OBRA:
ADS-CLASICO-11-2015-CEP/MPT-1
Proceso de Seleccin:
Entidad:
MUNICIPALIDAD PROVINCIAL DE TARMA
Contratista:
CONSORCIO POMACHACA
Valor Referencial:
S/. 590,177.81
7/3/2015
Monto de Contrato:
S/. 590,177.81
7/3/2015
Monto de Contrato (S/IGV):
S/. 500,150.69
Fecha V.R.:
Jul-15
Modalidad de Ejecucin:
Residente de Obra:
Supervisor de Obra:
Gastos Generales
Utilidad
IGV
Factor de Relacin
COSTO DIRECTO
11.5279%
7.00%
SUB TOTAL PRESUPUESTO
18.00%
PRESUPUESTO TOTAL
1.00000
PRESUPUESTO TOTAL CONTRATADO
Periodo:
AGOSTO 2015
7/22/2015
8/14/2015
8/14/2015
7/23/2015
Plazo de Ejecucin:
90
Fecha de Terminacin:
10/21/2015
Reg. CIP:
Reg. CIP:
421,968.75
48,644.13
29,537.81
500,150.69
90,027.12
590,177.81
76804
63404
disponible
a.directo
a.materiales
saldo
590,177.81
S/. 0.00
S/. 0.00
S/. 0.00
De:
118,035.56
236,071.12
dias
Al:
8/31/2015
UBICACIN:
Regin:
Provincia
JUNIN
TARMA
Distrito:
TARMA
Localidad:
590,177.81
354,106.69
236,071.12
236,071.12
POMACHACA
CONSORCIO
POMACHACA
PROYECTO
OBRA
UBICACIN
POMACHACA
TARMA
TARMA
JUNIN
LUGAR
DISTRITO
PROVINCIA
REGION
CONTRATISTA
CONSORCIO POMACHACA
INSPECTOR
PLANILLA DE METRADOS
10
COPIA DE CARTAS FIANZAS (FIEL CUMPLIMIENTO, ADELANTO DIRECTO Y ADELANTO POR MATERIALES)
11
12
13
14.1
14.2
14.3
14.4
e-mail: indirameza.constructorafinha@gmail.com
ORIZACION DE OBRA
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
2 UBICACIN:
3 Contratista:
Regin:
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
POMACHACA
Area Geogrf03
CONSORCIO POMACHACA
4 Proceso de Seleccin:
ADS-CLASICO-11-2015-CEP/MPT-1
5 Entidad:
6 Financiamiento:
RECURSOS ORDINARIOS
7 Modalidad de Ejecucin:
8 Contrato de Obra:
N 062-2015-SGL/MPT
10 Descripcin:
11
12 Supervisor de Obra:
13 Residente de Obra:
14 Valor Referencial:
S/.
S/.
15 Factor de Relacin
16 Monto de Contrato:
S/.
S/.
17 Plazo de Ejecucin:
90 Das Calendarios
Das Calendarios
- Inc. IGV
S/.
- Sin IGV
S/.
- Inc. IGV
S/.
- Sin IGV
S/.
23 Monto de la Inversion:
S/.
- Inc. IGV
24 Adelanto Directo:
25 Adelanto para Materiales:
26 Valorizacin Actual:
S/.
- Sin IGV
S/.
S/.
S/.
S/.
S/.
S/.
July-15
Das Calendarios
S/.
July-15
Julio, 2015
Julio. 2015
AL 31/08/2015
AL 31/08/2015
PLAZO DE EJECUCION
590,177.81
FECHA
PRESUP. BASE
Jul-15
PRESUPUESTO
CONTRATADO
590,177.81
FECHA FIRMA
DE CONTRATO
Jul-15
PLAZO DE
EJECUCION
ENTREGA
DE TERRENO
FECHA
INICIO
CONTRACTUAL
FECHA
TERMINO
CONTRACTUAL
90
22/07/15
23/07/15
21/10/15
ADELANTO
MAXIMO
ADELANTO
OTORGADO
%
RELACION
FECHA DE
ENTREGA
ADELANTO DIRECTO
118,035.56
118,035.56
20.00%
Julio, 2015
ADELANTO MATERIALES
236,071.12
236,071.12
40.00%
Julio. 2015
VALORIZACION
ACUMULADO
% AVANCE
ACUMULADO
VALORIZACION
ACTUAL
VALORIZACION
213,285.00
% AVANCE
ACTUAL
36.14%
AMPLIACION
AMPLIACION
DE PLAZO N 01 DE PLAZO N 02
AMPLIACION DE PLAZO
ADICIONAL DE OBRA
483,108.48
81.86%
AMPLIACION
DE PLAZO N 03
AMPLIACION
DE PLAZO N 04
-.-
-.-
-.-
-.-
ADICIONAL
DE OBRA N 01
ADICIONAL
DE OBRA N 02
ADICIONAL
DE OBRA N 03
ADICIONAL
DE OBRA N 04
-.-
-.-
-.-
-.-
POMACHACA
DESCRIPCION
G.G.
UTILIDAD
11.53%
7.00%
421,968.75
48,644.13
29,537.81
500,150.69
421,968.75
48,644.13
29,537.81
500,150.69
C.D.
SUB TOTAL
IFICACION DE LA OBRA
01:
A DEL PRESUPUESTO
F.R.
1.00000
SITUACION
DE LA OBRA
ADELANTADA
PRESUPUESTO BASE
TOTAL INC. IGV
18.00%
590,177.81
590,177.81
VALORIZACION DE OBRA N 02
Periodo: AGOSTO 2015
CURVA
"S"
Obra :
Proceso de Seleccin:
ADS-CLASICO-11-2015-CEP/MPT-1
Entidad:
Contratista:
CONSORCIO POMACHACA
Valor Referencial:
S/. 590,177.81
Monto de Contrato:
S/. 590,177.81
Fecha V.R.:
7/23/2015
Regin:
Provincia
Distrito:
Fecha Inicio plazo contractual:
Plazo de Ejecucin:
Fecha de Terminacin:
100%
90%
80%
73.08%
70%
60%
PORCENTAJE
50%
45.72%
40%
30.95%
30%
20%
10%
0.00%
0%
0.00%
1
VALORIZACION
Avance Programado Acumulado
% AVANCE
ACUMULADO
PROGRAMADO
VALORIZACIN
% AVANCE
PROGRAMADO
01
02
30.95%
42.13%
0.00%
30.95%
73.08%
03
26.92%
100.00%
10
% AVANCE
EJECUTADO
45.72%
% AVANCE
ACUMULADO
EJECUTADO
0.00%
45.72%
11
ON DE OBRA N 02
RVA
"S"
AVANCE DE OBRA
DO VS EJECUTADO
10
11
12
13
VALORIZACION
amado Acumulado
OBSERVACIONES
ADELANTADA
VALORIZACION DE OBRA N 02
Periodo: AGOSTO 2015
RESUMEN DE LA VALORIZACIO
OBRA:
Proceso de Seleccin:
ADS-CLASICO-11-2015-CEP/MPT-1
Entidad:
Contratista:
CONSORCIO POMACHACA
Valor Referencial:
S/. 590,177.81
Supervisor de Obra:
Monto de Contrato:
S/. 590,177.81
Fecha V.R.:
7/23/2015
Modalidad de Ejecucin:
Residente de Obra:
Plazo de Ejecucin:
Fecha de Terminacin:
FECHA
ADELANTO DIRECTO
Julio, 2015
118,035.56
ADELANTO MATERIALES
Julio. 2015
236,071.12
MONTO C/IGV
354,106.68
F 00
COSTO DIRECTO
GASTOS GENERALES
11.53%
UTILIDAD
7.00%
1.00000
% DE AVANCE
REAJUSTES (S)
F 01
F 00
AMORTIZACIONES (A)
ADELANTO DIRECTO
20.00%
ADELANTO MATERIALES
40.00%
10.00%
18.00%
N DE OBRA N 02
AGOSTO 2015
LA VALORIZACION
S OTORGADOS AL 31/08/2015
MONTO S/IGV
% PRESUPUESTO
100,030.14
0.00%
200,060.27
40.00%
300,090.41
40.00%
RIZACION DE August-2015
VALORIZACION
152,495.73
152,495.73
17,579.56
10,674.71
180,750.00
180,750.00
45.72%
Kr
S/. 0.00
-
S/. 180,750.00
TOTAL D
100,030.14
30,704.79
TOTAL A
130,734.93
S/. 50,015.07
50,015.07
S/. 0.00
50,015.07
9,002.71
S/. 59,017.78
VALORIZACION DE OBRA N 02
Periodo: AGOSTO 2015
RESUMEN DE LA VALORIZACION
OBRA:
Proceso de Seleccin:
ADS-CLASICO-11-2015-CEP/MPT-1
Entidad:
Contratista:
CONSORCIO POMACHACA
Valor Referencial:
S/. 590,177.81
Regin:
Monto de Contrato:
S/. 590,177.81
Provincia
TARMA
Fecha V.R.:
7/23/2015
Distrito:
TARMA
Modalidad de Ejecucin:
UBICACIN:
Localidad:
JUNIN
POMACHACA
ADELANTOS OTORGADOS
FECHA
MONTO C/IGV
01
ADELANTO DIRECTO
118,035.56
02
ADELANTO MATERIALES
236,071.12
354,106.68
S/. 180,750.00
ADELANTO DIRECTO
ADELANTO MATERIALES
130,734.93
AMORTIZACIONES (A)
ADELANTO DIRECTO
20.00%
100,030.14
ADELANTO MATERIALES
40.00%
30,704.79
S/. 50,015.07
EFECTIVO
I.G.V.
