R.N.No. :C1-NRS-002

SIRJAN (SAMANGAN) CCPP

Sub Contractor :

Item :STUD BOLTS+NUTS (GALVANIZED)

NIROO RESAN SAHAND CO.

Client : MAPNA-MD1
Coded by

Document Reference
Rev.

DWG No.

Description

Item No.

Quantity (set)

Weight ( kg )

GALVANIZED HEX. STUD BOLT, A307-B7+2NUT,


A194-2H SIZE: (7/8"X180)

300

219.90

GALVANIZED HEX. STUD BOLT, A307-B7+2NUT,


A194-2H SIZE: (3/4"X180)

80

41.76

GALVANIZED HEX. STUD BOLT, A307-B7+2NUT,


A19- 2H SIZE: (3/4"X160)

800

388.00

GALVANIZED HEAVY HEX. STUD BOLT, A307B7+2NUT, A194-2H SIZE: (5/8"X120)

240

62.64

Remarks

5
712.30
6

10

11

12

13

14

15

Quality Checks according to QCP and/or QC's based on special Contract requirement were performed .
Contractor certifies that it's representative has supervised/inspected the quality of above mentioned equipment .
Considering the terms and conditions
of the contract (mentioned), hereby MAPNA(MD1) and contractor release the equipment for shipment .

Comment :

REQUEST FOR INSPECTION NO C1-NRS-002


Contractor

MAPNA MD1

Name: E- Mansoorian

Name:

Date:

Date:

Sign:

Sign:

. QA QA :

MD1PR-FQP01/02-01

RELEASED NOTE

Date : 1395/02/28
Site :

Page :1

R.N.No. : C1-NRS-002

SIRJAN (SAMANGAN) CCPP

Sub Contractor:

Item : STUD BOLTS+NUTS (GALVANIZED)

NIROO RESAN SAHAND CO.

Client : MAPNA-MD1

Document Reference

Coded by
Rev.

DWG No.

Description

Item No.

Quantity (set)

Weight ( kg )

GALVANIZED HEX. STUD BOLT, A307-B7+2NUT,


A194-2H SIZE: (7/8"X180)

300

219.90

GALVANIZED HEX. STUD BOLT, A307-B7+2NUT,


A194-2H SIZE: (3/4"X180)

80

41.76

GALVANIZED HEX. STUD BOLT, A307-B7+2NUT,


A19- 2H SIZE: (3/4"X160)

800

388.00

GALVANIZED HEAVY HEX. STUD BOLT, A307B7+2NUT, A194-2H SIZE: (5/8"X120)

240

62.64

Remarks

712.30

10

11

12

13

14

15
Quality Checks according to QCP and/or QC's based on special Contract requirement were performed .
Contractor certifies that it's representative has supervised/inspected the quality of above mentioned equipment .
Considering the terms and conditions of the contract (mentioned),
hereby MAPNA(MD1) and contractor release the equipment for shipment .
Comment :

REQUEST FOR INSPECTION NO C1-NRS-002


MAPNA MD1

Contractor
Name:
Date:

E, Mansoorian

Sign:

MAPNA MD2

Name: Y- Fadaei
Date:

Name:
Date:

Sign:

Sign:

. QA QA :