Académique Documents
Professionnel Documents
Culture Documents
OBRA
Ubicacin
Area Geogrfica
Contratista
160,951.44
160,951.44
811,577.21
Formulas Polinomicas
3.2.2
a) Estructuras
Adel. Materiales
Del Contrato
162,315.44
#REF!
811,577.21
b) Arquitectura
Err:509
94,263.10
Err:509
c) Instal. Sanitarias
Err:509
16,794.00
Err:509
d) Instal. Electricas
Err:509
11,010.60
Err:509
160,951.44
#REF!
Err:509
TOTALES
CONTRATO PRINCIPAL
VALORIZACIONES
No
MES
Reales
REINTEGRO
DEDUCCION
Reales
FORMULA ESTRUCTURAS
0.00
501.16
0.00
167,053.39
0.00
#REF!
167,053.39
501.16
#REF!
Err:509
0.00
#REF!
Err:509
0.00
Err:509
0.00
#REF!
Err:509
0.00
#REF!
Err:509
0.00
Err:509
0.00
#REF!
Err:509
Err:509
#REF!
Err:509
Err:509
SUBTOTAL
Err:509
Err:509
#REF!
TOTAL ACUMULADO
Err:509
Err:509
#REF!
AVANCE ACUMULADO
Err:509
OCT
NOV
DIC
ENE
SUBTOTAL
FORMULA ARQUITECTURA
OCT
NOV
DIC
ENE
SUBTOTAL
FORMULA INSTALACIONES SANITARIAS
OCT
NOV
DIC
ENE
SUBTOTAL
FORMULA INSTALACIONES ELECTRICAS
OCT
NOV
DIC
ENE
DE VALORIZACIONES MENSUALES
AL 20 DE NOVIEMBRE DEL 2005
3.2.2
TOTAES
501.16
501.16
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
RESUMEN DE VALORIZACION N 02
AL MES DE MAYO DEL 2013
DESCRIPCIN
MONTO
CONTRATO
VAL ACUM
ANTERIOR
VAL
ACTUAL
VAL ACUM
ACTUAL
a) Frmula No 01
811,577.21
0.00
167,053.39
167,053.39
TOTAL CONTRACTUAL
% DE AVANCE DE OBRA A LA FECHA
811,577.21
0.00
0.00%
167,053.39
20.58%
167,053.39
20.58%
a) Frmula No 01
0.00
0.00
0.00
TOTAL REAJUSTE
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
167,053.39
167,053.39
0.00
0.00
0.00
0.00
0.00
167,053.39
30,069.61
167,053.39
30,069.61
S/.
0.00
197,122.99
197,122.99
TOTAL COMPROMISO
S/.
0.00
197,122.99
197,122.99
REAJUSTES (S)
AMORTIZACION (A)
Amortizacin del Adelanto en Efectivo
Amortizacin del Adelanto para Materiales
TOTAL AMORTIZACIONES
0.00
0.00
0.00
0.00
02
% DE
SALDO POR
AVANCE
VALORIZAR
ACUMUL.
20.58
644,523.83
20.58
644,523.83
79.42%
0.00
0.00
0.00
0.00
0.00
0.00
Ubicacin
Contratista :
Frmulas Polinmicas
a. Formula 01
b. Formula 02
c. Formula 03
S/. 160,951.44
804,757.24
Montos sin IGV
Adel. Efectivo
Del Contrato
A
C
0.19
1.00
#REF!
#REF!
Total
No.
Valorizacin
Mes
Monto
V
#REF!
0.000
0.000
0.000
0.00
84,854.31
Err:509
0.000
0.000
0.000
0.000
0.000
0.000
SUB TOTAL
Err:509
Formula 03 ( Subproyecto 01)
1
Aug-07
0.00
2
Sep-07
3,737.80
3
Oct-07
Err:509
0.000
0.000
0.000
0.000
0.000
0.000
SUB TOTAL
Formula 02 ( Subproyecto 01)
1
Aug-07
2
Sep-07
3
Oct-07
SUB TOTAL
167,053.39
160,906.36
167,053.39
#REF!
495,013.13
Err:509
EVOS SOLES)
izacin)
Ka
Jul-07
0.000
0.000
0.000
Reintegro
que NO
Corresponde
D = V*A/C (K/Ka - 1)
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
1,068.14
#DIV/0!
LP
OBRA
Ubicacin
Area Geogrfica
Factor Relacin
Valor Referencial
: S/.
C/IGV
: S/.
C/IGV
: S/.
S/IGV
Supervisor
Contratista
CON I.G.V.
(S/.)
191,532.21
644,088.45
957,661.11
SIN I.G.V.
(S/.)
160,951.44
541,250.80
804,757.24
06 de Sept 2007
CALCULOS SIN IGV
VALORIZACION
N
01
02
03
MES
AGOSTO
SEPTIEMBR
OCTUBRE
MONTO VALORIZADO
AMORTIZACION DEL
ADELANTO
53,436.35
249,498.47
167,053.39
0.00
78,500.00
77,507.12
469,988.21
156,007.12
S/,
AVANCE DE OBRA
AMORTIZACION ACUMULADA
S/,
334,769.03
58.40%
156,007.12
S/,
78,500.00
S/,
77,507.12
S/. 957,661.11
S/. 957,661.11
S/. 811,577.21
ING EDSON COSME BLACIDO PAPA
CONSORCIO SEOR DE LOS MILAGROS
LP
OBRA
Ubicacin
Area Geogrfica
Contratista
:
0
Valor Referencial
: MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.P N 86285 SEOR Monto Contractual
DEL DISTRITO DE TINCO, PROVINCIA DE CARHUAZ-ANCASH
:
0
:
2
Supervisor
: CONSORCIO SEOR DE LOS MILAGROS
: S/.
