AWI COLD STORAGE (PROJECT PANDA)

Work Schedule Monitoring (as of June 2015)


PROJECT TASKS
ITEM

STATUS

DESCRIPTION

STRUCTURAL DESIGN
Dellosa Design
Zamil Structural (for excavation purposes)
DONE (29 Apr '15)
Zamil Structural (for qoutation purposes)
with qoutation..
Zamil Structural (for AWI approval)
Dellosa Design Permits
DONE.
Electron Electrical Permits
DONE.

SITE DEVELOPMENT
Site Preparation (completion)
DONE (01 May'15)
Drainage
Culvert Box/Bridge
DONE.
Road to GTC
Concrete pavement in front of storage
Perimeter Fence & Gate

BUILDING
Fabrication of Rebars @ GL A-J/1-15
Footings & Column GL A-J/1-15 Pouring of concrete
Installation of Formworks for 2nd Lift of Column GL D & H/1-15
Installation of Anchor bolt of Column @GL A, B, D, H & J/1-15
Tie Beam, Ret. Wall & Slab-On-Grade @ GL A-C/1-15

Excavation for Tie Beam & Ret Wall Concrete Pouring


Preparation of Item 103 (Subgrade Preparation)

03.25
1

Installation of Vent Pipes & Preparation of Gravel Base


Installation of Rebars for Slab-on-Grade
Pouring of Slab-on-Grade (Bottom Slab Level)
Tie Beam, Ret. Wall & Slab-On-Grade @ GL I-J/1-15

Excavation for Tie Beam & Ret Wall Concrete Pouring


Preparation of Item 103 (Subgrade Preparation)
Installation of Vent Pipes & Preparation of Gravel Base
Installation of Rebars for Slab-on-Grade
Pouring of Slab-on-Grade (Bottom Slab Level)
Tie Beam, Ret. Wall & Slab-on-Grade @ GL D-H/1-15
Excavation for Tie Beam & Ret Wall Concrete Pouring
Preparation of Item 103 (Subgrade Preparation)
Installation of Vent Pipes & Preparation of Gravel Base
Installation of Rebars for Slab-on-Grade
Pouring of Slab-on-Grade (Bottom Slab Level)
Machine Room & EE Room
Concreting of Slab-on-Grade, 2nd Lift Column Concreting
Installation of Formworks for Top Slab
Masonry
Slab-on-Grade @ C-D & G-I/1-15
Preparation of Item 103 (Subgrade Preparation)
Installation of Vent Pipes
Preparation of Gravel Base
Installation of Rebars for Slab-on-Grade
Pouring of Slab-on-Grade (Bottom Slab Level)
Top Slab
Rebar Installation
Pouring of Top Slab Level
Note:
Item VII will start after the trusses installed.
Item VIII will start after the insulation installed.
- Start of Installation of Anchor Bolts

Structure (Zamil)
June 23,2015: Made Call to Joel Velasco
Anchor Bolt Setting (Tradebay)
Erection and Installation (Tradebay)
Roofings Metalplus (Tradebay/Technotrade)

PU Panel
Ex works by CARSTEN
PU Panel Installation

REFRIGERATION
Award and Downpayment (OMNICO)
Ex-works by OMNICO
Shipping
Piping Works
Equipment Installation (Machine Room/Compressors)
Electrical Wirings and Controls
Testing and /Commissioning
Temperature Pull-down

ELECTRICAL
Substation
Transformer
MTS/Power Panel/MDP/LP
Genset
Cable/Cable tray
Power and Lighting wiring
40 ftr ref van outlet

WATER SYSTEM
Deepwell (250 gal/min)/Tank (100 cu.m)
Pumps and Pipings

Water Softener

FIRE FIGHTING
Pump/Engine/Sprinklers/Extinguisher
Hydrants/Piping

WASTE WATER TREATMENT FACILITIES

Design
Award
Delivery and Constraction
Testing/Commissioning

10

FISH RECEIVING
Design
Award for Construction
Delivery Time
Dumping Shoot
Transfer & Inclined Conveyor
Sorting Conveyor
Weighing Scale

