This could be
costing you
millions/month
100%
5-10%
105%
95%
90%
85%
1
Planned Profit
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Logistics Constraints
Change OP.
Conditions.
Inventory
Off-spec &
reprocessing
Variant Constraints
Gap
Operational &
Hardware Trouble
Non-economic
blending
Blending Issues
Improper timing of
unloading or shipping
Pipeline
Occupation
1 2 Weeks
Summary
Manual process
- Very time intensive
Yield
- VeryAccounting
complex
- Requires expertise
Marketing
(pricing)
Laboratory
(Quality)
Analyst
Prone to error
Planning
- Data manually mapped and interpreted each time
- Potential for missed analysis
Accounting - Inconsistent
Operations
results
Scheduling
/ Blending
Purely retrospective
- Identify issues that may
have
occurred
10-40 days ago
Manual
data
mapping,
Manual Data
Collection
correlation
Report on Findings
- Bleeding
profits during
this timeand analysis
Management
Plan from HQ is
unrealistic, we will
never reach the plan
Performance Mgmt
Process Department
Operations
Crude
Trading
Crude
Chartering/logistics
Refining
Blending
Primary
Distribution
Immediate
Production planning
Performance monitoring
Constraints
Processing constraints
Blending constraints
Inventory levels.
Feed availability
Product demand
Export term contracts
Product specifications
Plan Recommendations
Crude selection.
Crude indifference values.
Crude arrival sequencing
Production plan.
Marketing plan
Operating strategies
Drivers
Performance targets
KPIs
Scheduling
Agenda
The Basics
LP Concepts
Study Areas
10
Lowering of
feedstock
acquisition costs
Better
utilization of
supply chain
assets
Increasing use of
technology
Emphasis on
operational
excellence
11
Daily
Outside
the Fence
Geography
Inside
The Fence
Yield
Accounting
(Advisor)
Refinery
Scheduling
(APS)
Collaborative
Demand Manager
(CDM)
Weekly
Seasonal
Annual
Refinery
Planning
(PIMS)
Fleet
Optimizer
(AFO)
Distribution
Planning
(DPO/PSCP)
Market
Wide
Primary Distribution
(IMOS)
12
What is PIMS?
Planning
Selects
Crudes
Plans
Operations
Sets
Targets for
schedulers
Optimizes
Delivers
profits
13
Schedules
Crude
Schedules
Units
Schedules
&
Optimizes
Blends
Sets
Targets for
Operations
Delivers
profits
14
11%
Scheduling
9%
10%
55%
36%
70%
0%
PIMS
Honeywell
Haverly
No/Unknown
7%
APS
M3
Honeywell
Haverly
Excel based/Unknown
15
16
17
The Basics
Secondary
Distribution
(Retail)
Terminal
Inventories
Short
Term
Demand
Production Plan
30/60/90/120
Day
Daily
30/60/90Day
Historical
Demand
Deal
Capture
Daily
Next 50 lifting
Collaborativ
e Demand
Mgmt (CDM)
30/60/90Day
Deals Spot,
Term, Exchange
Terminal Demand
& Inventories
Refinery
Planning
Distribution
Planning
30 Day
Demand
Product
Date
Location
Channel
of Trade
Fwd
Demand
Inventory Mgmt
& Operations
Scheduling
ERP
30 Day
30/60/90/120 Day
Transportation Loading
Plan (Sourcing priorities
for a given location)
Production Plan
Long Term &
Short Term
Daily
Actualized Movements
Refinery
Scheduling
30/60/90/120 Day
3rd Party
Daily
Nominations
-Pipeline Companies
-Vessel Providers
-Inspection Companies
-Rail
19
Demand
Operations
Concept
Supply
Produce
Engineering
Manufacturing
2010 Aspen Technology, Inc. All rights reserved
Supply Chain
|
20
10
21
Background
22
11
23
Bapco
Petrobras
Lyondell
Exxon/Mobil
McKenzie
Petronas
Ecopetrol
Shell
Basf
Premcor
Bpcl
Marathon
Bechtel
Repsol
Giant
Valero
Jacobs
Sinopec
Koa
COP
Statoil
FlintHills
Pemex
Chevron
(Caltex)
Citgo
Sunoco
Fortum
Adnoc
Pdvsa
Tesoro
Alon
Aramco
Jacobs
Murphy
HMEL
Total
Hpcl
NRL
24
12
LP Concepts
LP Concept
Objective Function
= Products - Raw Materials - Utilities - Catalysts - Chemicals Labor - Any Other Costs - Penalties
26
13
Simplified LP problem
I have a plant that produces RUL, RUP and FOL. There are 3
