Académique Documents
Professionnel Documents
Culture Documents
Project
Type:
Owner:
Architect:
Engineer:
General
Contractor/
CM:
Fabricator:
Steel
Erector:
Completion:
2006
Spans:
46 and 62 spans
CB 27 x 35/40 @ 46 spans
CB 30 x 57/73 @ 62 spans
Spacing:
Comments:
Value engineering redesign
and coordination between Fabricator and
Design Structural Engineer represented a
construction time savings of 1 year from
that of precast concrete.