Vous êtes sur la page 1sur 29

Mon/Year T.No.

of Trips
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12
Apr-12

May-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12

1351
1352
1353
1354
1355
-1356
1357
1358
1359
1360
1361
1362
1363
--1364
1365
1366
1367
1368

Outage
From
1800/1.11.11
1110/26.11.11
1230/23.12.11
1100/31.12.11
1350/4.1.12
1540/18.2.12

To
2300/13.11.11
2300/28.11.11
1450/23.12.11
0930/01.01.12
1635/4.1.12
1705/18.2.12

1030/1.4.12
0950/11.4.12
0000/23.4.12
1007/18.5.12
1515/25.6.12
0250/27.6.12
0232/30.7.12
1300/31.7.12

1600/3.4.12
0210/17.4.12
0240/23.4.12
1200/18.5.12
2330/26.612
0350/27.6.12
1235/31.7.12
1740/31.7.12

0840/22.10.12
0555/25.10.12
0437/27.11.12
1505/18.12.12
1015/24.12.12

0520/25.10.12
0725/25.10.12
0850/27.11.12
1450/20.12.12
1125/24.12.12

OUT H for Trip


306
35.5
2.2
22.3
2.45
1.25
0
53.3
136.2
2.4
1.53
32.15
1
34.03
4.4
0
0
56.45+11.55
1.3
4.13
47.45
1.1

Jan-13
Feb-13
Mar-13
Apr-13
May-13
Jun-13

1369
1370
1371
-1372
1373
1374
1375
1376
1377
1378
1379

0945/22.01.13
0235/24.01.13
1435/4.2.13

1250/22.01.13
0630/24.01.13
1230/6.2.13

3.05
3.55
45.55

2120/4.4.13
0000/7.4.13
-2.05/06.06.13
15.50/11.06.13
800/13.06.13
1335/29.06.13
0205/30.06.13

2400/6.4.13
2105/18.5.13
0300/08.06.13
1825/12.06.13
0035/18.06.13
1925/29.06.13
2130/30.06.13

50.4
576
429.05
48.55
26.35
112.35
5.5
19.25

Rea of Outage/Tripping
Annual Shut Down
Boiler Leakage.
LBB Relay Operated
Boiler Leakage
PA fan 2B tripped.
Turbine Tripped.
Boiler Leakage
No Demand
UAT-2A bucholz relay
Grid Disturbance
Boiler Leakage
Drum Level V Low
Grid Failure, B.G Stopped
Grid Failure

Boiler Leakage, No Demand


Check the Turbine Vibrations
PA fan 2B tripped.
Boiler Leakage
PA Header Pr Low.

T. Trippings R Hrs Outage


1350
Nov.11
1351
378.1 341.5
Dec.11
1353
719.1
24.5
jan.12
1354 741.15 2.45
Feb.12
1355 694.35 1.25
Mar.12
1355
744
0
Apr.12
1358
527.3 192.3
May.12
1359 742.07 1.53
Jun.12
1361 686.45 33.15
Jul.12
1363 705.17 38.43
Aug.12
1363
744
0
Sep.12
1363
744
0
Oct.12
1365
673.5
70.1
Nov.12
1366 715.47 4.13
Dec.12
1368 695.05 48.55

PA Header Pr Low.
PA fan 2B tripped.
No Demand.
No Demand
HP/IP/LP OH
HP/IP/LP OH
No Demand
No Demand
No Demand
UAT-2B bucholz relay
No Demand

trip of Mo Total RH
182588.78
1
182966.88
2
183685.98
1
184427.13
1
185121.48
0
185865.48
3
186392.78
1
187134.85
2
187821.3
2
188526.47
0
189270.47
0
190014.47
2
190687.97
1
191403.44
2
192098.49

Eq RH
217437.78
217835.88
218594.98
219356.13
220070.48
220814.48
221401.78
222163.85
222890.3
223635.47
224379.47
225123.47
225836.97
226572.44
227307.49

Eq RH si OH
0
398.1
1137.2
1858.35
2552.7
3276.7
3864
4566.07
5272.52
5977.69
6681.69
7425.69
8139.19
8834.66
9549.71