: S/.
: S/.
: S/.
:
957,661.11
957,661.11
957,661.11
811,577.21
Ing. Sonia Marisa Torres Palomino
CON I.G.V.
(S/.)
191,532.21
957,661.11
0.20
5 de July de 2007
SIN I.G.V.
(S/.)
160,951.44
804,757.24
0.20
MONTO VALORIZADO
MES
Aug-07
Sep-07
Oct-07
AMORTIZACION DEL
ADELANTO
53,436.35
249,498.47
167,053.39
10,687.27
49,899.69
33,410.68
469,988.21
93,997.64
S/.
334,769.03
AVANCE DE OBRA
AMORTIZACION ACUMULADA
S/.
93,997.64
S/.
60,586.96
58.40%
S/.
33,410.68
C/IGV
C/IGV
C/IGV
S/IGV
Ing. Sonia Marisa Torres Palomino
Pgina 17 de 69
:
:
:
:
0.00
MES
: MAYO 2013
MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.P N 86285 SEOR DE LOS MILAGROS
0.00
2.00
Adelanto
Utilizad (7)
FORMULA I ESTRUCTURAS
VAL
No
Mes
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
IU
21
04
Elemento
Valorizac.
(1)
Cemento
Porthlan Tipo I
68,407.57
141,576.30
108,198.30
41,395.03
15,910.40
167,053.39
Agregado Fino
68,407.57
141,576.30
108,198.30
41,395.03
15,910.40
167,053.39
05 Agregado Grueso
68,407.57
141,576.30
108,198.30
41,395.03
15,910.40
167,053.39
38
Hormign
68,407.57
141,576.30
108,198.30
41,395.03
15,910.40
167,053.39
Acero de
Construc. Corr
68,407.57
141,576.30
108,198.30
41,395.03
15,910.40
167,053.39
03
17 Bloque de ladrillo
43
Madera Nac.
Encofrado y
Carpinteria
68,407.57
141,576.30
108,198.30
41,395.03
15,910.40
167,053.39
68,407.57
141,576.30
108,198.30
41,395.03
15,910.40
167,053.39
Monto Adel
Otorg (2)
Coefi. (3)
% Inci. (3')
47,000.00
0.119
100.00
10,400.00
15,000.00
34,200.00
38,400.00
25,800.00
17,148.36
0.152
0.152
0.152
0.099
0.066
0.170
17.76
25.66
56.58
100.00
100.00
Imr
(4)
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Ima (5)
Oct. - 06
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Imo (6)
May. -06
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
(3)x(1)x(4)
100.00
8,140.50
16,847.58
12,875.60
4,926.01
1,893.34
19,879.35
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1,846.68
3,821.88
2,920.83
1,117.47
429.50
4,509.64
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
2,668.11
5,521.93
4,220.08
1,614.54
620.56
6,515.62
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
5,883.16
12,175.79
9,305.23
3,560.04
1,368.32
14,366.86
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
6,772.35
14,016.05
10,711.63
4,098.11
1,575.13
16,538.29
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
4,514.90
9,344.04
7,141.09
2,732.07
1,050.09
11,025.52
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
3,762.07
7,785.99
5,600.30
32.35
187,948.36
Adelanto
Utilizad (7)
FORMULA 2 ARQUITECTURA
Pgina 18 de 69
VAL
No
Mes
IU
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
0.00
3,204.69
63,496.54
Cemento
21
Porthlan Tipo I
51,566.19
37,617.39
Err:509
Err:509
0.00
3,204.69
63,496.54
05 Agregado Grueso
51,566.19
37,617.39
Err:509
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
Agregado Fino
0.00
3,204.69
63,496.54
51,566.19
37,617.39
Err:509
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
Tubera Acero
Negro y/o
Galvanizado
0.00
3,204.69
63,496.54
51,566.19
37,617.39
Err:509
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
Pintura Ltex
0.00
3,204.69
63,496.54
51,566.19
37,617.39
Err:509
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
Maquinaria y
Equipo Nacional
0.00
3,204.69
63,496.54
51,566.19
37,617.39
Err:509
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
Dollar + Inflac
USA
0.00
3,204.69
63,496.54
51,566.19
37,617.39
Err:509
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
Madera Nac.
Encofrado y
Carpinteria
0.00
3,204.69
63,496.54
51,566.19
37,617.39
Err:509
04
65
54
48
30
43
Elemento
Valorizac.
(1)
Monto Adel
Otorg (2)
Coefi. (3)
% Inci. (3')
38,580.00
0.168
100.00
11,500.00
0.109
12,156.78
0.109
4,150.00
0.055
7,750.00
0.055
3,850.00
0.184
6,250.00
0.184
20,500.00
0.184
44.95
55.05
36.36
63.64
9.78
15.22
75.00
Imr
(4)
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Ima (5)
Oct. - 05
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Imo (6)
May. -05
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
(3)x(1)x(4)
100.00
0.00
538.39
10,667.42
8,663.12
6,319.72
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
157.02
3,111.04
2,526.51
1,843.08
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
192.30
3,810.08
3,094.20
2,257.21
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
64.09
1,269.80
1,031.22
752.27
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
112.17
2,222.51
1,804.92
1,316.68
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
57.67
1,142.63
927.94
676.93
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
89.75
1,778.21
1,444.10
1,053.47
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
442.25
8,762.52
7,116.13
4,179.10
0.00
104,736.78
Adelanto
Utilizad (7)
Mes
01
02
03
Oct
Nov
Dic
IU
77
Elemento
Vlvula de
Bronce Nacional
Valorizac.
