DISEO DE PUENTE VIGA-LOSA

A.- PREDIMENSIONAMIENTO
LUZ DEL PUENTE

Puente simplemente apoyado de un slo tramo


=

20.00 mts.

PERALTE DE LA VIGA
H = L/15 =
ESPESOR DE LA LOSA
E =

1.33 mts.
0.25 mts.

PROYECTO
Puede redondear

PUENTE CARROZABLE MAYUSH


LIMA

OFICINA ZONAL:

B.- DISEO DE VIGAS


Area de influencia de la viga
Metrado de cargas
Ancho de via
Longitud de vereda
Ancho de viga
Espesor de losa

Separacin de vigas
Peso losa =
Peso viga =
Asfalto
=
Acera
=
Volado
=

E x (a + b + S/2 ) x 2.4 T/m.


f x b x 2.4 T/m.
0.05 x A/2 x 2 Ton/m.
0.55 x 0.4 Ton/m.
0.10 x 2.4 Ton/m.

(A) =
(c)=
(b)=
( f )=
(E)=
(g)=
(m)=
(S)=
(a)=
=
=
=
=
=
Wd =

3.60
1.15
0.70
1.08
0.25
0.25
1.10
2.20
1.05
1.710
1.814
0.180
0.220
0.261
4.185

m.
m.
m.
m.
m.
m.
m.
m.
m.

Ton.

1-MOMENTO POR PESO PROPIO


Nmero de diafragmas =
Peso propio Diafragma Wdiaf
=
Momento total por carga muerta Md =

4
0.8 x 0.2 x S/2 x 2.4 =
Wdiafx(L/4+2xL/8)+WdxL/8 =

2-MOMENTO POR SOBRECARGA


Sobrecarga vehicular H20S16
por viga
Ms/c=P/2*(9*L2/4-10,5*L+4,41)/L
P=
4000 Kg.
M s/c =M*(1+0,7/(s+b))
M s/c =

0.176
211.01

Ton-m

69.44

Ton-m

79.02

Ton-m

3-MOMENTO POR SOBRECARGA EQUIVALENTE


por viga
M eq=9*L/4+0,96*L*L/8

M eq =

47.50

Ton-m

4-CARGAS POR EJE TAMDEN


M et =(L-1,2)*6/2

M et =

56.40

Ton-m

Ml

79.02

Ton-m

Mi

20.55

Ton-m

310.58

Ton-m

Tomando el mayor Momento ( Ml )


5-MOMENTO POR IMPACTO
I = 15,24 / ( L + 38 ) =
0.26
I < = 0.30,
I =
0.26
Momento por impacto M i = i x M l

B1.- DISEO POR SERVICIO


Verificacion del peralte
M=Md+Ml+Mi
Fy =
F'c =
Fc=0,4*F'c
fy =0,4* fy
r = fy / Fc

4,200
210
84
1,680
20
9.6609
0.3257
0.8914
133.00

n=2100000/(15000*(raiz(f'c))

k = n / (n+r)
J = 1 - k/3
H=

Kg/cm.

d=raiz(2*M*100000/(F"c*k*j*b))

Kg/cm.
Kg/cm.
Kg/cm.

cms.

d=
d<H

97.13

cms.
1

b = L/4
=
b = 16 x E + 0,5 =
b = 0,5 + S
=
b = mnimo valor =

OK

5.00
4.50
2.70
2.70

B2.- DISEO POR ROTURA


Mu =1,3 x ( Md + 1,67 x (Ml+Mi) )

Mu=

490.48

Ton-m

Area de acero
b (cms)
=
d = H - 0,1 (cms) =

70.00
127.00

0.573233
W=(0,845-RAIZ(0,7182-1,695*Mu*100000/(0,9*F"c*b*d2))
W=
0.274267
As = w x f'c / fy x b x d
As=
121.91
1"

24

B3.- VERIFICACION POR AGRIETAMIENTO

Pgina 1

cm.
varillas

Por paquetes
Z = 2,300 Kg/cm
A = 2 x b x 10 / N
Fs mx = 23,000 / ( 8.25 x A ^(1/3))
Fs = Mu / ( As x j x d )
2042,90<3189,57

=
=
=

58.33
2,935.03
2,250.39
1 O,K

233.33
1,848.93
2,250.39
0

B4.- VERIFICACION POR CORTE


POR PESO PROPIO
Vd=Wd*L/2+W1*(1+0,75+0,5+0,75)

42.29

Ton.