Jan-13
Feb-13
Mar-13
Apr-13
May-13
Jun-13

7
45.55

626.4
429.05

212

Mon/Ye

RH Month

Oct.11
Nov.11

738.42
357.4

Dec.11
Jan-12

195.4
431.55

Feb-12
Mar-12
Apr-12

693.01
744
432.5

May.12

710.4

June.12

677.05

July.12

614.2

Aug.12
Sep.12
Oct.12

668.5
629
618.17

Nov.12

702.2

Dec.12

710.13

Com. RH Com Eq RH EQ RH si LOH T.No. of Trips


158029.5 182854.51
158767.9 183612.93
994
159125.3 184010.33
995
996
159320.7 184205.73
195.43
*
159752.3 184737.28
726.98
997
998
999
1000
1001
160445.3 185450.29
1339.99
1002
161189.3 186194.29
2063.99
*
161621.8 186706.79
2576.49
1003
1004
1005
1006
162332.2 187417.19
3266.89
1007
1008
1009
163009.2 188094.24
3923.94
1010
1011
163623.4 188708.44
4578.14
1012
1013
1014
1015
164291.9 189376.94
5186.64
1016
164920.9 190005.94
5815.64
1017
165539.1 190624.11
6453.81
1018
1019
166241.3 191326.31
7156.01
1020
1021
166951.4 192036.44
7886.14
1022
1023
1024

T trip of Month

Trips

Reason

1
2

1
1
1
0
1
1
1
1
1
1
0
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Gen stand by EF Relay operated


Busting of Main Steam line to PRDS
Overhaul done By BHEL
Overhaul done By BHEL
To attend LPT Viberation problum
To attend LPT Viberation problum
Boiler leakage
Boiler leakage
Box-up due to oil leakage near FD Fan
PA Header Pressusre Low
*
No Demand
Loss of All Fuel
High HPT Shaft Viberation
Boxed due oil leakage from HPT Brg 1
Boiler leakage
Grid Disterbance
Turbine over speed tripp
Boiler leakage
Stator Water coductivity very high
Boiler leakage
Boiler leakage
Grid Failure
Grid Failure
Boiler leakage+ND
ND
Generator Earth Fault
Generator Earth Fault
Flame Failure
Flame Failure
Boiler Leakage
Flame Failure
Oil leakage from Turbine Gov.sys.

0
5

1
0
4

2
4

1
1
2
2
3

Outage
From
1322/11.10.11
1415/13.11.11
0355/15.11.11
0000/1.12.11
1720/4.1.12
2140/6.1.12
1825/9.1.12
1840/11.1.12
1345/15.1.12
856/17.2.12
*
1335/13.4.12
1720/19.4.12
1000/21.4.12
2000/27.4.12
1150/14.5.12
1007/18.5.12
2325/30.5.12
1020/14.6.12
1635/17.6.12
2250/20.7.12
0055/25.7.12
0232/30.7.12
1300/31.7.12
0950/22.8.12
0050/17.9.12
435/1.10.12
2227/18.10.12
1715/12.11.12
0415/21.11.12
1450/6.12.12
0143/16.12.12
1700/29.12.12

OUT H for Trip


To
1840/11.10.11
2030/13.11.11
2400/30.11.11
2020/23.12.11
1445/5.1.12
1320/7.1.12
640/11.1.12
620/13.1.12
0050/21.1.12
1155/17.2.12
*
410/16.4.12
1850/19.4.12
1415/27.4.12
2250/30.4.12
1210/15.5.12
2225/18.5.12
555/31.5.12
250/16.6.12
1900/17.6.12
2205/23.7.12
1340/26.7.12
1740/30.7.12
1950/31.7.12
1300/25.8.12
1950/20.9.12
1330/1.10.12
1915/23.10.12
1915/12.11.12
0155/23.11.12
1900/7.12.12
540/16.12.12
1840/29.12.12

5.18
6.15
356.05
548.2
21.25
15.4
36.15
35.4
203.05
2.59
*
62.35
1.3
148.15
74.5
24.2
92.18
6.3
40.3
2.25
71.15
36.45
15.08
6.5
33.15+41.55
91
8.55
116.48
2
28.1
3.57
1.4

Month/Year
RH Month Com RH Com EQ Rh
143496 172869.63
Oct.2011
744
144239.6 173613.63
Nov.2011
660.35
144900
174313.98
Dec.2011

