Académique Documents
Professionnel Documents
Culture Documents
Date : 1395/02/28
Site :
Page :1
R.N.No. :C1-NRS-002
Sub Contractor :
Client : MAPNA-MD1
Coded by
Document Reference
Rev.
DWG No.
Description
Item No.
Quantity (set)
Weight ( kg )
300
219.90
80
41.76
800
388.00
240
62.64
Remarks
5
712.30
6
10
11
12
13
14
15
Quality Checks according to QCP and/or QC's based on special Contract requirement were performed .
Contractor certifies that it's representative has supervised/inspected the quality of above mentioned equipment .
Considering the terms and conditions
of the contract (mentioned), hereby MAPNA(MD1) and contractor release the equipment for shipment .
Comment :
MAPNA MD1
Name: E- Mansoorian
Name:
Date:
Date:
Sign:
Sign:
. QA QA :
MD1PR-FQP01/02-01
RELEASED NOTE
Date : 1395/02/28
Site :
Page :1
R.N.No. : C1-NRS-002
Sub Contractor:
Client : MAPNA-MD1
Document Reference
Coded by
Rev.
DWG No.
Description
Item No.
Quantity (set)
Weight ( kg )
300
219.90
80
41.76
800
388.00
240
62.64
Remarks
712.30
10
11
12
13
14
15
Quality Checks according to QCP and/or QC's based on special Contract requirement were performed .
Contractor certifies that it's representative has supervised/inspected the quality of above mentioned equipment .
Considering the terms and conditions of the contract (mentioned),
hereby MAPNA(MD1) and contractor release the equipment for shipment .
Comment :
Contractor
Name:
Date:
E, Mansoorian
Sign:
MAPNA MD2
Name: Y- Fadaei
Date:
Name:
Date:
Sign:
Sign:
. QA QA :
MD1PR-FQP01/02-01