Problems Experienced
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Number of Respondents
Innadequete Lighting
Water Temperature/Pressure
Sink/Tub/Toilet
Number of Towels
Cleanliness of the Hotel
Telephone Services
Size of Room
Room Readiness
Condition (Wear & Tear) of Hotel
Cleanliness of Room/Bath
Air-conditioner
Condition (Wear & Tear) of Room/Bath
Uncontrollable Noise
Pool Service
Fitness Centre Traetment Areas
Controllable Noise
Bed(mattress,Pillow,Blanket etc.)
Jan
Feb
Mar
18
21%
11%
11%
11%
11%
5%
5%
5%
5%
5%
5%
24
12%
8%
8%
69
5%
8%
13%
3%
3%
8%
3%
3%
8%
13%
5%
13%
5%
3%
4%
12%
4%
8%
8%
4%
15%
4%
4%
4%
4%
4%
10%
3%
1st
Qtr
111
9%
8%
12%
5%
5%
8%
4%
3%
8%
11%
5%
14%
5%
3%
4%
8%
3%
Apr
May
Jun
51
14%
6%
10%
8%
78
6%
8%
14%
58
9%
11%
9%
4%
2%
7%
2%
10%
10%
4%
6%
10%
6%
10%
2%
12%
3%
2%
5%
8%
8%
15%
2%
2%
2%
2%
5%
11%
5%
4%
16%
13%
16%
2%
4%
2nd
Qtr
1st
Half
187
9%
8%
11%
6%
1%
10%
5%
3%
5%
11%
9%
14%
2%
2%
4%
6%
4%
298
153 125
9%
6%
5%
8% 10%
9%
11% 18% 16%
4%
8%
3%
3%
1%
1%
9%
5%
5%
4%
3%
3%
2%
3%
3%
6%
3%
3%
11%
3%
8%
7% 14% 10%
13% 14% 13%
2%
1%
2%
1%
3%
1%
2%
1%
5%
7%
6%
7%
3%
4%
5%
Jul
Aug
Sep
3rd
Qtr
70
348
9%
6%
15% 11%
6% 15%
3%
5%
2%
1%
12%
6%
2%
3%
5%
3%
6%
4%
6%
5%
8% 11%
8% 12%
1%
2%
2%
2%
3%
8%
7%
9%
5%
9
Months
646
8%
10%
13%
4%
2%
8%
3%
3%
5%
8%
10%
13%
2%
2%
2%
7%
4%
24.8%
Oct
Nov
Dec
4th
Qtr
2nd
Half
Total
Year
348
646
Hotel Name
Problem Tracking Worksheet - 2011
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Problems Experienced
9Months
Number of Respondents
646
Innadequete Lighting
8%
Water Temperature/Pressure
10%
Sink/Tub/Toilet
13%
Number of Towels
4%
Cleanliness of the Hotel
2%
Telephone Services
8%
Size of Room
3%
Room Readiness
3%
Condition (Wear & Tear) of Hotel
5%
Cleanliness of Room/Bath
8%
Air-conditioner
10%
Condition (Wear & Tear) of Room/Bath
13%
Uncontrollable Noise
2%
Pool Service
2%
Fitness Centre Traetment Areas
2%
Controllable Noise
7%
Bed(mattress,Pillow,Blanket etc.)
4%
%
13%
Known Reasons
a) Sink grouting
b) Stopper getting stuck
c) Toilet flush leaking
d) Bath tub grouting
e) Bath tub in bad condition
a) Carpet worn out
b) Wall paper peeling
c) Bathroom tiles grouting
d) Tired looking curtains
e) Old bed skirts/bed covers
Water Temperature/Pressure
10%
a) Water not hot
b) Discolored water
e) Shower nozzle adjustments
Air-conditioner
10%
a) Inconsistent temperature
Innadequete Lighting
8%
b) Room condensation
a) Low watts globes
b) Light globes OOO
c) Dim desk light
Telephone Services
Cleanliness of Room/Bath
8%
8%
Controllable Noise
7%
5%
Progress
1. Grouting & reglazing work cost RM900 per
room. Work conducted gradually over 2004.
2. 30% of stopper has been replaced. Cost
RM80 per room.
3.
20% of toilet flush has been replaced. Cost
RM20 per room.
1. Carpet restoration completed for 75% of the
deluxe rooms. Work to continue gradually
over 2004. Refurshment of Superior room
budgeted for 2004. Depending on owners
cashflow.
2. Bedskirts
budgeted under 2004 capex.
1. Cost estimated RM30K to increase capacity
b) Had problems with Indah Water. Also need to change all GI for heat machine. To obtain specialist advise
pipes.
on this.
2. Cost to change
c) Some shower nozzles need adjustment and some need to be the G.I pipes approx RM1.2M. Did not budget
changed.
a) All thermostat controls being adjusted. Maids and supervisors to
ensure that controll is set on the red dot. Chill water balancing need
to be done.
b) Check insulation, check window seals
a) Increase light globes ranking.
b) Housekeeping and Engineering to change globes immediately.
Replace all globes with energy saving/long life globes.
c) Desk lamp shades need to be cleaned. Change the inner liner to
pure white incolour.
d) Find brighter shades for all mirror lights in the bathroom.
a) Being rectified with Maginet at present.
b) Maginet is sourcing new IRN box.
c) All room telephones need to be changed.
a) Most of the carpet stains being cleaned during restoration.
b) All vacum cleaners being serviced. Maids are now reminded on a
daily basis to pay attention to the carpet.
c) It has been emphasized during briefings and through daily
checkings these are monitored.
d) Outside windows will be cleaned during external painting.
e) More focus given. However, most stains due to water
leak/fungus.
a) Releasing the air is ongoing.
b) All FCU's being serviced and its on going.
c) Being rectified.
d) All trolleys being checked and some of the wheels will be
changed during the next three months.
a) Quotes obtained.will be presented to the owners.
b) Upholstry work will be done in the 1st quarter of 2004.
c) Changing the lobby rugs - on going.
d) This job was not approved earlier. Another attemp will be made
by end of this year/
e) Rectification of water leak.
f) Consultatnts are working with the owners to rectify pool tiles
problems. Pending approval