JABATAN PENGURUSAN
PEMBANGUNAN DAN HARTA BENDA

LAPORAN HARIAN TAPAK

Tarikh: ________________

Tajuk Projek :

PERSONEL

Bil.

TUKANG

Bil.

TUKANG

Bil.

OPERATOR JENTERA

Project Manager

Carpenters

Metal Workers

Tower Crane Operator

Construction Manager

Barbenders

Ironmongers

Mobile Crane Operator

Project Engineer

Concretors

Joiners

Roller Compactor Operator

Land Surveyor

Bricklayers

Glazier

Excavator Operator

Quantity Surveyor

Plasterer

Painters

Bulldozer Operator

Safety Officer

Paviour

Electrician

Backhoe Operator

Site Supervisor

Roofers

Plumbers

Backpusher Operator

Bil.

CUACA
PAGI

PETANG

Chainman
Buruh Am
JENTERA

Bil.

JENTERA

Bil.

JENTERA

Bil.

Concrete Mixer

Tower Crane

Hydraulic Excavator

Jumping Jack

Mobile Crane

Bulldozer

Vibrator Poker

Material Hoist

Backhoe

B/Bending Machine

Air Compressor

Backpusher

Steel Bar Cutter

Welding Set

Roller Compactor

Compactor (1 ton)

Pump

Motor Grader

Genset

Dumper (Truck)

LAIN-LAIN (Nyatakan)

Bil.

Baik
Gerimis
Hujan

Architect Instruction / Engineer Instruction / Lukisan Yang Di Terima atau Di Keluarkan :

Bahan Yang Sampai Di Tapak:

Pelawat :

KERJA / AKTIVITI / UJIAN YANG DIREKODKAN :

Disediakan Oleh

Di Sahkan Oleh

Jabatan Pengurusan Pembangunan dan Harta Benda

Jabatan Pengurusan Pembangunan dan Harta Benda

Nama:

Nama:

Tarikh:

Tarikh: