ITEM.

DESCRIPCION DE PARTIDA

UND

METRADO

P.U.

PRESUPUESTO

BASE

1.000
1.101
1.103

OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL

2.000
2.101
2.103a
2.103b
2.109
2.112
2.113

2.401
2.402

PAVIMENTOS
PARCHADO SUPERFICIAL
CARPETA ASFALTICA PARA PARCHADO PROFUNDO
BASE GRANULAR PARA PARCHADO PROFUNDO
DESARENADO DE CALZADA Y BERMAS
TRATAMIENTO DE FISURAS FINAS
TRATAMIENTO DE FISURAS GRUESAS
REPARACION SUPERFICIAL DE BERMAS CON CARPETA
ASFALTICA
IMPRIMACION ASFALTICA
RIEGO DE LIGA

2.406

SELLO ASFALTICO

M2

2.410

PAVIMENTO DE CONCRETO ASFALTICO

M3

2.420

CEMENTO ASFALTICO PEN 60/70

KG

2.421

EMULSION ASFALTICA

LT

2.423
2.500

FILLER O RELLENO MINERAL


NIVELACION DE BERMA CON MACADAM BITUMINOSO

KG
M3

3.000

OBRAS DE ARTE Y DRENAJE


LIMPIEZA DE ALCANTARILLAS METALICAS, INC.
CABEZAL
LIMPIEZA DE ALCANTARILLAS DE CONCRETO, INC.
CABEZAL

2.208

3.303
3.304
4.000
4.805a
4.805b
4.810a
4.810b
4.825
A.B.C.D.-

E.F.-

SEALIZACION Y SEGURIDAD VIAL


POSTE DELINEADOR
TACHA REFLECTIVA
MARCAS EN EL PAVIMENTO
PINTADO DE PARAPETOS Y MUROS DE
ALCANTARILLAS
CAPTAFAROS

Glb
MES

AVANCE PORCENTUAL

BASE

S/.

S/.

195,828.40
19,152.96

425,663.92
195,828.40
229,835.52

M3
M3
M3
M3
ML
ML

6,821.00
767.00
1,325.00
100.00
28,500.00
3,700.00

338.00
358.76
76.62
4.16
5.79
6.35

12,255,068.76
2,305,498.00
275,168.92
101,521.50
416.00
165,015.00
23,495.00

M2

3,840.00

13.65

52,416.00

M2
M2

72,396.00
506,753.00
1,048,239.0
0
18,245.00
2,627,299.0
0
1,378,443.0
0
875,766.00
734.00

0.36
0.27

26,062.56
136,823.31

1.18

1,236,922.02

120.66

2,201,441.70

1.16

3,047,666.84

1.49

2,053,880.07

0.54
212.30

472,913.64
155,828.20
12,688.41

ML

251.00

11.31

2,838.81

ML

960.00

10.26

9,849.60

240.00
19,266.00
64,795.00

91.29
12.79
14.49

1,220,396.39
21,909.60
246,412.14
938,879.55

M2

360.00

20.51

7,383.60

UND

394.00

14.75

5,811.50

UND
UND
M2

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
TOTAL PRESUPUESTO BASE S/IGV
PRESUPUESTO AFECTADO POR F.R. (S/IGV)

1.00
12.00

BASE

16.72%
10.00%

F.R.=

1.01798955
3

S/.
S/.
S/.
S/.

13,913,817.48
2,326,390.28
1,391,381.75
17,631,589.51

S/.
%

17,948,773.92

Valorizacin de obra N 11
Obra Principal Mes de Febrero - 2005
ACUMULADO MES ANTERIOR

PRESENTE VALORIZACION

ACUMULADO MES ACTUAL

SALDO POR VALORIZAR

ITEM.
METRADO
1.000

S/.

361,431.27

84.91%

METRADO

S/.

37,993.09

8.93%

METRADO

S/.

399,424.36

93.84%
100.00
%
88.58%

METRADO

S/.

26,239.56

6.16%

0.00

0.00

0.00%

1.37

26,239.56

11.42%

5,181.00
767.00
1,325.00

3,039,707.11
1,751,178.00
275,168.92
101,521.50

24.80%
75.96%
100.00%
100.00%

0.00

0.00

0.00%

28,500.00
3,700.00

165,015.00
23,495.00

100.00%
100.00%

0.00

0.00

0.00%

29,777.99
10,692.21

10,720.08
2,886.90

41.13%
2.11%

1.101

0.85

166,454.14

85.00%

0.15

29,374.26

15.00%

1.00

195,828.40

1.103

10.18

194,977.13

84.83%

0.45

8,618.83

3.75%

10.63

203,595.96

2.000
2.101
2.103a
2.103b

1,640.00
0.00
0.00

9,140,850.41
554,320.00
0.00
0.00

74.59%
24.04%
0.00%
0.00%

0.00
0.00
0.00

74,511.24
0.00
0.00
0.00

0.61%
0.00%
0.00%
0.00%

1,640.00
0.00
0.00

9,215,361.65
554,320.00
0.00
0.00

2.109

0.00

0.00

0.00%

100.00

416.00

100.00%

100.00

416.00

2.112
2.113

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

2.208

3,840.00

52,416.00

0.00%
0.00%
100.00
%
57.81%
97.50%

0.00

0.00

0.00%

3,840.00

52,416.00

763.83
1,968.61

274.98
531.52

1.06%
0.39%

42,618.01
496,060.79

15,342.48
133,936.41

75.20%
24.04%
0.00%
0.00%
100.00
%
0.00%
0.00%
100.00
%
58.87%
97.89%

97.74%

0.00

0.00

0.00% 1,024,515.20

1,208,927.94

97.74%

23,723.80

27,994.08

2.26%

99.35%

117.94

14,230.64

0.65%

18,244.03

2,201,324.66

99.99%

0.97

117.04

0.01%

97.57% 33,231.50

38,548.54

1.26% 2,596,707.47

3,012,180.67

98.84%

30,591.53

35,486.17

1.16%

2.401
2.402
2.406
2.410
2.420

41,854.18
15,067.50
494,092.18
133,404.89
1,024,515.2
1,208,927.94
0
18,126.09 2,187,094.02
2,563,475.9
2,973,632.13
7

