PROYECTO :
AMPLIACION DE RED PRIMARIA Y SECUNDARIA DEL SERVICIO DE ENERGIA ELECTRICA CON REF
LOCALIDADES DEL VALLE DE CHINCHEROS, PROVINCIA DE CHINCHEROS , REGION APURIMAC
CHINCHEROS
15-Dec-15
PPTO CONTRAC
DESCRIPCION
1 SUMINISTRO DE MATERIALES
RED SECUNADRAI
RED PRIMARIA
Red Primaria
174,201.12
174,201.12
80,902.60
80,902.60
1.0 Transporte
2.0 Suministro de Materiales
3.0 Montaje Electromcanico Redes
17,420.11
174,201.12
80,902.60
272,523.83
51,013.74
323,537.56
58,236.76
381,774.33
2,143.91
2,040.55
385,958.79
ESUMEN PRESUPUESTO
PPTO CONTRACTUAL
Red Secundaria
Alumbrado
133,845.78
TOTAL
16,538.50 150,384.28
174,201.12
133,845.78 16,538.50
###
65,985.27
860.25
66,845.52
80,902.60
65,985.27
860.25
###
13,384.58
133,845.78
65,985.27
1,653.85 32,458.54
16,538.50 324,585.41
860.25 147,748.11
213,215.63 19,052.60
###
39,976.86
3,568.86
94,568.00
253,192.49 22,621.46
###
45,574.65
4,071.86 107,884.81
298,767.14 26,693.32
###
1,680.07
149.99
3,974.33
1,599.07
142.75
3,782.72
302,046.29 26,986.06
###
AMPLIACION DE RED PRIMARIA Y SECUNDARIA DEL SERVICIO DE ENERGIA ELECTRICA CON REFORZAM
LOCALIDADES DEL VALLE DE CHINCHEROS, PROVINCIA DE CHINCHEROS , REGION APURIMA
UBICACIN
CHINCHEROS
FECHA :
15 de diciembre de 2015
COSTO DIRECT504,792.06
GASTOS GENERALES
11.700%
0.100%
926.00
a)
0.100%
676.00
90.00
240.00
346.00
0.00
0.000%
250.00
250.00
0.00
b)
11.600%
###
a)
3.700%
###
Remuneracion y Beneficios
Responsable Administrativo
Especialista en Adquisicin
3
4
1,200.00
1,340.00
950.00
420.50
Mobiliario de Oficiona
Computadora
Impresora
Utiles de Oficina
b)
3,771.50
4,500.00
4,870.00
1,750.00
7.900%
###
c)
0.00
0.00
0.00
0.00
6.900%
###
18.600%
###
750.00
1,820.00
250.00
750.00
520.00
0.000%
III Utilidad
15,000.00
9,000.00
6,000.00
3,500.00
1,500.00
750.00
CONORCIO MOROCHUCO
04 SAN CRISTOVAL
UBICACON:
FECHA:
10.10 8/300/150/270
472.67
17.00
15.00
10.10 8/200/140/260
384.96
15.00
7.00
50.00
5.00
6.00
16
14.00
15.00
10.89
47.50
57.00
ITEM
1.00
PRECIO
UNID UNITARI
O S/.
DESCRIPCION
SUMINISTRO DE MATERIALES
20.000 AISLADORES
20.100 AISLADORES DE PORCELANA DE TRACCION, CLASE ANSI:
20.101 54-2, PARA (RETENIDAS)
SUB TOTAL 20.00:
30.000 CONDUCTORES
30.100 CONDUCTOR DE COBRE DESNUDO, CABLEADO, TEMPLE BLANDO, DE :
30.101 25mm2, 7 HILOS
SUB TOTAL 30.00:
40.000
40.100
40.101
40.102
40.103
40.104
CABLES
CABLE AUTOPORTANTE DE ALUMINIO TIPO CAAI, C/ PORTANTE DE AL-AL AISLADO:
3x35+16+P/25mm2
15.45
0.00 646.79
3x25+16+P/25mm2
13.67
0.00
0.00
3x16+16+P/25mm2
13.03
0.00
0.00
2x35+16+P/25mm2
13.67
1,638.73
0.00
04 SAN CRISTOVAL
01 CHIPICUY
ITEM
40.105
40.106
40.107
40.108
PRECIO
UNID UNITARI
O S/.
DESCRIPCION
2x25+16+P/25mm2
9.89
110.77
0.00
2x16+16+P/25mm2
8.37
0.00
0.00
2x25+P/25mm2
8.45
0.00
0.00
2x16+P/25mm2
7.34
0.00
0.00
2.00
2.00
50.000
50.100
50.101
50.102
50.103
50.104
Cjto
Und
13.00
2.00
2.00
Pza
15.00
2.00
2.00
5.00
2.00
2.40
Und
2.00
2.00
4.00
15.00
5.00
12.00
15.00
5.00
15.00
15.00
5.00
0.00
1.00
50.200 ARMADO E1
Cjto
50.201 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movil Pza
50.202 Grapa de Suspencin, P/Cable Autoportante de Secc. 25-35 mm2 (SOT 14 Pza
50.300
50.301
50.302
50.303
50.304
ARMADO E1
Cjto
Und
2.00
0.00
2.00
5.00
0.00
1.40
Und
13.00
0.00
1.00
15.00
0.00
1.00
50.400
50.401
50.402
50.403
ARMADO E2
0.00
0.00
12.00
0.00
0.00
Und
8.00
0.00
0.00
Pza
15.00
0.00
0.00
11.00
10.00
12.00
11.00
10.00
15.00
11.00
10.00
6.00
7.00
6.00
7.00
Cjto
Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movil Pza
Gancho Ojal Roscado FG16mm(5/8") (SOT 2.2)
Mordaza Terminal Conica (Similar SO 3.25), Secc. Ancl.25-35mm2
50.500 ARMADO E3
Cjto
50.501 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movil Pza
50.502 Mordaza Terminal Conica (Similar SO 3.25), Secc. Ancl.25-35mm2
Pza
50.600
50.601
50.602
50.603
ARMADO E4
Cjto
Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movil Pza
12.00
Und
8.00
Pza
15.00
50.700 ARMADO E4
Cjto
6.00
7.00
12.00
14.00
0.00
0.00
50.701
50.702
50.703
50.704
50.800
50.801
50.802
50.803
ARMADO E5
50.900
50.901
50.902
50.903
50.904
50.905
ARMADO E5
Cjto
Und
50.910
51.911
52.912
53.913
Und
2.00
0.00
04 SAN CRISTOVAL
ITEM
01 CHIPICUY
PRECIO
UNID UNITARI
O S/.
DESCRIPCION
0.00
5.00
0.00
0.00
Pza
15.00
0.00
0.00
Und
13.00
0.00
0.00
2.00
2.00
Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movil Pza
Cjto
12.00
4.00
2.00
Pza
15.00
2.00
2.00
15.00
2.00
2.00
0.00
0.00
13.00
0.00
0.00
Pza
15.00
0.00
0.00
15.00
0.00
0.00
Und
2.00
0.00
0.00
5.00
0.00
0.00
Cjto
Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movil Pza
0.00
0.00
12.00
0.00
0.00
Und
8.00
0.00
0.00
Pza
15.00
0.00
0.00
14.00
15.00
60.000
60.100
60.101
60.102
60.103
60.104
60.105
60.106
60.107
60.108
60.109
60.110
RETENIDAS
SUMINISTROS VARIOS
Cjto
6.72
126.00 127.50
2.16
140.00 180.00
Pza
63.84
14.00
15.00
Pza
53.76
14.00
15.00
10.40
14.00
15.00
5.00
11.00
Pza
105.60
Pza
42.00
14.00
15.00
Pza
25.20
56.00
60.00
Plancha de AG de 254x254x6,4 mm
Pza
95.20
14.00
15.00
Pza
8.40
42.00
45.00
Pza
50.16
14.00
15.00
Cjto
u
91
04 SAN CRISTOVAL
PRECIO
UNID UNITARI
O S/.
01 CHIPICUY
ITEM
DESCRIPCION
5.00
6.00
5.00
6.00
04 SAN CRISTOVAL
01 CHIPICUY
ITEM
PRECIO
UNID UNITARI
O S/.
DESCRIPCION
Pza
210
5.00
Pza
5.00
6.00
Bls
49
5.00
6.00
M3
40
5.00
6.00
8.00
8.00
5.00
2.00
9.00
14.00
6.00
80.300 CONECTOR DE DERIVACION TIPO SL 2.1 CON CUBIERTA TIPO SP14, SECCION DE :
80.301 120/16-25-35mm2
7.5
0.3
167.00 173.00
80.400 CONECTOR AL-CU CON CUBIERTA PARA PAT TIPO SP14, SECCION DE :
80.401 120/16-25-35mm2 Incluye Cubierta Prtotectora
8.35
5.00
6.00
7.5
0.00
102.011 4x10mm2
0.00
13.3
9.10
19
13.00
19
13.00
04 SAN CRISTOVAL
ITEM
01 CHIPICUY
PRECIO
UNID UNITARI
O S/.
DESCRIPCION
102.032 Templador de AG
38
36.00
2.5
19
0.00
35
19
17.00
19
17.00
2.16
190 147.00
102.04 CONECTORES
Y ACCESORIOS
CONECTOR BIMETALICO
Al-Cu, TIPO DOBLE VIA: (COND. PRINC.max-min./COND. DERIV max-min./TOTA
102.041 max-min)
102.041 10-70/2.5-10mm, UN PERNO
38
36.00
114
0.00
0.3
43
19
18
19
18.00
102.044 NTERRUPTORES
INTERRUPTORES TERMOMAGNETICOS MODULARES DE DOS POLOS CURVA "C" 500 V. DE:
102.044 (INCLUYE BASE DE SUJECION C/PINTURA EPOXICA CROMATO DE ZINC Y ACABADO EPOXI)
(INCLUYE BASE DE SUJECION C/PINTURA EPOXICA CROMATO DE ZINC Y ACABADO EPOXI)
102.044 32A, 6KA
u
SUB TOTAL 102
TOTAL SUMINISTRO REDES SECUNDARIAS
38
CIO MOROCHUCO
TOTAL S/.
12.00
7.00
44.00
29.00
20 797.61
11 163.91
4.00
15.00
750.00
06 MOLLEPAMPA
TOTAL INVENTARIO
32,711.52
9.00
38.00
608.00
608.00
38.00
142.50
1 552.40
1,552.40
0.00
646.79
0.00
0.00
0.00
0.00
655.59
2,294.32
9 992.91
0.00
0.00
31 363.35
0.00
TOTAL INVENTARIO
06 MOLLEPAMPA
0.00
TOTAL S/.
110.77
0.00
0.00
0.00
0.00
0.00
1 095.52
0.00
0.00
0.00
42,451.78
0.00
0.00
0.00
0.00
0.00
4.00
4.00
4.00
4.40
6.00
52.00
60.00
22.00
12.00
9.00
9.00
9.00
29.00
29.00
29.00
0.00
348.00
435.00
0.00
2.00
1.40
1.00
1.00
1.00
4.00
2.80
2.00
2.00
0.00
8.00
14.00
26.00
30.00
0.00
1.00
1.00
2.00
0.00
1.00
1.00
2.00
0.00
12.00
8.00
30.00
6.00
6.00
6.00
27.00
27.00
27.00
0.00
324.00
405.00
3.00
3.00
3.00
6.00
16.00
16.00
16.00
32.00
0.00
192.00
128.00
480.00
0.00
0.00
0.00
TOTAL INVENTARIO
06 MOLLEPAMPA
0.00
0.00
0.00
0.00
TOTAL S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
1.00
1.00
4.00
8.00
5.00
5.00
0.00
96.00
75.00
75.00
0.00
0.00
1.00
1.00
2.00
1.40
0.00
0.00
1.00
1.00
2.00
1.40
0.00
0.00
15.00
15.00
4.00
7.00
1.00
2.00
1.00
3.00
1.00
2.00
1.00
3.00
0.00
24.00
8.00
45.00
2,950.00
9.00
81.00
90.00
9.00
9.00
9.00
3.00
9.00
36.00
9.00
27.00
9.00
38.00
334.50
410.00
38.00
38.00
38.00
19.00
38.00
152.00
38.00
114.00
38.00
2 247.84
885.60
2 425.92
2 042.88
395.20
2 006.40
1 596.00
3 830.40
3 617.60
957.60
1 906.08
21,911.52
TOTAL INVENTARIO
06 MOLLEPAMPA
4.00
4.00
15.00
15.00
TOTAL S/.
