Vous êtes sur la page 1sur 3

ENG/FORM-236

MSET ENGINEERING CORPORATION SDN BHD


QA/QC DEPARTMENT
COPPER SULPHATE TEST REPORT
(AFTER REMOVE CLADDING BEFORE OVERLAY)
PROJECT NO.
CLIENT/OWNER
ITEM NO.

: M2-209
: SBM MALAYSIA SDN.BHD
: V-T7161

No.

Nozzle no. / Service

Inspection

Result

Date

Acc

CAN 1 (LS1A,LS1B,CS1,CS2)

26.11.2012

TOP HEAD

27.11.2012

BOTTOM HEAD

27.11.2012

N5J1,K1BJ1,K2BJ1,N4J1,N1J1

31.12.2012

N2J12,N6J1,M1J1,M1J2,M1LS

31.12.2012

Rej

REPORT NO
DATE
PAGE NO

No.

Nozzle no. / Service

: M2-209/CSTR-001
: 2.1.2013
:
1 OF 1

Result

Inspection

Date

Acc

6
7
8
9
10
11
12

After Remove Clad


internal

external

This is to certify that all Carbon Steel surfaces have been tested with copper sulphate solution for the detection of any
free iron contamination. Any free iron contamination found has been removed by mechanical means and re-tested as per
standard specification CuSO4 testing section: MSETe/M2-172/WP-354

PREPARED BY :

MSET QAQC
DATE : 2.1.2013

REVIEWED BY :

AI / TPI
DATE :

WITNESSED BY :

CLIENT REP.
DATE :

REVIEWED BY :

OWNER REP.
DATE :

Rej

ENG/FORM-236

MSET ENGINEERING CORPORATION SDN BHD


QA/QC DEPARTMENT
COPPER SULPHATE TEST REPORT
(AFTER REMOVE CLADDING BEFORE OVERLAY)
PROJECT NO.
CLIENT/OWNER
ITEM NO.

: M2-209
: SBM MALAYSIA SDN.BHD
: V-T7161

No.

Nozzle no. / Service

Inspection

Result

Date

Acc

CAN 1 (LS1A,LS1B,CS1,CS2)

06.2.2013

N5J1,K1BJ1,K2BJ1,N4J1,N1J1

06.2.2013

N2J12,N6J1,M1J1,M1J2,M1LS

06.2.2013

Rej

REPORT NO
DATE
PAGE NO

No.

: M2-209/CSTR-001
:
:
1 OF 1

Result

Inspection

Nozzle no. / Service

Date

Acc

Rej

4
5
6
7
8
9
10
11
12

Overlayed

Overlayed

shell / head
external

shell
nozzle

external
long seam / cir. Seam

This is to certify that all INCO 625overlayed surfaces have been tested with copper sulphate solution for the detection of any
free iron contamination. Any free iron contamination found has been removed by mechanical means and re-tested as per
standard specification CuSO4 testing section: MSETe/M2-106/WP-354 REV. 0

PREPARED BY :

REVIEWED BY :

WITNESSED BY :

REVIEWED BY :

MSET QAQC
DATE :

AI / TPI
DATE :

CLIENT REP.
DATE :

OWNER REP.
DATE :

Vous aimerez peut-être aussi