18.00%
N DE OBRA N 02
: AGOSTO 2015
LA VALORIZACION
Residente de Obra:
Supervisor de Obra:
7/23/2015
90 D.C.
Fecha de Terminacin:
10/21/2015
% PRESUPUESTO
100,030.14
20.00%
200,060.27
40.00%
300,090.41
60.00%
ORIZACIONES A August-2015
VALORIZACION 07 VALORIZACION 08 VALORIZACION 09
-
TOTAL
180,750.00
S/. 180,750.00
130,734.93
100,030.14
30,704.79
S/. 50,015.07
VALORIZACION DE OBRA N
Periodo: - AGOSTO 2015
OBRA:
Contratista:
CONSORCIO POMACHACA
Plazo de Ejecucin:
Modalidad de
Ejecucin:
Fecha de Terminacin:
Valor Referencial:
S/. 590,177.81
Residente de Obra:
Monto de
Contrato:
S/. 590,177.81
Supervisor de Obra:
ITEM
DESCRIPCION PARTIDA
UNIDAD
Entidad:
PRESUPUESTO
METRADO
P. UNIT.
GASTOS GENERALES
UTILIDAD
10/21/2015
ING. CARLOS A. JAVE ORTIZ
ING. FRANCISCO J. PALOMINO VASQUEZ
PARCIAL
METRADO
MONTO
-
192,919.96
421,968.75
192,919.96
11.5279%
48,644.13
22,239.62
7.00%
29,537.81
13,504.40
500,150.69
228,663.98
1.00000
500,150.69
228,663.98
18.00%
90,027.12
41,159.52
590,177.81
269,823.50
90
VALORIZACION ANTERIOR
421,968.75
COSTO DIRECTO
7/23/2015
45.72%
VALORIZA
%
45.72
METRADO
-
VALORIZACION DE OBRA N
Periodo: - AGOSTO 2015
OBRA:
Contratista:
CONSORCIO POMACHACA
Plazo de Ejecucin:
Modalidad de
Ejecucin:
Fecha de Terminacin:
Valor Referencial:
S/. 590,177.81
Residente de Obra:
Monto de
Contrato:
S/. 590,177.81
Supervisor de Obra:
ITEM
DESCRIPCION PARTIDA
UNIDAD
Entidad:
PRESUPUESTO
METRADO
P. UNIT.
DESCRIPCION
7/23/2015
90
10/21/2015
ING. CARLOS A. JAVE ORTIZ
ING. FRANCISCO J. PALOMINO VASQUEZ
VALORIZACION ANTERIOR
PARCIAL
METRADO
MONTO
METRADO
AGOSTO
SETIEMBRE
OCTUBRE
ABRIL
30.95%
30.95%
45.72%
45.72%
ESTADO (MES)
ESTADO (ACUMULADO)
VALORIZA
ADELANTADA
14.77%
ADELANTADA
14.77%
ON DE OBRA N 02
o: - AGOSTO 2015
TARMA
TARMA
Reg. CIP:
76804
Distrito:
Reg. CIP:
63404
Localidad:
VALORIZACION ACTUAL
MONTO
152,495.73
JUNIN
POMACHACA
VALORIZACION ACUMULADA
%
36.14
METRADO
MONTO
-
345,415.69
81.86
METRADO
MONTO
-
76,553.06
152,495.73
345,415.69
76,553.06
17,579.56
39,819.18
8,824.96
10,674.71
24,179.10
5,358.70
180,750.00
409,413.97
90,736.72
180,750.00
409,413.97
90,736.72
32,535.00
73,694.51
16,332.61
213,285.00
483,108.48
107,069.33
36.14%
81.86%
18.14%
%
18.14
ON DE OBRA N 02
o: - AGOSTO 2015
TARMA
TARMA
Reg. CIP:
76804
Distrito:
Reg. CIP:
63404
Localidad:
VALORIZACION ACTUAL
JUNIN
POMACHACA
VALORIZACION ACUMULADA
MONTO
METRADO
MONTO
MAYO
JUNIO
JULIO
AGOSTO
METRADO
MONTO
VALORIZACION DE O
Periodo: - AGOSTO
OBRA:
Valor
Referencial:
Monto de
Contrato:
Modalidad de
Ejecucin:
Residente de
Obra:
Supervisor de
Obra:
ITEM
01
01
01.01
01.01.01
01.01.02
01.01.03
1.02
01.02.01
01.02.02
1.03
01.03.01
01.03.02
S/. 590,177.81
Plazo de Ejecucin: 90
Reg. CIP:
76804
Reg. CIP:
63404
DESCRIPCION PARTIDA
ESTRUCTURAS
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE OBRA
CERCO PERIMETRICO PROVISIONAL
ALMACEN Y CASETA DE GUARDIANIA
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
DEMOLICION DE EDIFICACION EXISTENTE
CORTE DE TERRENO MANUAL
UND.
PRESUPUESTO
METRADO
P. UNIT.
VALORIZACION ANTERIOR
PARCIAL
1.00
58.90
3.00
1,054.05
15.95
2,700.00
1,054.05
939.46
8,100.00
m2
m2
436.53
436.53
1.61
1.46
702.81
637.33
glb
m3
1.00
43.65
72.79
57.79
72.79
2,522.53
und
ml
mes
METRADO
1.00
58.90
3.00
436.53
436.53
1.00
43.65
MONTO
1,054.05
939.46
8,100.00
702.81
637.33
72.79
2,522.53
25
VALORIZACION DE O
Periodo: - AGOSTO
OBRA:
Valor
Referencial:
Monto de
Contrato:
Modalidad de
Ejecucin:
Residente de
Obra:
Supervisor de
Obra:
ITEM
01.03.03
01.03.04
01.03.05
01.03.06
01.03.07
01.03.08
01.03.09
01.03.10
1.04
01.04.01
01.04.01.01
01.04.02
01.04.02.01
01.04.03
01.04.03.01
S/. 590,177.81
Plazo de Ejecucin: 90
Reg. CIP:
76804
Reg. CIP:
63404
DESCRIPCION PARTIDA
UND.
NIVELACION Y APISONADO
m2
EXCAVACION DE ZANJAS PARA CIMIENTOS (MANUAL) m3
EXCAVACION PARA ZAPATAS (MANUAL)
m3
EXCAVACION PARA VIGAS DE CIMENTACION (MANUAL) m3
EXCAVACION PARA TANQUE CISTERNA (MANUAL)
m3
ELIMINACION DE MATERIAL EXCEDENTE
m3
RELLENO Y COMPACTADO CON MATERIAL PROPIO
m3
AFIRMADO PARA VEREDAS (15cm)
m2
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTOHORMIGON
30% P.G. MEZCLA 1:10 CEMENTOCIMIENTOS CORRIDOS
m3
HORMIGON 30% P.G.
SOLADOS
SOLADO DE CONCRETO C:H 1:12 E=4"
m2
SOBRECIMIENTO
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS
m3
PRESUPUESTO
METRADO
P. UNIT.
VALORIZACION ANTERIOR
PARCIAL
METRADO
MONTO
436.53
50.33
68.42
12.46
11.50
142.37
39.10
11.50
3.15
45.35
57.79
57.79
57.79
28.90
41.98
12.61
1,375.07
2,282.47
3,953.99
720.06
664.59
4,114.49
1,641.42
145.02
436.53
50.33
68.42
12.46
11.50
142.37
39.10
-
1,375.07
2,282.47
3,953.99
720.06
664.59
4,114.49
1,641.42
-
50.33
195.50
9,839.52
48.87
29.89
1,460.72
11.21
213.17
2,389.64
50.33
48.87
11.21
9,839.52
1,460.72
2,389.64
26
VALORIZACION DE O
Periodo: - AGOSTO
OBRA:
Valor
Referencial:
Monto de
Contrato:
Modalidad de
Ejecucin:
Residente de
Obra:
Supervisor de
Obra:
S/. 590,177.81
Plazo de Ejecucin: 90
Reg. CIP:
76804
Reg. CIP:
63404
ITEM
DESCRIPCION PARTIDA
01.04.03.02
01.04.04
01.04.04.01
1.05
01.05.01
01.05.01.01
01.05.01.02
01.05.02
01.05.02.01
01.05.02.02
01.05.03
01.05.03.01
ENCOFRADO Y DESENCOFRADO
FALSO PISO
FALSO PISO E= 4" DE CONCRETO 1:6
OBRAS DE CONCRETO ARMADO
VEREDAS
CONCRETO SIMPLE F'C=140 KG/CM2 (INC. ACABADO)
ENCOFRADO Y DESENCOFRADO NORMAL EN
VEREDAS
ZAPATAS
CONCRETO EN ZAPATAS F'C= 210 KG/CM2
ACERO F`Y=4200 KG/CM2
COLUMNAS Y COLUMNETAS
CONCRETO EN COLUMNAS F'C=210 KG/CM2
UND.
PRESUPUESTO
METRADO
P. UNIT.
VALORIZACION ANTERIOR
PARCIAL
m2
122.21
32.40
3,959.60
m2
298.32
26.19
7,813.00
m2
m2
1.73
2.46
35.79
51.19
61.92
125.93
m2
m2
24.44
691.04
320.28
4.72
7,827.64
3,261.71
m3
12.20
465.84
5,683.25
METRADO
122.21
24.44
691.04
12.20
MONTO
3,959.60
7,827.64
3,261.71
5,683.25
27
VALORIZACION DE O
Periodo: - AGOSTO
OBRA:
Valor
Referencial:
Monto de
Contrato:
Modalidad de
Ejecucin:
Residente de
Obra:
Supervisor de
Obra:
S/. 590,177.81
Plazo de Ejecucin: 90
Reg. CIP:
76804
Reg. CIP:
63404
ITEM
DESCRIPCION PARTIDA
01.05.03.02
01.05.03.03
01.05.04
01.05.04.01
01.05.04.02
01.05.04.03
01.05.05
01.05.05.01
01.05.05.02
01.05.05.03
01.05.06
01.05.06.01
01.05.06.02
01.05.06.03
01.05.06.04
UND.
PRESUPUESTO
METRADO
P. UNIT.
VALORIZACION ANTERIOR
PARCIAL
m2
kg
204.53
2,073.07
42.03
4.55
8,596.40
9,432.47
m3
m2
kg
14.59
180.43
2,224.86
362.85
48.23
4.55
5,293.98
8,702.14
10,123.11
m3
m2
kg
12.50
111.89
1,627.97
341.95
36.81
4.55
4,274.38
4,118.67
7,407.26
m3
m2
kg
und
0.47
5.25
27.57
44.00
356.57
41.55
4.55
2.51
167.59
218.14
125.44
110.44
METRADO
204.53
2,073.07
14.59
180.43
2,224.86
12.50
111.89
1,627.97
-
MONTO
8,596.40
9,432.47
5,293.98
8,702.14
10,123.11
4,274.38
4,118.67
7,407.26
-
28
VALORIZACION DE O
Periodo: - AGOSTO
OBRA:
Valor
Referencial:
Monto de
Contrato:
Modalidad de
Ejecucin:
Residente de
Obra:
Supervisor de
Obra:
ITEM
01.05.07
01.05.07.01
01.05.07.02
01.05.07.03
01.05.08
01.05.08.01
01.05.08.02
01.05.08.03
1.06
01.06.01
01.06.02
01.06.03
01.06.04
01.06.05
01.06.06
S/. 590,177.81
Plazo de Ejecucin: 90
Reg. CIP:
76804
Reg. CIP:
63404
DESCRIPCION PARTIDA
LOSA ARMADA
CONCRETO EN LOSAS MACIZAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL DE LOSAS
MACIZAS
ACERO F'Y = 4,200 KG/CM2
TANQUE CISTERNA Y TANQUE ELEVADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO F'Y = 4,200 KG/CM2
ESTRUCTURA DE MADERA Y COBERTURA
TIJERAL DE MADERA TORNILLO T-1 13.30m DE 3"X6"
TIJERAL DE MADERA TORNILLO T-2 13.20m DE 3"X6"
TIJERAL DE MADERA TORNILLO T-3 12.85m DE 3"X6"
TIJERAL DE MADERA TORNILLO T-3' 7.05m DE 3"X6"
TIJERAL DE MADERA TORNILLO T-4 12.60m DE
3"X6"
TIJERAL DE MADERA TORNILLO T-5 3.15m DE 3"X6"
UND.