(1)
Monto Adel
Otorg (2)
Coefi. (3)
% Inci. (3')
450.00
0.064
21.88
594.11
441.07
10,451.01
Imr
(4)
Err:509
Err:509
Err:509
Ima (5)
Imo (6)
Oct. - 05 May. -05
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
(3)x(1)x(4)
100.00
8.32
6.18
146.35
Pgina 19 de 69
04
05
06
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
77
Vlvula de
Bronce Nacional
551.34
14,866.77
Err:509
Aparato Sanitario
c/grifera
594.11
441.07
10,451.01
551.34
14,866.77
Err:509
72
Tubera PVC
Agua Desague
Elctricas
594.11
441.07
10,451.01
551.34
14,866.77
Err:509
04
594.11
441.07
10,451.01
Agregado Fino
551.34
14,866.77
Err:509
10
05 Agregado Grueso
21
03
61
51
43
594.11
441.07
10,451.01
551.34
14,866.77
Err:509
Cemento
Porthlan Tipo I
594.11
441.07
10,451.01
551.34
14,866.77
Err:509
Acero de
Construcin
Corrugado
594.11
441.07
10,451.01
551.34
14,866.77
Err:509
Plancha
Galvanizada
594.11
441.07
10,451.01
551.34
14,866.77
Err:509
Perfil de Acero
LAC
594.11
441.07
10,451.01
551.34
14,866.77
Err:509
Madera Nac.
Encofrado y
Carpinteria
594.11
441.07
10,451.01
551.34
14,866.77
Err:509
450.00
1,750.00
4,250.00
975.00
987.50
225.00
563.00
2,248.50
1,000.00
785.00
0.064
0.064
0.093
0.124
0.124
0.124
0.200
0.200
0.200
0.088
21.88
78.12
100.00
20.97
23.39
55.64
10.50
41.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
7.72
208.18
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
29.70
22.05
522.52
27.57
743.29
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
55.25
41.02
971.94
51.27
1,382.61
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
15.45
11.47
271.76
14.34
386.58
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
17.23
12.79
303.12
15.99
431.19
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
40.99
30.43
153.58
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
12.48
9.26
219.47
11.58
310.21
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
48.72
36.17
856.98
45.21
1,219.08
42.35
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
57.63
42.78
899.59
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
14.85
11.03
261.28
13.78
371.68
Err:509
48.50
28.41
Pgina 20 de 69
13,234.00
Adelanto
Utilizad (7)
Mes
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
01
02
03
04
05
Oct
Nov
Dic
Ene
Feb
IU
72
11
12
07
06
19
65
56
21
Elemento
Tubera PVC
Agua Desague
Elctricas
Valorizac.
(1)
0.00
1,185.48
4,884.95
5,353.31
20,547.76
Err:509
Aetefacto
Alumbrado
Exterior
0.00
1,185.48
4,884.95
5,353.31
20,547.76
Err:509
Aetefacto
Alumbrado
Interior
0.00
1,185.48
4,884.95
5,353.31
20,547.76
Err:509
Alambre y Cable
Tipo TW y THW
0.00
1,185.48
4,884.95
5,353.31
20,547.76
Err:509
Alambre y Cable
de Cobre
Desnudo
0.00
1,185.48
4,884.95
5,353.31
20,547.76
Err:509
0.00
1,185.48
4,884.95
5,353.31
20,547.76
Err:509
Tubera Acero
Negro y/o
Galvanizado
0.00
1,185.48
4,884.95
5,353.31
20,547.76
Err:509
Plancha de Acero
LAC
0.00
1,185.48
4,884.95
5,353.31
20,547.76
Err:509
Cemento
Porthlan Tipo I
0.00
1,185.48
4,884.95
5,353.31
20,547.76
Monto Adel
Otorg (2)
Coefi. (3)
% Inci. (3')
1,500.00
0.398
10.80
3,000.00
7,242.00
700.00
874.00
1,436.00
324.00
777.00
346.00
0.398
0.398
0.097
0.097
0.097
0.069
0.069
0.064
27.39
61.81
24.74
25.77
49.49
17.39
33.33
23.44
Imr
(4)
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Ima (5)
Oct. - 05
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Imo (6)
May. -05
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
(3)x(1)x(4)
100.00
0.00
50.96
209.97
230.11
883.22
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
129.23
532.52
583.58
1,754.67
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
291.63
1,201.72
1,316.93
4,431.72
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
28.45
117.23
128.47
425.86
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
29.63
122.11
133.82
513.63
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
56.91
234.50
256.99
887.60
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
14.22
58.62
64.23
186.93
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
27.26
112.34
123.11
472.55
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
17.78
73.28
80.31
174.63
Pgina 21 de 69
21
Cemento
Porthlan Tipo I
346.00
0.064
23.44
06
Mar
Err:509
Err:509
Err:509
Err:509
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
Agregado Fino
0.00
1,185.48
4,884.95
5,353.31
20,547.76
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
21.34
87.94
96.38
274.34
01
02
03
04
05
06
Oct
Nov
Dic
Ene
Feb
Mar
Poste de
Concreto
0.00
1,185.48
4,884.95
5,353.31
20,547.76
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
36.74
151.41
165.93
626.92
04
62
480.00
981.00
0.064
0.064
17,660.00
DEDUCTIVOS QUE NO
CORRESPONDEN POR ADELANTO
DE MATERIALES
ESTRUCTURAS
ARQUITECTURA
INSTALACIONES SANITARIAS
INSTALACIONES ELECTRICAS
DEDUCCIONES
Acumulada
Anterior
Acumulada
Actual
Deducin
del mes
1,457.97
693.09
68.26
281.37
Err:509
Err:509
Err:509
Err:509
Err:509
2,500.69
Err:509
Err:509
28.13
48.43
Pgina 22 de 69
RESPONDE
Mont. Max
Utilizab (8)
D=(2)x(6)
(5)
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Adelan X
Utilizar (9)
Saldo Adela. X
Deduccion (11)
Utilizar
47,000.00
38,859.50
22,011.92
9,136.32
4,210.31
2,316.98
-17,562.38
D=(7)x((4)-(5))
(6)
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
10,400.00
8,553.32