2.421

932,395.51

1,389,269.31

2.423

875,766.00

472,913.64

2.500

724.47

153,804.98

98.70%

12,387.28

97.63%
100.00
%
96.94%

3.000
3.303

251.00

2,838.81

3.304

930.65

9,548.47

4.000

18,486.34

0.90%

944,802.45

1,407,755.65

0.00

0.00%

875,766.00

472,913.64

2,023.22

1.30%

734.00

155,828.20

0.00

0.00%

0.00

0.00

0.00%

251.00

2,838.81

0.00

0.00

0.00%

930.65

9,548.47

49,464.63

4.05%

9.53

12,387.28

4.805a

240.00

21,909.60

4.805b
4.810a

16,800.00
58,521.77

214,872.00
847,980.45

89.89%
100.00
%
87.20%
90.32%

4.810b

340.38

6,981.19

94.55%

19.62

402.41

5.45%

360.00

7,383.60

4.825

358.00

5,280.50

90.86%

36.00

531.00

9.14%

394.00

5,811.50

A.B.C.-

1,097,023.74

67.64% 12,406.94
100.00
0.00
%

D.-

10,611,692.70
1,774,275.02
1,061,169.27
13,447,136.9
9

E.F.-

13,689,044.9
7
76.27%

1,146,488.37

0.00

0.00

0.00%

240.00

21,909.60

1,539.00
1,990.85

19,683.81
28,847.41

7.99%
3.07%

18,339.00
60,512.62

234,555.81
876,827.86

68.54%
100.00
%
100.00
%
97.63%
100.00
%
96.94%
93.94%
100.00
%
95.19%
93.39%
100.00
%
100.00
%

433,640.55

646,124.42

31.46%

0.00

0.00

0.00%

0.00

0.00

0.00%

301.13

2.37%

0.00

0.00

0.00%

29.35

301.13

3.06%

73,908.02

6.06%

0.00

0.00

0.00%

927.00
4,282.38

11,856.33
62,051.69

4.81%
6.61%

0.00

0.00

0.00%

0.00

0.00

0.00%

161,968.96
27,081.21
16,196.90

10,773,661.66
1,801,356.23
1,077,366.17

3,140,155.82
525,034.05
314,015.58

205,247.07

13,652,384.06

3,979,205.45

208,939.38
1.16%

13,897,984.35
77.43%

4,050,789.57
22.57%

Resumen de la Valorizacin de obra N 11


Obra Principal

Mes de Febrero 2005

PAGO A CUENTA A CANCELAR AL CONTRATISTA

CONCEPTO
A.- Monto valorizado en el presente mes:
- Valorizacin No.11
- Regularizacin Valorizacin anterior
B.- Reajuste de las Valorizaciones:
- Reajuste de la Valorizacin No.11
Regularizacin Reajuste Valorizacin
anterior
- Retencin por atraso de Obra
C.-

Deduccin del Reajuste que no


corresponde:
- Por Adelanto Directo
- Por Adelanto de Materiales
- Por Regularizacin del Adelanto Directo
Por Regularizacin del Adelanto de
Materiales

D.- Amortizacin del Adelanto Directo:


- En la Valorizacin No.11
- Regularizacin Valorizacin anterior
E.- Amortizacin del Adelanto de Materiales:

MONTO
S/.
208,939.38
208,939.38
0.00
4,630.43
7,939.70
-3,309.27
0.00
-10,662.25
1,286.75
-12,716.49
0.00
767.49
0.00
0.00
0.00
-180,870.94

- En la Valorizacin No.11
- Regularizacin Valorizacin anterior

-180,870.94
-0.00

F.- Otros:
- Otros

I.-

TOTAL ABONOS (sin IGV)


(A+B+C+D+E+F)

0.00
0.00

S/.

22,036.62

Retenciones:
Multa por atraso injustificado en inicio de
- trabajos
Multa por falta o deficiencia de mantenimiento de
- trnsito
Multa por no presentacin del CAO
- Actualizado
Multa por atraso del Calendario de Utilizacin de
- Equipos

0.00
0.00
0.00
0.00
0.00

II.- TOTAL RETENCIONES

S/.

0.00

III.- MONTO NETO A PAGAR ( I - II )

S/.

22,036.62

IV.- I.G.V. ( 19% DE I )

S/.

4,186.96

V.- MONTO A FACTURAR ( I + IV )

S/.

26,223.58

SON: VEINTISEIS MIL DOSCIENTOS VEINTITRES Y 58/100 NUEVOS


SOLES
NOTA:
1.- Se aplica el 19 % por concepto de IGV, segn lo dispuesto en la
Adenda No. 01 al Contrato de Obra, con fecha 25.03.2004