PRESUPUESTO
METRADO
P. UNIT.
VALORIZACION ANTERIOR
PARCIAL
m3
m2
kg
0.44
4.42
33.80
358.05
33.62
4.55
157.54
148.60
153.79
m3
m2
kg
7.15
72.62
606.76
348.87
37.83
4.55
2,494.42
2,747.21
2,760.76
und
und
und
und
und
und
2.00
3.00
2.00
1.00
1.00
2.00
1,465.20
1,452.20
1,350.00
1,140.00
1,310.00
825.00
2,930.40
4,356.60
2,700.00
1,140.00
1,310.00
1,650.00
METRADO
0.44
4.42
33.80
3.58
36.31
303.38
-
MONTO
157.54
148.60
153.79
1,247.21
1,373.61
1,380.38
-
29
VALORIZACION DE O
Periodo: - AGOSTO
OBRA:
Valor
Referencial:
Monto de
Contrato:
Modalidad de
Ejecucin:
Residente de
Obra:
Supervisor de
Obra:
ITEM
01.06.07
01.06.08
01.06.09
01.06.10
01.06.11
1.07
01.07.01
01.07.02
1.08
01.08.01
01.08.02
01.08.03
01.08.04
2.00
2.01
S/. 590,177.81
Plazo de Ejecucin: 90
Reg. CIP:
76804
Reg. CIP:
63404
DESCRIPCION PARTIDA
UND.
PRESUPUESTO
METRADO
P. UNIT.
VALORIZACION ANTERIOR
PARCIAL
und
und
ml
ml
ml
2.00
1.00
404.47
17.45
64.00
1,135.00
1,045.00
15.45
15.45
23.40
2,270.00
1,045.00
6,249.06
269.60
1,497.60
m2
ml
319.90
29.71
54.81
102.24
17,533.72
3,037.55
glb
glb
und
und
1.00
1.00
4.00
3.00
2,400.00
3,200.00
16.95
350.00
2,400.00
3,200.00
67.80
1,050.00
METRADO
0.50
4.00
3.00
-
MONTO
1,200.00
67.80
1,050.00
-
30
VALORIZACION DE O
Periodo: - AGOSTO
OBRA:
Valor
Referencial:
Monto de
Contrato:
Modalidad de
Ejecucin:
Residente de
Obra:
Supervisor de
Obra:
S/. 590,177.81
Plazo de Ejecucin: 90
Reg. CIP:
76804
Reg. CIP:
63404
ITEM
DESCRIPCION PARTIDA
02.01.01
02.01.02
2.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.02.07
02.02.08
02.02.09
2.03
02.03.01
2.04
UND.
PRESUPUESTO
METRADO
P. UNIT.
VALORIZACION ANTERIOR
PARCIAL
m2
m2
259.37
210.95
53.50
91.25
13,876.30
19,249.19
m2
m2
m2
m2
m2
m2
m2
m2
m
56.42
671.85
10.03
65.10
150.06
40.10
3.20
4.42
221.19
18.74
22.45
29.38
35.69
37.68
31.08
29.32
33.00
19.98
1,057.31
15,083.03
294.68
2,323.42
5,654.26
1,246.31
93.82
145.86
4,419.38
m2
319.85
43.88
14,035.02
METRADO
259.37
210.95
25.00
250.00
40.00
70.00
-
MONTO
13,876.30
19,249.19
468.50
5,612.50
1,427.60
2,637.60
-
31
VALORIZACION DE O
Periodo: - AGOSTO
OBRA:
Valor
Referencial:
Monto de
Contrato:
Modalidad de
Ejecucin:
Residente de
Obra:
Supervisor de
Obra:
ITEM
02.04.01
02.04.02
02.04.03
02.04.04
2.05
02.05.01
02.05.02
2.06
02.06.01
02.06.02
2.07
02.07.01
02.07.02
02.07.03
2.08
S/. 590,177.81
Plazo de Ejecucin: 90
Reg. CIP:
76804
Reg. CIP:
63404
DESCRIPCION PARTIDA
CONTRAPISO DE 2"
PISO DE PORCELANATO DE 60X60 CM.
PISO DE LOSETA VINILICA A=1.6 MM.
PISO DE CEMENTO SIN COLOREAR ACABADO
FROTACHADO E=1.5cm
ZOCALOS Y CONTRAZOCALOS
ZOCALO DE PORCELANATO DE 60X60 CM.
CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM
CARPINTERIA DE MADERA
PUERTA APANELADA DE MADERA TORNILLO E=11/4"
PUERTA CONTRAPLACADA DE 45 MM TRIPLAY
CARPINTERIA METALICA
VENTANA DE ALUMINIO
PUERTA METAL LAC 1/16" C/MARCO 2"X2"X1/4" Y
REFUERZOS
PANEL METALICO
CERRAJERIA
UND.
PRESUPUESTO
METRADO
P. UNIT.
VALORIZACION ANTERIOR
PARCIAL
m2
m2
m2
m2
222.86
85.35
133.86
52.99
27.01
93.89
34.50
28.69
6,019.45
8,013.51
4,618.17
1,520.28
m2
m
56.42
256.19
78.34
10.07
4,419.94
2,579.83
m2
m2
4.18
40.68
448.67
181.52
1,875.44
7,384.23
m2
m2
glb
48.05
8.25
1.00
95.00
620.85
2,000.00
4,564.75
5,122.01
2,000.00
METRADO
MONTO
32
VALORIZACION DE O
Periodo: - AGOSTO
OBRA:
Valor
Referencial:
Monto de
Contrato:
Modalidad de
Ejecucin:
Residente de
Obra:
Supervisor de
Obra:
S/. 590,177.81
Plazo de Ejecucin: 90
Reg. CIP:
76804
Reg. CIP:
63404
ITEM
DESCRIPCION PARTIDA
02.08.01
02.08.02
02.08.03
02.08.04
2.09
02.09.01
2.10
02.10.01
02.10.02
2.11
02.11.01
02.11.02
02.11.03
02.11.04
02.11.05
UND.
PRESUPUESTO
METRADO
P. UNIT.
VALORIZACION ANTERIOR
PARCIAL
6.00
42.00
7.00
7.00
15.51
15.25
66.15
40.47
93.06
640.50
463.05
283.29
528.58
6.25
3,303.63
m2
m2
65.67
65.67
23.42
5.51
1,537.99
361.84
m2
m2
m2
m2
m2
319.85
215.15
671.85
10.03
51.24
18.91
8.97
14.53
17.96
7.87
6,048.36
1,929.90
9,761.98
180.14
403.26
pza
pza
und
und
p2
METRADO
MONTO
33
VALORIZACION DE O
Periodo: - AGOSTO
OBRA:
Valor
Referencial:
Monto de
Contrato:
Modalidad de
Ejecucin:
Residente de
Obra:
Supervisor de
Obra:
ITEM
02.11.06
2.12
02.12.01
02.12.02
02.12.03
02.12.04
2.13
02.13.01
3.00
3.01
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
S/. 590,177.81
Plazo de Ejecucin: 90
Reg. CIP:
76804
Reg. CIP:
63404
DESCRIPCION PARTIDA
UND.
PRESUPUESTO
METRADO
P. UNIT.
VALORIZACION ANTERIOR
PARCIAL
m2
89.72
16.15
1,448.98
und
pza
und
pza
7.00
8.00
7.00
4.00
253.20
238.71
39.07
204.32
glb
1.00
450.00
1,772.40
1,909.68
273.49
817.28
0.00
450.00
34.00
2.00
32.00
4.00
50.00
49.82
51.82
70.99
72.76
65.87
1,693.88
103.64
2,271.68
291.04
3,293.50
und
und
pto
pto
pto
METRADO
MONTO
34
VALORIZACION DE O
Periodo: - AGOSTO
OBRA:
Valor
Referencial:
Monto de
Contrato:
Modalidad de
Ejecucin:
Residente de
Obra:
Supervisor de
Obra:
ITEM
03.01.06
3.02
03.02.01
03.02.02
03.02.03
03.02.04
3.03
03.03.01
03.03.02
03.03.03
03.03.04
03.03.05
3.04
03.04.01
03.04.02
S/. 590,177.81
Plazo de Ejecucin: 90
Reg. CIP:
76804
Reg. CIP:
63404
DESCRIPCION PARTIDA
UND.
PRESUPUESTO
METRADO
P. UNIT.
VALORIZACION ANTERIOR
PARCIAL
4.00
86.11
344.44
ml
ml
ml
ml
3.75
1.55
189.30
137.70
17.10
16.33
18.01
17.10
64.13
25.31
3,409.29
2,354.67
m
m
m
m
m
378.60
275.40
7.50
2.00
42.30
10.98
11.13
13.71
12.34
10.82
4,157.03
3,065.20
102.83
24.68
457.69
1.00
1.00
353.09
236.61
353.09
236.61
pto
und
pza
METRADO
3.75
1.55
189.30
137.70
-
MONTO
64.13
25.31
3,409.29
2,354.67
-
35
VALORIZACION DE O
Periodo: - AGOSTO
OBRA:
Valor
Referencial:
Monto de
Contrato:
Modalidad de
Ejecucin:
Residente de
Obra:
Supervisor de
Obra:
ITEM
03.04.03
03.04.04
03.04.05
03.04.06
3.05
03.05.01
3.06
03.06.01
03.06.02
03.06.03
03.06.04
4.00
S/. 590,177.81
Plazo de Ejecucin: 90
Reg. CIP:
76804
Reg. CIP:
63404
DESCRIPCION PARTIDA
UND.
PRESUPUESTO
METRADO
P. UNIT.
VALORIZACION ANTERIOR
PARCIAL
pza
pza
pza
und
1.00
4.00
7.00
1.00
67.95
62.95
52.95
350
67.95
251.80
370.65
350.00
und
1.00
704.08
704.08
und
und
und
und
19.00
13.00
6.00
1.00
140.31
105.31
62.71
986.9
2,665.89
1,369.03
376.26
986.90
METRADO
MONTO
36
VALORIZACION DE O
Periodo: - AGOSTO
OBRA:
Valor
Referencial:
Monto de
Contrato:
Modalidad de
Ejecucin:
Residente de
Obra:
Supervisor de
Obra:
ITEM
4.01
04.01.01
04.01.01.01
04.01.01.02
04.01.01.03
04.01.02
04.01.02.01
04.01.02.02
04.01.02.03
04.01.03
04.01.03.01
04.01.03.02
04.01.03.03
04.01.03.04
04.01.03.05
S/. 590,177.81
Plazo de Ejecucin: 90
Reg. CIP:
76804
Reg. CIP:
63404
DESCRIPCION PARTIDA
UND.
