COSTOVERVIEW
Progressmadeversusthecostspentovertime.If%Completelinebelowthecumulativeco
line,yourprojectmaybeoverbudget.
%COMPLETE
COST
$9,120.00
1%
$10,000.00
1%
$8,000.00
1%
$6,000.00
0%
$4,000.00
0%
$2,000.00
0%
$0.00
CUMULATIVE COST
ChartTitle
THU4/14/16 WED7/6/16
REMAININGCOST
$9,120.00
CumulativePercentComplete
CumulativeCost
%COMPLETE
COSTSTATUS
0%
Coststatusforalltopleveltasks.Isyourbaselinezero?
Trysettingasbaseline
$0.00
$0.00
$0.00
$0.00
CMAssignsTasksto
PM&Team
$0.00
$0.00
$0.00
$0.00
$0.00
SiteSurveying
$0.00
$200.00
$0.00
$200.00
$200.00
Clear&Grub
$0.00
$300.00
$0.00
$300.00
$300.00
StripTopsoil&
Stockpile
$0.00
$500.00
$0.00
$500.00
$500.00
CuttoFill
$0.00
$200.00
$0.00
$200.00
$200.00
BorrowMaterial
$0.00
$300.00
$0.00
$300.00
$300.00
RemainingCost
ActualCost
BaselineCost
ShowOwner
$0.00
Waste
Discussing
Plans/Project
Sanitary
$100.00
Sinks
$100.00
Electrical
$0.00
Ductworkfor
$100.00
VennerPlaster
$0.00
ExhaustFans
Meetingwith
Owner/SiteVisit
RoofSheathing
CostVariance
Exterior
Cost
Exterior
Baseline
Cost
Electrical
Remaining
Cost
Hydrant&
ActualCost
Sanitary
Name
CuttoFill
Coststatusfortopleveltasks.
$1,200.00
$1,000.00
$800.00
$600.00
$400.00
$200.00
$0.00
Meetingwith
COSTSTATUS
SiteSurveying
ChartTitle
UtilityExcavation
$0.00
$500.00
$0.00
$500.00
$500.00
SanitaryManhole
$0.00
$200.00
$0.00
$200.00
$200.00
4"SanitaryPipe,
Valves&Fittings
$0.00
$50.00
$0.00
$50.00
$50.00
4"H2OPipe,Valves
&Fittings
$0.00
$50.00
$0.00
$50.00
$50.00
Hydrant&ValveBox
$0.00
$50.00
$0.00
$50.00
$50.00
Electricalductbank
conduit4"
$0.00
$50.00
$0.00
$50.00
$50.00
Electricalductbank
formwork
$0.00
$100.00
$0.00
$100.00
$100.00
Electricalductbank
concrete
$0.00
$100.00
$0.00
$100.00
$100.00
AllFormwork/Rebar
$0.00
$500.00
$0.00
$500.00
$500.00
AllConcrete
$0.00
$600.00
$0.00
$600.00
$600.00
ExteriorWood
Framing
$0.00
$600.00
$0.00
$600.00
$600.00
WoodRoofJoists
$0.00
$100.00
$0.00
$100.00
$100.00
InteriorWallFraming
$0.00
$100.00
$0.00
$100.00
$100.00
ExteriorSheathing
$0.00
$150.00
$0.00
$150.00
$150.00
RedwoodSiding
$0.00
$150.00
$0.00
$150.00
$150.00
BattInsulationWalls
$0.00
$200.00
$0.00
$200.00
$200.00
RoofSheathing
$0.00
$250.00
$0.00
$250.00
$250.00
BattInsulationWalls
$0.00
$300.00
$0.00
$300.00
$300.00
StandingSeamRoof
$0.00
$320.00
$0.00
$320.00
$320.00
ExhaustFans
$0.00
$100.00
$0.00
$100.00
$100.00
GypsumWallBoard
$0.00
$100.00
$0.00
$100.00
$100.00
GypsumCeiling
System
$0.00
$200.00
$0.00
$200.00
$200.00
VennerPlaster
$0.00
$20.00
$0.00
$20.00
$20.00
MarbleWallPanels
$0.00
$150.00
$0.00
$150.00
$150.00
Door,Frames
Hardware,Windows
$0.00
$150.00
$0.00
$150.00
$150.00
Ductworkfor
ExhaustFans
$0.00
$150.00
$0.00
$150.00
$150.00
PlumbingPiping
$0.00
$100.00
$0.00
$100.00
$100.00
100AElectricalPanel
$0.00
$100.00
$0.00
$100.00
$100.00
ElectricalWiring
$0.00
$150.00
$0.00
$150.00
$150.00
WaterFountain
$0.00
$20.00
$0.00
$20.00
$20.00
Toilets/Urinals
$0.00
$160.00
$0.00
$160.00
$160.00
Sinks
$0.00
$60.00
$0.00
$60.00
$60.00
LightFixtures
$0.00
$60.00
$0.00
$60.00
$60.00
ToiletPaper
Dispensers
$0.00
$20.00
$0.00
$20.00
$20.00
SanitaryNapkin
Dispensers
$0.00
$20.00
$0.00
$20.00
$20.00
PaperTowel
Dispensers
$0.00
$20.00
$0.00
$20.00
$20.00
Mirrors
$0.00
$20.00
$0.00
$20.00
$20.00
WasteReceptacles
$0.00
$20.00
$0.00
$20.00
$20.00
GrabBars
$0.00
$20.00
$0.00
$20.00
$20.00
AllDocuments
Completed/Filed
$0.00
$510.00
$0.00
$510.00
$510.00
ShowOwner
FinishedProject
$0.00
$0.00
$0.00
$0.00
$0.00
ProjectCompletion
Party
$0.00
$1,000.00
$0.00
$1,000.00
$1,000.00
ost