1 365.00
06 MOLLEPAMPA
15.00
15.00
15.00
15.00
TOTAL INVENTARIO
3 150.00
105.00
735.00
600.00
5,955.00
6.00
22.00
44.00
4.00
11.00
77.00
15.00
38.00
285.00
###
445.00
133.50
4.00
15.00
125.25
4.00
4.00
4.00
4.00
TOTAL S/.
664.75
### 1 386.00
0.00
0.00
0.00
0.00
10 395.00
33.60
56.00
280.00
48.00
80
160
48.00
80.00
560.00
TOTAL INVENTARIO
06 MOLLEPAMPA
96.00
48.00
48.00
48.00
###
TOTAL S/.
170.00
67.00
84.00
84.00
817.00
680.00
167.50
2 940.00
336.00
1 764.72
96.00
170.00
1 360.00
###
402.00
120.60
48.00
0.00
85.00
0.00
3 655.00
48.00
85.00
3 230.00
25 648.82
###
CONORCIO MOROCHUCO
200.0000 DESBROCE
200.1000 DESBROCE DE ARBOLES
Km
707.50
1.23823
Pza
Pza
336.77
336.77
9
10
442.04
442.04
8
5
Pza
Pza
SA
N
IC
04
PRECIO
UNITARIO
S/.
H
IP
UNID.
DESCRIPCION
01
ITEM
04
Cjto
Cjto
198.70
195.09
7
3
389.73
389.71
4
2
Cjto
Cjto
SUB TOTAL 202
SA
N
IC
Y
2.0000 MONTAJE ELECTROMECANICO
PRECIO
UNITARIO
S/.
H
IP
UNID.
DESCRIPCION
01
ITEM
04
Cjto
Cjto
172.49
308.09
2
3
1.52
1.45
1.27
1.07
1.25
1.16
1.11
1.07
0
0
0
1638.73
110.77
0
0
0
ml
204.1020 3x25+16+P/25mm2
ml
204.1030 3x16+16+P/25mm2
ml
204.1040 2x35+16+P/25mm2
ml
204.1050 2x25+16+P/25mm2
ml
204.1060 2x16+16+P/25mm2
ml
204.1070 2x25+P/25mm2
ml
204.1080 2x16+P/25mm2
ml
SUB TOTAL 204
205.0000 FERRETERIA
205.1000 MONTAJE DE ARMADOS QUE COMPRENDE: INSTALACION Y FIJACION EN EL POSTE DE TODA LA
FERRETERIA Y ACCESORIOS COMO LAS GRAPAS DE ANCLAJE Y ACCESORIOS DE QUE SE COMPONE
SA
N
IC
Y
2.0000 MONTAJE ELECTROMECANICO
PRECIO
UNITARIO
S/.
H
IP
UNID.
DESCRIPCION
01
ITEM
04
Cjto
205.1020 Armado E1
Cjto
205.1030 Armado E1
Cjto
205.1040 Armado E2
Cjto
205.1050 Armado E3
Cjto
205.1060 Armado E4
Cjto
205.1070 Armado E4
Cjto
205.1080 Armado E5
Cjto
205.1090 Armado E5
Cjto
205.1100 Armado E6
Cjto
23.14
27.79
32.08
34.75
23.14
34.75
37.90
41.68
46.32
52.11
2
15
0
0
11
6
0
2
0
Km
207.0020 Replanteo Topogrfico, Ubicacin de Estructuras de Acuerdo a la Ingeniera de Detalle de las Redes Secund
Km
Km
207.0040 Elaboracin, Gestin de Aprobacin y Ejecucin del Plan de Monitoreo Arqueologico de obras de proyecto b
Km
Km
UN
SUB TOTAL 207
437.14
392.94
366.15
791.14
870
500
SA
N
IC
Y
2.0000 MONTAJE ELECTROMECANICO
PRECIO
UNITARIO
S/.
H
IP
UNID.
DESCRIPCION
01
ITEM
1.7495
1.7495
1.7495
1.7495
1.7495
1
04
cjto
24.59
19
cjto
27.53
11
cjto
31.73
Km
229.01
1.7495
241.34
1.7495
209.2000 Expediente Tcnico Finales Conforme a Obra (1 Original + 3 Copias) de Redes Secundarias, Incluye la Presentacin
Digitalizada del Expediente en un CD
Km
SUB TOTAL 209
RESUMEN
SUMINISTRO DE MATERIALES
SA
N
IC
Y
2.0000 MONTAJE ELECTROMECANICO
PRECIO
UNITARIO
S/.
H
IP
UNID.
DESCRIPCION
01
ITEM
MONTAJE ELECTROMECANICO
TRASPORTE DE MATERIALES
GASTOS GENERALES 11.7%
UTILIDAD 6.9%
SUB TOTAL
IGV 18%
TOTAL
04
SA
N
IC
H
IP
PRECIO
UNITARIO
S/.
Y
2.0000 MONTAJE ELECTROMECANICO
UNID.
DESCRIPCION
01
ITEM
M
O
LL
EP
AM
PA
06
SA
TOTAL
INVENTARIO
04
01
H
IP
IC
CR
IS
TO
VA
L
LIARIAS
ENTO DE REDES PRIMARIAS DE 08
0.62049
0.65559
2.51431
TOTAL S/.
1,778.87
1,778.87
10
3
8
2
27
15
9,092.79
5,051.55
5
4
4
5
17
14
7,514.68
6,188.56
TOTAL S/.
06
SA
04
M
O
LL
EP
AM
PA
TO
VA
L
CR
IS
Y
U
IC
H
IP
C
01
TOTAL
INVENTARIO
27,847.58
1
5
1
3
9
11
1,788.30
2,145.99
2
6
5
0
11
8
4,287.03
3,117.68
11,339.00
TOTAL S/.
06
SA
04
M
O
LL
EP
AM
PA
TO
VA
L
CR
IS
Y
U
IC
H
IP
C
01
TOTAL
INVENTARIO
2
3
4
0
8
6
1379.92
1848.54
3,228.46
0
646.79
0
0
0
0
0
0
0
0
0
655.59
0
0
0
0
0
646.79
0
2294.32
110.77
0
0
0
0.00
937.85
0.00
2454.92
138.46
0.00
0.00
0.00
3,531.23
TOTAL S/.
06
SA
04
M
O
LL
EP
AM
PA
TO
VA
L
CR
IS
Y
U
IC
H
IP
C
01
TOTAL
INVENTARIO
0
2
5
1
0
10
7
0
2
0
0
9
1
1
6
3
0
1
0
1
2
26
6
2
17
19
7
3
2
1
46.28
722.54
192.48
69.5
393.38
660.25
265.3
125.04
92.64
52.11
2,619.52
0.64679
0.64679
0.64679
0.64679
0.64679
1
0.65559
0.65559
0.65559
0.65559
0.65559
0
3.05188
3.05188
3.05188
3.05188
3.05188
2
1,334.10
1,199.21
1,117.45
2,414.46
2,655.14
1,000.00
9,720.35
TOTAL S/.
06
SA
04
M
O
LL
EP
AM
PA
TO
VA
L
CR
IS
Y
U
IC
H
IP
C
01
TOTAL
INVENTARIO
18
48
85
2,090.15
13
48
72
1,982.16
13
412.49
4,484.80
0.64679
0.65559
3.05188
698.91
0.64679
0.65559
3.05188
736.54
1,435.45
65,985.27
133,845.78
M
O
LL
EP
AM
PA
TO
VA
L
N
SA
04
TOTAL S/.
06
CR
IS
Y
U
IC
H
IP
C
01
TOTAL
INVENTARIO
65,985.27
13,384.58
23,240.50
10,660.78
247,116.92
44,481.04
291,597.96
CONORCIO MOROCHUCO
UNID.
PRECIO
UNITARIO
S/.
5.00
06 MOLLEPAMPA
DESCRIPCION
04 SAN CRISTOVAL
ITEM
01 CHIPICUY
INV.
TOTAL
TOTAL
S/.
SUMINISTRO MATERIALES AP
1.00 SUMINISTRO DE MATERIALES
90.00 CONDUCTORES
90.10 CORDON PORTATIL DE COBRE (NLT)
0.00 2x2.5 mm2
17.50
17.50
42.50
77.50
387.5
387.50
Cjto
u
Pza
35.00
7.0
7.0
17.0
31.0
1,085.00
23.00
14.0
14.0
34.0
62.0
1,426.00
2,511.00
Cjto
405.0
7.0
7.0
17.0
31.0
12,555.00
Pza
35.0
7.0
7.0
17.0
31.0
1,085.00
###
16 538.50
CONORCIO MOROCHUCO
UNID.
PRECIO
UNITARIO
EN S/.
06 MOLLEPAMPA
DESCRIPCION
04 SAN CRISTOVAL
ITEM
01 CHIPICUY
INV.
TOTAL
TOTAL
206 LUMINARIAS
206.1 INST.DE ARTEFACTOS DE ILUMINACION QUE COMPRENDE : ARTEFACTO, LAMPARA
206.1 Luminarias de 50 - 70 W
Pza
SUBTOTAL 260
TOTAL MONTAJE ELECTROMECANICO AP
27.75
7.0
7.0
17.0
31.0
860.25
860.25
860.25
RESUMEN
SUMINISTRO DE MATRIALES AP
MONTAJE ELECTROMECANICO AP
TRASPORTE DE MATERIALES
COSTO DIRECTO
GASTOS GENERALES 11.7%
UTILIDAD 6.9%
16,538.50
860.25
1,653.85
19,052.60
2,076.73
952.63
SUB TOTAL
IGV 18%
TOTAL
22,081.96
3,974.75
29,086.08
FORMULA POLINOMICA
PROYECTO:
UBICACIN:
Fecha:
N
AMPLIACION DE RED PRIMARIA Y SECUNDARIA DEL SERVICIO DE ENERGIA ELECTRICA CON REFORZAMIENTO
LOCALIDADES DEL VALLE DE CHINCHEROS, PROVINCIA DE CHINCHEROS , REGION APURIMAC
APURIMAC
15 de noviembre de 2015
ELEMENTO REPRESENTATIVO
INDICE
SIMBOLO
SIMBOLO
MONOMIO
062
002
011
002
006
PC
FP
LL
FE
PT
PC
011
011
030
AE1
AE2
DI
AE
MONTAJE ELECTROMECANICO
TRANSPORTE
047
032
EN
EN
039
GG
GG
NOTAS:
1.-
2.3.-
En la frmula los sub-indices "o" de cada smbolo corresponden al indice de precios segn (CREPCO) a la
fecha de Elaboracin del Presupuesto (Presupuesto Base) y los sub-indices "r" al indice de precios al
momento de reajuste o fecha de valorizacin
En el caso de los monomios compuestos por varios indices se ha considerado para efecto de denominacin
el smbolo que tiene mayor porcentaje de incidencia
En caso de cambios en el suministro se deber actualizar la formula polinmica.
INCIDENCIA
65,744.46
31,774.57
13,640.00
21,911.52
5,955.00
0.110
0.053
0.023
0.037
0.010
139,025.55
174,201.12
11,756.82
65,822.82
251,780.77
81,398.00
32,458.54
113,856.54
94,568.00
599,230.86
599,360.06
COEFICIENTE
0.2320
0.291
0.020
0.110
0.4200
0.136
0.054
0.158
0.1900
0.1580
1.00
AMPLIACION DE RED PRIMARIA Y SECUNDARIA DEL SERVICIO DE ENERGIA ELECTRICA CON REFORZAMIENTO DE REDES PRIMA
CHINCHEROS, PROVINCIA DE CHINCHEROS , REGION APURIMAC
UBICACIN: APURIMAC
TIEMPO:
SEIS MESES CALENDARIO (180 DIAS)
Fecha:
15 de diciembre de 2015
MESES
AVANCE %
ITEM
DESCRIPCION
MONTO
1
2
3
4
1 SUMINISTRO DE MATERIALES
POSTES Y ACCESORIOS DE CONCRETO ARMADO
AISLADORES
CONDUCTORES
CABLES
FERRETERIA DE POSTES Y CRUCETAS
RETENIDAS
PUESTA A TIERRA
TRANSFORMADORES
TABLEROS DE DISTRIBUCION
SECCIONADORES PARARRAYOS, TERMINACIONES Y ACCESORIOS
FUSIBLES DE EXPULSION
LUMINARIA Y LAMPARAS
SUB TOTAL ACUMULADO SUMINISTRO DE MATERIALES
2 MONTAJE ELECTROMECANICO
POSTES, ESTRUCTURAS, CRUCETAS, DUCTOS Y PASTORALES DE C.A
AISLADORES
RETENIDAS
PUESTA A TIERRA
TRANSFORMADORES
TABLERO DE DISTRIBUCION
SECCIONADORES
CONDUCTORES
CABLES
LUMINARIAS
FERRETERIA
DESMONTAJE
OBRAS PRELIMINARES
PRUEBAS Y PUESTA EN SERVICIO
65,744.46
11,148.82
23,371.05
42,451.78
5,461.00
21,911.52
5,955.00
0.00
0.00
664.75
174,201.12
39,288.82
390,198.32
42,450.97
3,320.46
21,986.40
6,989.95
1,597.36
1,307.89
1,085.28
17,422.69
0.00
860.25
11,820.72
0.00
21,270.21
1,835.45
0.00
21,914.82
21,914.82
5,574.41
11,685.52
21,914.82
39,174.76
12,735.29
21,914.82
5,574.41
11,685.52
42,451.78
5,461.00
21,911.52
5,955.00
0.00
0.00
664.75
174,201.12
39,288.82
329,108.74
100.00
100.00
100.00
100.00
100.00
100.00
100.00
#DIV/0!
