01.07
2,198.72
E
P
2,397.55
E
P
225.00
E
P
3,348.00
E
07.01.08
220.00
E
07.01.09
2,717.28
E
07.01.10
2,279.20
E
07.01.11
396.00
E
07.01.12
ESTANTE METALICO INDUSTRIAL CON 5 DIVISIONES L=5.15M, A=1.00M, H=2.40M.
1,325.95
E
07.01.13
345.00
1,127.70
64.32
PERIODO
N
PARTIDAS
Mes
E
TOTAL
1 MES
2 MES
PERIODO
N
PARTIDAS
Mes
07.02
EQUIPAMIENTO BASICO
07.02.01
OFICINAS
07.02.01.01
CAMARA WEB 5MPX 1080P HD, CAP. VIDEO 720P, ZOOM DIGITAL 3X, MICROFONO INC
TOTAL
1 MES
198.00
E
07.02.01.02
CMARA DE FOTOS SEMI PROFESIONAL 12.1 MPX CMOS 1/1.7 " SX(28mm-140mm)
4.0X + FILMADORA PANT. 3" LCD
649.00
07.02.01.03
07.02.01.04
07.02.01.05
MICROFONO DE PERIFONEO
07.02.01.06
120.00
E
P
840.00
50.00
E
P
540.00
E
07.02.01.07
07.02.01.08
07.02.01.09
07.02.01.10
07.02.01.11
07.02.01.12
189.90
E
P
1,200.00
E
P
2,846.00
E
P
6,200.00
E
P
5,827.97
E
P
118.18
E
07.02.01.13
EQUIPO DE COMUNICACION INALAMBRICO ACCESS POINT VEL. TRANS. 300MBPS
2,880.00
E
07.02.01.14
BANDERAS(03 UNIDADES)
07.02.01.15
720.00
E
P
359.70
E
07.02.01.16
EXTINTOR , ACETATO POTACIO 2.5GAL ANSI/UL 40F -120F ALUMINIO 125PSI
119.90
E
07.02.01.17
MONITOR LED 21 PULGADAS VGA-HDMI FULL HD(PARA CAMARA DE VIGILANCIA)
1,130.00
E
07.02.01.18
CAMARAS DE VIGILANCIA IP DOMO PTZ IP 1.3Mp HD 1280 X 960 30 FPS
3,345.30
E
07.02.01.19
CAMARAS DE VIGILANCIA IP FIJAS TIPO TUBO DE 3.6MM - RESOLUCION DE 2Mp
1,561.14
E
07.02.01.20
500.00
E
07.02.01.21
07.02.02
07.02.02.01
SWITCH DE 24P PoE/24 PUERTOS GI, RAQUEABLE CAP. 12Gbps FLASH 32 MB MIN.
DRAM 128 MB
4,661.02
DORMITORIOS
ALMOHADAS 1 1/2 PLAZAS DE POLIURETANO, DERIVADO ORGNICO TERMOPLSTICO
275.00
E
07.02.02.02
1,315.60
E
07.02.02.03
3,400.00
E
07.02.02.04
823.90
E
07.02.02.05
07.02.02.06
2,409.00
E
P
E
629.19
2 MES
PERIODO
N
PARTIDAS
Mes
07.02.02.07
07.02.02.08
07.02.02.09
07.02.02.10
07.02.02.11
07.02.02.12
07.02.03
COCINA
07.02.03.01
07.02.03.02
07.02.03.03
07.02.03.04
07.02.03.05
TOTAL
1 MES
451.46
E
P
1,030.92
E
P
1,195.46
E
P
2,630.92
E
P
468.16
E
P
171.40
76.89
E
P
104.50
E
P
143.00
E
P
19.44
E
P
32.78
E
07.02.03.06
5.79
E
07.02.03.07
07.02.03.08
07.02.03.09
07.02.03.10
9.79
E
P
42.24
E
P
42.24
E
P
42.24
E
07.02.03.11
07.02.03.12
07.02.03.13
07.02.03.14
07.02.03.15
42.24
E
P
27.39
E
P
21.60
E
P
21.60
E
P
14.52
E
07.02.03.16
CUCHILLO DE ACERO INOXIDABLE DE COCINA CON MANGO DE MADERA
7.59
E
07.02.03.17
CUCHILLO DE ACERO INOXIDABLE DE MESA MODELO COLA DE PATO
36.84
E
07.02.03.18
22.99
E
07.02.03.19
71.50
E
07.02.03.20
17.49
E
07.02.03.21
7.59
E
07.02.03.22
13.20
E
07.02.03.23
450.00
2 MES
PERIODO
N
PARTIDAS
COCINA SEMIINDUSTRIAL ALTA 03 HORNILLAS LARGO 0.90M X ANCHO 55CM X ALTO
70CM
07.02.03.24
Mes
TOTAL
E
P
E
2,699.00
1 MES
2 MES
PERIODO
N
PARTIDAS
Mes
07.02.04
TOTAL
1 MES
OFICINA 2
07.02.04.01
BOTIQUN PRIMEROS AUXILIOS DE MADERA INC. KIT DE MEDICAMENTOS
690.00
E
07.02.04.02
07.02.05
HERRAMIENTAS
07.02.05.01
385.00
15.88
E
07.02.05.02
34.76
E
07.02.05.03
PAPELERAS DE BASURAS CHICO DE PLASTICO (25 LITROS) 35CMX42CMX69CM
164.50
E
07.02.05.04
07.02.05.05
