Activity ID
Original Start
Duration
Finish
1032.38 30-Jun-14 A
23-Nov-17
8.42%
-99.63
1032.38 30-Jun-14 A
23-Nov-17
8.42%
-99.63
Activity Name
24-Feb-16 15:32
Performance Total Float 14
% Complete
JA
2015
A JJA
2016
JA
2017
A JJA
MIP2-6-1000
LOA
0.00 30-Jun-14 A
MIP2-6-1010
Notice to Proceed
5.00 30-Jun-14 A
24-Jul-14 A
100%
MIP2-6-1020
0.00
06-Oct-15*
0%
-79.38
MIP2-6-1030
0.00
03-Mar-16*
0%
-99.69
MIP2-6-1040
0.00
28-Oct-16*
0%
-99.63
329.00 29-Oct-16
23-Nov-17
0%
-99.63
329.00 29-Oct-16
23-Nov-17
0%
-99.63
706.63 30-Jun-14 A
27-Oct-16
35.56%
-99.63
27-Oct-16,
619.75 30-Jun-14 A
24.00 30-Jun-14 A
01-Jul-16
03-Sep-14 A
37.5%
100%
-2.25
01-Jul-16, PREL
27.00 25-Jul-14 A
03-Oct-14 A
100%
Care of Work
MIP2-6-20050
Care of Work
TENDER DESIGN
PRELIMINARY, CONTRACTUAL
CO
DELIVERABLES
MIP2-6-1050
Insurance
100%
LOA, 30-Jun-14 A
MIP2-6-1060
CIDB
MIP2-6-1070
1.00 25-Jul-14 A
25-Jul-14 A
100%
MIP2-6-1080
1.00 25-Jul-14 A
25-Jul-14 A
100%
MIP2-6-1180
Performance Bond
24.00 28-Jul-14 A
30-Jul-14 A
100%
MIP2-6-1090
DBKL DO Approval
MIP2-6-1170
520.00 23-Sep-14 A
23-Jun-16
19.62%
-4.72
MIP2-6-1171
Services
520.00 23-Sep-14 A
23-Jun-16
19.62%
-4.72
MIP2-6-1172
520.00 23-Sep-14 A
23-Jun-16
19.62%
-4.72
MIP2-6-1173
Temporary Works
520.00 23-Sep-14 A
23-Jun-16
19.62%
-4.72
MIP2-6-1110
6.00 03-Oct-14 A
09-Feb-15
30%
-11.37
MIP2-6-1120
19.15%
-11.37
MIP2-6-1130
3.00 03-Oct-14 A
07-Oct-14 A
MIP2-6-1150
6.00 04-Nov-14 A
09-Feb-15
MIP2-6-1100
SO Confirmation of Work
1.00 05-Nov-14 A
06-Nov-14 A
MIP2-6-1140
Silt Trap
6.00 04-Feb-15*
09-Feb-15
0%
-97.89
MIP2-6-1160
Wash Trough
6.00 04-Feb-15
10-Feb-15
0%
-99.69
3.00 17-Sep-14 A
520.00 03-Oct-14 A
03-Oct-14 A
01-Jul-16
30%
-97.89
100%
Renovation
100%
100%
MIP2-6-1200
Furniture
13.00 01-Oct-14 A
17-Oct-14 A
100%
MIP2-6-1210
Equipment
13.00 18-Oct-14 A
05-Nov-14 A
100%
03-May-16
18-Oct-14 A
40%
100%
100%
532.75 26-Jul-14 A
56.00 26-Jul-14 A
36.88
MIP2-6-1230
1st Stage
1.00 23-Dec-14 A
24-Dec-14 A
MIP2-6-1240
2nd Stage
1.00 15-Apr-15
16-Apr-15
0%
240.25
MIP2-6-1250
3rd Stage
1.00 27-Jan-16
28-Jan-16
0%
5.88
MIP2-6-1260
4th Stage
1.00 30-Apr-16
03-May-16
0%
36.88
Approval
1.00 21-Nov-14 A
Project Quality Pl
Plan (PQP)
MIP2-6-1290
Submission
MIP2-6-1300
Approval
Approval
157.38 26-Jul-14 A
56.00 26-Jul-14 A
1.00 04-Feb-15
156.25 26-Jul-14 A
56.00 26-Jul-14 A
1.00 20-Jan-15 A
127.75 26-Jul-14 A
56.00 26-Jul-14 A
Approval
Environmental M
Management Plan (EMP)
MIP2-6-1350
Method Statement and Equipment Calibration Report
MIP2-6-1360
Approval
MIP2-6-1370
Establish Baseline
Baseli Report
MIP2-6-1390
Noise Level Record
132.88 26-Jul-14 A
56.00 26-Jul-14 A
27-Dec-14 A
13-Oct-14 A
100%
100%
27-Dec-14 A
100%
20-Jan-15 A
07-Oct-14 A
100%
100%
20-Jan-15 A
100%
04-Feb-15
18-Oct-14 A
100%
100%
-19.88
0%
-19.88
04-Feb-15
1.00 12-Dec-14 A
12-Dec-14 A
100%
597.38 26-Jul-14 A
28.00 13-Aug-14 A
30-Apr-16
30-Sep-14 A
100%
100%
46.99
04-Feb-15
0%
64.99
0.88 02-Mar-15
03-Mar-15
0%
46.99
555.38 17-Sep-14 A
6.88 17-Sep-14 A
30-Apr-16
07-Oct-14 A
0%
100%
46.99
4.88 17-Sep-14 A
07-Oct-14 A
100%
3.00 17-Sep-14 A
07-Oct-14 A
100%
MIP2-6-1420
0.88 07-Oct-14 A
MIP2-6-1410
Routine Monitoring
MIP2-6-1440
Approval
07-Oct-14 A
100%
416.88 21-Nov-14 A
30-Apr-16
15.2%
46.99
157.38 26-Jul-14 A
46.00 26-Jul-14 A
04-Feb-15
01-Dec-14 A
100%
100%
-4.72
1.00 04-Feb-15
685.25
231.38
7.00
7.00
04-Feb-15
0%
-4.72
25-Jul-14 A
25-Jul-14 A
25-Jul-14 A
25-Jul-14 A
27-Oct-16
02-May-15
04-Aug-14 A
04-Aug-14 A
27.66%
0%
0%
100%
-99.63
279.25
MIP2-6-1460
7.00 25-Jul-14 A
04-Aug-14 A
100%
MIP2-6-1470
ARCHITECTURE
7.00 25-Jul-14 A
04-Aug-14 A
100%
MIP2-6-1480
7.00 25-Jul-14 A
04-Aug-14 A
100%
MIP2-6-1490
TNB SUBSTATION
7.00 25-Jul-14 A
04-Aug-14 A
100%
6.88 09-Sep-14 A
7.00 09-Sep-14 A
17-Sep-14 A
17-Sep-14 A
0%
100%
2nd Submission
MIP2-6-1500
SUB CONTRACTING
MIP2-6-1510
7.00 09-Sep-14 A
17-Sep-14 A
100%
MIP2-6-1520
ARCHITECTURE
7.00 09-Sep-14 A
17-Sep-14 A
100%
MIP2-6-1530
7.00 09-Sep-14 A
17-Sep-14 A
100%
MIP2-6-1540
TNB SUBSTATION
7.00 09-Sep-14 A
17-Sep-14 A
100%
Actual Work
Remaining Work
Milestone
Page 1 of 33
1.00 04-Feb-15
GENERAL
QAQC Submission
1st Submission
MIP2-6-1450
SUB CONTRACTING
100%
100%
MIP2-6-1380
03-May-16, Traffic M
12-Dec-14 A
08-Dec-14 A
MIP2-6-1400
Erosion Sediment
Sedimen Control Plan (ESCP)
MIP2-6-1430
Submission
Practical Co
100%
05-Nov-14 A
01-Oct-14 A
Traffic Management
Manageme Plan (TMP)
MIP2-6-1220
Report
System Equipment Ro
100%
83.00 25-Jul-14 A
56.00 25-Jul-14 A
Satellite Office
MIP2-6-1190
30-Apr-16, Environm
30-Apr-16, Establish
27-Oct-16,
02-May-15, QAQC Submission
04-Aug-14 A, 1st Submission
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
SUB CONTRACTING
7.00 24-Oct-14 A
7.00 24-Oct-14 A
03-Nov-14 A
03-Nov-14 A
0%
100%
MIP2-6-1560
7.00 24-Oct-14 A
03-Nov-14 A
100%
MIP2-6-1570
ARCHITECTURE
7.00 24-Oct-14 A
03-Nov-14 A
100%
MIP2-6-1580
7.00 24-Oct-14 A
03-Nov-14 A
100%
MIP2-6-1590
TNB SUBSTATION
7.00 24-Oct-14 A
03-Nov-14 A
100%
SUB CONTRACTING
7.00 20-Dec-14 A
7.00 20-Dec-14 A
29-Dec-14 A
29-Dec-14 A
0%
100%
MIP2-6-1610
7.00 20-Dec-14 A
29-Dec-14 A
100%
MIP2-6-1620
ARCHITECTURE
7.00 20-Dec-14 A
29-Dec-14 A
100%
MIP2-6-1630
7.00 20-Dec-14 A
29-Dec-14 A
100%
MIP2-6-1640
TNB SUBSTATION
7.00 20-Dec-14 A
29-Dec-14 A
100%
SUB CONTRACTING
6.88 06-Feb-15 A
7.00 06-Feb-15 A
13-Feb-15 A
13-Feb-15 A
0%
100%
MIP2-6-1660
7.00 06-Feb-15 A
13-Feb-15 A
100%
MIP2-6-1670
ARCHITECTURE
7.00 06-Feb-15 A
13-Feb-15 A
100%
MIP2-6-1680
7.00 06-Feb-15 A
13-Feb-15 A
100%
MIP2-6-1690
TNB SUBSTATION
7.00 06-Feb-15 A
13-Feb-15 A
100%
SUB CONTRACTING
7.00 12-Mar-15
7.00 12-Mar-15
20-Mar-15
20-Mar-15
0%
0%
279.25
279.25
MIP2-6-1710
7.00 12-Mar-15
20-Mar-15
0%
279.25
MIP2-6-1720
ARCHITECTURE
7.00 12-Mar-15
20-Mar-15
0%
279.25
MIP2-6-1730
7.00 12-Mar-15
20-Mar-15
0%
279.25
MIP2-6-1740
TNB SUBSTATION
7.00 12-Mar-15
20-Mar-15
0%
279.25
SUB CONTRACTING
7.00 23-Apr-15
7.00 23-Apr-15
02-May-15
02-May-15
0%
0%
279.25
279.25
MIP2-6-1780
7.00 23-Apr-15
02-May-15
0%
279.25
MIP2-6-1790
ARCHITECTURE
7.00 23-Apr-15
02-May-15
0%
279.25
MIP2-6-1750
7.00 23-Apr-15
02-May-15
0%
279.25
MIP2-6-1760
TNB SUBSTATION
7.00 23-Apr-15
02-May-15
0%
279.25
3rd Submission
MIP2-6-1550
4th Submission
MIP2-6-1600
5th Submission
MIP2-6-1650
6th Submission
MIP2-6-1700
7th Submission
MIP2-6-1770
MIP2-6-1810
Survey Report
10.00 08-Sep-14 A
19-Sep-14 A
100%
MIP2-6-1820
5.00 20-Sep-14 A
25-Sep-14 A
100%
61.13 26-Jan-15 A
1.00 26-Jan-15 A
11-Mar-15
26-Jan-15 A
67%
100%
324.45
60.00 27-Jan-15 A
10-Mar-15
67%
324.45
1.00 10-Mar-15
11-Mar-15
0%
324.45
Soil Investigation
MIP2-6-1850
S. I. Report
Dilapidation Survey
Surv
MIP2-6-1860
Proposal
MIP2-6-1870
MIP2-6-1880
32.13 08-Aug-14 A
9.00 08-Aug-14 A
15-Sep-14 A
19-Aug-14 A
100%
100%
100%
8.00 19-Aug-14 A
28-Aug-14 A
15.00 28-Aug-14 A
15-Sep-14 A
100%
294.75 10-Dec-14 A
7.00 10-Dec-14 A
08-Sep-15
17-Dec-14 A
81.1%
100%
24-Dec-14 A
100%
MIP2-6-1890
5.00 20-Dec-14 A
23-Dec-14 A
100%
MIP2-6-1910
Install Inclinometer
7.00 27-Dec-14 A
13-Jan-15 A
100%
MIP2-6-1930
3.00 27-Dec-14 A
13-Jan-15 A
100%
MIP2-6-1940
5.00 04-Feb-15
09-Feb-15
0%
172.88
Monitoring
MIP2-6-1950
182.75 09-Jan-15 A
58.00 09-Jan-15 A
08-Sep-15
15-Apr-15
2.08%
6.25%
172.88
172.88
MIP2-6-1960
60.00 15-Apr-15
25-Jun-15
0%
172.88
MIP2-6-1970
61.00 26-Jun-15
08-Sep-15
0%
172.88
122.94 07-Jun-16
11.00 07-Jun-16
27-Oct-16
20-Jun-16
0%
0%
-99.63
2.31
MIP2-6-2020
10.00 25-Aug-16
07-Sep-16
0%
-67.63
MIP2-6-1980
Bomba Inspection
10.00 27-Aug-16
05-Sep-16
0%
-66.38
MIP2-6-1990
TNB Inspection
10.00 05-Oct-16
17-Oct-16
0%
-99.63
MIP2-6-2000
Majlis Perbandaran
10.00 22-Oct-16
27-Oct-16
0%
-99.63
174.00 25-Feb-15
3.00 18-Sep-15
22-Sep-15
22-Sep-15
0%
0%
162.25
162.25
90.00 25-Feb-15
89.00 25-Feb-15
11-Jun-15
10-Jun-15
0%
0%
222.25
162.25
STRUCTURE
MIP2-6-2040
MIP2-6-2050
Metal Works
Approval
ARCHITECTURE
MIP2-6-2060
Finishes
MIP2-6-2070
Approval
1.00 10-Jun-15
11-Jun-15
0%
222.25
120.00 25-Feb-15
119.00 25-Feb-15
16-Jul-15
15-Jul-15
0%
0%
35.38
35.38
1.00 15-Jul-15
16-Jul-15
0%
35.38
60.00 25-Feb-15
59.00 25-Feb-15
07-May-15
06-May-15
0%
0%
252.25
252.25
MIP2-6-2100
59.00 25-Feb-15
06-May-15
0%
252.25
MIP2-6-2120
Telecommunication
59.00 25-Feb-15
06-May-15
0%
252.25
MIP2-6-2140
59.00 25-Feb-15
06-May-15
0%
252.25
MIP2-6-2160
Generator Set
59.00 25-Feb-15
06-May-15
0%
252.25
MIP2-6-2090
Approval
1.00 06-May-15
07-May-15
0%
252.25
MIP2-6-2110
Approval
1.00 06-May-15
07-May-15
0%
252.25
MIP2-6-2130
Approval
1.00 06-May-15
07-May-15
0%
252.25
MIP2-6-2150
Approval
1.00 06-May-15
07-May-15
0%
252.25
MIP2-6-2170
Approval
1.00 06-May-15
07-May-15
0%
252.25
ELECTRICAL
MIP2-6-2080
Actual Work
Remaining Work
Milestone
Page 2 of 33
172.88
5.00 19-Dec-14 A
2017
A JJA
SHOP DRAWING
MIP2-6-2030
MIP2-6-1900
APPROVAL BY AUTHORITIES
AU
MIP2-6-2010
Landscape Department
2016
JA
100%
100%
MIP2-6-1840
25-Sep-14 A
08-Sep-14 A
Soil Investigation
MIP2-6-1830
Request Start Soil Investigation Work By R.E.
2015
A JJA
19.88 02-Sep-14 A
5.00 02-Sep-14 A
Site Survey
MIP2-6-1800
08-Sep-15, Monitoring
27-Oct-16, A
16-Jul-15, ARCHITECTURE
07-May-15, ELECTRICAL
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
2015
A JJA
2016
JA
2017
A JJA
61.00 10-Jun-15
60.00 10-Jun-15
21-Aug-15
20-Aug-15
0%
0%
162.25
162.25
MIP2-6-2200
Cold Water
60.00 10-Jun-15
20-Aug-15
0%
162.25
MIP2-6-2220
60.00 10-Jun-15
20-Aug-15
0%
162.25
MIP2-6-2240
60.00 10-Jun-15
20-Aug-15
0%
162.25
MIP2-6-2260
Lift Service
60.00 10-Jun-15
20-Aug-15
0%
162.25
MIP2-6-2190
Approval
1.00 20-Aug-15
21-Aug-15
0%
162.25
MIP2-6-2210
Approval
1.00 20-Aug-15
21-Aug-15
0%
162.25
MIP2-6-2230
Approval
1.00 20-Aug-15
21-Aug-15
0%
162.25
MIP2-6-2250
Approval
1.00 20-Aug-15
21-Aug-15
0%
162.25
MIP2-6-2270
Approval
1.00 20-Aug-15
21-Aug-15
0%
162.25
99.00 09-May-16
06-Sep-16
0%
-57.50
06-Sep-16, PR
89.00 19-May-16
89.00 19-May-16
21.00 19-May-16
06-Sep-16
06-Sep-16
15-Jun-16
0%
0%
0%
-57.50
-57.50
-57.50
06-Sep-16, LI
06-Sep-16, LI
MECHANICAL
MIP2-6-2180
20.00 15-Jun-16
12-Jul-16
0%
-57.50
MIP2-6-2300
20.00 15-Jun-16
12-Jul-16
0%
-57.50
MIP2-6-2310
Cable
20.00 15-Jun-16
12-Jul-16
0%
-57.50
MIP2-6-2320
28.00 12-Jul-16
12-Aug-16
0%
-57.50
MIP2-6-2330
20.00 12-Aug-16
06-Sep-16
0%
-57.50
57.13 09-May-16
30.00 09-May-16
22-Jul-16
10-Jun-16
0%
0%
-18.63
-18.63
30.00 10-Jun-16
22-Jul-16
0%
-18.63
Measurement
49.38 04-Jul-16
20.00 04-Jul-16
29-Aug-16
28-Jul-16
0%
0%
-60.75
-60.75
MIP2-6-2370
Fabrication
20.00 29-Jul-16
19-Aug-16
0%
-60.75
MIP2-6-2380
Delivery
10.00 19-Aug-16
29-Aug-16
0%
-60.75
547.63 20-Sep-14 A
16-Jul-16
13.99%
-13.88
57.00 20-Sep-14 A
13-Feb-15
85%
21.70
30.00 27-Nov-14 A
18-Feb-15
PROVISIONAL SUM
SU
MIP2-6-2390
MIP2-6-2400
85.42%
21.70
MIP2-6-2410
146.00 04-Feb-15
29-Jul-15
0%
276.38
MIP2-6-2430
118.00 04-Feb-15
24-Jun-15
0%
295.25
MIP2-6-2420
61.00 25-Mar-16
07-Jun-16
0%
2.31
PROTECTION & R
RELOCATION OF UTILITIES
MIP2-6-2440
Receive Utility Information From Consultant
229.75 20-Sep-14 A
29.00 20-Sep-14 A
0%
100%
81.88
08-Oct-15
26-Dec-14 A
MIP2-6-2450
30.00 20-Nov-14 A
10-Mar-15
50%
21.70
MIP2-6-2460
30.00 17-Mar-15*
20-Apr-15
0%
15.88
MIP2-6-2470
Approval
10.00 21-Apr-15
02-May-15
0%
15.88
80.00 02-May-15
15.00 02-May-15
07-Aug-15
21-May-15
0%
0%
81.88
81.88
TELECOMUNICAT
TELECOMUNICATION
WORKS
MIP2-6-2480
Excavation
MIP2-6-2490
15.00 21-May-15
09-Jun-15
0%
81.88
MIP2-6-2500
Manhole Installation
25.00 09-Jun-15
07-Jul-15
0%
81.88
MIP2-6-2510
Backfilling
10.00 07-Jul-15
21-Jul-15
0%
81.88
MIP2-6-2520
15.00 21-Jul-15
07-Aug-15
0%
81.88
120.50 02-May-15
15.00 02-May-15
26-Sep-15
21-May-15
0%
0%
81.88
116.88
ELECTRICAL WORKS
WO
MIP2-6-2530
Excavation
MIP2-6-2540
30.00 21-May-15
25-Jun-15
0%
116.88
MIP2-6-2550
Backfilling
11.25 07-Aug-15
20-Aug-15
0%
81.88
MIP2-6-2560
15.25 20-Aug-15
09-Sep-15
0%
81.88
MIP2-6-2570
14.00 09-Sep-15
26-Sep-15
0%
81.88
130.38 02-May-15
15.00 02-May-15
08-Oct-15
21-May-15
0%
0%
81.88
112.00
STREET LIGHTIN
LIGHTING WORKS
MIP2-6-2580
Excavation
MIP2-6-2590
20.00 21-May-15
15-Jun-15
0%
112.00
MIP2-6-2600
Backfilling
30.00 15-Jun-15
21-Jul-15
0%
112.00
MIP2-6-2610
10.00 21-Jul-15
01-Aug-15
0%
112.00
MIP2-6-2620
15.38 01-Aug-15
19-Aug-15
0%
112.00
MIP2-6-2630
10.00 26-Sep-15
08-Oct-15
0%
81.88
99.00 02-May-15
15.00 02-May-15
29-Aug-15
21-May-15
0%
0%
15.88
15.88
WATER RETICULATION
RETICUL
MIP2-6-2640
JBA Approval
MIP2-6-2650
Excavation
30.00 21-May-15
25-Jun-15
0%
15.88
MIP2-6-2660
30.00 26-Jun-15
01-Aug-15
0%
15.88
MIP2-6-2670
Backfilling
9.00 01-Aug-15
12-Aug-15
0%
15.88
MIP2-6-2680
15.00 12-Aug-15
29-Aug-15
0%
15.88
224.00 29-Aug-15
165.00 29-Aug-15
30.38 29-Aug-15
28-May-16
19-Mar-16
03-Oct-15
0%
0%
0%
15.88
74.88
15.88
29.00 03-Oct-15
06-Nov-15
0%
15.88
1.00 06-Nov-15
07-Nov-15
0%
15.88
87.00 03-Dec-15
19-Mar-16
0%
74.88
167.00 07-Nov-15
30.38 07-Nov-15
28-May-16
10-Dec-15
0%
0%
15.88
15.88
29.00 10-Dec-15
15-Jan-16
0%
15.88
Unforseen Design/Authorities
Design
Requirement
Architectural Design
Des
MIP2-6-2690
Discussion Progress
MIP2-6-2700
Design
MIP2-6-2710
Approval
MIP2-6-2720
Additional Work
C&S Design
MIP2-6-2730
Discussion Progress
MIP2-6-2740
Design
MIP2-6-2750
Approval
MIP2-6-2760
Additional Work
Design
MIP2-6-2790
Approval
Actual Work
Remaining Work
Milestone
1.00 18-Jan-16
19-Jan-16
0%
15.88
87.00 17-Feb-16
28-May-16
0%
15.88
165.00 07-Nov-15
30.38 07-Nov-15
26-May-16
10-Dec-15
0%
0%
17.88
17.88
29.00 10-Dec-15
15-Jan-16
0%
17.88
1.00 15-Jan-16
16-Jan-16
0%
17.88
Page 3 of 33
21-Aug-15, MECHANICAL
22-Jul-16, Car P
29-Aug-16, Of
16-Jul-16, PROV
07-Aug-15, TELECOMUNICATI
26-Sep-15, ELECTRICAL WO
28-May-16, Unfors
19-Mar-16, Architectu
28-May-16, C&S D
26-May-16, Additio
Activity ID
Original Start
Duration
Activity Name
MIP2-6-2800
Additional Work
Additional Interfacing
Interfac
M&E C&S Architectural and System Work
MIP2-6-2810
Interfacing Progress and Decision
Architectural Design
Des
MIP2-6-2820
Design
MIP2-6-2830
Approval
MIP2-6-2840
Additional Work
C&S Design
MIP2-6-2850
Design
MIP2-6-2860
Approval
MIP2-6-2870
Additional Work
M&E Design
MIP2-6-2880
Design
MIP2-6-2890
Approval
MIP2-6-2900
Additional Work
Interfacing Work W
With Taman Mewar Station and Adjacent Develo pment
MIP2-6-2910
Taman Mewar Station
MIP2-6-2920
Adjacent Development
24-Feb-16 15:32
Finish
2016
JA
2017
A JJA
87.00 15-Feb-16
26-May-16
0%
17.88
26-May-16
10-Dec-15
0%
0%
17.88
17.88
26-May-16, Additio
138.00 10-Dec-15
29.00 10-Dec-15
26-May-16
15-Jan-16
0%
0%
17.88
17.88
26-May-16, Archite
1.00 15-Jan-16
16-Jan-16
0%
17.88
87.00 15-Feb-16
26-May-16
0%
17.88
138.00 10-Dec-15
29.00 10-Dec-15
26-May-16
15-Jan-16
0%
0%
17.88
17.88
1.00 15-Jan-16
16-Jan-16
0%
17.88
87.00 15-Feb-16
26-May-16
0%
17.88
138.00 10-Dec-15
29.00 10-Dec-15
26-May-16
15-Jan-16
0%
0%
17.88
17.88
1.00 15-Jan-16
16-Jan-16
0%
17.88
87.00 15-Feb-16
26-May-16
0%
17.88
146.00 04-Feb-15
146.00 04-Feb-15
29-Jul-15
29-Jul-15
0%
0%
276.38
276.38
146.00 04-Feb-15
29-Jul-15
0%
276.38
263.00 29-Aug-15
114.00 29-Aug-15
27.00 29-Aug-15
16-Jul-16
16-Jan-16
03-Oct-15
0%
0%
0%
-23.00
-23.00
-23.00
Stump
10.00 03-Oct-15
15-Oct-15
0%
-23.00
MIP2-6-2950
Ground Beam
10.00 16-Oct-15
27-Oct-15
0%
-23.00
MIP2-6-2960
Ground Slab
9.00 27-Oct-15
06-Nov-15
0%
-23.00
MIP2-6-2970
Column
10.00 06-Nov-15
19-Nov-15
0%
-23.00
MIP2-6-2980
Roof Beam
19.00 19-Nov-15
10-Dec-15
0%
-23.00
MIP2-6-2990
Roof Truss
Roof Covering
2015
A JJA
165.00 07-Nov-15
27.00 07-Nov-15
MIP2-6-2940
ARCHITECTURE
MIP2-6-3000
29.00 11-Dec-15
16-Jan-16
0%
-23.00
149.00 16-Jan-16
19.00 16-Jan-16
16-Jul-16
11-Feb-16
0%
0%
-23.00
-23.00
MIP2-6-3010
Brick Work
20.00 12-Feb-16
05-Mar-16
0%
-23.00
MIP2-6-3020
Plastering
30.00 05-Mar-16
08-Apr-16
0%
-23.00
MIP2-6-3030
Floor Screeding
20.00 09-Apr-16
03-May-16
0%
-23.00
MIP2-6-3040
10.00 03-May-16
14-May-16
0%
-23.00
MIP2-6-3050
Ceiling
10.00 14-May-16
27-May-16
0%
-23.00
MIP2-6-3060
Painting
10.00 27-May-16
09-Jun-16
0%
-23.00
MIP2-6-3070
Perimeter Drain
0%
-23.00
26-May-16, C&S D
26-May-16, M&E D
16-Jul-16, Car p
16-Jan-16, STRUCTURE
16-Jul-16, ARCH
30.00 09-Jun-16
16-Jul-16
620.38 06-Nov-14 A
19-Oct-16
1.71%
-92.50
19-Oct-16,
SITE PREPARATION
PREPARATIO
MIP2-6-3080
Temporary Access Road
248.00 06-Nov-14 A
248.00 06-Nov-14 A
31-Jul-15
31-Jul-15
14.64%
40.27%
205.13
205.13
Site Clearance, D
Demolition & Earthwork
MIP2-6-3090
General Site Clearance
248.00 06-Nov-14 A
2.00 06-Nov-14 A
31-Jul-15
08-Nov-14 A
7.11%
100%
205.13
13-Feb-15
85%
344.55
145.63 11-Mar-15
11.25 28-Mar-15
31-Jul-15
10-Apr-15
0%
0%
75.13
-19.88
15.00 11-Mar-15
9.00 11-Mar-15
28-Mar-15
21-Mar-15
0%
0%
-19.88
-19.88
CONSTRUCTION
MIP2-6-3100
Earthwork
MIP2-6-3120
Remove Construction
Constr
Debris
MIP2-6-3130
Level 60m and 59m
MIP2-6-3140
31-Jul-15, Earthwork
28-Mar-15, Remove Construction Deb
6.00 21-Mar-15
28-Mar-15
0%
-19.88
Level 57m
119.38 10-Apr-15
9.00 10-Apr-15
31-Jul-15
20-Apr-15
0%
0%
75.13
-19.88
MIP2-6-3160
Level 58m
14.00 20-Apr-15
08-May-15
0%
-19.88
MIP2-6-3170
Level 59m
20.00 08-May-15
01-Jun-15
0%
-19.88
MIP2-6-3180
Level 60m
30.00 01-Jun-15
07-Jul-15
0%
75.13
MIP2-6-3190
Level 61m
45.00 08-Jul-15
31-Jul-15
0%
75.13
29.00 04-Feb-15
29.00 04-Feb-15
11-Mar-15
11-Mar-15
0%
0%
-19.88
-19.88
-79.44
0%
0%
-79.44
-79.44
Import Earth
MIP2-6-3150
58.00 08-Nov-14 A
GROUND TREATMENT
TREAT
MIP2-6-3200
Disposal Unsuitable Material
STRUCTURAL TEST
TES PILE IN FOUNDATION ENGINEER DRAWING
MIP2-6-3210
Boring
122.50 29-Nov-14 A
1.00 29-Nov-14 A
25-Feb-15
29-Nov-14 A
7.72%
100%
MIP2-6-3220
Steel Bar
1.00 01-Dec-14 A
01-Dec-14 A
100%
MIP2-6-3230
Concrete
1.00 02-Dec-14 A
02-Dec-14 A
100%
MIP2-6-3240
Approval
2.00 16-Dec-14 A
16-Dec-14 A
100%
Report
11.00 10-Feb-15
2.00 10-Feb-15
25-Feb-15
12-Feb-15
9.00 12-Feb-15
25-Feb-15
0%
-79.44
100%
100%
-78.44
24-Feb-15
0%
-78.44
09-Dec-15
09-Dec-15
04-Jul-15
0%
0%
0%
43.31
-34.69
-34.69
16.00 04-Feb-15 A
14.00 04-Feb-15 A
24-Feb-15
06-Feb-15 A
Report
10.00 10-Feb-15
RETAINING WALL
Reinforced Modular
Modu Wall
MIP2-6-3290
Earthwork to Platform Level
250.94 10-Feb-15
134.81 29-Jun-15
5.00 29-Jun-15
MIP2-6-3300
5.00 04-Jul-15
10-Jul-15
0%
-34.69
MIP2-6-3310
7.00 10-Jul-15
25-Jul-15
0%
-34.69
MIP2-6-3320
7.00 25-Jul-15
01-Aug-15
0%
-34.69
Layer 1
MIP2-6-3330
14.88 01-Aug-15
9.88 01-Aug-15
19-Aug-15
13-Aug-15
0%
0%
-34.69
-34.69
MIP2-6-3340
1.00 13-Aug-15
14-Aug-15
0%
-34.69
MIP2-6-3350
3.00 14-Aug-15
18-Aug-15
0%
-34.69
MIP2-6-3360
Sand Blanket
1.00 18-Aug-15
19-Aug-15
0%
-34.69
13.88 19-Aug-15
7.88 19-Aug-15
07-Sep-15
29-Aug-15
0%
0%
-34.69
-34.69
Layer 2
MIP2-6-3370
Actual Work
Remaining Work
Milestone
Page 4 of 33
09-Dec-15, RETAINING W
09-Dec-15, Reinforced Mo
19-Aug-15, Layer 1
