Vous êtes sur la page 1sur 2

Project

53 Benitez by Rockwell Primaries

Owner

Rockell Primaries

Contractor :

MCDC

Subject

Ready of Enclosure of Bulkhead and Ceiling

HMS
Item

Location

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

501
502
503
505
506
507
508
509
510
511
512
515
516
517
518
519
520
521
523
525
526
527
528
529
530
531
532
533

Ceiling

Prepared by:
Cris Casili
PIC
Checked by:
Arch. Andrew Ang
Inspector

Bulkhead

T&B
Ceiling

Remarks

Noted by:
Macquille Trampe
IPM
Noted by:
Arch. Walfrido Simbul
Coordinator

ICPWI
Signature

Ceiling

Bulkhead

T&B
Ceiling

Remarks

PCI
Signature

Ceiling

Bulkhead

T&B
Ceiling

Remarks

Signature

Conforme by:

HMS

PCI

ICPWI

Ceiling

LGB
Bulkhead

T&B
Ceiling

Remarks

LGB

Signature

Vous aimerez peut-être aussi