Académique Documents
Professionnel Documents
Culture Documents
UBICACIN:
ESTRUCTURA:
PROGRESIVA:
Datos:
a) Caudal (Q)
1.6 m3/s
0.9522 m
c) Talud (Z)
d) Rugosidad (n)
0.017
e) Pendiente (s)
0.06 m/m
b) Tirante (y)
0.6 m
0.5713 m2
0.9522 m
4) Permetro (P)
2.1522 m
0.2655
6) Velocidad (V)
2.8005 m/s
7) Ancho adoptado
3.00 m
f) Tipo: Rectangular
Resultados:
(ancho de alcantarilla)
Pgina 4
DETERMINACIN DEL A
8m
HL-93
2
1. Un Carril Cargado:
3.57
14.78
14.78
MATERIALES:
RESISTENCIA DEL CONCRETO (fc)
FLUENCIA DEL ACERO (fy)
CARPETA ASFLTICA
DENSIDAD DEL CONCRETO
DENSIDAD DEL ASFALTO
BOMBEO
350 Kg./cm
4200 Kg./cm
0.05 m
2400 Kg./cm
2000 Kg./cm
2%
E = 2100+0.12(L1*W
A. REDIMENSIONAMIENTO
LUZ (L,S) =
h=(1.2(S+3000))/30 =
SE ASUME
ANCHO DE SARDINEL
H. DE LA VIGA BORDE
h=
b=
hb =
0.25
0.45 m
0.25 m
0.25 m
5.50
2%
0.25
8m
5.5 m
0.44 m
0.25
2%
0.05
0.45
6.00
B. DISEO DE LOSA
METRADO DE CARGAS
b.1 Momentos por Carga Muerta
SELECCIN DE MODIFIC
(Franja Interior de 1.00 m de ancho)
DC
Peso Concreto =
MDC = DC*L^2/8 =
1.20 Tn/m
9.60 Tn.m
DW
Peso Asfalto =
MDW = DW*L^2/8 =
0.10 Tn/m
0.80 Tn.m
Pgina 4 de 49
Pgina 5 de 49
Pgina 5
Pgina 6
COMBINACIN DE CARG
* Camin HL-93
RESISTENCIA 1 Estado
(Por Barett)
14.78
14.78
3.57
CL
Mcamion =
31.63 Tn-m
0.78
3.225
0.28
2.925
1.86
5.075
2.925
DISEO
14.78
14.78
3.57
VERIFICACIN DE PERA
Mcamion =
27.34 Tn-m
-0.3
4.3
-0.15
4.3
2.00
4.00
Mcamion =
4.00
31.63 Tn-m
* Tandem
(Por Barett)
11.20
11.20
CL
Mtandem =
38.30 Tn-m
3.7
DETERMINACIN DEL VA
1.2
1.99
3.70
3.1
1.43
4.30
11.2
11.2
CL
Mtandem =
38.08 Tn-m
1.2
2.00
4.00
2.8
1.40
4.00
38.30 Tn-m
Pgina 6 de 49
Pgina 7
* S/C Equivalente
Tn/m
MOMENTO RESISTENTE
Ms/c eq =
7.76 Tn-m
8.00
REA DE REFUERZO DE
2.00
4.00
Ms/c eq =
4.00
7.76 Tn-m
ACERO DE REPARTICI
W=
Tn/m
L=
8.00
2.00
4.00
1.20 Tn/m
8.00 m
MDC =
9.60 Tn-m
MDC =
9.60 Tn-m
ACERO DE TEMPERATU
4.00
MDC =
9.60 Tn-m
DISTRIBUCIN DE ACER
ACERO PRINCIPAL
W=
0.10
0.10 Tn/m
Tn/m
L=
8.00 m
MDC =