SISTEMA DE DESAGUE
SALIDA DE DESAGUE
SALIDA DE DESAGUE PVC-SAL DE 4"
pto
SALIDA DE DESAGUE PVC-SAL 2"
pto
SALIDA DE VENTILACION PVC-SAL 2"
pto
REDES DE DISTRIBUCION
RED DE DISTRIBUCION TUBERIA PVC-SAL P/DESAGUE
ml
DE
RED2"DE DISTRIBUCION TUBERIA PVC-SAL P/DESAGUE
ml
DE 4"
EXCAVACION Y RELLENO PARA TUBERIA
m
ACCESORIOS DE REDES
TEE PVC SAL 4"
pza
YEE PVC SAL 2"
pza
YEE PVC SAL 4" CON REDUCCION DE 2"
pza
CODO PVC SAL 4"X45
pza
CODO PVC SAL 4"X90
pza
PRESUPUESTO
METRADO
7.00
16.00
4.00
P. UNIT.
VALORIZACION ANTERIOR
PARCIAL
658.07
1,437.44
223.76
45.68
51.5
97.18
94.01
89.84
55.94
0
21.72
26.17
22.52
11.00
8.00
14.00
5.00
3.00
20.45
16.21
25.39
31.59
22.02
224.95
129.68
355.46
157.95
66.06
992.17
1,347.76
2,188.49
METRADO
7.00
16.00
4.00
45.68
51.50
97.18
11.00
8.00
14.00
5.00
3.00
MONTO
658.07
1,437.44
223.76
992.17
1,347.76
2,188.49
224.95
129.68
355.46
157.95
66.06
37
VALORIZACION DE O
Periodo: - AGOSTO
OBRA:
Valor
Referencial:
Monto de
Contrato:
Modalidad de
Ejecucin:
Residente de
Obra:
Supervisor de
Obra:
ITEM
04.01.03.06
04.01.04
04.01.04.01
04.01.04.02
04.01.04.03
04.01.04.04
04.01.05
04.01.05.01
04.01.05.02
4.02
04.02.01
04.02.01.01
04.02.02
04.02.02.01
04.02.02.02
S/. 590,177.81
Plazo de Ejecucin: 90
Reg. CIP:
76804
Reg. CIP:
63404
DESCRIPCION PARTIDA
UND.
PRESUPUESTO
METRADO
P. UNIT.
VALORIZACION ANTERIOR
PARCIAL
pza
11.00
14.92
164.12
und
und
und
pza
4.00
7.00
12.00
4.00
74.67
72.13
60.95
19.35
298.68
504.91
731.40
77.40
pza
pza
1.00
1.00
211.61
237.63
211.61
237.63
pto
24.00
58.21
1,397.04
m
m
75.95
4.50
13.01
13.59
988.11
61.16
METRADO
11.00
1.00
1.00
24.00
75.95
4.50
MONTO
164.12
211.61
237.63
1,397.04
988.11
61.16
38
VALORIZACION DE O
Periodo: - AGOSTO
OBRA:
Valor
Referencial:
Monto de
Contrato:
Modalidad de
Ejecucin:
Residente de
Obra:
Supervisor de
Obra:
ITEM
04.02.02.03
04.02.03
04.02.03.01
04.02.03.02
04.02.03.03
4.03
S/. 590,177.81
Plazo de Ejecucin: 90
Reg. CIP:
76804
Reg. CIP:
63404
DESCRIPCION PARTIDA
UND.
PRESUPUESTO
METRADO
P. UNIT.
VALORIZACION ANTERIOR
PARCIAL
38.75
15.19
588.61
pza
und
und
30.00
22.00
23.00
7.46
7.36
62.34
223.80
161.92
1,433.82
METRADO
38.75
30.00
22.00
-
MONTO
588.61
223.80
161.92
-
39
VALORIZACION DE O
Periodo: - AGOSTO
OBRA:
Valor
Referencial:
Monto de
Contrato:
Modalidad de
Ejecucin:
Residente de
Obra:
Supervisor de
Obra:
ITEM
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
5
5.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
S/. 590,177.81
Plazo de Ejecucin: 90
Reg. CIP:
76804
Reg. CIP:
63404
DESCRIPCION PARTIDA
UND.
ml
ml
und
und
pza
glb
glb
glb
glb
glb
glb
PRESUPUESTO
METRADO
P. UNIT.
VALORIZACION ANTERIOR
PARCIAL
81.85
145.80
17.00
15.00
2.00
58.24
22.35
25.91
23.30
33.56
4,766.94
3,258.63
440.47
349.50
67.12
1.00
1.00
1.00
1.00
1.00
1.00
5,339.67
10,924.06
1,211.84
550.84
720.00
1722.71
5,339.67
10,924.06
1,211.84
550.84
720.00
1,722.71
METRADO
145.80
17.00
15.00
-
MONTO
3,258.63
440.47
349.50
-
40
VALORIZACION DE O
Periodo: - AGOSTO
OBRA:
Valor
Referencial:
Monto de
Contrato:
Modalidad de
Ejecucin:
Residente de
Obra:
Supervisor de
Obra:
S/. 590,177.81
Plazo de Ejecucin: 90
Reg. CIP:
76804
Reg. CIP:
63404
ITEM
DESCRIPCION PARTIDA
UND.
PRESUPUESTO
METRADO
P. UNIT.
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
PARCIAL
METRADO
MONTO
421,968.75
192,919.96
11.53%
48,644.13
22,239.62
7.00%
29,537.81
13,504.40
500,150.69
228,663.98
1.00000
500,150.69
228,663.98
18.00%
90,027.12
41,159.52
590,177.81
269,823.49
VALORIZACION ANTERIOR
45.72%
41
CION DE OBRA N 02
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
RIZACION ANTERIOR
POMACHACA
VALORIZACION ACTUAL
100.00
100.00
100.00
100.00
100.00
100.00
100.00
METRADO
MONTO
VALORIZACION ACUMULADA
%
METRADO
1.00
58.90
3.00
436.53
436.53
1.00
43.65
MONTO
1,054.05
939.46
8,100.00
702.81
637.33
72.79
2,522.53
100.00
100.00
100.00
100.00
100.00
100.00
100.00
METRADO
MONTO
42
CION DE OBRA N 02
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
RIZACION ANTERIOR
POMACHACA
VALORIZACION ACTUAL
100.00
100.00
100.00
100.00
100.00
100.00
100.00
-
100.00
100.00
100.00
METRADO
MONTO
VALORIZACION ACUMULADA
%
METRADO
436.53
50.33
68.42
12.46
11.50
142.37
39.10
50.33
48.87
11.21
MONTO
1,375.07
2,282.47
3,953.99
720.06
664.59
4,114.49
1,641.42
9,839.52
1,460.72
2,389.64
100.00
100.00
100.00
100.00
100.00
100.00
100.00
-
100.00
100.00
100.00
METRADO
11.50
-
MONTO
145.02
100.00
43
CION DE OBRA N 02
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
RIZACION ANTERIOR
POMACHACA
VALORIZACION ACTUAL
METRADO
100.00
100.00
100.00
100.00
298.32
-
MONTO
7,813.00
-
VALORIZACION ACUMULADA
%
METRADO
100.00
122.21
298.32
24.44
691.04
12.20
MONTO
3,959.60
7,813.00
7,827.64
3,261.71
5,683.25
METRADO
100.00
100.00
100.00
100.00
100.00
1.73
2.46
-
MONTO
61.92
125.93
-
100.00
100.00
-
44
CION DE OBRA N 02
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
RIZACION ANTERIOR
POMACHACA
VALORIZACION ACTUAL
METRADO
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
-
0.47
5.25
27.57
44.00
MONTO
167.59
218.14
125.44
110.44
VALORIZACION ACUMULADA
%
METRADO
100.00
100.00
100.00
100.00
204.53
2,073.07
14.59
180.43
2,224.86
12.50
111.89
1,627.97
0.47
5.25
27.57
44.00
MONTO
8,596.40
9,432.47
5,293.98
8,702.14
10,123.11
4,274.38
4,118.67
7,407.26
167.59
218.14
125.44
110.44
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
METRADO
MONTO
45
CION DE OBRA N 02
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
RIZACION ANTERIOR
POMACHACA
VALORIZACION ACTUAL
METRADO
100.00
100.00
100.00
50.00
50.00
50.00
-
3.58
36.31
303.38
2.00
3.00
2.00
1.00
1.00
2.00
MONTO
1,248.95
1,373.61
1,380.38
2,930.40
4,356.60
2,700.00
1,140.00
1,310.00
1,650.00
VALORIZACION ACUMULADA
%
METRADO
50.07
50.00
50.00
100.00
100.00
100.00
100.00
100.00
100.00
0.44
4.42
33.80
7.16
72.62
606.76
2.00
3.00
2.00
1.00
1.00
2.00
MONTO
157.54
148.60
153.79
2,496.16
2,747.22
2,760.76
2,930.40
4,356.60
2,700.00
1,140.00
1,310.00
1,650.00
100.00
100.00
100.00
100.07
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
METRADO
-0.00
-
MONTO
-1.74
-
-0.07
-
46
CION DE OBRA N 02
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
RIZACION ANTERIOR
POMACHACA
VALORIZACION ACTUAL
METRADO
50.00
100.00
100.00
2.00
1.00
404.47
17.45
64.00
319.90
29.71
0.50
1.00
-
MONTO
2,270.00
1,045.00
6,249.06
269.60
1,497.60
17,533.72
3,037.55
1,200.00
3,200.00
-
VALORIZACION ACUMULADA
%
100.00
100.00
100.00
100.00
100.00
100.00
100.00
50.00
100.00
-
METRADO
2.00
1.00
404.47
17.45
64.00
319.90
29.71
1.00
1.00
4.00
3.00
-
MONTO
2,270.00
1,045.00
6,249.06
269.60
1,497.60
17,533.72
3,037.55
2,400.00
3,200.00
67.80
1,050.00
-
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
METRADO
MONTO
47
CION DE OBRA N 02
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
RIZACION ANTERIOR
POMACHACA
VALORIZACION ACTUAL
METRADO
100.00
100.00
44.31
37.21
61.44
46.65
-
31.42
421.85
10.03
25.10
80.06
40.10
3.20
4.42
221.19
-
MONTO
588.81
9,470.53
294.68
895.82
3,016.66
1,246.31
93.82
145.86
4,419.38
-
VALORIZACION ACUMULADA
%
METRADO
55.69
62.79
100.00
38.56
53.35
100.00
100.00
100.00
100.00
-
259.37
210.95
56.42
671.85
10.03
65.10
150.06
40.10
3.20
4.42
221.19
-
MONTO
13,876.30
19,249.19
1,057.31
15,083.03
294.68
2,323.42
5,654.26
1,246.31
93.82
145.86
4,419.38
-
METRADO
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
-
319.85
-
MONTO
14,035.02
-
100.00
48
CION DE OBRA N 02
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
RIZACION ANTERIOR
POMACHACA
VALORIZACION ACTUAL
METRADO
222.86
85.35
133.86
52.99
56.42
256.19
4.18
40.68
-
MONTO
6,019.45
8,013.51
4,618.17
1,520.28
4,419.94
2,579.83
1,875.44
7,384.23
-
VALORIZACION ACUMULADA
%
METRADO
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
-
222.86
85.35
133.86
52.99
56.42
256.19
4.18
40.68
-
MONTO
6,019.45
8,013.51
4,618.17
1,520.28
4,419.94
2,579.83
1,875.44
7,384.23
-
METRADO
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
-
48.05
8.25
1.00
-
MONTO
4,564.75
5,122.01
2,000.00
-
100.00
100.00
100.00
49
CION DE OBRA N 02
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
RIZACION ANTERIOR
POMACHACA
VALORIZACION ACTUAL
METRADO
528.58
107.58
335.93
5.02
25.62
MONTO
3,303.63
964.95
4,880.99
90.07
201.63
VALORIZACION ACUMULADA
%
METRADO
100.00
50.00
50.00
50.00
50.00
528.58
107.58
335.93
5.02
25.62
MONTO
3,303.63
964.95
4,880.99
90.07
201.63
METRADO
100.00
50.00
50.00
50.00
50.00
6.00
42.00
7.00
7.00
65.67
65.67
319.85
107.58
335.93
5.02
25.62
MONTO
93.06
640.50
463.05
283.29
1,537.99
361.84
6,048.36
964.95
4,880.99
90.07
201.63
100.00
100.00
100.00
100.00
100.00
100.00
100.00
50.00
50.00
50.00
50.00
50
CION DE OBRA N 02
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
