Vous êtes sur la page 1sur 8

PROJECT

: 53 BENITEZ ROCKWELL PRIMARIES

OWNER

: ROCKWELL PRIMARIES

CONTRACTOR

: MCDC

DATE

: FEBRUARY 26,2016

SCOPE OF WORKS

NO.

DRY WORKS
FRAMING

1
2

1-PHASE

DRY WALL

2-PHASE

3
4
5
6
7
8
9

FRAMING

CEILING
ORDINARY

ENCLOSURE
FRAMING

CEILING MR

ENCLOSURE
FRAMING

BULKHEAD

ENCLOSURE

SEALANT APPLICATIONS
10 CONCEALED SEALANT APPL.
11 EXPOSED SEALANT APPLICATION

PAINTING WORKS
12 SKIMCOAT PUTTY
13 BORAL PUTTY
14 SANDING
15 PRIMER
16 FIRST COAT
17 FINAL COAT

THRESHOLDS
18 MAINDOOR THRESHOLD
19 COMMON T&B THRESHOLD
20 MASTERS T&B THRESHOLD

ITEM NO

FIFTH FLOOR
1

10

11

12

15 16

17

18

19

20 21

23

25

SCOPE OF WORKS

NO.

FIFTH FLOOR
1

10

11

12

15 16

17

18

19

DOOR INSTALLATIONS & PAINTING


21
22
23

DOOR INSTALLATION
MAINDOOR

DOOR PAINTING
LOCKSET INSTALLATION

24

SEALANT APPLICATION

25

DOOR INSTALLATION

26
27

BEDROOM-1

DOOR PAINTING
LOCKSET INSTALLATION

28

SEALANT APPLICATION

29

DOOR INSTALLATION

30
31

BEDROON-2

DOOR PAINTING
LOCKSET INSTALLATION

32

SEALANT APPLICATION

33

DOOR INSTALLATION

34
35

MASTERS
BEDROOM

SEALANT APPLICATION
DOOR INSTALLATION
COMMON T&B
DOOR

40

43

N /A

DOOR PAINTING
LOCKSET INSTALLATION
SEALANT APPLICATION

49
51

N/A

DOOR INSTALLATION
UTILITY ROOM
DOOR

48
50

DOOR PAINTING
LOCKSET INSTALLATION
SEALANT APPLICATION

45
47

N/A

DOOR INSTALLATION
MASTERS T&B
DOOR

44
46

DOOR PAINTING
LOCKSET INSTALLATION
SEALANT APPLICATION

41
42

N /A

DOOR PAINTING

37
39

N/A

LOCKSET INSTALLATION

36
38

N/A

DOOR INSTALLATION
MAIDS T&B
DOOR

DOOR PAINTING
LOCKSET INSTALLATION

20 21

23

25

MAIDS T&B
DOOR

N/A

52

N/A

N /A

SEALANT APPLICATION

SCOPE OF WORKS

NO.

FIFTH FLOOR
1

N/A

N/A

N/A

N/A

N/A

10

11

12

N/A

N/A

N/A

N/A

15 16

17

18

19

20 21

N/A

N/A

N/A

N/A

WET WORKS
53 COMMON T&B PIPE CHASE
54 MASTERS T&B PIPE CHASE
55 PANEL BOARD PIPE CHASE

TILE WORKS
56
57
58
59

WALL TILES

COMMON T&B
MASTERS T&B

FLOOR TILES
WALL TILES

60

FLOOR TILES
LIVING/DINNING/KITCHEN TILES

61

MAIDS ROOM FLOOR TILES

CONCRETE TOPPING
62 BEDROOM 1
63 BEDROOM 2
64 MASTERS BEDROOM
65 BALCONY AREA ( W.O.P.)

METROLINK CONSTRUCTION & DEVELOPMENT CORP.

PREPARED BY:

CHECKED BY:

ROCKWELL PRIMARIES

CHECKED BY:

NOTED BY:

N/A

23

25

PROJECT IN CHARGE

PROJECT MANAGER

INSPECTOR

COORDINATOR

26 27

28

29

30

31 32

33

26 27

28

29

30

N/A

N/A

31 32

33

N/A

26 27

28

29

30

31 32

33

N/A

N/A

N/A

N/A

N/A

N/A

N/A

LEGEND :
ON GOING
INCOMPLETE
DONE

N/A

CLOSED OUT
PRIORITY UNITS

Vous aimerez peut-être aussi