0.80 Tn-m
MDC =
0.80 Tn-m
8.00
MDW =
0.80 Tn-m
Dimetro a usar =
Espaciamiento (S) =
Camin HL-93
Tandem de Diseo
Pgina 7 de 49
S asumido =
3.57
14.78
14.78
11.20
Pgina 8 de 49
11.20
Pgina 8
Pgina 9
8000 mm
5500 mm
6000 mm
2
Dimetro a usar =
1. Un Carril Cargado:
Espaciamiento (S) =
E = 250+0.42(L1*W1)^1/2
E=
3035.96
W/NL
S asumido =
3000 mm
W/NL
ACERO DE TEMPERATURA
E=
2895.99
3000 mm
Dimetro a usar =
Espaciamiento (S) =
M LL+IM = m(Mmax*1.33+Ms/c)/E
Mmax =
Ms/c =
m=
M LL+IM =
S asumido =
38.30 Tn-m
7.76 Tn-m
1.20
23.20 Tn-m/m
GRAFICA
M LL+IM = m(Mmax*1.33+Ms/c)/E
Mmax =
Ms/c =
m=
M LL+IM =
SE ASUME
38.30 Tn-m
7.76 Tn-m
1.00
20.27 Tn-m/m
M LL+IM =
23.20 Tn-m/m
0.95
1.05
1.05
n = nD * nR * n1
n=
1.05
Pgina 9 de 49
Pgina 10 de 49
Pgina 10
56.49 Tn-m
33.60 Tn-m
33600.00 Kg.-m
140 Kg./cm
1680 Kg./cm
2100000 Kg./cm
280624.30
7.48
12
0.38
0.87
100 cm.
38.10 cm.
d asumido =
<
50
cm.
40 cm.
40
50
10
Pgina 11 de 49
OK!
Pgina 11
As = M / (fs * j * d) =
57.47 cm
56.49 Tn-m
526.45 cm
As =
40.22 cm
As asumido =
40.22 cm
ACERO DE REPARTICIN
%Asr = 1750 / S^0.5 =
19.57 % de As
<
Asr =
7.87 cm
8.93 cm
50%
OK!
ACERO DE TEMPERATURA
DISTRIBUCIN DE ACERO
ACERO PRINCIPAL
Dimetro
# 02
# 03
# 04
# 05
# 06
# 08
# 11
pulg.
1/4
3/8
1/2
5/8
3/4
1
1 3/8
cm.,
0.365
0.953
1.27
1.587
1.905
2.54
3.581
Asp =
Dimetro a usar =
Permetro
cm.
2
3
4
5
6
8
11.2
Peso
Kg./ml
0.25
0.58
1.02
1.60
2.26
4.04
7.95
rea
cm
0.32
0.74
1.29
2.00
2.84
5.10
10.06
40.22 cm
"
rea =
5.10 cm
Asp (final) =
42.50 cm
USAR:
12 cm.
"
12
cm.
Pgina 12 de 49
Pgina 12
USAR:
"
12
cm.
Pgina 13 de 49
Pgina 13
ACERO DE REPARTICIN
Asr =
Dimetro a usar =
7.87 cm
5/8 "
Espaciamiento (S) =
25.41 cm.
S asumido =
25 cm.
USAR:
5/8
"
rea =
2.00 cm
Asp (final) =
8.00 cm
25
cm.
ACERO DE TEMPERATURA
Ast =
Dimetro a usar =
8.93 cm
5/8 "
Espaciamiento (S) =
22.40 cm.
S asumido =
22 cm.
USAR:
5/8
5/8
"
rea =
2.00 cm
Asp (final) =
9.09 cm
22
cm.
22
"
cm.
5/8
25
"
cm.
12
"
Pgina 14 de 49
cm.