#DIV/0!
100.00
100.00
100.00
100.00
21,225.49
1,660.23
80.00
50.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
33.33
0.00
3,940.24
0.00
6,381.06
14,889.14
100.00
0.00
131,947.63
6,381.06
14,889.14
12,735.29
26,825.96
46.10
32,458.54
32,458.54
0.00
9,737.56
9,737.56
6,491.71
6,491.71
16,229.27
16,229.27
100.00
94,568.00
15,761.33
15,761.33
15,761.33
15,761.33
66.67
94,568.00
15,761.33
15,761.33
15,761.33
15,761.33
66.67
649,172.49
22,142.40
62,302.86
74,163.09
387,925.30
84.19
116,851.05
3,985.63
11,214.52
13,349.36
69,826.55
84.19
766,023.54
26,128.03
73,517.38
87,512.45
457,751.86
84.19
4 TRANSPORTE
SUB TOTAL ACUMULADO TRANSPORTE
MESES
5
AVANCE %
6
0.00
8,490.19
1,660.23
21,986.40
3,494.98
1,597.36
1,307.89
1,085.28
8,711.35
3,940.24
0.00
0.00
3,494.98
8,711.35
860.25
3,940.24
0.00
1,835.45
100.00
100.00
100.00
100.00
100.00
100.00
100.00
#DIV/0!
#DIV/0!
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
#DIV/0!
100.00
100.00
52,273.91
18,842.26
100.00
0.00
0.00
100.00
15,761.33
15,761.33
100.00
15,761.33
15,761.33
100.00
68,035.25
34,603.60
100.00
12,246.34
6,228.65
100.00
80,281.59
40,832.24
100.00
UBICACION
FECHA
: PURIMAC
A
15 de Diciembre del 2015
10.000
5.000
1.000
M3
M3
Pza
COSTO UNITARIO
Partida 201.1020
Izaje Poste de C.A.C. de 8/200 KG. (Hoyos de 1.40x0.65x0.65m) (En terreno normal)
Rendimiento
20.00 Pza/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Piedra Mediana de Cantera
M3
Cemento Portland Tipo I
Blsa
Hormign
M3
Agua Transportada
M3
Pintura esmalte amarillo
GLN
Pintura esmalte negro
GLN
UBICACION
: PURIMAC
A
FECHA
15 de Diciembre del 2015
Operario
Oficial
Peon
Camion Grua 6 Tn.
Pluma de Izaje
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
Equipos de Seguridad
Herramientas
0.200
1.000
10.000
1.000
0.000
0.150
3.000
5.000
HH
HH
HH
HM
HM
HM
% MO
% MO
Excavacin de Hoyo
Compactacin de Hoyo, Limpieza de Desmonte
Sealizacin de Poste
10.000
5.000
1.000
M3
M3
Pza
COSTO UNITARIO
UBICACION
FECHA
: PURIMAC
A
15 de Diciembre del 2015
Partida 201.2010
Izaje Poste de C.A.C. de 8/300 KG. (Hoyos de 1.40x0.65x0.65m) (En terreno rocoso)
Rendimiento
15.00 Pza/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Piedra Mediana de Cantera
M3
Cemento Portland Tipo I
Blsa
Hormign
M3
Agua Transportada
M3
Pintura esmalte amarillo
GLN
Pintura esmalte negro
GLN
Fuilminante
UND.
Dinamita
KG
Nitrato de Amonio al 33%
KG
Operario
0.200
HH
Oficial
1.000
HH
Peon
7.000
HH
Camion Grua 6 Tn.
1.000
HM
Pluma de Izaje
0.000
HM
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.150
HM
Barrenos 5' X 1/8"
0.50
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
Excavacin de Hoyo
Compactacin de Hoyo, Limpieza de Desmonte
Sealizacin de Poste
10.000
5.000
1.000
M3
M3
Pza
COSTO UNITARIO
Partida 200.2020
Izaje Poste de C.A.C. de 8/200 KG. (Hoyos de 1.40x0.65x0.65m) (En terreno rocoso)
Rendimiento
15.00 Pza/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Piedra Mediana de Cantera
M3
Cemento Portland Tipo I
Blsa
Hormign
M3
Agua Transportada
M3
UBICACION
: PURIMAC
A
FECHA
15 de Diciembre del 2015
Pintura esmalte amarillo
Pintura esmalte negro
Fuilminante
Dinamita
Nitrato de Amonio al 33%
Operario
Oficial
Peon
Camion Grua 6 Tn.
Pluma de Izaje
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
Barrenos 5' X 1/8"
Equipos de Seguridad
Herramientas
Excavacin de Hoyo
Compactacin de Hoyo, Limpieza de Desmonte
Sealizacin de Poste
0.200
1.000
7.000
1.000
0.000
0.150
0.50
3.000
5.000
GLN
GLN
UND.
KG
KG
HH
HH
HH
HM
HM
HM
HM
% MO
% MO
10.000
5.000
1.000
M3
M3
Pza
COSTO UNITARIO
UBICACION
FECHA
: PURIMAC
A
15 de Diciembre del 2015
202.000 RETENIDAS
Partida 202.1010
Instalacin de Retenida Simple (En terreno normal)
Rendimiento
7.00 Cjto/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Piedra Mediana de Cantera
M3
Operario
0.100
HH
Oficial
1.000
HH
Peon
2.000
HH
Tirfor 3 ton.
1.000
HM
Escalera de Tres Cuerpos
1.000
HM
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.150
HM
Caja de herramientas
1.000
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
Excavacin de Hoyo
Compactacin de Hoyo, Limpieza de Desmonte
5.000
4.000
M3
M3
COSTO UNITARIO
Partida 202.1020
Instalacin de Retenida Vertical (En terreno normal)
Rendimiento
6.00 Cjto/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Piedra Mediana de Cantera
M3
Operario
0.100
HH
Oficial
1.000
HH
Peon
2.000
HH
Tirfor 3 ton.
1.000
HM
Escalera de Tres Cuerpos
1.000
HM
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.150
HM
Caja de herramientas
1.000
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
Excavacin de Hoyo
5.000
M3
UBICACION
: PURIMAC
A
FECHA
15 de Diciembre del 2015
Compactacin de Hoyo, Limpieza de Desmonte
4.000
M3
COSTO UNITARIO
UBICACION
FECHA
: PURIMAC
A
15 de Diciembre del 2015
Partida 202.2010
Instalacin de Retenida Simple (En terreno rocoso)
Rendimiento
5.00 Cjto/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Piedra Mediana de Cantera
M3
Fuilminante
UND.
Dinamita
KG
Nitrato de Amonio al 33%
KG
Operario
0.100
HH
Oficial
1.000
HH
Peon
2.000
HH
Tirfor 3 ton.
1.000
HM
Escalera de Tres Cuerpos
1.000
HM
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.150
HM
Barrenos 5' X 1/8"
0.500
HM
Caja de herramientas
1.000
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
Excavacin de Hoyo
Compactacin de Hoyo, Limpieza de Desmonte
5.000
4.000
M3
M3
COSTO UNITARIO
Partida 202.2020
Instalacin de Retenida Vertical (En terreno rocoso)
Rendimiento
5.00 Cjto/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Piedra Mediana de Cantera
M3
Fuilminante
UND.
Dinamita
KG
Nitrato de Amonio al 33%
KG
Operario
0.100
HH
Oficial
1.000
HH
Peon
2.000
HH
Tirfor 3 ton.
1.000
HM
Escalera de Tres Cuerpos
1.000
HM
UBICACION
: PURIMAC
A
FECHA
15 de Diciembre del 2015
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
Barrenos 5' X 1/8"
Caja de herramientas
Equipos de Seguridad
Herramientas
0.150
0.500
1.000
3.000
5.000
HM
HM
HM
% MO
% MO
Excavacin de Hoyo
Compactacin de Hoyo, Limpieza de Desmonte
5.000
4.000
M3
M3
COSTO UNITARIO
UBICACION
FECHA
: PURIMAC
A
15 de Diciembre del 2015
5.000
4.000
M3
M3
COSTO UNITARIO
Partida 203.1020
Instalacin de Puesta a Tierra (En terreno rocoso)
Rendimiento
4.00 Cjto/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Agua Transportada
M3
Operario
0.100
HH
Oficial
1.000
HH
Peon
2.000
HH
Escalera de Tres Cuerpos
1.000
HM
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.150
HM
Caja de herramientas
1.000
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
Excavacin de Hoyo
Compactacin de Hoyo, Limpieza de Desmonte
5.000
4.000
M3
M3
UBICACION
FECHA
: PURIMAC
A
15 de Diciembre del 2015
COSTO UNITARIO
UBICACION
FECHA
: PURIMAC
A
15 de Diciembre del 2015
2800.00 M/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
1.000
HH
Oficial
8.000
HH
Peon
12.000
HH
Topografo Operador de Estacin Total
1.000
HH
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.750
HM
Portabobina
2.000
HM
Poleas
24.000
HM
Tirfor 3 ton.
2.000
HM
Dinamometro
1.000
HM
Radio UHF
4.000
HM
Tiralinea
2.000
HM
Escalera de Tres Cuerpos
6.000
HM
Cable Gua
0.500
HM
Estacin Total (Jalon, Prisma)
1.000
HM
Winche de 3 Ton
1.000
HM
Freno Hidrahulico
1.000
HM
Caballete Alzabobina
1.000
HM
Caja de herramientas
8.000
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
COSTO UNITARIO
Partida 204.1020
Conductor 3x25+16+P/25mm2
Rendimiento
3000.00 M/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
1.000
HH
Oficial
8.000
HH
Peon
12.000
HH
Topografo Operador de Estacin Total
1.000
HH
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.750
HM
UBICACION
: PURIMAC
A
FECHA
15 de Diciembre del 2015
Portabobina
Poleas
Tirfor 3 ton.
Dinamometro
Radio UHF
Tiralinea
Escalera de Tres Cuerpos
Cable Gua
Estacin Total (Jalon, Prisma)
Winche de 3 Ton
Freno Hidrahulico
Caballete Alzabobina
Caja de herramientas
Equipos de Seguridad
Herramientas
2.000
24.000
2.000
1.000
4.000
2.000
6.000
0.500
1.000
1.000
1.000
1.000
8.000
3.000
5.000
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
% MO
% MO
COSTO UNITARIO
UBICACION
FECHA
: PURIMAC
A
15 de Diciembre del 2015
Partida 204.1020
Conductor 3x16+16+P/25mm2
Rendimiento
3340.00 M/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
1.000
HH
Oficial
8.000
HH
Peon
12.000
HH
Topografo Operador de Estacin Total
1.000
HH
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.750
HM
Portabobina
2.000
HM
Poleas
24.000
HM
Tirfor 3 ton.