07-Sep-15, Layer 2
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
MIP2-6-3380
1.00 29-Aug-15
01-Sep-15
0%
-34.69
MIP2-6-3390
1.00 01-Sep-15
02-Sep-15
0%
-34.69
MIP2-6-3400
3.00 02-Sep-15
05-Sep-15
0%
-34.69
MIP2-6-3410
Sand Blanket
Layer 3
MIP2-6-3420
1.00 05-Sep-15
07-Sep-15
0%
-34.69
12.88 07-Sep-15
7.88 07-Sep-15
22-Sep-15
15-Sep-15
0%
0%
-34.69
-34.69
MIP2-6-3430
1.00 15-Sep-15
17-Sep-15
0%
-34.69
MIP2-6-3440
3.00 17-Sep-15
21-Sep-15
0%
-34.69
MIP2-6-3450
Sand Blanket
1.00 21-Sep-15
22-Sep-15
0%
-34.69
12.88 22-Sep-15
7.88 22-Sep-15
08-Oct-15
02-Oct-15
0%
0%
-34.69
-34.69
Layer 4
MIP2-6-3460
MIP2-6-3470
1.00 02-Oct-15
03-Oct-15
0%
-34.69
MIP2-6-3480
3.00 03-Oct-15
07-Oct-15
0%
-34.69
MIP2-6-3490
Sand Blanket
1.00 07-Oct-15
08-Oct-15
0%
-34.69
12.88 08-Oct-15
7.88 08-Oct-15
23-Oct-15
17-Oct-15
0%
0%
-34.69
-34.69
Layer 5
MIP2-6-3500
MIP2-6-3510
1.00 17-Oct-15
19-Oct-15
0%
-34.69
MIP2-6-3520
3.00 19-Oct-15
22-Oct-15
0%
-34.69
MIP2-6-3530
Sand Blanket
1.00 22-Oct-15
23-Oct-15
0%
-34.69
13.88 23-Oct-15
8.88 23-Oct-15
09-Nov-15
03-Nov-15
0%
0%
-34.69
-34.69
Layer 6
MIP2-6-3540
MIP2-6-3550
1.00 03-Nov-15
04-Nov-15
0%
-34.69
MIP2-6-3560
3.00 04-Nov-15
07-Nov-15
0%
-34.69
MIP2-6-3570
Sand Blanket
1.00 07-Nov-15
09-Nov-15
0%
-34.69
12.88 09-Nov-15
7.88 09-Nov-15
25-Nov-15
19-Nov-15
0%
0%
-34.69
-34.69
Layer 7
MIP2-6-3580
MIP2-6-3590
1.00 19-Nov-15
20-Nov-15
0%
-34.69
MIP2-6-3600
3.00 20-Nov-15
24-Nov-15
0%
-34.69
MIP2-6-3610
Sand Blanket
1.00 24-Nov-15
25-Nov-15
0%
-34.69
12.88 25-Nov-15
7.88 25-Nov-15
09-Dec-15
03-Dec-15
0%
0%
-34.69
-34.69
Layer 8
MIP2-6-3620
MIP2-6-3630
1.00 03-Dec-15
04-Dec-15
0%
-34.69
MIP2-6-3640
3.00 04-Dec-15
08-Dec-15
0%
-34.69
MIP2-6-3650
Sand Blanket
1.00 08-Dec-15
09-Dec-15
0%
-34.69
64.88 10-Feb-15
27.88 27-Mar-15
1.00 27-Mar-15
28-Apr-15
28-Apr-15
28-Mar-15
0%
0%
0%
229.38
0.50
0.50
Wall 4
RC. Wall 1(11.6m)
MIP2-6-3660
Survey Setting out
MIP2-6-3670
5.88 28-Mar-15
03-Apr-15
0%
4.50
MIP2-6-3680
Earthwork
5.00 03-Apr-15
03-Apr-15
0%
4.50
MIP2-6-3690
Base Preparation
3.00 03-Apr-15
07-Apr-15
0%
4.50
MIP2-6-3700
Formwork
6.00 07-Apr-15
14-Apr-15
0%
4.50
MIP2-6-3710
Steel Bar
4.00 14-Apr-15
18-Apr-15
0%
4.50
MIP2-6-3720
Concrete
2.00 18-Apr-15
22-Apr-15
0%
4.50
MIP2-6-3730
Remove Formwork
1.00 27-Apr-15
28-Apr-15
0%
0.50
44.88 10-Feb-15
5.00 10-Feb-15
04-Apr-15
16-Feb-15
0%
0%
249.38
0.50
Platform
MIP2-6-3750
1.00 16-Feb-15
17-Feb-15
0%
0.50
MIP2-6-3760
19.00 17-Feb-15
13-Mar-15
0%
0.50
MIP2-6-3770
10.00 13-Mar-15
25-Mar-15
0%
0.50
MIP2-6-3780
Concrete
2.00 25-Mar-15
27-Mar-15
0%
0.50
MIP2-6-3790
7.88 27-Mar-15
04-Apr-15
0%
249.38
25.88 28-Mar-15
1.00 28-Mar-15
27-Apr-15
28-Mar-15
0%
0%
0.50
0.50
MIP2-6-3810
5.88 30-Mar-15
04-Apr-15
0%
0.50
MIP2-6-3820
Earthwork
5.00 04-Apr-15
10-Apr-15
0%
0.50
MIP2-6-3830
Base Preparation
3.00 10-Apr-15
14-Apr-15
0%
0.50
MIP2-6-3840
Formwork
5.00 14-Apr-15
20-Apr-15
0%
0.50
MIP2-6-3850
Steel Bar
3.00 20-Apr-15
23-Apr-15
0%
0.50
MIP2-6-3860
Concrete
2.00 23-Apr-15
25-Apr-15
0%
0.50
MIP2-6-3870
Remove Formwork
1.00 25-Apr-15
27-Apr-15
0%
0.50
216.38 06-Dec-14 A
114.00 10-Feb-15
2.00 10-Feb-15
15-Oct-15
26-Jun-15
12-Feb-15
4.39%
0%
0%
18.88
-79.44
-72.06
25-Feb-15
25-Feb-15
25-Feb-15
25-Feb-15
02-May-15
02-May-15
12-Mar-15
26-Feb-15
0%
0%
0%
0%
-46.63
-46.63
-41.63
-79.44
ELEVATED STRUCTURE
STRUC
BORED PILE & CONTIGUOS BORED PILE RET
Bore pile Team 1
MIP2-6-3880
Cut off Existing pile
57.00
57.00
13.00
1.00
MIP2-6-3900
Boring
10.00 26-Feb-15
10-Mar-15
0%
-79.44
MIP2-6-3910
10.00 27-Feb-15
11-Mar-15
0%
-41.63
MIP2-6-3920
Concrete
10.00 28-Feb-15
12-Mar-15
0%
-41.63
14.00 10-Mar-15
2.00 10-Mar-15
26-Mar-15
12-Mar-15
0%
0%
-43.63
-79.44
MIP2-6-3940
Boring
10.00 12-Mar-15
24-Mar-15
0%
-79.44
MIP2-6-3950
10.00 13-Mar-15
25-Mar-15
0%
-43.63
MIP2-6-3960
Concrete
10.00 14-Mar-15
26-Mar-15
0%
-43.63
13.00 24-Mar-15
1.00 24-Mar-15
07-Apr-15
25-Mar-15
0%
0%
-44.63
-79.44
Boring
10.00 25-Mar-15
04-Apr-15
0%
-79.44
Zone A
Bore Pile 2.2m
Row 1
MIP2-6-3890
Row 2
MIP2-6-3930
Row 3
MIP2-6-3970
MIP2-6-3980
Actual Work
Remaining Work
Milestone
Page 5 of 33
2015
A JJA
2016
JA
2017
A JJA
22-Sep-15, Layer 3
08-Oct-15, Layer 4
23-Oct-15, Layer 5
09-Nov-15, Layer 6
25-Nov-15, Layer 7
09-Dec-15, Layer 8
28-Apr-15, Wall 4
28-Apr-15, RC. Wall 1(11.6m)
26-Mar-15, Row 2
07-Apr-15, Row 3
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
MIP2-6-3990
10.00 26-Mar-15
06-Apr-15
0%
-44.63
MIP2-6-4000
Concrete
10.00 27-Mar-15
07-Apr-15
0%
-44.63
12.00 04-Apr-15
1.00 04-Apr-15
18-Apr-15
06-Apr-15
0%
0%
-45.63
-79.44
Row 4
MIP2-6-4010
MIP2-6-4020
Boring
9.00 06-Apr-15
16-Apr-15
0%
-79.44
MIP2-6-4030
9.00 07-Apr-15
17-Apr-15
0%
-45.63
MIP2-6-4040
Concrete
9.00 08-Apr-15
18-Apr-15
0%
-45.63
13.00 16-Apr-15
1.00 16-Apr-15
02-May-15
17-Apr-15
0%
0%
-46.63
-79.44
MIP2-6-4060
Boring
10.00 17-Apr-15
29-Apr-15
0%
-79.44
MIP2-6-4070
10.00 18-Apr-15
30-Apr-15
0%
-46.63
MIP2-6-4080
Concrete
10.00 20-Apr-15
02-May-15
0%
-46.63
30.00
30.00
12.00
2.00
29-Apr-15
29-Apr-15
29-Apr-15
29-Apr-15
04-Jun-15
04-Jun-15
15-May-15
02-May-15
0%
0%
0%
0%
-77.44
-77.44
-75.44
-79.44
Row 5
MIP2-6-4050
Zone D
Bore Pile 2.2m
Row 1
MIP2-6-4090
MIP2-6-4100
Boring
8.00 02-May-15
13-May-15
0%
-79.44
MIP2-6-4110
8.00 05-May-15
14-May-15
0%
-75.44
MIP2-6-4120
Concrete
8.00 06-May-15
15-May-15
0%
-75.44
11.00 13-May-15
1.00 13-May-15
25-May-15
14-May-15
0%
0%
-76.44
-79.44
Row 2
MIP2-6-4130
MIP2-6-4140
Boring
8.00 14-May-15
23-May-15
0%
-79.44
MIP2-6-4150
8.00 15-May-15
23-May-15
0%
-76.44
MIP2-6-4160
Concrete
8.00 16-May-15
25-May-15
0%
-76.44
11.00 23-May-15
1.00 23-May-15
04-Jun-15
23-May-15
0%
0%
-77.44
-79.44
Row 3
MIP2-6-4170
MIP2-6-4180
Boring
8.00 25-May-15
02-Jun-15
0%
-79.44
MIP2-6-4190
8.00 26-May-15
03-Jun-15
0%
-77.44
MIP2-6-4200
Concrete
8.00 27-May-15
04-Jun-15
0%
-77.44
02-Jun-15
02-Jun-15
02-Jun-15
02-Jun-15
26-Jun-15
26-Jun-15
12-Jun-15
03-Jun-15
0%
0%
0%
0%
-79.44
-79.44
-77.44
-79.44
Zone G
Bore Pile 2.2m
Row 1
MIP2-6-4210
20.00
20.00
8.00
1.00
MIP2-6-4220
Boring
5.00 03-Jun-15
10-Jun-15
0%
-79.44
MIP2-6-4230
5.00 04-Jun-15
11-Jun-15
0%
-77.44
MIP2-6-4240
Concrete
5.00 05-Jun-15
12-Jun-15
0%
-77.44
8.00 10-Jun-15
1.00 10-Jun-15
19-Jun-15
11-Jun-15
0%
0%
-78.44
-79.44
MIP2-6-4260
Boring
5.00 11-Jun-15
17-Jun-15
0%
-79.44
MIP2-6-4270
5.00 12-Jun-15
18-Jun-15
0%
-78.44
MIP2-6-4280
Concrete
5.00 13-Jun-15
19-Jun-15
0%
-78.44
8.00 17-Jun-15
1.00 17-Jun-15
26-Jun-15
18-Jun-15
0%
0%
-79.44
-79.44
MIP2-6-4300
Boring
5.00 18-Jun-15
24-Jun-15
0%
-79.44
MIP2-6-4310
5.00 19-Jun-15
25-Jun-15
0%
-79.44
MIP2-6-4320
Concrete
Row 2
MIP2-6-4250
Row 3
MIP2-6-4290
5.00 20-Jun-15
26-Jun-15
0%
-79.44
168.25 12-Feb-15
3.00 12-Feb-15
03-Sep-15
16-Feb-15
0%
0%
52.00
-72.06
159.25 25-Feb-15
27.63 25-Feb-15
1.00 25-Feb-15
03-Sep-15
28-Mar-15
26-Feb-15
0%
0%
0%
52.00
-35.63
-78.06
MIP2-6-4350
Boring
24.63 26-Feb-15
26-Mar-15
0%
-78.06
MIP2-6-4360
24.63 27-Feb-15
27-Mar-15
0%
-35.63
MIP2-6-4370
Concrete
24.63 28-Feb-15
28-Mar-15
0%
-35.63
14.75 26-Mar-15
1.00 26-Mar-15
13-Apr-15
27-Mar-15
0%
0%
-25.00
-78.06
MIP2-6-4390
Boring
12.00 27-Mar-15
10-Apr-15
0%
-25.00
MIP2-6-4400
11.75 28-Mar-15
11-Apr-15
0%
-25.00
MIP2-6-4410
Concrete
11.75 30-Mar-15
13-Apr-15
0%
-25.00
21.38 27-Mar-15
1.00 27-Mar-15
21-Apr-15
28-Mar-15
0%
0%
-75.69
-78.06
MIP2-6-4430
Boring
18.50 28-Mar-15
18-Apr-15
0%
-78.06
MIP2-6-4440
18.38 30-Mar-15
20-Apr-15
0%
-75.69
MIP2-6-4450
Concrete
18.38 31-Mar-15
21-Apr-15
0%
-75.69
24.50 18-Apr-15
1.88 18-Apr-15
19-May-15
21-Apr-15
0%
0%
-78.06
-78.06
MIP2-6-4470
Boring
20.63 21-Apr-15
16-May-15
0%
-78.06
MIP2-6-4480
20.63 22-Apr-15
18-May-15
0%
-78.06
MIP2-6-4490
Concrete
20.63 23-Apr-15
19-May-15
0%
-78.06
8.88 16-May-15
1.00 16-May-15
27-May-15
18-May-15
0%
0%
-77.94
-77.94
MIP2-6-4510
Boring
5.88 18-May-15
25-May-15
0%
-77.94
MIP2-6-4520
5.88 19-May-15
26-May-15
0%
-77.94
MIP2-6-4530
Concrete
5.88 20-May-15
27-May-15
0%
-77.94
81.75 27-May-15
1.00 27-May-15
03-Sep-15
28-May-15
0%
0%
52.00
52.00
MIP2-6-4550
Boring
26.25 28-May-15
29-Jun-15
0%
52.00
MIP2-6-4560
26.25 30-Jun-15
01-Aug-15
0%
52.00
MIP2-6-4570
Concrete
26.25 03-Aug-15
03-Sep-15
0%
52.00
Zone C
MIP2-6-4380
Zone D
MIP2-6-4420
Zone E2
MIP2-6-4460
Zone I
MIP2-6-4500
Zone H2
MIP2-6-4540
Actual Work
Remaining Work
Milestone
Page 6 of 33
2015
A JJA
2016
JA
2017
A JJA
18-Apr-15, Row 4
02-May-15, Row 5
04-Jun-15, Zone D
04-Jun-15, Bore Pile 2.2m
15-May-15, Row 1
25-May-15, Row 2
04-Jun-15, Row 3
26-Jun-15, Zone G
26-Jun-15, Bore Pile 2.2m
12-Jun-15, Row 1
19-Jun-15, Row 2
26-Jun-15, Row 3
13-Apr-15, Zone C
21-Apr-15, Zone D
19-May-15, Zone E2
27-May-15, Zone I
03-Sep-15, Zone H2
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
85.38
85.38
32.50
1.00
MIP2-6-4590
Boring
29.50 26-Feb-15
01-Apr-15
0%
-79.38
MIP2-6-4600
29.50 27-Feb-15
02-Apr-15
0%
-73.06
MIP2-6-4610
Concrete
29.50 28-Feb-15
03-Apr-15
0%
-73.06
22.38 01-Apr-15
1.00 01-Apr-15
27-Apr-15
02-Apr-15
0%
0%
-79.38
-79.38
MIP2-6-4630
Boring
19.50 02-Apr-15
24-Apr-15
0%
-79.38
MIP2-6-4640
19.38 03-Apr-15
25-Apr-15
0%
-79.38
MIP2-6-4650
Concrete
19.38 04-Apr-15
27-Apr-15
0%
-79.38
15.63 24-Apr-15
1.88 24-Apr-15
14-May-15
27-Apr-15
0%
0%
-79.19
-79.19
MIP2-6-4670
Boring
11.75 27-Apr-15
12-May-15
0%
-79.19
MIP2-6-4680
11.75 28-Apr-15
13-May-15
0%
-79.19
MIP2-6-4690
Concrete
11.75 29-Apr-15
14-May-15
0%
-79.19
25.50 24-Apr-15
1.88 24-Apr-15
26-May-15
27-Apr-15
0%
0%
-41.44
-50.31
MIP2-6-4710
Boring
21.75 27-Apr-15
23-May-15
0%
-50.31
MIP2-6-4720
21.63 28-Apr-15
25-May-15
0%
-41.44
MIP2-6-4730
Concrete
21.63 29-Apr-15
26-May-15
0%
-41.44
10.75 23-May-15
0.88 23-May-15
05-Jun-15
25-May-15
0%
0%
-50.31
-50.31
Zone B1
MIP2-6-4620
Zone G
MIP2-6-4660
Zone E1
MIP2-6-4700
Zone H1
MIP2-6-4740
25-Feb-15
25-Feb-15
25-Feb-15
25-Feb-15
05-Jun-15
05-Jun-15
03-Apr-15
26-Feb-15
0%
0%
0%
0%
-50.31
-50.31
-73.06
-79.38
MIP2-6-4750
Boring
7.88 25-May-15
03-Jun-15
0%
-50.31
MIP2-6-4760
7.88 26-May-15
04-Jun-15
0%
-50.31
MIP2-6-4770
Concrete
27-Apr-15, Zone B1
14-May-15, Zone G
26-May-15, Zone E1
05-Jun-15, Zone H1
-50.31
15-Oct-15, Bore pile Team 4
13-May-15, CPB Wall 1
5.88
97.25
-99.69
60.75 03-Mar-15
2.00 03-Mar-15
13-May-15
05-Mar-15
0%
0%
-4.38
-99.69
14-Mar-15
0%
-99.69
16-Mar-15
0%
14.38
MIP2-6-4820
Concrete
10.00 07-Mar-15
19-Mar-15
0%
14.38
MIP2-6-4830
Capping Beam A1
3.00 19-Mar-15
23-Mar-15
0%
14.38
MIP2-6-4840
2.00 13-Apr-15
15-Apr-15
0%
-3.38
MIP2-6-4850
Earthwork
2.00 15-Apr-15
17-Apr-15
0%
-3.38
MIP2-6-4860
Skin Wall A1
10.00 18-Apr-15
30-Apr-15
0%
-4.38
MIP2-6-4870
3.00 11-May-15
13-May-15
0%
-4.38
50.00 16-Mar-15
2.00 16-Mar-15
13-May-15
17-Mar-15
0%
0%
97.25
-99.69
MIP2-6-4890
Boring
16.00 18-Mar-15
04-Apr-15
0%
-99.69
MIP2-6-4900
Steel Bar
16.00 19-Mar-15
06-Apr-15
0%
-4.38
MIP2-6-4910
Concrete
16.00 20-Mar-15
07-Apr-15
0%
-4.38
MIP2-6-4920
Capping Beam B1
5.00 07-Apr-15
13-Apr-15
0%
-4.38
MIP2-6-4930
3.00 13-Apr-15
16-Apr-15
0%
-4.38
MIP2-6-4940
Earthwork
2.00 16-Apr-15
18-Apr-15
0%
-4.38
MIP2-6-4950
Skin Wall B1
10.00 18-Apr-15
30-Apr-15
0%
-4.38
MIP2-6-4960
3.00 11-May-15
13-May-15
0%
97.25
180.88 25-Feb-15
47.63 25-Feb-15
0.38 25-Feb-15
15-Oct-15
21-Apr-15
25-Feb-15
0%
0%
0%
5.88
-99.69
-66.31
MIP2-6-4980
Boring
3.88 04-Apr-15
09-Apr-15
0%
-99.69
MIP2-6-4990
4.00 10-Apr-15
15-Apr-15
0%
-99.69
MIP2-6-5000
Concrete
4.00 16-Apr-15
21-Apr-15
0%
-99.69
4.88 21-Apr-15
1.00 21-Apr-15
25-Apr-15
22-Apr-15
0%
0%
-42.13
-99.69
MIP2-6-5020
Boring
1.75 22-Apr-15
23-Apr-15
0%
-99.69
MIP2-6-5030
1.75 23-Apr-15
24-Apr-15
0%
-42.13
MIP2-6-5040
Concrete
1.88 24-Apr-15
25-Apr-15
0%
-42.13
4.88 24-Apr-15
1.00 24-Apr-15
29-Apr-15
24-Apr-15
0%
0%
82.38
-99.69
MIP2-6-5060
Boring
1.88 25-Apr-15
27-Apr-15
0%
-99.69
MIP2-6-5070
1.88 25-Apr-15
28-Apr-15
0%
82.38
MIP2-6-5080
Concrete
1.88 27-Apr-15
29-Apr-15
0%
82.38
10.88 27-Apr-15
1.00 27-Apr-15
12-May-15
28-Apr-15
0%
0%
-99.69
-99.69
MIP2-6-5100
Boring
7.63 28-Apr-15
09-May-15
0%
-99.69
MIP2-6-5110
7.63 29-Apr-15
11-May-15
0%
-99.69
MIP2-6-5120
Concrete
7.88 30-Apr-15
12-May-15
0%
-99.69
11.88 09-May-15
1.00 09-May-15
22-May-15
11-May-15
0%
0%
-98.31
-98.31
MIP2-6-5140
Boring
3.00 11-May-15
14-May-15
0%
-98.31
MIP2-6-5150
3.00 15-May-15
18-May-15
0%
-98.31
MIP2-6-5160
Concrete
2.88 20-May-15
22-May-15
0%
-98.31
5.00 22-May-15
1.00 22-May-15
28-May-15
23-May-15
0%
0%
-98.31
-98.31
Zone H2
MIP2-6-5170
0%
8.75 06-Mar-15
Zone B1
MIP2-6-5130
2017
A JJA
0.04%
0.15%
25%
8.75 05-Mar-15
Zone I
MIP2-6-5090
15-Oct-15
13-May-15
02-Mar-15
Steel Bar
Zone D
MIP2-6-5050
2016
JA
05-Jun-15
Boring
Zone B2
MIP2-6-5010
7.88 27-May-15
MIP2-6-4810
2015
A JJA
205.38 14-Jan-15 A
90.25 14-Jan-15 A
20.00 14-Jan-15 A
MIP2-6-4800
CBP Wall B1
MIP2-6-4880
Actual Work
Remaining Work
Milestone
Page 7 of 33
25-Apr-15, Zone B2
29-Apr-15, Zone D
12-May-15, Zone I
22-May-15, Zone B1
28-May-15, Zone H2
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
MIP2-6-5180
Boring
1.88 23-May-15
26-May-15
0%
-98.31
MIP2-6-5190
2.00 25-May-15
27-May-15
0%
-98.31
MIP2-6-5200
Concrete
2.00 26-May-15
28-May-15
0%
-98.31
23.63 26-May-15
1.00 26-May-15
23-Jun-15
27-May-15
0%
0%
-50.88
-50.88
Zone G
MIP2-6-5210
MIP2-6-5220
Boring
6.88 27-May-15
04-Jun-15
0%
-50.88
MIP2-6-5230
6.88 05-Jun-15
15-Jun-15
0%
-50.88
MIP2-6-5240
Concrete
6.88 16-Jun-15
23-Jun-15
0%
-50.88
5.00 23-Jun-15
1.00 23-Jun-15
29-Jun-15
24-Jun-15
0%
0%
-50.88
-50.88
MIP2-6-5260
Boring
2.00 24-Jun-15
26-Jun-15
0%
-50.88
MIP2-6-5270
2.00 25-Jun-15
27-Jun-15
0%
-50.88
MIP2-6-5280
Concrete
2.00 26-Jun-15
29-Jun-15
0%
-50.88
77.63 26-Jun-15
3.00 26-Jun-15
15-Oct-15
30-Jun-15
0%
0%
5.88
5.88
MIP2-6-5300
Boring
20.00 30-Jun-15
23-Jul-15
0%
5.88
MIP2-6-5310
Steel Bar
20.00 01-Jul-15
24-Jul-15
0%
5.88
MIP2-6-5320
Concrete
20.00 02-Jul-15
27-Jul-15
0%
5.88
MIP2-6-5330
Capping Beam A2
9.00 27-Jul-15
11-Aug-15
0%
5.88
MIP2-6-5340
Skin Wall A2
10.00 11-Aug-15
18-Sep-15
0%
5.88
MIP2-6-5350
3.00 26-Sep-15
15-Oct-15
Zone H1
MIP2-6-5250
CBP Wall A2
MIP2-6-5290
0%
5.88
120.92 06-Dec-14 A
94.29 06-Dec-14 A
25.00 06-Dec-14 A
05-Jun-15
11-May-15
27-Jan-15 A
13.98%
76.89%
100%
112.83
-1.41
3.00 30-Dec-14 A
30-Dec-14 A
100%
MIP2-6-5370
MIP2-6-5380
Boring
20.00 30-Dec-14 A
16-Feb-15
76%
-1.41
MIP2-6-5390
Steel Bar
20.00 30-Dec-14 A
16-Feb-15
76%
-1.41
MIP2-6-5400
Concrete
21.00 30-Dec-14 A
16-Feb-15
76%
-1.41
MIP2-6-5410
Earthwork
20.00 16-Feb-15
13-Mar-15
0%
-1.41
MIP2-6-5420
Capping Beam 2
9.00 13-Mar-15
24-Mar-15
0%
-1.41
MIP2-6-5430
Skin Wall 2
10.00 24-Mar-15
22-Apr-15
0%
-1.41
MIP2-6-5440
3.00 30-Apr-15
11-May-15
0%
-1.41
63.00 14-Feb-15
3.00 14-Feb-15
30-Apr-15
18-Feb-15
0%
0%
142.45
112.83
MIP2-6-5460
Boring
30.00 18-Feb-15
26-Mar-15
0%
112.83
MIP2-6-5470
Steel Bar
30.00 21-Feb-15
27-Mar-15
0%
142.45
MIP2-6-5480
Concrete
30.00 23-Feb-15
28-Mar-15
0%
142.45
MIP2-6-5490
Capping Beam 5
MIP2-6-5500
Skin Wall 5
MIP2-6-5510
CPB Wall 5
MIP2-6-5450
9.00 28-Mar-15
08-Apr-15
0%
142.45
10.00 08-Apr-15
20-Apr-15
0%
142.45
2.00 28-Apr-15
30-Apr-15
0%
142.45
05-Jun-15
23-May-15
27-Mar-15
0%
0%
0%
112.83
123.83
112.83
59.63 26-Mar-15
48.63 26-Mar-15
1.00 26-Mar-15
MIP2-6-5530
Boring
20.00 27-Mar-15
20-Apr-15
0%
112.83
MIP2-6-5540
Steel Bar
20.00 28-Mar-15
21-Apr-15
0%
123.83
MIP2-6-5550
Concrete
20.00 30-Mar-15
22-Apr-15
0%
123.83
MIP2-6-5560
Capping Beam A3
10.00 22-Apr-15
06-May-15
0%
123.83
MIP2-6-5570
Skin Wall A3
15.00 06-May-15
20-May-15
0%
123.83
MIP2-6-5580
CPB Wall 6
CBP Wall A3
MIP2-6-5520
2.88 20-May-15
23-May-15
0%
123.83
38.63 20-Apr-15
1.00 20-Apr-15
05-Jun-15
21-Apr-15
0%
0%
112.83
112.83
MIP2-6-5600
Boring
20.00 21-Apr-15
06-May-15
0%
112.83
MIP2-6-5610
Steel Bar
20.00 22-Apr-15
06-May-15
0%
112.83
MIP2-6-5620
Concrete
20.00 23-Apr-15
06-May-15
0%
112.83
MIP2-6-5630
Capping Beam B2
8.00 06-May-15
15-May-15
0%
112.83
MIP2-6-5640
Skin Wall B2
15.00 15-May-15
01-Jun-15
0%
112.83
MIP2-6-5650
3.75 01-Jun-15
05-Jun-15
0%
112.83
159.69 01-Jun-15
159.69 01-Jun-15
26.38 01-Jun-15
10-Dec-15
10-Dec-15
02-Jul-15
0%
0%
0%
-24.69
-24.69
-19.88
CBP Wall B2
MIP2-6-5590
Area B
24.88 02-Jul-15
01-Aug-15
0%
-19.88
MIP2-6-5680
Area C
25.00 01-Aug-15
01-Sep-15
0%
-19.88
MIP2-6-5690
Area D
25.38 02-Sep-15
02-Oct-15
0%
-19.88
MIP2-6-5700
Area F
20.00 02-Oct-15
27-Oct-15
0%
-19.88
10-Dec-15
30-Jul-15
13-Jul-15
0%
0%
0%
-24.69
86.13
86.13
133.31 02-Jul-15
22.50 02-Jul-15
9.75 02-Jul-15
MIP2-6-5720
Formwork
4.88 13-Jul-15
21-Jul-15
0%
86.13
MIP2-6-5730
Steel Bar
4.88 16-Jul-15
24-Jul-15
0%
86.13
MIP2-6-5740
Concrete
2.00 24-Jul-15
27-Jul-15
0%
86.13
MIP2-6-5750
Remove Formwork
1.00 29-Jul-15
30-Jul-15
0%
86.13
09-Sep-15
13-Aug-15
0%
0%
52.00
61.00
Area B
MIP2-6-5760
Excavation
31.75 01-Aug-15
10.00 01-Aug-15
MIP2-6-5770
Formwork
4.88 13-Aug-15
19-Aug-15
0%
61.00
MIP2-6-5780
Steel Bar
4.88 17-Aug-15
21-Aug-15
0%
61.00
MIP2-6-5790
Concrete
2.00 03-Sep-15
05-Sep-15
0%
52.00
MIP2-6-5800
Remove Formwork
1.00 08-Sep-15
09-Sep-15
0%
52.00
23.38 02-Sep-15
30-Sep-15
0%
35.38
Area C
Actual Work
Remaining Work
Milestone
Page 8 of 33
2015
A JJA
2016
JA
2017
A JJA
23-Jun-15, Zone G
29-Jun-15, Zone H1
09-Sep-15, Area B
30-Sep-15, Area C
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
MIP2-6-5810
Excavation
10.63 02-Sep-15
14-Sep-15
0%
35.38
MIP2-6-5820
Formwork
4.88 14-Sep-15
21-Sep-15
0%
35.38
MIP2-6-5830
Steel Bar
4.88 18-Sep-15
23-Sep-15
0%
35.38
MIP2-6-5840
Concrete
2.00 25-Sep-15
26-Sep-15
0%
35.38
MIP2-6-5850
Remove Formwork
1.00 29-Sep-15
30-Sep-15
0%
35.38
10-Dec-15
13-Oct-15
0%
0%
-34.69
1.75
Area D
MIP2-6-5860
Excavation
58.06 02-Oct-15
8.88 02-Oct-15
MIP2-6-5870
Formwork
4.88 13-Oct-15
20-Oct-15
0%
1.75
MIP2-6-5880
Steel Bar
4.88 17-Oct-15
23-Oct-15
0%
1.75
MIP2-6-5890
Concrete
2.00 23-Oct-15
24-Oct-15
0%
1.75
MIP2-6-5900
Remove Formwork
1.00 09-Dec-15
10-Dec-15
0%
-34.69
Area F
MIP2-6-5910
Excavation
23.25 27-Oct-15
9.63 27-Oct-15
24-Nov-15
06-Nov-15
0%
0%
-19.88
-19.88
MIP2-6-5920
Formwork
5.88 06-Nov-15
14-Nov-15
0%
-19.88
MIP2-6-5930
Steel Bar
4.88 12-Nov-15
18-Nov-15
0%
-19.88
MIP2-6-5940
Concrete
2.00 18-Nov-15
20-Nov-15
0%
-19.88
MIP2-6-5950
Remove Formwork
0.88 23-Nov-15
24-Nov-15
0%
-19.88
28-Mar-15
28-Mar-15
02-May-15
02-May-15
02-May-15
31-Oct-15
12-Aug-15
25-May-15
25-May-15
12-May-15
0%
0%
0%
0%
0%
68.50
-77.88
-46.63
-46.63
-46.63
WORK BELOW LO
LOWEST FLOOR
Pile Caps
Zone A
20A22
MIP2-6-5960
Excavation
179.25
113.63
19.00
19.00
7.00
2015
A JJA
2016
JA
24-Nov-15, Area F
Formwork
5.00 12-May-15
18-May-15
0%
-46.63
MIP2-6-5980
Steel Bar
3.00 15-May-15
19-May-15
0%
-46.63
MIP2-6-5990
Concrete
3.00 19-May-15
22-May-15
0%
-46.63
MIP2-6-6000
Remove formwork
1.00 25-May-15
25-May-15
0%
-46.63
09-May-15