Pgina 14
Pgina 15 de 49
Pgina 15
Pgina 16 de 49
Pgina 16
Pgina 17 de 49
Pgina 17
Pgina 18 de 49
Pgina 18
8.00 M
SOBRECARGA =
HL-93
4.00 TN
P.E. (C)
2.40 TN/M3
F'C
350 KG/CM2
F'Y
4200 KG/CM2
FC
140 KG/CM2
FS
1680 KG/CM2
12.00
Es
3500000 KG/CM2
Ec
280624.30 KG/CM2
12
0.500
0.833
0.9
b'
25.00 CM
'
0.85
ANCHO CAJUEL
0.60 M
ANCHO VIA
4.8 M
Y
4.20
Y
8.40
4.20
25.00
0.2
0.55
METRADO DE CARGAS:
Peso propio
0.45 TN / M
Peso baranda =
0.15 TN / M
Wpp =
0.6 TN / M
PROYECTO: Mejoramiento de la carretera Cayrahuiri (EMP. PE 3 SH) - Orurillo de los distritos de Asillo y Orurillo,
de Orurillo - Melgar - Puno
COMPONENTE: Sistema de Drenaje y Obras de Arte
UBICACIN: Asillo, Orurillo, - Melgar - Puno
Fecha: Noviemb
L=
e=
eadop =
Le =
(A)=
SARDINEL
(S) =
(a) =
ALTO DE SARDINAL
(h) =
(B) =
CONCRETO A UTILIZAR
f'c =
ACERO A UTILIZAR
f'y =
a
h
fs = 0.40 x fy
r = fs / fc
n=2100000/
n = Es / Ec =
(15000(f^ c))
k = n / (n+r)
j=1-k/3
PROYECTO: Mejoramiento de la carretera Cayrahuiri (EMP. PE 3 SH) - Orurillo de los distritos de Asillo y Orurillo,
de Orurillo - Melgar - Puno
COMPONENTE: Sistema de Drenaje y Obras de Arte
UBICACIN: Asillo, Orurillo, - Melgar - Puno
Fecha: Noviemb
R = (fc . j . k) / 2
1.00m x e x 2.40Tn/m2
Asfalto
=
=
WD
PROYECTO: Mejoramiento de la carretera Cayrahuiri (EMP. PE 3 SH) - Orurillo de los distritos de Asillo y Orurillo,
de Orurillo - Melgar - Puno
COMPONENTE: Sistema de Drenaje y Obras de Arte
UBICACIN: Asillo, Orurillo, - Melgar - Puno
*
Fecha: Noviemb
P=
4.00
R1
R3
R2
MD
M S/C
Ton
Reaccin de estribo
M max por Peso propio
(WD . L2 ) / 8
Ancho efectivo ( E ) :
M ecua
Momento equivalente
M eq
M eq
ML
I= 15.24/(L+38)
I= 0.30
MI
M=
Peralte:
d=
=(2/())
21.0
<
30.0
Asumiendo peralte
BIEN!
d=
Mu=1.3(MD+1.67(ML+MI)) =
= 0.9
PROYECTO: Mejoramiento de la carretera Cayrahuiri (EMP. PE 3 SH) - Orurillo de los distritos de Asillo y Orurillo,
de Orurillo - Melgar - Puno
COMPONENTE: Sistema de Drenaje y Obras de Arte
UBICACIN: Asillo, Orurillo, - Melgar - Puno
Fecha: Noviemb
As1 =
As2 =
31.8%
<
Asr
Acero de temperatura
Ast
Ast
( Ast = 0.0018 x b x d )
PROYECTO: Mejoramiento de la carretera Cayrahuiri (EMP. PE 3 SH) - Orurillo de los distritos de Asillo y Orurillo,
de Orurillo - Melgar - Puno
COMPONENTE: Sistema de Drenaje y Obras de Arte
UBICACIN: Asillo, Orurillo, - Melgar - Puno
FIERRO
ACERO PRINCIPAL
cm2
Fecha: Noviemb
ACERO DE REPARTO
fy=4200
17.11
5.44
1 @
30
cm
93
cm
3/4 @
17
cm
52
cm
5/8 @
12
cm
36
cm
1/2 @
cm
23
cm
3/8 @
cm
13
cm
ACERO DE TEMPERATURA
cm2
1/4 @
2.70
26
12
Acero de temperatura
de 3/8'' @ 25 cm
LUZ = 3.6 m.
de 3/4'' @ 15 cm
de 1/2'' @ 20 cm
Acero principal
Acero de reparticin
G.- DISEO DE VIGA SARDINEL
Metrado de cargas
Peso propio =
1 x a x S x 2.4
Baranda =
0.15 Tn/m
( WD x L^2 ) / 8
WD
MD
1.44
m.