2.000
HM
Dinamometro
1.000
HM
Radio UHF
4.000
HM
Tiralinea
2.000
HM
Escalera de Tres Cuerpos
6.000
HM
Cable Gua
0.500
HM
Estacin Total (Jalon, Prisma)
1.000
HM
Winche de 3 Ton
1.000
HM
Freno Hidrahulico
1.000
HM
Caballete Alzabobina
1.000
HM
Caja de herramientas
8.000
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
COSTO UNITARIO
Partida 204.1040
Conductor 2x35+16+P/25mm2
Rendimiento
4000.00 M/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
1.000
HH
Oficial
8.000
HH
Peon
12.000
HH
Topografo Operador de Estacin Total
1.000
HH
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.750
HM
Portabobina
2.000
HM
UBICACION
: PURIMAC
A
FECHA
15 de Diciembre del 2015
Poleas
Tirfor 3 ton.
Dinamometro
Radio UHF
Tiralinea
Escalera de Tres Cuerpos
Cable Gua
Estacin Total (Jalon, Prisma)
Winche de 3 Ton
Freno Hidrahulico
Caballete Alzabobina
Caja de herramientas
Equipos de Seguridad
Herramientas
24.000
2.000
1.000
4.000
2.000
6.000
0.500
1.000
1.000
1.000
1.000
8.000
3.000
5.000
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
% MO
% MO
COSTO UNITARIO
UBICACION
FECHA
: PURIMAC
A
15 de Diciembre del 2015
Partida 204.1040
Conductor 2x25+16+P/25mm2
Rendimiento
3500.00 M/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
1.000
HH
Oficial
8.000
HH
Peon
12.000
HH
Topografo Operador de Estacin Total
1.000
HH
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.800
HM
Portabobina
2.000
HM
Poleas
24.000
HM
Tirfor 3 ton.
2.000
HM
Dinamometro
1.000
HM
Radio UHF
4.000
HM
Tiralinea
2.000
HM
Escalera de Tres Cuerpos
6.000
HM
Cable Gua
0.500
HM
Estacin Total (Jalon, Prisma)
1.000
HM
Winche de 3 Ton
1.000
HM
Freno Hidrahulico
1.000
HM
Caballete Alzabobina
2.000
HM
Caja de herramientas
8.000
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
COSTO UNITARIO
Partida 204.1050
Conductor 2x16+16+P/25mm2
Rendimiento
3800.00 M/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
1.000
HH
Oficial
8.000
HH
Peon
12.000
HH
Topografo Operador de Estacin Total
1.000
HH
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.800
HM
Portabobina
2.000
HM
UBICACION
: PURIMAC
A
FECHA
15 de Diciembre del 2015
Poleas
Tirfor 3 ton.
Dinamometro
Radio UHF
Tiralinea
Escalera de Tres Cuerpos
Cable Gua
Estacin Total (Jalon, Prisma)
Winche de 3 Ton
Freno Hidrahulico
Caballete Alzabobina
Caja de herramientas
Equipos de Seguridad
Herramientas
24.000
2.000
1.000
4.000
2.000
6.000
0.500
1.000
1.000
1.000
2.000
8.000
3.000
5.000
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
% MO
% MO
COSTO UNITARIO
UBICACION
FECHA
: PURIMAC
A
15 de Diciembre del 2015
Partida 204.1070
Conductor 2x25+P/25mm2
Rendimiento
4000.00 M/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
1.000
HH
Oficial
8.000
HH
Peon
12.000
HH
Topografo Operador de Estacin Total
1.000
HH
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.800
HM
Portabobina
2.000
HM
Poleas
24.000
HM
Tirfor 3 ton.
2.000
HM
Dinamometro
1.000
HM
Radio UHF
4.000
HM
Tiralinea
2.000
HM
Escalera de Tres Cuerpos
6.000
HM
Cable Gua
0.500
HM
Estacin Total (Jalon, Prisma)
1.000
HM
Winche de 3 Ton
1.000
HM
Freno Hidrahulico
1.000
HM
Caballete Alzabobina
2.000
HM
Caja de herramientas
8.000
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
COSTO UNITARIO
Partida 204.1080
Conductor 2x16+P/25mm2
Rendimiento
4200.00 M/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
1.000
HH
Oficial
8.000
HH
Peon
12.000
HH
Topografo Operador de Estacin Total
1.000
HH
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.800
HM
Portabobina
2.000
HM
UBICACION
: PURIMAC
A
FECHA
15 de Diciembre del 2015
Poleas
Tirfor 3 ton.
Dinamometro
Radio UHF
Tiralinea
Escalera de Tres Cuerpos
Cable Gua
Estacin Total (Jalon, Prisma)
Winche de 3 Ton
Freno Hidrahulico
Caballete Alzabobina
Caja de herramientas
Equipos de Seguridad
Herramientas
24.000
2.000
1.000
4.000
2.000
6.000
0.500
1.000
1.000
1.000
2.000
8.000
3.000
5.000
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
% MO
% MO
COSTO UNITARIO
UBICACION
: PURIMAC
A
FECHA
15 de Diciembre del 2015
206.000 LUMINARIAS
Partida 206.101
Luminarias de 50W
Rendimiento
18.00 Pza/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
0.100
HH
Oficial
1.000
HH
Peon
3.000
HH
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.150
HM
Escalera de Tres Cuerpos
1.000
HM
Caja de herramientas
1.000
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
COSTO UNITARIO
205.000 FERRETERIA
Partida 205.1010
Armado Tipo E0
Rendimiento
18.00 Cjto/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
0.100
HH
Oficial
1.000
HH
Peon
2.000
HH
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.150
HM
Escalera de Tres Cuerpos
1.000
HM
Caja de herramientas
1.000
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
COSTO UNITARIO
Partida 205.1020
Armado Tipo E1
Rendimiento
15.00 Cjto/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
UBICACION
: PURIMAC
A
FECHA
15 de Diciembre del 2015
Operario
Oficial
Peon
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
Escalera de Tres Cuerpos
Caja de herramientas
Equipos de Seguridad
Herramientas
0.100
1.000
2.000
0.150
1.000
1.000
3.000
5.000
HH
HH
HH
HM
HM
HM
% MO
% MO
COSTO UNITARIO
UBICACION
FECHA
: PURIMAC
A
15 de Diciembre del 2015
Partida 205.1030
Armado Tipo E'1
Rendimiento
13.00 Cjto/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
0.100
HH
Oficial
1.000
HH
Peon
2.000
HH
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.150
HM
Escalera de Tres Cuerpos
1.000
HM
Caja de herramientas
1.000
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
COSTO UNITARIO
Partida 205.1040
Armado Tipo E2
Rendimiento
12.00 Cjto/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
0.100
HH
Oficial
1.000
HH
Peon
2.000
HH
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.150
HM
Escalera de Tres Cuerpos
1.000
HM
Caja de herramientas
1.000
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
COSTO UNITARIO
Partida 205.1050
Armado Tipo E3
Rendimiento
18.00 Cjto/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
0.100
HH
Oficial
1.000
HH
Peon
2.000
HH
UBICACION
: PURIMAC
A
FECHA
15 de Diciembre del 2015
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
Escalera de Tres Cuerpos
Caja de herramientas
Equipos de Seguridad
Herramientas
0.150
1.000
1.000
3.000
5.000
HM
HM
HM
% MO
% MO
COSTO UNITARIO
Partida 205.1060
Armado Tipo E4
Rendimiento
12.00 Cjto/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
0.100
HH
Oficial
1.000
HH
Peon
2.000
HH
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.150
HM
Escalera de Tres Cuerpos
1.000
HM
Caja de herramientas
1.000
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
COSTO UNITARIO
UBICACION
FECHA
: PURIMAC
A
15 de Diciembre del 2015
Partida 205.1070
Armado Tipo E'4
Rendimiento
11.00 Cjto/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
0.100
HH
Oficial
1.000
HH
Peon
2.000
HH
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.150
HM
Escalera de Tres Cuerpos
1.000
HM
Caja de herramientas
1.000
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
COSTO UNITARIO
Partida 205.1080
Armado Tipo E5
Rendimiento
10.00 Cjto/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
0.100
HH
Oficial
1.000
HH
Peon
2.000
HH
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.150
HM
Escalera de Tres Cuerpos
1.000
HM
Caja de herramientas
1.000
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
COSTO UNITARIO
Partida 205.1090
Armado Tipo E'5
Rendimiento
9.00 Cjto/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
0.100
HH
UBICACION
: PURIMAC
A
FECHA
15 de Diciembre del 2015
Oficial
Peon
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
Escalera de Tres Cuerpos
Caja de herramientas
Equipos de Seguridad
Herramientas
1.000
2.000
0.150
1.000
1.000
3.000
5.000
HH
HH
HM
HM
HM
% MO
% MO
COSTO UNITARIO
UBICACION
FECHA
: PURIMAC
A
15 de Diciembre del 2015
Partida 205.1100
Armado Tipo E6
Rendimiento
8.00 Cjto/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
0.100
HH
Oficial
1.000
HH
Peon
2.000
HH
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.150
HM
Escalera de Tres Cuerpos
1.000
HM
Caja de herramientas
1.000
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
COSTO UNITARIO
207.000 OBRAS PRELIMINARES
Partida 207.001
Estudios de Ingeniera de las Redes Secundarias
Rendimiento
2.50 Km/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Estacas de madera de 5*5*30 cm.
UN
Cal
KG
Ingeniero de Redes Secundarias
0.400
HH
Tcnico Especialista en Dibujo por Computadora
0.500
HH
Topografo Operador de Estacin Total
1.000
HH
Oficial
1.000
HH
Peon
2.000
HH
Papel Bond A-4
Millar
Equipo de computo
2.000
HM
Impresora laser
0.100
HM
Plotter
0.100
HM
Estacin Total (Jalon, Prisma)
1.000
HM
Caja de herramientas
1.000
HM
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.150
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
UBICACION
FECHA
: PURIMAC
A
15 de Diciembre del 2015
COSTO UNITARIO
UBICACION
FECHA
: PURIMAC
A
15 de Diciembre del 2015
Partida 207.002
Replanteo Topogrfico, Ubicacin de Estructuras de Acuerdo a la Ingeniera de Detalle
de las Redes Secundarias
Rendimiento
3.50 Km/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Estacas de madera de 5*5*30 cm.
UN
Cal
KG
Ingeniero de Redes Secundarias
0.250
HH
Tcnico Especialista en Dibujo por Computadora
0.250
HH
Topografo Operador de Estacin Total
1.000
HH
Oficial
2.000
HH
Peon
6.000
HH
Papel Bond A-4
Millar
Equipo de computo
1.000
HM
Impresora laser
0.125
HM
Plotter
0.075
HM
Estacin Total (Jalon, Prisma)
1.000
HM
Caja de herramientas
1.000
HM
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.200
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
COSTO UNITARIO
Partida 207.003
Monitoreo de Impacto Ambiental
Rendimiento
3.50 Km/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Ingeniero de Ambiental
0.250
HH
Tcnico Especialista en Dibujo por Computadora
0.250
HH
Topografo Operador de Estacin Total
1.000
HH
Oficial
2.000
HH
Peon
6.000
HH
Papel Bond A-4
Millar
Equipo de computo
1.000
HM
Impresora laser
0.125
HM
UBICACION
: PURIMAC
A
FECHA
15 de Diciembre del 2015
Plotter
Estacin Total (Jalon, Prisma)
Caja de herramientas
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
Equipos de Seguridad
Herramientas
0.075
1.000
1.000
0.200
3.000
5.000
HM
HM
HM
HM
% MO
% MO
COSTO UNITARIO
UBICACION
: PURIMAC
A
FECHA
15 de Diciembre del 2015
209.000 PRUEBAS Y PUESTA EN SERVICIO
Partida 209.1000
Pruebas y Puesta en Servicio de las Redes Secundarias
Rendimiento
6.00 Km/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
1.000
HH
Oficial
3.000
HH
Peon
6.000
HH
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.300
HM
Medidor de resistencia de puesta a tierra
1.000
HM
Medidor de aislamiento elctrico
1.000
HM
Estacin Total (Jalon, Prisma)
1.000
HM
Binoculares
1.000
hm
Escalera de Tres Cuerpos
1.000
HM
Caja de herramientas
3.000
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
COSTO UNITARIO
Partida 209.2000
Expediente Tcnico Finales Conforme a Obra (1 Original + 3 Copias) de las Redes
Secundarias, Incluye la Presentacin Digitalizada del Expediente en un CD
Rendimiento
2.50 Km/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Ingeniero de Redes Secundarias
0.450
HH
Tcnico Especialista en Dibujo por Computadora
0.450
HH
Topografo Operador de Estacin Total
0.700
HH
Papel Bond A-4
Millar
Equipo de computo
1.000
HM
Impresora laser
0.250
HM
Plotter
0.150
HM
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.150
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
COSTO UNITARIO
UBICACION
: PURIMAC
A
FECHA
15 de Diciembre del 2015
Partida 200.100
DESBROSE DE ARBOLES
TALADO DE ARBOLES Y VEGETACION (considera el pago de arboles)
Rendimiento
2.50 Km/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Operario
0.200
HH
Oficial
0.500
HH
Peon
10.000
HH
Pago por Arbol
Millar
Motocierra
1.000
HM
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.150
HM
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
COSTO UNITARIO
UBICACION
: PURIMAC
A
FECHA
15 de Diciembre del 2015
Partida 207.0004
Elaboracin, Gestin de Aprobacin y Ejecucin del Plan de Monitoreo Arqueologico de
obras de proyecto bajo la supervision del Ministerio de Cultura
Rendimiento
3.50 Km/Da
RECURSO
UND.