6252015

follow up to Robert de Mesa


Payment for Zamil
schedule of arrival of Zamil

APRIL 2015

MAY 2015

JUNE 2015

04.01

04.08

04.15

04.22

04.29

05.06

05.13

05.20

05.27

06.03

06.10

06.17

06.24

10

11

12

13

14

04.03
04.15

JOEL
04.15
04.15
DONE

DONE

DONE

DONE

REFRIGERATION EQUIPMENTS MANUFACTURING

JULY 2015

AUGUST 2015

SEPTEMBER 2015

07.01

07.08

07.15

07.22

07.29

08.05

08.12

08.19

08.26

09.02

09.09

09.16

15

16

17

18

19

20

21

22

23

24

25

26

09.23
NUM
27

FABRICATION : 8 WEEKS

SHIPMENT

on-site

DEL.

on-site

10

11

12

13

14

OCTOBER 2015

09.30 10.07 10.14


MBER OF WEEKS
28
29
30

DECEMBER 2015

NOVEMBER 2015

10.21

10.28

11.04

11.11

11.18

11.25

12.02

12.09

12.16

12.23

31

32

33

34

35

36

37

38

39

40

15

16

17

18

19

20

21
0

JANUARY 2016

FEBRUARY 2016

MARCH 20

12.30

01.06

01.13

01.20

01.27

02.03

02.10

02.17

02.24

02.02

02.09

02.16

41

42

43

44

45

46

47

48

49

46

47

48

MARCH 2016
02.23

02.30

Project Panda (Cold Storage 6,000MT)

I.
II.
III.
IV.
V.
VI.
VII.
VIII.

Program of Works
Fabrication of Rebars for Footing @ GL A-J/1-15
Footing & Column @ GL A,B,D,H & J/1-15
Tie Beam, Ret. Wall & Slab-on-Grade@ GL A-C/1-15
Tie Beam, Ret. Wall & Slab-on-Grade @ GL I-J/1-15
Tie Beam, Ret. Wall & Slab-on-Grade @ GL D-H/1-15
Machine Room & EE Room
Slab-on-Grade @ C-D & G-I/1-15
Top Slab
Note:
Item VII will start after the trusses installed.
Item VIII will start after the insulation installed.
- Start of Installation of Anchor Bolts

Prepared by:
Engr. John Harris Z. Aring
DDBS

WORKING DAYS
MONTH 1

ESTIMATED DAYS

10

11

12

13

14

15

16

17

18

19

20

MONTH 2
21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

MONTH 2
46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

MONTH 3
71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

MONTH 4
96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

MONTH 5
121

122

123

124

125

126

127

128

129

130

131

132

133

134

135

136

137

138

139

140

141

142

143

144

145

MONTH 6
146

147

148

149

150

151

152

153

154

155

156

157

158

159

160

161

162

163

164

165

166

167

168

169

170

171

172

173

174

175

176

177

178

179

180

Project Panda (Cold Storage 6,000MT)

I.

II.

III.

IV.

V.