07.02.05.06
07.02.05.07
119.80
E
P
1,023.41
E
P
307.78
E
P
39.27
E
07.02.05.08
TRAPEADOR CON MOPA PLANA CON MICOFIBRA 35 CM Y MANGO DE ALUMINIO
114.78
E
07.02.05.09
07.02.05.10
07.02.05.11
07.02.05.12
07.02.05.13
07.02.05.14
07.02.06
SANITARIAS
07.02.06.01
07.02.06.02
07.02.06.03
07.02.07.01
70.00
E
P
61.38
E
P
43.89
E
P
705.00
E
P
188.97
E
P
178.83
751.25
E
P
2,529.89
E
P
1,263.85
E
P
3,427.55
E
07.02.07.02
07.02.07.03
GENERADOR ELECTRICO 8HP 6kW prime 7.5kVA MONOFASICO 220V, 60HZ, 4T-REFRIGE
1,488.81
E
P
6,045.43
E
07.02.07.04
1,226.64
E
07.02.07.05
474.30
E
07.02.07.06
PULSADOR DE EMERGENCIA
104.00
E
07.02.07.07
92.94
E
07.02.07.08
13,769.40
E
07.02.07.09
1,883.87
2 MES
PERIODO
N
PARTIDAS
Mes
E
TOTAL
1 MES
2 MES
PERIODO
N
PARTIDAS
Mes
07.02.07.10
TOTAL
1 MES
2 MES
24.00
P
E
07.02.07.11
TRANSFORMADOR DE AISLAMIENTO 3.0kVA 220V MONOFASICA (PARA UPS)
1,280.30
E
07.02.07.12
DETECTOR DE TEMPERATURA
07.02.07.13
216.00
P
E
P
2,383.90
E
07.02.07.14
REPETIDOR DE SENAL HDMI (PARA REPETIDOR DE CAMARA DE VIGILANCIA)
465.00
P
E
07.02.08
07.02.08.01
MOVILIDAD
MOTO LINEAL CILIN. 124CC -140CC, 4 T, MONOCILINDRICO, OHC, POT. MAX.
11.13HP@7,000 RPM -12.0HP@ 7,500 RPM
6,690.00
RESUMEN
P =PROGRAMADO
AVANCE
MENSUAL (%)
945,284.44
Porcentaje (%)
E = EJECUTADO
Porcentaje (%)
P =PROGRAMADO
Porcentaje (%)
________________________________________
945,284.44
136130.63
295,110.55
14.40%
31.22%
67,425.02
170,783.26
7.13%
18.07%
136130.63
431,241.18
14.40%
45.62%
67425.02
238,208.28
7.13%
25.20%
_____________________________
Ing. Roberto Huaman Lacuta
SUPERVISOR
PERIODO
3 MES
4 MES
0.00
1,612.77
1,075.17
7,860.55
7,860.55
181.02
181.01
114.29
64.75
1,771.46
1,003.83
129.34
73.29
229.52
130.06
19.25
19.25
PERIODO
3 MES
4 MES
120.44
215.38
21.51
50.33
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
27,909.62
552.94
2,126.23
1,126.41
7,600.02
122.91
2,649.68
PERIODO
3 MES
4 MES
205.30
331.48
195.79
53,727.81
1,165.19
228.39
5.46
131.33
23.47
2,415.90
649.34
405.12
405.12
11.58
23.15
38.72
14.11
56.95
117.56
27.44
34.43
49.18
PERIODO
3 MES
4 MES
359.28
126.30
172.26
PERIODO
3 MES
4 MES
583.33
1,166.66
33.73
27.44
268.26
44.13
2,764.29
886.32
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
32.30
65.99
233.90
338.45
3.01
330.50
235.91
22.80
5.23
696.05
31.37
70.56
61.14
100.33
PERIODO
3 MES
4 MES
113.11
64.24
182.50
143.90
933.70
2,150.82
743.76
89.92
69.19
67.52
31.90
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
63.21
7.55
22.20
102.74
49.86
734.60
182.86
209.94
255.37
72.24
32.10
109.34
119.76
224.90
171.81
119.76
113.74
176.40
290.18
288.05
174.58
161.21
190.19
PERIODO
3 MES
4 MES
62.79
923.16
34.81
122.30
139.41
107.91
54.58
21.80
206.23
81.93
207.62
23.23
242.29
40.75
714.13
43.13
70.56
61.14
100.33
133.11
81.08
51.87
PERIODO
3 MES
4 MES
40.90
PERIODO
3 MES
4 MES
322.88
142.95
16.50
16.71
18.59
53.00
25.00
31.56
79.85
126.21
37.93
38.31
80.08
12.54
12.46
8.93
7.82
11.90
30.76
80.98
42.10
8.42
62.20