09-May-15
27-Apr-15
0%
0%
0%
-42.13
-42.13
-42.13
09-May-15, Zone B2
09-May-15, Part1
06-May-15, 2B0903
Excavation
34.88 28-Mar-15
10.00 27-Apr-15
1.00 27-Apr-15
2B0903
MIP2-6-6020
Formwork
6.00 28-Apr-15
1.00 28-Apr-15
06-May-15
28-Apr-15
0%
0%
-42.13
-42.13
MIP2-6-6030
Steel Bar
1.00 29-Apr-15
29-Apr-15
0%
-42.13
MIP2-6-6040
Concrete
1.00 30-Apr-15
30-Apr-15
0%
-42.13
MIP2-6-6050
Remove formwork
1.00 05-May-15
06-May-15
0%
-42.13
2B0904
MIP2-6-6060
Formwork
9.00 28-Apr-15
1.00 28-Apr-15
09-May-15
28-Apr-15
0%
0%
-42.13
-42.13
MIP2-6-6070
Steel Bar
1.00 29-Apr-15
29-Apr-15
0%
-42.13
MIP2-6-6080
Concrete
1.00 30-Apr-15
30-Apr-15
0%
-42.13
MIP2-6-6090
Remove formwork
1.00 05-May-15
06-May-15
0%
-42.13
MIP2-6-6100
Backfilling
3.00 06-May-15
09-May-15
0%
-42.13
10-Apr-15
31-Mar-15
0%
0%
-18.25
-18.25
10-Apr-15, Part2
Excavation
11.00 28-Mar-15
2.00 28-Mar-15
3B1207
MIP2-6-6120
6.00 31-Mar-15
1.00 31-Mar-15
07-Apr-15
01-Apr-15
0%
0%
-18.25
-18.25
07-Apr-15, 3B1207
Formwork
MIP2-6-6130
Steel Bar
1.00 01-Apr-15
02-Apr-15
0%
-18.25
MIP2-6-6140
Concrete
1.00 02-Apr-15
03-Apr-15
0%
-18.25
MIP2-6-6150
Remove formwork
1.00 06-Apr-15
07-Apr-15
0%
-18.25
3B1208
MIP2-6-6160
Formwork
6.00 31-Mar-15
1.00 31-Mar-15
07-Apr-15
01-Apr-15
0%
0%
-18.25
-18.25
MIP2-6-6170
Steel Bar
1.00 01-Apr-15
02-Apr-15
0%
-18.25
MIP2-6-6180
Concrete
1.00 02-Apr-15
03-Apr-15
0%
-18.25
MIP2-6-6190
Part2
MIP2-6-6110
09-May-15, 2B0904
07-Apr-15, 3B1208
Remove formwork
1.00 06-Apr-15
07-Apr-15
0%
-18.25
3B1211
MIP2-6-6200
Formwork
6.00 31-Mar-15
1.00 31-Mar-15
07-Apr-15
01-Apr-15
0%
0%
-18.25
-18.25
MIP2-6-6210
Steel Bar
1.00 01-Apr-15
02-Apr-15
0%
-18.25
MIP2-6-6220
Concrete
1.00 02-Apr-15
03-Apr-15
0%
-18.25
MIP2-6-6230
Remove formwork
1.00 06-Apr-15
07-Apr-15
0%
-18.25
3B1212
MIP2-6-6240
Formwork
9.00 31-Mar-15
1.00 31-Mar-15
10-Apr-15
01-Apr-15
0%
0%
-18.25
-18.25
MIP2-6-6250
Steel Bar
1.00 01-Apr-15
02-Apr-15
0%
-18.25
MIP2-6-6260
Concrete
1.00 02-Apr-15
03-Apr-15
0%
-18.25
MIP2-6-6270
Remove formwork
1.00 06-Apr-15
07-Apr-15
0%
-18.25
MIP2-6-6280
Backfilling
3.00 07-Apr-15
10-Apr-15
0%
-18.25
17-Apr-15
31-Mar-15
0%
0%
-24.25
-35.63
17-Apr-15, Part3
Excavation
17.00 28-Mar-15
2.00 28-Mar-15
5B1215
MIP2-6-6300
6.00 31-Mar-15
1.00 31-Mar-15
07-Apr-15
01-Apr-15
0%
0%
-35.63
-35.63
07-Apr-15, 5B1215
Formwork
MIP2-6-6310
Steel Bar
1.00 01-Apr-15
02-Apr-15
0%
-35.63
MIP2-6-6320
Concrete
1.00 02-Apr-15
03-Apr-15
0%
-35.63
MIP2-6-6330
Part3
MIP2-6-6290
Remove formwork
1.00 06-Apr-15
07-Apr-15
0%
-35.63
5B1216
MIP2-6-6340
Formwork
9.00 07-Apr-15
1.00 07-Apr-15
17-Apr-15
08-Apr-15
0%
0%
-24.25
-35.63
MIP2-6-6350
Steel Bar
1.00 08-Apr-15
09-Apr-15
0%
-35.63
MIP2-6-6360
Concrete
1.00 09-Apr-15
10-Apr-15
0%
-35.63
MIP2-6-6370
Remove formwork
1.00 13-Apr-15
14-Apr-15
0%
-24.25
MIP2-6-6380
Backfilling
3.00 14-Apr-15
17-Apr-15
0%
-24.25
Excavation
15.00 13-Apr-15
11.00 13-Apr-15
2.00 13-Apr-15
29-Apr-15
24-Apr-15
15-Apr-15
0%
0%
0%
-25.00
-21.00
-25.00
Zone C
Part1
MIP2-6-6390
Actual Work
Remaining Work
Milestone
Page 9 of 33
2017
A JJA
10-Dec-15, Area D
MIP2-6-5970
Zone B2
Part1
MIP2-6-6010
07-Apr-15, 3B1211
10-Apr-15, 3B1212
17-Apr-15, 5B1216
29-Apr-15, Zone C
24-Apr-15, Part1
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
2C0901
MIP2-6-6400
Formwork
5.00 15-Apr-15
1.00 15-Apr-15
20-Apr-15
16-Apr-15
0%
0%
-20.00
-20.00
MIP2-6-6410
Steel Bar
1.00 16-Apr-15
17-Apr-15
0%
-20.00
MIP2-6-6420
Concrete
1.00 16-Apr-15
17-Apr-15
0%
-20.00
MIP2-6-6430
2015
A JJA
2016
JA
Remove formwork
1.00 20-Apr-15
20-Apr-15
0%
-20.00
Formwork
6.00 15-Apr-15
1.00 15-Apr-15
21-Apr-15
16-Apr-15
0%
0%
-21.00
-21.00
MIP2-6-6450
Steel Bar
1.00 16-Apr-15
17-Apr-15
0%
-21.00
MIP2-6-6460
Concrete
1.00 17-Apr-15
18-Apr-15
0%
-21.00
MIP2-6-6470
Remove formwork
1.00 21-Apr-15
21-Apr-15
0%
-21.00
2c0903
MIP2-6-6480
Formwork
6.00 15-Apr-15
1.00 15-Apr-15
21-Apr-15
16-Apr-15
0%
0%
-21.00
-21.00
MIP2-6-6490
Steel Bar
1.00 16-Apr-15
17-Apr-15
0%
-21.00
MIP2-6-6500
Concrete
1.00 17-Apr-15
18-Apr-15
0%
-21.00
MIP2-6-6510
Remove formwork
1.00 21-Apr-15
21-Apr-15
0%
-21.00
2C0906
MIP2-6-6520
Formwork
9.00 15-Apr-15
1.00 15-Apr-15
24-Apr-15
16-Apr-15
0%
0%
-21.00
-21.00
MIP2-6-6530
Steel Bar
1.00 16-Apr-15
17-Apr-15
0%
-21.00
MIP2-6-6540
Concrete
1.00 17-Apr-15
18-Apr-15
0%
-21.00
MIP2-6-6550
Remove formwork
1.00 21-Apr-15
21-Apr-15
0%
-21.00
MIP2-6-6560
Backfilling
3.00 22-Apr-15
24-Apr-15
0%
-21.00
13.00 15-Apr-15
2.00 15-Apr-15
29-Apr-15
17-Apr-15
0%
0%
-25.00
-25.00
29-Apr-15, Part2
Excavation
3C1204
MIP2-6-6580
8.00 17-Apr-15
2.00 17-Apr-15
25-Apr-15
18-Apr-15
0%
0%
-25.00
-25.00
25-Apr-15, 3C1204
Formwork
MIP2-6-6590
Steel Bar
2.00 20-Apr-15
21-Apr-15
0%
-25.00
MIP2-6-6600
Concrete
1.00 22-Apr-15
22-Apr-15
0%
-25.00
MIP2-6-6610
Remove formwork
1.00 25-Apr-15
25-Apr-15
0%
-25.00
2C1205
MIP2-6-6620
Formwork
8.00 17-Apr-15
2.00 17-Apr-15
25-Apr-15
18-Apr-15
0%
0%
-25.00
-25.00
MIP2-6-6630
Steel Bar
2.00 20-Apr-15
21-Apr-15
0%
-25.00
MIP2-6-6640
Concrete
1.00 22-Apr-15
22-Apr-15
0%
-25.00
MIP2-6-6650
Remove formwork
1.00 25-Apr-15
25-Apr-15
0%
-25.00
3C1207
MIP2-6-6660
Formwork
8.00 17-Apr-15
2.00 17-Apr-15
25-Apr-15
18-Apr-15
0%
0%
-25.00
-25.00
MIP2-6-6670
Steel Bar
2.00 20-Apr-15
21-Apr-15
0%
-25.00
MIP2-6-6680
Concrete
1.00 22-Apr-15
22-Apr-15
0%
-25.00
MIP2-6-6690
Remove formwork
1.00 25-Apr-15
25-Apr-15
0%
-25.00
3C1208
MIP2-6-6700
Formwork
8.00 17-Apr-15
2.00 17-Apr-15
25-Apr-15
18-Apr-15
0%
0%
-25.00
-25.00
MIP2-6-6710
Steel Bar
2.00 20-Apr-15
21-Apr-15
0%
-25.00
MIP2-6-6720
Concrete
1.00 22-Apr-15
22-Apr-15
0%
-25.00
MIP2-6-6730
Remove formwork
1.00 25-Apr-15
25-Apr-15
0%
-25.00
29-Apr-15
18-Apr-15
0%
0%
-25.00
-25.00
21-Apr-15, 2c0902
21-Apr-15, 2c0903
24-Apr-15, 2C0906
25-Apr-15, 2C1205
25-Apr-15, 3C1207
25-Apr-15, 3C1208
2C1209
MIP2-6-6740
Formwork
11.00 17-Apr-15
2.00 17-Apr-15
MIP2-6-6750
Steel Bar
2.00 20-Apr-15
21-Apr-15
0%
-25.00
MIP2-6-6760
Concrete
1.00 22-Apr-15
22-Apr-15
0%
-25.00
MIP2-6-6770
Remove formwork
1.00 25-Apr-15
25-Apr-15
0%
-25.00
MIP2-6-6780
Backfilling
3.00 25-Apr-15
29-Apr-15
0%
29-Apr-15, 2C1209
-25.00
22-Jun-15
22-Jun-15
09-Jun-15
0%
0%
0%
-77.44
-77.44
-77.44
22-Jun-15, Zone D
22-Jun-15, Part1
22-Jun-15, 9D22
Excavation
51.00 21-Apr-15
14.00 04-Jun-15
3.00 04-Jun-15
9D22
MIP2-6-6800
Formwork
11.00 09-Jun-15
3.00 09-Jun-15
22-Jun-15
12-Jun-15
0%
0%
-77.44
-77.44
MIP2-6-6810
Steel Bar
3.00 12-Jun-15
16-Jun-15
0%
-77.44
MIP2-6-6820
Concrete
2.00 16-Jun-15
18-Jun-15
0%
-77.44
MIP2-6-6830
Remove formwork
1.00 20-Jun-15
22-Jun-15
0%
-77.44
16-May-15
25-Apr-15
0%
0%
-75.69
-75.69
16-May-15, Part2
Excavation
19.25 21-Apr-15
4.00 21-Apr-15
2D1201
MIP2-6-6850
10.00 25-Apr-15
5.00 25-Apr-15
09-May-15
02-May-15
0%
0%
-71.44
-71.44
09-May-15, 2D1201
Formwork
MIP2-6-6860
Steel Bar
3.00 28-Apr-15
02-May-15
0%
-71.44
MIP2-6-6870
Concrete
2.00 02-May-15
06-May-15
0%
-71.44
MIP2-6-6880
Remove formwork
1.00 08-May-15
09-May-15
0%
-71.44
09-May-15
02-May-15
0%
0%
-71.44
-71.44
Zone D
Part1
MIP2-6-6790
Part2
MIP2-6-6840
2D1202
MIP2-6-6890
Formwork
10.00 25-Apr-15
5.00 25-Apr-15
MIP2-6-6900
Steel Bar
5.00 28-Apr-15
06-May-15
0%
-71.44
MIP2-6-6910
Concrete
2.00 06-May-15
08-May-15
0%
-71.44
MIP2-6-6920
Remove formwork
1.00 08-May-15
09-May-15
0%
-71.44
Formwork
10.00 25-Apr-15
5.00 25-Apr-15
09-May-15
02-May-15
0%
0%
-71.44
-71.44
MIP2-6-6940
Steel Bar
3.00 28-Apr-15
02-May-15
0%
-71.44
MIP2-6-6950
Concrete
2.00 02-May-15
06-May-15
0%
-71.44
MIP2-6-6960
Remove formwork
4D1203
MIP2-6-6930
1.00 08-May-15
09-May-15
0%
-71.44
Formwork
10.00 25-Apr-15
5.00 25-Apr-15
09-May-15
02-May-15
0%
0%
-71.44
-71.44
MIP2-6-6980
Steel Bar
3.00 28-Apr-15
02-May-15
0%
-71.44
MIP2-6-6990
Concrete
2.00 02-May-15
06-May-15
0%
-71.44
5D1204
MIP2-6-6970
Actual Work
Remaining Work
Milestone
Page 10 of 33
2017
A JJA
20-Apr-15, 2C0901
2c0902
MIP2-6-6440
Part2
MIP2-6-6570
09-May-15, 2D1202
09-May-15, 4D1203
09-May-15, 5D1204
Activity ID
Original Start
Duration
Activity Name
MIP2-6-7000
Finish
1.00 08-May-15
09-May-15
0%
-71.44
Formwork
10.00 25-Apr-15
5.00 25-Apr-15
09-May-15
02-May-15
0%
0%
-71.44
-71.44
MIP2-6-7020
Steel Bar
3.00 28-Apr-15
02-May-15
0%
-71.44
MIP2-6-7030
Concrete
2.00 02-May-15
06-May-15
0%
-71.44
MIP2-6-7040
Remove formwork
1.00 08-May-15
09-May-15
0%
-71.44
09-May-15
02-May-15
0%
0%
-71.44
-71.44
2D1205
MIP2-6-7010
Remove formwork
24-Feb-16 15:32
2D1206
MIP2-6-7050
Formwork
10.00 25-Apr-15
5.00 25-Apr-15
MIP2-6-7060
Steel Bar
3.00 28-Apr-15
02-May-15
0%
-71.44
MIP2-6-7070
Concrete
2.00 02-May-15
06-May-15
0%
-71.44
MIP2-6-7080
Remove formwork
1.00 08-May-15
09-May-15
0%
-71.44
15.25 25-Apr-15
5.00 25-Apr-15
16-May-15
02-May-15
0%
0%
-75.69
-75.69
Steel Bar
3.00 02-May-15
08-May-15
0%
-75.69
Concrete
2.00 08-May-15
12-May-15
0%
-75.69
Remove formwork
1.00 14-May-15
16-May-15
0%
-75.69
15.25 25-Apr-15
5.00 25-Apr-15
16-May-15
02-May-15
0%
0%
-75.69
-75.69
2D1207
MIP2-6-7090
Formwork
MIP2-6-7100
MIP2-6-7110
MIP2-6-7120
2015
A JJA
2016
JA
09-May-15, 2D1206
16-May-15, 2D1207
16-May-15, 2D0908
Formwork
MIP2-6-7140
Steel Bar
3.00 02-May-15
08-May-15
0%
-75.69
MIP2-6-7150
Concrete
2.00 08-May-15
12-May-15
0%
-75.69
MIP2-6-7160
Remove formwork
1.00 14-May-15
16-May-15
0%
-75.69
09-Jun-15
05-Jun-15
21-May-15
0%
0%
0%
-78.06
-77.06
-78.06
09-Jun-15, Zone E2
05-Jun-15, Part1
Excavation
17.00 19-May-15
15.00 19-May-15
2.00 19-May-15
4E1203
MIP2-6-7180
13.00 21-May-15
5.00 21-May-15
05-Jun-15
27-May-15
0%
0%
-77.06
-77.06
05-Jun-15, 4E1203
Formwork
MIP2-6-7190
Steel Bar
3.00 27-May-15
30-May-15
0%
-77.06
MIP2-6-7200
Concrete
2.00 30-May-15
02-Jun-15
0%
-77.06
MIP2-6-7210
Remove formwork
1.00 04-Jun-15
05-Jun-15
0%
-77.06
05-Jun-15
27-May-15
0%
0%
-77.06
-77.06
4E1204
MIP2-6-7220
Formwork
13.00 21-May-15
5.00 21-May-15
MIP2-6-7230
Steel Bar
3.00 27-May-15
30-May-15
0%
-77.06
MIP2-6-7240
Concrete
2.00 30-May-15
02-Jun-15
0%
-77.06
MIP2-6-7250
Remove formwork
1.00 04-Jun-15
05-Jun-15
0%
-77.06
05-Jun-15
27-May-15
0%
0%
-77.06
-77.06
05-Jun-15, 4E1204
4E1207
MIP2-6-7260
Formwork
13.00 21-May-15
5.00 21-May-15
MIP2-6-7270
Steel Bar
3.00 27-May-15
30-May-15
0%
-77.06
MIP2-6-7280
Concrete
2.00 30-May-15
02-Jun-15
0%
-77.06
MIP2-6-7290
Remove formwork
1.00 04-Jun-15
05-Jun-15
0%
-77.06
09-Jun-15
23-May-15
0%
0%
-78.06
-78.06
09-Jun-15, Part2
Excavation
15.00 21-May-15
2.00 21-May-15
5E1208
MIP2-6-7310
13.00 23-May-15
5.00 23-May-15
09-Jun-15
29-May-15
0%
0%
-78.06
-78.06
09-Jun-15, 5E1208
Formwork
MIP2-6-7320
Steel Bar
3.00 29-May-15
02-Jun-15
0%
-78.06
MIP2-6-7330
Concrete
2.00 02-Jun-15
04-Jun-15
0%
-78.06
MIP2-6-7340
Remove formwork
1.00 08-Jun-15
09-Jun-15
0%
-78.06
09-Jun-15
29-May-15
0%
0%
-78.06
-78.06
Part2
MIP2-6-7300
3E1211
MIP2-6-7350
Formwork
13.00 23-May-15
5.00 23-May-15
MIP2-6-7360
Steel Bar
3.00 29-May-15
02-Jun-15
0%
-78.06
MIP2-6-7370
Concrete
2.00 02-Jun-15
04-Jun-15
0%
-78.06
MIP2-6-7380
Remove formwork
1.00 08-Jun-15
09-Jun-15
0%
-78.06
Formwork
13.00 23-May-15
5.00 23-May-15
09-Jun-15
29-May-15
0%
0%
-78.06
-78.06
MIP2-6-7400
Steel Bar
3.00 29-May-15
02-Jun-15
0%
-78.06
MIP2-6-7410
Concrete
2.00 02-Jun-15
04-Jun-15
0%
-78.06
MIP2-6-7420
Remove formwork
3E1212
MIP2-6-7390
05-Jun-15, 4E1207
09-Jun-15, 3E1211
09-Jun-15, 3E1212
1.00 08-Jun-15
09-Jun-15
0%
-78.06
09-Jun-15
09-Jun-15
28-May-15
0%
0%
0%
-78.06
-78.06
-77.94
09-Jun-15, Zone I
09-Jun-15, Part1
09-Jun-15, 2I1201
Excavation
23.50 12-May-15
10.13 27-May-15
1.00 27-May-15
2I1201
MIP2-6-7440
Formwork
9.13 28-May-15
2.00 28-May-15
09-Jun-15
30-May-15
0%
0%
-78.06
-77.94
MIP2-6-7450
Steel Bar
2.00 30-May-15
02-Jun-15
0%
-77.94
MIP2-6-7460
Concrete
2.00 02-Jun-15
04-Jun-15
0%
-77.94
MIP2-6-7470
Remove formwork
1.00 08-Jun-15
09-Jun-15
0%
-78.06
2I1202
MIP2-6-7480
Formwork
9.00 28-May-15
2.00 28-May-15
09-Jun-15
30-May-15
0%
0%
-77.94
-77.94
MIP2-6-7490
Steel Bar
2.00 30-May-15
02-Jun-15
0%
-77.94
MIP2-6-7500
Concrete
2.00 02-Jun-15
04-Jun-15
0%
-77.94
MIP2-6-7510
Remove formwork
1.00 08-Jun-15
09-Jun-15
0%
-77.94
2I1205
MIP2-6-7520
Formwork
9.00 28-May-15
2.00 28-May-15
09-Jun-15
30-May-15
0%
0%
-77.94
-77.94
MIP2-6-7530
Steel Bar
2.00 30-May-15
02-Jun-15
0%
-77.94
MIP2-6-7540
Concrete
2.00 02-Jun-15
04-Jun-15
0%
-77.94
MIP2-6-7550
Remove formwork
1.00 08-Jun-15
09-Jun-15
0%
-77.94
30-May-15
14-May-15
0%
0%
-99.69
-99.69
30-May-15, Part2
Excavation
17.00 12-May-15
2.00 12-May-15
2I0903
MIP2-6-7570
12.00 14-May-15
3.00 14-May-15
28-May-15
18-May-15
0%
0%
-97.69
-97.69
28-May-15, 2I0903
Formwork
MIP2-6-7580
Steel Bar
3.00 18-May-15
21-May-15
0%
-97.69
Zone I
Part1
MIP2-6-7430
Part2
MIP2-6-7560
Actual Work
Remaining Work
Milestone
Page 11 of 33
2017
A JJA
09-May-15, 2D1205
2D0908
MIP2-6-7130
Zone E2
Part1
MIP2-6-7170
09-Jun-15, 2I1202
09-Jun-15, 2I1205
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
MIP2-6-7590
Concrete
3.00 21-May-15
25-May-15
0%
-97.69
MIP2-6-7600
Remove formwork
1.00 27-May-15
28-May-15
0%
-97.69
28-May-15
18-May-15
0%
0%
-97.69
-97.69
2I0904
MIP2-6-7610
Formwork
12.00 14-May-15
3.00 14-May-15
MIP2-6-7620
Steel Bar
3.00 18-May-15
21-May-15
0%
-97.69
MIP2-6-7630
Concrete
3.00 21-May-15
25-May-15
0%
-97.69
MIP2-6-7640
Remove formwork
1.00 27-May-15
28-May-15
0%
-97.69
28-May-15
18-May-15
0%
0%
-97.69
-97.69
2I0906
MIP2-6-7650
Formwork
12.00 14-May-15
3.00 14-May-15
MIP2-6-7660
Steel Bar
3.00 18-May-15
21-May-15
0%
-97.69
MIP2-6-7670
Concrete
3.00 21-May-15
25-May-15
0%
-97.69
MIP2-6-7680
Remove formwork
1.00 27-May-15
28-May-15
0%
-97.69
28-May-15
18-May-15
0%
0%
-97.69
-97.69
2I0907
MIP2-6-7690
Formwork
12.00 14-May-15
3.00 14-May-15
MIP2-6-7700
Steel Bar
3.00 18-May-15
21-May-15
0%
-97.69
MIP2-6-7710
Concrete
3.00 21-May-15
25-May-15
0%
-97.69
MIP2-6-7720
Remove formwork
1.00 27-May-15
28-May-15
0%
-97.69
Formwork
12.00 14-May-15
3.00 14-May-15
28-May-15
18-May-15
0%
0%
-97.69
-97.69
MIP2-6-7740
Steel Bar
3.00 18-May-15
21-May-15
0%
-97.69
MIP2-6-7750
Concrete
3.00 21-May-15
25-May-15
0%
-97.69
MIP2-6-7760
Remove formwork
2I0908
MIP2-6-7730
1.00 27-May-15
28-May-15
0%
-97.69
Formwork
12.00 14-May-15
3.00 14-May-15
28-May-15
18-May-15
0%
0%
-97.69
-97.69
MIP2-6-7780
Steel Bar
3.00 18-May-15
21-May-15
0%
-97.69
MIP2-6-7790
Concrete
3.00 21-May-15
25-May-15
0%
-97.69
MIP2-6-7800
Remove formwork
1.00 27-May-15
28-May-15
0%
-97.69
2I0909
MIP2-6-7770
2I0910
MIP2-6-7810
Formwork
15.00 14-May-15
3.00 14-May-15
30-May-15
18-May-15
0%
0%
-99.69
-99.69
MIP2-6-7820
Steel Bar
3.00 18-May-15
21-May-15
0%
-99.69
MIP2-6-7830
Concrete
3.00 21-May-15
25-May-15
0%
-99.69
MIP2-6-7840
Remove formwork
1.00 30-May-15
30-May-15
0%
-99.69
2015
A JJA
2016
JA
28-May-15, 2I0906
28-May-15, 2I0907
28-May-15, 2I0908
28-May-15, 2I0909
30-May-15, 2I0910
Formwork
15.00 14-May-15
3.00 14-May-15
30-May-15
18-May-15
0%
0%
-99.69
-96.69
MIP2-6-7860
Steel Bar
3.00 18-May-15
21-May-15
0%
-96.69
MIP2-6-7870
Concrete
3.00 21-May-15
25-May-15
0%
-96.69
MIP2-6-7880
Remove formwork
1.00 30-May-15
30-May-15
0%
30-May-15, 2I0911
-99.69
01-Aug-15
21-Jul-15
09-Jul-15
0%
0%
0%
-99.69
-99.69
-99.69
01-Aug-15, Zone H2
21-Jul-15, Part1
21-Jul-15, 24H12
Excavation
53.50 28-May-15
13.00 03-Jul-15
5.00 03-Jul-15
24H12
MIP2-6-7900
Formwork
8.00 09-Jul-15
2.00 09-Jul-15
21-Jul-15
11-Jul-15
0%
0%
-99.69
-99.69
MIP2-6-7910
Steel Bar
2.00 10-Jul-15
13-Jul-15
0%
-99.69
MIP2-6-7920
Concrete
2.00 13-Jul-15
15-Jul-15
0%
-99.69
MIP2-6-7930
Remove formwork
1.00 17-Jul-15
21-Jul-15
0%
-99.69
01-Aug-15
22-Jul-15
0%
0%
-99.69
-99.69
01-Aug-15, Part2
Excavation
53.50 28-May-15
1.00 21-Jul-15
2H1202
MIP2-6-7950
9.00 22-Jul-15
2.00 22-Jul-15
01-Aug-15
24-Jul-15
0%
0%
-99.69
-99.69
01-Aug-15, 2H1202
Formwork
MIP2-6-7960
Steel Bar
2.00 24-Jul-15
27-Jul-15
0%
-99.69
MIP2-6-7970
Concrete
2.00 27-Jul-15
29-Jul-15
0%
-99.69
MIP2-6-7980
Remove formwork
1.00 31-Jul-15
01-Aug-15
0%
-99.69
2H1203
MIP2-6-7990
Formwork
9.00 22-Jul-15
2.00 22-Jul-15
01-Aug-15
24-Jul-15
0%
0%
-99.69
-99.69
MIP2-6-8000
Steel Bar
2.00 24-Jul-15
27-Jul-15
0%
-99.69
MIP2-6-8010
Concrete
2.00 27-Jul-15
29-Jul-15
0%
-99.69
MIP2-6-8020
Remove formwork
1.00 31-Jul-15
01-Aug-15
0%
-99.69
2H1204
MIP2-6-8030
Formwork
9.00 22-Jul-15
2.00 22-Jul-15
01-Aug-15
24-Jul-15
0%
0%
-99.69
-99.69
MIP2-6-8040
Steel Bar
2.00 24-Jul-15
27-Jul-15
0%
-99.69
MIP2-6-8050
Concrete
2.00 27-Jul-15
29-Jul-15
0%
-99.69
MIP2-6-8060
Part2
MIP2-6-7940
01-Aug-15, 2H1203
01-Aug-15, 2H1204
Remove formwork
1.00 31-Jul-15
01-Aug-15
0%
-99.69
2H1206
MIP2-6-8070
Formwork
9.00 22-Jul-15
2.00 22-Jul-15
01-Aug-15
24-Jul-15
0%
0%
-99.69
-99.69
MIP2-6-8080
Steel Bar
2.00 24-Jul-15
27-Jul-15
0%
-99.69
MIP2-6-8090
Concrete
2.00 27-Jul-15
29-Jul-15
0%
-99.69
MIP2-6-8100
Remove formwork
1.00 31-Jul-15
01-Aug-15
0%
-99.69
08-Jun-15
29-May-15
0%
0%
-99.69
-98.31
08-Jun-15, Part3
Excavation
8.38 28-May-15
1.00 28-May-15
2H0907
MIP2-6-8120
6.00 01-Jun-15
1.00 01-Jun-15
08-Jun-15
01-Jun-15
0%
0%
-99.69
-99.69
08-Jun-15, 2H0907
Formwork
MIP2-6-8130
Steel Bar
1.00 02-Jun-15
02-Jun-15
0%
-99.69
MIP2-6-8140
Concrete
1.00 03-Jun-15
03-Jun-15
0%
-99.69
MIP2-6-8150
Part3
MIP2-6-8110
Remove formwork
1.00 08-Jun-15
08-Jun-15
0%
-99.69
2H0909
MIP2-6-8160
Formwork
7.38 29-May-15
1.00 29-May-15
08-Jun-15
30-May-15
0%
0%
-99.69
-98.31
MIP2-6-8170
Steel Bar
1.00 30-May-15
01-Jun-15
0%
-98.31
MIP2-6-8180
Concrete
1.00 01-Jun-15
02-Jun-15
0%
-98.31
Actual Work
Remaining Work
Milestone
Page 12 of 33
2017
A JJA
28-May-15, 2I0904
2I0911
MIP2-6-7850
Zone H2
Part1
MIP2-6-7890
01-Aug-15, 2H1206
08-Jun-15, 2H0909
Activity ID
Original Start
Duration
Activity Name
MIP2-6-8190
Remove formwork
24-Feb-16 15:32
Finish
2016
JA
08-Jun-15
0%
-99.69
20-Apr-15
20-Apr-15
06-Apr-15
0%
0%
0%
-17.38
-17.38
-17.38
20-Apr-15, Zone F
20-Apr-15, Part1
20-Apr-15, 4F1201
Excavation
4F1201
MIP2-6-8210
Formwork
11.00 07-Apr-15
3.00 07-Apr-15
20-Apr-15
10-Apr-15
0%
0%
-17.38
-17.38
MIP2-6-8220
Steel Bar
3.00 10-Apr-15
14-Apr-15
0%
-17.38
MIP2-6-8230
Concrete
2.00 14-Apr-15
16-Apr-15
0%
-17.38
MIP2-6-8240
Remove formwork
1.00 18-Apr-15
20-Apr-15
0%
-17.38
20-Apr-15
10-Apr-15
0%
0%
-17.38
-17.38
4F1202
MIP2-6-8250
Formwork
11.00 07-Apr-15
3.00 07-Apr-15
MIP2-6-8260
Steel Bar
3.00 10-Apr-15
14-Apr-15
0%
-17.38
MIP2-6-8270
Concrete
2.00 14-Apr-15
16-Apr-15
0%
-17.38
MIP2-6-8280
Remove formwork
1.00 18-Apr-15
20-Apr-15
0%
-17.38
Formwork
11.00 07-Apr-15
3.00 07-Apr-15
20-Apr-15
10-Apr-15
0%
0%
-17.38
-17.38
MIP2-6-8300
Steel Bar
3.00 10-Apr-15
14-Apr-15
0%
-17.38
MIP2-6-8310
Concrete
2.00 14-Apr-15
16-Apr-15
0%
-17.38
MIP2-6-8320
Remove formwork
1.00 18-Apr-15
20-Apr-15
0%
-17.38
2F1203
MIP2-6-8290
2015
A JJA