****************** ********************************************* ********** ***************
Ingeniero de Redes Secundarias
0.450
HH
Tcnico Especialista en Dibujo por Computadora
0.450
HH
Topografo Operador de Estacin Total
0.700
HH
Papel Bond A-4
Millar
Equipo de computo
1.000
HM
Impresora laser
0.250
HM
Plotter
0.150
HM
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.150
HM
Pago por derecho de suevercion Ministerio de cultura
1.000
Glb
Equipos de Seguridad
3.000
% MO
Herramientas
5.000
% MO
COSTO UNITARIO
8.76
6.58
9.60
131.40
13.16
3.84
131.40
13.16
3.84
336.77
0.0800
0.4000
4.0000
0.4000
0.0000
0.0600
14.26
10.63
9.60
150.00
8.94
90.00
1.14
4.25
38.40
60.00
0.00
5.40
1.31
2.19
15.0000
2.0000
0.4000
8.76
6.58
9.60
131.40
13.16
3.84
COSTO UNITARIO
43.79
65.40
1.31
2.19
131.40
13.16
3.84
336.77
15.00
6.58
9.60
80.00
17.55
5.12
80.00
17.55
5.12
442.04
0.0100
0.0067
2.000
0.500
2.000
0.1067
0.5333
3.7333
0.5333
0.0000
0.0800
0.2667
49.50
49.50
35.00
50.00
3.50
14.26
10.63
9.60
150.00
8.94
90.00
22.00
0.50
0.33
70.00
25.00
7.00
1.52
5.67
35.84
80.00
0.00
7.20
5.87
1.29
2.15
5.3333
2.6667
0.5333
15.00
6.58
9.60
80.00
17.55
5.12
COSTO UNITARIO
199.83
43.03
93.07
1.29
2.15
80.00
17.55
5.12
442.04
15.00
6.58
85.71
30.08
COSTO UNITARIO
85.71
30.08
198.70
10.00
66.67
66.67
5.3333
COSTO UNITARIO
6.58
35.09
35.09
195.09
15.00
6.58
120.00
42.11
120.00
42.11
389.73
0.2400
0.8000
1.6000
90.00
22.00
1.33
21.60
17.60
2.14
1.50
2.50
51.59
1.50
2.50
8.0000
6.4000
15.00
6.58
120.00
42.11
120.00
42.11
COSTO UNITARIO
389.71
10.00
6.58
66.67
35.09
COSTO UNITARIO
66.67
35.09
172.49
15.00
6.58
150.00
52.64
150.00
52.64
COSTO UNITARIO
308.09
1.52
0.0053
0.0640
0.0053
0.0027
0.0107
0.0053
0.0160
0.0013
0.0027
0.0027
0.0027
0.0027
0.0213
COSTO UNITARIO
0.30
2.35
2.89
5.00
6.25
0.15
3.52
28.90
12.50
29.82
22.10
15.30
1.33
0.00
0.15
0.02
0.01
0.07
0.00
0.06
0.04
0.03
0.08
0.06
0.04
0.03
0.02
0.03
0.77
0.02
0.03
1.45
1.27
0.0480
0.0040
0.0020
0.0080
0.0040
0.0120
0.0010
0.0020
0.0020
0.0020
0.0020
0.0160
COSTO UNITARIO
2.35
2.89
5.00
6.25
0.15
3.52
28.90
12.50
29.82
22.10
15.30
1.33
0.11
0.01
0.01
0.05
0.00
0.04
0.03
0.03
0.06
0.04
0.03
0.02
0.01
0.02
0.57
0.01
0.02
1.07
1.25
0.0505
0.0042
0.0021
0.0084
0.0042
0.0126
0.0011
0.0021
0.0021
0.0021
0.0042
0.0168
COSTO UNITARIO
2.35
2.89
5.00
6.25
0.15
3.52
28.90
12.50
29.82
22.10
15.30
1.33
0.12
0.01
0.01
0.05
0.00
0.04
0.03
0.03
0.06
0.05
0.06
0.02
0.01
0.02
0.63
0.01
0.02
1.16
1.11
0.0457
0.0038
0.0019
0.0076
0.0038
0.0114
0.0010
0.0019
0.0019
0.0019
0.0038
0.0152
COSTO UNITARIO
2.35
2.89
5.00
6.25
0.15
3.52
28.90
12.50
29.82
22.10
15.30
1.33
0.11
0.01
0.01
0.05
0.00
0.04
0.03
0.02
0.06
0.04
0.06
0.02
0.01
0.02
0.59
0.01
0.02
1.07
27.75
23.14
0.0533
0.5333
1.0667
0.0800
0.5333
0.5333
COSTO UNITARIO
14.26
10.63
9.60
90.00
3.52
1.33
0.76
5.67
10.24
7.20
1.88
0.71
0.50
0.83
16.67
9.79
0.50
0.83
27.79
32.08
34.75
0.0667
0.4444
0.4444
COSTO UNITARIO
90.00
3.52
1.33
6.00
1.56
0.59
0.42
0.69
8.15
0.42
0.69
23.14
34.75
37.90
41.68
0.8889
1.7778
0.1333
0.8889
0.8889
COSTO UNITARIO
10.63
9.60
90.00
3.52
1.33
9.45
17.07
12.00
3.13
1.18
0.83
1.39
27.79
16.31
0.83
1.39
46.32
52.11
COSTO UNITARIO
437.14
392.94
0.1714
2.2857
2.2857
0.4571
COSTO UNITARIO
4.65
12.50
1.33
90.00
0.80
28.57
3.04
41.14
7.48
12.47
96.87
7.48
12.47
366.15
229.01
241.34
707.50
n de Monitoreo Arqueologico de
791.14
PROYECTO
UBICACION
FECHA
: PURIMAC
A
15 de Diciembre del 2015
PROYECTO
UBICACION
: PURIMAC
A
FECHA
15 de Diciembre del 2015
RECURSO
UND.
CANTIDAD P.UNIT.
****************** ********************************************* ********** *************** ************* **************
Yeso
Qtal
0.1000
5.00
Cemento Portland Tipo I
Blsa
0.2500
23.00
Agregados
M3
0.1000
70.00
Agua Transportada
M3
0.1000
3.06
Mastil de AG 3"x3m
UND.
0.0000
25.00
Operario
0.100
HH
0.0800
14.26
Oficial
0.250
HH
0.2000
10.63
Peon
1.000
HH
0.8000
9.60
Camioneta Rural 4 X 4 130 HP 5 Pasajeros
0.100
HM
0.0800
80.59
Equipos de Seguridad
2.000
% MO
Herramientas
5.000
% MO
COSTO UNITARIO
RIAS
IA ELECTRICA CON REFORZAMIENTO DE REDES PRIMARIAS DE 08
SUBTOTAL
TOTAL
************* ***************
0.50
4.60
7.00
0.31
12.41
0.76
1.42
5.12
7.30
4.30
4.30
0.22
0.22
0.37
0.37
24.59
SUBTOTAL
TOTAL
************* ***************
0.50
5.75
7.00
0.31
13.56
0.63
4.72
4.27
9.62
3.58
3.58
0.29
0.29
0.48
0.48
27.53
RIAS
IA ELECTRICA CON REFORZAMIENTO DE REDES PRIMARIAS DE 08
SUBTOTAL
TOTAL
************* ***************
0.50
5.75
7.00
0.31
0.00
13.56
1.14
2.13
7.68
10.95
6.45
6.45
0.22
0.22
0.55
0.55
31.73
CONSORCIO MOROCH
PLANILLA DE MATERIALE
OBRA: AMPLIACION DE RED PRIMARIA Y SECUNDARIA DEL SERVICIO DE ENERGIA EL
ITEM
DESCRIPCION
UNID
10.102 8/200/140/260
u
SUB TOTAL 10.00:
20.000 AISLADORES
20.100 AISLADORES DE PORCELANA DE TRACCION, CLASE ANSI:
20.101 54-2, PARA (RETENIDAS)
u
SUB TOTAL 20.00:
30.000 CONDUCTORES
30.100 CONDUCTOR DE COBRE DESNUDO, CABLEADO, TEMPLE BLANDO, DE :
30.101 25mm2, 7 HILOS
m
SUB TOTAL 30.00:
40.000 CABLES
40.100 CABLE AUTOPORTANTE DE ALUMINIO TIPO CAAI, C/ PORTANTE DE AL-AL AISLADO:
40.101 3x35+16+P/25mm2
40.102 3x25+16+P/25mm2
40.103 3x16+16+P/25mm2
40.104 2x35+16+P/25mm2
40.105 2x25+16+P/25mm2
40.106 2x16+16+P/25mm2
40.107 2x25+P/25mm2
40.108 2x16+P/25mm2
m
SUB TOTAL 40.00:
Cjto
Und
Pza
m
Und
50.200 ARMADO E1
Cjto
50.201 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movil (SOT 15.8)
Pza
50.202 Grapa de Suspencin, P/Cable Autoportante de Secc. 25-35 mm2 (SOT 14.1)
Pza
50.300 ARMADO E1
Cjto
Und
Und
50.304 Grapa de Suspencin, P/Cable Autoportante de Secc. 25-35 mm2 (SOT 14.1)
Pza
50.400 ARMADO E2
Cjto
50.401 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movil (SOT 15.8)
Pza
Und
Pza
50.500 ARMADO E3
Cjto
50.501 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movil (SOT 15.8)
Pza
Pza
50.600 ARMADO E4
Cjto
50.601 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movil (SOT 15.8)
Pza
Und
Pza
50.700 ARMADO E4
Cjto
Und
Pza
Und
50.800 ARMADO E5
Cjto
50.801 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movil (SOT 15.8)
Pza
Pza
50.803 Grapa de Suspencin, P/Cable Autoportante de Secc. 25-35 mm2 (SOT 14.1)
Pza
50.900 ARMADO E5
Cjto
Und
Pza
50.903 Grapa de Suspencin, P/Cable Autoportante de Secc. 25-35 mm2 (SOT 14.1)
Pza
Und
50.910 ARMADO E6
Cjto
51.911 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movil (SOT 15.8)
Pza
Und
Pza
Cjto
Pza
Pza
Pza
Pza
60.108 Grapa Doble Va AG, 3 Pernos, 6 Long P/Cable de Acero 3/8" Diam.
Pza
Pza
Pza
Pza
SUB TOTAL 60.00:
Cjto
Pza
Pza
Bls
Bls
SUB TOTAL 70.00:
80.300 CONECTOR DE DERIVACION TIPO SL 2.1 CON CUBIERTA TIPO SP14, SECCION DE :
80.301 120/16-25-35mm2
80.400 CONECTOR AL-CU CON CUBIERTA PARA PAT TIPO SP14, SECCION DE :
80.401 120/16-25-35mm2 Incluye Cubierta Prtotectora
u
SUB TOTAL 80.00:
SUMINISTRO MATERIALES AP
1 SUMINISTRO DE MATERIALES
90
CONDUCTORES
2x2.5 mm2
SUB TOTAL 90,000
100
FERRETERIA
Cjto
u
100.200 Pastoral Prablico de AG de 1.00m/0.50m/38mm/5, e=3,2mm
100.300 Abrazadera de AG P/Pastorales 1 1/2" x 140mm (Poste) 1 1/2" (Pastoral), 3/16" Espeso Pza
100.100 SUMINISTROS VARIOS
LUMINARIA Y LAMPARAS
Cjto
Pza
###
CABLES
###
###
2x6 mm2
###
3x10 mm2
###
4x10mm2
###
FERRETERIA DE ACOMETIDAS
###
###
1/2"x30 m.
