This estimate provides for replacing the service main feeder pillar at the Income Tax campus in Gadag, Karnataka. The existing feeder pillar is over 15 years old and damaged by weather conditions. It will be replaced with a new outdoor type feeder pillar containing one incoming and six outgoing switches, located near the existing one. The service main cable from the power pole will also be replaced as it is damaged in places. Earthing will be provided with 600mm x 600mm x 6mm earth electrodes. The work is estimated to cost Rs. 4,83,612 and take three months to complete after administrative approval, expenditure sanction, and letter of acceptance are obtained.
This estimate provides for replacing the service main feeder pillar at the Income Tax campus in Gadag, Karnataka. The existing feeder pillar is over 15 years old and damaged by weather conditions. It will be replaced with a new outdoor type feeder pillar containing one incoming and six outgoing switches, located near the existing one. The service main cable from the power pole will also be replaced as it is damaged in places. Earthing will be provided with 600mm x 600mm x 6mm earth electrodes. The work is estimated to cost Rs. 4,83,612 and take three months to complete after administrative approval, expenditure sanction, and letter of acceptance are obtained.
This estimate provides for replacing the service main feeder pillar at the Income Tax campus in Gadag, Karnataka. The existing feeder pillar is over 15 years old and damaged by weather conditions. It will be replaced with a new outdoor type feeder pillar containing one incoming and six outgoing switches, located near the existing one. The service main cable from the power pole will also be replaced as it is damaged in places. Earthing will be provided with 600mm x 600mm x 6mm earth electrodes. The work is estimated to cost Rs. 4,83,612 and take three months to complete after administrative approval, expenditure sanction, and letter of acceptance are obtained.
State: Karnataka Branch: E&M HCESD/Hubli Name of the work: fans at
Division: BCED II/Bangalore
Subdivision:
Maintenance and operation of electrical installation and
Income Tax, Gadag. (S.H: Replacement of service main feeder pillar)
Head of the Account:
Deposit
This preliminary estimate amounting to Rs 4,83,612/- W O has
been framed by Shri N C Ragahavacharyalu Executive Engineer (E), Bangalore Central Electrical Division 2, CPWD, Bangalore and submitted for Obtaining Administrative approval and Expenditure sanction from the competent authority and depositing the fund REPORT History:This estimate caters for replacement of service main feeder pillar at Income Tax campus, Gadag. The existing feeder pillar was erected during the construction at gadag. It has out lived for more than 15 years and due t atmospheric and weather condition and the metal box got damaged and beyond economical repairs. Hence the same is proposed to be replacing with a new feeder pillar to receive and distribute power supply to the campus. This estimate has been prepared as per the request letter No. MISC/ITO/W-1 & DDO/GDG/2015-16 dated 22/12/2015 of the Income Tax Officer, Gadag. Design and Scope This estimate caters for replacement of service main feeder pillar at Income Tax campus, Gadag. The existing feeder pillar was erected during the construction of IT campus at gadag. The existing feeder pillar has outlived and hence 1 no. outdoor type feeder pillar with one incoming and six outgoing switches is proposed to be erected just a little distance away from the existing feeder pillar . Also the service main able from the HESCOM pole to the feeder pillar is proposed to be replace as the existing cable is found damaged at certain places. Necessary earth sets with 600 mm x 600mm x 6 mm plate earth electrode are proposed for earthing of new feeder. Any unforeseen minor items left out will be met from the contingencies proposed. Method: Work shall be executed by call of tenders Rate : DSR& M/R Cost : Rs 4, 83,612/- WO Time : Three months after AA, ES and LOA
Kirloskar As Per Manufacture Specification/ 250M Horizontal As Per Manufacture Specification IP-55 As Per Manufacture Specification As Per Manufacture Specification 75 1450