ML = p' . LUZ / 4
MD + ML +MI
p' =
ML
MI
PROYECTO: Mejoramiento de la carretera Cayrahuiri (EMP. PE 3 SH) - Orurillo de los distritos de Asillo y Orurillo,
de Orurillo - Melgar - Puno
COMPONENTE: Sistema de Drenaje y Obras de Arte
UBICACIN: Asillo, Orurillo, - Melgar - Puno
Fecha: Noviemb
=(2/
())
Asumiendo peralte
20.0
<
50.0
BIEN!
PROYECTO: Mejoramiento de la carretera Cayrahuiri (EMP. PE 3 SH) - Orurillo de los distritos de Asillo y Orurillo,
de Orurillo - Melgar - Puno
COMPONENTE: Sistema de Drenaje y Obras de Arte
UBICACIN: Asillo, Orurillo, - Melgar - Puno
Fecha: Noviemb
=
Mu = 1.3 ( MD + 1.67 ( ML + MI )) =
= 0.9
As1
As2
VL =
VI =
30 % de V L
Vu=
1.30 ( VD + 1.67 ( VL + VI ) )
(0.85*(0.53(fc)^(0.5)*b*d))
Vcon =
de 3/8'' 1 @ 0.05 m
6 @ 0.10 m
de 5/8''
r@
a
h
e
112 Kg/cm2
1680 Kg/cm2
15.0
8.37
0.36
0.88
0.72 Tn/m
0.10 Tn/m
0.82 Tn/m
13.26 Tn
6.30 Tn
0.32 Tn
1.33 Tn-m
14.40 Tn-m
7.20 Tn-m
1.44 m
5.00 Tn-m
9.72 Tn-m
1.16 Tn-m
5.00 Tn-m
0.37
0.30
0.30
1.50 Tn-m
7.83 Tn-m
21.01 cm
26.0 cm
20.37 cm2
15.84 Tn-m
BIEN!
50.00%
5.44 cm2
5.40 cm2
2.70 cm2 en c/s
ACERO DE TEMPERATURA
cm2
cm
cm
cm
cm
cm
cm
e = 30 cm.
de 3/4'' @ 15 cm
Acero principal
0.24 Tn/m
0.00 Tn/m
0.24 Tn/m
0.39 Tn-m
2.09 Tn
1.88 Tn-m
0.56 Tn-m
2.83 Tn-m
19.97 cm
46.00 cm
4.16 cm2
5.80 Tn-m
100.8 cm2
3.45 cm2
3.45 cm2
0.43 Tn
2.09 Tn
0.63 Tn
6.46 Tn
6.94 Tn
de 3/8'' 1 @ 0.05 m
6 @ 0.10 m
r @ 0.20 m
UBICACIN:
ESTRUCTURA:
PROGRESIVA:
2.40 Mts.
B=
0.40 Mts.
C=
0.40 Mts.
D=
0.40 Mts.
E=
0.40 Mts.
F=
1.20 Mts.
G=
0.40 Mts.
H=
0.20 Mts.
I=
0.20 Mts.
J=
0.20 Mts.
s =
F
MURO
B
G
Largo cajuela
RELLENO
1800.00 Kg/m3
h' =
8.80 ml.