###
###
1/2"
###
###
###
###
###
###
###
###
###
m
m
m
m
u
u
u
Templador de AG
u
Armella Tirafon de AG
u
Tubo de 2"Fx3m (Incluye Tubo Curvado de PVC-P a AC)
u
Tubo PVC de 3/4" x 3m long. (Tubo Bastn)
m
Alambre de AoGo. N12
Medidor Monofsico de Energa Activa, tipo Electrnico con Micro Procesador de 220V;10-4 u
###
CONECTORES Y ACCESORIOS
CONECTOR BIMETALICO Al-Cu, TIPO DOBLE VIA: (COND. PRINC.max-min./COND. DERIV max-min./
max-min)
###
10-70/2.5-10mm, UN PERNO
###
CINTA DE NYLON
###
4,6x170mm
###
u
u
###
###
Trifasico 245x200x525mm
###
NTERRUPTORES
INTERRUPTORES TERMOMAGNETICOS MODULARES DE DOS POLOS CURVA "C" 500 V. DE:
(INCLUYE BASE DE SUJECION C/PINTURA EPOXICA CROMATO DE ZINC Y ACABADO EPOXI)
###
32A, 6KA
SUB TOTAL 102,000
TOTAL SUMINISTRO REDES SECUNDARIAS
2
200
MONTAJE ELECTROMECANICO
DESBROCE
Km
Pza
Pza
Pza
Pza
RETENIDAS
Cjto
Cjto
Cjto
Cjto
SUB TOTAL 202
###
PUESTA A TIERRA
203.100 PUESTA A TIERRA TIPO VARILLA (BRONCE) PARA M.T. QUE COMPRENDE : EXCAVACION EN
TERRENO, ARMADO DE LA PUESTA A TIERRA, COMPACTACION, RETIRO DE DESMONTE, INSTALACION
DE CAJA REGISTRO DE MANTENIMIENTO PARA PUESTA A TIERRA Y SUELO ARTIFICIAL, INSTALACION
DE CONECTORES PARA RED TIPO PERNO PARTIDO CON CONECTORES ANDERSON Y SPILT BOLT
203.101 Puesta a Tierra en Terreno Normal
Cjto
Cjto
SUB TOTAL 203
###
CONDUCTORES
ml
204.102 3x25+16+P/25mm2
ml
204.103 3x16+16+P/25mm2
ml
204.104 2x35+16+P/25mm2
ml
204.105 2x25+16+P/25mm2
ml
204.106 2x16+16+P/25mm2
ml
204.107 2x25+P/25mm2
ml
204.108 2x16+P/25mm2
ml
SUB TOTAL 204
###
FERRETERIA
Cjto
205.102 Armado E1
Cjto
205.103 Armado E1
Cjto
205.104 Armado E2
Cjto
205.105 Armado E3
Cjto
205.106 Armado E4
Cjto
205.107 Armado E4
Cjto
205.108 Armado E5
Cjto
205.109 Armado E5
Cjto
205.110 Armado E6
Cjto
SUB TOTAL 205
###
LUMINARIAS
Pza
206.101 Luminarias de 50 - 70 W
SUB TOTAL 206
###
OBRAS PRELIMINARES
Km
Km
Km
207.004 Elaboracin, Gestin de Aprobacin y Ejecucin del Plan de Monitoreo Arqueologico de obraKm
207.005 Pago por compensacion daos y perjuicios segn expediente de servidumbre
Km
UN
SUB TOTAL 207
Montaje Electromecanico Acometidas Domicilairias
###
CAJAS PORTAMEDIDORES
cjto
cjto
208.202 INST.ACOMETIDA DOMICILIARIA 1 AEREA SIMPLE SOBRE FACHADA ZONA RURAL TIPO ELSE
A CAJA PORTAMEDIDOR CON CRUCE DE CALLE Y ACCESORIOS DE FIJACION E INCLUYE SUMINISTRO
DE CINTA AISLANTE, CORREA PLASTICA, MASTIL, CEMENTO Y MATERIAL AGREGADO.
AGREGADO INCLUYE EQUIPO DE MEDICION
cjto
Km
209.200 Expediente Tcnico Finales Conforme a Obra (1 Original + 3 Copias) de Redes Secundarias, Incluye la Presentac
Digitalizada del Expediente en un CD
SUB TOTAL 209
TOTAL MONTAJE ELECTROMECANICO REDES SECUNDARIAS
Km
ORCIO MOROCHUCO
NILLA DE MATERIALES
CIO DE ENERGIA ELECTRICA CON REFORZAMIENTO DE REDES PRIMARIAS DE 08
OS , REGION APURIMAC.
ARTAMENTO DE APURIMAC
SED
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
1.00
0.00
0.00
1.00
0.00
1.00
0.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
1.00
9.5
9.5
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
65.49
54.80
37.79
24.27
32.59
41.20
67.12
77.72
33.03
49.44
71.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.4
1.00
0.00
1.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
1.00
10
10
10
10
10
10
10
1
1
1
1
2.5
0.00
0.00
0.00
2.50
0.00
0.00
0.00
0.00
2.50
2.50
0.00
1
2
1
2
1
2
1
2
20
-
32
-
32
-
0.7
1
1.4
2
1.4
2
1
2
1
1
1
10
1
2
4
2
2
2
20
2
2
4
2
2
2
20
2
SEGURIDAD)
12
12
1
-
2
-
2
-
0.005
0.00
0.05
0.00
0.02
0.00
0.04
0.07
0.00
0.03
0.05
0.00
DENTIFICACION
ERISTICAS :
DENTIFICACION
ERISTICAS :
1
1
1
E LA RETENIDA,
E LA RETENIDA,
O DE CEMENTO
1
0
INSTALACION
NSTALACION
-
65.49
54.8
37.79
24.27
32.59
41.2
67.12
77.72
33.03
49.44
71.82
E COMPONE
SUMINISTRO
0.01
0.07
0.05
0.04
0.02
0.03
0.04
0.07
0.08
0.03
0.05
0.07
0.05
0.04
0.02
0.03
0.04
0.07
0.08
0.03
0.05
0.07
0.07
REDES SECUNDARIAS DE
12.0
13.0
14.0 15.0 16.0 17.0 18.0 19.0 20.0 21.0 22.0 23.0 24.0
1.00
1.00
1.00
1.00
1.00
0.00
1.00
0.00
0.00
1.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
1.00
1.00
0.00
1.00
0.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
1.00
0.00
1.00
1.00
1.00
1.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
0.00
9.5
9.5
9.5
9.5
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
74.92
55.78
56.32
75.30
74.14
59.10
46.34
36.81
55.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
0.00
10
10
10
10
10
10
10
0.00
2.50
0.00
0.00
0.00
0.00
2.50
0.00
0.00
0.00
2.50
0.00
0.00
1
2
1
2
1
2
16
-
16
-
32
-
16
-
32
-
0.7
1
0.7
1
1.4
2
0.7
1
1.4
2
1
2
1
1
1
10
1
1
2
1
1
1
10
1
2
4
2
2
2
20
2
1
2
1
1
1
10
1
2
4
2
2
2
20
2
12
12
1
-
1
-
2
-
1
-
2
-
0.07
0.06
0.00
0.11
0.12
0.00
0.06
0.08
0.00
0.06
0.00
0.04
0.06
1
1
0
0
74.92
55.78
14.7
56.32
75.3
74.14
59.1
46.34
36.81
55.85
0.07492 0.05578 0.0147 0.105 0.1243 0.0282 0.0563 0.0753 0.0741 0.0591 0.0463 0.0368 0.0559
0.07492 0.05578 0.0147 0.105 0.1243 0.0282 0.0563 0.0753 0.0741 0.0591 0.0463 0.0368 0.0559
0.07492 0.05578 0.0147 0.105 0.1243 0.0282 0.0563 0.0753 0.0741 0.0591 0.0463 0.0368 0.0559
0.07492 0.05578 0.0147 0.105 0.1243 0.0282 0.0563 0.0753 0.0741 0.0591 0.0463 0.0368 0.0559
0.07492 0.05578 0.0147 0.105 0.1243 0.0282 0.0563 0.0753 0.0741 0.0591 0.0463 0.0368 0.0559