713.55

145613.5

175067.53

EQ RH si LOH
0
0
0
0
0

Jan-12
Feb-12
Mar-12

744
603.2
46

146357.5
146960.7
147006.7

175811.53
176434.73
176500.73

0
0
66.03

Apr-12
May.12
June.12
July.12

720
744
688
726.37

147726.7
148470.7
149158.7
149885.1

177220.73
177964.73
178672.73
179439.1

766.03
1510.03
2218.03
2964.4

August.12

696.05

150581.2

180175.15

3660.45

Sep.12

558.45

151139.6

180773.6

4218.9

Oct.2012
Nov.12
Dec.12

744
720
714.45

151883.6
152603.6
153318.1

181517.6
182237.6
182972.05

4922.9
5642.9
6377.35

Tot Trips
-0
911
912
913
914
*
915
916
*
*
917
918
919
920
921
922
923
*
*
924

Trips of Month

Trips

Reason

Outage
--

0
2
2
0
1
1
0
0
1
2
2
2
0
0
1

0
1
1
1
1
0
1
0
1
0
0
1
1
1
1
1
1
1
0
0
1

Boiler Leakage
Gen standby EF relay operated
ATRS card of fire protection failed
Boiler Leakage
*
OVERHAULING done by BHEL
OVERHAULING done by BHEL
Rotor o/V
*
*
Boiler Leakage
Grid Failure
Grid Failure
ND
Gen Relay panel problem
ND
ND
*
*
Boiler Leakage

0705/6.11.11
0100/26.11.11
0540/24.12.11
0505/24.12.11
*
0320/26.02.12
1805/31.312
*
*
1800/01.06.12
0232/30.7.12
1300/31.7.112
1530/28.8.12
2350/30.8.12
1420/4.9.12
1145/17.9.12
*
*
2145/26.12.12

Outage

1540/0.11.11
0350/26.11.11
0750/24.12.11
0900/28.12.11
*
23.55/29.03.12
2010/31.3.12
*
*
0200/03.06.12
1200/30.07.12
2055/31.7.12
1205/30.08.12
0310/31.08.12
1620/6.9.12
0300/22.9.12
*
*
0300/28.12.12

Out Hours of Trip

56.35
2.5
2.1
27.55
*
92.4
695.55
2.05
*
*
32
9.28
7.55
44.35
3.2
50
111.115
*
*
29.15

Mon/Ye

RH month
720
725.15

Total RH
129365.83
130085.83
130810.98

Eq RH
153037.83
153757.83
154562.98

Nov-11
Dec-11

Jan-12

741.35

131552.33

155344.33

Feb-12
Mar-12

696
660.25

132248.33
132908.58

156040.33
156760.58

Apr-12
May-12
Jun-12
Jul-12

720
742.27
718.4
692.27

133628.58
134370.85
135089.25
135781.52

157480.58
158242.85
158981.25
159773.52

Aug-12

639.34

136420.86

160492.86

Sep-12

472.15

136893.01

161005.01

Oct-12
Nov-12
Dec-12

742.35
688.35
482.3

137635.36
138323.71
138806.01

161767.36
162475.71
162978.01

Eq RH since LOH

T.No. of Trips

Trip Mon

Trips

951
952
953
954
955
956
*
957
958
959
*
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975

0
4

0
1
1
1
1
1
1
0
1
1
1
0
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

2
0
3

0
1
1
5

2
1
1
1

Reason
*
UST-5B Bucholz relay operated
LBB relay operated
ATRS card of MS steam temp very low malfunction
BMCC supply failure
MS temp Very low card failure
Boxed up due to spark in slip ring of gen
*
No Demand
MS temp Very low card failure
MS steam line bursted
*
Grid Failure
48V toBFP control panel failed
Unloading of PA fan -5A
APH-5A gear box problem.
MS temp Very low card failure
Grid Failure
Grid Failure
MS temp Very low card failure
Turbine lub oil pr very low.
Boiler leakage
No Demand
APH-5A coupling problem
No Demand
UAT-5A tripped.
Condenser tube leakage.
O/H of Generator