Program of Works
Temporary Fence (Perimeter Enclosure)
Layout & Staking
Fabrication of Rebars for Footing @ GL A-J/1-15
Footing & Column @ GL A,B,D,H & J/1-15
Excavation for Footing @ GL A-J/1-15
Installation of Forms for Footing @ GL A-J/1-15
Installation of Rebars Footing @ GL A-J/1-15
Pouring of Concrete @ Footing @ GL A-J/1-15
Installation of Formworks for 2nd Lift of Column GL D & H/1-15
Pouring of Concrete @ 2nd Lift of Column GL D & H/1-15
Installation of Formworks for 3nd Lift of Column GL D & H/1-15
Pouring of Concrete @ 3nd Lift of Column GL D & H/1-15
Installation of Anchor Bolt of Column @ GL A,B,D,H & J/1-15
Tie Beam, Ret. Wall & Slab-on-Grade@ GL A-C/1-15
Excavation for Tie Beam
Installation of Forms forTie Beam & Ret. Wall
Installation of Rebars forTie Beam & Ret. Wall
Pouring of Concrete @ Tie Beam & Ret. Wall
Preparation of Item 103 (Subgrade Preparation)
Installation of Vent Pipes
Preparation of Gravel Base
Installation of Rebars for Slab-on-Grade
Pouring of Slab-on-Grade (Bottom Slab Level)
Tie Beam, Ret. Wall & Slab-on-Grade @ GL I-J/1-15
Excavation for Tie Beam
Installation of Forms forTie Beam & Ret. Wall
Installation of Rebars forTie Beam & Ret. Wall
Pouring of Concrete @ Tie Beam & Ret. Wall
Preparation of Item 103 (Subgrade Preparation)
Installation of Vent Pipes
Preparation of Gravel Base
Installation of Rebars for Slab-on-Grade
Pouring of Slab-on-Grade (Bottom Slab Level)
Tie Beam, Ret. Wall & Slab-on-Grade @ GL D-H/1-15
Excavation for Tie Beam
Installation of Forms forTie Beam & Ret. Wall
Installation of Rebars forTie Beam & Ret. Wall
Pouring of Concrete @ Tie Beam & Ret. Wall
Preparation of Item 103 (Subgrade Preparation)
Installation of Vent Pipes

VI.

VII.

VIII.

Preparation of Gravel Base


Installation of Rebars for Slab-on-Grade
Pouring of Slab-on-Grade (Bottom Slab Level)
Machine Room & EE Room
Concreting of Slab-on-Grade
Installation of Formworks for 2nd Lift of Columns
Concreting for 2nd Lift of Columns
Installation of Formworks for Top Slab
Masonry
Slab-on-Grade @ C-D & G-I/1-15
Preparation of Item 103 (Subgrade Preparation)
Installation of Vent Pipes
Preparation of Gravel Base
Installation of Rebars for Slab-on-Grade
Pouring of Slab-on-Grade (Bottom Slab Level)
Top Slab
Rebar Installation
Pouring of Top Slab Level
Note:
Item VII will start after the trusses installed.
Item VIII will start after the insulation installed.
- Start of Installation of Anchor Bolts

Prepared by:
Engr. John Harris Z. Aring
DDBS

WORKING DAYS
MONTH 1

ESTIMATED DAYS

4
8
120
5
23
17
5
7
2
10
2

3
14
10
3
7
4
3
4
3
3
14
10
3
7
3
3
4
3
5
20
15
5
10
8

71

10

11

12

13

14

15

16

17

18

19

20

5
6
5
2
5
1
15
15

10
8
5
6
5
4
10

MONTH 2
21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

MONTH 2
46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

MONTH 3
71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

MONTH 4
96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

MONTH 5
121

122

123

124

125

126

127

128

129

130

131

132

133

134

135

136

137

138

139

140

141

142

143

144

145

MONTH 6
146

147

148

149

150

151

152

153

154

155

156

157

158

159

160

161

162

163

164

165

166

167

168

169

170

171

172

173

174

175

176

177

178

179

180

Project Panda (Cold Storage 6,000MT)

I.
II.
III.
IV.
V.
VI.
VII.
VIII.

Program of Works
Fabrication of Rebars for Footing @ GL A-J/1-15
Footing & Column @ GL A,B,D,H & J/1-15
Tie Beam, Ret. Wall & Slab-on-Grade@ GL A-C/1-15
Tie Beam, Ret. Wall & Slab-on-Grade @ GL I-J/1-15
Tie Beam, Ret. Wall & Slab-on-Grade @ GL D-H/1-15
Machine Room & EE Room
Slab-on-Grade @ C-D & G-I/1-15
Top Slab
Note:
Item VII will start after the trusses installed.
Item VIII will start after the insulation installed.
- Start of Installation of Anchor Bolts

Prepared by:
Engr. John Harris Z. Aring
DDBS

Start (Day)

Finish (Day)

8
8
59
69
79
36

127
57
101
111
143
73

ESTIMATED DAYS

120
51
43
43
65
38
34

14