Crudes available with the following yields:
Yield From
Crude
RUL
RUP
FOL
Cost
Crude ($/bbl)
PRICE
65
($/bbl)
90
100
50
55
27
Simplified LP problem
LINEAR EQUATIONS:
RUL = .5 * A + .2 * B
RUP = .2 * A + .5 * B
FOL = .3 * A + .3 * B
+ .2 * C
+ .2 * C
+ .6 * C
28
14
3428.6
3085.7
1300.0
RUL
0.5
0.2
0.2
RUP
0.2
0.5
0.2
FOL
0.3
0.3
0.6
Margin
20.0
18.0
13.0
Yield
FEEDSTOCK PURCHASES
AAA
171.4
BBB
171.4
CCC
100.0
PRODUCT SALES
RUL
85.7
34.3
20.0
RUP
34.3
85.7
20.0
FOL
51.4
51.4
60.0
120.0
120.0
40.0
51.4
51.4
60.0
CAPACITY UTILIZATION
29
30
Optimum Economics
15
PIMS Features
32
16
33
Licensor data
Generic databases
Refinery technology database delivered with PIMS
Crude assay databases such as BP or Chevron (separately
licensed)
34
17
35
PIMS
WEIGHT
VOLUME
MIP
RFG
SAMPLE
VOLSAMP
MIPSAMP
VOLRFG
LIBRARY
PETROLIB
PCHEMLIB
PPIMS
MPIMS
PSAMPLE
PVOLSAMP
PMIPSAMP
MODELA
MIPA
MODELB
MIPB
MIPG
PVOLRFG
GLOBAL
XPIMS
XMODELA
XMODELB
XGLOBAL
36
18
MENUS
EXCEL
DATA
MANAGER
PIMS
SOLUTION
REPORTS
PIMS
VALIDATION &
MATRIX GENERATION
XPRESS
PIMS
RECURSION
SummarySolution.LST
FullSolution.LST
OPTIMIZATION
IterationLog.LST
PrimalDual.LST
Non-Converged
2010 Aspen Technology, Inc. All rights reserved
37
Stream A at 10 with
a quality of 20
Tank
Stream B at 20
with a quality of 10
38
19
PIMS Options
40
20
HTML Reports
Synchronized Scrolling
The synchronized scrolling feature is now available with the
Go to command.
2010 Aspen Technology, Inc. All rights reserved
41
42
21
Use of KPIs
* TABLE
*
*
CCAPCCU
ZLIMSEV
PURCARL
MARGVALU
XRVIURG
*** End
SOLNKPIS
Solution KPIs
TEXT
Cat Cracker Capacity
Reformer Severity
Purchased Arab Light
Marginal Values
RVI of Unleaded Regular
43
Table of Contents
YELLOW
RED
32
96
55
1.00E+03
15
30
100
20
1.00E+06
13
***
43
PPIMS
Periodic PIMS
First Time
Period
44
Inventory
Inventory
Second Time
Period
Third Time
Period
2010 Aspen Technology, Inc. All rights reserved
44
22
Report Writer
45
MIP
46
23
MIP
47
47
Automated flowsheeting
48
24
CME
Rigorous
Simulation
Sustained
Model
Accuracy
Integrated
Refinery
Scheduling &
Blend
Optimization
49
CM
PIMS
Calcs
PIMS
Assay
Management
Output
Copy
Paste
50
25
51
RefSYS Reactor
Simulation Mode
RefSYS Reactor
Calibration Mode
(one or more base cases)
Data from Data Historian,
Laboratory, etc
What-if
Analysis
Aspen
PIMS
Update LP vectors or
sub-model calculator
52
26
Challenge
Process unit
performance
changes with time
Hard to keep
planning &
scheduling models
accurate
Impact
Challenge
Schedulers dont
trust the plan
Large gap between
plan and actual
operation
Major economic
decisions based on
inaccurate model
Solution
Lost Margin
53
54
27
777
Automatically combine
information from different
applications for plan vs.
schedule vs. actual analysis.
55
Lack of real-time
feedback and audit of
changes
Separate spreadsheets
from disparate sources
56
28
57
CEPSA
Solution
Result
58
29
CEPSA
Result
Solution
59
CEPSA
Solution
Result
60
30
Technology
Services
aspenONE Solutions
Supply Chain
Supply Chain
Forecasting
APC
MES
Distribution
Modeling
Enterprise
Control strategy
Solution/Architectural Design
Performance Monitoring
Process optimization
Sustainability
Decision support
Workflow automation
Unlocking greater
business value
Data visualization
Database
Performance Management
KPIs
61
62
31
63
Description
CGO is most valuable as HCR feed stock. Next best routing is to ARDS Unit.
CGO to FCC is the lowest value.
Heavy diesel should be recovered and routed to the DHTU than dropping it
in the CDU to AR and processing it in the ARDS unit.
Consider recovering iC5 from HCR LN & Light St. run Naphtha for MOGAS
blending.
64
32
Description
New Refinery - configuration of Refinery and sizing of new units are
decided, as per results from PIMS.