4,731.44
1,810.61
693.14
263.64
-4,246.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
15,000.00
12,331.89
6,809.96
2,589.88
975.34
354.78
-6,160.83
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
34,200.00
28,316.84
16,141.05
6,835.82
3,275.79
1,907.47
-12,459.39
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
38,400.00
31,627.65
17,611.60
6,899.97
2,801.86
1,226.73
-15,311.56
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
25,800.00
21,285.10
11,941.06
4,799.98
2,067.90
1,017.82
-10,007.71
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
17,148.36
13,386.29
5,600.30
0.00
Err:509
Err:509
Mont. Max
Utilizab (8)
Adelan X
Utilizar (9)
Saldo Adela. X
Deduccion (11)
Utilizar
Pgina 23 de 69
D=(2)x(6)
(5)
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
D=(7)x((4)-(5))
(6)
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
38,580.00
38,580.00
38,041.61
27,374.19
18,711.07
12,391.35
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
11,500.00
11,500.00
11,342.98
8,231.94
5,705.43
3,862.35
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
12,156.78
12,156.78
11,964.48
8,154.41
5,060.20
2,802.99
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
4,150.00
4,150.00
4,085.91
2,816.11
1,784.89
1,032.62
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
7,750.00
7,750.00
7,637.83
5,415.32
3,610.40
2,293.72
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
3,850.00
3,850.00
3,792.33
2,649.70
1,721.75
1,044.82
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
6,250.00
6,250.00
6,160.25
4,382.05
2,937.94
1,884.48
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
20,500.00
20,500.00
20,057.75
11,295.23
4,179.10
0.00
0.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Mont. Max
Utilizab (8)
D=(2)x(6)
(5)
Err:509
Err:509
Err:509
Adelan X
Utilizar (9)
Saldo Adela. X
Deduccion (11)
Utilizar
D=(7)x((4)-(5))
(6)
441.68
Err:509
435.50
Err:509
289.16
Err:509
Pgina 24 de 69
Err:509
Err:509
Err:509
281.44
73.25
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1,750.00
1,720.30
1,698.24
1,175.73
1,148.16
404.87
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
4,250.00
4,194.75
4,153.73
3,181.78
3,130.51
1,747.90
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
975.00
959.55
948.08
676.33
661.99
275.41
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
987.50
970.27
957.48
654.36
638.37
207.18
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
225.00
184.01
153.58
0.00
Err:509
Err:509
563.00
550.52
541.26
321.79
310.21
0.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
2,248.50
2,199.78
2,163.62
1,306.63
1,261.42
42.35
0.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1,000.00
942.37
899.59
0.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
785.00
770.15
759.12
497.84
484.05
112.37
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Pgina 25 de 69
Err:509
Mont. Max
Utilizab (8)
D=(2)x(6)
(5)
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Adelan X
Utilizar (9)
Saldo Adela. X
Deduccion (11)
Utilizar
(10) = (9) - (7)
D=(7)x((4)-(5))
(6)
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1,500.00
1,500.00
1,449.04
1,239.07
1,008.96
125.74
Err:509
3,000.00
3,000.00
2,870.77
2,338.25
1,754.67
0.00
Err:509
Err:509
7,242.00
7,242.00
6,950.37
5,748.65
4,431.72
0.00
Err:509
Err:509
700.00
700.00
671.55
554.32
425.86
0.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
874.00
874.00
844.37
722.26
588.44
74.81
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1,436.00
1,436.00
1,379.09
1,144.59
887.60
0.00
Err:509
Err:509
324.00
324.00
309.78
251.16
186.93
0.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
777.00
777.00
749.74
637.39
514.28
41.73
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
346.00
346.00
328.22
254.93
174.63
0.00
Err:509
Pgina 26 de 69
Err:509
480.00
480.00
458.66
370.71
274.34
0.00
Err:509
Err:509
981.00
981.00
944.26
792.85
626.92
0.00
Err:509
Err:509
Contratista:
Area Geog.:
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
356,570.23
Indice mes
del Pago
Ia
Indice
Base
Io
Sep-07
0.00
0.00
Feb-07
459.08
459.08
Acero de Construccion
Acero de Construccion
corrugado
02
1
2
3
Sep-07
Oct-07
160,906.36
167,053.39
72,323.93
72,324.93
Acero de Construccion
Alambre N 16
02
1
2
3
Sep-07
Oct-07
160,906.36
167,053.39
5,170.78
5,170.78
0.00
0.00
459.08
459.08
Acero de Construccion
Alambre N 8
02
1
2
3
Sep-07
Oct-07
160,906.36
167,053.39
1,298.98
1,298.98
0.00
0.00
459.08
459.08
Acero de Construccion
Clavos
02
1
2
3
Sep-07
Oct-07
160,906.36
167,053.39
5,011.55
5,012.55
0.00
0.00
459.08
459.08
Cemento Tipo I
21
Sep-07
160,906.36
133,240.69
0.00
207.94
2
3
Oct-07
167,053.39
133,241.69
0.00
207.94
Bloque y Ladrillo
Ladrillo KK 18 huecos
17
1
2
3
Sep-07
Oct-07
160,906.36
167,053.39
25,307.92
25,308.92
0.00
0.00
628.59
628.59
Bloque y Ladrillo
Ladrillo de techo 30x30x15
17
1
2
3
Sep-07
Oct-07
160,906.36
167,053.39
4,501.52
4,502.52
0.00
0.00
628.59
628.59
Hormign
38
1
2
3
Sep-07
Oct-07
160,906.36
167,053.39
29,814.56
29,815.56
0.00
0.00
321.48
321.48
Madera Tornillo
42
1
2
3
Sep-07
Oct-07
160,906.36
167,053.39
79,900.29
79,901.29
0.00
0.00
643.80
643.80
ESPONDE
ATERIALES
a valorizacin)
AMC
Adelanto
Adelanto
Reintegros
Deflactado
Utilizado
A*Io / Ia
U = V *C*%
que NO corresp.