0.07
0.06
0.01
0.11
0.12
0.03
0.06
0.08
0.07
0.06
0.05
0.04
0.06
0.07
0.06
0.01
0.11
0.12
0.03
0.06
0.08
0.07
0.06
0.05
0.04
0.06
1
TOTAL
1.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
23.00
9.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
1.00
8.00
0.00
1.00
0.00
1.00
1.00
1.00
0.00
1.00
17.00
9.5
9.5
76.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
51.97
52.10
76.48
33.93
55.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15.57
25.69
53.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,636.82
94.62
0.00
0.00
0.00
2.00
2.00
2.00
2.00
2.00
17
17.00
17.00
0
0.00
0.00
0.00
0.00
0
0.00
0.00
0.00
9
9.00
9.00
7
7.00
7.00
14.00
0
0.00
0.00
0.00
0.00
2
4.00
2.00
2.00
0
0.00
1.00
1.00
2.00
1.40
0
0.00
0.00
0.00
18.00
162.00
180.00
18.00
18.00
18.00
7.00
18.00
72.00
18.00
54.00
18.00
8.00
8.00
8.00
8.00
8.00
8.00
7.00
8.00
10.00
166.00
8.00
0.00
1.00
0.00
1.00
1.00
1.00
0.00
1.00
10
10
10
10
10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.50
20.00
1
2
8.00
16.00
8.00
8.00
16
-
16
-
16
-
16
-
16
-
276
0.7
1
0.7
1
0.7
1
0.7
1
0.7
1
11.9
17
1
2
1
1
1
10
1
1
2
1
1
1
10
1
1
2
1
1
1
10
1
1
2
1
1
1
10
1
1
2
1
1
1
10
1
17
34
17
17
17
170
34
102
1
-
1
-
1
-
1
-
1
-
17
0
17
0.05
0.00
0.08
0.03
0.06
0.00
0.03
0.05
18
8
8
5
1
1
1.22
9
7
2
0
0
1
51.97
52.1
76.48
33.93
55.38
15.57
25.69
53.36
7
1
0
0
0
1636.82
94.62
0
0
0
2
17
0
0
9
7
0
2
0
0
1.73144
1.73144
1.73144
1.73144
1.73144
1
17
15
0.05
0.05
0.08
0.03
0.06
0.02
0.03
0.05
1.73144
0.05
0.05
0.08
0.03
0.06
0.02
0.03
0.05
1.73144
CONORCIO MOROCHUCO
PLANILLA DE MATERIALES
OBRA: AMPLIACION DE RED PRIMARIA Y SECUNDARIA DEL SERVICIO DE ENERGIA EL
ITEM
DESCRIPCION
UNID
SED
1.0
2.0
SUMINISTRO DE MATERIALES
10.000 POSTES Y ACCESORIOS DE CONCRETO ARMADO
10.100 POSTES CONCRETO ARMADO CENTRIFUGADO DE :
10.101 8/300/150/270
0.00
1.00
0.00
10.102 8/200/140/260
0.00
0.00
1.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
5.00
11.73
29.50
40.102 3x25+16+P/25mm2
0.00
0.00
0.00
40.104 3x16+16+P/25mm2
0.00
0.00
0.00
40.104 2x35+16+P/25mm2
0.00
0.00
0.00
40.105 2x25+16+P/25mm2
0.00
0.00
0.00
40.111 2x16+16+P/25mm2
0.00
0.00
0.00
40.112 2x25+P/25mm2
0.00
0.00
0.00
40.114 2x16+P/25mm2
0.00
0.00
0.00
50.100 ARMADO E0
Cjto
2.00
0.00
0.00
Und
2.00
0.00
0.00
Pza
2.00
0.00
0.00
2.40
0.00
0.00
Und
4.00
0.00
0.00
50.200 ARMADO E1
Cjto
0.00
0.00
1.00
50.201 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movi Pza
0.00
0.00
1.00
50.202 Grapa de Suspencin, P/Cable Autoportante de Secc. 25-35 mm2 (SOT 14 Pza
0.00
0.00
1.00
50.300 ARMADO E1
Cjto
0.00
0.00
0.00
Und
0.00
0.00
0.00
0.00
0.00
0.00
Und
0.00
0.00
0.00
50.304 Grapa de Suspencin, P/Cable Autoportante de Secc. 25-35 mm2 (SOT 14 Pza
0.00
0.00
0.00
50.400 ARMADO E2
Cjto
0.00
0.00
0.00
50.401 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movi Pza
0.00
0.00
0.00
Und
0.00
0.00
0.00
Pza
0.00
0.00
0.00
50.500 ARMADO E3
Cjto
0.00
0.00
0.00
50.501 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movi Pza
0.00
0.00
0.00
Pza
0.00
0.00
0.00
50.600 ARMADO E4
Cjto
0.00
1.00
0.00
50.601 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movi Pza
0.00
1.00
0.00
Und
0.00
1.00
0.00
Pza
0.00
2.00
0.00
50.700 ARMADO E4
Cjto
0.00
0.00
0.00
Und
0.00
0.00
0.00
0.00
0.00
0.00
Pza
0.00
0.00
0.00
Und
0.00
0.00
0.00
50.800 ARMADO E5
Cjto
0.00
0.00
0.00
50.801 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movi Pza
0.00
0.00
0.00
Pza
0.00
0.00
0.00
50.803 Grapa de Suspencin, P/Cable Autoportante de Secc. 25-35 mm2 (SOT 14 Pza
0.00
0.00
0.00
50.900 ARMADO E5
Cjto
0.00
0.00
0.00
Und
0.00
0.00
0.00
Pza
0.00
0.00
0.00
50.903 Grapa de Suspencin, P/Cable Autoportante de Secc. 25-35 mm2 (SOT 14 Pza
0.00
0.00
0.00
Und
0.00
0.00
0.00
0.00
0.00
0.00
Cjto
0.00
0.00
0.00
51.911 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movi Pza
0.00
0.00
0.00
Und
0.00
0.00
0.00
Pza
0.00
0.00
0.00
50.920 ARMADO E7
Cjto
0.00
0.00
0.00
50.921 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Mov Pza
0.00
0.00
0.00
50.922 Grapa de Suspencin, P/Cable Autoportante de Secc. 25-35 mm2 (SOT 14 Pza
0.00
0.00
0.00
Cjto
0.00
1.00
0.00
0.00
8.50
0.00
0.00
12.00
0.00
Pza
0.00
1.00
0.00
Pza
0.00
1.00
0.00
0.00
1.00
0.00
1.000
60.000 RETENIDAS
60.100 SUMINISTROS VARIOS
60.101 Cable AG de 3/8", 7 Hilos
Pza
1.00
0.00
Pza
0.00
1.00
0.00
60.108 Grapa Doble Va AG, 3 Pernos, 6 Long P/Cable de Acero 3/8" Diam.
Pza
0.00
4.00
0.00
Pza
0.00
1.00
0.00
Pza
0.00
3.00
0.00
Pza
0.00
1.00
0.00
Cjto
0.00
0.00
0.00
0.00
0.00
0.00
Pza
0.00
0.00
0.00
Pza
0.00
0.00
0.00
Bls
0.00
0.00
0.00
Bls
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.00
7.00
8.00
0.00
0.00
0.00
80.300
80.301 120/16-25-35mm2
80.400 CORREA PLASTICA
80.401 De Amarre de 4,6x170mm
CONDUCTORES
2.50
0.00
2.50
1.00
0.00
1.00
2.00
0.00
2.00
Cjto
1.00
0.00
1.00
Pza
1.00
0.00
1.00
FERRETERIA
Cjto
LUMINARIA Y LAMPARAS
CABLES
###
###
2x6 mm2
15
12
38
###
3x10 mm2
###
4x10mm2
###
FERRETERIA DE ACOMETIDAS
###
###
1/2"x30 m.
0.7
0.7
0.7
###
###
1/2"
###
###
###
Templador de AG
###
Armella Tirafon de AG
###
###
###
12
###
###
###
CONECTORES Y ACCESORIOS
CONECTOR BIMETALICO Al-Cu, TIPO DOBLE VIA: (COND. PRINC.max-min./COND. DERIV max-min./
max-min)
###
10-70/2.5-10mm, UN PERNO
###
CINTA DE NYLON
###
4,6x170mm
###
###
###
Trifasico 245x200x525mm
###
NTERRUPTORES
INTERRUPTORES TERMOMAGNETICOS MODULARES DE DOS POLOS CURVA "C" 500 V. DE:
(INCLUYE BASE DE SUJECION C/PINTURA EPOXICA CROMATO DE ZINC Y ACABADO EPOXI)
1
###
32A, 6KA
2
200
MONTAJE ELECTROMECANICO
DESBROCE
Km
0.01
0.01
0.03
Pza
Pza
Pza
Pza
RETENIDAS
Cjto
Cjto
Cjto
Cjto
PUESTA A TIERRA
203.100 PUESTA A TIERRA TIPO VARILLA (BRONCE) PARA M.T. QUE COMPRENDE : EXCAVACION EN
TERRENO, ARMADO DE LA PUESTA A TIERRA, COMPACTACION, RETIRO DE DESMONTE, INSTALACION
DE CAJA REGISTRO DE MANTENIMIENTO PARA PUESTA A TIERRA Y SUELO ARTIFICIAL, INSTALACION
DE CONECTORES PARA RED TIPO PERNO PARTIDO CON CONECTORES ANDERSON Y SPILT BOLT
203.101 Puesta a Tierra en Terreno Normal
Cjto
Cjto
CONDUCTORES
ml
5.00
11.73
29.5
40.106 3x25+16+P/25mm2
ml
40.107 3x16+16+P/25mm2
ml
40.108 2x35+16+P/25mm2
ml
40.109 2x25+16+P/25mm2
ml
40.110 2x16+16+P/25mm2
ml
40.111 2x25+P/25mm2
ml
40.112 2x16+P/25mm2
ml
FERRETERIA
Cjto
2.00
205.102 Armado E1
Cjto
205.103 Armado E1
Cjto
205.104 Armado E2
Cjto
205.105 Armado E3
Cjto
205.106 Armado E4
Cjto
205.107 Armado E4
Cjto
205.108 Armado E5
Cjto
205.109 Armado E5
Cjto
205.110 Armado E6
Cjto
205.111 Armado E7
Cjto
SUB TOTAL 205
###
LUMINARIAS
Pza
Km
0.01
0.01
0.03
Km
0.01
0.01
0.03
OBRAS PRELIMINARES
Km
0.01
0.01
0.03
0.01
0.01
0.03
Km
0.01
0.01
0.03
UN
SUB TOTAL 207
CAJAS PORTAMEDIDORES
cjto
cjto
208.202 INST.ACOMETIDA DOMICILIARIA 1 AEREA SIMPLE SOBRE FACHADA ZONA RURAL TIPO ELSE
A CAJA PORTAMEDIDOR CON CRUCE DE CALLE Y ACCESORIOS DE FIJACION E INCLUYE SUMINISTRO
DE CINTA AISLANTE, CORREA PLASTICA, MASTIL, CEMENTO Y MATERIAL AGREGADO.
cjto
AGREGADO.
Km
0.01
0.01
0.03
209.200 Expediente Tcnico Finales Conforme a Obra (1 Original + 3 Copias) de Redes Secundarias, Incluye la Presentac
Digitalizada del Expediente en un CD
SUB TOTAL 209
TOTAL MONTAJE ELECTROMECANICO REDES SECUNDARIAS
Km
0.01
0.01
0.03
ROCHUCO
ATERIALES
DE ENERGIA ELECTRICA CON REFORZAMIENTO DE REDES PRIMARIAS DE 08
EGION APURIMAC.
MENTO DE APURIMAC
REDES SECUNDARIAS DE
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0 14.0
1.00
1.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
0.00
0.00
9.50
0.00
0.00
9.50
0.00
0.00
9.50
0.00
0.00
9.50
25.63
10.07
40.80
6.89
30.68
42.58
9.11
46.46
40.55
9.23
34.48
32.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
2.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
2.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
2.00
0.00
0.00
1.00
0.00
0.00
1.00
1.00
1.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
1.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
1.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
2.00
2.00
0.00
2.00
0.00
0.00
2.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
8.50
8.50
8.50
8.50
0.00
8.50
8.50
0.00
8.50
8.50
0.00
8.50
12.00
12.00
12.00
12.00
0.00
12.00
12.00
0.00
12.00
12.00
0.00
12.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
4.00
4.00
4.00
4.00
0.00
4.00
4.00
0.00
4.00
4.00
0.00
4.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
3.00
3.00
3.00
3.00
0.00
3.00
3.00
0.00
3.00
3.00
0.00
3.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
5.00
0.00
0.00
12.00
8.00
6.00
6.00
12.00
8.00
9.00
3.00
6.00
8.00
3.00
6.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
2.50
0.00
2.50
0.00
0.00
0.00
0.00
2.50
0.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
2.00
0.00
2.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
0.00
0.00
0.00
1.00
18
16
35
19
42
0.7
0.7
0.7
0.7
0.7
10
12
12
18
DERIV max-min./TOTAL
0
0.03
0.01
0.04
0.01
0.03
0.04
0.01
0.05
0.04
0.01
0.03
0.03
1
1
1
1
0
1
25.63
10.07
40.8
6.89
30.68
42.58
9.11
46.46
40.55
9.23
34.48
32
0.03
0.01
0.04
0.01
0.03
0.04
0.01
0.05
0.04
0.01
0.03
0.03
0.03
0.01
0.04
0.01
0.03
0.04
0.01
0.05
0.04
0.01
0.03
0.03
0.03
0.01
0.04
0.01
0.03
0.04
0.01
0.05
0.04
0.01
0.03
0.03
0.03
0.01
0.04
0.01
0.03
0.04
0.01
0.05
0.04
0.01
0.03
0.03
0.03
0.01
0.04
0.01
0.03
0.04
0.01
0.05
0.04
0.01
0.03
0.03
0.03
0.01
0.04
0.01
0.03
0.04
0.01
0.05
0.04
0.01
0.03
0.03
0.01
0.04
0.01
0.03
0.04
0.01
0.05
0.04
0.01
0.03
0.03
cluye la Presentacin
0.03
TOTAL
23.0
1.00
0.00
1.00
0.00
1.00
1.00
0.00
0.00
1.00
15.00
0.00
1.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
7.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
1.00
6.00
1.00
0.00
1.00
0.00
1.00
1.00
0.00
0.00
1.00
15.00
0.00
0.00
0.00
0.00
9.50
0.00
0.00
0.00
9.50
57.00
3.57
39.86
26.44
8.29
49.70
51.00
29.31
37.61
26.30
646.79
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
1.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
5.00
0.00
1.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
5.00
0.00
1.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
5.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.40
0.00
1.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
1.00
10.00
2.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
1.00
10.00
2.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
1.00
10.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
14.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
1.00
1.00
0.00
0.00
1.00
15.00
8.50
0.00
8.50
0.00
8.50
8.50
0.00
0.00
8.50
127.50
12.00
0.00
12.00
0.00
12.00
12.00
0.00
0.00
12.00
180.00
1.00
0.00
1.00
0.00
1.00
1.00
0.00
0.00
1.00
15.00
1.00
0.00
1.00
0.00
1.00
1.00
0.00
0.00
1.00
15.00
1.00
0.00
1.00
0.00
1.00
1.00
0.00
0.00
1.00
15.00
1.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
0.00
11.00
1.00
0.00
1.00
0.00
1.00
1.00
0.00
0.00
1.00
15.00
4.00
0.00
4.00
0.00
4.00
4.00
0.00
0.00
4.00
60.00
1.00
0.00
1.00
0.00
1.00
1.00
0.00
0.00
1.00
15.00
3.00
0.00
3.00
0.00
3.00
3.00
0.00
0.00
3.00
45.00
1.00
0.00
1.00
0.00
1.00
1.00
0.00
0.00
1.00
15.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
1.00
6.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
1.00
6.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
1.00
6.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
1.00
6.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
1.00
6.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
1.00
6.00
1.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
1.00
8.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
5.00
0.00
0.00
0.00
0.00
0.00
14.00
6.00
3.00
6.00
9.00
6.00
6.00
6.00
3.00
6.00
173.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
1.00
6.00
0.00
2.50
0.00
0.00
0.00
0.00
0.00
0.00
2.50
17.50
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
7.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
14.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
7.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
7.00
39
17
12
36
15
314.00
0.00
0.00
0.7
9.10
0.7
0.7
0.7
0.7
13.00
13.00
36.00
0.00
17.00
17.00
12
12
20
147.00
0.00
36.00
0.00
0.00
18.00
18
0.00
0.04
0.03
0.01
0.05
0.05
0.03
0.04
10.00
3.00
0.62
5.00
4.00
1.00
5.00
2.00
6.00
2.00
3.00
3.57
39.86
26.44
8.29
49.7
51
29.31
37.61
26.3
646.79
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
5.00
1.00
0.00
10.00
7.00
0.00
2.00
0.00
0.00
0.00
7.00
0.00
0.04
0.03
0.01
0.05
0.05
0.03
0.04
0.03
0.65
0.00
0.04
0.03
0.01
0.05
0.05
0.03
0.04
0.03
0.65
0.00
0.04
0.03
0.01
0.05
0.05
0.03
0.04
0.03
0.65
0.00
0.04
0.03
0.01
0.05
0.05
0.03
0.04
0.03
0.65
0.00
0.04
0.03
0.01
0.05
0.05
0.03
0.04
0.03
0.65
1.00
18.00
13.00
5.00
0.00
0.04
0.03
0.01
0.05
0.05
0.03
0.04
0.03
0.65
0.00
0.04
0.03
0.01
0.05
0.05
0.03
0.04
0.03
0.65
CONORCIO MOROCHUCO
PLANILLA DE MATERIALES
OBRA: AMPLIACION DE RED PRIMARIA Y SECUNDARIA DEL SERVICIO DE ENERGIA EL
DESCRIPCION
UNID
SED
1.0
2.0
1.00
0.00
10.102 8/200/140/260
0.00
0.00
0.00
0.00
1.00
0.00
26.82
19.13
0.00
0.00
40.103 3x16+16+P/25mm2
40.104 2x35+16+P/25mm2
40.105 2x25+16+P/25mm2
40.106 2x16+16+P/25mm2
40.107 2x25+P/25mm2
40.108 2x16+P/25mm2
m
SUB TOTAL 40.00:
Cjto
Und
Pza
Und
50.200 ARMADO E1
Cjto
50.201 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movi Pza
50.202 Grapa de Suspencin, P/Cable Autoportante de Secc. 25-35 mm2 (SOT 14 Pza
50.300 ARMADO E1
Cjto
Und
1.4
Und
50.304 Grapa de Suspencin, P/Cable Autoportante de Secc. 25-35 mm2 (SOT 14 Pza
50.400 ARMADO E2
Cjto
50.401 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movi Pza
Und
Pza
50.500 ARMADO E3
Cjto
50.501 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movi Pza
Pza
50.600 ARMADO E4
Cjto
50.601 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movi Pza
Und
Pza
50.700 ARMADO E4
Cjto
Und
Pza
Und
50.800 ARMADO E5
Cjto
50.801 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movi Pza
Pza
50.803 Grapa de Suspencin, P/Cable Autoportante de Secc. 25-35 mm2 (SOT 14 Pza
50.900 ARMADO E5
Cjto
Und
Pza
50.903 Grapa de Suspencin, P/Cable Autoportante de Secc. 25-35 mm2 (SOT 14 Pza
Und
1.4
Cjto
51.911 Perno Ojal Abierto FG de 5/8 200 mm, C/Tuerca-Arandelas Fija y Movi Pza
Und
Pza
1.00
0.00
Cjto
m
10
Pza
Pza
Pza
Pza
60.108 Grapa Doble Va AG, 3 Pernos, 6 Long P/Cable de Acero 3/8" Diam.
Pza
Pza
Pza
Pza
Cjto
Pza
Pza
Bls
Bls
80.300
80.301 120/16-25-35mm2
80.400 CORREA PLASTICA
80.401 De Amarre de 4,6x170mm
CONDUCTORES
2x2.5 mm2
2.50
2.50
1
2
1
2
Cjto
Pza
m
m
m
64
-
m
u
2.8
4
u
u
u
u
u
m
4
8
4
4
4
40
FERRETERIA
Cjto
u
100.200 Pastoral Prablico de AG de 1.00m/0.50m/38mm/5, e=3,2mm
100.300 Abrazadera de AG P/Pastorales 1 1/2" x 140mm (Poste) 1 1/2" (PastoPza
100.100 SUMINISTROS VARIOS
LUMINARIA Y LAMPARAS
###
CABLES
###
###
2x6 mm2
###
3x10 mm2
###
4x10mm2
###
FERRETERIA DE ACOMETIDAS
###
###
1/2"x30 m.
###
###
1/2"
###
###
###
Templador de AG
###
Armella Tirafon de AG
###
###
###
###
###
CONECTORES Y ACCESORIOS
CONECTOR BIMETALICO Al-Cu, TIPO DOBLE VIA: (COND. PRINC.max-min./COND. DERIV max-min./
max-min)
###
10-70/2.5-10mm, UN PERNO
###
CINTA DE NYLON
###
4,6x170mm
###
###
24
###
Trifasico 245x200x525mm
###
NTERRUPTORES
INTERRUPTORES TERMOMAGNETICOS MODULARES DE DOS POLOS CURVA "C" 500 V. DE:
(INCLUYE BASE DE SUJECION C/PINTURA EPOXICA CROMATO DE ZINC Y ACABADO EPOXI)
###
32A, 6KA
Km
0.005
0.03
0.02
2
200
MONTAJE ELECTROMECANICO
DESBROCE
Pza
Pza
Pza
Pza
RETENIDAS
Cjto
Cjto
Cjto
Cjto
SUB TOTAL 202
###
PUESTA A TIERRA
203.100 PUESTA A TIERRA TIPO VARILLA (BRONCE) PARA M.T. QUE COMPRENDE : EXCAVACION EN
TERRENO, ARMADO DE LA PUESTA A TIERRA, COMPACTACION, RETIRO DE DESMONTE, INSTALACION
DE CAJA REGISTRO DE MANTENIMIENTO PARA PUESTA A TIERRA Y SUELO ARTIFICIAL, INSTALACION
DE CONECTORES PARA RED TIPO PERNO PARTIDO CON CONECTORES ANDERSON Y SPILT BOLT
203.101 Puesta a Tierra en Terreno Normal
Cjto
Cjto
CONDUCTORES
ml
204.102 3x25+16+P/25mm2
ml
204.103 3x16+16+P/25mm2
ml
204.104 2x35+16+P/25mm2
ml
26.82
19.13
204.105 2x25+16+P/25mm2
ml
204.106 2x16+16+P/25mm2
ml
204.107 2x25+P/25mm2
ml
204.108 2x16+P/25mm2
ml
FERRETERIA
Cjto
205.102 Armado E1
Cjto
205.103 Armado E1
Cjto
205.104 Armado E2
Cjto
205.105 Armado E3
Cjto
205.106 Armado E4
Cjto
205.107 Armado E4
Cjto
205.108 Armado E5
Cjto
205.109 Armado E5
Cjto
205.110 Armado E6
Cjto
LUMINARIAS
Pza
206.101 Luminarias de 50 - 70 W
OBRAS PRELIMINARES
Km
Km
Km
UN
SUB TOTAL 207
CAJAS PORTAMEDIDORES
cjto
cjto
208.202 INST.ACOMETIDA DOMICILIARIA 1 AEREA SIMPLE SOBRE FACHADA ZONA RURAL TIPO ELSE
A CAJA PORTAMEDIDOR CON CRUCE DE CALLE Y ACCESORIOS DE FIJACION E INCLUYE SUMINISTRO
DE CINTA AISLANTE, CORREA PLASTICA, MASTIL, CEMENTO Y MATERIAL AGREGADO.
cjto
AGREGADO.
SUB TOTAL 208
###
Km
0.01
0.03
0.02
209.200 Expediente Tcnico Finales Conforme a Obra (1 Original + 3 Copias) de Redes Secundarias, Incluye la Presentac
Digitalizada del Expediente en un CD
SUB TOTAL 209
TOTAL MONTAJE ELECTROMECANICO REDES SECUNDARIAS
Km
0.01
0.03
0.02
ROCHUCO
TERIALES
DE ENERGIA ELECTRICA CON REFORZAMIENTO DE REDES PRIMARIAS DE 08
EGION APURIMAC.
MENTO DE APURIMAC
REDES SECUNDARI
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
1.00
0.00
0.00
0.00
1.00
0.00
0.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
0.00
1.00
9.50
27.01
42.22
27.08
15.00
25.69
35.43
37.36
41.00
22.21
17.89
29.43
14.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
0.00
1.00
10
10
10
10
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
64
-
48
-
16
-
16
-
32
-
32
-
32
-
64
-
48
-
16
-
48
-
2.8
4
2.1
3
0.7
1
0.7
1
1.4
2
1.4
2
1.4
2
2.8
4
2.1
3
0.7
1
2.1
3
4
8
4
4
4
40
3
6
3
3
3
30
1
2
1
1
1
10
1
2
1
1
1
10
2
4
2
2
2
20
2
4
2
2
2
20
2
4
2
2
2
20
4
8
4
4
4
40
3
6
3
3
3
30
1
2
1
1
1
10
3
6
3
3
3
30
DERIV max-min./TOTAL
24
18
12
12
12
24
18
18
0.03
0.04
0.03
0.02
0.03
0.04
0.04
0.04
0.02
0.02
0.03
0.01
1
1
27.01
42.22
27.08
15
25.69
35.43
37.36
41
22.21
17.89
29.43
14.32
0.015
0.041
0.015
0.041
0.015
0.041
0.015
0.041
0.015
0.041
0.03
0.04
0.03
0.02
0.03
0.04
0.04
0.04
0.02
0.02
0.03
0.01
0.04
0.03
0.02
0.03
0.04
0.04
0.04
0.02
0.02
0.03
0.01
cluye la Presentacin
0.03
DES SECUNDARIAS DE
15.0 16.0 17.0 18.0 19.0 20.0 21.0 22.0
0.00
0.00
1.00
1.00
1.00
0.00
0.00
1.00
1.00
1.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
0.00
1.00
0.00
0.00
1.00
1.00
1.00
0.00
0.00
1.00
9.50
9.50
9.50
42.35
37.61
31.10
29.89
21.14
35.87
39.81
32.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
0.00
0.00
1.00
10
10
10
10
1
-
2.50
2.50
2.50
2.50
2.50
2.50
2.50
1
2
1
2
1
2
1
2
1
2
1
2
1
2
64
-
32
-
16
-
48
-
32
-
16
-
48
-
32
-
2.8
4
1.4
2
0.7
1
2.1
3
1.4
2
0.7
1
2.1
3
1.4
2
4
8
4
4
4
40
2
4
2
2
2
20
1
2
1
1
1
10
3
6
3
3
3
30
2
4
2
2
2
20
1
2
1
1
1
10
3
6
3
3
3
30
2
4
2
2
2
20
24
12
18
12
18
12
0.04
0.04
0.03
0.03
0.02
0.04
0.04
0.03
1
1
42.35
37.61
31.1
29.89
21.14
35.87
39.81
32.23
0.04
0.04
0.03
0.03
0.02
0.04
0.04
0.03
0.00
0.00
0.00
0.00
0.00
0.04
0.04
0.03
0.03
0.02
0.04
0.04
0.03
0.00
0.00
0.00
0.00
0.00
TOTAL
12.00
7.00
4.00
9.00
38.00
###
0.00
0.00
0.00
0.00
0.00
9.00
9.00
9.00
2.00
1.40
1.00
1.00
1.00
1.00
2.00
6.00
6.00
6.00
3.00
3.00
3.00
6.00
0.00
0.00
0.00
0.00
2.00
1.00
1.00
0.00
1.00
1.00
2.00
1.40
1.00
2.00
1.00
3.00
9.00
81.00
90.00
9.00
9.00
9.00
3.00
9.00
36.00
9.00
27.00
9.00
4.00
4.00
4.00
4.00
4.00
4.00
6.00
4.00
15.00
###
4.00
42.50
17.00
34.00
17.00
17.00
###
0.00
0.00
33.60
48.00
48.00
96.00
48.00
48.00
48.00
###
96.00
###
48.00
0.00
48.00
0.66
8.00
2.00
4.00
5.00
1.00
3.00
4.00
0.00
0.00
0.00
###
0.00
0.00
0.00
0.00
0.00
9.00
1.00
1.00
6.00
3.00
0.00
1.00
0.00
1.00
17.00
0.66
0.66
0.66
0.66
0.66
48.00
48.00
0.00
0.00
0.66
0.00
0.00
0.66