POR SOBRECARGA HS 20
Vl=2,52(4*p*1+4*p*0,79+p*0,58)

19.81

Ton.

5.15

Ton.

109.17

Ton.

3.75

cms.

7.07

kg/cm

POR IMPACTO
DISEO POR ROTURA
Vu =1,3(Vd+1,67*(Vl+Vi))
Esfuerzo cortante nominal
V"u=Vu/0,85*(b*d)
Esfuerzo cortante resis de concreto
Vc=0,85*(0,5(f"c)^1/2+175*r*Vu*d/Mu)
r=
0.021675
Vc>V"u

Av=2*0,71
S=Av*Fy/(Vu-Vc)*b

1.42
26

ACERO LATERAL
A=0,1*As

As =

12.19

3 / 4"

cm.
varillas

B5.- VERIFICACION POR FATIGA


Mu=
Fs max=M/(As*j*d)
Fmin=Mmin/(As*j*d)
Fs-Fmin=
Valor admisible (Fa)
1635,36-0,36*Fmin=
Fa>(Fs-Fmin)

310.58
2250.39
1528.93
721.46
1375.6344
1

C.- DISEO DE LA LOSA


METRADO DE CARGAS
Peso propio
(1m) x (e) x (2,4 T/m)
Asfalto
(1m) x (0.05) x (2T/m)

0.6
0.1
0.7

Md=Wd*s/10
Ml=(s+0,61)/9,74*P
P=7,258
Momento positivo=0,8*Ml
Momento Negativo=0,9*Ml
Momento por Impacto
I=15,24/(S+38)
I=<0,3

0.34
2.09
7.258
1.67
1.88

0.38
0.30 Menor valor

0.3

Momento positivo=I*M+
Momento negativo=I*M-

0.50
0.56

VERIFICACION DEL PERALTE


d=raiz(2*M*/(Fc*j*k*100)
d<H,
considerando recubrimiento d=

6.40
1
19

cms

5.62
8.01

T-m
cm.

6.33
1

cm.

DISEO POR ROTURA


M+=1,3*(Md+1,67*(M+I))
As=(0,845-raiz(0,7182-1,695*Mu*
100000/(0,9*F':c*b*d))*F"c*b*d/Fy:
verificando la cuantia minima
As min=14*b*d/Fy
As min<As
Considerando acero de
5/8"

M-=1,3*(Md+1,67*(M+I))
As=(0,845-raiz(0,7182-1,695*Mu*
100000/(0,9*F':c*b*d))*F"c*b*d/Fy:

25

cms

6.21
8.93

Pgina 2

T-m
cm.

verificando la cuantia minima


As min=14*b*d/Fy
As min<As
Considerando acero de
5/8"

6.33
1
@

22

distancia
1.225
0.950
0.917
0.525
1.400
Md=
0.50
2.35
0.71

Momento
0.15
0.11
0.01
0.33
0.21
0.81

cm.
cms

D.- DISEO TRAMO EN VOLADIZO


Momento por peso propio
0,35*0,15*2,4
0,25*0,2*2,4
0,25*0,05/2*2,4
Asf,(a*e)
Branda 0,15

carga
0.126
0.120
0.015
0.630
0.150

x=distancia al sardinel rueda


Ml=p*x/(0,8*x+1,143)
Momento impacto =
DISEO POR ROTURA
As=

7.70 T-m
11.32

cm.
cms

5/8"

Usar fierro
@

17

AGE
g\datos\programa\hoj\alberto\puente,age

Pgina 3

cms

Norma

Descripcin

En cms.

