Académique Documents
Professionnel Documents
Culture Documents
and
Market Forces Pressure
Dr Marios Leonardos
Public Power Corporation, Greece
p. 1
p. 2
European Lignites
Stripping ratio (t/m3) LQV (kJ/Kg)
p. 3
Mt/y
Lignite
Cost
/t
Stripping
Ratio
t/m
Excavation
Cost
/m
Fuel Cost
/Gcal
33
9,8
4,0
2,06
6,3
Kolubara, Serbia
30
13,3
2,2
3,83
7,0
15
13,0
5,2
2,20
3,5
40
9,6
2,6
2,92
6,4
11
12,0
3,0
3,00
4,6
19,6
10,0
4,0
2,05
3,8
Rovinari / Romania
6,3
14,8
5,3
2,44
9,2
Visonta/Bkkabany /
Hungary
8,15
15,0
6,9
1,96
8,8
48
15,3
4,8
2,70
12,9
Production
Mine
p. 4
Excavation Cost
/m
Stripping Ratio
t/m
p. 5
p. 6
p. 7
p. 8
LCP BREF
p. 9
LIGNITEPRODUCTION(Mt/year)
80
70
60
50
40
30
20
10
0
1950
1960
1970
1980
1990
2000
2010
2020
p. 10
p. 11
p. 12
Significant
environmental
impact for
Ptolemais basin
region in case the
planned sequence
of the mining fields
will not be
completed
smoothly.
The ground surface
will not be restored
to a usable form.
The Company (or
the country) will
pay an unbearable
cost to correct the
situation .
Marios Leonardos / PPC / Greece
p. 13
TPP
New Unit
PTOL5
2061
45
2018
2018
2019
2019
43
43
39
38
45
45
45
45
45
31
31
2018
2018
p. 14
788
83
621
60
87
60
1000
900
800
700
600
Mt
500
PTOLEMAIS
AMYNTAION
400
300
200
100
0
2014 2018 2022 2026 2030 2034 2038 2042 2046 2050 2054 2058
Marios Leonardos / PPC / Greece
p. 15
Solution
Increase of operating hours from 17500 to 32000.
p. 16
Fossil Fuels
Future
p. 17
p. 18
p. 19
p. 20
p. 21
Thank you
p. 22