Académique Documents
Professionnel Documents
Culture Documents
PROJECT :
Water Tank Slab
'file:///var/www/apps/conversion/tmp/scratch_4/313365614.xls'#$Sheet1
April 12, 2016
2:23:36 AM
(3) Loadings :
Dead Load =
=
Live Load =
=
UDL, n =
=
3
3
Long Edge 3 =
Long Edge 4 =
Nd =
0
0
4
(kN/m2)
(kN/m2)
(kN/m2)
(kN/m2)
(kN/m2)
(kN/m2)
(SLS)
(ULS)
(SLS)
(ULS)
(SLS)
(ULS)
460
(N/mm2)
6.00
8.40
40.00
64.00
46.00
72.40
(kNm/m)
17.96
35.91
18.24
36.49
d
(mm)
204
204
192
192
[edge 3]
[edge 1]
lx = 3
[edge 2]
[edge 4]
# : continuous
K
(M/bd2fcu)
0.0123
0.0247
0.0141
0.0283
z
(mm)
193.80
193.80
182.40
182.40
As min As required
(mm2/m) (mm2/m)
325
325
325
463
325
325
325
500
(OK)
(OK)
(OK)
(OK)
Note :
(1) Minimum As / bh
(simply supported)
(N/mm2)
(OK)
23.184 KNm/m
Slab thickness =
Bar Dia.
Spacing
Fcu =
250 mm
35 N/mm2
Fy =
12 mm
460 N/mm2
200 mm
Ast
Err:511
Cover =
Effective d
565.5 mm2/m/face
Err:511
Err:511
40 mm
204 mm
219.2 N/mm2
40 mm
Err:511
104.07 mm
=
1
0.00143
Err:511
=
0.00076
Err:511
Err:511
0.126 mm
Crack Width =
=
fc (N/mm2)
Err:511
=
4.87 N/mm2
<
368 N/mm2
OK
0.00066
<
0.2 mm
OK
<
15.75 N/mm2
OK
0.00175
Min. Ast
Err:511
0.0013
Bending Moment =
437.5 mm2/m/face
(ok)
Vol. of conc =
Vol. of Rebars =
Wt. of rebars =
=
Weightage =
2.25
0.020
1.63
163
Cum
Cum
KN
Kg
72.4 Kg/m3
Soffit Formwork =
9 m2
Vert. Formwork =
3 m2
Vol. of Rebars =
Rebars
Length
Vol
3 0.005089
3 0.005089
3 0.005089
3 0.005089
0.020358
0.020358 cum