7.9.1 RNC 371

Recubrimiento
r=
Dimetro de estribos 1/2" de =
Dimetro acero principal 1" dp =
Cantidad de varillas
c=
Ancho de viga
b=
Espaciamiento entre varillas
Espaciamiento por paquetes
Separacin libre entre capas
Ancho de viga necasario 1capa
Ancho de viga necasario 2 capas
Ancho de viga necasario paquetes

5.00
1.27
2.50
24
70.00
2.50
5.00
2.50
130.04

7.6.1 RNC 372


7.7.5. RNC 372
7.6.2 RNC 372

2 capas

Paquetes

12

70.04
67.54

Pgina 4

Pgina 5

Pgina 6

DISEO DE ESTRIBOS
DATOS
ALTURA DE ZAPATA CIMENTACION (m)
TIPO DE TERRENO
(Kg/m2)
ANCHO DE PUENTE
(m)
LUZ DEL PUENTE
(m)
ALTURA DEL ESTRIBO
(m)
ANGULO DE FRICCION INTERNA (grado)
ALTURA EQUIV, DE SOBRE CARGA (m)
PESO ESPECIF, RELLENO
(Tn/m3)
PESO ESPECIF, CONCRETO
(Tn/m3)

d =

A =
L =
H =

h' =
1 =
2 =
M =
N =
E =
G =
a =
b =
c =
B =

1.50
2.60
5.70
20.00
6.60
45.00
0.60
1.60
2.30
1.60
1.70
1.00
1.70
1.70
0.70
1.00
6

A- ANALISIS DE ESTABILIDAD EN LA SECCION A-A


1-Empuje de terreno,
h=
1.70
h'=
0.60
C=
E= 0,5*W*h (h+2h")*C
Ev=E*Sen (o/2)=
Eh=E*Cos (o/2)=

0.17
0.670 TN
0.256
0.619

Punto de aplicacin de empuje Ea


Dh=h*(h+3*h')/(h+2h')/3

0.68

Fuerzas verticales actuantes


Pi(tn)

Xi(m)

P1
Ev
Total

2.737
0.256
2.993

0.35
0.70

Xv=Mt/Pi
Z=Eh*Dh/Pi
e=b/2-(Xv-Z)

0.380 m
0.141 m
0.111 m

Mi(Tn-m)
0.958
0.179
1.137

Esfuerzo a compresin del concreto F`c= 0,4(Fc)


F`c=
700
Tn/m2

Verificaciones de Esfuerzos de Traccion y Compresion,


P =Fv(1+6e/b)/(ab)

8.34 <

CONFORME

2.70 >2

CONFORME

3.38 >2

CONFORME

Chequeo al volteo
FSV=Mi/(Eh*Dh)
Chequeo al Deslizamiento
FSD=Pi*f/Eh

B- ANALISIS DE ESTABILIDAD EN LA SECCION B-B


1-Estado : Estribo sin puente y con relleno sobrecargado,
a-Empuje terreno:
H=
6.60
h'=
0.60
C=
0.17
E= 0,5*W*h (h+2h")*C=
7.001 Tn
Ev=E*Sen (o/2)=
2.679 Tn
Eh=E*Cos (o/2)=
6.468 Tn
Punto de aplicacin de empuje Ea
Dh=h*(h+3*h')/(h+2h')/3

2.37 m

Fuerzas verticales actuantes


Pi(tn)
P1
P2
P3
Ev
Total

Xi(m)
10.626
11.270
5.635
2.679
30.210

2.35
1.5
0.67
2.37

Mi(Tn-m)
24.971
16.905
3.775
6.349
52.000

Estribo 7

Xv=Mt/Pi
Z=Eh*Dh/Pi
e=b/2-(Xv-Z)

1.72 m
0.51
0.14 m

Esfuerzo a compresin del concreto F`c= 0,4(Fc)


F`c=
700
Tn/m2

Verificaciones de Esfuerzos de Traccion y Compresion,


P =Fv(1+6e/b)/(ab)

14.67 <F`c

CONFORME

3.39 >2

CONFORME

3.27 >2

CONFORME

Chequeo al volteo
FSV=Mi/(Eh*Dh)
Chequeo al Deslizamiento
FSD=Pi*f/Eh

2-Estado :Estribo con puente y relleno sobrecargado,


Peso propio
82.2135
Reaccin del puente debido a peso propio,
R1=
14.42 tn/m
P=
Rodadura -fuerza Horizontal
R2=5% de s/c equivalente,

4.00 T

0.207 Tn/M

Reaccion por sobrecarga


R3=
10.86 Tn

Fuerzas verticales actuantes


Pi(tn)
R1
R3
P vertical tot,
Total

Xi(m)
14.420
10.860
30.210
55.490

Xv=Mt/Pi

1.5
1.50
1.72

Mi(Tn-m)
21.630
16.290
51.961
89.881

1.620 m

FUERZAS HORIZONTALES ESTABILIZADORAS


Pi(tn)

yi(m)