1.00 08-Jun-15
14.00 03-Apr-15
14.00 03-Apr-15
2.00 03-Apr-15
Zone F
Part1
MIP2-6-8200
20-Apr-15, 2F1203
Formwork
11.00 07-Apr-15
3.00 07-Apr-15
20-Apr-15
10-Apr-15
0%
0%
-17.38
-17.38
MIP2-6-8340
Steel Bar
3.00 08-Apr-15
11-Apr-15
0%
-17.38
MIP2-6-8350
Concrete
2.00 14-Apr-15
16-Apr-15
0%
-17.38
MIP2-6-8360
Remove formwork
1.00 18-Apr-15
20-Apr-15
0%
-17.38
13.00 03-Apr-15
2.00 03-Apr-15
18-Apr-15
06-Apr-15
0%
0%
-73.06
-73.06
18-Apr-15, Part2
Excavation
4F1205
MIP2-6-8380
9.00 07-Apr-15
3.00 07-Apr-15
17-Apr-15
10-Apr-15
0%
0%
-73.06
-73.06
17-Apr-15, 4F1205
Formwork
MIP2-6-8390
Steel Bar
3.00 08-Apr-15
11-Apr-15
0%
-73.06
MIP2-6-8400
Concrete
2.00 11-Apr-15
14-Apr-15
0%
-73.06
MIP2-6-8410
Remove formwork
1.00 16-Apr-15
17-Apr-15
0%
-73.06
2F1206
MIP2-6-8420
Formwork
10.00 06-Apr-15
3.00 06-Apr-15
17-Apr-15
09-Apr-15
0%
0%
-73.06
-72.06
MIP2-6-8430
Steel Bar
3.00 07-Apr-15
10-Apr-15
0%
-72.06
MIP2-6-8440
Concrete
2.00 10-Apr-15
13-Apr-15
0%
-72.06
MIP2-6-8450
Remove formwork
1.00 16-Apr-15
17-Apr-15
0%
-73.06
18-Apr-15
09-Apr-15
0%
0%
-73.06
-71.06
4F1207
MIP2-6-8460
Formwork
11.00 06-Apr-15
3.00 06-Apr-15
MIP2-6-8470
Steel Bar
3.00 07-Apr-15
10-Apr-15
0%
-71.06
MIP2-6-8480
Concrete
2.00 10-Apr-15
13-Apr-15
0%
-71.06
MIP2-6-8490
Remove formwork
1.00 17-Apr-15
18-Apr-15
0%
-73.06
18-Apr-15
09-Apr-15
0%
0%
-73.06
-71.06
4F1208
MIP2-6-8500
Formwork
11.00 06-Apr-15
3.00 06-Apr-15
MIP2-6-8510
Steel Bar
3.00 07-Apr-15
10-Apr-15
0%
-71.06
MIP2-6-8520
Concrete
2.00 10-Apr-15
13-Apr-15
0%
-71.06
MIP2-6-8530
Remove formwork
1.00 17-Apr-15
18-Apr-15
0%
-73.06
18-Apr-15
09-Apr-15
0%
0%
-73.06
-71.06
2F1209
MIP2-6-8540
Formwork
11.00 06-Apr-15
3.00 06-Apr-15
MIP2-6-8550
Steel Bar
3.00 07-Apr-15
10-Apr-15
0%
-71.06
MIP2-6-8560
Concrete
2.00 10-Apr-15
13-Apr-15
0%
-71.06
MIP2-6-8570
Remove formwork
20-Apr-15, 4F1204
17-Apr-15, 2F1206
18-Apr-15, 4F1207
18-Apr-15, 4F1208
18-Apr-15, 2F1209
1.00 17-Apr-15
18-Apr-15
0%
-73.06
12-Aug-15
12-Aug-15
30-Jun-15
0%
0%
0%
-86.31
-99.69
-79.44
12-Aug-15, Zone G
12-Aug-15, Part1
12-Aug-15, 9G22
Excavation
74.63 14-May-15
38.25 26-Jun-15
3.00 26-Jun-15
9G22
MIP2-6-8590
Formwork
35.25 30-Jun-15
5.00 30-Jun-15
12-Aug-15
06-Jul-15
0%
0%
-99.69
-79.44
MIP2-6-8600
Steel Bar
5.00 31-Jul-15
06-Aug-15
0%
-99.69
MIP2-6-8610
Concrete
2.00 06-Aug-15
08-Aug-15
0%
-99.69
MIP2-6-8620
Remove formwork
1.00 11-Aug-15
12-Aug-15
0%
-99.69
19-Jun-15
09-Jun-15
0%
0%
-99.69
-99.69
19-Jun-15, Part2
Excavation
9.00 09-Jun-15
1.00 09-Jun-15
4G1201
MIP2-6-8640
8.00 10-Jun-15
2.00 10-Jun-15
18-Jun-15
11-Jun-15
0%
0%
-99.69
-99.69
18-Jun-15, 4G1201
Formwork
MIP2-6-8650
Steel Bar
2.00 12-Jun-15
13-Jun-15
0%
-99.69
MIP2-6-8660
Concrete
1.00 13-Jun-15
15-Jun-15
0%
-99.69
MIP2-6-8670
Zone G
Part1
MIP2-6-8580
Part2
MIP2-6-8630
Remove formwork
1.00 17-Jun-15
18-Jun-15
0%
-99.69
4G1202
MIP2-6-8680
Formwork
8.00 10-Jun-15
2.00 10-Jun-15
19-Jun-15
11-Jun-15
0%
0%
-99.69
-98.69
MIP2-6-8690
Steel Bar
2.00 11-Jun-15
12-Jun-15
0%
-98.69
MIP2-6-8700
Concrete
1.00 13-Jun-15
13-Jun-15
0%
-98.69
MIP2-6-8710
Remove formwork
1.00 17-Jun-15
19-Jun-15
0%
-99.69
12.13 19-Jun-15
3.00 19-Jun-15
03-Jul-15
22-Jun-15
0%
0%
-99.69
-99.69
03-Jul-15, Part3
Excavation
4G0903
MIP2-6-8730
9.25 22-Jun-15
4.00 22-Jun-15
02-Jul-15
26-Jun-15
0%
0%
-98.94
-98.94
02-Jul-15, 4G0903
Formwork
MIP2-6-8740
Steel Bar
3.00 24-Jun-15
27-Jun-15
0%
-98.94
MIP2-6-8750
Concrete
2.00 27-Jun-15
29-Jun-15
0%
-98.94
MIP2-6-8760
Remove formwork
1.00 02-Jul-15
02-Jul-15
0%
-98.94
10.00 22-Jun-15
03-Jul-15
0%
-99.69
Part3
MIP2-6-8720
4G0904
Actual Work
Remaining Work
Milestone
Page 13 of 33
2017
A JJA
20-Apr-15, 4F1202
4F1204
MIP2-6-8330
Part2
MIP2-6-8370
19-Jun-15, 4G1202
03-Jul-15, 4G0904
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
MIP2-6-8770
Formwork
4.00 22-Jun-15
26-Jun-15
0%
-99.69
MIP2-6-8780
Steel Bar
3.00 24-Jun-15
27-Jun-15
0%
-99.69
MIP2-6-8790
Concrete
2.00 27-Jun-15
30-Jun-15
0%
-99.69
MIP2-6-8800
Remove formwork
1.00 02-Jul-15
03-Jul-15
0%
-99.69
Formwork
10.00 22-Jun-15
4.00 22-Jun-15
03-Jul-15
26-Jun-15
0%
0%
-99.69
-99.69
MIP2-6-8820
Steel Bar
2.88 24-Jun-15
27-Jun-15
0%
-99.69
MIP2-6-8830
Concrete
2.00 27-Jun-15
30-Jun-15
0%
-99.69
MIP2-6-8840
Remove formwork
1.00 02-Jul-15
03-Jul-15
0%
-99.69
6G0905
MIP2-6-8810
6G0907
MIP2-6-8850
Formwork
10.00 22-Jun-15
4.00 22-Jun-15
03-Jul-15
26-Jun-15
0%
0%
-99.69
-98.69
MIP2-6-8860
Steel Bar
3.00 24-Jun-15
27-Jun-15
0%
-98.69
MIP2-6-8870
Concrete
2.00 27-Jun-15
30-Jun-15
0%
-98.69
MIP2-6-8880
Remove formwork
1.00 02-Jul-15
03-Jul-15
0%
-99.69
2015
A JJA
2016
JA
03-Jul-15, 6G0907
10.00 14-May-15
2.00 14-May-15
26-May-15
16-May-15
0%
0%
-21.69
-25.06
26-May-15, Part4
4G1206
MIP2-6-8900
8.00 16-May-15
2.00 16-May-15
26-May-15
19-May-15
0%
0%
-21.69
-21.69
26-May-15, 4G1206
Formwork
MIP2-6-8910
Steel Bar
2.00 18-May-15
20-May-15
0%
-21.69
MIP2-6-8920
Concrete
2.00 20-May-15
22-May-15
0%
-21.69
MIP2-6-8930
Remove formwork
1.00 25-May-15
26-May-15
0%
-21.69
3G1208
MIP2-6-8940
Formwork
8.00 16-May-15
2.00 16-May-15
26-May-15
19-May-15
0%
0%
-21.69
-21.69
MIP2-6-8950
Steel Bar
2.00 18-May-15
20-May-15
0%
-21.69
MIP2-6-8960
Concrete
2.00 20-May-15
22-May-15
0%
-21.69
MIP2-6-8970
Remove formwork
1.00 25-May-15
26-May-15
0%
-21.69
3G1209
MIP2-6-8980
Formwork
8.00 16-May-15
2.00 16-May-15
26-May-15
19-May-15
0%
0%
-21.69
-25.06
MIP2-6-8990
Steel Bar
2.00 18-May-15
20-May-15
0%
-25.06
MIP2-6-9000
Concrete
2.00 20-May-15
22-May-15
0%
-25.06
MIP2-6-9010
Remove formwork
1.00 25-May-15
26-May-15
0%
-21.69
03-Jun-15
03-Jun-15
27-May-15
0%
0%
0%
-21.69
-21.69
-21.69
03-Jun-15, Zone B1
03-Jun-15, Part1
03-Jun-15, 2B0901
26-May-15, 3G1208
26-May-15, 3G1209
Excavation
30.75 27-Apr-15
7.00 26-May-15
1.00 26-May-15
2B0901
MIP2-6-9030
Formwork
6.00 27-May-15
1.00 27-May-15
03-Jun-15
28-May-15
0%
0%
-21.69
-21.69
MIP2-6-9040
Steel Bar
1.00 28-May-15
29-May-15
0%
-21.69
MIP2-6-9050
Concrete
1.00 29-May-15
30-May-15
0%
-21.69
MIP2-6-9060
Remove formwork
1.00 02-Jun-15
03-Jun-15
0%
-21.69
2B0902
MIP2-6-9070
Formwork
6.00 27-May-15
1.00 27-May-15
03-Jun-15
28-May-15
0%
0%
-21.69
-21.69
MIP2-6-9080
Steel Bar
1.00 28-May-15
29-May-15
0%
-21.69
MIP2-6-9090
Concrete
1.00 29-May-15
30-May-15
0%
-21.69
MIP2-6-9100
Remove formwork
1.00 02-Jun-15
03-Jun-15
0%
-21.69
14-May-15
30-Apr-15
0%
0%
-79.38
-79.38
14-May-15, Part2
Excavation
13.00 27-Apr-15
3.00 27-Apr-15
2B1205
MIP2-6-9120
10.00 30-Apr-15
3.00 30-Apr-15
14-May-15
06-May-15
0%
0%
-79.38
-79.38
14-May-15, 2B1205
Formwork
MIP2-6-9130
Steel Bar
3.00 05-May-15
08-May-15
0%
-79.38
MIP2-6-9140
Concrete
2.00 08-May-15
11-May-15
0%
-79.38
MIP2-6-9150
Remove formwork
Zone B1
Part1
MIP2-6-9020
Part2
MIP2-6-9110
1.00 13-May-15
14-May-15
0%
-79.38
10.00 30-Apr-15
3.00 30-Apr-15
14-May-15
06-May-15
0%
0%
-79.38
-79.38
Steel Bar
3.00 05-May-15
08-May-15
0%
-79.38
Concrete
2.00 08-May-15
11-May-15
0%
-79.38
2B1206
MIP2-6-9160
Formwork
MIP2-6-9170
MIP2-6-9180
MIP2-6-9190
Remove formwork
1.00 13-May-15
14-May-15
0%
-79.38
10.00 30-Apr-15
3.00 30-Apr-15
14-May-15
06-May-15
0%
0%
-79.38
-79.38
Steel Bar
3.00 05-May-15
08-May-15
0%
-79.38
Concrete
2.00 08-May-15
11-May-15
0%
-79.38
Remove formwork
1.00 13-May-15
14-May-15
0%
-79.38
10.00 30-Apr-15
3.00 30-Apr-15
14-May-15
06-May-15
0%
0%
-79.38
-79.38
3B1209
MIP2-6-9200
Formwork
MIP2-6-9210
MIP2-6-9220
MIP2-6-9230
3B1210
MIP2-6-9240
Formwork
MIP2-6-9250
Steel Bar
3.00 05-May-15
08-May-15
0%
-79.38
MIP2-6-9260
Concrete
2.00 08-May-15
11-May-15
0%
-79.38
MIP2-6-9270
Remove formwork
1.00 13-May-15
14-May-15
0%
-79.38
10.00 30-Apr-15
3.00 30-Apr-15
14-May-15
06-May-15
0%
0%
-79.38
-79.38
4B1213
MIP2-6-9280
Formwork
MIP2-6-9290
Steel Bar
3.00 05-May-15
08-May-15
0%
-79.38
MIP2-6-9300
Concrete
2.00 08-May-15
11-May-15
0%
-79.38
MIP2-6-9310
Remove formwork
1.00 13-May-15
14-May-15
0%
-79.38
10.00 30-Apr-15
3.00 30-Apr-15
14-May-15
06-May-15
0%
0%
-79.38
-79.38
4B1214
MIP2-6-9320
Formwork
MIP2-6-9330
Steel Bar
3.00 05-May-15
08-May-15
0%
-79.38
MIP2-6-9340
Concrete
2.00 08-May-15
11-May-15
0%
-79.38
MIP2-6-9350
Remove formwork
1.00 13-May-15
14-May-15
0%
-79.38
9.00 04-Jun-15
9.00 04-Jun-15
16-Jun-15
16-Jun-15
0%
0%
-49.94
-49.94
Zone E1
Part1
Actual Work
Remaining Work
Milestone
Page 14 of 33
2017
A JJA
03-Jul-15, 6G0905
Excavation
Part4
MIP2-6-8890
03-Jun-15, 2B0902
14-May-15, 2B1206
14-May-15, 3B1209
14-May-15, 3B1210
14-May-15, 4B1213
14-May-15, 4B1214
16-Jun-15, Zone E1
16-Jun-15, Part1
Activity ID
Original Start
Duration
Activity Name
MIP2-6-9360
24-Feb-16 15:32
Finish
Excavation
2.00 04-Jun-15
08-Jun-15
0%
-49.94
4E1201
MIP2-6-9370
Formwork
7.00 08-Jun-15
2.00 08-Jun-15
16-Jun-15
10-Jun-15
0%
0%
-49.94
-49.94
MIP2-6-9380
Steel Bar
2.00 09-Jun-15
11-Jun-15
0%
-49.94
MIP2-6-9390
Concrete
1.00 11-Jun-15
12-Jun-15
0%
-49.94
MIP2-6-9400
Remove formwork
1.00 15-Jun-15
16-Jun-15
0%
-49.94
4E1202
MIP2-6-9410
Formwork
7.00 08-Jun-15
2.00 08-Jun-15
16-Jun-15
10-Jun-15
0%
0%
-49.94
-49.94
MIP2-6-9420
Steel Bar
2.00 09-Jun-15
11-Jun-15
0%
-49.94
MIP2-6-9430
Concrete
1.00 11-Jun-15
12-Jun-15
0%
-49.94
MIP2-6-9440
2015
A JJA
2016
JA
16-Jun-15, 4E1202
Remove formwork
1.00 15-Jun-15
16-Jun-15
0%
-49.94
Formwork
7.00 08-Jun-15
2.00 08-Jun-15
16-Jun-15
10-Jun-15
0%
0%
-49.94
-49.94
MIP2-6-9460
Steel Bar
2.00 09-Jun-15
11-Jun-15
0%
-49.94
MIP2-6-9470
Concrete
1.00 11-Jun-15
12-Jun-15
0%
-49.94
MIP2-6-9480
Remove formwork
1.00 15-Jun-15
16-Jun-15
0%
-49.94
9.00 04-Jun-15
2.00 04-Jun-15
16-Jun-15
08-Jun-15
0%
0%
-49.94
-49.94
16-Jun-15, Part2
Excavation
4E1206
MIP2-6-9500
7.00 08-Jun-15
2.00 08-Jun-15
16-Jun-15
10-Jun-15
0%
0%
-49.94
-49.94
16-Jun-15, 4E1206
Formwork
MIP2-6-9510
Steel Bar
2.00 09-Jun-15
11-Jun-15
0%
-49.94
MIP2-6-9520
Concrete
1.00 11-Jun-15
12-Jun-15
0%
-49.94
MIP2-6-9530
Remove formwork
1.00 15-Jun-15
16-Jun-15
0%
-49.94
4E1209
MIP2-6-9540
Formwork
7.00 08-Jun-15
2.00 08-Jun-15
16-Jun-15
10-Jun-15
0%
0%
-49.94
-49.94
MIP2-6-9550
Steel Bar
2.00 09-Jun-15
11-Jun-15
0%
-49.94
MIP2-6-9560
Concrete
1.00 11-Jun-15
12-Jun-15
0%
-49.94
MIP2-6-9570
Remove formwork
1.00 15-Jun-15
16-Jun-15
0%
-49.94
3E1210
MIP2-6-9580
Formwork
7.00 08-Jun-15
2.00 08-Jun-15
16-Jun-15
10-Jun-15
0%
0%
-49.94
-49.94
MIP2-6-9590
Steel Bar
2.00 09-Jun-15
11-Jun-15
0%
-49.94
MIP2-6-9600
Concrete
1.00 11-Jun-15
12-Jun-15
0%
-49.94
MIP2-6-9610
Remove formwork
1.00 15-Jun-15
16-Jun-15
0%
-49.94
09-Jul-15
17-Jun-15
09-Jun-15
0%
0%
0%
-50.88
-50.31
-50.31
09-Jul-15, Zone H1
17-Jun-15, Part1
17-Jun-15, 4H1201
16-Jun-15, 4E1205
16-Jun-15, 4E1209
16-Jun-15, 3E1210
Excavation
28.88 05-Jun-15
9.00 05-Jun-15
2.00 05-Jun-15
4H1201
MIP2-6-9630
Formwork
7.00 09-Jun-15
2.00 09-Jun-15
17-Jun-15
11-Jun-15
0%
0%
-50.31
-50.31
MIP2-6-9640
Steel Bar
2.00 11-Jun-15
13-Jun-15
0%
-50.31
MIP2-6-9650
Concrete
2.00 13-Jun-15
16-Jun-15
0%
-50.31
MIP2-6-9660
Remove formwork
1.00 16-Jun-15
17-Jun-15
0%
-50.31
4H1205
MIP2-6-9670
Formwork
7.00 09-Jun-15
2.00 09-Jun-15
17-Jun-15
11-Jun-15
0%
0%
-50.31
-50.31
MIP2-6-9680
Steel Bar
2.00 11-Jun-15
13-Jun-15
0%
-50.31
MIP2-6-9690
Concrete
2.00 13-Jun-15
16-Jun-15
0%
-50.31
MIP2-6-9700
Remove formwork
1.00 16-Jun-15
17-Jun-15
0%
-50.31
09-Jul-15
30-Jun-15
0%
0%
-50.88
-50.88
09-Jul-15, Part2
Excavation
9.00 29-Jun-15
1.00 29-Jun-15
8H0908
MIP2-6-9720
8.00 30-Jun-15
2.00 30-Jun-15
09-Jul-15
02-Jul-15
0%
0%
-50.88
-50.88
09-Jul-15, 8H0908
Formwork
MIP2-6-9730
Steel Bar
2.00 02-Jul-15
04-Jul-15
0%
-50.88
MIP2-6-9740
Concrete
1.00 04-Jul-15
06-Jul-15
0%
-50.88
MIP2-6-9750
Remove formwork
1.00 08-Jul-15
09-Jul-15
0%
-50.88
10-Apr-15
26-May-15
26-May-15
26-May-15
12-Sep-15
08-Jul-15
23-Jun-15
02-Jun-15
0%
0%
0%
0%
-52.25
2.00
15.00
15.00
Zone H1
Part1
MIP2-6-9620
Part2
MIP2-6-9710
128.63
37.00
24.00
7.00
MIP2-6-9780
Steel Bar
5.00 03-Jun-15
10-Jun-15
0%
15.00
MIP2-6-9790
Concrete
3.00 11-Jun-15
15-Jun-15
0%
15.00
MIP2-6-9800
Remove formwork
2.00 17-Jun-15
19-Jun-15
0%
15.00
MIP2-6-9810
3.00 19-Jun-15
23-Jun-15
0%
15.00
37.00 26-May-15
7.00 26-May-15
08-Jul-15
02-Jun-15
0%
0%
-6.00
-6.00
MIP2-6-9830
Formwork
14.00 02-Jun-15
19-Jun-15
0%
-6.00
MIP2-6-9840
9.00 19-Jun-15
30-Jun-15
0%
-6.00
MIP2-6-9850
Concrete
3.00 30-Jun-15
03-Jul-15
0%
-6.00
MIP2-6-9860
Remove formwork
2.00 06-Jul-15
08-Jul-15
0%
-6.00
26-Jun-15
28-May-15
0%
0%
-46.63
-46.63
Trenches
MIP2-6-9870
Excavation
27.00 26-May-15
3.00 26-May-15
MIP2-6-9880
Formwork
10.00 29-May-15
10-Jun-15
0%
-46.63
MIP2-6-9890
Steel Bar
5.00 10-Jun-15
16-Jun-15
0%
-46.63
MIP2-6-9900
Concrete
2.00 16-Jun-15
18-Jun-15
0%
-46.63
MIP2-6-9910
Remove formwork
2.00 20-Jun-15
23-Jun-15
0%
-46.63
MIP2-6-9920
3.00 23-Jun-15
26-Jun-15
0%
-46.63
21-May-15
30-Apr-15
16-Apr-15
0%
0%
0%
-42.13
-35.63
-35.63
0%
-35.63
0%
-35.63
Formwork
33.88 10-Apr-15
17.00 10-Apr-15
5.00 10-Apr-15
MIP2-6-9950
Steel Bar
4.00 16-Apr-15
21-Apr-15
MIP2-6-9960
Concrete
2.00 21-Apr-15
23-Apr-15
Zone B2
Trenches
MIP2-6-9940
Actual Work
Remaining Work
Milestone
Page 15 of 33
2017
A JJA
16-Jun-15, 4E1201
4E1205
MIP2-6-9450
Part2
MIP2-6-9490
17-Jun-15, 4H1205
26-Jun-15, Trenches
21-May-15, Zone B2
30-Apr-15, Trenches
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
MIP2-6-9970
Remove formwork
1.00 25-Apr-15
27-Apr-15
0%
-35.63
MIP2-6-9980
3.00 27-Apr-15
30-Apr-15
0%
-35.63
Formwork
10.00 09-May-15
3.00 09-May-15
21-May-15
13-May-15
0%
0%
-42.13
-42.13
MIP2-6-10000
Steel Bar
3.00 13-May-15
16-May-15
0%
-42.13
MIP2-6-10010
Concrete
1.00 16-May-15
18-May-15
0%
-42.13
MIP2-6-10020
Remove formwork
1.00 20-May-15
21-May-15
0%
-42.13
18-Jun-15
18-Jun-15
02-Jun-15
0%
0%
0%
-2.50
-42.13
-42.13
Stump
MIP2-6-9990
Formwork
40.13 29-Apr-15
23.00 21-May-15
10.00 21-May-15
MIP2-6-10050
Steel Bar
5.00 02-Jun-15
09-Jun-15
0%
-42.13
MIP2-6-10060
Concrete
2.00 09-Jun-15
11-Jun-15
0%
-42.13
MIP2-6-10070
Remove formwork
1.00 13-Jun-15
15-Jun-15
0%
-42.13
MIP2-6-10080
3.00 15-Jun-15
18-Jun-15
0%
-42.13
33.13 29-Apr-15
3.00 29-Apr-15
10-Jun-15
05-May-15
0%
0%
4.50
27.63
Zone C
Trenches
MIP2-6-10040
Stump
MIP2-6-10090
Formwork
MIP2-6-10100
Steel Bar
3.00 05-May-15
08-May-15
0%
27.63
MIP2-6-10110
Concrete
1.00 08-May-15
09-May-15
0%
27.63
MIP2-6-10120
Remove formwork
1.00 09-Jun-15
10-Jun-15
0%
4.50
17-Jul-15
17-Jul-15
18-Jun-15
0%
0%
0%
-6.00
-6.00
4.50
Formwork
56.75 12-May-15
32.50 10-Jun-15
7.00 10-Jun-15
MIP2-6-10150
Steel Bar
5.00 18-Jun-15
24-Jun-15
0%
4.50
MIP2-6-10160
Concrete
3.00 06-Jul-15
09-Jul-15
0%
-6.00
MIP2-6-10170
Remove formwork
2.00 11-Jul-15
14-Jul-15
0%
-6.00
MIP2-6-10180
3.00 14-Jul-15
17-Jul-15
0%
-6.00
20-Jun-15
15-May-15
0%
0%
-42.13
-18.88
Zone D
Lift Core ED0
MIP2-6-10140
Stump
MIP2-6-10190
Formwork
33.25 12-May-15
3.00 12-May-15
MIP2-6-10200
Steel Bar
2.00 15-May-15
18-May-15
0%
-18.88
MIP2-6-10210
Concrete
1.00 18-May-15
19-May-15
0%
-18.88
MIP2-6-10220
Remove formwork
2.00 18-Jun-15
20-Jun-15
0%
-42.13
22-Jul-15
22-Jul-15
24-Jun-15
0%
0%
0%
-50.88
-50.88
-42.13
Formwork
25.75 20-Jun-15
25.75 20-Jun-15
3.00 20-Jun-15
MIP2-6-10240
Steel Bar
2.00 24-Jun-15
26-Jun-15
0%
-42.13
MIP2-6-10250
Concrete
1.00 26-Jun-15
27-Jun-15
0%
-42.13
MIP2-6-10260
Remove formwork
2.00 09-Jul-15
11-Jul-15
0%
-50.88
MIP2-6-10270
Earthwork
7.00 11-Jul-15
22-Jul-15
0%
-50.88
02-May-15
02-May-15
16-Apr-15
0%
0%
0%
-17.38
-17.38
-17.38
Zone E2
Stump
MIP2-6-10230
2015
A JJA
2016
JA
2017
A JJA
21-May-15, Stump
18-Jun-15, Zone C
18-Jun-15, Trenches
10-Jun-15, Stump
17-Jul-15, Zone D
17-Jul-15, Lift Core ED0
20-Jun-15, Stump
22-Jul-15, Zone E2
22-Jul-15, Stump
Formwork
17.00 13-Apr-15
17.00 13-Apr-15
3.00 13-Apr-15
MIP2-6-10290
Steel Bar
2.00 16-Apr-15
18-Apr-15
0%
-17.38
MIP2-6-10300
Concrete
1.00 18-Apr-15
20-Apr-15
0%
-17.38
MIP2-6-10310
Remove formwork
2.00 22-Apr-15
24-Apr-15
0%
-17.38
MIP2-6-10320
Earthwork
7.00 24-Apr-15
02-May-15
0%
-17.38
12-Sep-15
12-Sep-15
0%
0%
-52.25
-99.69
12-Sep-15, Zone G
Earthwork
93.63 22-May-15
7.00 04-Sep-15
22.00 12-Aug-15
7.00 12-Aug-15
08-Sep-15
19-Aug-15
0%
0%
-48.25
-99.69
Formwork
MIP2-6-10350
Steel Bar
5.00 20-Aug-15
25-Aug-15
0%
-99.69
MIP2-6-10360
Concrete
3.00 25-Aug-15
29-Aug-15
0%
-99.69
MIP2-6-10370
Remove formwork
2.00 02-Sep-15
04-Sep-15
0%
-99.69
MIP2-6-10380
3.00 04-Sep-15
08-Sep-15
0%
-48.25
05-Jun-15
27-May-15
0%
0%
-25.06
-25.06
Zone F
Stump
MIP2-6-10280
Zone G
MIP2-6-10330
Stump
MIP2-6-10390
Formwork
12.00 22-May-15
4.00 22-May-15
MIP2-6-10400
Steel Bar
2.00 27-May-15
29-May-15
0%
-25.06
MIP2-6-10410
Concrete
2.00 29-May-15
01-Jun-15
0%
-25.06
MIP2-6-10420
Remove formwork
02-May-15, Zone F
02-May-15, Stump
05-Jun-15, Stump
2.00 03-Jun-15
05-Jun-15
0%
-25.06
01-Sep-15
01-Sep-15
0%
0%
-42.25
-90.19
01-Sep-15, Zone H2
Earthwork
74.50 02-Jun-15
7.00 22-Aug-15
Lift Core
MIP2-6-10440
35.00 21-Jul-15
12.00 21-Jul-15
01-Sep-15
04-Aug-15
0%
0%
-42.25
-90.19
Formwork
MIP2-6-10450
Steel Bar
9.00 04-Aug-15
14-Aug-15
0%
-90.19
MIP2-6-10460
Concrete
3.00 14-Aug-15
17-Aug-15
0%
-90.19
MIP2-6-10470
Remove formwork
2.00 20-Aug-15
21-Aug-15
0%
-90.19
MIP2-6-10480
7.00 22-Aug-15
01-Sep-15
0%
-42.25
19-Jun-15
09-Jun-15
0%
0%
-36.69
-36.69
Zone H2
MIP2-6-10430
Stump
MIP2-6-10490
Formwork
14.00 02-Jun-15
5.00 02-Jun-15
MIP2-6-10500
Steel Bar
3.00 09-Jun-15
12-Jun-15
0%
-36.69
MIP2-6-10510
Concrete
2.00 12-Jun-15
15-Jun-15
0%
-36.69
MIP2-6-10520
Remove formwork
2.00 17-Jun-15
19-Jun-15
0%
-36.69
29-Jun-15
29-Jun-15
03-Jun-15
0%
0%
0%
-36.19
-36.19
-36.19
Formwork
30.00 25-May-15
30.00 25-May-15
9.00 25-May-15
MIP2-6-10540
Steel Bar
7.00 04-Jun-15
12-Jun-15
0%
-36.19
MIP2-6-10550
Concrete
3.00 13-Jun-15
16-Jun-15
0%
-36.19
MIP2-6-10560
Remove formwork
2.00 18-Jun-15
20-Jun-15
0%
-36.19
MIP2-6-10570
Earthwork
7.00 20-Jun-15
29-Jun-15
0%
-36.19
15.00 11-May-15
27-May-15
0%
-60.88
Zone I
Stump
MIP2-6-10530
Zone B1
Actual Work
Remaining Work
Milestone
Page 16 of 33
19-Jun-15, Stump
29-Jun-15, Zone I
29-Jun-15, Stump
27-May-15, Zone B1
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
15.00 11-May-15
3.00 11-May-15
27-May-15
14-May-15
0%
0%
-60.88
-60.88
Steel Bar
3.00 14-May-15
16-May-15
0%
-60.88
Concrete
1.00 18-May-15
18-May-15
0%
-60.88
MIP2-6-10610
Remove formwork
1.00 21-May-15
21-May-15
0%
-60.88
MIP2-6-10620
Earthwork
5.00 22-May-15
27-May-15
0%
-60.88
15-Jul-15
15-Jul-15
18-Jun-15
0%
0%
0%
-46.63
-46.63
-39.63
Stump
MIP2-6-10580
Formwork
MIP2-6-10590
MIP2-6-10600
Formwork
28.00 12-Jun-15
28.00 12-Jun-15
5.00 12-Jun-15
MIP2-6-10640
Steel Bar
3.00 26-Jun-15
30-Jun-15
0%
-46.63
MIP2-6-10650
Concrete
2.00 30-Jun-15
02-Jul-15
0%
-46.63
MIP2-6-10660
Remove formwork
2.00 04-Jul-15
07-Jul-15
0%
-46.63
MIP2-6-10670
Earthwork
7.00 07-Jul-15
15-Jul-15
0%
-46.63