RIZACION ANTERIOR
POMACHACA
VALORIZACION ACTUAL
METRADO
7.00
8.00
7.00
4.00
34.00
2.00
32.00
4.00
50.00
MONTO
1,772.40
1,909.68
273.49
817.28
1,693.88
103.64
2,271.68
291.04
3,293.50
VALORIZACION ACUMULADA
%
METRADO
100.00
100.00
100.00
100.00
-
100.00
100.00
100.00
100.00
100.00
7.00
8.00
7.00
4.00
34.00
2.00
32.00
4.00
50.00
MONTO
1,772.40
1,909.68
273.49
817.28
1,693.88
103.64
2,271.68
291.04
3,293.50
METRADO
100.00
100.00
100.00
100.00
-
100.00
100.00
100.00
100.00
100.00
89.72
1.00
-
MONTO
1,448.98
450.00
-
100.00
100.00
51
CION DE OBRA N 02
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
RIZACION ANTERIOR
POMACHACA
VALORIZACION ACTUAL
METRADO
100.00
100.00
100.00
100.00
-
4.00
378.60
275.40
7.50
2.00
42.30
-
MONTO
344.44
4,157.03
3,065.20
102.83
24.68
457.69
-
VALORIZACION ACUMULADA
%
METRADO
100.00
100.00
100.00
100.00
100.00
100.00
-
4.00
3.75
1.55
189.30
137.70
378.60
275.40
7.50
2.00
42.30
-
MONTO
344.44
64.13
25.31
3,409.29
2,354.67
4,157.03
3,065.20
102.83
24.68
457.69
-
METRADO
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
-
1.00
1.00
MONTO
353.09
236.61
100.00
100.00
52
CION DE OBRA N 02
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
RIZACION ANTERIOR
POMACHACA
VALORIZACION ACTUAL
METRADO
MONTO
VALORIZACION ACUMULADA
%
METRADO
MONTO
METRADO
1.00
4.00
7.00
1.00
1.00
19.00
13.00
6.00
1.00
-
MONTO
67.95
251.80
370.65
350.00
704.08
2,665.89
1,369.03
376.26
986.90
-
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
53
CION DE OBRA N 02
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
RIZACION ANTERIOR
POMACHACA
VALORIZACION ACTUAL
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
METRADO
MONTO
VALORIZACION ACUMULADA
%
METRADO
7.00
16.00
4.00
45.68
51.50
97.18
11.00
8.00
14.00
5.00
3.00
MONTO
658.07
1,437.44
223.76
992.17
1,347.76
2,188.49
224.95
129.68
355.46
157.95
66.06
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
METRADO
MONTO
54
CION DE OBRA N 02
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
RIZACION ANTERIOR
POMACHACA
VALORIZACION ACTUAL
METRADO
100.00
100.00
100.00
100.00
100.00
100.00
4.00
7.00
12.00
4.00
-
MONTO
298.68
504.91
731.40
77.40
-
VALORIZACION ACUMULADA
%
METRADO
100.00
100.00
100.00
100.00
-
11.00
4.00
7.00
12.00
4.00
1.00
1.00
24.00
75.95
4.50
MONTO
164.12
298.68
504.91
731.40
77.40
211.61
237.63
1,397.04
988.11
61.16
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
METRADO
MONTO
55
CION DE OBRA N 02
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
RIZACION ANTERIOR
POMACHACA
VALORIZACION ACTUAL
100.00
100.00
100.00
-
METRADO
23.00
-
MONTO
1,433.82
-
VALORIZACION ACUMULADA
%
METRADO
100.00
38.75
30.00
22.00
23.00
-
MONTO
588.61
223.80
161.92
1,433.82
-
100.00
100.00
100.00
100.00
METRADO
MONTO
56
CION DE OBRA N 02
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
RIZACION ANTERIOR
POMACHACA
VALORIZACION ACTUAL
METRADO
100.00
100.00
100.00
-
MONTO
VALORIZACION ACUMULADA
%
METRADO
145.80
17.00
15.00
-
MONTO
3,258.63
440.47
349.50
-
METRADO
100.00
100.00
100.00
-
81.85
2.00
1.00
1.00
1.00
1.00
1.00
1.00
MONTO
4,766.94
67.12
100.00
100.00
5,339.67
10,924.06
1,211.84
550.84
720.00
1,722.71
100.00
100.00
100.00
100.00
100.00
100.00
57
CION DE OBRA N 02
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
RIZACION ANTERIOR
POMACHACA
VALORIZACION ACTUAL
METRADO
MONTO
VALORIZACION ACUMULADA
%
METRADO
MONTO
METRADO
MONTO
152,495.73
345,415.70
76,553.06
17,579.56
39,819.18
8,824.96
10,674.71
24,179.10
5,358.71
180,750.00
409,413.98
90,736.73
180,750.00
409,413.98
90,736.73
32,535.00
73,694.52
16,332.61
213,285.00
483,108.49
107,069.34
36.14%
81.86%
18.14%
58
CONSTRUCCION Y EQUIPAMIENTO DEL PUESTO DE SALUD DE POMACHACA DISTRITO DE TARMA, PROVINCIA DE TARMA
ADELANDO DIRECTO
Periodo:
AGOSTO 2015
DESCRIPCION
Monto de Contrato:
S/. 590,177.81
ADELANTO BASE
S/. 118,036.00
Factor de Descuento:
20.00%
S/. 236,071.12
Factor de Descuento:
40.00%
COSTO TOTAL
VALORIZACION
VALORIZACION N 01 (Agosto-2015)
COSTO DIRECTO
192,919.97
VALORIZACION N 02 (Setiembre-2015)
VALORIZACION
11.53%
7.00%
22,239.62
-
192,919.97
22,239.62
AMORTIZACIONES
(C/IGV)
ADELANTO
MATERIALES
ADELANTO
DIRECTO
20.00%
VALORIZACION N 01 (Agosto-2015)
UTILIDAD
VALORIZACION N 03 (Octubre-2015)
TOTAL AMORTIZADO
GASTOS
GENERALES
40.00%
118,035.57
107,929.40
COSTO
OBRA
VALORIZADO
13,504.40
SALDO POR
AMORTIZAR
128,142.15
VAL.
BRUTA
228,663.99
13,504.40
FACTOR DE
RELACION
228,663.99
1.00000
228,663.99
228,663.99
AMORTIZACIONES
(S/IGV)
ADELANTO
MATERIALES
ADELANTO
DIRECTO
20.00%
40.00%
100,030.14
91,465.60
VALORIZACION N 02 (Setiembre-2015)
354,107.12
VALORIZACION N 03 (Octubre-2015)
354,107.12
TOTAL AMORTIZADO
118,035.57
107,929.40
836,356.39
100,030.14
91,465.60
SALDO POR
AMORTIZAR
84,771.31
-
84,771.31
ENSUALES
DELANDO DIRECTO
ADELANDO MATERIALES
MONTO (S/.)
DESCRIPCION
100,030.51
18,005.49
118,036.00
IGV
ADELANTO BASE
IGV DEL ADELANTO
COSTO TOTAL
VAL.
TOTAL
18.00%
41,159.52
% EJECUTADO
MENSUAL
269,823.51
41,159.52
269,823.51
DEDUCCIONES
(C/IGV)
FIEL
CUMPLIMIENTO
DEDUCCIONES
(S/IGV)
FIEL
CUMPLIMIENTO
10.00%
10.00%
-
MONTO (S/.)
200,060.27
36,010.85
236,071.12
% ACUMULADO
EJECUTADO
MENSUAL
45.72%
45.72%
0.00%
45.72%
0.00%
45.72%
45.72%
45.72%
VALORIZACION
NETA
IGV
18.00%
###
37,168.25
6,690.29
0.00
###
0.00
###
0.00
37,168.25
0.00
6,690.29
OBRA:
Valor
Referencial:
S/. 590,177.81
Monto de
Contrato:
S/. 590,177.81
Plazo de Eje
Modalidad de
Ejecucin:
Residente de
Obra:
Supervisor de
Obra:
ITEM
DESCRIPCION PARTIDA
01
ESTRUCTURAS
01.01
OBRAS PROVISIONALES
01.01.01
01.01.01.02
01.01.02
TRABAJOS PRELIMINARES
01.01.02.01
01.01.02.02
01.01.03
MOVIMIENTO DE TIERRAS
01.01.03.01
01.01.01.01
01.01.03.02
01.01.03.03
01.01.03.04
01.01.04
01.01.04.01
Fecha de Termi
UNIDAD METRADO
und
ml
mes
m2
m2
glb
m3
m2
m3
m3
m3
1.00
58.90
3.00
436.53
436.53
1.00
43.65
436.53
50.33
68.42
12.46
METRADO
AGOSTO
METRADO
SETIEMBRE
METRADO METRADO
OCTUBRE NOVIEMBRE
1.00
58.90
3.00
436.53
436.53
1.00
43.65
436.53
50.33
68.42
12.46
61
ITEM
DESCRIPCION PARTIDA
UNIDAD METRADO
01
ESTRUCTURAS
01.01.04.02
01.01.05.01
01.01.05.02
01.01.05.03
01.01.06
01.01.06.01
SOLADOS
01.01.06.02
01.01.07
SOBRECIMIENTO
01.01.07.01
01.01.07.02
01.01.08
FALSO PISO
01.01.08.01
01.01.08.02
01.01.08.03
VEREDAS
01.01.04.03
01.01.05
m3
m3
m3
m2
11.50
142.37
39.10
11.50
METRADO
AGOSTO
METRADO
SETIEMBRE
METRADO METRADO
OCTUBRE NOVIEMBRE
11.50
142.37
39.10
CIMIENTO CORRIDO
50.33
50.33
m2
48.87
48.87
m3
m2
11.21
122.21
11.21
122.21
298.32
m2
298.32
62
ITEM
DESCRIPCION PARTIDA
01
ESTRUCTURAS
01.01.08.04
01.01.08.05
01.01.09
ZAPATAS
01.01.09.01
01.01.10
01.01.10.01
COLUMNAS Y COLUMNETAS
01.01.10.02
01.01.11
01.01.11.01
VIGAS
01.01.11.02
01.01.12.01
01.01.12.02
VIGAS DE CIMENTACION
01.01.10.03
UNIDAD METRADO
m2
m2
m3
kg
m3
m2
kg
1.73
2.46
24.44
691.04
12.20
204.53
2,073.07
m3
m2
kg
14.59
180.43
2,224.86
m3
m2
kg
12.50
111.89
1,627.97
01.02.01.01
LOSAS ALIGERADAS
01.02.02
01.02.02.03
m3
CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL DE LOSAS ALIGERADAm2
kg
ACERO F'Y = 4,200 KG/CM2
LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADO und
0.47
5.25
27.57
44.00
01.02.02.04
LOSA ARMADA
01.02.02.05
01.02.03
m3
CONCRETO EN LOSAS MACIZAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL DE LOSAS MACIZAS m2
kg
ACERO F'Y = 4,200 KG/CM2
01.02.03.01
01.02.03.02
01.01.12
01.01.12.03
01.02.01
01.02.02.01
01.02.02.02
01.02.02.06
01.02.03.03
m3
m2
0.44
4.42
33.80
7.15
72.62
METRADO
AGOSTO
METRADO
SETIEMBRE
METRADO METRADO
OCTUBRE NOVIEMBRE
24.44
691.04
12.20
204.53
2,073.07
14.59
180.43
2,224.86
12.50
111.89
1,627.97
0.47
5.25
27.57
44.00
0.44
4.42
33.80
3.58
3.58
36.31
36.31
63
ITEM
DESCRIPCION PARTIDA
01
ESTRUCTURAS
01.02.03.04
01.03
01.03.01
01.03.04.01
01.03.04.02
COBERTURA
01.03.04.03
01.03.04.04
01.03.04.05
OTROS
01.03.01.01
01.03.02
01.03.02.01
01.03.02.02
01.03.02.03
01.03.03
01.03.03.01
01.03.03.02
01.03.04
UNIDAD METRADO
kg
und
und
und
und
und
und
und
und
ml
ml
ml
m2
ml
606.76
2.00
3.00
2.00
1.00
1.00
2.00
2.00
1.00
404.47
17.45
64.00
319.90
29.71
METRADO
AGOSTO
METRADO
SETIEMBRE
METRADO METRADO
OCTUBRE NOVIEMBRE
303.38
303.38
2.00
3.00
2.00
1.00
1.00
2.00
2.00
1.00
404.47
17.45
64.00
319.90
29.71
64
ITEM
DESCRIPCION PARTIDA
UNIDAD METRADO
01
ESTRUCTURAS
01.03.05
01.03.05.03
glb
FLETE TERRESTRE
glb
MITIGACION IMPACTO AMBIENTAL
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESI und
und
DISEO DE MEZCLAS
01.03.05.04
ARQUITECTURA
01.03.05.05
01.03.05.06
01.03.05.07
01.03.05.08
01.03.05.09
01.03.05.17
01.03.05.18
CIELORRASOS
01.03.05.19
01.03.05.20
PISOS Y PAVIMENTOS
01.03.05.21
01.03.06
m2
CONTRAPISO DE 2"
m2
PISO DE PORCELANATO DE 60X60 CM.