Eh
R2
Total

6.468
0.207
6.675

Yh=Mi/Pi
Z=
e=

2.557

2.37
8.40

Mi(Tn-m)
15.329
1.739
17.068

0.308
0.038

VERIFICACIONES
1-Verificacion de compresion y traccin
P =Fv(1+6e/b)/(ab)

22.29 <F`c

CONFORME

5.27 >2

CONFORME

5.82 >2

CONFORME

Chequeo al volteo
FSV=Mi/(Eh*Dh)
Chequeo al Deslizamiento
FSD=Pi*f/Eh

C- ANALISIS DE ESTABILIDAD EN LA SECCION C-C


1-Estado : Estribo sin puente y con relleno sobrecargado,
a-Empuje terreno:
B=
6
H=
8.10
h'=
0.60
C=
0.17
E= 0,5*W*h (h+2h")*C=
10.245
Ev=E*Sen (o/2)=
3.921
Eh=E*Cos (o/2)=
9.465
Punto de aplicacin de empuje Ea
Dh=h*(h+3*h')/(h+2h')/3

2.87

Fuerzas verticales actuantes


Pi(tn)
P1
P2

Xi(m)
10.626
11.270

3.95
3.1

Mi(Tn-m)
41.973
34.937

Estribo 8

P3
P4
P5
Ev
Total

5.635
20.700
11.220
3.921
63.372

2.27
3
5.15
6.00

Xv=Mt/Pi
Z=Eh*Dh/Pi
e=b/2-(Xv-Z)

3.678 m
0.429 m
-0.249 m

12.791
62.100
57.783
23.526
233.110

>b/6
e<b/6,

b/6= 1.000
CONFORME

VERIFICACIONES
1-Verificacion de compresion y traccin
P =Fv(1+6e/b)/(ab)

7.93 <

CONFORME

8.58 >2

CONFORME

4.69 >2

CONFORME

Chequeo al volteo
FSV=Mi/(Eh*Dh)
Chequeo al Deslizamiento
FSD=Pi*f/Eh

2-ESTADO:Estribo con puente y relleno sobrecargado,


Fuerzas verticales actuantes
Pi(tn)
R1
R3
P vertical tot,
Total

Xi(m)
14.420
10.860
63.372
88.652

Xv=Mt/Pi

3.1
3.10
3.68

Mi(Tn-m)
44.702
33.666
233.209
311.577

3.515 m

FUERZAS HORIZONTALES ESTABILIZADORAS


Pi(tn)
Eh
R2
Total
Yh=Mi/Pi
Z=
e=

yi(m)
9.465
0.207
9.672

2.87
9.90

Mi(Tn-m)
27.165
2.049
29.214

3.02
0.33
-0.19 <b/6

CONFORME

VERIFICACIONES
1-Verificacion de compresion y traccin
P =Fv(1+6e/b)/(ab)

11.97 <

CONFORME

10.67 >2

CONFORME

6.42 >2

CONFORME

Chequeo al volteo
FSV=Mi/(Eh*Dh)
Chequeo al Deslizamiento
FSD=Pi*f/Eh

AGE

Estribo 9

DISEO DE PUENTE VIGA-LOSA


A.- PREDIMENSIONAMIENTO
LUZ DEL PUENTE

Puente simplemente apoyado de un slo tramo


=

25.00 m

PROYECTO

PERALTE DE LA VIGA
H = L/15 =
ESPESOR DE LA LOSA
E =

1.75 m
0.20 m

UBICACIN

PUENTE HUAYO
OMAS-YAUYOS

B.- DISEO DE VIGAS


Metrado de cargas
Ancho de via
Longitud de vereda
Ancho de viga

Peso losa =
Peso viga =
Asfalto
=
Acera
=
Volado
=

Area de influencia de la viga


(A)=
3.60
(c)=
0.50
(b)=
0.50
( f )=
1.55
Espesor de losa
(E)=
0.20
(g)=
0.26
(m)=
0.90
Separacin de vigas
(S)=
1.80
(a)=
0.90
E x (a + b + S/2 ) x 2.4 T/m. =
1.104
f x b x 2.4 T/m.
=
1.860
0.05 x A/2 x 2 Ton/m.
=
0.180
0.55 x 0.4 Ton/m.
=
0.220
0.10 x 2.4 Ton/m.
=
0.261
Wd =
3.625