13-Jul-15
13-Jul-15
24-Jun-15
0%
0%
0%
-50.31
-50.31
-50.31
Zone E1
Stump
MIP2-6-10630
Formwork
23.00 17-Jun-15
23.00 17-Jun-15
7.00 17-Jun-15
MIP2-6-10690
Steel Bar
3.00 25-Jun-15
27-Jun-15
0%
-50.31
MIP2-6-10700
Concrete
2.00 27-Jun-15
30-Jun-15
0%
-50.31
MIP2-6-10710
Remove formwork
2.00 02-Jul-15
04-Jul-15
0%
-50.31
MIP2-6-10720
Earthwork
7.00 04-Jul-15
Zone H1
Stump
MIP2-6-10680
13-Jul-15
0%
-50.31
122.63 30-Apr-15
54.75 30-Apr-15
3.00 30-Apr-15
28-Sep-15
04-Jul-15
05-May-15
0%
0%
0%
-94.25
-79.38
-35.63
MIP2-6-10740
Formwork
6.00 06-May-15
12-May-15
0%
-35.63
MIP2-6-10750
Steel Bar
5.00 07-May-15
12-May-15
0%
-35.63
MIP2-6-10760
Concrete
2.00 02-Jul-15
04-Jul-15
0%
-79.38
Zone B
MIP2-6-10770
Excavation
32.50 27-May-15
3.00 27-May-15
04-Jul-15
30-May-15
0%
0%
-77.50
-60.88
MIP2-6-10780
Formwork
6.00 30-May-15
08-Jun-15
0%
-60.88
MIP2-6-10790
Steel Bar
5.00 01-Jun-15
08-Jun-15
0%
-56.00
MIP2-6-10800
Concrete
2.00 02-Jul-15
04-Jul-15
0%
-77.50
Zone C
MIP2-6-10810
Excavation
23.50 08-Jun-15
3.00 08-Jun-15
04-Jul-15
11-Jun-15
0%
0%
-73.38
-60.88
MIP2-6-10820
Formwork
6.00 11-Jun-15
18-Jun-15
0%
-60.88
MIP2-6-10830
Steel Bar
5.00 12-Jun-15
18-Jun-15
0%
-60.88
MIP2-6-10840
Concrete
2.00 02-Jul-15
04-Jul-15
0%
-73.38
01-Jul-15
22-Jun-15
0%
0%
-22.88
-22.88
Zone D
MIP2-6-10850
Excavation
11.00 18-Jun-15
3.00 18-Jun-15
MIP2-6-10860
Formwork
6.00 22-Jun-15
29-Jun-15
0%
-22.88
MIP2-6-10870
Steel Bar
5.00 23-Jun-15
29-Jun-15
0%
-22.88
MIP2-6-10880
Concrete
2.00 29-Jun-15
01-Jul-15
0%
-22.88
04-Aug-15
25-Jul-15
0%
0%
-50.88
-50.88
Zone E
MIP2-6-10890
Excavation
11.00 22-Jul-15
3.00 22-Jul-15
MIP2-6-10900
Formwork
8.00 25-Jul-15
04-Aug-15
0%
-50.88
MIP2-6-10910
Steel Bar
5.00 27-Jul-15
01-Aug-15
0%
-50.88
MIP2-6-10920
Concrete
2.00 01-Aug-15
04-Aug-15
0%
-50.88
16-May-15
07-May-15
0%
0%
-17.38
-17.38
Zone F
MIP2-6-10930
Excavation
11.00 02-May-15
3.00 02-May-15
MIP2-6-10940
Formwork
8.00 07-May-15
16-May-15
0%
-17.38
MIP2-6-10950
Steel Bar
5.00 08-May-15
14-May-15
0%
-17.38
MIP2-6-10960
Concrete
2.00 14-May-15
16-May-15
0%
-17.38
Excavation
11.00 12-Sep-15
3.00 12-Sep-15
28-Sep-15
17-Sep-15
0%
0%
-99.69
-99.69
MIP2-6-10980
Formwork
8.00 17-Sep-15
28-Sep-15
0%
-99.69
MIP2-6-10990
Steel Bar
5.00 18-Sep-15
25-Sep-15
0%
-99.69
MIP2-6-11000
Concrete
Zone G
MIP2-6-10970
2.00 25-Sep-15
28-Sep-15
0%
-99.69
Excavation
11.00 01-Sep-15
3.00 01-Sep-15
14-Sep-15
04-Sep-15
0%
0%
-90.19
-90.19
MIP2-6-11020
Formwork
8.00 04-Sep-15
14-Sep-15
0%
-90.19
MIP2-6-11030
Steel Bar
5.00 05-Sep-15
11-Sep-15
0%
-90.19
MIP2-6-11040
Concrete
2.00 11-Sep-15
14-Sep-15
0%
-90.19
Zone H
MIP2-6-11010
Zone I
MIP2-6-11050
Excavation
11.00 29-Jun-15
3.00 29-Jun-15
11-Jul-15
02-Jul-15
0%
0%
-36.19
-36.19
MIP2-6-11060
Formwork
6.00 02-Jul-15
09-Jul-15
0%
-36.19
MIP2-6-11070
Steel Bar
5.00 03-Jul-15
09-Jul-15
0%
-36.19
MIP2-6-11080
Concrete
2.00 09-Jul-15
11-Jul-15
0%
-36.19
138.38 16-May-15
24.25 04-Jul-15
3.00 04-Jul-15
31-Oct-15
05-Aug-15
09-Jul-15
0%
0%
0%
68.50
-79.38
-79.38
Steel Bar
2.00 13-Jul-15
15-Jul-15
0%
-79.38
MIP2-6-11110
Concrete
2.00 16-Jul-15
21-Jul-15
0%
-79.38
MIP2-6-11111
4.00 21-Jul-15
27-Jul-15
0%
-79.38
MIP2-6-11112
Steel Bar
3.00 28-Jul-15
01-Aug-15
0%
-79.38
MIP2-6-11113
Concrete
1.00 03-Aug-15
Zone B
MIP2-6-11120
Column Formwork
05-Aug-15
0%
-79.38
23.25 04-Jul-15
3.00 04-Jul-15
03-Aug-15
09-Jul-15
0%
0%
-77.50
-77.50
MIP2-6-11130
Steel Bar
2.00 10-Jul-15
13-Jul-15
0%
-77.50
MIP2-6-11140
Concrete
2.00 14-Jul-15
16-Jul-15
0%
-77.50
Actual Work
Remaining Work
Milestone
Page 17 of 33
2015
A JJA
2016
JA
2017
A JJA
27-May-15, Stump
15-Jul-15, Zone E1
15-Jul-15, Stump
13-Jul-15, Zone H1
13-Jul-15, Stump
04-Jul-15, Zone B
04-Jul-15, Zone C
01-Jul-15, Zone D
04-Aug-15, Zone E
16-May-15, Zone F
28-Sep-15, Zone G
14-Sep-15, Zone H
11-Jul-15, Zone I
03-Aug-15, Zone B
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
MIP2-6-11141
4.00 17-Jul-15
25-Jul-15
0%
-77.50
MIP2-6-11142
Steel Bar
3.00 27-Jul-15
31-Jul-15
0%
-77.50
MIP2-6-11143
Concrete
1.00 01-Aug-15
03-Aug-15
0%
-77.50
18.25 04-Jul-15
3.00 04-Jul-15
29-Jul-15
09-Jul-15
0%
0%
-73.38
-73.38
Zone C
MIP2-6-11150
Column Formwork
MIP2-6-11160
Steel Bar
2.00 09-Jul-15
11-Jul-15
0%
-73.38
MIP2-6-11170
Concrete
2.00 11-Jul-15
14-Jul-15
0%
-73.38
MIP2-6-11171
4.00 14-Jul-15
22-Jul-15
0%
-73.38
MIP2-6-11172
Steel Bar
3.00 22-Jul-15
27-Jul-15
0%
-73.38
MIP2-6-11173
Concrete
Zone D
MIP2-6-11180
Column Formwork
1.00 27-Jul-15
29-Jul-15
0%
-73.38
18.25 01-Jul-15
3.00 01-Jul-15
25-Jul-15
06-Jul-15
0%
0%
-22.88
-22.88
MIP2-6-11190
Steel Bar
2.00 06-Jul-15
08-Jul-15
0%
-22.88
MIP2-6-11200
Concrete
2.00 08-Jul-15
11-Jul-15
0%
-22.88
MIP2-6-11201
4.00 11-Jul-15
16-Jul-15
0%
-22.88
MIP2-6-11202
Steel Bar
3.00 16-Jul-15
23-Jul-15
0%
-22.88
MIP2-6-11203
Concrete
1.00 23-Jul-15
25-Jul-15
0%
-22.88
18.88 04-Aug-15
3.00 04-Aug-15
26-Aug-15
07-Aug-15
0%
0%
-50.88
-50.88
Zone E
MIP2-6-11210
Column Formwork
MIP2-6-11220
Steel Bar
2.00 07-Aug-15
11-Aug-15
0%
-50.88
MIP2-6-11230
Concrete
2.00 11-Aug-15
14-Aug-15
0%
-50.88
MIP2-6-11231
4.00 14-Aug-15
19-Aug-15
0%
-50.88
MIP2-6-11232
Steel Bar
3.00 19-Aug-15
24-Aug-15
0%
-50.88
MIP2-6-11233
Concrete
1.00 24-Aug-15
26-Aug-15
0%
-50.88
19.38 16-May-15
3.00 16-May-15
10-Jun-15
20-May-15
0%
0%
-17.38
-17.38
Zone F
MIP2-6-11240
Column Formwork
MIP2-6-11250
Steel Bar
2.00 20-May-15
23-May-15
0%
-17.38
MIP2-6-11260
Concrete
2.00 23-May-15
27-May-15
0%
-17.38
MIP2-6-11261
4.00 27-May-15
02-Jun-15
0%
-17.38
MIP2-6-11262
Steel Bar
3.00 02-Jun-15
08-Jun-15
0%
-17.38
MIP2-6-11263
Concrete
1.00 08-Jun-15
10-Jun-15
0%
-17.38
18.63 28-Sep-15
3.00 28-Sep-15
21-Oct-15
01-Oct-15
0%
0%
-99.69
-99.69
Zone G
MIP2-6-11270
Column Formwork
MIP2-6-11280
Steel Bar
2.00 01-Oct-15
03-Oct-15
0%
-99.69
MIP2-6-11290
Concrete
2.00 03-Oct-15
07-Oct-15
0%
-99.69
MIP2-6-11291
4.00 07-Oct-15
13-Oct-15
0%
-99.69
MIP2-6-11292
Steel Bar
3.00 13-Oct-15
19-Oct-15
0%
-99.69
MIP2-6-11293
Concrete
1.00 19-Oct-15
21-Oct-15
0%
-99.69
19.00 14-Sep-15
3.00 14-Sep-15
09-Oct-15
19-Sep-15
0%
0%
-90.19
-90.19
Zone H
MIP2-6-11300
Column Formwork
MIP2-6-11310
Steel Bar
2.00 19-Sep-15
23-Sep-15
0%
-90.19
MIP2-6-11320
Concrete
2.00 23-Sep-15
26-Sep-15
0%
-90.19
MIP2-6-11321
4.00 26-Sep-15
02-Oct-15
0%
-90.19
MIP2-6-11322
Steel Bar
3.00 02-Oct-15
07-Oct-15
0%
-90.19
MIP2-6-11323
Concrete
1.00 07-Oct-15
09-Oct-15
0%
-90.19
04-Aug-15
16-Jul-15
0%
0%
-36.19
-36.19
Zone I
MIP2-6-11330
Column Formwork
18.25 11-Jul-15
3.00 11-Jul-15
MIP2-6-11340
Steel Bar
2.00 16-Jul-15
21-Jul-15
0%
-36.19
MIP2-6-11350
Concrete
2.00 21-Jul-15
24-Jul-15
0%
-36.19
MIP2-6-11351
4.00 24-Jul-15
30-Jul-15
0%
-36.19
MIP2-6-11352
Steel Bar
3.00 30-Jul-15
03-Aug-15
0%
-36.19
MIP2-6-11353
Concrete
1.00 03-Aug-15
04-Aug-15
0%
-36.19
31-Oct-15
12-Aug-15
11-Aug-15
0%
0%
0%
35.38
100.50
100.50
Formwork
80.75 25-Jul-15
6.00 05-Aug-15
5.00 05-Aug-15
MIP2-6-11370
Steel Bar
3.00 07-Aug-15
11-Aug-15
0%
100.50
MIP2-6-11380
Concrete
1.00 11-Aug-15
12-Aug-15
0%
100.50
SD0
MIP2-6-11390
Formwork
9.00 25-Jul-15
5.00 25-Jul-15
05-Aug-15
31-Jul-15
0%
0%
107.13
107.13
MIP2-6-11400
Steel Bar
3.00 31-Jul-15
04-Aug-15
0%
107.13
MIP2-6-11410
Concrete
1.00 04-Aug-15
05-Aug-15
0%
107.13
SG0
MIP2-6-11420
Formwork
9.00 21-Oct-15
5.00 21-Oct-15
31-Oct-15
27-Oct-15
0%
0%
35.38
35.38
MIP2-6-11430
Steel Bar
3.00 27-Oct-15
30-Oct-15
0%
35.38
MIP2-6-11440
Concrete
1.00 30-Oct-15
31-Oct-15
0%
35.38
SH0
MIP2-6-11450
Formwork
9.00 09-Oct-15
5.00 09-Oct-15
20-Oct-15
16-Oct-15
0%
0%
44.88
44.88
MIP2-6-11460
Steel Bar
3.00 16-Oct-15
19-Oct-15
0%
44.88
MIP2-6-11470
Concrete
1.00 20-Oct-15
20-Oct-15
0%
44.88
22-Aug-15
22-Aug-15
15-Aug-15
0%
0%
0%
124.00
124.00
124.00
Staircase
SA0
MIP2-6-11360
Formwork
17.00 04-Aug-15
17.00 04-Aug-15
10.00 04-Aug-15
MIP2-6-11490
Steel Bar
5.00 15-Aug-15
21-Aug-15
0%
124.00
MIP2-6-11500
Concrete
2.00 21-Aug-15
22-Aug-15
0%
124.00
27-Jun-16
17-Dec-15
26-Aug-15
06-Aug-15
0%
0%
0%
0%
-1.50
48.50
-66.38
-66.38
Ramp
RI0
MIP2-6-11480
Frame
Ground Floor
Zone B & C
MIP2-6-11510
Column Formwork
Actual Work
Remaining Work
Milestone
277.75
120.75
20.00
3.00
25-Jul-15
25-Jul-15
03-Aug-15
03-Aug-15
Page 18 of 33
2015
A JJA
2016
JA
2017
A JJA
29-Jul-15, Zone C
25-Jul-15, Zone D
26-Aug-15, Zone E
10-Jun-15, Zone F
21-Oct-15, Zone G
09-Oct-15, Zone H
04-Aug-15, Zone I
31-Oct-15, Staircase
12-Aug-15, SA0
05-Aug-15, SD0
31-Oct-15, SG0
20-Oct-15, SH0
22-Aug-15, Ramp
22-Aug-15, RI0
27-Jun-16, Fram
17-Dec-15, Ground Floor
26-Aug-15, Zone B & C
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
MIP2-6-11520
Steel Bar
2.00 06-Aug-15
08-Aug-15
0%
-66.38
MIP2-6-11530
Concrete
2.00 10-Aug-15
12-Aug-15
0%
-66.38
MIP2-6-11540
5.00 13-Aug-15
19-Aug-15
0%
-66.38
MIP2-6-11550
Steel Bar
2.00 20-Aug-15
22-Aug-15
0%
-66.38
MIP2-6-11560
Concrete
2.00 24-Aug-15
26-Aug-15
0%
-66.38
Column Formwork
9.00 05-Aug-15
3.00 05-Aug-15
15-Aug-15
08-Aug-15
0%
0%
-57.25
-57.25
MIP2-6-11580
Steel Bar
1.00 06-Aug-15
07-Aug-15
0%
-57.25
MIP2-6-11590
Concrete
1.00 07-Aug-15
08-Aug-15
0%
-57.25
MIP2-6-11600
3.00 08-Aug-15
12-Aug-15
0%
-57.25
MIP2-6-11610
Steel Bar
2.00 11-Aug-15
13-Aug-15
0%
-57.25
MIP2-6-11620
Concrete
2.00 13-Aug-15
15-Aug-15
0%
-57.25
20.00 26-Aug-15
3.00 26-Aug-15
22-Sep-15
01-Sep-15
0%
0%
-50.88
-50.88
Zone A
MIP2-6-11570
Zone D, E & F
MIP2-6-11630
Column Formwork
MIP2-6-11640
Steel Bar
2.00 28-Aug-15
01-Sep-15
0%
-50.88
MIP2-6-11650
Concrete
2.00 01-Sep-15
03-Sep-15
0%
-50.88
MIP2-6-11660
10.00 03-Sep-15
15-Sep-15
0%
-50.88
MIP2-6-11670
Steel Bar
5.00 11-Sep-15
18-Sep-15
0%
-50.88
MIP2-6-11680
Concrete
Column Formwork
3.00 18-Sep-15
22-Sep-15
0%
-50.88
49.00 21-Oct-15
3.00 21-Oct-15
17-Dec-15
24-Oct-15
0%
0%
-99.69
-99.69
MIP2-6-11700
Steel Bar
2.00 22-Oct-15
24-Oct-15
0%
-99.69
MIP2-6-11710
Concrete
2.00 24-Oct-15
27-Oct-15
0%
-99.69
MIP2-6-11720
10.00 27-Oct-15
07-Nov-15
0%
-99.69
MIP2-6-11730
Steel Bar
5.00 04-Nov-15
10-Nov-15
0%
-99.69
MIP2-6-11740
Concrete
3.00 10-Nov-15
14-Nov-15
0%
-99.69
MIP2-6-11750
Remove formwork
1.00 16-Dec-15
17-Dec-15
0%
-99.69
31-Oct-15
15-Aug-15
08-Aug-15
0%
0%
0%
82.38
142.50
142.50
Formwork
80.75 25-Jul-15
9.00 05-Aug-15
3.00 05-Aug-15
MIP2-6-11770
Steel Bar
3.00 07-Aug-15
11-Aug-15
0%
142.50
MIP2-6-11780
Concrete
1.00 11-Aug-15
12-Aug-15
0%
142.50
MIP2-6-11790
Remove formwork
1.00 14-Aug-15
15-Aug-15
0%
142.50
ED1
MIP2-6-11800
Formwork
9.00 25-Jul-15
3.00 25-Jul-15
05-Aug-15
29-Jul-15
0%
0%
153.13
153.13
MIP2-6-11810
Steel Bar
3.00 28-Jul-15
31-Jul-15
0%
153.13
MIP2-6-11820
Concrete
1.00 31-Jul-15
01-Aug-15
0%
153.13
MIP2-6-11830
Lift Core
EA1
MIP2-6-11760
Remove formwork
1.00 04-Aug-15
05-Aug-15
0%
153.13
EG1
MIP2-6-11840
Formwork
9.00 21-Oct-15
3.00 21-Oct-15
31-Oct-15
24-Oct-15
0%
0%
82.38
82.38
MIP2-6-11850
Steel Bar
3.00 23-Oct-15
27-Oct-15
0%
82.38
MIP2-6-11860
Concrete
1.00 27-Oct-15
28-Oct-15
0%
82.38
MIP2-6-11870
Remove formwork
1.00 30-Oct-15
31-Oct-15
0%
82.38
EH1
MIP2-6-11880
Formwork
9.00 09-Oct-15
3.00 09-Oct-15
20-Oct-15
13-Oct-15
0%
0%
91.88
91.88
MIP2-6-11890
Steel Bar
3.00 12-Oct-15
16-Oct-15
0%
91.88
MIP2-6-11900
Concrete
1.00 16-Oct-15
17-Oct-15
0%
91.88
MIP2-6-11910
Remove formwork
1.00 20-Oct-15
20-Oct-15
0%
91.88
Formwork
85.13 15-Aug-15
9.00 15-Aug-15
5.00 15-Aug-15
27-Nov-15
26-Aug-15
21-Aug-15
0%
0%
0%
24.38
100.50
100.50
MIP2-6-11930
Steel Bar
3.00 21-Aug-15
25-Aug-15
0%
100.50
MIP2-6-11940
Concrete
1.00 25-Aug-15
26-Aug-15
0%
100.50
SD1
MIP2-6-11950
Formwork
9.00 26-Sep-15
5.00 26-Sep-15
06-Oct-15
02-Oct-15
0%
0%
68.13
68.13
MIP2-6-11960
Steel Bar
3.00 02-Oct-15
05-Oct-15
0%
68.13
MIP2-6-11970
Staircase
SA1
MIP2-6-11920
Concrete
1.00 06-Oct-15
06-Oct-15
0%
68.13
SG1
MIP2-6-11980
Formwork
9.00 18-Nov-15
5.00 18-Nov-15
27-Nov-15
23-Nov-15
0%
0%
24.38
24.38
MIP2-6-11990
Steel Bar
3.00 23-Nov-15
26-Nov-15
0%
24.38
MIP2-6-12000
Concrete
1.00 26-Nov-15
27-Nov-15
0%
24.38
SH1
MIP2-6-12010
Formwork
9.00 18-Nov-15
5.00 18-Nov-15
27-Nov-15
23-Nov-15
0%
0%
24.38
24.38
MIP2-6-12020
Steel Bar
3.00 23-Nov-15
26-Nov-15
0%
24.38
MIP2-6-12030
Concrete
1.00 26-Nov-15
27-Nov-15
0%
24.38
07-Dec-15
07-Sep-15
28-Aug-15
0%
0%
0%
57.50
133.63
133.63
Formwork
93.13 15-Aug-15
17.00 15-Aug-15
10.00 15-Aug-15
MIP2-6-12050
Steel Bar
5.00 28-Aug-15
04-Sep-15
0%
133.63
MIP2-6-12060
Concrete
2.00 04-Sep-15
07-Sep-15
0%
133.63
RI1
MIP2-6-12070
Formwork
17.00 18-Nov-15
10.00 18-Nov-15
07-Dec-15
28-Nov-15
0%
0%
57.50
57.50
MIP2-6-12080
Steel Bar
5.00 28-Nov-15
04-Dec-15
0%
57.50
MIP2-6-12090
Concrete
2.00 04-Dec-15
07-Dec-15
0%
57.50
119.75 05-Aug-15
20.00 26-Aug-15
3.00 26-Aug-15
29-Dec-15
21-Sep-15
01-Sep-15
0%
0%
0%
57.50
-66.38
-66.38
2.00 28-Aug-15
01-Sep-15
0%
-66.38
Ramp
RA1
MIP2-6-12040
1st Floor
Zone A, B & C
MIP2-6-12100
MIP2-6-12110
Column Formwork
Steel Bar
Actual Work
Remaining Work
Milestone
Page 19 of 33
2015
A JJA
2016
JA
2017
A JJA
15-Aug-15, Zone A
05-Aug-15, ED1
31-Oct-15, EG1
20-Oct-15, EH1
27-Nov-15, Staircase
26-Aug-15, SA1
06-Oct-15, SD1
27-Nov-15, SG1
27-Nov-15, SH1
07-Dec-15, Ramp
07-Sep-15, RA1
07-Dec-15, RI1
Activity ID
Original Start
Duration
Activity Name
MIP2-6-12120
Concrete
MIP2-6-12130
MIP2-6-12140
Steel Bar
MIP2-6-12150
Concrete
Zone D, E & F
MIP2-6-12160
Column Formwork
24-Feb-16 15:32
Finish
2.00 01-Sep-15
03-Sep-15
0%
-66.38
10.00 03-Sep-15
15-Sep-15
0%
-66.38
5.00 11-Sep-15
18-Sep-15
0%
-66.38
3.00 18-Sep-15
21-Sep-15
0%
-66.38
20.00 22-Sep-15
3.00 22-Sep-15
16-Oct-15
26-Sep-15
0%
0%
-50.88
-50.88
MIP2-6-12170
Steel Bar
2.00 23-Sep-15
26-Sep-15
0%
-50.88
MIP2-6-12180
Concrete
2.00 26-Sep-15
29-Sep-15
0%
-50.88
MIP2-6-12190
10.00 29-Sep-15
09-Oct-15
0%
-50.88
MIP2-6-12200
Steel Bar
5.00 07-Oct-15
12-Oct-15
0%
-50.88
MIP2-6-12210
Concrete
3.00 12-Oct-15
16-Oct-15
0%
-50.88
20.00 14-Nov-15
3.00 14-Nov-15
07-Dec-15
17-Nov-15
0%
0%
-99.63
-99.63
2.00 16-Nov-15
17-Nov-15
0%
-99.63
Column Formwork
MIP2-6-12230
Steel Bar
MIP2-6-12240
Concrete
MIP2-6-12250
MIP2-6-12260
MIP2-6-12270
2.00 18-Nov-15
19-Nov-15
0%
-99.63
10.00 20-Nov-15
01-Dec-15
0%
-99.63
Steel Bar
5.00 27-Nov-15
03-Dec-15
0%
-99.63
Concrete
3.00 03-Dec-15
07-Dec-15
0%
-99.63
Formwork
77.75 05-Aug-15
6.00 15-Aug-15
3.00 15-Aug-15
07-Nov-15
22-Aug-15
19-Aug-15
0%
0%
0%
82.38
142.50
142.50
MIP2-6-12290
Steel Bar
3.00 18-Aug-15
21-Aug-15
0%
142.50
MIP2-6-12300
Concrete
1.00 21-Aug-15
22-Aug-15
0%
142.50
ED2
MIP2-6-12310
Formwork
6.00 05-Aug-15
3.00 05-Aug-15
11-Aug-15
08-Aug-15
0%
0%
153.13
153.13
MIP2-6-12320
Steel Bar
3.00 07-Aug-15
10-Aug-15
0%
153.13
MIP2-6-12330
Concrete
1.00 11-Aug-15
11-Aug-15
0%
153.13
EG2
MIP2-6-12340
Formwork
6.00 31-Oct-15
3.00 31-Oct-15
07-Nov-15
04-Nov-15
0%
0%
82.38
82.38
MIP2-6-12350
Steel Bar
3.00 03-Nov-15
06-Nov-15
0%
82.38
MIP2-6-12360
Concrete
1.00 06-Nov-15
07-Nov-15
0%
82.38
EH2
MIP2-6-12370
Formwork
6.00 21-Oct-15
3.00 21-Oct-15
27-Oct-15
23-Oct-15
0%
0%
91.88
91.88
MIP2-6-12380
Steel Bar
3.00 23-Oct-15
26-Oct-15
0%
91.88
MIP2-6-12390
Concrete
1.00 26-Oct-15
27-Oct-15
0%
91.88
19-Dec-15
05-Oct-15
30-Sep-15
0%
0%
0%
16.38
80.38
80.38
Lift Core
EA2
MIP2-6-12280
Formwork
75.00 22-Sep-15
11.00 22-Sep-15
7.00 22-Sep-15
MIP2-6-12410
Steel Bar
3.00 30-Sep-15
03-Oct-15
0%
80.38
MIP2-6-12420
Concrete
1.00 03-Oct-15
05-Oct-15
0%
80.38
SD2
MIP2-6-12430
Formwork
11.00 16-Oct-15
7.00 16-Oct-15
29-Oct-15
24-Oct-15
0%
0%
60.13
60.13
MIP2-6-12440
Steel Bar
3.00 24-Oct-15
28-Oct-15
0%
60.13
MIP2-6-12450
Concrete
1.00 28-Oct-15
29-Oct-15
0%
60.13
SG2
MIP2-6-12460
Formwork
11.00 07-Dec-15
7.00 07-Dec-15
19-Dec-15
15-Dec-15
0%
0%
16.38
16.38
MIP2-6-12470
Steel Bar
3.00 15-Dec-15
18-Dec-15
0%
16.38
MIP2-6-12480
Concrete
1.00 18-Dec-15
19-Dec-15
0%
16.38
SH2
MIP2-6-12490
Formwork
11.00 07-Dec-15
7.00 07-Dec-15
19-Dec-15
15-Dec-15
0%
0%
16.38
16.38
MIP2-6-12500
Steel Bar
3.00 15-Dec-15
18-Dec-15
0%
16.38
MIP2-6-12510
Concrete
1.00 18-Dec-15
19-Dec-15
0%
16.38
29-Dec-15
12-Oct-15
03-Oct-15
0%
0%
0%
57.50
121.50
121.50
Staircase
SA2
MIP2-6-12400
Formwork
81.00 22-Sep-15
17.00 22-Sep-15
10.00 22-Sep-15
MIP2-6-12530
Steel Bar
5.00 03-Oct-15
09-Oct-15
0%
121.50
MIP2-6-12540
Concrete
2.00 09-Oct-15
12-Oct-15
0%
121.50
RI2
MIP2-6-12550
Formwork
17.00 07-Dec-15
10.00 07-Dec-15
29-Dec-15
18-Dec-15
0%
0%
57.50
57.50
MIP2-6-12560
Steel Bar
5.00 18-Dec-15
26-Dec-15
0%
57.50
MIP2-6-12570
Concrete
2.00 26-Dec-15
29-Dec-15
0%
57.50
131.75 12-Aug-15
20.00 22-Sep-15
3.00 22-Sep-15
19-Jan-16
16-Oct-15
25-Sep-15
0%
0%
0%
54.50
-66.38
-66.38
2.00 23-Sep-15
25-Sep-15
0%
-66.38
Ramp
RA2
MIP2-6-12520
2nd Floor
Zone A, B & C
MIP2-6-12580
Column Formwork
MIP2-6-12590
Steel Bar
MIP2-6-12600
Concrete
MIP2-6-12610
MIP2-6-12620
MIP2-6-12630
Zone D, E & F
MIP2-6-12640
2.00 26-Sep-15
28-Sep-15
0%
-66.38
10.00 28-Sep-15
09-Oct-15
0%
-66.38
Steel Bar
5.00 06-Oct-15
12-Oct-15
0%
-66.38
Concrete
3.00 12-Oct-15
16-Oct-15
0%
-66.38
18.00 16-Oct-15
3.00 16-Oct-15
06-Nov-15
20-Oct-15
0%
0%
-50.88
-50.88
Column Formwork
MIP2-6-12650
Steel Bar
2.00 17-Oct-15
20-Oct-15
0%
-50.88
MIP2-6-12660
Concrete
2.00 17-Oct-15
20-Oct-15
0%
-50.88
MIP2-6-12670
10.00 20-Oct-15
31-Oct-15
0%
-50.88
MIP2-6-12680
Steel Bar
5.00 28-Oct-15
03-Nov-15
0%
-50.88
MIP2-6-12690
Concrete
3.00 03-Nov-15
06-Nov-15
0%
-50.88
20.00 07-Dec-15
3.00 07-Dec-15
02-Jan-16
10-Dec-15
0%
0%
-99.63
-99.63
Column Formwork
Actual Work
Remaining Work
Milestone
Page 20 of 33
2015
A JJA
2016
JA
2017
A JJA
11-Aug-15, ED2
07-Nov-15, EG2
27-Oct-15, EH2
19-Dec-15, Staircase
05-Oct-15, SA2
29-Oct-15, SD2
19-Dec-15, SG2
19-Dec-15, SH2
29-Dec-15, Ramp
12-Oct-15, RA2
29-Dec-15, RI2
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
MIP2-6-12710
Steel Bar
2.00 08-Dec-15
10-Dec-15
0%
-99.63
MIP2-6-12720
Concrete
2.00 10-Dec-15
12-Dec-15
0%
-99.63
MIP2-6-12730
10.00 12-Dec-15
26-Dec-15
0%
-99.63
MIP2-6-12740
Steel Bar
5.00 21-Dec-15
29-Dec-15
0%
-99.63
MIP2-6-12750
Concrete
3.00 29-Dec-15
02-Jan-16
0%
-99.63
14-Nov-15
01-Sep-15
26-Aug-15
0%
0%
0%
82.38
142.50
142.50
Formwork
77.75 12-Aug-15
6.00 22-Aug-15
3.00 22-Aug-15
MIP2-6-12770
Steel Bar
3.00 25-Aug-15
29-Aug-15
0%
142.50
MIP2-6-12780
Concrete
1.00 29-Aug-15
01-Sep-15
0%
142.50
ED3
MIP2-6-12790
Formwork
6.00 12-Aug-15
3.00 12-Aug-15
18-Aug-15
14-Aug-15
0%
0%
153.13
153.13
MIP2-6-12800
Steel Bar
3.00 14-Aug-15
17-Aug-15
0%
153.13
MIP2-6-12810
Concrete
1.00 17-Aug-15
18-Aug-15
0%
153.13
EG3
MIP2-6-12820
Formwork
6.00 07-Nov-15
3.00 07-Nov-15
14-Nov-15
12-Nov-15
0%
0%
82.38
82.38
MIP2-6-12830
Steel Bar
3.00 10-Nov-15
14-Nov-15
0%
82.38
MIP2-6-12840
Lift Core
EA3
MIP2-6-12760
Concrete
1.00 14-Nov-15
14-Nov-15
0%
82.38
EH3
MIP2-6-12850
Formwork
6.00 27-Oct-15
3.00 27-Oct-15
03-Nov-15
30-Oct-15
