Vous êtes sur la page 1sur 1

DESAGREGADO DE GASTOS POR ESPECFICAS

CONSTRUCCION DE ESTRADO CON VESTIDORES EN LA PLAZA DE ARMAS DE PERALVILLO

REV.:

FECHA:

ARQUITECTURA

N001

5/9/2016

CHANCAY

TEM

DESCRIPCIN

UND

COSTO UNITARIO

CANTIDAD

DIRECTO

IGV

PARCIAL

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-PERSONAL

20,728.97

OPERADOR DE EQUIPO LIVIANO

hh

6.3368

18.30

21.59

136.84

OPERARIO

hh

660.7105

18.30

21.59

14267.38

OFICIAL

hh

15.9368

15.30

18.05

287.72

PEON

hh

370.7385

13.80

16.28

6037.11

2.28

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-BIENES


5

CLAVOS PARA MADERA CON CABEZA DE 1"

11,022.01

kg

0.4296

4.50

5.31

CLAVOS PARA MADERA CON CABEZA DE 2"

kg

0.0912

4.50

5.31

0.48

CLAVOS PARA MADERA CON CABEZA DE 3"

kg

4.3200

4.50

5.31

22.94

ARENA FINA

m3

6.9001

47.46

56.00

386.42

ARENA GRUESA

m3

12.9269

30.00

35.40

457.61

5,829.7000

0.53

0.63

3,645.89

10

BLOQUE SILICICO ESTANDAR 11.5 X 24 X 9 cm

11

CEMENTO PORTLAND TIPO I (42.5 kg)

12

CERRADURA EXTERIOR DE DOS GOLPES

13

BISAGRA CAPUCHINA PLOMA 3" X 3"

14

TOTAL

135.7313

18.64

22.00

2,985.44

bls

1.0000

17.79

20.99

20.99

6.0000

1.50

1.77

10.62

BISAGRA CAPUCHINA PLOMA 3 1/2" X 3 1/2"

par

3.0000

2.00

2.36

7.08

15

CERRADEURA DE PERILLA EPOLEG BAO

par

2.0000

26.00

30.68

61.36

16

CAL HIDRATADA DE 30 Kg

8.0889

15.25

18.00

145.56

17

COLA SINTETICA FULLER

bls

0.8640

4.36

5.14

4.45

18

LIJA PARA MADERA

gal

20.8200

2.12

2.50

52.08

19

MADERA TORNILLO

95.4288

5.20

6.14

585.55

20

MADERA DE CEDRO (p2)

p2

103.2480

6.20

7.32

755.36

21

MADERA PINO PARA ANDAMIOS

p2

25.1100

5.50

6.49

162.96

22

MADERA PINO (REGLAS)

p2

11.0769

1.81

2.14

23.66

23

TRIPLAY LUPUNA DE 4' X 8' X 4 mm

p2

5.0880

25.00

29.50

150.10

24

PINTURA LATEX SUPERMATE

pl

13.7480

36.44

43.00

591.15

25

TAPAPOROS DE MADERA ACABADA CON BARNIZ O LACA

gal

5.0540

15.00

17.70

89.46

26

BARNIZ MARINO

gal

4.5450

35.51

41.90

190.44

27

PINTURA IMPRIMANTE PARA MUROS

gal

44.6810

12.71

15.00

670.12

29

HERRAMIENTAS MANUALES

518.56

611.90

629.46

30

MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3

hm

6.34

20.00

23.60

149.55

31

CEPILLADORA ELECTRICA

hm

1.92

15.00

17.70

33.98

25

SC DEMOLICION CONSTRUCCION EXISTENTE

550.00

649.00

2,271.50

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-SERVICIOS


%MO

1.0

812.99

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-SUBCONTRATOS


GLB

3.50

2,271.50

SUB TOTAL inc. I.G.V.

34,835.48
===============

TOTAL

S/. 34,835.48