1-MOMENTO POR PESO PROPIO


Nmero de diafragmas =
Peso propio Diafragma Wdiaf
=
Momento total por carga muerta Md =

4
0.8 x 0.2 x S/2 x 2.4 =
Wdiafx(L/4+2xL/8)+WdxL/8 =

2-MOMENTO POR SOBRECARGA

Sobrecarga vehicular HS20

4P

L/2

m
m
m
m
m
m
m
m
m

ton/m

0.144
285.00

ton-m

4P

L/2

Momento por viga:


M =P/2*(9*L^2/4-10,5*L+4,41)/L
P=
M s/c =M*(1+0,7/(s+b))

91.85

ton-m

4000 Kg.
M s/c =

107.82

ton-m

3-MOMENTO POR SOBRECARGA EQUIVALENTE


por viga
M eq=9*L/4+0,96*L*L/8

M eq =

67.19

ton-m

4-CARGAS POR EJE TAMDEN


M et =(L-1,2)*6/2

M et =

71.40

ton-m

Ml

107.82

ton-m

Mi

25.88

ton-m

418.70

ton-m

Tomando el mayor Momento ( Ml )


5-MOMENTO POR IMPACTO
i = 15,24 / ( L + 38 ) =
0.24
i < = 0.30,
i =
0.24
Momento por impacto M i = i x M l

B1.- DISEO POR SERVICIO


Verificacion del peralte
M=Md+Ml+Mi
Fy =
F'c =
Fc=0,4*F'c
fy =0,4* fy
r = fy / Fc
n=2100000/(15000*(raiz(f'c))

k = n / (n+r)
J = 1 - k/3
H=

4,200 Kg/cm.
210 Kg/cm.
84 Kg/cm.
1,680 Kg/cm.
20
9.6609
0.3257
0.8914
175.00 cms.

d=raiz(2*M*100000/(F"c*k*j*b))
d=
122.18
d<H
Ancho efectivo de viga T :
b = L/4
=
b = 16 x E + 0,5 =
b = 0,5 + S
=
b = mnimo valor =

B2.- DISEO POR ROTURA


Mu =1,3 x ( Md + 1,67 x (Ml+Mi) )

Mu=

660.76

ton-m

cms.
1
6.25
3.70
2.30
2.30

OK
m
m
m
m

Area de acero
b (cms)
=
d = H - 0,14 (cms) =

0.510857
W=(0,845-RAIZ(0,7182-1,695*Mu*100000/(0,9*F"c*b*d2))
W=
0.336643
As = w x f'c / fy x b x d
As=
135.50
cm

50.00
161.00

1 3/8"

13

varillas

B3.- VERIFICACION POR AGRIETAMIENTO

Fsmax=

d c A

X (centroide refuerzo)=
dc (recub.+diam./2)=

14 cm

6.27 cm
Z = 2,300 Kg/cm (condiciones de exposicin: severo)
A=2xbxX/N
=
Fs mx = 23,000 / ( dc x A )^(1/3)
=
Fs = Mu / ( As x j x d )
=

107.69
2,621.68 kg/cm
2,153.10 kg/cm
1

B4.- VERIFICACION POR CORTE


POR PESO PROPIO
Vd=Wd*L/2+W1*(1+0,75+0,5+0,75)

45.67 ton

POR SOBRECARGA HS 20
Vl=2,52(4*p*1+4*p*0,79+p*0,58)

19.81 ton

POR IMPACTO

4.75 ton

DISEO POR ROTURA


Vu =1,3(Vd+1,67*(Vl+Vi))

112.69 ton

Esfuerzo cortante nominal


V"u=Vu/0,85*(b*d)

3.58 kg/cm

Esfuerzo cortante resis de concreto


Vc=0,85*(0,5(f"c)^1/2+175*r*Vu*d/Mu)
r=
0.021675
Vc>V"u

7.04 kg/cm
1

Av=2*0,71
S=Av*Fy/(Vu-Vc)*b

1.42
34

ACERO LATERAL
A=0,1*As

As =

13.55

3 / 4"

cm.
varillas

B5.- VERIFICACION POR FATIGA


Mu=
Fs max=M/(As*j*d)
Fmin=Mmin/(As*j*d)
Fs-Fmin=
Valor admisible (Fa)
1635,36-0,36*Fmin=
Fa>(Fs-Fmin)

