The main purpose of this report is to record the number of
workers who did particular job or activity at a certain period of time. It is a report where the assignment of manpower is cited. It includes the quantities of manpower in a day or a week depending whether the report is on a daily or weekly basis. It is very important to monitor the manpower to conserve time and avoid delays in the project. Manpower and equipment loading schedules must always be interconnected. The two must be dependent with each other because equipment can only be utilized with the presence of workers and some tasks or work can only be performed with the help or presence of a certain equipment. Manpower schedules coordinate the manpower requirements of a project and show the number of personnel required for each activity. Manpower designation varies from laborer, skilled laborer, foreman, machine operator, etc.