HANGER WIRE ——
TO STRUCTURE
PRELUDE WAIN BEAM
oa CROSS TEE AxTBC —— HANGER WIRE
To STRUCTURE
PRELUDE MAIN BEAM
ACOUSTICAL LAY.
PANEL
‘axrac PRELUDE CROSS Ti \
GENERAL NOTES FOR AXIOM AND FORMATION CEILING SYSTEMS:
+ INSTALL PER ASTM C636 AND PRODUCT INSTALLATION INSTRUCTIONS
‘= CONSULT YOUR LOCAL BUILDING CODE FOR ADDITIONAL REQUIREMENTS OUTSIDE OF
THE ARMSTRONG INSTALLATION INSTRUCTIONS, THIS INCLUDES BUT IS NOT LIMITED TO
BRACING OF TRANSITIONS, AND ADDITIONAL SEISMIC REQUIREMENTS,
‘+ CANTILEVER CALCULATIONS TO BE SUPPLIED BY PROJECT ENGINEER.
+ FIELD VERIFY ALL CONDITIONS AND DIMENSIONS.
“horanna aqua bemacuetveregertpmnevarrttieabencenresmrenr al [PROUECT NAME 4 INCH AXIOM TRANSITION
we ts cts ev ssn sre rast tga ae hese bare ‘ACOUSTICAL TO DRYWALL
‘Aumstrong does not warrant, and assumes no liabilly fr the accuracy or completeness of |OWG.NO. SECTION PATH: REV: DATE:
asheantreatetn sey nel neers egret peur pe eaten eae [OATE: 9/3/09 SCALE 1:4. bese.
Amor ion tasetn unica pasa wotacunangevip ign smce, [DRAWN BY! MSS ony
Tech re @dmstrong ceiuinc systems * ARMSTRONG WORLD INDUSTRIES, INC. * Lancaster, PA” Phone: 877-ARMSTRONG