0%
0%
91.88
91.88
MIP2-6-12860
Steel Bar
3.00 29-Oct-15
02-Nov-15
0%
91.88
MIP2-6-12870
Concrete
1.00 02-Nov-15
03-Nov-15
0%
91.88
14-Jan-16
29-Oct-15
24-Oct-15
0%
0%
0%
7.38
71.38
71.38
Formwork
75.00 16-Oct-15
11.00 16-Oct-15
7.00 16-Oct-15
MIP2-6-12890
Steel Bar
3.00 24-Oct-15
28-Oct-15
0%
71.38
MIP2-6-12900
Staircase
SA3
MIP2-6-12880
Concrete
1.00 28-Oct-15
29-Oct-15
0%
71.38
SD3
MIP2-6-12910
Formwork
11.00 06-Nov-15
7.00 06-Nov-15
20-Nov-15
16-Nov-15
0%
0%
53.13
53.13
MIP2-6-12920
Steel Bar
3.00 16-Nov-15
19-Nov-15
0%
53.13
MIP2-6-12930
Concrete
1.00 19-Nov-15
20-Nov-15
0%
53.13
SG3
MIP2-6-12940
Formwork
11.00 02-Jan-16
7.00 02-Jan-16
14-Jan-16
09-Jan-16
0%
0%
7.38
7.38
MIP2-6-12950
Steel Bar
3.00 11-Jan-16
13-Jan-16
0%
7.38
MIP2-6-12960
Concrete
1.00 14-Jan-16
14-Jan-16
0%
7.38
SH3
MIP2-6-12970
Formwork
11.00 02-Jan-16
7.00 02-Jan-16
14-Jan-16
09-Jan-16
0%
0%
7.38
7.38
MIP2-6-12980
Steel Bar
3.00 11-Jan-16
13-Jan-16
0%
7.38
MIP2-6-12990
Concrete
1.00 14-Jan-16
14-Jan-16
0%
7.38
19-Jan-16
03-Nov-15
28-Oct-15
0%
0%
0%
54.50
118.50
118.50
Formwork
79.00 16-Oct-15
15.00 16-Oct-15
10.00 16-Oct-15
MIP2-6-13010
Steel Bar
3.00 28-Oct-15
31-Oct-15
0%
118.50
MIP2-6-13020
Concrete
2.00 31-Oct-15
03-Nov-15
0%
118.50
RI3
MIP2-6-13030
Formwork
15.00 02-Jan-16
10.00 02-Jan-16
19-Jan-16
13-Jan-16
0%
0%
54.50
54.50
MIP2-6-13040
Steel Bar
3.00 14-Jan-16
16-Jan-16
0%
54.50
MIP2-6-13050
Concrete
Ramp
RA3
MIP2-6-13000
3rd Floor
Zone A, B & C
MIP2-6-13060
Column Formwork
2.00 16-Jan-16
19-Jan-16
0%
54.50
145.75 18-Aug-15
49.00 16-Oct-15
3.00 16-Oct-15
16-Feb-16
12-Dec-15
20-Oct-15
0%
0%
0%
49.50
-24.63
-66.38
MIP2-6-13070
Steel Bar
2.00 17-Oct-15
20-Oct-15
0%
-66.38
MIP2-6-13080
Concrete
2.00 20-Oct-15
22-Oct-15
0%
-66.38
MIP2-6-13090
10.00 22-Oct-15
03-Nov-15
0%
-66.38
MIP2-6-13100
Steel Bar
5.00 30-Oct-15
05-Nov-15
0%
-66.38
MIP2-6-13110
Concrete
3.00 05-Nov-15
09-Nov-15
0%
-66.38
MIP2-6-13120
Remove formwork
1.00 11-Dec-15
12-Dec-15
0%
-24.63
Column Formwork
20.00 06-Nov-15
3.00 06-Nov-15
30-Nov-15
10-Nov-15
0%
0%
-50.88
-50.88
2.00 07-Nov-15
10-Nov-15
0%
-50.88
Zone D, E & F
MIP2-6-13130
MIP2-6-13140
Steel Bar
MIP2-6-13150
Concrete
MIP2-6-13160
MIP2-6-13170
MIP2-6-13180
Zone G,H & I
MIP2-6-13190
2.00 10-Nov-15
13-Nov-15
0%
-50.88
10.00 13-Nov-15
25-Nov-15
0%
-50.88
Steel Bar
5.00 21-Nov-15
27-Nov-15
0%
-50.88
Concrete
3.00 27-Nov-15
30-Nov-15
0%
-50.88
20.00 02-Jan-16
3.00 02-Jan-16
26-Jan-16
06-Jan-16
0%
0%
-99.63
-99.63
Column Formwork
MIP2-6-13200
Steel Bar
2.00 04-Jan-16
06-Jan-16
0%
-99.63
MIP2-6-13210
Concrete
2.00 06-Jan-16
08-Jan-16
0%
-99.63
MIP2-6-13220
10.00 08-Jan-16
19-Jan-16
0%
-99.63
MIP2-6-13230
Steel Bar
5.00 16-Jan-16
21-Jan-16
0%
-99.63
MIP2-6-13240
Concrete
3.00 21-Jan-16
26-Jan-16
0%
-99.63
21-Nov-15
08-Sep-15
04-Sep-15
0%
0%
0%
82.38
142.50
142.50
Formwork
77.75 18-Aug-15
6.00 01-Sep-15
3.00 01-Sep-15
MIP2-6-13260
Steel Bar
3.00 03-Sep-15
07-Sep-15
0%
142.50
MIP2-6-13270
Concrete
1.00 07-Sep-15
08-Sep-15
0%
142.50
ED4
MIP2-6-13280
Formwork
6.00 18-Aug-15
3.00 18-Aug-15
25-Aug-15
21-Aug-15
0%
0%
153.13
153.13
MIP2-6-13290
Steel Bar
3.00 20-Aug-15
24-Aug-15
0%
153.13
Lift Core
EA4
MIP2-6-13250
Actual Work
Remaining Work
Milestone
Page 21 of 33
2015
A JJA
2016
JA
2017
A JJA
18-Aug-15, ED3
14-Nov-15, EG3
03-Nov-15, EH3
14-Jan-16, Staircase
29-Oct-15, SA3
20-Nov-15, SD3
14-Jan-16, SG3
14-Jan-16, SH3
19-Jan-16, Ramp
03-Nov-15, RA3
19-Jan-16, RI3
25-Aug-15, ED4
Activity ID
Original Start
Duration
Activity Name
MIP2-6-13300
24-Feb-16 15:32
Finish
Concrete
1.00 24-Aug-15
25-Aug-15
0%
153.13
EG4
MIP2-6-13310
Formwork
6.00 16-Nov-15
3.00 16-Nov-15
21-Nov-15
18-Nov-15
0%
0%
82.38
82.38
MIP2-6-13320
Steel Bar
3.00 18-Nov-15
20-Nov-15
0%
82.38
MIP2-6-13330
Concrete
1.00 21-Nov-15
21-Nov-15
0%
82.38
EH4
MIP2-6-13340
Formwork
6.00 03-Nov-15
3.00 03-Nov-15
10-Nov-15
06-Nov-15
0%
0%
91.88
91.88
MIP2-6-13350
Steel Bar
3.00 05-Nov-15
09-Nov-15
0%
91.88
MIP2-6-13360
Concrete
1.00 09-Nov-15
10-Nov-15
0%
91.88
11-Feb-16
21-Nov-15
17-Nov-15
0%
0%
0%
-1.63
62.38
62.38
Formwork
75.00 09-Nov-15
11.00 09-Nov-15
7.00 09-Nov-15
MIP2-6-13380
Steel Bar
3.00 18-Nov-15
20-Nov-15
0%
62.38
MIP2-6-13390
Staircase
SA4
MIP2-6-13370
Concrete
1.00 21-Nov-15
21-Nov-15
0%
62.38
SD4
MIP2-6-13400
Formwork
11.00 01-Dec-15
7.00 01-Dec-15
12-Dec-15
08-Dec-15
0%
0%
44.13
44.13
MIP2-6-13410
Steel Bar
3.00 08-Dec-15
11-Dec-15
0%
44.13
MIP2-6-13420
Concrete
1.00 11-Dec-15
12-Dec-15
0%
44.13
SG4
MIP2-6-13430
Formwork
11.00 26-Jan-16
7.00 26-Jan-16
11-Feb-16
04-Feb-16
0%
0%
-1.63
-1.63
MIP2-6-13440
Steel Bar
3.00 04-Feb-16
10-Feb-16
0%
-1.63
MIP2-6-13450
Concrete
1.00 10-Feb-16
11-Feb-16
0%
-1.63
11.00 26-Jan-16
7.00 26-Jan-16
11-Feb-16
04-Feb-16
0%
0%
-1.63
-1.63
SH4
MIP2-6-13460
Formwork
MIP2-6-13470
Steel Bar
3.00 04-Feb-16
10-Feb-16
0%
-1.63
MIP2-6-13480
Concrete
1.00 10-Feb-16
11-Feb-16
0%
-1.63
Formwork
79.00 09-Nov-15
15.00 09-Nov-15
10.00 09-Nov-15
16-Feb-16
26-Nov-15
20-Nov-15
0%
0%
0%
49.50
113.50
113.50
MIP2-6-13500
Steel Bar
3.00 21-Nov-15
24-Nov-15
0%
113.50
MIP2-6-13510
Concrete
2.00 24-Nov-15
26-Nov-15
0%
113.50
15.00 26-Jan-16
10.00 26-Jan-16
16-Feb-16
10-Feb-16
0%
0%
49.50
49.50
3.00 10-Feb-16
13-Feb-16
0%
49.50
Ramp
RA4
MIP2-6-13490
RI4
MIP2-6-13520
Formwork
MIP2-6-13530
Steel Bar
MIP2-6-13540
Concrete
4th Floor
Zone A, B & C
MIP2-6-13550
Column Formwork
2.00 13-Feb-16
16-Feb-16
0%
49.50
159.75 25-Aug-15
20.00 09-Nov-15
3.00 09-Nov-15
10-Mar-16
02-Dec-15
13-Nov-15
0%
0%
0%
44.50
-66.38
-66.38
MIP2-6-13560
Steel Bar
2.00 10-Nov-15
13-Nov-15
0%
-66.38
MIP2-6-13570
Concrete
2.00 13-Nov-15
14-Nov-15
0%
-66.38
MIP2-6-13580
10.00 16-Nov-15
26-Nov-15
0%
-66.38
MIP2-6-13590
Steel Bar
5.00 23-Nov-15
28-Nov-15
0%
-66.38
MIP2-6-13600
Concrete
3.00 28-Nov-15
02-Dec-15
0%
-66.38
20.00 01-Dec-15
3.00 01-Dec-15
23-Dec-15
03-Dec-15
0%
0%
-50.88
-50.88
Zone D, E & F
MIP2-6-13610
Column Formwork
MIP2-6-13620
Steel Bar
2.00 02-Dec-15
03-Dec-15
0%
-50.88
MIP2-6-13630
Concrete
2.00 04-Dec-15
05-Dec-15
0%
-50.88
MIP2-6-13640
10.00 05-Dec-15
17-Dec-15
0%
-50.88
MIP2-6-13650
Steel Bar
5.00 14-Dec-15
19-Dec-15
0%
-50.88
MIP2-6-13660
Concrete
3.00 19-Dec-15
23-Dec-15
0%
-50.88
20.00 26-Jan-16
3.00 26-Jan-16
22-Feb-16
29-Jan-16
0%
0%
-99.63
-99.63
2.00 27-Jan-16
29-Jan-16
0%
-99.63
Column Formwork
MIP2-6-13680
Steel Bar
MIP2-6-13690
Concrete
MIP2-6-13700
MIP2-6-13710
MIP2-6-13720
2.00 29-Jan-16
01-Feb-16
0%
-99.63
10.00 01-Feb-16
16-Feb-16
0%
-99.63
Steel Bar
5.00 12-Feb-16
18-Feb-16
0%
-99.63
Concrete
3.00 18-Feb-16
22-Feb-16
0%
-99.63
Formwork
77.75 25-Aug-15
7.00 08-Sep-15
3.00 08-Sep-15
28-Nov-15
15-Sep-15
11-Sep-15
0%
0%
0%
82.38
142.50
142.50
MIP2-6-13740
Steel Bar
3.00 11-Sep-15
14-Sep-15
0%
142.50
MIP2-6-13750
Concrete
1.00 15-Sep-15
15-Sep-15
0%
142.50
ED5
MIP2-6-13760
Formwork
6.00 25-Aug-15
3.00 25-Aug-15
03-Sep-15
29-Aug-15
0%
0%
153.13
153.13
MIP2-6-13770
Steel Bar
3.00 28-Aug-15
02-Sep-15
0%
153.13
MIP2-6-13780
Lift Core
EA5
MIP2-6-13730
Concrete
1.00 02-Sep-15
03-Sep-15
0%
153.13
EG5
MIP2-6-13790
Formwork
6.00 21-Nov-15
3.00 21-Nov-15
28-Nov-15
25-Nov-15
0%
0%
82.38
82.38
MIP2-6-13800
Steel Bar
3.00 24-Nov-15
27-Nov-15
0%
82.38
MIP2-6-13810
Concrete
1.00 27-Nov-15
28-Nov-15
0%
82.38
EH5
MIP2-6-13820
Formwork
6.00 10-Nov-15
3.00 10-Nov-15
18-Nov-15
14-Nov-15
0%
0%
91.88
91.88
MIP2-6-13830
Steel Bar
3.00 13-Nov-15
17-Nov-15
0%
91.88
MIP2-6-13840
Concrete
1.00 17-Nov-15
18-Nov-15
0%
91.88
05-Mar-16
15-Dec-15
10-Dec-15
0%
0%
0%
-10.63
53.38
53.38
Formwork
75.00 02-Dec-15
11.00 02-Dec-15
7.00 02-Dec-15
MIP2-6-13860
Steel Bar
3.00 10-Dec-15
14-Dec-15
0%
53.38
MIP2-6-13870
Concrete
1.00 14-Dec-15
15-Dec-15
0%
53.38
Staircase
SA5
MIP2-6-13850
Actual Work
Remaining Work
Milestone
Page 22 of 33
2015
A JJA
2016
JA
2017
A JJA
21-Nov-15, EG4
10-Nov-15, EH4
11-Feb-16, Staircase
21-Nov-15, SA4
12-Dec-15, SD4
11-Feb-16, SG4
11-Feb-16, SH4
16-Feb-16, Ramp
26-Nov-15, RA4
16-Feb-16, RI4
03-Sep-15, ED5
28-Nov-15, EG5
18-Nov-15, EH5
05-Mar-16, Staircase
15-Dec-15, SA5
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
SD5
MIP2-6-13880
Formwork
11.00 23-Dec-15
7.00 23-Dec-15
08-Jan-16
04-Jan-16
0%
0%
35.13
35.13
MIP2-6-13890
Steel Bar
3.00 04-Jan-16
07-Jan-16
0%
35.13
MIP2-6-13900
Concrete
1.00 07-Jan-16
08-Jan-16
0%
35.13
SG5
MIP2-6-13910
Formwork
11.00 22-Feb-16
7.00 22-Feb-16
05-Mar-16
01-Mar-16
0%
0%
-10.63
-10.63
MIP2-6-13920
Steel Bar
3.00 01-Mar-16
04-Mar-16
0%
-10.63
MIP2-6-13930
Concrete
1.00 04-Mar-16
05-Mar-16
0%
-10.63
SH5
MIP2-6-13940
Formwork
11.00 22-Feb-16
7.00 22-Feb-16
05-Mar-16
01-Mar-16
0%
0%
-10.63
-10.63
MIP2-6-13950
Steel Bar
3.00 01-Mar-16
04-Mar-16
0%
-10.63
MIP2-6-13960
Concrete
1.00 04-Mar-16
05-Mar-16
0%
-10.63
10-Mar-16
19-Dec-15
14-Dec-15
0%
0%
0%
44.50
108.50
108.50
Formwork
79.00 02-Dec-15
15.00 02-Dec-15
10.00 02-Dec-15
MIP2-6-13980
Steel Bar
3.00 14-Dec-15
17-Dec-15
0%
108.50
MIP2-6-13990
Concrete
2.00 17-Dec-15
19-Dec-15
0%
108.50
RI5
MIP2-6-14000
Formwork
15.00 22-Feb-16
10.00 22-Feb-16
10-Mar-16
04-Mar-16
0%
0%
44.50
44.50
MIP2-6-14010
Steel Bar
3.00 04-Mar-16
08-Mar-16
0%
44.50
MIP2-6-14020
Concrete
Ramp
RA5
MIP2-6-13970
5th Floor
Zone A, B & C
MIP2-6-14030
Column Formwork
2.00 08-Mar-16
10-Mar-16
0%
44.50
176.75 03-Sep-15
20.00 02-Dec-15
3.00 02-Dec-15
05-Apr-16
28-Dec-15
05-Dec-15
0%
0%
0%
36.50
-66.38
-66.38
MIP2-6-14040
Steel Bar
2.00 03-Dec-15
05-Dec-15
0%
-66.38
MIP2-6-14050
Concrete
2.00 05-Dec-15
08-Dec-15
0%
-66.38
MIP2-6-14060
10.00 08-Dec-15
19-Dec-15
0%
-66.38
MIP2-6-14070
Steel Bar
5.00 16-Dec-15
22-Dec-15
0%
-66.38
MIP2-6-14080
Concrete
3.00 22-Dec-15
28-Dec-15
0%
-66.38
23.00 23-Dec-15
3.00 23-Dec-15
22-Jan-16
29-Dec-15
0%
0%
-50.88
-50.88
Zone D, E & F
MIP2-6-14090
Column Formwork
MIP2-6-14100
Steel Bar
2.00 26-Dec-15
29-Dec-15
0%
-50.88
MIP2-6-14110
Concrete
2.00 29-Dec-15
31-Dec-15
0%
-50.88
MIP2-6-14120
10.00 31-Dec-15
13-Jan-16
0%
-50.88
MIP2-6-14130
Steel Bar
5.00 13-Jan-16
19-Jan-16
0%
-50.88
MIP2-6-14140
Concrete
3.00 19-Jan-16
22-Jan-16
0%
-50.88
23.00 22-Feb-16
3.00 22-Feb-16
18-Mar-16
25-Feb-16
0%
0%
-99.63
-99.63
Column Formwork
MIP2-6-14160
Steel Bar
2.00 23-Feb-16
25-Feb-16
0%
-99.63
MIP2-6-14170
Concrete
2.00 25-Feb-16
27-Feb-16
0%
-99.63
MIP2-6-14180
10.00 27-Feb-16
10-Mar-16
0%
-99.63
MIP2-6-14190
Steel Bar
5.00 10-Mar-16
15-Mar-16
0%
-99.63
MIP2-6-14200
Concrete
3.00 16-Mar-16
18-Mar-16
0%
-99.63
05-Dec-15
25-Sep-15
19-Sep-15
0%
0%
0%
82.38
142.50
142.50
Formwork
77.75 03-Sep-15
7.00 17-Sep-15
3.00 17-Sep-15
MIP2-6-14220
Steel Bar
3.00 19-Sep-15
23-Sep-15
0%
142.50
MIP2-6-14230
Concrete
1.00 23-Sep-15
25-Sep-15
0%
142.50
ED6
MIP2-6-14240
Formwork
7.00 03-Sep-15
3.00 03-Sep-15
11-Sep-15
07-Sep-15
0%
0%
153.13
153.13
MIP2-6-14250
Steel Bar
3.00 07-Sep-15
10-Sep-15
0%
153.13
MIP2-6-14260
Lift Core
EA6
MIP2-6-14210
Concrete
1.00 10-Sep-15
11-Sep-15
0%
153.13
EG6
MIP2-6-14270
Formwork
6.00 28-Nov-15
3.00 28-Nov-15
05-Dec-15
02-Dec-15
0%
0%
82.38
82.38
MIP2-6-14280
Steel Bar
3.00 01-Dec-15
04-Dec-15
0%
82.38
MIP2-6-14290
Concrete
1.00 04-Dec-15
05-Dec-15
0%
82.38
EH6
MIP2-6-14300
Formwork
6.00 18-Nov-15
3.00 18-Nov-15
25-Nov-15
21-Nov-15
0%
0%
91.88
91.88
MIP2-6-14310
Steel Bar
3.00 20-Nov-15
24-Nov-15
0%
91.88
MIP2-6-14320
Concrete
1.00 24-Nov-15
25-Nov-15
0%
91.88
31-Mar-16
09-Jan-16
06-Jan-16
0%
0%
0%
-22.63
44.38
44.38
Formwork
78.00 28-Dec-15
11.00 28-Dec-15
7.00 28-Dec-15
MIP2-6-14340
Steel Bar
3.00 06-Jan-16
09-Jan-16
0%
44.38
MIP2-6-14350
Concrete
1.00 09-Jan-16
09-Jan-16
0%
44.38
SD6
MIP2-6-14360
Formwork
11.00 22-Jan-16
7.00 22-Jan-16
05-Feb-16
30-Jan-16
0%
0%
23.13
23.13
MIP2-6-14370
Steel Bar
3.00 01-Feb-16
04-Feb-16
0%
23.13
MIP2-6-14380
Concrete
1.00 05-Feb-16
05-Feb-16
0%
23.13
SG6
MIP2-6-14390
Formwork
11.00 19-Mar-16
7.00 19-Mar-16
31-Mar-16
26-Mar-16
0%
0%
-22.63
-22.63
MIP2-6-14400
Steel Bar
3.00 26-Mar-16
30-Mar-16
0%
-22.63
MIP2-6-14410
Staircase
SA6
MIP2-6-14330
Concrete
1.00 30-Mar-16
31-Mar-16
0%
-22.63
SH6
MIP2-6-14420
Formwork
11.00 19-Mar-16
7.00 19-Mar-16
31-Mar-16
26-Mar-16
0%
0%
-22.63
-22.63
MIP2-6-14430
Steel Bar
3.00 26-Mar-16
30-Mar-16
0%
-22.63
MIP2-6-14440
Concrete
1.00 30-Mar-16
31-Mar-16
0%
-22.63
82.00 28-Dec-15
15.00 28-Dec-15
05-Apr-16
14-Jan-16
0%
0%
36.50
103.50
Ramp
RA6
Actual Work
Remaining Work
Milestone
Page 23 of 33
2015
A JJA
2016
JA
2017
A JJA
08-Jan-16, SD5
05-Mar-16, SG5
05-Mar-16, SH5
10-Mar-16, Ramp
19-Dec-15, RA5
10-Mar-16, RI5
11-Sep-15, ED6
05-Dec-15, EG6
25-Nov-15, EH6
31-Mar-16, Staircase
09-Jan-16, SA6
05-Feb-16, SD6
31-Mar-16, SG6
31-Mar-16, SH6
05-Apr-16, Ramp
14-Jan-16, RA6
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
MIP2-6-14450
Formwork
10.00 28-Dec-15
09-Jan-16
0%
103.50
MIP2-6-14460
Steel Bar
3.00 09-Jan-16
12-Jan-16
0%
103.50
MIP2-6-14470
Concrete
2.00 13-Jan-16
14-Jan-16
0%
103.50
RI6
MIP2-6-14480
Formwork
15.00 19-Mar-16
10.00 19-Mar-16
05-Apr-16
30-Mar-16
0%
0%
36.50
36.50
MIP2-6-14490
Steel Bar
3.00 30-Mar-16
02-Apr-16
0%
36.50
MIP2-6-14500
Concrete
2.00 02-Apr-16
05-Apr-16
0%
36.50
189.75 11-Sep-15
20.00 28-Dec-15
3.00 28-Dec-15
28-Apr-16
20-Jan-16
31-Dec-15
0%
0%
0%
31.50
-66.38
-66.38
6th Floor
Zone A, B & C
MIP2-6-14510
Column Formwork
MIP2-6-14520
Steel Bar
2.00 29-Dec-15
31-Dec-15
0%
-66.38
MIP2-6-14530
Concrete
2.00 31-Dec-15
04-Jan-16
0%
-66.38
MIP2-6-14540
10.00 04-Jan-16
14-Jan-16
0%
-66.38
MIP2-6-14550
Steel Bar
5.00 12-Jan-16
16-Jan-16
0%
-66.38
MIP2-6-14560
Concrete
3.00 16-Jan-16
20-Jan-16
0%
-66.38
20.00 22-Jan-16
3.00 22-Jan-16
18-Feb-16
27-Jan-16
0%
0%
-50.88
-50.88
Zone D, E & F
MIP2-6-14570
Column Formwork
MIP2-6-14580
Steel Bar
2.00 25-Jan-16
27-Jan-16
0%
-50.88
MIP2-6-14590
Concrete
2.00 27-Jan-16
29-Jan-16
0%
-50.88
MIP2-6-14600
10.00 29-Jan-16
12-Feb-16
0%
-50.88
MIP2-6-14610
Steel Bar
5.00 06-Feb-16
15-Feb-16
0%
-50.88
MIP2-6-14620
Concrete
Column Formwork
3.00 15-Feb-16
18-Feb-16
0%
-50.88
20.00 19-Mar-16
3.00 19-Mar-16
11-Apr-16
22-Mar-16
0%
0%
-99.63
-99.63
MIP2-6-14640
Steel Bar
2.00 19-Mar-16
22-Mar-16
0%
-99.63
MIP2-6-14650
Concrete
2.00 22-Mar-16
24-Mar-16
0%
-99.63
MIP2-6-14660
10.00 24-Mar-16
05-Apr-16
0%
-99.63
MIP2-6-14670
Steel Bar
5.00 01-Apr-16
07-Apr-16
0%
-99.63
MIP2-6-14680
Concrete
3.00 07-Apr-16
11-Apr-16
0%
-99.63
12-Dec-15
02-Oct-15
29-Sep-15
0%
0%
0%
82.38
142.50
142.50
Formwork
76.75 11-Sep-15
6.00 25-Sep-15
3.00 25-Sep-15
MIP2-6-14700
Steel Bar
3.00 28-Sep-15
01-Oct-15
0%
142.50
MIP2-6-14710
Concrete
1.00 01-Oct-15
02-Oct-15
0%
142.50
ED7
MIP2-6-14720
Formwork
6.00 11-Sep-15
3.00 11-Sep-15
19-Sep-15
15-Sep-15
0%
0%
153.13
153.13
MIP2-6-14730
Steel Bar
3.00 14-Sep-15
18-Sep-15
0%
153.13
MIP2-6-14740
Concrete
1.00 18-Sep-15
19-Sep-15
0%
153.13
EG7
MIP2-6-14750
Formwork
6.00 05-Dec-15
3.00 05-Dec-15
12-Dec-15
09-Dec-15
0%
0%
82.38
82.38
MIP2-6-14760
Steel Bar
3.00 08-Dec-15
11-Dec-15
0%
82.38
MIP2-6-14770
Lift Core
EA7
MIP2-6-14690
Concrete
1.00 11-Dec-15
12-Dec-15
0%
82.38
EH7
MIP2-6-14780
Formwork
6.00 25-Nov-15
3.00 25-Nov-15
02-Dec-15
28-Nov-15
0%
0%
91.88
91.88
MIP2-6-14790
Steel Bar
3.00 27-Nov-15
01-Dec-15
0%
91.88
MIP2-6-14800
Concrete
1.00 01-Dec-15
02-Dec-15
0%
91.88
23-Apr-16
04-Feb-16
29-Jan-16
0%
0%
0%
-31.63
35.38
35.38
Formwork
78.00 20-Jan-16
11.00 20-Jan-16
7.00 20-Jan-16
MIP2-6-14820
Steel Bar
3.00 29-Jan-16
03-Feb-16
0%
35.38
MIP2-6-14830
Staircase
SA7
MIP2-6-14810
Concrete
1.00 03-Feb-16
04-Feb-16
0%
35.38
SD7
MIP2-6-14840
Formwork
11.00 18-Feb-16
7.00 18-Feb-16
02-Mar-16
26-Feb-16
0%
0%
14.13
14.13
MIP2-6-14850
Steel Bar
3.00 26-Feb-16
01-Mar-16
0%
14.13
MIP2-6-14860
Concrete
1.00 01-Mar-16
02-Mar-16
0%
14.13
SG7
MIP2-6-14870
Formwork
11.00 11-Apr-16
7.00 11-Apr-16
23-Apr-16
19-Apr-16
0%
0%
-31.63
-31.63
MIP2-6-14880
Steel Bar
3.00 19-Apr-16
22-Apr-16
0%
-31.63
MIP2-6-14890
Concrete
1.00 22-Apr-16
23-Apr-16
0%
-31.63
SH7
MIP2-6-14900
Formwork
11.00 11-Apr-16
7.00 11-Apr-16
23-Apr-16
19-Apr-16
0%
0%
-31.63
-31.63
MIP2-6-14910
Steel Bar
3.00 19-Apr-16
22-Apr-16
0%
-31.63
MIP2-6-14920
Concrete
1.00 22-Apr-16
23-Apr-16
0%
-31.63
Formwork
82.00 20-Jan-16
15.00 20-Jan-16
10.00 20-Jan-16
28-Apr-16
11-Feb-16
03-Feb-16
0%
0%
0%
31.50
98.50
98.50
Ramp
RA7
MIP2-6-14930
MIP2-6-14940
Steel Bar
3.00 03-Feb-16
06-Feb-16
0%
98.50
MIP2-6-14950
Concrete
2.00 06-Feb-16
11-Feb-16
0%
98.50
15.00 11-Apr-16
10.00 11-Apr-16
28-Apr-16
22-Apr-16
0%
0%
31.50
31.50
3.00 22-Apr-16
26-Apr-16
0%
31.50
RI7
MIP2-6-14960
Formwork
MIP2-6-14970
Steel Bar
MIP2-6-14980
Concrete
7th Floor
Zone A, B & C
MIP2-6-14990
Column Formwork
2.00 26-Apr-16
28-Apr-16
0%
31.50
206.75 19-Sep-15
20.00 20-Jan-16
3.00 20-Jan-16
26-May-16
17-Feb-16
25-Jan-16
0%
0%
0%
23.50
-66.38
-66.38
MIP2-6-15000
Steel Bar
2.00 21-Jan-16
25-Jan-16
0%
-66.38
MIP2-6-15010
Concrete
2.00 25-Jan-16
27-Jan-16
0%
-66.38
MIP2-6-15020
10.00 27-Jan-16
11-Feb-16
0%
-66.38
MIP2-6-15030
Steel Bar
5.00 05-Feb-16
13-Feb-16
0%
-66.38
Actual Work
Remaining Work
Milestone
Page 24 of 33
2015
A JJA
2016
JA
2017
A JJA
05-Apr-16, RI6
18-Feb-16, Zone D, E
19-Sep-15, ED7
12-Dec-15, EG7
02-Dec-15, EH7
23-Apr-16, Staircase
04-Feb-16, SA7
02-Mar-16, SD7
23-Apr-16, SG7
23-Apr-16, SH7
28-Apr-16, Ramp
11-Feb-16, RA7
28-Apr-16, RI7
Activity ID
Original Start
Duration
Activity Name
MIP2-6-15040
Zone D, E & F
MIP2-6-15050
Concrete
Column Formwork
MIP2-6-15060
Steel Bar
MIP2-6-15070
Concrete
MIP2-6-15080
MIP2-6-15090
MIP2-6-15100
Zone G,H & I
MIP2-6-15110
24-Feb-16 15:32
Finish
3.00 13-Feb-16
17-Feb-16
0%
-66.38
20.00 18-Feb-16
3.00 18-Feb-16
12-Mar-16
22-Feb-16
0%
0%
-50.88
-50.88
2.00 19-Feb-16
22-Feb-16
0%
-50.88
2.00 22-Feb-16
24-Feb-16
0%
-50.88
10.00 24-Feb-16
07-Mar-16
0%
-50.88
Steel Bar
5.00 03-Mar-16
09-Mar-16
0%
-50.88
Concrete
3.00 09-Mar-16
12-Mar-16
0%
-50.88
20.00 14-Apr-16
3.00 14-Apr-16
07-May-16
18-Apr-16
0%
0%
-99.63
-99.63
Column Formwork
MIP2-6-15120
Steel Bar
2.00 15-Apr-16
18-Apr-16
0%
-99.63
MIP2-6-15130
Concrete
2.00 18-Apr-16
20-Apr-16
0%
-99.63
MIP2-6-15140
10.00 20-Apr-16
03-May-16
0%
-99.63
MIP2-6-15150
Steel Bar
5.00 28-Apr-16
05-May-16
0%
-99.63
MIP2-6-15160
Concrete
3.00 05-May-16
07-May-16
0%
-99.63
19-Dec-15
09-Oct-15
06-Oct-15
0%
0%
0%
82.38
142.50
142.50
Formwork
76.75 19-Sep-15
6.00 02-Oct-15
3.00 02-Oct-15
MIP2-6-15180
Steel Bar
3.00 05-Oct-15
08-Oct-15
0%
142.50
MIP2-6-15190
Concrete
1.00 08-Oct-15
09-Oct-15
0%
142.50
ED8
MIP2-6-15200
Formwork
6.00 19-Sep-15
3.00 19-Sep-15
28-Sep-15
23-Sep-15
0%
0%
153.13
153.13
MIP2-6-15210
Steel Bar
3.00 22-Sep-15
26-Sep-15
0%
153.13
MIP2-6-15220
Lift Core
EA8
MIP2-6-15170
Concrete
1.00 26-Sep-15
28-Sep-15
0%
153.13
EG8
MIP2-6-15230
Formwork
6.00 12-Dec-15
3.00 12-Dec-15
19-Dec-15
