GENERAL |. ALL MATERIALS AND CONSTRUCTION OF CONCRETE STRUCTURES SHALL BE IN ACCORDANCE WITH THE FOLLOWING SAUDI ARAVCD STANDARDS AND SPECIFICATIONS, INCLUDING INOUSTRY CODES AND STANDARDS REFERENCED IN THE SAUD] ARAWCC STANDARDS SaES-A-114 ~ EXCAVATION AND BACKFILL SRES-M-I@@——~ SALIDT ARAVCO BUILDING CODE SRES-Q-@01 CRITERIA FOR DESIGN AND CONSTRUCTION OF CONCRETE STRUCTURES SBES-0-€95 —- CONCRETE FOUNDATIONS SRES-0-019 = CEMENT BASED, NON-SHRENK GROUT FOR STRUCTURAL AND EQUIPMENT GROUTING SAES-H-293—~ COATING REQUTREVENTS FOR CONCRETE SURFACES SAES-H-Iet ~ APPROVED PROTECTIVE COATING SYSTEMS SAES-H-I82 - SAFETY REQUIREMENTS FOR COATING APPLICATIONS 9-SAMSS-@75 ~ CAULKING COPOUND WOINT SEALANT: a3-SAMSS-288 a2-semss-097 99-SNSS-186 AGGREGATES FOR CONCRETE READY-MIXED PORTLAND CENENT CONCRETE EPOKY COATING OF STEEL REINFORCING BARS. 2. ANCHOR BOLTS SHELL BE HEADED 2OLTS PER ASTM AS@7 GRADE 4 HEAVY HEXAGONAL OR THREADED BOLTS PER ASTM A36/R56N. NUTS SHALL SE HEAVY HEXAGONAL NUTS PER ASTM A563/2563M GRADE 4, MASHERS SHALL GE PER AST F455/F430l ANCHOR BOLTS, MUTS AND WASHERS SHALL BE GALVANIZED FER ASTH AI53/A153M OR ASTM ALL ANCHOR BOLTS SHALL GE [V ACCORDANCE WITH A4-@36322 SH Gl REV @8 AND SHALL NGT BE IN CONTACT WITH REINFORCEMENT Bai CONCRETE |, OETAILING OF REINFORCING SHALL CONFORM TO THE REQUIREMENTS OF Act315 "MANUAL OF CONCRETE PRACTICE FOR DETAILS AND DETAILING OF CONCRETE REINFORCE VENT? 2) CONCRETE MX SHALL COMPLY WITH @9-S4MSS~A97. PORTLAND CEVENT SHALL SE TYPE-V FOR ALL CONCRETE STRUCTURES. 3, CASTAN-PLACE CONCRETE SHALL CONFORM To 99-SaWSS-037, STRUCTURAL CONCRETE (IRUR COMPRESSIVE STRENGTH OF 28 MP IN 28 OAYS). 4, LEAN CONCRETE FOR SCREEDING, BLINOING AND CONCRETE FOR DUCT BANKS SHALL CONFORM 70 BS-SAMSS-@87, NON-STRUCTURAL CONCRETE taMMiay COMPRESSIVE STRENGTH OF 28 NPa IN 28 DAYS. 5 COARSE AND FINE AGOREGATES SHALL SE NORVAL WEIGHT TYPE £ND SHALL CONFORM TO @9-SAMSS-O88, 6. CONCRETE REINFORCING BARS SHALL GE DEFORMED ROUND CONFORMING TO S450 SSA 2/1398H (1979), REGARS SHALL SE HOT-ROLLED WITH MMU YIELD STRENGTH OF #14 MPa 160,000 psb). REBARS SHALL BE FHE COATED PER OS-SANSS~1d6, 7. WELOED WERE FAGRIC (WHF) REINFORCEMENT SHALL CONFORM TO _SASO SSA 224, (COLO DRANN) MRE METH WINDY VELO STRENGTH OF 240 win (34,800 peb. WIRE FabRc SHaLl SE EPOXY COATED. PER AST ASa4 OR GALVAMZED PER ASTH ATCT. 8. MIMWUY CONGRETE COVER SHALL CONFORM TO SAES-O-9@1, TABLE 2.UNLESS OTHERMSE SPECIFICALLY NOTED IN THE OESCGN ORAMINGS. REINFORCEMENT FOR SLABS-ON-GRADE SHALL BE PLACED AT OR ABOVE M-DEPTH OF THE SLAB FOR SINGLE LAYER. 9, GROUT FOR STRUCTURAL SASE_AND SEARING PLATES, ANCHOR BOLTS, COLULINS AND PRECAST MEMBERS SHALL BE PREPACKAGED, CENENT-3ASED, NONSSHAINK, NON-CATALYZED NATURAL AGGREGATE GROUT 12, GROUT FOR STRUCTURAL BACKFILL, MASONRY GROUT, HOLLOW CORE BLOCK FILLER GROUT AND OTHER APPLICATIONS WHERE NON-SHRINK CHARACTENTSTIC 16 NOT NECESSARY” SHALL SE SITE MdxED CROUT USING CLE«N AELL GRADED SAND THAT VETS THE AEOUIREVENTS OF @9-SAMCS-088, TYPE v PORTLAND CEMENT AND POTABLE MATER, MINIMUM 28-DaY COMPRESSIVE STRENGTH SHALL SE 1aliPa (2080 PSU) 11, FINISHING OF CAST-IN-PLACE CONCRETE STRUCTURES AND SLABS SHALL CONEORK TO ‘SAES-O-@01 SECTION 8, 12, EXTERNAL CORNERS OF STRUCTURES AND FOUNDATIONS ABOVE GRADE SHALL BE FORWED MITH A 25mm CHAMFER, 13, COORDINATE CONCRETE WORK WITH PIPING, MECHANICAL AND ELECTAICAL WORKS PRIOR TO PLACING CONCRETE, 4, ALL. CONCRETE SURFACES IN DIRECT CONTACT WITH EARTH SHALL GE COATED MITH TWO CORTS OF CGAL TAA OR BITUMEN COATING THAT CONFORVS TO SKES-H-I@I, APCS*I@ OR APCS-3, WHICHEVER [5 APBLICABLE PER SAES-OO2O1, 15. CAULKING COMPOUND OR JOINT SEALANT SHALL CONFORM TO 99-SAMSS-075, JOINT FILLER SHALL CONFORM TO AST 17S) GH ASTR-DI7S2, TYPE. SHALL BE AS NOTED IN THE CONSTRUCTION ORAMINGS. EARTHWORKS AND SITE PREPARATION |. UNLESS OTHERMSE SPECIFICALLY NOTED ON CONSTRUCTION ORAKINGS, EXCAVATION, BACKFILLING, FILL MATERIAL, PREPARATION AND COMPACTION REQUIREMENT FOR THE SITE. TO OBTAIN THE FINAL GRADE SHALL BE PER SAES“A“II4,, 2. FILL MATERIAL SHALL SE MARL.PLACEMENT AND COMPACTION SHALL CONFORM TO SAES-A-IN4. 5. SACKFILL AROUND AND UNDER FOUNDATIONS SHALL BE MARL.GACKFILL SHALL GE LACED IN MAMMA 200re (GAINCHILIFTS AND. SHALL. GE-COPACTED TO 9@ PERCENT OF THE MAXIMUM DENSITY OETERMINED BY ASTM DISS7 OR 85% OF THE MAXIVIM STANDARD. PROCTOR DENSITY AS OETERMINED #Y ASTM DB38, 4, SURFCO}AL DELETERIOUS MATERTALS INCLUOING LOOSE SOILS AND VEGETATION SHALL BE REMOVED PRO AREAS TO RECEIVE FILL 5. FIMSHED GRADE ELEVATIONS SHALL HAVE AN ALLOWAGLE TOLERANCE OF ~Onm AND +10. 