418.70 Ton-m
2153.10 kg/cm
1465.57 kg/cm
687.53 kg/cm
1387.85 kg/cm
1

C.- DISEO DE LA LOSA


C1.- Tramo Interior
METRADO DE CARGAS
Peso propio
(1m) x (e) x (2,4 T/m)
Asfalto
(1m) x (0.05) x (2T/m)
Wd =

0.48 ton/m
0.10 ton/m
0.58 ton/m

Momento por Peso Propio


Md=Wd*s^2/10 =
Md(+) y Md(-) =

0.19 ton-m

Momento por Sobrecarga


Ml=(s+0,61)/9,74*P
P (rueda mas pesada)=
Momento positivo=0,8*Ml
Momento Negativo=0,9*Ml
Momento por Impacto

1.80 ton-m
7.258 ton
1.44 ton-m
1.62 ton-m

Por paquetes
466.67
1,608.06 kg/cm2
2,153.10 kg/cm2
0

i=15,24/(S+38)
i=<0,3

0.38
0.30 Menor valor

0.3

Momento positivo=I*M+
Momento negativo=I*M-

0.43 ton-m
0.49 ton-m

VERIFICACION DEL PERALTE


Hallando los momentos por servicio:
M(+)=Md(+) + Ml(+) + Mi(+)=
M(-)=Md(-) + Ml(-) + Mi(-) =

2.06 ton-m
2.30 ton-m

d=raiz(2*M*/(Fc*j*k*100)

13.00 cm

d<H,
considerando recubrimiento (3 cm.+5/8"/2) d=
DISEO POR ROTURA
Mu+=1,3*(Md+1,67*(M+I))
As=(0,845-raiz(0,7182-1,695*Mu*
100000/(0,9*F':c*b*d))*F"c*b*d/Fy:
verificando la cuantia minima
As min=14*b*d/Fy
As min<As
Considerando acero de

16 cm

=
=

4.31 ton-m
7.35 cm

5.33 cm
1/2"

Mu-=1,3*(Md+1,67*(M+I))
As=(0,845-raiz(0,7182-1,695*Mu*
100000/(0,9*F':c*b*d))*F"c*b*d/Fy:
verificando la cuantia minima
As min=14*b*d/Fy
As min<As
Considerando acero de

1
18

cm
4.83 ton-m
8.32 cm

5.33 cm
1/2"

1
16

cm

C2.- Tramo en Voladizo


Momento por peso propio
1

3
4
0.90

Seccin
1
2
3
4
Asfalto
Baranda

carga (ton)
0,35*0,15*1*2,4
0,25*0,2*1*2,4
0,25*0,05/2*1*2,4
E*a*1*2.4
(a-0.25)*0.05*1*2
0.15*1

0.126
0.120
0.015
0.432
0.065
0.150

distancia
1.075
0.800
0.683
0.450
0.325
1.200
Md=

Momento (ton-m)
0.14
0.10
0.01
0.19
0.02
0.18
0.64
ton-m

Momento por Sobrecarga


P=7.258 ton
0.305

0.65
X=distancia al sardinel rueda=
Ml=P*X/(0,8*X+1,143) =

0.35 m
1.79 ton-m

Momento por Impacto


Momento impacto Mi=i*Ml

0.54 ton-m

DISEO POR ROTURA


Mu=1,3*(Md+1,67*(Ml+Mi))
As=
Considerando acero de

5.89 ton-m
10.36 cm
1/2"

