Vous êtes sur la page 1sur 1

Economizer on Power Plants often have maintenance or cleaning of the supposed (not in accordance with the

specifications of the device) this results in decreased performance and increased maintenance costs.
Evaluation of the performance of the appliance has been done with testing on an industrial scale is carried out for 5
months with intervals of 48 hours (2 days).
There was a decline in the performance of the device as a result of the increase in factor fouling which are a function
of time, with a thermal resistance asymptotic actual result of factors fouling by 0.01689 (m 2K)/W and the cleaning
intervals for nearly five months for the maintenance operation, reducing lost time on the production of paper, and
pressing maintenance cost significantly.