16-Dec-15
0%
0%
82.38
82.38
MIP2-6-15240
Steel Bar
3.00 15-Dec-15
18-Dec-15
0%
82.38
MIP2-6-15250
Concrete
1.00 18-Dec-15
19-Dec-15
0%
82.38
EH8
MIP2-6-15260
Formwork
6.00 02-Dec-15
3.00 02-Dec-15
09-Dec-15
05-Dec-15
0%
0%
91.88
91.88
MIP2-6-15270
Steel Bar
3.00 04-Dec-15
08-Dec-15
0%
91.88
MIP2-6-15280
Concrete
1.00 08-Dec-15
09-Dec-15
0%
91.88
20-May-16
01-Mar-16
25-Feb-16
0%
0%
0%
-43.63
26.38
26.38
Formwork
81.00 17-Feb-16
11.00 17-Feb-16
7.00 17-Feb-16
MIP2-6-15300
Steel Bar
3.00 25-Feb-16
29-Feb-16
0%
26.38
MIP2-6-15310
Concrete
1.00 29-Feb-16
01-Mar-16
0%
26.38
SD8
MIP2-6-15320
Formwork
11.00 12-Mar-16
7.00 12-Mar-16
25-Mar-16
21-Mar-16
0%
0%
5.13
5.13
MIP2-6-15330
Steel Bar
3.00 21-Mar-16
24-Mar-16
0%
5.13
MIP2-6-15340
Concrete
1.00 24-Mar-16
25-Mar-16
0%
5.13
SG8
MIP2-6-15350
Formwork
11.00 09-May-16
7.00 09-May-16
20-May-16
16-May-16
0%
0%
-43.63
-43.63
MIP2-6-15360
Steel Bar
3.00 16-May-16
19-May-16
0%
-43.63
MIP2-6-15370
Staircase
SA8
MIP2-6-15290
Concrete
1.00 19-May-16
20-May-16
0%
-43.63
SH8
MIP2-6-15380
Formwork
11.00 09-May-16
7.00 09-May-16
20-May-16
16-May-16
0%
0%
-43.63
-43.63
MIP2-6-15390
Steel Bar
3.00 16-May-16
19-May-16
0%
-43.63
MIP2-6-15400
Concrete
1.00 19-May-16
20-May-16
0%
-43.63
26-May-16
05-Mar-16
29-Feb-16
0%
0%
0%
23.50
93.50
93.50
Formwork
85.00 17-Feb-16
15.00 17-Feb-16
10.00 17-Feb-16
MIP2-6-15420
Steel Bar
3.00 29-Feb-16
03-Mar-16
0%
93.50
MIP2-6-15430
Ramp
RA8
MIP2-6-15410
Concrete
2.00 03-Mar-16
05-Mar-16
0%
93.50
RI8
MIP2-6-15440
Formwork
15.00 09-May-16
10.00 09-May-16
26-May-16
19-May-16
0%
0%
23.50
23.50
MIP2-6-15450
Steel Bar
3.00 19-May-16
24-May-16
0%
23.50
MIP2-6-15460
Concrete
2.00 24-May-16
26-May-16
0%
23.50
Roof
MIP2-6-15470
40.00 09-May-16
10.00 09-May-16
27-Jun-16
19-May-16
0%
0%
-7.63
-99.63
MIP2-6-15480
20.00 19-May-16
14-Jun-16
0%
-99.63
MIP2-6-15490
Water Tank
10.00 14-Jun-16
27-Jun-16
0%
-7.63
05-Aug-15
05-Aug-15
05-Aug-15
21-Nov-15
30-Sep-16
30-Sep-16
09-Jan-16
14-Dec-15
0%
0%
0%
0%
-77.50
-77.50
50.25
-68.50
ABWF WORKS
ARCHITECTURAL
LEVEL LG
MIP2-6-15500
Wall Painting
MIP2-6-15510
347.13
347.13
128.13
20.00
Floor Screeding
20.00 14-Dec-15
09-Jan-16
0%
-68.50
Brick Work
MIP2-6-15520
Zone A, B & C
74.13 05-Aug-15
30.00 05-Aug-15
04-Nov-15
11-Sep-15
0%
0%
-8.38
-79.38
MIP2-6-15530
Zone D, E & F
12.00 26-Aug-15
11-Sep-15
0%
35.38
MIP2-6-15540
12.00 21-Oct-15
04-Nov-15
0%
-68.50
71.13 17-Aug-15
7.00 17-Aug-15
13-Nov-15
25-Aug-15
0%
0%
84.63
-79.38
Plastering Work
MIP2-6-15550
Zone A, B & C
MIP2-6-15580
Zone D, E & F
7.00 11-Sep-15
21-Sep-15
0%
128.38
MIP2-6-15590
7.00 04-Nov-15
13-Nov-15
0%
-68.50
43.00 13-Aug-15
15.00 13-Aug-15
06-Oct-15
12-Sep-15
0%
0%
-79.38
-79.38
TNB Substation
MIP2-6-15600
Brick Work
MIP2-6-15610
Plastering Work
15.00 02-Sep-15
02-Oct-15
0%
-79.38
MIP2-6-15620
Floor Screeding
3.00 02-Oct-15
06-Oct-15
0%
-79.38
Actual Work
Remaining Work
Milestone
Page 25 of 33
2015
A JJA
2016
JA
2017
A JJA
12-Mar-16, Zone D, E
07-May-16, Zone G
28-Sep-15, ED8
19-Dec-15, EG8
09-Dec-15, EH8
20-May-16, Stairca
01-Mar-16, SA8
25-Mar-16, SD8
20-May-16, SG8
20-May-16, SH8
26-May-16, Ramp
05-Mar-16, RA8
26-May-16, RI8
27-Jun-16, Roof
30-Sep-16, A
30-Sep-16, A
09-Jan-16, LEVEL LG
Activity ID
Original Start
Duration
Activity Name
Ceiling Finishes
MIP2-6-15630
Zone A
24-Feb-16 15:32
Finish
66.13 25-Aug-15
2.00 25-Aug-15
14-Nov-15
28-Aug-15
0%
0%
86.25
147.00
MIP2-6-15640
Zone D
2.00 21-Sep-15
23-Sep-15
0%
128.38
MIP2-6-15650
Zone G
2.00 13-Nov-15
14-Nov-15
0%
86.25
MIP2-6-15660
Zone H
2.00 13-Nov-15
14-Nov-15
0%
-68.50
Tiling
MIP2-6-15670
Zone A
69.13 28-Aug-15
5.00 28-Aug-15
20-Nov-15
03-Sep-15
0%
0%
88.25
147.00
MIP2-6-15680
Zone D
5.00 23-Sep-15
30-Sep-15
0%
128.38
MIP2-6-15690
Zone G
5.00 16-Nov-15
20-Nov-15
0%
86.25
MIP2-6-15700
Zone H
5.00 16-Nov-15
20-Nov-15
0%
88.25
68.38 04-Sep-15
2.00 04-Sep-15
25-Nov-15
05-Sep-15
0%
0%
86.25
147.00
Zone B+C
2.00 30-Sep-15
01-Oct-15
0%
128.38
MIP2-6-15730
Zone F+G
2.00 21-Nov-15
23-Nov-15
0%
86.25
MIP2-6-15740
Zone H
2.00 23-Nov-15
25-Nov-15
0%
86.25
152.00 28-Aug-15
10.00 16-Dec-15
03-Mar-16
30-Dec-15
0%
0%
9.88
-60.50
LEVEL G
MIP2-6-15750
MIP2-6-15760
Wall Painting
Floor Screeding
20.00 09-Jan-16
03-Feb-16
0%
-68.50
Brick Work
MIP2-6-15770
Zone A, B & C
69.00 28-Aug-15
6.00 28-Aug-15
20-Nov-15
05-Sep-15
0%
0%
62.25
30.38
MIP2-6-15780
Zone D, E & F
6.00 22-Sep-15
30-Sep-15
0%
106.00
MIP2-6-15790
6.00 14-Nov-15
20-Nov-15
0%
-60.50
60.00 17-Dec-15
30.00 17-Dec-15
03-Mar-16
20-Jan-16
0%
0%
-99.69
-99.69
System Equipment
Equipm
Room
MIP2-6-15800
Brick Work
MIP2-6-15810
Plastering Work
20.00 20-Jan-16
15-Feb-16
0%
-99.69
MIP2-6-15820
Floor Screeding
15.00 15-Feb-16
03-Mar-16
0%
-99.69
78.00 05-Sep-15
15.00 05-Sep-15
08-Dec-15
23-Sep-15
0%
0%
62.25
122.25
Plastering Work
MIP2-6-15830
Zone A, B & C
MIP2-6-15840
Zone D, E & F
15.00 30-Sep-15
17-Oct-15
0%
106.00
MIP2-6-15850
15.00 21-Nov-15
08-Dec-15
0%
-60.50
65.00 25-Sep-15
2.00 25-Sep-15
10-Dec-15
26-Sep-15
0%
0%
65.25
122.25
106.00
Ceiling Finishes
MIP2-6-15860
Zone A
MIP2-6-15870
Zone D
2.00 17-Oct-15
20-Oct-15
0%
MIP2-6-15880
Zone G
2.00 08-Dec-15
10-Dec-15
0%
65.25
MIP2-6-15890
Zone H
2.00 08-Dec-15
10-Dec-15
0%
-60.50
Tiling
MIP2-6-15900
Zone A
68.00 26-Sep-15
5.00 26-Sep-15
16-Dec-15
02-Oct-15
0%
0%
68.25
122.25
MIP2-6-15910
Zone D
5.00 20-Oct-15
26-Oct-15
0%
106.00
MIP2-6-15920
Zone G
5.00 10-Dec-15
16-Dec-15
0%
65.25
MIP2-6-15930
Zone H
5.00 10-Dec-15
16-Dec-15
0%
68.25
69.00 02-Oct-15
3.00 02-Oct-15
23-Dec-15
06-Oct-15
0%
0%
65.25
122.25
Zone D
3.00 26-Oct-15
29-Oct-15
0%
106.00
MIP2-6-15960
Zone G
3.00 16-Dec-15
19-Dec-15
0%
65.25
MIP2-6-15970
Zone H
3.00 19-Dec-15
23-Dec-15
0%
65.25
133.00 22-Sep-15
20.00 13-Jan-16
03-Mar-16
06-Feb-16
0%
0%
13.25
-71.50
LEVEL 1
MIP2-6-15980
Wall Painting
MIP2-6-15990
Floor Screeding
20.00 06-Feb-16
03-Mar-16
0%
-71.50
Brick Work
MIP2-6-16000
Zone A, B & C
71.00 22-Sep-15
7.00 22-Sep-15
15-Dec-15
30-Sep-15
0%
0%
44.25
29.38
MIP2-6-16010
Zone D, E & F
7.00 16-Oct-15
24-Oct-15
0%
88.00
MIP2-6-16020
7.00 07-Dec-15
15-Dec-15
0%
-71.50
79.00 30-Sep-15
15.00 30-Sep-15
05-Jan-16
19-Oct-15
0%
0%
44.25
29.38
Plastering Work
MIP2-6-16030
Zone A, B & C
MIP2-6-16040
Zone D, E & F
15.00 24-Oct-15
12-Nov-15
0%
88.00
MIP2-6-16050
15.00 15-Dec-15
05-Jan-16
0%
-71.50
66.00 19-Oct-15
2.00 19-Oct-15
07-Jan-16
21-Oct-15
0%
0%
47.25
105.25
88.00
Ceiling Finishes
MIP2-6-16060
Zone A
MIP2-6-16070
Zone D
2.00 12-Nov-15
14-Nov-15
0%
MIP2-6-16080
Zone G
2.00 05-Jan-16
07-Jan-16
0%
47.25
MIP2-6-16090
Zone H
2.00 05-Jan-16
07-Jan-16
0%
-71.50
Tiling
MIP2-6-16100
Zone A
69.00 21-Oct-15
5.00 21-Oct-15
12-Jan-16
27-Oct-15
0%
0%
50.25
105.25
MIP2-6-16110
Zone D
5.00 14-Nov-15
20-Nov-15
0%
88.00
MIP2-6-16120
Zone G
5.00 07-Jan-16
12-Jan-16
0%
47.25
MIP2-6-16130
Zone H
5.00 07-Jan-16
12-Jan-16
0%
50.25
70.00 27-Oct-15
3.00 27-Oct-15
19-Jan-16
30-Oct-15
0%
0%
47.25
105.25
Zone F
3.00 20-Nov-15
24-Nov-15
0%
88.00
MIP2-6-16160
Zone G
3.00 13-Jan-16
15-Jan-16
0%
47.25
MIP2-6-16170
Zone H
3.00 16-Jan-16
19-Jan-16
0%
47.25
133.00 16-Oct-15
20.00 06-Feb-16
25-Mar-16
03-Mar-16
0%
0%
-3.75
-71.50
LEVEL 2
MIP2-6-16180
MIP2-6-16190
Wall Painting
Floor Screeding
20.00 03-Mar-16
25-Mar-16
0%
-71.50
Brick Work
MIP2-6-16200
Zone A, B & C
71.00 16-Oct-15
7.00 16-Oct-15
09-Jan-16
24-Oct-15
0%
0%
27.25
88.25
MIP2-6-16210
Zone D, E & F
7.00 06-Nov-15
16-Nov-15
0%
73.00
MIP2-6-16220
7.00 02-Jan-16
09-Jan-16
0%
-71.50
Actual Work
Remaining Work
Milestone
Page 26 of 33
2015
A JJA
2016
JA
2017
A JJA
20-Nov-15, Tiling
03-Mar-16, LEVEL G
03-Mar-16, System Eq
16-Dec-15, Tiling
03-Mar-16, LEVEL 1
05-Jan-16, Plastering Wo
12-Jan-16, Tiling
25-Mar-16, LEVEL 2
Activity ID
Original Start
Duration
Activity Name
Plastering Work
MIP2-6-16230
Zone A, B & C
24-Feb-16 15:32
Finish
79.00 24-Oct-15
15.00 24-Oct-15
28-Jan-16
12-Nov-15
0%
0%
27.25
88.25
MIP2-6-16240
Zone D, E & F
15.00 16-Nov-15
02-Dec-15
0%
73.00
MIP2-6-16250
15.00 11-Jan-16
28-Jan-16
0%
-71.50
66.00 12-Nov-15
2.00 12-Nov-15
30-Jan-16
14-Nov-15
0%
0%
30.25
88.25
73.00
Ceiling Finishes
MIP2-6-16260
Zone A
MIP2-6-16270
Zone D
2.00 03-Dec-15
04-Dec-15
0%
MIP2-6-16280
Zone G
2.00 28-Jan-16
30-Jan-16
0%
30.25
MIP2-6-16290
Zone H
2.00 28-Jan-16
30-Jan-16
0%
-71.50
Tiling
MIP2-6-16300
Zone A
69.00 14-Nov-15
5.00 14-Nov-15
06-Feb-16
19-Nov-15
0%
0%
33.25
88.25
MIP2-6-16310
Zone D
5.00 05-Dec-15
10-Dec-15
0%
73.00
MIP2-6-16320
Zone G
5.00 30-Jan-16
06-Feb-16
0%
30.25
MIP2-6-16330
Zone H
5.00 30-Jan-16
06-Feb-16
0%
33.25
70.00 20-Nov-15
3.00 20-Nov-15
16-Feb-16
23-Nov-15
0%
0%
30.25
88.25
Zone F
3.00 10-Dec-15
14-Dec-15
0%
73.00
MIP2-6-16360
Zone G
3.00 06-Feb-16
12-Feb-16
0%
30.25
MIP2-6-16370
Zone H
3.00 12-Feb-16
16-Feb-16
0%
30.25
114.75 01-Dec-15
20.00 03-Mar-16
18-Apr-16
25-Mar-16
0%
0%
-20.75
-71.50
Floor Screeding
20.00 25-Mar-16
18-Apr-16
0%
-71.50
Brick Work
MIP2-6-16410
Zone D, E & F
52.75 01-Dec-15
7.00 01-Dec-15
04-Feb-16
08-Dec-15
0%
0%
10.25
56.00
MIP2-6-16400
Zone A, B & C
7.00 12-Dec-15
21-Dec-15
0%
-24.63
MIP2-6-16420
7.00 26-Jan-16
04-Feb-16
0%
-71.50
60.75 08-Dec-15
15.00 08-Dec-15
24-Feb-16
28-Dec-15
0%
0%
10.25
56.00
LEVEL 3
MIP2-6-16380
MIP2-6-16390
Wall Painting
Plastering Work
MIP2-6-16440
Zone D, E & F
MIP2-6-16430
Zone A, B & C
15.00 21-Dec-15
09-Jan-16
0%
42.25
MIP2-6-16450
15.00 04-Feb-16
24-Feb-16
0%
-71.50
47.75 28-Dec-15
2.00 28-Dec-15
26-Feb-16
30-Dec-15
0%
0%
13.25
56.00
42.25
Ceiling Finishes
MIP2-6-16470
Zone D
MIP2-6-16460
Zone A
2.00 11-Jan-16
12-Jan-16
0%
MIP2-6-16480
Zone G
2.00 24-Feb-16
26-Feb-16
0%
13.25
MIP2-6-16490
Zone H
2.00 24-Feb-16
26-Feb-16
0%
-71.50
Tiling
MIP2-6-16510
Zone D
50.75 30-Dec-15
5.00 30-Dec-15
03-Mar-16
06-Jan-16
0%
0%
16.25
56.00
MIP2-6-16500
Zone A
5.00 13-Jan-16
18-Jan-16
0%
42.25
MIP2-6-16520
Zone G
5.00 26-Feb-16
03-Mar-16
0%
13.25
MIP2-6-16530
Zone H
5.00 26-Feb-16
03-Mar-16
0%
16.25
41.00 18-Jan-16
3.00 18-Jan-16
10-Mar-16
21-Jan-16
0%
0%
13.25
42.25
Zone F
3.00 21-Jan-16
26-Jan-16
0%
42.25
MIP2-6-16560
Zone G
3.00 03-Mar-16
07-Mar-16
0%
13.25
MIP2-6-16570
Zone H
3.00 07-Mar-16
10-Mar-16
0%
13.25
133.00 02-Dec-15
20.00 25-Mar-16
11-May-16
18-Apr-16
0%
0%
-37.75
-71.50
LEVEL 4
MIP2-6-16580
Wall Painting
MIP2-6-16590
Floor Screeding
20.00 18-Apr-16
11-May-16
0%
-71.50
Brick Work
MIP2-6-16600
Zone A, B & C
71.00 02-Dec-15
7.00 02-Dec-15
01-Mar-16
10-Dec-15
0%
0%
-6.75
-15.63
MIP2-6-16610
Zone D, E & F
7.00 23-Dec-15
04-Jan-16
0%
39.00
MIP2-6-16620
7.00 22-Feb-16
01-Mar-16
0%
-71.50
79.00 10-Dec-15
15.00 10-Dec-15
17-Mar-16
30-Dec-15
0%
0%
-6.75
54.25
Plastering Work
MIP2-6-16630
Zone A, B & C
MIP2-6-16640
Zone D, E & F
15.00 04-Jan-16
21-Jan-16
0%
39.00
MIP2-6-16650
15.00 01-Mar-16
17-Mar-16
0%
-71.50
66.00 30-Dec-15
2.00 30-Dec-15
19-Mar-16
02-Jan-16
0%
0%
-3.75
54.25
39.00
Ceiling Finishes
MIP2-6-16660
Zone A
MIP2-6-16670
Zone D
2.00 21-Jan-16
25-Jan-16
0%
MIP2-6-16680
Zone G
2.00 18-Mar-16
19-Mar-16
0%
-3.75
MIP2-6-16690
Zone H
2.00 18-Mar-16
19-Mar-16
0%
-71.50
Tiling
MIP2-6-16700
Zone A
69.00 02-Jan-16
5.00 02-Jan-16
25-Mar-16
08-Jan-16
0%
0%
-0.75
54.25
MIP2-6-16710
Zone D
5.00 25-Jan-16
30-Jan-16
0%
39.00
MIP2-6-16720
Zone G
5.00 19-Mar-16
25-Mar-16
0%
-3.75
MIP2-6-16730
Zone H
5.00 19-Mar-16
25-Mar-16
0%
-0.75
70.00 08-Jan-16
3.00 08-Jan-16
01-Apr-16
11-Jan-16
0%
0%
-3.75
54.25
Zone F
3.00 30-Jan-16
03-Feb-16
0%
39.00
MIP2-6-16760
Zone G
3.00 25-Mar-16
29-Mar-16
0%
-3.75
MIP2-6-16770
Zone H
3.00 29-Mar-16
01-Apr-16
0%
-3.75
136.00 28-Dec-15
20.00 21-Apr-16
09-Jun-16
14-May-16
0%
0%
-57.75
-74.50
LEVEL 5
MIP2-6-16780
MIP2-6-16790
Wall Painting
Floor Screeding
20.00 14-May-16
09-Jun-16
0%
-74.50
Brick Work
MIP2-6-16800
Zone A, B & C
74.00 28-Dec-15
7.00 28-Dec-15
26-Mar-16
06-Jan-16
0%
0%
-26.75
-5.63
MIP2-6-16810
Zone D, E & F
7.00 22-Jan-16
30-Jan-16
0%
19.00
MIP2-6-16820
7.00 19-Mar-16
26-Mar-16
0%
-92.50
Actual Work
Remaining Work
Milestone
Page 27 of 33
2015
A JJA
2016
JA
2017
A JJA
28-Jan-16, Plastering W
06-Feb-16, Tiling
18-Apr-16, LEVEL 3
24-Feb-16, Plastering W
03-Mar-16, Tiling
11-May-16, LEVEL
17-Mar-16, Plastering
25-Mar-16, Tiling
09-Jun-16, LEVEL
Activity ID
Original Start
Duration
Activity Name
Plastering Work
MIP2-6-16830
Zone A, B & C
24-Feb-16 15:32
Finish
82.00 06-Jan-16
15.00 06-Jan-16
13-Apr-16
22-Jan-16
0%
0%
-26.75
37.25
MIP2-6-16840
Zone D, E & F
15.00 01-Feb-16
20-Feb-16
0%
19.00
MIP2-6-16850
15.00 26-Mar-16
13-Apr-16
0%
-74.50
69.00 22-Jan-16
2.00 22-Jan-16
15-Apr-16
26-Jan-16
0%
0%
-23.75
37.25
Ceiling Finishes
MIP2-6-16860
Zone A
MIP2-6-16870
Zone D
2.00 20-Feb-16
23-Feb-16
0%
19.00
MIP2-6-16880
Zone G
2.00 13-Apr-16
15-Apr-16
0%
-23.75
MIP2-6-16890
Zone H
2.00 13-Apr-16
15-Apr-16
0%
-74.50
Tiling
MIP2-6-16900
Zone A
72.00 26-Jan-16
5.00 26-Jan-16
21-Apr-16
01-Feb-16
0%
0%
-20.75
37.25
MIP2-6-16910
Zone D
5.00 23-Feb-16
29-Feb-16
0%
19.00
MIP2-6-16920
Zone G
5.00 15-Apr-16
21-Apr-16
0%
-23.75
MIP2-6-16930
Zone H
5.00 15-Apr-16
21-Apr-16
0%
-20.75
73.00 01-Feb-16
3.00 01-Feb-16
28-Apr-16
05-Feb-16
0%
0%
-23.75
37.25
Zone F
3.00 29-Feb-16
03-Mar-16
0%
19.00
MIP2-6-16960
Zone G
3.00 21-Apr-16
25-Apr-16
0%
-23.75
MIP2-6-16970
Zone H
3.00 25-Apr-16
28-Apr-16
0%
-23.75
136.00 20-Jan-16
20.00 14-May-16
04-Jul-16
09-Jun-16
0%
0%
-74.50
-74.50
Floor Screeding
20.00 09-Jun-16
04-Jul-16
0%
-74.50
Brick Work
MIP2-6-17000
Zone A, B & C
74.00 20-Jan-16
7.00 20-Jan-16
19-Apr-16
29-Jan-16
0%
0%
-43.75
-25.63
MIP2-6-17010
Zone D, E & F
7.00 18-Feb-16
26-Feb-16
0%
2.00
MIP2-6-17020
7.00 11-Apr-16
19-Apr-16
0%
-74.50
82.00 29-Jan-16
15.00 29-Jan-16
07-May-16
19-Feb-16
0%
0%
-43.75
20.25
LEVEL 6
MIP2-6-16980
MIP2-6-16990
Wall Painting
Plastering Work
MIP2-6-17030
Zone A, B & C
MIP2-6-17040
Zone D, E & F
15.00 26-Feb-16
15-Mar-16
0%
2.00
MIP2-6-17050
15.00 19-Apr-16
07-May-16
0%
-74.50
69.00 19-Feb-16
2.00 19-Feb-16
09-May-16
22-Feb-16
0%
0%
-40.75
20.25
Ceiling Finishes
MIP2-6-17060
Zone A
MIP2-6-17070
Zone D
2.00 15-Mar-16
17-Mar-16
0%
2.00
MIP2-6-17080
Zone G
2.00 07-May-16
09-May-16
0%
-40.75
MIP2-6-17090
Zone H
2.00 07-May-16
09-May-16
0%
-74.50
Tiling
MIP2-6-17100
Zone A
72.00 22-Feb-16
5.00 22-Feb-16
14-May-16
27-Feb-16
0%
0%
-37.75
20.25
MIP2-6-17110
Zone D
5.00 17-Mar-16
23-Mar-16
0%
2.00
MIP2-6-17120
Zone G
5.00 10-May-16
14-May-16
0%
-40.75
MIP2-6-17130
Zone H
5.00 10-May-16
14-May-16
0%
-37.75
73.00 27-Feb-16
3.00 27-Feb-16
23-May-16
02-Mar-16
0%
0%
-40.75
20.25
MIP2-6-17150
Zone F
3.00 23-Mar-16
26-Mar-16
0%
2.00
MIP2-6-17160
Zone G
3.00 14-May-16
18-May-16
0%
-40.75
MIP2-6-17170
Zone H
LEVEL 7
MIP2-6-17180
Wall Painting
3.00 18-May-16
23-May-16
0%
-40.75
139.00 17-Feb-16
20.00 13-Jun-16
01-Aug-16
09-Jul-16
0%
0%
-77.50
-77.50
MIP2-6-17190
Floor Screeding
20.00 09-Jul-16
01-Aug-16
0%
-77.50
Brick Work
MIP2-6-17200
Zone A, B & C
77.00 17-Feb-16
7.00 17-Feb-16
16-May-16
25-Feb-16
0%
0%
-63.75
-66.38
MIP2-6-17210
Zone D, E & F
7.00 12-Mar-16
21-Mar-16
0%
-15.00
MIP2-6-17220
7.00 09-May-16
16-May-16
0%
-84.63
85.00 25-Feb-16
15.00 25-Feb-16
03-Jun-16
12-Mar-16
0%
0%
-63.75
3.25
Plastering Work
MIP2-6-17230
Zone A, B & C
MIP2-6-17240
Zone D, E & F
15.00 21-Mar-16
06-Apr-16
0%
-15.00
MIP2-6-17250
15.00 16-May-16
03-Jun-16
0%
-77.50
72.00 14-Mar-16
2.00 14-Mar-16
07-Jun-16
15-Mar-16
0%
0%
-60.75
3.25
Ceiling Finishes
MIP2-6-17260
Zone A
MIP2-6-17270
Zone D
2.00 06-Apr-16
08-Apr-16
0%
-15.00
MIP2-6-17280
Zone G
2.00 03-Jun-16
07-Jun-16
0%
-60.75
MIP2-6-17290
Zone H
2.00 03-Jun-16
07-Jun-16
0%
-77.50
Tiling
MIP2-6-17300
Zone A
75.00 16-Mar-16
5.00 16-Mar-16
13-Jun-16
21-Mar-16
0%
0%
-57.75
3.25
MIP2-6-17310
Zone D
5.00 08-Apr-16
14-Apr-16
0%
-15.00
MIP2-6-17320
Zone G
5.00 07-Jun-16
13-Jun-16
0%
-60.75
MIP2-6-17330
Zone H
5.00 07-Jun-16
13-Jun-16
0%
-57.75
76.00 21-Mar-16
3.00 21-Mar-16
20-Jun-16
24-Mar-16
0%
0%
-60.75
3.25
Zone F
3.00 14-Apr-16
18-Apr-16
0%
-15.00
MIP2-6-17360
Zone G
3.00 13-Jun-16
16-Jun-16
0%
-60.75
MIP2-6-17370
Zone H
3.00 16-Jun-16
20-Jun-16
0%
-60.75
Brick Work
59.00 14-Jun-16
5.00 14-Jun-16
24-Aug-16
20-Jun-16
0%
0%
-77.50
-99.63
MIP2-6-17390
Plastering Work
15.00 20-Jun-16
11-Jul-16
0%
-67.63
MIP2-6-17420
3.00 20-Jun-16
24-Jun-16
0%
-60.75
MIP2-6-17430
Wall Painting
7.00 25-Jun-16
04-Jul-16
0%
-60.75
MIP2-6-17400
Ceiling Finishes
5.00 11-Jul-16
16-Jul-16
0%
-63.50
MIP2-6-17410
Floor Screeding
20.00 01-Aug-16
24-Aug-16
0%
-77.50
ROOF LEVEL
MIP2-6-17380
Actual Work
Remaining Work
Milestone
Page 28 of 33
2015
A JJA
2016
JA
2017
A JJA
13-Apr-16, Plastering
15-Apr-16, Ceiling F
21-Apr-16, Tiling
28-Apr-16, Internal
04-Jul-16, LEVEL
19-Apr-16, Brick Wo
07-May-16, Plasteri
09-May-16, Ceiling
14-May-16, Tiling
23-May-16, Interna
01-Aug-16, LEV
16-May-16, Brick W
03-Jun-16, Plaster
07-Jun-16, Ceiling
13-Jun-16, Tiling
20-Jun-16, Intern
24-Aug-16, RO
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
2015
A JJA
2016
JA
2017
A JJA
Floor Coating
MIP2-6-17450
LEVEL LG
30.00 24-Aug-16
3.00 24-Aug-16
30-Sep-16
27-Aug-16
0%
0%
-77.50
-77.50
MIP2-6-17460
LEVEL G
3.00 27-Aug-16
01-Sep-16
0%
-77.50
MIP2-6-17470
LEVEL 1
3.00 01-Sep-16
05-Sep-16
0%
-77.50
MIP2-6-17480
LEVEL 2
3.00 05-Sep-16
08-Sep-16
0%
-77.50
MIP2-6-17490
LEVEL 3
3.00 08-Sep-16
10-Sep-16
0%
-77.50
MIP2-6-17500
LEVEL 4
3.00 12-Sep-16
15-Sep-16
0%
-77.50
MIP2-6-17510
LEVEL 5
3.00 17-Sep-16
20-Sep-16
0%
-77.50
MIP2-6-17520
LEVEL 6
3.00 20-Sep-16
23-Sep-16
0%
-77.50
MIP2-6-17530
LEVEL 7
3.00 23-Sep-16
27-Sep-16
0%
-77.50
MIP2-6-17440
ROOF LEVEL
3.00 27-Sep-16
30-Sep-16
0%
-77.50
14-May-15
14-May-15
05-Sep-15
08-Sep-15
08-Sep-15
19-Oct-16
19-Oct-16
05-Oct-16
22-Jul-16
14-Sep-15
0%
0%
0%
0%
0%
-92.50
-92.50
-99.63
-48.25
-48.25
19-Oct-16,
19-Oct-16,
05-Oct-16, E
22-Jul-16, LEVE
30.00 14-Sep-15
10.00 14-Sep-15
21-Oct-15
28-Sep-15
0%
0%
-48.25
-48.25
BWF
BUILDING SERVICES
SERVI
Electrical
LEVEL LG
MIP2-6-17540
Services Riser Ready
STANBY GENE
GENERATOR
MIP2-6-17550 Trunking
432.00
432.00
325.00
261.25
5.00
MIP2-6-17560
Cabling
10.00 28-Sep-15
09-Oct-15
0%
-48.25
MIP2-6-17570
10.00 09-Oct-15
21-Oct-15
0%
-48.25
51.50 21-Oct-15
30.38 21-Oct-15
21-Dec-15
21-Nov-15
0%
0%
-48.25
-48.25
INCOMING SERVICES
SE
MIP2-6-17580 Trunking
MIP2-6-17590
15.00 10-Nov-15
27-Nov-15
0%
-48.25
MIP2-6-17600
Cable Termination
20.00 27-Nov-15
21-Dec-15
0%
-48.25
207.63 13-Nov-15
30.00 21-Dec-15
22-Jul-16
21-Jan-16
0%
0%
-48.25
-48.25
15.00 21-Jan-16
12-Feb-16
0%
-3.25
MAIN DISTRIBUTION
DISTRIB
MIP2-6-17610 Trunking
MIP2-6-17620
DB Room Cabling
MIP2-6-17630
Fitting
30-Sep-16, F
21-Dec-15, INCOMING S
22-Jul-16, MAIN
30.00 12-Feb-16
17-Mar-16
0%
-3.25
150.00 21-Jan-16
15.00 21-Jan-16
22-Jul-16
12-Feb-16
0%
0%