12

cm

DISEO DE PUENTE VIGA-LOSA


A.- PREDIMENSIONAMIENTO
LUZ DEL PUENTE

Puente simplemente apoyado de un slo tramo


=

25.00 m

PROYECTO

PERALTE DE LA VIGA
H = L/15 =
ESPESOR DE LA LOSA
E =

1.75 m
0.20 m

UBICACIN

PUENTE HUAYO
OMAS-YAUYOS

B.- DISEO DE VIGAS


Metrado de cargas
Ancho de via
Longitud de vereda
Ancho de viga

Peso losa =
Peso viga =
Asfalto
=
Acera
=
Volado
=

Area de influencia de la viga


(A)=
3.60
(c)=
0.50
(b)=
0.50
( f )=
1.55
Espesor de losa
(E)=
0.20
(g)=
0.26
(m)=
0.90
Separacin de vigas
(S)=
1.80
(a)=
0.90
E x (a + b + S/2 ) x 2.4 T/m. =
1.104
f x b x 2.4 T/m.
=
1.860
0.05 x A/2 x 2 Ton/m.
=
0.180
0.55 x 0.4 Ton/m.
=
0.220
0.10 x 2.4 Ton/m.
=
0.261
Wd =
3.625

1-MOMENTO POR PESO PROPIO


Nmero de diafragmas =
Peso propio Diafragma Wdiaf
=
Momento total por carga muerta Md =

4
0.8 x 0.2 x S/2 x 2.4 =
Wdiafx(L/4+2xL/8)+WdxL/8 =

2-MOMENTO POR SOBRECARGA

Sobrecarga vehicular HS20

4P

L/2

m
m
m
m
m
m
m
m
m

ton/m

0.144
285.00

ton-m

4P

L/2

Momento por viga:


M =P/2*(9*L^2/4-10,5*L+4,41)/L
P=
M s/c =M*(1+0,7/(s+b))

91.85

ton-m

4000 Kg.
M s/c =

107.82

ton-m

3-MOMENTO POR SOBRECARGA EQUIVALENTE


por viga
M eq=9*L/4+0,96*L*L/8

M eq =

67.19

ton-m

4-CARGAS POR EJE TAMDEN


M et =(L-1,2)*6/2

M et =

71.40

ton-m

Ml

107.82

ton-m

Mi

25.88

ton-m

418.70

ton-m

Tomando el mayor Momento ( Ml )


5-MOMENTO POR IMPACTO
i = 15,24 / ( L + 38 ) =
0.24
i < = 0.30,
i =
0.24
Momento por impacto M i = i x M l

B1.- DISEO POR SERVICIO


Verificacion del peralte
M=Md+Ml+Mi
Fy =
F'c =
Fc=0,4*F'c
fy =0,4* fy
r = fy / Fc
n=2100000/(15000*(raiz(f'c))

k = n / (n+r)
J = 1 - k/3
H=

4,200 Kg/cm.
210 Kg/cm.
84 Kg/cm.
1,680 Kg/cm.
20
9.6609
0.3257
0.8914
175.00 cms.

d=raiz(2*M*100000/(F"c*k*j*b))
d=
122.18
d<H
Ancho efectivo de viga T :
B = L/4
=
B = 16 x E + b =
B=S+b
=
B = mnimo valor =
B<=Ancho Pte/2

B2.- DISEO POR ROTURA


Mu =1,3 x ( Md + 1,67 x (Ml+Mi) )

Mu=

660.76

ton-m

cms.
1
6.25
3.70
2.30
2.30
2.30

OK
m
m
m
m
m

Area de acero
b (cms)
=
d = H - 0,14 (cms) =

0.510857
W=(0,845-RAIZ(0,7182-1,695*Mu*100000/(0,9*F"c*b*d2))
W=
0.336643
As = w x f'c / fy x b x d
As=
135.50
cm

50.00
161.00

1 3/8"

13

varillas

B3.- VERIFICACION POR AGRIETAMIENTO

Fsmax=

d c A

X (centroide refuerzo)=
dc (recub.+diam./2)=

14 cm

6.27 cm
Z = 2,300 Kg/cm (condiciones de exposicin: severo)
A=2xbxX/N
=
Fs mx = 23,000 / ( dc x A )^(1/3)
=
Fs = Mu / ( As x j x d )
=

107.69
2,621.68 kg/cm
2,153.10 kg/cm
1

B4.- VERIFICACION POR CORTE


POR PESO PROPIO
Vd=Wd*L/2+W1*(1+0,75+0,5+0,75)

45.67 ton

POR SOBRECARGA HS 20
Vl=2,52(4*p*1+4*p*0,79+p*0,58)

19.81 ton

POR IMPACTO

4.75 ton

DISEO POR ROTURA


Vu =1,3(Vd+1,67*(Vl+Vi))