D
U*(Ir - Ia) / Io
Coef.
Incid. Mon.
C
% en
Monom.
%
0.117
0.117
100.00%
100.00%
#DIV/0!
18,826.04
19,545.25
0.00
0.00
0.117
0.117
100.00%
100.00%
#DIV/0!
18,826.04
19,545.25
0.00
0.00
0.117
0.117
100.00%
100.00%
#DIV/0!
18,826.04
19,545.25
0.00
0.00
0.117
0.117
100.00%
100.00%
#DIV/0!
18,826.04
19,545.25
0.00
0.00
0.233
81.12%
#DIV/0!
30,412.85
0.00
Ir
0.233
81.12%
0.103
0.103
52.43%
52.43%
0.103
0.103
0.00
0.00
FORMULA 01
31,574.69
0.00
#DIV/0!
8,689.41
9,021.37
0.00
0.00
52.43%
52.43%
#DIV/0!
8,689.41
9,021.37
0.00
0.00
0.233
0.233
18.88%
18.88%
#DIV/0!
7,078.34
7,348.75
0.00
0.00
0.195
0.195
96.41%
96.41%
#DIV/0!
30,250.32
31,405.95
0.00
0.00
0.00
Contratista:
Area Geog.:
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
Acero de Construccion
Acero de Construccion
corrugado
02
Acero de Construccion
Alambre N 16
02
Acero de Construccion
Alambre N 8
02
Acero de Construccion
Clavos
02
Indice mes
del Pago
Ia
Indice
Base
Io
Sep-07
0.00
0.00
Feb-07
459.08
459.08
0.00
0.00
459.08
459.08
0.00
0.00
459.08
459.08
0.00
0.00
459.08
459.08
112,160.57
1
2
3
Sep-07
Oct-07
84,854.31
Err:509
19,874.40
1
2
3
Sep-07
Oct-07
84,854.31
2,340.76
1
2
3
Sep-07
Oct-07
84,854.31
1
2
3
Sep-07
Oct-07
84,854.31
19,875.40
2,341.76
483.38
484.38
2,580.70
2,581.70
Cemento Tipo I
21
Bloque y Ladrillo
Ladrillo KK 18 huecos
17
Bloque y Ladrillo
Ladrillo de techo 30x30x15
17
Hormign
38
1
2
3
Sep-07
Oct-07
84,854.31
1
2
3
Sep-07
Oct-07
84,854.31
1
2
3
Sep-07
Oct-07
84,854.31
1
2
Sep-07
Oct-07
84,854.31
59,928.48
59,929.48
13,495.78
13,496.78
1,610.46
1,611.46
11,846.62
11,847.62
0.00
0.00
207.94
207.94
0.00
0.00
628.59
628.59
0.00
0.00
628.59
628.59
0.00
0.00
321.48
321.48
RRESPONDE
MATERIALES
de la valorizacin)
AMC
Adelanto
Adelanto
Reintegros
Coef.
Incid. Mon.
C
% en
Monom.
%
Deflactado
Utilizado
A*Io / Ia
U = V *C*%
que NO corresp.
D
U*(Ir - Ia) / Io
0.184
0.184
75.00%
75.00%
#DIV/0!
11,709.89
0.00
0.184
0.184
75.00%
75.00%
#DIV/0!
11,709.89
0.00
0.184
0.184
75.00%
75.00%
#DIV/0!
11,709.89
0.00
0.184
0.184
75.00%
75.00%
#DIV/0!
11,709.89
0.00
Ir
Ir
N FORMULA 02
0.00
0.00
0.295
0.295
75.59%
75.59%
#DIV/0! 18,921.71
0.00
0.295
0.295
24.41%
24.41%
#DIV/0!
6,110.32
0.00
0.295
0.295
24.41%
24.41%
#DIV/0!
6,110.32
0.00
0.184
0.184
25.00%
25.00%
#DIV/0!
3,903.30
0.00
Contratista:
Area Geog.:
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
Indice mes
del Pago
Ia
21
Bloque y Ladrillo
Ladrillo KK 18 huecos
17
Hormign
38
Indice
Base
Io
Ir
Ir
72,520.00
Sep-07
Cemento Tipo I
AMC
2
3
4
Sep-07
Oct-07
3,737.80
Err:509
38,879.57
2
3
4
Sep-07
Oct-07
3,737.80
11,183.34
Sep-07
3,737.80
Feb-07
0.00
0.00
207.94
207.94
11,184.34
0.00
0.00
628.59
628.59
22,457.09
0.00
321.48
38,880.57
0.00
Oct-07
22,458.09
0.00
321.48
0.00
Adelanto
Adelanto
Reintegros
Coef.
Incid. Mon.
C
% en
Monom.
%
0.328
0.328
77.13%
77.13%
#DIV/0!
945.61
0.00
0.135
0.135
27.41%
27.41%
#DIV/0!
138.31
0.00
0.328
22.87%
#DIV/0!
