Vous êtes sur la page 1sur 2

Working

Instrument Sheet
Establish :

2015.11.30

Document No

WI-P-A1255
Model

Err:502

Working Order & Method

Process No

2-18

Packing (2)

PAGE

#REF!

Err:504

[* Mark is a very important point]

Clamp PAD

A260140
FITMENT
TOP-UP
A260140
MIDDLE
FITMENT
UP
Installation
Guide &
TDS
A26014
0
FITMEN
T BT-UP

[Antenna]

1.Put the Clamp PAD Between Radome and Clamp


[Fitment-up Loading]
2.Put Antenna onto the Fitment-Down .
*.Check Fitment Quantity (Top-up(1ea), BT-up(1ea), Middle-up(2ea)
3.Put the Fitment-Up onto the Fitment-Down.

Caution
* Should wear gloves in working
* Should Check that Every S/N is matched up

Critical to Quality

Distinguish disposal into recycle and wastes.


Keep Chemical Harzardos in the desiganated cabinet, and
handling it by following safe rules (MSDS)

Packing (2)
Err:504

Process

A
p
p
r
o
v
a
l

Charge

Check

Confirm

Approval

Complete
Material & Quantity

oint]

*Former Antenna Ass'y Set


*CLAMP PAD
*A260140 FITMENT BT-UP
*A260140 FITMENT TOP-UP
*A260140 MIDDLE FITMENT UP

:
:
:
:
:

Clamp
PAD

Equipment & Tool

[Fitment-up Loading]

recycle and wastes.


s in the desiganated cabinet, and
e rules (MSDS)

Revision
Rev

Date

#REF!

Contents
Initial Registration

1
1
1
1
2

set
pcs
pcs
pcs
pcs

Vous aimerez peut-être aussi