m2
PISO DE LOSETA VINILICA A=1.6 MM.
PISO DE CEMENTO SIN COLOREAR ACABADO FROTACHADO E=1m2
01.03.06.01
ZOCALOS Y CONTRAZOCALOS
01.03.07
01.03.07.01
01.03.07.02
CARPINTERIA DE MADERA
01.03.05.01
01.03.05.02
01.03.05.10
01.03.05.11
01.03.05.12
01.03.05.13
01.03.05.14
01.03.05.15
01.03.05.16
01.03.05.22
01.03.05.23
m2
m2
m2
m2
m2
m2
m2
m2
m
m2
m2
m
1.00
1.00
4.00
3.00
METRADO
AGOSTO
METRADO
SETIEMBRE
METRADO METRADO
OCTUBRE NOVIEMBRE
0.50
0.50
1.00
4.00
3.00
259.37
210.95
259.37
210.95
56.42
671.85
10.03
65.10
150.06
40.10
3.20
4.42
221.19
25.00
31.42
250.00
421.85
10.03
40.00
25.10
70.00
80.06
40.10
3.20
4.42
221.19
222.86
85.35
133.86
52.99
56.42
256.19
319.85
222.86
85.35
133.86
52.99
56.42
256.19
65
ITEM
DESCRIPCION PARTIDA
UNIDAD METRADO
01
ESTRUCTURAS
01.03.07.03
01.03.07.04
01.03.07.05
CARPINTERIA METALICA
01.03.08
01.03.08.02
m2
VENTANA DE ALUMINIO
PUERTA METAL LAC 1/16" C/MARCO 2"X2"X1/4" Y REFUERZOS m2
glb
PANEL METALICO
01.03.09
CERRAJERIA
01.03.09.01
01.03.10.01
01.03.10.02
01.03.11
01.03.11.01
JARDINERIA
01.03.11.02
01.03.12
01.03.12.01
PINTURA
01.03.08.01
01.03.09.02
01.03.10
m2
m2
4.18
40.68
48.05
8.25
1.00
pza
pza
und
und
6.00
42.00
7.00
7.00
p2
528.58
m2
m2
65.67
65.67
METRADO
AGOSTO
METRADO
SETIEMBRE
METRADO METRADO
OCTUBRE NOVIEMBRE
4.18
40.68
528.58
66
ITEM
DESCRIPCION PARTIDA
01
ESTRUCTURAS
01.03.12.02
01.03.12.07
01.03.12.08
01.03.13
01.03.14
01.03.14.01
VARIOS
01.03.14.02
01.03.14.03
UNIDAD METRADO
m2
m2
m2
m2
m2
m2
319.85
215.15
671.85
10.03
51.24
89.72
METRADO
AGOSTO
METRADO
SETIEMBRE
METRADO METRADO
OCTUBRE NOVIEMBRE
107.58
335.93
5.02
25.62
7.00
8.00
7.00
4.00
INSTALACIONES ELECTRICAS
01.03.14.04
01.03.14.05
34.00
2.00
32.00
4.00
50.00
01.04.01
und
INTERRUPTOR SIMPLE
und
INTERRUPTOR DOBLE
pto
SALIDA DE CENTRO DE LUZ
pto
SALIDA PARA SPOT-LIGHT
pto
SALIDA PARA TOMACORRIENTE DOBLE
pto
SALIDA P/TOMACORRIENTE BIPOLAR SIMPLE A PRUEBA DE AGUA
4.00
01.04.01.01
01.04.01.02
ml
ml
3.75
1.55
3.75
01.04.02
1.55
01.04.02.01
ml
189.30
189.30
01.04.02.02
ml
137.70
137.70
01.04.02.03
01.04.02.04
378.60
01.03.12.03
01.03.12.04
01.03.12.05
01.03.12.06
01.03.13.01
01.03.13.02
01.03.14.06
01.03.14.07
01.03.14.08
01.04
und
pza
und
pza
7.00
8.00
7.00
4.00
glb
1.00
34.00
2.00
32.00
4.00
50.00
4.00
378.60
67
ITEM
DESCRIPCION PARTIDA
UNIDAD METRADO
01
ESTRUCTURAS
01.04.02.05
01.04.03.01
CABLE
CABLE
CABLE
CABLE
01.04.03.02
01.04.03.03
01.04.04.04
TABLERO GENERAL
TABLEROS DISTRIBUCION CAJA METALICA
INTERRUPTOR THERMOMAGNETICO MONOFASICA 40A
INTERRUPTOR THERMOMAGNETICO MONOFASICA 20A
INTERRUPTOR THERMOMAGNETICO MONOFASICA 15A
MEDIDOR DE LUZ
01.04.04.05
POZO DE TIERRA
01.04.04.06
01.04.05
ARTEFACTOS ELECTRICOS
01.04.05.01
01.04.02.06
01.04.03
01.04.04
01.04.04.01
01.04.04.02
01.04.04.03
01.04.05.02
01.04.06
01.04.06.01
ELECTRICO
ELECTRICO
ELECTRICO
ELECTRICO
TW
TW
TW
TW
AWG-MCM
AWG-MCM
AWG-MCM
AWG-MCM
NO.
NO.
NO.
NO.
12 -4.0 MM2.
8 -10 MM2.
10 -6 MM2.
16 -1.5 MM2.
m
m
m
m
275.40
7.50
2.00
42.30
und
pza
pza
pza
pza
und
1.00
1.00
1.00
4.00
7.00
1.00
und
1.00
19.00
13.00
6.00
1.00
METRADO
AGOSTO
METRADO
SETIEMBRE
METRADO METRADO
OCTUBRE NOVIEMBRE
275.40
7.50
2.00
42.30
68
ITEM
DESCRIPCION PARTIDA
UNIDAD METRADO
METRADO
AGOSTO
METRADO
SETIEMBRE
METRADO METRADO
OCTUBRE NOVIEMBRE
01.04.06.02
ESTRUCTURAS
INSTALACIONES SANITARIAS
01.04.06.03
SISTEMA DE DESAGUE
01.04.06.04
SALIDA DE DESAGUE
01.04.06.05
7.00
16.00
01.04.07
4.00
01.04.07.01
REDES DE DISTRIBUCION
01.04.07.01.01
45.68
51.50
01.04.07.02
97.18
01.04.07.02.01
ACCESORIOS DE REDES
01.04.07.02.02
11.00
8.00
14.00
5.00
01.04.07.04.02
01.04.07.04.03
ADITAMENTOS VARIOS
01.04.07.04.04
01.04.07.06
01.04.07.06.01
CAMARAS DE INSPECCION
01.04.07.07
01.04.07.07.01
01.04.07.07.02
01.04.07.07.03
01.05
01.05.01
REDES DE DISTRIBUCION
01
01.04.06.06
01.04.07.01.02
01.04.07.03
01.04.07.03.01
01.04.07.04
01.04.07.04.01
01.04.07.05
01.04.07.05.01
pto
pto
pto
ml
ml
m
pza
pza
pza
pza
pza
pza
7.00
16.00
4.00
45.68
51.50
97.18
11.00
8.00
14.00
5.00
3.00
11.00
3.00
11.00
4.00
7.00
12.00
4.00
1.00
1.00
24.00
und
und
und
pza
pza
pza
pto
4.00
7.00
12.00
4.00
1.00
1.00
24.00
69
ITEM
DESCRIPCION PARTIDA
01
ESTRUCTURAS
01.05.01.01
01.05.02
01.05.02.01
01.05.02.02
01.05.02.04
01.05.03
01.05.03.01
01.05.04.01
01.05.04.02
UNIDAD METRADO
m
m
m
75.95
4.50
38.75
METRADO
AGOSTO
METRADO
SETIEMBRE
METRADO METRADO
OCTUBRE NOVIEMBRE
75.95
4.50
38.75
30.00
22.00
23.00
145.80
17.00
15.00
EQUIPAMIENTO
01.05.05
01.05.05.01
EQUIPAMIENTO DE CONSULTORIO
EQUIPAMIENTO DE TOPICO
01.05.01.02
01.05.02.03
01.05.03.02
01.05.03.03
01.05.04
01.05.05.02
pza
und
und
30.00
22.00
23.00
ml
ml
und
und
pza
81.85
145.80
17.00
15.00
2.00
glb
glb
1.00
1.00
70
ITEM
DESCRIPCION PARTIDA
01
ESTRUCTURAS
01.05.06
EQUIPAMIENTO
EQUIPAMIENTO
EQUIPAMIENTO
EQUIPAMIENTO
01.05.06.01
01.05.06.02
01.05.06.03
DE
DE
DE
DE
UNIDAD METRADO
glb
glb
glb
glb
1.00
1.00
1.00
1.00
METRADO
AGOSTO
METRADO
SETIEMBRE
METRADO METRADO
OCTUBRE NOVIEMBRE
71
7/23/2015
Plazo de Ejecucin:
UBICACIN:
90
Fecha de Terminacin:
Regin:
###
Provincia
TARMA
TARMA
Reg. CIP:
76804
Distrito:
Reg. CIP:
63404
Localidad:
METRADO
ANTERIOR
JUNIN
METRADO
POR
VALORIZAR
METRADO
ACTUAL
1.00
100.00%
0.00
1.00
100.00%
58.90
100.00%
0.00
58.90
100.00%
3.00
100.00%
0.00
3.00
100.00%
METRADO
ACUMULADO
POMACHACA
0.00
436.53
100.00%
436.53
100.00%
0.00
436.53
100.00%
0.00
436.53
100.00%
0.00
1.00
100.00%
0.00
1.00
100.00%
43.65
100.00%
0.00
43.65
100.00%
436.53
100.00%
0.00
436.53
100.00%
50.33
100.00%
0.00
50.33
100.00%
68.42
100.00%
0.00
68.42
100.00%
12.46
100.00%
0.00
12.46
100.00%
72
METRADO