280.39
0.00
A*Io / Ia
0.328
22.87%
0.00
LP
OBRA
Ubicacin
Contratista
FECHA INICIO
MES VALORIZADO
0
CONSORCIO SEOR DE LOS MILAGROS
3/15/2010
3/31/2010
PLAZO EJECUC.
PPTO
CNTR.C/IGV
VALORIZACION No 01
CALCULO DE REINTEGRO AUTORIZADO
AL 31 DE MAYO DEL 2013
(CALCULOS S/IGV)
VALORIZACIN
N
MES
PROGRAMADO
VAL (S/,)
INDICE K
REAL
R=V'(K-1) S/,
VAL (S/,)
INDICE K
R=V'(K-1)
REINTEGRO
BRUTO
AUTORIZADO
DEDUCCIO
EFECTIVO
FORMULA 01
01
MARZO
42,367.83
1.000
0.00
167,053.39
0.00
167,053.39
1.003
501.16
501.16
501.16
501.16
02
03
ACUMULADOS
FORMULA 02
01
MARZO
02
03
ACUMULADOS
FORMULA 03
01
MARZO
02
03
ACUMULADOS
FORMULA 04
01
MARZO
02
03
ACUMULADOS
FORMULA 05
01
MARZO
02
03
ACUMULADOS
FORMULA 06
01
MARZO
02
ACUMULADOS
FORMULA 07
01
02
MARZO
42,367.83
0.00
ACUMULADOS
FORMULA 08
01
MARZO
02
03
ACUMULADOS
TOTAL ACUMULADOS
RESUMEN DE REINTEGROS
0.00
REINTEGRO
ACUM.
ANTERIOR
501.16
REINTEGRO
ACUM.
ACTUAL
REINTEGRO
ACTUAL
FORMULA 01
0.00
501.16
501.16
FORMULA 02
0.00
0.00
0.00
FORMULA 03
0.00
0.00
0.00
FORMULA 04
0.00
0.00
0.00
FORMULA 05
0.00
0.00
0.00
FORMULA 06
0.00
0.00
0.00
FORMULA 07
0.00
0.00
0.00
FORMULA 08
0.00
0.00
0.00
TOTALES
0.00
501.16
501.16
501.16
0.00
180 D. C.
S/. 957,661.11
DEDUCCIONES
MATERIAL
REINTEGRO
AUTORIZ
501.16
0.00
501.16
0.00
501.16
valorizacion 1
valorizacion 2
formula 01
1239.48
9160.84
10400.32
formula 02
608.07
6464.86
7072.93
formula 03
229.02
287.57
516.59
17989.84
CERTIFICADO DE PAGO N 01
AMC
C.E.
Valor Referencial :
Monto Contractual :
A.
0
2
Supervisor :
120 das c.
Contratista
REAJUSTES
SUBPROYECTO 1
(B1) SUB. - TOTAL
MONTO DE VALORIZACIN BRUTA (VB) = (1) + (2)
AMORTIZACIONES
Amortizacin del Adelanto en Efectivo
Amortizacin del Adelanto para Materiales
TOTAL AMORTIZACIONES
0.00
0.00
GARANTIAS
GARANTIA DE FIEL CUMPLIMIENTO(10%)
MONTO DE LA VALORIZACION N 01
MONTO A PAGAR AL CONTRATISTA
En efectivo L.N.. -(3)-(4)
IGV. 18% DE VN
TOTAL A PAGAR CON IGV.
OBRA- ADELANTADA
20.58%
8.68%
Valor Referencial :
957,661.11
C/IGV
Monto Contractual :
957,661.11
C/IGV
811,577.21
S/IGV
0.00
0.00
167,053.39
0.00
167,053.39
0.00
16,705.34
150,348.05
150,348.05
27,062.65
177,410.70
177,410.70
11.90%
OBRA
042-2010-2009-GRA
PROPIETARIO
CONTRATISTA
I.U.
ELEMENTO
ACERO CONSTRUCCION LISO
AGREGADO GRUESO
INCIDENCIA
IND. BASE
INCID.
ESPECIFICA
Nov-09
Mar-10
Apr-10
May-10
Jun-10
0.132
100.00%
459.08
445.81
0.00
0.00
0.00
0.132
0.128
0.000
0.000
0.000
207.94
207.94
0.00
0.00
0.00
0.089
0.089
0.000
0.000
0.000
643.80
649.68
0.097
0.098
0.000
0.000
0.000
323.41
329.31
0.120
0.122
0.000
0.000
0.000
346.35
349.61
0.119
0.120
0.000
0.000
0.000
499.13
502.65
0.109
0.110
0.000
0.000
0.000
413.41
415.58
0.334
0.336
0.000
0.000
0.000
1.000
1.003
0.000
0.000
0.000
0.089
100.00%
0.089 Ar/Ao
B
17
BLOQUE Y LADRILLO
0.097
100.00%
0.097 Br/Bo
C
21
0.120
100.00%
0.120 Cr/Co
I
39
0.119
100.00%
0.119 Ir/Io
M
43
0.109
100.00%
0.109 Mr/Mo
M
47
0.334
0.334 Mr/Mo
COEFICIENTE DE REAJUSTE ( K ) :
11/30/2009
COEF.
0.132 Ar/Ao
A
FECHA DE PRESUPUESTO:
1.000
100.00%
I.U.
ELEMENTO
AGREGADO FINO
INCIDENCIA
IND. BASE
INCID.