-48.25
-48.25
MIP2-6-17650 LEVEL G
15.00 12-Feb-16
29-Feb-16
0%
-48.25
MIP2-6-17660 LEVEL 1
15.00 29-Feb-16
17-Mar-16
0%
-48.25
MIP2-6-17670 LEVEL 2
15.00 17-Mar-16
04-Apr-16
0%
-48.25
MIP2-6-17680 LEVEL 3
15.00 04-Apr-16
20-Apr-16
0%
-48.25
MIP2-6-17690 LEVEL 4
15.00 21-Apr-16
09-May-16
0%
-48.25
MIP2-6-17700 LEVEL 5
15.00 09-May-16
27-May-16
0%
-48.25
MIP2-6-17710 LEVEL 6
15.00 27-May-16
15-Jun-16
0%
-48.25
MIP2-6-17720 LEVEL 7
15.00 15-Jun-16
02-Jul-16
0%
-48.25
15.00 02-Jul-16
22-Jul-16
0%
-48.25
207.00 13-Nov-15
10.00 13-Nov-15
21-Jul-16
24-Nov-15
0%
0%
-47.63
19.38
MIP2-6-17750 LEVEL G
10.00 08-Dec-15
19-Dec-15
0%
7.38
MIP2-6-17760 LEVEL 1
10.00 05-Jan-16
15-Jan-16
0%
36.38
MIP2-6-17770 LEVEL 2
10.00 28-Jan-16
12-Feb-16
0%
26.38
MIP2-6-17780 LEVEL 3
10.00 24-Feb-16
07-Mar-16
0%
16.38
MIP2-6-17790 LEVEL 4
10.00 18-Mar-16
29-Mar-16
0%
6.38
MIP2-6-17800 LEVEL 5
10.00 13-Apr-16
25-Apr-16
0%
-6.63
MIP2-6-17810 LEVEL 6
10.00 07-May-16
18-May-16
0%
-16.63
MIP2-6-17820 LEVEL 7
10.00 03-Jun-16
16-Jun-16
0%
-29.63
10.00 11-Jul-16
21-Jul-16
0%
-47.63
60.00 04-Nov-15
30.00 04-Nov-15
15-Jan-16
09-Dec-15
0%
0%
20.88
20.88
30.00 09-Dec-15
15-Jan-16
0%
20.88
05-Feb-16
11-Sep-15
0%
0%
60.38
30.38
05-Feb-16, LEVEL G
125.00 05-Sep-15
5.00 05-Sep-15
120.00 11-Sep-15
30.00 11-Sep-15
05-Feb-16
19-Oct-15
0%
0%
30.38
30.38
Cabling
MIP2-6-17640 LEVEL LG
Installation of
o Sub Switchboard (SSB)
MIP2-6-17740 LEVEL LG
LIGHTING & P
POWER
MIP2-6-17840 Cabling
MIP2-6-17850
LEVEL G
MIP2-6-17860
MAIN DISTRIBUTION
DISTRIB
MIP2-6-17870 Trunking
MIP2-6-17880
Cabling
30.00 19-Oct-15
23-Nov-15
0%
30.38
MIP2-6-17890
30.00 23-Nov-15
30-Dec-15
0%
30.38
MIP2-6-17900
Fitting
30.00 30-Dec-15
05-Feb-16
0%
30.38
60.00 21-Nov-15
30.00 21-Nov-15
03-Feb-16
28-Dec-15
0%
0%
62.38
62.38
LIGHTING & P
POWER
MIP2-6-17910 Cabling
MIP2-6-17920
LEVEL 1
MIP2-6-17930
MAIN DISTRIBUTION
DISTRIB
MIP2-6-17940 Trunking
22-Jul-16, Cabli
21-Jul-16, Instal
03-Feb-16, LIGHTING
30.00 28-Dec-15
03-Feb-16
0%
62.38
121.00 19-Oct-15
1.00 19-Oct-15
14-Mar-16
20-Oct-15
0%
0%
29.38
29.38
14-Mar-16, LEVEL 1
120.00 20-Oct-15
30.00 20-Oct-15
14-Mar-16
24-Nov-15
0%
0%
29.38
29.38
MIP2-6-17950
Cabling
30.00 24-Nov-15
31-Dec-15
0%
29.38
MIP2-6-17960
30.00 31-Dec-15
06-Feb-16
0%
29.38
MIP2-6-17970
Fitting
30.00 06-Feb-16
14-Mar-16
0%
29.38
60.00 15-Dec-15
30.00 15-Dec-15
01-Mar-16
21-Jan-16
0%
0%
15.88
15.88
30.00 21-Jan-16
01-Mar-16
0%
15.88
143.00 11-Jan-16
1.00 06-Feb-16
01-Jul-16
10-Feb-16
0%
0%
-31.63
-61.63
01-Jul-16, LEVEL
120.00 10-Feb-16
30.00 10-Feb-16
01-Jul-16
15-Mar-16
0%
0%
-61.63
-61.63
01-Jul-16, MAIN
30.00 16-Mar-16
19-Apr-16
0%
-61.63
LIGHTING & P
POWER
MIP2-6-17980 Cabling
MIP2-6-17990
LEVEL 2
MIP2-6-18000
MAIN DISTRIBUTION
DISTRIB
MIP2-6-18010 Trunking
MIP2-6-18020
Cabling
Actual Work
Remaining Work
Milestone
Page 29 of 33
01-Mar-16, LIGHTING
Activity ID
Original Start
Duration
Activity Name
24-Feb-16 15:32
Finish
2015
A JJA
2016
JA
2017
A JJA
MIP2-6-18030
30.00 19-Apr-16
25-May-16
0%
-61.63
MIP2-6-18040
Fitting
30.00 25-May-16
01-Jul-16
0%
-61.63
60.00 11-Jan-16
30.00 11-Jan-16
23-Mar-16
18-Feb-16
0%
0%
51.38
51.38
30.00 18-Feb-16
23-Mar-16
0%
51.38
16-May-16
22-Dec-15
0%
0%
-20.13
-24.63
16-May-16, LEVEL
121.00 21-Dec-15
1.00 21-Dec-15
120.00 22-Dec-15
30.00 22-Dec-15
16-May-16
29-Jan-16
0%
0%
-24.63
-24.63
16-May-16, MAIN D
LIGHTING & P
POWER
MIP2-6-18050 Cabling
MIP2-6-18060
LEVEL 3
MIP2-6-18070
MAIN DISTRIBUTION
DISTRIB
MIP2-6-18080 Trunking
23-Mar-16, LIGHTING
MIP2-6-18090
Cabling
30.00 29-Jan-16
08-Mar-16
0%
-24.63
MIP2-6-18100
30.00 08-Mar-16
11-Apr-16
0%
-24.63
MIP2-6-18110
Fitting
30.00 11-Apr-16
16-May-16
0%
-24.63
60.00 04-Feb-16
30.00 04-Feb-16
15-Apr-16
12-Mar-16
0%
0%
5.88
5.88
30.00 12-Mar-16
15-Apr-16
0%
5.88
09-May-16
11-Dec-15
0%
0%
11.38
-15.63
09-May-16, LEVEL
124.00 10-Dec-15
1.00 10-Dec-15
120.00 11-Dec-15
30.00 11-Dec-15
06-May-16
18-Jan-16
0%
0%
-15.63
-15.63
06-May-16, MAIN D
LIGHTING & P
POWER
MIP2-6-18120 Cabling
MIP2-6-18130
LEVEL 4
MIP2-6-18140
MAIN DISTRIBUTION
DISTRIB
MIP2-6-18150 Trunking
15-Apr-16, LIGHTIN
MIP2-6-18160
Cabling
30.00 18-Jan-16
26-Feb-16
0%
-15.63
MIP2-6-18170
30.00 26-Feb-16
31-Mar-16
0%
-15.63
MIP2-6-18180
Fitting
30.00 31-Mar-16
06-May-16
0%
-15.63
60.00 01-Mar-16
30.00 01-Mar-16
09-May-16
04-Apr-16
0%
0%
11.38
11.38
30.00 04-Apr-16
09-May-16
0%
11.38
30-May-16
07-Jan-16
0%
0%
-5.63
-5.63
30-May-16, LEVEL
124.38 06-Jan-16
1.00 06-Jan-16
120.00 07-Jan-16
30.00 07-Jan-16
30-May-16
15-Feb-16
0%
0%
-5.63
-5.63
30-May-16, MAIN
LIGHTING & P
POWER
MIP2-6-18190 Cabling
MIP2-6-18200
LEVEL 5
MIP2-6-18210
MAIN DISTRIBUTION
DISTRIB
MIP2-6-18220 Trunking
MIP2-6-18230
Cabling
30.00 15-Feb-16
19-Mar-16
0%
-5.63
MIP2-6-18240
30.00 19-Mar-16
23-Apr-16
0%
-5.63
MIP2-6-18250
Fitting
30.00 23-Apr-16
30-May-16
0%
-5.63
57.38 26-Mar-16
30.00 26-Mar-16
28-May-16
27-Apr-16
0%
0%
-4.50
-4.50
30.00 27-Apr-16
28-May-16
0%
-4.50
147.00 29-Jan-16
1.00 29-Jan-16
26-Jul-16
30-Jan-16
0%
0%
-51.63
-25.63
120.00 30-Jan-16
30.00 30-Jan-16
24-Jun-16
09-Mar-16
0%
0%
-25.63
-25.63
LIGHTING & P
POWER
MIP2-6-18260 Cabling
MIP2-6-18270
LEVEL 6
MIP2-6-18280
MAIN DISTRIBUTION
DISTRIB
MIP2-6-18290 Trunking
MIP2-6-18300
30.00 09-Mar-16
12-Apr-16
0%
-25.63
MIP2-6-18310
30.00 12-Apr-16
17-May-16
0%
-25.63
MIP2-6-18320
Fitting
30.00 17-May-16
24-Jun-16
0%
-25.63
80.00 19-Apr-16
30.00 19-Apr-16
26-Jul-16
25-May-16
0%
0%
-51.63
-51.63
LIGHTING & P
POWER
MIP2-6-18330 G.I. Conduit
09-May-16, LIGHT
28-May-16, LIGHT
26-Jul-16, LEVE
24-Jun-16, MAIN
26-Jul-16, LIGH
MIP2-6-18340
Cabling
20.00 25-May-16
18-Jun-16
0%
-51.63
MIP2-6-18350
30.00 18-Jun-16
26-Jul-16
0%
-51.63
06-Aug-16
26-Feb-16
0%
0%
-61.63
-45.63
06-Aug-16, LEV
137.00 25-Feb-16
1.00 25-Feb-16
136.00 26-Feb-16
30.00 26-Feb-16
06-Aug-16
31-Mar-16
0%
0%
-61.63
-45.63
06-Aug-16, MA
LEVEL 7
MIP2-6-18360
MAIN DISTRIBUTION
DISTRIB
MIP2-6-18370 Trunking
MIP2-6-18380
30.00 31-Mar-16
06-May-16
0%
-45.63
MIP2-6-18390
30.00 06-May-16
11-Jun-16
0%
-45.63
MIP2-6-18400
Fitting
30.00 01-Jul-16
06-Aug-16
0%
-61.63
60.00 16-May-16
30.00 16-May-16
29-Jul-16
23-Jun-16
0%
0%
-54.63
-54.63
30.00 23-Jun-16
29-Jul-16
0%
-54.63
87.00 20-Jun-16
1.00 20-Jun-16
05-Oct-16
21-Jun-16
0%
0%
-99.63
-49.63
10.00 22-Sep-16
05-Oct-16
0%
-99.63
26.00 21-Jun-16
5.00 21-Jun-16
23-Jul-16
28-Jun-16
0%
0%
-49.63
-49.63
LIGHTING & P
POWER
MIP2-6-18410 Cabling
MIP2-6-18420
ROOF LEVEL
MIP2-6-18430
MIP2-6-18440
MAIN DISTRIBUTION
DISTRIB
MIP2-6-18450 Trunking
MIP2-6-18460
Cabling
7.00 28-Jun-16
06-Jul-16
0%
-49.63
MIP2-6-18470
7.00 06-Jul-16
16-Jul-16
0%
-49.63
MIP2-6-18480
Fitting
EARTHING & L
LIGTHING PROTECTION SYSTEM
MIP2-6-18490 Conduit
MIP2-6-18500
Configuration
MIP2-6-18510
Earthling
Copper Tape
MIP2-6-18520 Connecting Surround Roof Area
MIP2-6-18530 Connection to Lower Ground Earth Chamber
LIGHTING & P
POWER
MIP2-6-18540 Cabling
MIP2-6-18550
MECHANICAL
Auto Waste Collection
Co
System (AWCS)
Lower Ground
MIP2-6-18560 1500mm x1500mm Maintain ace Service Pit
MIP2-6-18570
Actual Work
Remaining Work
Milestone
7.00 16-Jul-16
23-Jul-16
0%
-49.63
77.00 20-Jun-16
20.00 08-Aug-16
22-Sep-16
01-Sep-16
0%
0%
-99.63
-99.63
20.00 19-Aug-16
12-Sep-16
0%
-99.63
7.00 14-Sep-16
22-Sep-16
0%
-99.63
40.00 20-Jun-16
30.00 20-Jun-16
08-Aug-16
27-Jul-16
0%
0%
-99.63
-99.63
10.00 27-Jul-16
08-Aug-16
0%
-99.63
60.00 20-Jun-16
30.00 20-Jun-16
01-Sep-16
27-Jul-16
0%
0%
-82.63
-82.63
30.00 27-Jul-16
01-Sep-16
0%
-82.63
19-Oct-16
19-Aug-16
25-Jul-15
18-Jun-15
0%
0%
0%
0%
-92.50
-73.50
249.50
249.50
25-Jul-15
0%
249.50
432.00
383.00
60.00
30.00
14-May-15
14-May-15
14-May-15
14-May-15
30.00 18-Jun-15
Page 30 of 33
29-Jul-16, LIGH
05-Oct-16, R
23-Jul-16, MAIN
22-Sep-16, E
08-Aug-16, Co
01-Sep-16, LI
19-Oct-16,
19-Aug-16, Au
25-Jul-15, Lower Ground
Activity ID
Original Start
Duration
Activity Name
500mm Diameter
Diame
AWCS Pipe Floor to Floor (by Other)
MIP2-6-18580 ROOF LEVEL
24-Feb-16 15:32
Finish
50.00 20-Jun-16
5.00 20-Jun-16
19-Aug-16
27-Jun-16
0%
0%
-73.50
-73.50
MIP2-6-18590
LEVEL 7
5.00 27-Jun-16
02-Jul-16
0%
-73.50
MIP2-6-18600
LEVEL 6
5.00 02-Jul-16
11-Jul-16
0%
-73.50
MIP2-6-18610
LEVEL 5
5.00 11-Jul-16
16-Jul-16
0%
-73.50
MIP2-6-18620
LEVEL 4
5.00 16-Jul-16
21-Jul-16
0%
-73.50
MIP2-6-18630
LEVEL 3
5.00 22-Jul-16
27-Jul-16
0%
-73.50
MIP2-6-18640
LEVEL 2
5.00 27-Jul-16
02-Aug-16
0%
-73.50
MIP2-6-18650
LEVEL 1
5.00 02-Aug-16
08-Aug-16
0%
-73.50
MIP2-6-18660
LEVEL G
5.00 08-Aug-16
13-Aug-16
0%
-73.50
MIP2-6-18670
LEVEL LG
5.00 13-Aug-16
19-Aug-16
0%
-73.50
95.50 14-May-15
20.00 14-May-15
05-Sep-15
05-Jun-15
0%
0%
120.88
-79.38
20.00 05-Jun-15
02-Jul-15
0%
-79.38
MIP2-6-18700
30.00 02-Jul-15
08-Aug-15
0%
120.88
MIP2-6-18710
23.00 08-Aug-15
05-Sep-15
0%
120.88
216.00 04-Nov-15
10.00 29-Jun-16
23-Jul-16
13-Jul-16
0%
0%
-29.63
-29.63
10.00 11-Jul-16
21-Jul-16
0%
-67.63
MIP2-6-18740
Pressure Test
10.00 13-Jul-16
23-Jul-16
0%
-29.63
196.00 04-Nov-15
15.00 04-Nov-15
29-Jun-16
21-Nov-15
0%
0%
-29.63
72.38
LEVEL G
15.00 21-Nov-15
09-Dec-15
0%
72.38
MIP2-6-18770
LEVEL 1
7.00 15-Dec-15
23-Dec-15
0%
67.38
MIP2-6-18780
LEVEL 2
7.00 11-Jan-16
18-Jan-16
0%
54.38
MIP2-6-18790
LEVEL 3
7.00 04-Feb-16
15-Feb-16
0%
41.38
MIP2-6-18800
LEVEL 4
7.00 01-Mar-16
09-Mar-16
0%
28.38
MIP2-6-18810
LEVEL 5
15.00 26-Mar-16
13-Apr-16
0%
12.38
MIP2-6-18820
LEVEL 6
7.00 19-Apr-16
27-Apr-16
0%
7.38
MIP2-6-18830
LEVEL 7
7.00 16-May-16
25-May-16
0%
-8.63
MIP2-6-18840
ROOF LEVEL
7.00 20-Jun-16
29-Jun-16
0%
-29.63
288.00 04-Nov-15
254.00 04-Nov-15
20.00 11-Jul-16
19-Oct-16
07-Sep-16
02-Aug-16
0%
0%
0%
-92.50
-88.50
-58.50
ENVIRONMENT
ENVIRONMENTAL
CONTROL SYSTEM
VENTILATION SYSTEM
MIP2-6-18850 Installation of Fire Damper
MIP2-6-18860
Trunking
20.00 11-Jul-16
02-Aug-16
0%
-88.50
MIP2-6-18870
Cable
20.00 22-Jul-16
13-Aug-16
0%
-88.50
MIP2-6-18880
20.00 13-Aug-16
07-Sep-16
0%
-88.50
204.00 04-Nov-15
30.00 04-Nov-15
11-Jul-16
09-Dec-15
0%
0%
-58.50
115.50
MIP2-6-18900 LEVEL G
30.00 08-Dec-15
14-Jan-16
0%
86.50
MIP2-6-18910 LEVEL 1
10.00 05-Jan-16
15-Jan-16
0%
85.50
MIP2-6-18920 LEVEL 2
10.00 11-Jan-16
21-Jan-16
0%
80.50
MIP2-6-18930 LEVEL 3
10.00 04-Feb-16
18-Feb-16
0%
60.50
MIP2-6-18940 LEVEL 4
10.00 01-Mar-16
12-Mar-16
0%
40.50
MIP2-6-18950 LEVEL 5
30.00 26-Mar-16
30-Apr-16
0%
-2.50
MIP2-6-18960 LEVEL 6
10.00 19-Apr-16
30-Apr-16
0%
-2.50
MIP2-6-18970 LEVEL 7
10.00 16-May-16
28-May-16
0%
-25.50
15.00 20-Jun-16
11-Jul-16
0%
-88.50
239.00 04-Nov-15
30.00 02-Jul-16
19-Aug-16
08-Aug-16
0%
0%
-52.63
-52.63
Installation of
o Vent Ducting at Staircase
MIP2-6-18890 LEVEL LG
AIR CONDITIONING
CONDITIO
SYSTEM
MIP2-6-18990 Installation of FCU Split Unit
MIP2-6-19000
10.00 08-Aug-16
19-Aug-16
0%
-52.63
199.00 04-Nov-15
20.00 04-Nov-15
02-Jul-16
27-Nov-15
0%
0%
-33.50
145.50
MIP2-6-19020 LEVEL G
20.00 21-Nov-15
14-Dec-15
0%
131.50
MIP2-6-19030 LEVEL 1
20.00 15-Dec-15
09-Jan-16
0%
110.50
MIP2-6-19040 LEVEL 2
10.00 11-Jan-16
21-Jan-16
0%
100.50
MIP2-6-19050 LEVEL 3
10.00 04-Feb-16
18-Feb-16
0%
80.50
MIP2-6-19060 LEVEL 4
10.00 01-Mar-16
12-Mar-16
0%
60.50
MIP2-6-19070 LEVEL 5
30.00 26-Mar-16
30-Apr-16
0%
17.50
MIP2-6-19080 LEVEL 6
10.00 19-Apr-16
30-Apr-16
0%
17.50
MIP2-6-19090 LEVEL 7
10.00 16-May-16
28-May-16
0%
-5.50
10.00 20-Jun-16
02-Jul-16
0%
-52.63
Cabling
MIP2-6-19110 LEVEL LG
199.00 04-Nov-15
20.00 04-Nov-15
01-Jul-16
27-Nov-15
0%
0%
-22.13
25.50
MIP2-6-19120 LEVEL G
20.00 21-Nov-15
14-Dec-15
0%
11.50
MIP2-6-19130 LEVEL 1
20.00 15-Dec-15
09-Jan-16
0%
-9.50
MIP2-6-19140 LEVEL 2
10.00 11-Jan-16
21-Jan-16
0%
-19.50
MIP2-6-19150 LEVEL 3
10.00 04-Feb-16
18-Feb-16
0%
-39.50
MIP2-6-19160 LEVEL 4
10.00 01-Mar-16
12-Mar-16
0%
-59.50
MIP2-6-19170 LEVEL 5
20.00 26-Mar-16
19-Apr-16
0%
-92.50
MIP2-6-19180 LEVEL 6
10.00 19-Apr-16
30-Apr-16
0%
28.38
MIP2-6-19190 LEVEL 7
10.00 16-May-16
28-May-16
0%
5.38
10.00 20-Jun-16
01-Jul-16
0%
-52.13
120.00 19-Apr-16
30.00 19-Apr-16
10-Sep-16
25-May-16
0%
0%
-92.50
-92.50
CONTROL SYS
SYSTEM: ELECTRICAL
MIP2-6-19210 Trunking
MIP2-6-19220
30.00 13-May-16
18-Jun-16
0%
-92.50
MIP2-6-19230
30.00 07-Jun-16
15-Jul-16
0%
-92.50
MIP2-6-19240
Cable
30.00 01-Jul-16
06-Aug-16
0%
-92.50
Actual Work
Remaining Work
Milestone
Page 31 of 33
2015
A JJA
2016
JA
2017
A JJA
19-Aug-16, 50
23-Jul-16, COLD
29-Jun-16, Cold
19-Oct-16,
07-Sep-16, VE
11-Jul-16, Install
19-Aug-16, AIR
02-Jul-16, Coppe
01-Jul-16, Cablin
10-Sep-16, C
Activity ID
Original Start
Duration
Activity Name
MIP2-6-19250
24-Feb-16 15:32
Finish
2016
JA
2017
A JJA
10-Sep-16
0%
-92.50
19-Oct-16
19-Oct-16
0%
0%
-92.50
-92.50
19-Oct-16,
246.63 04-Nov-15
150.00 25-Feb-16
30.00 25-Feb-16
27-Aug-16
17-Aug-16
30-Mar-16
0%
0%
0%
-66.38
-66.38
-66.38
27-Aug-16, FI
17-Aug-16, WE
30.00 30-Mar-16
05-May-16
0%
-66.38
MIP2-6-19290
30.00 05-May-16
10-Jun-16
0%
-66.38
MIP2-6-19300
Earthing
30.00 10-Jun-16
18-Jul-16
0%
-66.38
MIP2-6-19310
30.00 19-Jul-16
17-Aug-16
0%
-66.38
208.00 04-Nov-15
15.00 13-Apr-16
15-Jul-16
30-Apr-16
0%
0%
-37.75
-81.63
MIP2-6-19330
15.00 30-Apr-16
18-May-16
0%
-81.63
MIP2-6-19340
15.00 18-May-16
07-Jun-16
0%
-81.63
MIP2-6-19350
15.00 07-Jun-16
25-Jun-16
0%
-81.63
MIP2-6-19360
15.00 25-Jun-16
15-Jul-16
0%
-81.63
Piping Work
MIP2-6-19370 LEVEL LG
204.00 04-Nov-15
15.00 04-Nov-15
11-Jul-16
21-Nov-15
0%
0%
-33.75
155.25
MIP2-6-19380 LEVEL G
15.00 21-Nov-15
08-Dec-15
0%
141.25
MIP2-6-19390 LEVEL 1
15.00 15-Dec-15
05-Jan-16
0%
120.25
MIP2-6-19400 LEVEL 2
15.00 11-Jan-16
28-Jan-16
0%
100.25
MIP2-6-19410 LEVEL 3
15.00 04-Feb-16
24-Feb-16
0%
80.25
MIP2-6-19420 LEVEL 4
15.00 01-Mar-16
17-Mar-16
0%
60.25
MIP2-6-19430 LEVEL 5
15.00 26-Mar-16
13-Apr-16
0%
-81.63
MIP2-6-19440 LEVEL 6
15.00 19-Apr-16
07-May-16
0%
17.25
MIP2-6-19450 LEVEL 7
15.00 16-May-16
03-Jun-16
0%
-5.75
15.00 20-Jun-16
11-Jul-16
0%
-33.75
50.00 26-Mar-16
15.00 26-Mar-16
25-May-16
13-Apr-16
0%
0%
2.25
2.25
MIP2-6-19480
15.00 26-Mar-16
13-Apr-16
0%
17.25
MIP2-6-19490
Cable
15.00 13-Apr-16
30-Apr-16
0%
2.25
MIP2-6-19500
20.00 30-Apr-16
25-May-16
0%
2.25
50.00 16-May-16
15.00 16-May-16
18-Jul-16
03-Jun-16
0%
0%
-84.63
-84.63
AUTOMATIC G
GAS FLOODING SYSTEM (GENSET)
MIP2-6-19510 Conduit
30.00 12-Sep-16
30.00 12-Sep-16
FIRE ALARM S
SYSTEM (GL,L1,L2,L3,L4,L5,L6)
MIP2-6-19470 Conduit
2015
A JJA
30.00 06-Aug-16
MIP2-6-19280
MIP2-6-19530
15.00 16-May-16
03-Jun-16
0%
-69.63
MIP2-6-19540
15.00 16-May-16
03-Jun-16
0%
-69.63
MIP2-6-19550
15.00 16-May-16
03-Jun-16
0%
-69.63
MIP2-6-19520
Cable
15.00 03-Jun-16
23-Jun-16
0%
-84.63
MIP2-6-19560
15-Jul-16, HOSE
11-Jul-16, Piping
25-May-16, FIRE A
18-Jul-16, AUTO
20.00 23-Jun-16
18-Jul-16
0%
-84.63
PORTABLES A
APPLANCES
MIP2-6-19570 Fire Extinguisher (dry powder)
10.00 25-Jun-16
10.00 25-Jun-16
09-Jul-16
09-Jul-16
0%
0%
-32.75
-32.75
09-Jul-16, PORT
10.00 17-Aug-16
10.00 17-Aug-16
27-Aug-16
27-Aug-16
0%
0%
-66.38
-66.38
27-Aug-16, TE
04-Feb-15
04-Feb-15
10-Dec-15
10-Dec-15
29-Jul-16
25-Jun-16
21-Apr-16
22-Dec-15
0%
0%
0%
0%
-25.56
2.50
55.44
-34.69
29-Jul-16, EXTE
25-Jun-16, ROAD
21-Apr-16, INTERN
EXTERNAL / ANCILLIARY
ANCI
WORKS
ROAD WORKS
INTERNAL ROAD
MIP2-6-19590
Temporary Drain Diversion
447.94
419.88
109.00
10.00
MIP2-6-19600
Import Earth
25.00 16-Jan-16
19-Feb-16
0%
-34.69
MIP2-6-19610
Sub-Base
15.00 19-Feb-16
08-Mar-16
0%
-34.69
MIP2-6-19620
10.00 08-Mar-16
19-Mar-16
0%
2.31
MIP2-6-19630
Binder Course
3.00 19-Mar-16
22-Mar-16
0%
2.31
MIP2-6-19640
Wearing Course
3.00 22-Mar-16
25-Mar-16
0%
2.31
MIP2-6-19650
Line Marking
3.00 06-Apr-16
09-Apr-16
0%
46.31
MIP2-6-19660
Signage
10.00 09-Apr-16
21-Apr-16
0%
46.31
80.00 22-Dec-15
20.00 22-Dec-15
30-Mar-16
16-Jan-16
0%
0%
74.44
-34.69
Outside Boundary
EXISTING ROAD
MIP2-6-19690
Maintain Existing Road for Construction of Retaining Wal
Construct New Alignment Expansion Road Level
MIP2-6-19700
Earthwork
60.00 16-Jan-16
30-Mar-16
0%
74.44
407.38 04-Feb-15
60.00 04-Feb-15
10-Jun-16
15-Apr-15
0%
0%
5.88
155.25
10-Jun-16, EXIST
86.00 15-Oct-15
30.00 15-Oct-15
27-Jan-16
19-Nov-15
0%
0%
5.88
5.88
27-Jan-16, Construct Ne
MIP2-6-19710
Subgrade
20.00 19-Nov-15
12-Dec-15
0%
5.88
MIP2-6-19720
Crusherun
20.00 12-Dec-15
07-Jan-16
0%
5.88
MIP2-6-19730
Traffic Divertion
15.00 08-Jan-16
27-Jan-16
0%
5.88
60.00 19-Nov-15
30.00 19-Nov-15
01-Feb-16
23-Dec-15
0%
0%
9.88
9.88
Drainage / Culvert
Culv
Crossing
MIP2-6-19740
Within Boundary
MIP2-6-19750
Outside Boundary
30.00 23-Dec-15
01-Feb-16
0%
9.88
111.00 28-Jan-16
30.00 28-Jan-16
10-Jun-16
05-Mar-16
0%
0%
5.88
5.88
MIP2-6-19770
Sub-Base
25.00 12-Feb-16
11-Mar-16
0%
5.88
MIP2-6-19780
25.00 11-Mar-16
09-Apr-16
0%
5.88
MIP2-6-19790
Road Kerb
10.00 04-Apr-16
14-Apr-16
0%
5.88
MIP2-6-19800
Binder Course
7.00 15-Apr-16
22-Apr-16
0%
5.88
MIP2-6-19810
Wearing Course
7.00 22-Apr-16
30-Apr-16
0%
5.88
MIP2-6-19820
Line Marking
7.00 30-Apr-16
10-May-16
0%
5.88
MIP2-6-19830
Signage
10.00 28-May-16
10-Jun-16
0%
5.88
60.00 13-Apr-16
30.00 13-Apr-16
25-Jun-16
18-May-16
0%
0%
-6.63
-6.63
Elevated Walkway
Walkwa
MIP2-6-19840
Prepare For Connection
Actual Work
Remaining Work
Milestone
30-Mar-16, Culvert 1
Page 32 of 33
01-Feb-16, Drainage / C
10-Jun-16, New A
25-Jun-16, Eleva
Activity ID
Original Start
Duration
Activity Name
MIP2-6-19850
SEWERAGE WORKS
WOR
MIP2-6-19860
Pipe Connection Ground Floor
24-Feb-16 15:32
Finish
30.00 18-May-16
25-Jun-16
0%
-6.63
125.00 12-Nov-15
20.00 17-Dec-15
11-Apr-16
12-Jan-16
0%
0%
64.13
64.13
MIP2-6-19870
20.00 13-Jan-16
06-Feb-16
0%
64.13
MIP2-6-19900
20.00 25-Jan-16
19-Feb-16
0%
64.13
MIP2-6-19880
10.00 06-Feb-16
20-Feb-16
0%
64.13
MIP2-6-19910
30.00 19-Feb-16
25-Mar-16
0%
64.13
MIP2-6-19890
20.00 20-Feb-16
02-Mar-16
0%
64.13
MIP2-6-19920
Authority Approval
1.00 09-Apr-16
11-Apr-16
0%
64.13
Manhole
MIP2-6-19930
No 1, 2, 3
60.00 12-Nov-15
20.00 12-Nov-15
25-Jan-16
05-Dec-15
0%
0%
64.13
64.13
MIP2-6-19940
No 4, 5, 6
20.00 05-Dec-15
30-Dec-15
0%
64.13
MIP2-6-19950
No 7, 8, 9
20.00 30-Dec-15
25-Jan-16
0%
64.13
120.00 08-Mar-16
20.00 08-Mar-16
29-Jul-16
30-Mar-16
0%
0%
-34.69
-34.69
WATER RETICULATION
RETICUL
MIP2-6-19960
Installation of Pipeline
MIP2-6-19970
Fire Hydrant
20.00 08-Mar-16
30-Mar-16
0%
-34.69
MIP2-6-19980
30.00 30-Mar-16
05-May-16
0%
-34.69
MIP2-6-19990
20.00 05-May-16
28-May-16
0%
-34.69
MIP2-6-20000
Testing
20.00 28-May-16
23-Jun-16
0%
-34.69
MIP2-6-20010
30.00 23-Jun-16
29-Jul-16
0%
-34.69
86.13 19-Jul-16
28-Oct-16
0%
-99.63
MIP2-6-20020
As-Built
60.00 19-Jul-16
28-Sep-16
0%
-84.63
MIP2-6-20030
10.00 17-Oct-16
22-Oct-16
0%
-99.63
MIP2-6-20040
Hand Over
2.00 27-Oct-16
28-Oct-16
0%
-99.63
FINALISATION WORKS
WO
Actual Work
Remaining Work
Milestone
Page 33 of 33
2015
A JJA
2016
JA
2017
A JJA
11-Apr-16, SEWERA
25-Jan-16, Manhole
29-Jul-16, WAT
28-Oct-16,