Outage
From
*
0430/21.12.11
1230/24.12.11
2130/24.12.11
2145/27.12.11
2200/02.01.12
01.35/24.01.12
*
2250/09.03.12
2035/15.03.12
2100/23.03.12
*
1007/18.05.12
1240/01.06.12
1640/10.07.12
0005/14.07.12
1110/18.07.12
0232/30.07.12
1300/31.07.12
1634/07.08.12
0820/20.08.12
0030/18.08.12
2055/27.08.12
0400/01.09.12
0625/15.09.12
1115/04.10.12
2110/3.11.12
0230/21.12.12

Outage

OUT H for Trip


To
*
0640/21.12.11
0505/25.12.11
0505/25.12.11
0040/28.12.11
2340/02.01.12
0220/24.01.12
*
1800/12.03.12
2320/15.03.12
1040/23.03.12
*
1140/18.05.12
1400/01.06.12
1800/10.07.12
2205/14.07.12
1210/18.07.12
2005/30.07.12
2240/31.07.12
1930/07.08.12
0955/20.08.12
1120/19.08.12
1400/30.08.12
1500/02.09.12
0310/24.09.12
1240/04.10.12
0435/5.11.12

*
2.1
7.35
7.35
2.55
1.4
0.45
*
67.5
2.45
13.4
*
1.33
1.2
1.2
22
1
17.33
9.4
2.56
1.35
34.5
65.05
35
212.45
1.25
31.25
261.3

Outage
0
18.45

2.25
0
83.35

0
1.33
1.2
51.33

104.26

247.45
1.25
31.25
261.3

Mon/Ye

RH during month
720
738.3
711.5

Total RH
130672.66
131392.66
132130.96
132842.46

Eq RH
150747.66
151467.66
152225.96
153037.46

Nov-11
Dec-11
Jan-12

Feb-12

216.55

133059.01

153274.01

Mar-12

736

133795.01

154050.01

Apr-12
May-12
Jun-12
Jul-12

717.25
744
720
724.02

134512.26
135256.26
135976.26
136700.28

154787.26
155531.26
156251.26
157035.28

Aug-12
Sep-12

743
641.45

137443.28
138084.73

157778.28
158459.73

Oct-12

666.15

138750.88

159205.88

Nov-12
Dec-12

717.35
744

139468.23
140212.23

159943.23
160687.23

Eq RH si OH

T.No. of Trips

trips of Month

Tips

805
806
807
808
809
810
811
812

0
1
5

813
814
815
*
*
816
817
818
*
819
820
821
822
823
824
825
*

0
1
1
1
1
1
1
0
1
1
1
1
0
0
1
1
1
0
1
1
1
1
1
1
1
0

1
0
0
3

0
2
4

1
0

Reason
*
LBB relay operated
UAT-6A Bucholz relay operated
UAT-6A Bucholz relay operated
Gen Protection Operated
RH card failure
Annual Maintenance
Syn after Overhaul.
PA fan-6A overloaded.
FSSS fault
FSSS fault
No Demand
*
*
Grid Failure
MS temp Very Low
Grid Failure
*
Station Supply Fail
No Demand
APH-6A problem.'
PA fan-6A Tripped.
Condenser tube leakage+ND
Flame Failure
FD fan-6B tripped.
*

Outage
From
*
1230/23.12.11
0425/2.01.12
1245/03.01.12
0245/19.01.12
0220/29.01.12
0220/31.01.12
**
0540/25.02.12
2210/13.3.12
0530/25.3.12
0630/11.4.12
*
*
0232/30.07.12
1705/30.07.12
1300/31.07.12
*
0925/02.09.12
0555/17.09.12
1930/08.10.12
1120/10.10.12
2255/26.10.12
0015/26.10.12
0905/28.11.12
*

Outage
To
*
*
1800/23.12.11
530
0715/02.01.12
250
1355/03.01.12
110
0455/19.01.12
210
0640/29.01.12
420
**
21.4
1950/20.02.12
475.5
0855/25.02.12
315
0110/24.3.12
300
1030/25.3.12
500
0905/11.4.12
2.35
*
*
*
*
1620/30.07.12
13.48
1755/30.07.12
0.5
1820/31.07.12
5.2
*
*
1530/02.09.12
6.05
0555/20.09.12
72.1
1540/09.10.12
20.1
1240/10.10.12
1.2
0455/29.10.12 40.45+13.15
0215/26.10.12
2.15
1130/28.11.12
2.25
*
*

OUT H for Trip


-

45+13.15

Vous aimerez peut-être aussi