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
62.28
39.60
68.34
15.92
24.72
8.37
27.92
110.75
16.98
20.00
7.47
47.80
18.56
1.95
54.08
22.16
212.01
22.44
9.43
475.09
44.32
9.42
PERIODO
3 MES
4 MES
245.44
203.26
4,201.12
1,093.53
395.46
140.20
147.87
192.37
100.47
50.52
13,193.80
218.15
355.53
69.46
15.08
63.25
734.60
268.19
354.95
42.63
PERIODO
3 MES
4 MES
119.76
147.72
302.85
124.36
150.67
136.59
865.55
311.00
179.33
39.00
298.27
140.77
48.47
432.97
361.91
161.89
7,092.79
91.63
399.80
1,586.19
433.96
225.54
93.45
7,092.79
PERIODO
3 MES
2,351.44
1,983.75
4 MES
PERIODO
3 MES
4 MES
16,264.17
12,607.12
1,717.83
4,353.34
22,016.12
5,828.80
6,827.82
22.51
394.85
280.13
105.85
10,653.17
4,913.27
198.98
4,794.65
608.79
549.68
749.11
1,689.93
749.11
732.70
512.89
PERIODO
3 MES
4 MES
2,568.24
562.40
282.24
550.26
387.97
696.32
276.39
186.80
200.66
477.02
248.88
230.44
115.22
18,316.67
4,172.19
848.87
848.87
1,657.73
1,557.22
490.67
56.49
2,501.18
151.88
320.00
380.88
2,123.71
940.32
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
1,506.74
1,406.74
550.00
162.85
119.43
253.90
186.19
255.15
451.42
66.00
66.84
148.72
1,151.72
177.15
175.00
1,149.56
120.12
187.12
243.17
284.04
574.92
967.61
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
213.79
213.78
2.54
2.54
194.68
64.14
62.00
285.46
58.34
141.98
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
12.82
155.88
124.71
54.58
43.66
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
1,304.26
1,061.41
975.73
25.95
3.24
10.32
15.48
20.71
289.69
PERIODO
3 MES
4 MES
102.18
PERIODO
3 MES
4 MES
13.24
92.12
59.09
33.53
3,872.21
8.35
9.09
5,234.35
1,151.48
137.52
334.64
1,767.65
5,239.20
4,302.56
1,245.32
2,147.04
617.26
1,519.98
5,836.27
596.32
1,705.44
31.02
29.28
PERIODO
3 MES
4 MES
325.86
49.51
49.03
587.52
518.40
367.20
43.92
22.72
66.19
135.00
2,000.00
27.23
135.68
126.64
PERIODO
3 MES
4 MES
416.58
388.80
390.40
128.85
54.55
878.40
162.79
2,000.00
960.00
540.00
2,160.00
2,198.72
2,397.55
225.00
3,348.00
220.00
2,717.28
2,279.20
396.00
1,325.95
345.00
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
198.00
649.00
120.00
840.00
50.00
540.00
189.90
1,200.00
2,846.00
6,200.00
5,827.97
118.18
2,880.00
720.00
359.70
119.90
1,130.00
3,345.30
1,561.14
500.00
4,661.02
275.00
1,315.60
3,400.00
823.90
2,409.00
629.19
PERIODO
3 MES
4 MES
451.46
1,030.92
1,195.46
2,630.92
468.16
171.40
76.89
104.50
143.00
19.44
32.78
5.79
9.79
42.24
42.24
42.24
42.24
27.39
21.60
21.60
14.52
7.59
36.84
22.99
71.50
17.49
7.59
13.20
450.00
PERIODO
3 MES
4 MES
2,699.00
PERIODO
3 MES
4 MES
690.00
385.00
15.88
34.76
164.50
119.80
1,023.41
307.78
39.27
114.78
70.00
61.38
43.89
705.00
188.97
178.83
751.25
2,529.89
1,263.85
3,427.55
1,488.81
6,045.43
1,226.64
474.30
104.00
92.94
13,769.40
1,883.87
PERIODO
3 MES
4 MES
PERIODO
3 MES
4 MES
24.00
1,280.30
216.00
2,383.90
465.00
6,690.00
322,333.58
191,709.68
34.10%
20.28%
753,574.76
945,284.44
79.72%
100.00%
_____________________________
Ing. Roberto Huaman Lacuta
SUPERVISOR