ESPECIFICA
Nov-09
Mar-10
0.095
100.00%
628.59
638.88
0.095
0.097
323.41
329.31
0.114
0.116
346.35
349.61
0.159
0.160
499.13
502.65
0.130
0.131
413.41
415.58
0.432
0.434
329.73
329.49
0.070
0.070
0.000
0.000
0.000
1.000
1.008
0.000
0.000
0.000
0.095 Ar/Ao
C
21
0.114
100.00%
0.114 Cr/Co
I
39
0.159
100.00%
0.159 Ir/Io
M
43
100.00%
0.130 Mr/Mo
M
47
0.432
100.00%
0.432 Mr/Mo
P
54
PINTURA LATEX
0.070
0.070 Pr/Po
COEFICIENTE DE REAJUSTE ( K ) :
FECHA DE PRESUPUESTO:
COEF.
1.000
100.00%
May-10
Jun-10
0.000
0.000
0.000
0.000
0.000
0.000
0.00
0.000
0.000
0.000
0.00
0.000
0.000
0.000
0.00
0.000
0.000
0.000
0.00
I.U.
10
ELEMENTO
APARATO SANITARIO CON GRIFERIA
INCIDENCIA
IND. BASE
INCID.
ESPECIFICA
Nov-09
Mar-10
Apr-10
May-10
Jun-10
100.00%
321.48
321.06
0.00
0.00
0.00
0.143
0.143
0.000
0.000
0.000
346.35
349.61
0.00
0.00
0.00
0.174
0.176
0.000
0.000
0.000
413.41
415.58
0.00
0.00
0.00
0.433
0.435
0.000
0.000
0.000
301.29
302.28
0.00
0.00
0.00
0.099
0.099
0.000
0.000
0.000
340.04
331.63
0.00
0.00
0.00
0.151
0.147
0.000
0.000
0.000
0.143
0.143 Ar/Ao
I
39
0.174
100.00%
0.174 Ir/Io
M
47
0.433
100.00%
0.433 Mr/Mo
P
51
0.099
100.00%
0,099 Pr/Po
T
72
FECHA DE PRESUPUESTO:
COEF.
0.151
100.00%
COEFICIENTE DE REAJUSTE ( K ) :
1.000
1.000
1.000
0.000
0.000
0.000
I.U.
7
ELEMENTO
ALAMBRE Y CABLE TIPO TW Y THW
COEF.
INCIDENCIA
IND. BASE
INCID.
ESPECIFICA
Nov-09
Mar-10
Apr-10
May-10
Jun-10
100.00%
528.24
561.39
0.00
0.00
0.00
0.090
0.096
0.000
0.000
0.000
271.54
269.30
0.00
0.00
0.00
0.348
0.345
0.000
0.000
0.000
0.090
0.090 Ar/Ao
A
12
FECHA DE PRESUPUESTO:
0.348
100.00%
39
0.138
100.00%
0.138 Ir/Io
M
47
0.357
100.00%
0,357 Pr/Po
T
74
0.067
0.067 Tr/To
COEFICIENTE DE REAJUSTE ( K ) :
1.000
100.00%
346.35
349.61
0.00
0.00
0.00
0.138
0.139
0.000
0.000
0.000
413.41
415.58
0.00
0.00
0.00
0.357
0.359
0.000
0.000
0.000
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
AREA GEOGRAFICA 2
SIMBOLO
A
I.U.
2
ELEMENTO
ACERO DE CONSTRUCCION LISO
COEF.
INCIDENCIA
IND. BASE
INCID.
ESPECIFICA
Nov-09
Mar-10
Apr-10
May-10
Jun-10
100.00%
459.08
445.81
0.00
0.00
0.00
0.091
0.088
0.000
0.000
0.000
207.94
207.94
0.00
0.00
0.00
0.102
0.102
0.000
0.000
0.000
643.80
649.68
0.00
0.00
0.00
0.089
0.090
0.000
0.000
0.000
323.41
329.31
0.00
0.00
0.00
0.105
0.107
0.000
0.000
0.000
346.35
349.61
0.00
0.00
0.00
0.125
0.126
0.000
0.000
0.000
499.13
502.65
0.00
0.00
0.00
0.059
0.059
0.000
0.000
0.000
413.41
415.58
0.00
0.00
0.00
0.344
0.346
0.000
0.000
0.000
330.19
334.95
0.00
0.00
0.00
0.085
0.086
0.000
0.000
0.000
0.091
0.091 Ar/Ao
A
AGREGADO GRUESO
0.102
100.00%
0.102 Ar/Ao
B
17
BLOQUE Y LADRILLO
0.089
100.00%
0.089 Br/Bo
C
21
0.105
100.00%
0,105 Cr/Co
I
39
0.125
100.00%
0.125 Ir/Io
M
43
0.059
100.00%
0.059 Mr/Mo
M
47
0.344
100.00%
0.344 Mr/Mo
M
48
0.085
0.085 Mr/Mo
COEFICIENTE DE REAJUSTE ( K ) :
FECHA DE PRESUPUESTO:
1.000
100.00%
1.000
1.005
0.000
0.000
0.000
I.U.
39
ELEMENTO
INDICE GRAL DE PRECIOS AL CONSUMIDOR
COEF.
INCIDENCIA
IND. BASE
INCID.
ESPECIFICA
Nov-09
Mar-10
Apr-10
May-10
Jun-10
100.00%
346.35
349.61
0.00
0.00
0.00
1.000
1.009
0.000
0.000
0.000
1.000
1.000 Ir/Io
COEFICIENTE DE REAJUSTE ( K ) :
FECHA DE PRESUPUESTO:
1.000
1.000
1.009
0.000
0.000
0.000
I.U.
39
ELEMENTO
COEF.
INCIDENCIA
IND. BASE
INCID.