Up gradation study of the existing Refinery for meeting future
65
Determine constraints in streams disposal (qualities, units' capacities, etc.) and analyze the
commercial impact of cost of constraints e.g. RON/MON, RVP, Benzene in Gasoline.
Analyze the impact of various modes of operation and cut point optimization.
Determine the available blend flexibility and constraints, impact of seasonality etc.
Fine-tune regularly and maintain an updated and accurate LP model for the Refining Complex
and work with SCO.
Use real time prices for accurate economics and analyze quick-wins.
66
33
PIMS
SAYS
PIMS
Optimizes
&
You Say
67
Improve
supply chain
visibility
Improve
operational
efficiency
68
34
Align refining
& logistics
Monitor &
maintain
model
accuracy
Integrate
planning &
scheduling
Collaborative
scheduling
Optimize
product
blending
69
Planning
Scheduling
Scheduling
Advanced
Advanced
Process
Process
Control
Control
DistributedControl
Control
Distributed
System&&Plant
Plant
System
Gap between
monthly
Scheduling
bridges
the plan
gap and
operations
narrowed
between
theismonthly
plan and daily
operations.
Scheduling determines how and
Planning determines what to do
when
ImplementingMargins
a scheduling solution
improves coordination, resulting in
increased margins.
70
35
71
Challenge
Impact
Challenge
Multiple schedulers
using disconnected
spreadsheets
No models of
process units
Unable to properly
understand impact
of changes
Lack of coordination
and visibility
Continuous
fire-fighting
Multi-user scheduling
system having refinerywide visibility
Instability in
refinery operations
Excess safety stock
Solution
72
36
73
Multi-User Environment
Teamwork
Multiple simultaneous users
Access controlled by role-based security
Coordination
All users share the same common data
Coordination between schedulers is improved
Coordination between departments is improved
Communication
Automatically notifies all users of updates to schedule
Users leave messages informing others of whats changed
74
37
75
Challenge
Impact
Challenge
Logistics schedule
constantly changing
High demurrage
costs
Unplanned outages
and shutdowns
Instability/slowdown
of refinery operation
Difficult to
coordinate refinery
& logistics activities
Friction between
refinery & logistics
Refinery scheduling
system integrated with
logistics information
Solution
Lost Margin
76
38
Refinery
Feedstock Receipts
Feedstock Scheduling
Product Scheduling
Product Shipments
Scheduling
DB
77
Challenge
Impact
Challenge
Sub-optimal
blending
(quality/recipe
giveaway)
Frequent reblending
Blending solution to
meet product specs and
maximize margins
Shipments delayed
Solution
Lost Margin
79
39
80
Derived
Calculations
Complex
Calculations
81
40
Aspen MBO
Blending and Scheduling
82
ExxonMobil
Optimize Gasoline Blending
Challenge
Solution
Results
83
41
ExxonMobil
Optimize Gasoline Blending
Challenge
Results
Solution
84
ExxonMobil
Optimize Gasoline Blending
Challenge
Results
Solution
Ref: Gasoline Blending and Validation, Frank Kelly, ExxonMobil ; AspenTech Global
Conference Washington, DC, May 2011
85
42
Integration
between
Planning &
Scheduling
Collaborative
scheduling
Align refining
& logistics
Monitor &
maintain
Model
Accuracy
Optimize
product
blending
86
Advanced scheduling
to meet demands
with higher margins
87
43
88
Improved
Refinery
Efficiency
2010 Aspen Technology, Inc. All rights reserved
89
44
A 5% reduction in inventory
results in a one time savings of
$8M of working capital for a
200,000 BPD refinery
90
91
45
Challenge
Impact
Challenge
Performed in silos
Procure less
optimal crudes
Spreadsheets cant
handle complexity
and business
constraints
Produce less
profitable products
Difficult to align
supply and demand
profitably
Solution
92
Shell
Results
Solution
Constraints
&
Contracts
Pricing
engine
Crude
Prices
Optimised
Plan
Scheduled
Stocks
RPS
Refinery
Scheduling
(Orion)
Actual
Sales
(Demand)
Transport
Plan
Scheduled
Liftings
Refinery
Production
EO
Demand
Mgmt
(DM)
Primary
Distribution
Planning
(DPO)
Refinery
Planning
(PIMS)
Demand
EO
RPS
Sales to
Customer
(ERP)
Product
Prices
EO
Primary
Distribution
Scheduling
Latest
Estimate
Integration is
KEY
93
46
Shell
Solution
Results
Collaborative
Forecasting
Demand Cell
Owners
Latest Estimate
Pricing Engine
Regional Price
Strategists
Forward
Prices
Consolidated Demand
DPO
Envelope
Planner
Call on
Refinery
Production
Envelope
Plan
PIMS
Refinery
Planners
Handshake
94
Shell
Results
Solution
95
47
Total Petroleum
Solution
Result
96
Total Petroleum
Solution
Result
97
48
Total Petroleum
Result
Solution
98
99
49