112.69 ton

Esfuerzo cortante nominal


V"u=Vu/0,85*(b*d)

3.58 kg/cm

Esfuerzo cortante resis de concreto


Vc=0,85*(0,5(f"c)^1/2+175*r*Vu*d/Mu)
r=
0.021675
Vc>V"u

7.04 kg/cm
1

Av=2*0,71
S=Av*Fy/(Vu-Vc)*b

1.42
34

ACERO LATERAL
A=0,1*As

As =

13.55

3 / 4"

cm.
varillas

B5.- VERIFICACION POR FATIGA


Mu=
Fs max=M/(As*j*d)
Fmin=Mmin/(As*j*d)
Fs-Fmin=
Valor admisible (Fa)
1635,36-0,36*Fmin=
Fa>(Fs-Fmin)

418.70 Ton-m
2153.10 kg/cm
1465.57 kg/cm
687.53 kg/cm
1387.85 kg/cm
1

C.- DISEO DE LA LOSA


C1.- Tramo Interior
METRADO DE CARGAS
Peso propio
(1m) x (e) x (2,4 T/m)
Asfalto
(1m) x (0.05) x (2T/m)
Wd =

0.48 ton/m
0.10 ton/m
0.58 ton/m

Momento por Peso Propio


Md=Wd*s^2/10 =
Md(+) y Md(-) =

0.19 ton-m

Por paquetes
466.67
1,608.06 kg/cm2
2,153.10 kg/cm2
0

Momento por Sobrecarga


Ml=(s+0,61)/9,74*P
P (rueda mas pesada)=
Momento positivo=0,8*Ml
Momento Negativo=0,9*Ml

1.80 ton-m
7.258 ton
1.44 ton-m
1.62 ton-m

Momento por Impacto


i=15,24/(S+38)
i=<0,3

0.38
0.30 Menor valor

0.3

Momento positivo=I*M+
Momento negativo=I*M-

0.43 ton-m
0.49 ton-m

VERIFICACION DEL PERALTE


Hallando los momentos por servicio:
M(+)=Md(+) + Ml(+) + Mi(+)=
M(-)=Md(-) + Ml(-) + Mi(-) =

2.06 ton-m
2.30 ton-m

d=raiz(2*M*/(Fc*j*k*100)

13.00 cm

d<H,
considerando recubrimiento (3 cm.+5/8"/2) d=
DISEO POR ROTURA
Mu+=1,3*(Md+1,67*(M+I))
As=(0,845-raiz(0,7182-1,695*Mu*
100000/(0,9*F':c*b*d))*F"c*b*d/Fy:
verificando la cuantia minima
As min=14*b*d/Fy
As min<As
Considerando acero de

16 cm

=
=

4.31 ton-m
7.35 cm

5.33 cm
1/2"

Mu-=1,3*(Md+1,67*(M+I))
As=(0,845-raiz(0,7182-1,695*Mu*
100000/(0,9*F':c*b*d))*F"c*b*d/Fy:
verificando la cuantia minima
As min=14*b*d/Fy
As min<As
Considerando acero de

1
18

cm
4.83 ton-m
8.32 cm

5.33 cm
1/2"

1
16

cm

C2.- Tramo en Voladizo


Momento por peso propio
1

3
4
0.90

Seccin
1
2
3
4
Asfalto
Baranda

carga (ton)
0,35*0,15*1*2,4
0,25*0,2*1*2,4
0,25*0,05/2*1*2,4
E*a*1*2.4
(a-0.25)*0.05*1*2
0.15*1

0.126
0.120
0.015
0.432
0.065
0.150

distancia
1.075
0.800
0.683
0.450
0.325
1.200
Md=

Momento por Sobrecarga


P=7.258 ton
0.305

0.65
X=distancia al sardinel rueda=
Ml=P*X/(0,8*X+1,143) =

0.35 m
1.79 ton-m

Momento por Impacto


Momento impacto Mi=i*Ml

0.54 ton-m

DISEO POR ROTURA

Momento (ton-m)
0.14
0.10
0.01
0.19
0.02
0.18
0.64
ton-m

Mu=1,3*(Md+1,67*(Ml+Mi))
As=
Considerando acero de

5.89 ton-m
10.36 cm
1/2"

12

cm