13260.00 Kg.
6300.00 Kg.
Rodadura
320.00 Kg.
P.E. muro m =
2.30 Tn/m3
0.00
32
Coef. de friccin =
Resistencia del terreno (qadm) =
0.00
1.00
0.31
Empuje
E=
44.64 Kg.
Empuje
Ev=
12.30 Kg.
Empuje
Eh=
42.91 Kg.
0.09 Mts.
92.00 Kg.
Peso(Kg)
X (Mts)
Peso Propio
92.00
0.100
Ev
12.30
0.200
Sumas=
Xv=
0.112 Mts.
z=
0.037 Mts.
Excentric. e=
0.025 Mts.
104.30
9.20
2.46
11.66 Kg x Mt.
700000
<
Fc
OK!
3.02
>
2.00
OK!
Chequeo al Volteo:
Kg/m2
UBICACIN:
ESTRUCTURA:
PROGRESIVA:
Chequeo de deslizamiento:
234.38
>
2.00
OK!
0.31
Empuje
E=
111.60 Kg.
Empuje
Ev=
30.76 Kg.
Empuje
Eh=
107.28 Kg.
Pto. apliac.=
0.17 Mts.
Peso(Kg)
X (Mts)
Peso 1
460.00
0.100
46.00
Peso 2
552.00
0.30
165.60
Peso 3
552.00
0.53
292.56
Ev
30.76
0.80
Sumas=
Xv=
0.33 Mts.
z=
0.01 Mts.
Excentric. e=
0.08 Mts.
24.61
1594.76
528.77 Kg x Mt.
Esfuerzo a compresin del concreto Fc= 0,4(Fc)
Fc=
700000
<
Fc
OK!
28.99
>
2.00
OK!
0.00
>
1.50
RECALCULAR
Chequeo al Volteo:
Chequeo de deslizamiento:
1506.82 Kg/ml
36.36 Kg/ml
6300.00 Kg/ml
*****
Peso(Kg)
X (Mts)
R1
1506.82
0.50
753.41
R3
6300.00
0.50
3150.00
1594.76
0.33
Peso vertical
Sumas=
Xv=
9401.58
526.27
4429.68 Kg x Mt.
0.47 Mts.
Peso(Kg)
X (Mts)
Eh
107.28
0.17
18.24
R2
36.36
2.20
79.99 ******
Sumas=
143.64
98.23 Kg x Mt.
Kg/m2
UBICACIN:
ESTRUCTURA:
PROGRESIVA:
Xv=
0.68 Mts.
z=
0.01 Mts.
Excentric. e=
-0.06 Mts.
700000
Kg/m2
<
Fc
OK!
45.09
>
2.00
OK!
0.00
>
1.50
RECALCULAR
Chequeo al Volteo:
Chequeo de deslizamiento:
0.31
Empuje
Pa=
337.59 Kg.
Empuje
Pv=
93.05 Kg.
Empuje
Ph=
324.51 Kg.
Pto. apliac.=
0.32 Mts.
Empuje Pasivo
Kp =
3.25
Empuje
Pp=
468.00 Kg.
Pto. apliac.=
0.13 Mts.
Peso(Kg)
460.00
1.10
506.00
Peso 2
552.00
0.90
496.80
Peso 3
552.00
0.67
369.84
Peso 4
2208.00
1.20
2649.60
Peso 5
864.00
1.80
1555.20
Ev
93.05
2.40
Sumas=
Xv=
X (Mts)
Peso 1
4729.05
223.32
5800.76 Kg x Mt.
1.23 Mts.
z=
0.02 Mts.
Excentric. e=
-0.01 Mts.
<b/6
0.40 OK!
700000
1921.18
<
Fc
OK!
55.86
>
2.00
OK!
0.00
>
1.75
RECALCULAR
Chequeo al Volteo:
Chequeo de deslizamiento:
Kg/m2
UBICACIN:
ESTRUCTURA:
PROGRESIVA:
Fuerzas
Peso(Kg)
X (Mts)
R1
1506.82
0.90
1356.14
R3
6300.00
0.90
5670.00
Peso vertical
4729.05
1.23
Sumas=
Xv=
12535.87
5816.73
12842.87 Kg x Mt.
1.02 Mts.
Fuerzas Horizontales
Fuerzas
Peso(Kg)
X (Mts)
Eh
324.51
0.32
R2
36.36
3.20
Sumas=
Yh=
0.61 Mts.
z=
0.02 Mts.
Excentric. e=
0.20 Mts.
360.87
103.84
116.35 *****
220.19 Kg x Mt.
<b/6
0.40 OK!
700000
225.54
<
Fc
OK!
