Photo Requirement of Site Installation


1. Scope
ID eNodeB installation, RRU 8862, RRU8964, GPS, DCPD, Antenna installation photo
should be taken. All equipments photo should be taken orderly.

2. Universal requirement of site photos


2.1 Requirement
1)
2)
3)
4)
5)
6)
7)

Photo Size: (1024*768px), Good Clarity, Proper angle photo /zoom, setting should be proper
( Date, Time & mode ),
First photo should be Panorama photo ( Tower , Fence, Gate & shelter ) required for every
site.
All the three sector Antenna, Diplexer, RRU photo should be unique. (First to third sector
photo should be taken by orderly; otherwise it will be big issue to identify the sectors.
Photographs of all installed equipments should be submitted according to this document.
If any photo not matching according to requirement vendor needs to go site & resubmit
correct photographs.
If the photo submitted by vendor is not as per requirement and delay in submitting, ZTE have
reserve the right to refuse sign up on WCC.
Folder name should be yyyymmdd_Region_Subcon Name_Site Name_Auditor
name_(Site ID) e.g. 20121218_PB_Blues_Chandigarh TE_Rajesh

2.2 Forbidden:
1)
2)

Fake photos forbidden strictly!


a) Same photo for different sites
b) Photo mismatch
Meaningless photo not required;

3. Work flow for Photo Submission


Subcon:
Submit by next of installation

SE/PC
Audit 100%

Email
Photo Req

QE:
1. Audit 100%,
2. Upload: p6
3. Inform to PQM with tracker

count

Email
Remarks

<>
All Rights reserved, No Spreading abroad without Permission of ZTE

Internal Use Only

Full View of Equipment


Location

Full view of DCPD with


BBU, Dummy & GPS
Tray.

Photo req: MCB


Connections, Bus Bar
Connection,

Antenna photo from


back side clearly
showing both upper and
lower fixing assembly
with nut bolt

Sector
wise
photo

<>
All Rights reserved, No Spreading abroad without Permission of ZTE

Internal Use Only

Jumper connection at
antenna ports must
include labeling and
weatherproofing of ports

Sector
wise
photo
(2)

GPS antenna photo


showing no obstacle
within the 90 degrees
elevation angle

RRU installation with


weather profing &
Labeling

Sector
wise
photo

Power and optical


connection at RRU photo

Sector
wise
photo

<>
All Rights reserved, No Spreading abroad without Permission of ZTE

Internal Use Only

Photo of grounding
connection of RRU

Sector
wise
photo

Outdoor Power cable &


GPS Grounding clips
installation photo at with
waterproofing &
grounding termination
at Ground bar

Sector
wise
photo

Roxtec photo with EGB


& grounding clips

Full
view of
EGB

Site cleaning photo

<>
All Rights reserved, No Spreading abroad without Permission of ZTE