ANTERIOR
METRADO
ACTUAL
METRADO
ACUMULADO
METRADO
POR
VALORIZAR
11.50
100.00%
0.00
11.50
100.00%
142.37
100.00%
0.00
142.37
100.00%
39.10
100.00%
0.00
39.10
100.00%
0.00
11.50
0.00
0.00
50.33
100.00%
48.87
0.00
50.33
48.87
11.21
100.00%
122.21
100.00%
0.00
100.00%
0.00
100.00%
0.00
122.21
100.00%
0.00
298.32
100.00%
298.32
0.00
100.00%
0.00
11.21
-
100.00%
100.00%
0.00
0.00
73
METRADO
ANTERIOR
METRADO
ACTUAL
METRADO
ACUMULADO
0.00
1.73
0.00
2.46
0.00
0.00
24.44
100.00%
691.04
0.00
691.04
100.00%
0.00
24.44
100.00%
METRADO
POR
VALORIZAR
12.20
100.00%
0.00
204.53
100.00%
0.00
2,073.07
100.00%
0.00
14.59
2,224.86
12.20
100.00%
204.53
100.00%
2,073.07
100.00%
0.00
100.00%
180.43
100.00%
0.00
14.59
100.00%
0.00
180.43
100.00%
0.00
2,224.86
100.00%
12.50
100.00%
0.00
12.50
100.00%
0.00
111.89
100.00%
0.00
111.89
100.00%
1,627.97
100.00%
0.00
1,627.97
100.00%
0.47
100.00%
0.00
0.47
100.00%
5.25
100.00%
5.25
100.00%
27.57
100.00%
27.57
100.00%
44.00
100.00%
44.00
100.00%
0.00
0.44
100.00%
0.00
4.42
100.00%
0.44
100.00%
0.00
4.42
100.00%
33.80
0.00
33.80
100.00%
0.00
3.58
50.00%
36.31
50.00%
3.58
50.07%
7.16
100.07%
-0.00
36.31
50.00%
72.62
100.00%
74
METRADO
ANTERIOR
303.38
METRADO
ACTUAL
50.00%
303.38
50.00%
METRADO
ACUMULADO
606.76
100.00%
METRADO
POR
VALORIZAR
0.00
2.00
100.00%
2.00
100.00%
3.00
100.00%
3.00
100.00%
2.00
100.00%
2.00
100.00%
1.00
100.00%
1.00
100.00%
1.00
100.00%
1.00
100.00%
2.00
100.00%
2.00
100.00%
2.00
100.00%
2.00
100.00%
1.00
100.00%
1.00
100.00%
404.47
100.00%
404.47
100.00%
17.45
100.00%
17.45
100.00%
64.00
100.00%
64.00
100.00%
0.00
319.90
100.00%
319.90
100.00%
29.71
100.00%
29.71
100.00%
0.00
75
METRADO
ANTERIOR
METRADO
ACTUAL
METRADO
ACUMULADO
METRADO
POR
VALORIZAR
0.50
50.00%
1.00
100.00%
1.00
100.00%
1.00
100.00%
4.00
100.00%
0.00
4.00
100.00%
3.00
100.00%
0.00
3.00
100.00%
0.50
0.00
0.00
259.37
100.00%
210.95
100.00%
0.00
259.37
100.00%
0.00
210.95
100.00%
56.42
100.00%
0.00
25.00
44.31%
31.42
55.69%
250.00
37.21%
421.85
62.79%
671.85
100.00%
10.03
100.00%
10.03
100.00%
40.00
61.44%
25.10
38.56%
65.10
100.00%
70.00
46.65%
80.06
53.35%
150.06
100.00%
40.10
100.00%
40.10
100.00%
3.20
100.00%
3.20
100.00%
4.42
100.00%
4.42
100.00%
221.19
100.00%
221.19
100.00%
0.00
-
0.00
0.00
319.85
-
222.86
100.00%
222.86
100.00%
85.35
100.00%
85.35
100.00%
133.86
100.00%
133.86
100.00%
52.99
100.00%
52.99
100.00%
0.00
56.42
100.00%
56.42
100.00%
256.19
100.00%
256.19
100.00%
0.00
76
METRADO
ANTERIOR
METRADO
ACUMULADO
METRADO
POR
VALORIZAR
METRADO
ACTUAL
4.18
100.00%
4.18
100.00%
40.68
100.00%
40.68
100.00%
0.00
0.00
48.05
0.00
8.25
0.00
1.00
0.00
0.00
6.00
0.00
42.00
0.00
7.00
0.00
7.00
100.00%
528.58
0.00
528.58
100.00%
0.00
0.00
0.00
0.00
65.67
65.67
77
METRADO
ANTERIOR
METRADO
ACTUAL
METRADO
ACUMULADO
METRADO
POR
VALORIZAR
319.85
107.58
50.00%
107.58
50.00%
107.58
335.93
50.00%
335.93
50.00%
335.93
5.02
50.00%
5.02
50.00%
5.02
25.62
50.00%
25.62
50.00%
25.62
0.00
89.72
0.00
0.00
7.00
100.00%
7.00
100.00%
8.00
100.00%
8.00
100.00%
7.00
100.00%
7.00
100.00%
4.00
100.00%
4.00
100.00%
1.00
0.00
-
0.00
0.00
0.00
34.00
100.00%
34.00
100.00%
2.00
100.00%
2.00
100.00%
32.00
100.00%
32.00
100.00%
4.00
100.00%
4.00
100.00%
50.00
100.00%
50.00
100.00%
4.00
100.00%
4.00
100.00%
0.00
3.75
100.00%
1.55
0.00
3.75
100.00%
0.00
1.55
100.00%
189.30
100.00%
0.00
189.30
100.00%
137.70
100.00%
0.00
137.70
100.00%
0.00
-
378.60
100.00%
378.60
100.00%
78
METRADO
ANTERIOR
METRADO
ACUMULADO
275.40
100.00%
275.40
100.00%
7.50
100.00%
7.50
100.00%
2.00
100.00%
2.00
100.00%
42.30
100.00%
42.30
100.00%
0.00
-
METRADO
POR
VALORIZAR
METRADO
ACTUAL
0.00
1.00
0.00
1.00
0.00
1.00
0.00
4.00
0.00
7.00
0.00
1.00
1.00
0.00
0.00
0.00
-
0.00
19.00
0.00
13.00
0.00
6.00
0.00
1.00
79
METRADO
ANTERIOR
METRADO
ACTUAL
METRADO
ACUMULADO
METRADO
POR
VALORIZAR
0.00
0.00
0.00
7.00
100.00%
0.00
7.00
100.00%
16.00
100.00%
0.00
16.00
100.00%
4.00
0.00
4.00
100.00%
0.00
45.68
100.00%
51.50
100.00%
0.00
45.68
100.00%
0.00
51.50
100.00%
97.18
0.00
97.18
100.00%
0.00
11.00
100.00%
8.00
14.00
100.00%
5.00
3.00
100.00%
11.00
100.00%
0.00
11.00
100.00%
0.00
8.00
100.00%
0.00
14.00
100.00%
0.00
5.00
100.00%
0.00
3.00
100.00%
0.00
11.00
100.00%
0.00
4.00
100.00%
4.00
100.00%
7.00
100.00%
7.00
100.00%
12.00
100.00%
12.00
100.00%
4.00
100.00%
4.00
100.00%
0.00
1.00
0.00
1.00
100.00%
0.00
1.00
100.00%
1.00
100.00%
0.00
0.00
24.00
0.00
0.00
24.00
-
100.00%
80
METRADO
ANTERIOR
METRADO
ACUMULADO
METRADO
POR
VALORIZAR
METRADO
ACTUAL
75.95
100.00%
0.00
75.95
100.00%
4.50
100.00%
0.00
4.50
100.00%
38.75
0.00
38.75
100.00%
0.00
30.00
100.00%
0.00
30.00
100.00%
22.00
100.00%
0.00
22.00
100.00%
23.00
100.00%
23.00
100.00%
145.80
100.00%
17.00
100.00%
15.00
-
0.00
0.00
81.85
0.00
145.80
100.00%
0.00
17.00
100.00%
0.00
15.00
100.00%
0.00
2.00
0.00
0.00
0.00
1.00
0.00
1.00
81
METRADO
ANTERIOR
METRADO
ACTUAL
METRADO
ACUMULADO
METRADO
POR
VALORIZAR
0.00
1.00
0.00
1.00
0.00
1.00
0.00
1.00
82
VALORIZACION DE OBRA
Periodo: AGOSTO 2015
CALCULO
Obra : CONSTRUCCION Y EQUIPAMIENTO DEL PUESTO DE SALUD DE POMACHACA DISTRITO DE TARMA, PROVINCIA DE TAR
Frmula Polinmi
00
Entidad:
Contratista:
CONSORCIO POMACHACA
Valor Referencial:
S/. 590,177.81
Monto de Contrato:
S/. 590,177.81
Fecha V.R.:
42208
Modalidad de Ejecucin:
Area Geogrfica:
03
Residente de Obra:
Supervisor de Obra:
UBICACIN:
Regin:
JUNIN
Provincia
TARMA
Distrito:
TARMA
Localidad:
POMACHACA
Mononomio
Simbolo
AAC
Elemento Representativo
Acero de Construccion Corrugado
Agregado Grueso
Cemento portland Tipo I
Cdigo
N
03
Coef.
Inc.