58.33
>
2.00
OK!
0.00
>
1.50
RECALCULAR
Chequeo al Volteo:
Chequeo de deslizamiento:
T =Fv(1+/-6e/b)/(ab)
Tmax =
0.78
<
OK!
Tmin =
0.26
>
OK!
Kg/m2
3.50
2.40
Ton/m3
Df = 3.50 m
H=
Adoptado
2.45
0.60
0.75
0.50
0.60
3.00
0.50
0.35
I=
0.40
J=
0.50
A
B
C
D
E
F
G
=
=
=
=
=
=
=
Pred
2.00
0.50
0.30
0.50
0.50
RELLENO
F
MURO
G
O
B
A
Seccin
Ancho
(m)
Alto
(m)
rea
(m2)
Peso
Especifico
(Ton/m3)
Peso
(Ton)
Brazo
(m)
Momento
respecto a
A
Obs.
2.45
0.50
1.23
2.40
2.95
1.23
3.63
Muro
0.35
2.50
0.88
2.40
2.11
0.78
1.65
Muro
0.40
3.00
1.20
2.40
2.88
1.15
3.31
Muro
0.50
3.00
0.75
2.40
1.80
1.52
2.74
Muro
0.50
3.00
0.75
1.52
1.14
1.68
1.92
Relleno
0.60
3.00
1.80
1.52
2.74
2.15
5.89
Relleno
2.26
0.78
1.76
Reaccin
R
P=
15.88
M.R. =
20.90
3.50
Base =
1.75
(0.50H)
2.63
(0.75H)
2.45
Base
adoptada =
' =
C' =
18.00
0.093
Ka =
0.38
Pa =
3.54
1/2 . Ka . Y . H2
F.R. =
F.O. =
F.S. =
5.39
3.54
1.52
OK
3.50
2.45
Ka =
0.38
m
m
.. = (
.. )/(
.. )
Ha =
3.54
MR =
20.90
MO =
4.13
F.S. =
5.06
=
=
=
=
=
e=
3.50
2.45
1.52
27.00
0.14
0.17
m
m
Peso especfico (Ton/m3)
ngulo de friccin del suelo
Cohesin del suelo
B/6
0.41
qpunta =
9.18 Ton/m2
qtaln =
3.78 Ton/m2
qu =
F.S. =
31.70 Ton/m2
3.45 OK
OK
1.50 Mts.
B=
0.50 Mts.
C=
0.40 Mts.
D=
2.00 Mts.
E=
0.50 Mts.
F=
0.50 Mts.
G=
0.10 Mts.
w=
1800.00 Kg/m3
Largo cajuela
1.20 ml.
Pe muro
2.30 Tn/m3
30.00
27.00
Coef. de friccin =
0.70
1.06
Ka =
0.38
Empuje
Ea=
2137.50 Kg.
Empuje
Ev=
498.99 Kg.
Empuje
Eh=
2078.44 Kg.
Pto. apliac.=
0.83 Mts.
Peso(Kg)
X (Mts)
Peso 1
1840.00
0.70
1288.00
Peso 2
230.00
0.93
213.90
Peso 3
1725.00
0.75
1293.75
Peso 4
180.00
0.97
174.60
Peso 5
1800.00
1.25
2250.00
498.99
1.50
748.49
Ev
Sumas=
Xv=
0.95 Mts.
z=
0.27 Mts.
Excentric. e=
0.07 Mts.
6273.99
5968.74 Kg x Mt.
<
b/6
0.25 OK!
700000
5353.80
<
OK!
3.46
>
2.00
OK!