ESPECIFICA
Nov-09
Mar-10
Apr-10
May-10
Jun-10
100.00%
346.35
349.61
0.00
0.00
0.00
1.000
1.009
0.000
0.000
0.000
1.000
1.000 Ir/Io
COEFICIENTE DE REAJUSTE ( K ) :
FECHA DE PRESUPUESTO:
1.000
1.000
1.009
0.000
0.000
0.000
I.U.
39
ELEMENTO
INDICE GRAL DE PRECIOS AL CONSUMIDOR
COEF.
INCIDENCIA
IND. BASE
INCID.
ESPECIFICA
Nov-09
Mar-10
Apr-10
May-10
Jun-10
100.00%
346.35
349.61
0.00
0.00
0.00
1.000
1.009
0.000
0.000
0.000
1.000
1.000 Ir/Io
COEFICIENTE DE REAJUSTE ( K ) :
FECHA DE PRESUPUESTO:
1.000
1.000
1.009
0.000
0.000
0.000
Jul-10
Aug-10
Sep-10
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Jul-10
Aug-10
Sep-10
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
Jul-10
Aug-10
Sep-10
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
Jul-10
Aug-10
Sep-10
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Jul-10
Aug-10
Aug-10
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
Jul-10
Aug-10
Sep-10
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
Jul-10
Aug-10
Sep-10
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
Jul-10
Aug-10
Sep-10
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
VALORIZACION
VALORIZACION No 01
C/IGV
PERIODO
C/IGV
MES
MAYO 2013
S/. 811,577.21
S/IGV
Residente
OBRA
MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.P N 86285 SEOR DE LOS MILA Supervisor
Ubicacin
Area Geogrfica
Propietario
INDICES UNIFICADOS
SIMBOLO
CODIGO
2
4
5
7
10
12
17
21
39
43
47
48
51
54
72
74
ELEMENTO
ACERO DE CONSTRUCCIN LISO
AGREGADO FINO
AGREGADO GRUESO
ALAMBRE Y CABLE TIPO TW Y THV
APARATO SANITARIO CON GRIFERIA
ARTEFACTO DE ALUMBRADO INTERIOR
BLOQUE Y LADRILLO
CEMENTO PORTLAND TIPO I
INDICE GENERAL PRECIOS AL CONSUMIDOR
MADERA NACIONAL, ENCOF. Y CARP.
MANO DE OBRA I/LEYES SOCIALES
MAQUINARIA Y EQUIPO NACIONAL
PERFIL DE ACERO LIVIANO
PINTURA LATEX
TUBERIA PVC PARA AGUA
TUBERIA PVC PARA ELECTRICIDAD (SAP)
IND. BASE
Aug-09
459.08
628.59
207.94
528.24
321.48
271.54
643.80
323.41
346.35
499.13
413.41
330.19
301.29
329.73
340.04
0.00
Sep-10
445.81
638.88
207.94
561.39
321.06
269.30
649.68
329.31
349.61
502.65
415.58
334.95
302.28
329.49
331.63
0.00
Indicer Ir
Oct-10
Nov-10
IFICADOS
Indicer Ir
Dec-10
Jan-11
Feb-11
Mar-11
VALORIZACION No 01
AL 31 DE MAYO DEL 2013
Mes Valorizado
MAYO 2013
A.M.C
Valor Referencial
957,661.11
C/IGV
Monto Contractual
957,661.11
C/IGV
S/IGV
OBRA
811,577.21
Ubicacin
Supervisor
Area Geogrfica
02
Contratista
CUADRO RESUMEN
ESPECIALIDAD
SUBPROYECTO 1
SUB - TOTAL
IMPUESTO IGV 18%
TOTAL
AVANCES
Monto del
Mes
Avance Real Acumulado
Mes Actual
Contrato
Anterior
Sin IGV
Acumulado
S/.
%
811,577.21
0.00 167,053.39
167,053.39
20.58
SALDO
S/.
644,523.83
Avance Programado
%
Acumulado
79.42
118,932.30
811,577.21
0.00
167,053.39
167,053.39
644,523.83
811,577.21
146,083.90
957,661.11
0.00
0.00
0.00
167,053.39
30,069.61
197,122.99
167,053.39
30,069.61 20.58%
197,122.99
644,523.83
116,014.29 79.42%
760,538.12
ADELANTADA
11.90%
OK
118,932.30
22,597.14
141,529.44
%
17.59%
8.68%
VALORIZACION DE OBRA N
L. P.
SUBPRESUPUESTO
001 GENERAL
PROPIETARIO
CONTRATISTA
PRESUPUESTO
:
:
:
ITEM
DESCRIPCION PARTIDA
FORMULA 01:
Und
COSTO DIRECTO
Metra
P. Unit
S/.
P. Parcial
S/.
P. Total
S/.
670,724.97
GASTOS GENERALES
12.00%
80,487.00
UTILIDAD
9.00%
60,365.25
SUB TOTAL
811,577.21
FACTOR DE RELACION
1.00000
1.00
811,577.21
IGV
18.00%
TOTAL VALORIZADO
146,083.90
957,661.11
AVANCE REAL
Pgina 68 de 69
SUB PROYECTO N 01
ACION DE OBRA N 01
VALORIZACION No 01
AL 31 DE MAYO DEL 2013
FORMULA 01:
VAL ACTUAL
Metra
Valor
VAL ACUMULADA
%
Metra
Valor
SALDOS
%
Metra
Valor
138,060.65
138,060.65
532,664.32
16,567.28
16,567.28
63,919.72
12,425.46
12,425.46
47,939.7889
167,053.39
167,053.39
644,523.83
1.00
1.00
1.00
167,053.39
167,053.39
644,523.83
30,069.61
30,069.61
116,014.29
197,122.99
197,122.99
760,538.12
20.58%
20.58%
Pgina 69 de 69
0.00%
SUB PROYECTO N 01