0.208
05
Jul-15
37.500%
35.096%
21
Ind. Base
27.404%
49
0.065
100.000%
30
0.092
100.000%
Adelanto Directo
Adelanto Materiales
Jan-14
Jan-14
Indice
Indice
Jan-14
Indice
446.97
474.67
474.67
474.67
167.61
178.00
178.00
178.00
377.24
388.14
388.14
388.14
132.40
136.22
136.22
136.22
354.74
354.74
354.74
354.74
97.21
97.21
97.21
97.21
233.87
249.28
249.28
249.28
233.87
249.28
249.28
249.28
358.44
381.51
381.51
381.51
358.44
381.51
381.51
381.51
4
5
6
T
M
I
72
47
COEFICIENTE
DE
39
REAJUSTE
0.121
0.251
0.263
K =
100.000%
100.000%
100.000%
359.22
370.19
370.19
370.19
359.22
370.19
370.19
370.19
471.44
498.10
498.10
498.10
471.44
498.10
498.10
498.10
386.60
393.46
393.46
393.46
386.60
393.46
393.46
393.46
1.000
1.000
###
N DE OBRA N 02
GOSTO 2015
LO
DE
76804
Reg. CIP:
63404
Periodo:
AGOSTO 2015
7/23/2015
De:
7/23/2015
Plazo de Ejecucin:
90 dias
Al:
8/31/2015
Fecha de Terminacin:
10/21/2015
Mar-14
K
Indice
Apr-14
K
Indice
May-14
K
Indice
Jun-14
Indice
Jul-14
K
Indice
Aug-14
K
Indice
1.000
1.000
1.000
1.000
VALORIZACION DE OBRA N 02
Periodo: AGOSTO 2015
Obra :
Frmula Polinmica:
Unica
Entidad:
Contratista:
CONSORCIO POMACHACA
Valor Referencial:
S/. 590,177.81
Monto de Contrato:
S/. 590,177.81
Fecha V.R.:
Supervisor de Obra:
Fecha Inicio plazo contractual:
7/23/2015
Modalidad de Ejecucin:
Plazo de Ejecucin:
VALORIZACIONES
N
Residente de Obra:
Fecha de Terminacin:
AVANCE
PERIODO
PROGRAMADO
DEL
AL
01
7/23/2015
8/31/2015
130,612.83
02
9/1/2015
9/30/2015
177,757.69
03
10/1/2015
10/20/2015
113,598.23
180,750.00
421,968.75
7/23/2015
90
10/21/2015
C= VALx(Kr-1)
Kr
CALENDARIO
VALORIZACION
REINTEGRO
RECONOCIDO
ADELANTADA
1.000
RETRASADA
1.000
RETRASADA
1.000
TOTALES
REAJUSTE
ANALISIS
DE OBRA
REAL
180,750.00
AGOSTO 2015
DESCRIPCION
MONTO (S/.)
Monto de Contrato:
S/. 590,177.81
ADELANTO BASE
S/. 118,035.56
Factor de Descuento:
0.00%
100,030.14
18,005.42
118,035.56
VALORIZACION
VALORIZACION N 01 (Agosto-2015)
COSTO TOTAL
AMORTIZACIO
IGV
AMORTIZACION MONTO DEL
N
AMORTIZACIO
DEL MES
ADELANTO
DEL MES
N
(Con IGV)
(Inc. IGV)
(Sin IGV)
MENSUAL
213,285.00
18,005.42
118,035.56
118,035.56
100,030.14
MONTO
VALORIZADO
SALDO POR
AMORTIZAR
(Inc. IGV)
-
VALORIZACION N 02 (Setiembre-2015)
VALORIZACION N 03 (Octubre-2015)
TOTAL ACUMULADO
213,285.00
100,030.14
18,005.42
118,035.56
VALORIZACION DE OBRA N 02
Periodo: AGOSTO 2015
Obra :
Frmula Polinmica:
Varias
Entidad:
Contratista:
CONSORCIO POMACHACA
Valor Referencial:
S/. 590,177.81
Regin:
Monto de Contrato:
S/. 590,177.81
Provincia
TARMA
Fecha V.R.:
42208
Distrito:
TARMA
Modalidad de Ejecucin:
Residente de Obra:
Supervisor de Obra:
Localidad:
De = A x VAL / C x ( K /
FORMULA:
D.S. N 017-79-VC
DONDE:
De :
VALORIZACION
N
01
DEL
AL
7/23/2015
8/31/2015
MONTO
180,750.00
Err:509
Reg. CIP:
76804
JUNIN
Fecha Inicio plazo contractual:
7/23/2015
Plazo de Ejecucin:
POMACHACA
90
Fecha de Terminacin:
10/21/2015
Ka - 1 )
Deduccin del Reajuste generado por el Adelanto en Efectivo
Monto del Adelanto Otorgado en Efectivo
V:
C:
K:
Err:509
A:
Ka:
PERIODO
Ka
Kr
AD. EFECTIVO
mes de dic.
Deduccion
(Kr / Ka - 1)
g= (e / f - 1)
Ax(VAL/C)x(K/Ka-1)
h= a x d x g
-
02
9/1/2015
9/30/2015
03
10/1/2015
10/20/2015
00
12/30/1899
12/30/1899
00
12/30/1899
12/30/1899
00
12/30/1899
12/30/1899
12/30/1899
00
12/30/1899
1,263,046.61
252.53%
#REF!
1,263,046.61
00
12/30/1899
12/30/1899
00
12/30/1899
12/30/1899
00
12/30/1899
12/30/1899
00
12/30/1899
12/30/1899
12/30/1899
12/30/1899
TOTALES
180,750.00
252.53%
#REF!
-
VALORIZACION DE OBRA N 02
Periodo: AGOSTO 2015
Obra :
Frmula Polinmica:
Varias
Entidad:
Contratista:
CONSORCIO POMACHACA
Valor Referencial:
S/. 590,177.81
Regin:
Monto de Contrato:
S/. 590,177.81
Provincia
TARMA
Distrito:
TARMA
Residente de Obra:
Supervisor de Obra:
S/. 118,035.56
Fecha V.R.:
7/23/2015
Modalidad de Ejecucin:
Localidad:
POMACHACA
AMORT = AxVAL/C
FORMULA:
D.S. N 017-79-VC
DONDE:
De :
A:
V:
C:
K:
Ka:
VALORIZACION
N
PERIODO
Monto
por Amortizar
MONTO
MONTO
AxVAL/C
e= a x d
DEL
AL
01
7/23/2015
8/31/2015
02
9/1/2015
9/30/2015
03
10/1/2015
12/30/1899
10/20/2015
12/30/1899
TOTALES
Amortizacin
213,285.00
213,285.00
100,030.14
100,030.14
f
100,030.14
Saldo a
Amortizar
g= f - e
MONTO
RENOVACION
CARTA FIANZA
-
0.00%
-
100,030.14
CONSTRUCCION Y EQUIPAMIENTO DEL PUESTO DE SALUD DE POMACHACA DISTRITO DE TARMA, PROVINCIA DE TARMA - JUNIN
Periodo:
AGOSTO 2015
DESCRIPCION
MONTO (S/.)
Monto de Contrato:
S/. 590,177.81
ADELANTO BASE
S/. 236,071.12
200,060.27
36,010.85
236,071.12
AMORTIZACION
DEL MES
(Sin IGV)
MONTO DEL
ADELANTO
(Inc. IGV)
Factor de Descuento:
0.00%
VALORIZACION
VALORIZACION N 01 (Agosto-2015)
MONTO
VALORIZADO
213,285.00
AMORTIZACION
IGV
DEL MES
AMORTIZACION
(Inc. IGV)
MENSUAL
36,231.66
5,526.86
30,704.79
236,071.12
SALDO POR
AMORTIZAR
(Inc. IGV)
199,839.47
VALORIZACION N 02 (Setiembre-2015)
VALORIZACION N 03 (Octubre-2015)
TOTAL ACUMULADO
213,285.00
36,231.66
5,526.86
30,704.79
199,839.47
VALORIZACION DE OBRA N 02
Periodo: AGOSTO 2015
Obra :
Frmula Polinmica:
Varias
Entidad:
Contratista:
CONSORCIO POMACHACA
Valor Referencial:
S/. 590,177.81
C/IGV
Regin:
Monto de Contrato:
S/. 590,177.81
C/IGV
Provincia
TARMA
S/. 236,071.12
C/IGV
Distrito:
TARMA
Jul-15
Modalidad de Ejecucin:
Residente de Obra:
Supervisor de Obra:
Localidad:
POMACHACA
D.S. N 017-79-VC
DONDE:
P. Unit.
Precio Unitario
Ima
Imo
Fr.
factor de Relacion
VALORIZACION
N
01
PERIODO
DEL
AL
7/23/2015
8/31/2015
Amortizacin
Monto
MONTO
mes
por Amortizar
AMORT
213,285.00
30,704.79
200,060.27
Saldo a
MONTO
Amortizar
RENOVACION
g= f - AMORT CARTA FIANZA
169,355.48
199,839.47
02
9/1/2015
9/30/2015
03
10/1/2015
10/20/2015
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
200,060.27
0.00%
200,060.27
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
TOTALES
0.00%
30,704.79
200,060.27
169,355.48
199,839.47
01
0
Residente de Obra:
Supervisor de Obra:
Descripcion
Und P. Unitario
Anterior
Cant.
Kg
Kg
Kg
Kg
4.10
4.10
4.10
3.12
0.00
0.00
0.00
0.00
M3
M3
M3
M3
M3
UND
UND
M3
M3
110.00
110.00
100.00
80.00
90.00
31.19
103.00
20.00
150.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
BOL
16.86
0.00
GLN
UND
UND
P2
28.00
24.50
25.00
3.80
0.00
0.00
0.00
0.00
17.41
67.65
0.00
0.00
AGREGADO GRUESO
PIEDRA CHANCADA 1/2"
PIEDRA CHANCADA 3/4"
ARENA FINA
ARENA GRUESA
HORMIGON
CAJA DE C DE DESAGUE DE 12"X24"
TAPA PRE FABRICADA DE CONCRETO ARMADO
MATERIAL SELECTO
ARENA SELECTA P/FILTRO LENTO
111.86
50.14
29.24
12.30
26.55
45.66
7.74
6.20
5.21
38.42
23.46
14.88
37.03
42.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EDUCCION DE MATERIALES
y Utilizados en el Mes
Mes de Valorizacion:
AGOSTO 2015
PALOMINO VASQUEZ
0.00
0.00
0.00
0.00
Valorizacion de Materiales
Actual
Acumluado
Cant.
P.Parcial
Cant.
P.Parcial
1,477.00
123.00
30.00
80.00
60.00
250.00
123.00
328.00
246.00
780.00
30.00
80.00
60.00
250.00
19,523.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
70.00
0.00
70.00
50.00
20.00
0.00
0.00
0.00
1,100.00
7,700.00
0.00
5,600.00
4,500.00
623.80
0.00
0.00
0.00
4,215.00
0.00
250.00
4,215.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,437.10
0.00
0.00
10.00
0.00
174.10
0.00
488,789.78
0.00
0.00
0.00
0.00
4,437.10
10.00
0.00
424,000.00
4,215.00
0.00
0.00
0.00
0.00
0.00
558,000.00
1,100.00
7,700.00
0.00
5,600.00
4,500.00
623.80
0.00
0.00
0.00
4,215.00
250.00
610,000.00
123.00
328.00
246.00
780.00
19,523.80
10.00
70.00
0.00
70.00
50.00
20.00
0.00
0.00
0.00
Monto Max
174.10
0.00
900,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
150.00
50.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,519.00
744.00
0.00
0.00
29,652.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
150.00
50.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,519.00
744.00
0.00
0.00
28,298.90
2,980,789.78