6. INSIDE OR CLOSE TO EXISTING FACILITIES, FLELD SHALL EXERCISE CAUTION WHEN EXCAVATING TO 2VOO GAMACE TO UNDETECTED UNGERCRGUND PIPING, ELECTRICAL AND COMMUNICATION CABLES, aND QTHER UNDERGROUND UTILITIES. T. QEWATERING AND SHORING WLL GE REQUIRED FOR THE FOUNDATION CONSTRUCTION GELON, MATER TABLE. Act GhcH ACTIVITIES SHDULD BE CARRIED OUT aS MER SAUD] AHaMCO'S. CONSTAUCTION. SAFETY MaKUAL;SECTION 2.6. ROADS AND PAVING |, ROADS AND PAVING SHALL BE CONSTRUCTED TO LINES. GRADES AND CROSS SECTIONS AS SHOWN ON CONSTRUCTION DRAWINGS IN ACCORDANCE WITH SAES-O-226, 2. MATERIAL SPECIFICATION AND CONSTRUCTION OF ASPHALT CONCRETE PAVEMENT SHALL CONFORM Ta'SAES-0-2D5. 3. SUBGRADE PREPARATION SHALL EIN ACCORDANCE WITH SAES-0-206 SECTION Sel ANO SHALL Be COMPACTED TO 8 MINMUM95, PERCENT OF THE VAXIMUM DRY DENSITY AS OETERMINED BY ASTADISST. 4. PAVE AREAS THAT HAVE GEEN DEGRADED DURING INSTALLATION OF EQUIPMENT 2ND FOUNDATIONS. SHALL BE REPAIRED ‘AND RESTORED TO PRE-CONSTAUCTION CONDITION ACL asT™ AB Be BF BM BP BS Bw BLOG B08 BOC BoP BOT ce FON FFL FOL cL HPFS 1D IE Lac Lor. Lye MUN Max mmm. MPa AMERICAN ANERICAN TESTING Ai NCRETE INSTITUTE. IETY FOR MATERIALS. ANCHOR BOLT BOLT CIRCLE BOTH FACES BENCH MARK BASE PLATE 80TH SIDES BOTH WAYS BUILDING BOTTOM OF PIPE BOTTOM CENTER TO CENTER ~ FOUNDATION - FINISH FLOOR LINE - FINISH GRADE LINE ‘ADE LINE - HIGHEST POINT OF FINISH SURFACE - INSIDE DIAMETER - INVERT ELEVATION = Location = LOW POINT - LEVEL - METER ~ MINIMUM = MAXIMUM ~ MILLIMETER = MEGAPASCAL BOTTOM OF BASE PLATE. BOTTOM OF CONCRETE MATL. Misc NS oc oD PCD Ps PAL Pst PL REF REQD SAES SAMSS CL OR € - CENTER LINE cLR - CLEARANCE, col = COLUMN CONC - CONCRETE OIA (@)- DIAMETER DET ~ DETAIL owc - DRAWING EF - EACH FACE EL (ELEV)- ELEVATION Ew - EACH way EXT ~ EXTENSION EXIST — - EXISTING FTC - FOOTING FS - FAR SIDE FPRF - FIREPROOFING MATERIAL MISCELLANEOUS, NEAR SIDE ON CENTER OUTSIDE DIAMETER PITCH CIRCLE OLAMETER PIPE SUPPORT PIPE LINE POUNDS PER SQUARE INCH PLATE, REFERENCE, REQUIRED SAUDE ARAMCO ENGINEERING STANDARD. SAUDI ARAMCO MATERIALS SYSTEM SPECIFICATION. Saso SH SL STA sTo Tac Toc Tos TYP THK TOP/BTM uno we SAUDE ARABIAN STANDARDS ORGANIZATION SHEET SLEEPER STATION STANDARD TOP OF CONCRETE TOP OF GROUT TOP OF STEEL (SUPPORT) TYPICAL, THICKNESS. TOP AND BOTTOM UNLESS NOTED OTHERWISE WORKING POINT

Vous aimerez peut-être aussi