Vous êtes sur la page 1sur 1

KEY FOCUS AREAS

KPI RUNNING BELOW TARGETS

Cause Analysis and Action plan for WUR every time it goes above 1.4

Line wise CPWD tracking. Focus on Manpower intensive lines.

CIP Tracker Report

CO2 Consumption in system is as per actual yield not 100%

Track Usage Variance of RM PM. Ensure timely correction of practices/BOM

Update Concentrate Yield File

Communicate Water Level and TDS Data for Goblej Pond

Ensure
o

Timely NPT (before 8). Approve/Revoke extra NPT on HSPET lines within 24hrs.

Correct M/C Time Entered in SAP

Proper Downtime Entry in Logbooks

Correct Maintenance order ZP01, ZP02, ZP03

Vous aimerez peut-être aussi