2.11
>
1.50
OK!
Chequeo al Volteo:
Chequeo de deslizamiento:
T =Fv(1+/-6e/b)/(ab)
Tmax =
0.54
<
OK!
Tmin =
0.30
>
OK!
PLANILLA DE METRADOS
PROYECTO :
UBICACIN:
Partida
Descripcin
Unidad
N de
veces
Largo
MEDIDAS
Ancho
ALCANTARILLA PROGRESIVA:
06.02
06.02.01
TRABAJOS PRELIMINARES
06.02.01.01
Demolicin de Estructuras
06.02.01.02
Encauzamiento de Alcantarilla
06.02.01.03
6.70
5.00
06.02.01.04
6.70
5.00
06.02.02
MOVIMIENTO DE TIERRAS
06.02.02.01
06.02.02.02
06.02.02.03
06.02.02.04
Volumen =
-0.14
2.45
5.00
06.02.03
06.02.03.01
06.02.04
06.02.04.01
06.02.04.02
Aleros
Aleros
SUPER-ESTRUCTURA
06.02.05.01
Losa
3.60
8.80
Sardinel
3.60
0.20
3.00
8.80
3.00
3.60
Encofrado y desencofrado
Losa
Sardinel
06.02.05.03
Estribos
06.02.05
06.02.05.02
kg
06.02.06
REVOQUES Y ENLUCIDOS
06.02.06.01
06.02.06.02
06.02.07
PINTURAS
06.02.07.01
Pintura en Sardineles
06.02.08
VARIOS
06.02.08.01
Apoyos de neopreno
und
3.60
0.90
PLANILLA DE METRADOS
Parcial
Total
###
###
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
33.50
33.50
33.50
0.00
33.50
0.00
0.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
-0.14
0.00
-0.14
0.00
0.00
0.00
24.50
0.00
24.50
0.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.79
0.30
9.50
0.20
0.29
0.00
31.08
26.40
0.00
0.30
1.80
0.20
2.88
0.00
0.00
0.00
897.60
0.00
0.00
0.00
1.00
1.00
1.00
1.00
0.00
0.00
0.00
6.48
6.48
0.00
0.00
2.00
2.00
MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA PICHACANI - YURACMAYO, DISTRITOS DE PICHACANI Y SAN ANTONIO, PROVINCIA DE
PUNO - PUNO
UBICACIN:
06.02.04.04
UNIDAD :
TOTAL :
Descripcin
N de
N de piezas Longitud por
Elementos
Peso (Kg/m)
por elemento Pieza (m)
iguales
Longitud
Total (m)
Alcantarilla
Acero Principal
0.10
3.50
0.10
3/ 4''
59
3.70
2.26
218.30
Acero de Reparticin
0.10
8.70
0.10
1/ 2''
18
8.90
1.02
160.20
Acero de Temperatura
0.05
3.50
0.05
3/ 8''
36
3.60
0.00
129.60
Acero de Temperatura
0.05
8.70
0.05
3/ 8''
15
8.80
0.00
132.00
Acero en Sardinel
0.20
3.50
0.20
1/ 2''
3.90
1.02
31.20
Acero en Sardinel
0.20
3.50
0.20
1/ 2''
3.90
1.02
31.20
3/ 8''
18
0.60
0.58
10.80
Estribos
0.60
MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA PICHACANI - YURACMAYO, DISTRITOS DE PICHACANI Y SAN ANTONIO, PROVINCIA DE
PUNO - PUNO
UBICACIN:
06.02.04.04
UNIDAD :
TOTAL :
Descripcin
0.50
3/ 4''
N de
N de piezas Longitud por
Elementos
Peso (Kg/m)
por elemento Pieza (m)
iguales
1
17
0.50
2.26
Longitud
Total (m)
8.50
UNO / PUNO
KG
897.60
Metrado
parcial
493.36
163.40
31.82
31.82
6.26
UNO / PUNO
KG
897.60
Metrado
parcial
19.21