Vous êtes sur la page 1sur 16

MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO


TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

RESUMEN DE METRADOS DE TRANSPORTE


TRANSPORTE DE MATERIAL

PARTIDA

d<=1km

d>1km

m3-km

m3-km

278,186.20

2,446,820.05

MATERIAL DE SUBBASE GRANULAR

67,505.95

611,356.40

MATERIAL DE BASE GRANULAR

45,316.91

418,355.00

EXCEDENTES DE CORTE PARA RELLENOS

26,893.33

415,284.90

MATERIAL PARA RELLENOS Y MEJORAMIENTOS

61,077.00

577,599.80

3,777.81

12,339.70

AGREGADO PARA CONCRETO HIDRAULICO

28,793.36

187,156.90

MATERIAL DE FILTRO DRENANTE

21,691.77

140,996.50

MATERIAL PARA RELLENO DE ESTRUCTURAS

23,130.07

83,730.85

528,695.30

1,106,424.50

492,280.70

1,036,404.50

36,414.60

70,020.00

TRANSPORTE DE ROCA DE CANTERA

5,096.20

109,413.40

TRANSPORTE DE MEZCLA ASFALTICA

15,717.25

168,130.70

TIPO DE TRANSPORTE
TRANSPORTE DE MATERIAL GRANULAR

PIEDRA PARA PEDRAPLENES, GAVIONES Y DISIPADORES

TRANSPORTE DE MATERIAL EXCEDENTE A DME


MATERIAL DE EXPLANACIONES
MATERIAL DE DERRUMBES

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

METRADOS DE TRANSPORTE DE MATERIAL DE RELLENO DE CANTERA


CANTERA LA ARENA II

UBICACIN

MATERIAL PARA RELLENO

UBICACIN (KM)

21.480

ACCESO (KM)

0.050

MEJORAM.
SECTORES
CRITICOS

VOLUMEN
TOTAL

DISTANCIA
TRANSP.

MATERIAL

MOMENTO

CANTERA BARRO NEGRO


TRANSPORTE DE
MATERIAL DE CANTERA

UBICACIN (KM)

26.160

ACCESO (KM)

0.500

DISTANCIA
TRANSP.

MATERIAL

MOMENTO

CANTERA LA COLPA I
TRANSPORTE DE
MATERIAL DE CANTERA

UBICACIN (KM)

35.480

ACCESO (KM)

0.050

DISTANCIA
TRANSP.

MATERIAL

MOMENTO

TRANSPORTE DE
MATERIAL DE CANTERA

INICIO

FINAL

LONG.

C.G.

PLATAFORMA

MEJORAM.
PLATAFORMA

TRANSPORTE

D <= 1 KM

D > 1 KM

TRANSPORTE

D <= 1 KM

D > 1 KM

TRANSPORTE

D <= 1 KM

D > 1 KM

00+000
01+000
02+000
03+000
04+000
05+000
06+000
07+000
08+000
09+000
10+000
11+000
12+000
13+000
14+000

01+000
02+000
03+000
04+000
05+000
06+000
07+000
08+000
09+000
10+000
11+000
12+000
13+000
14+000
15+000

1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000

0.50
1.50
2.50
3.50
4.50
5.50
6.50
7.50
8.50
9.50
10.50
11.50
12.50
13.50
14.50

7472.67
1576.74
338.78
710.12
1618.48
0.00
50.80
6906.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00

540.00
2214.00
0.00
1296.00
2376.00
702.00
3645.00
0.00
432.00
702.00
675.00
891.00
162.00
1377.00
2943.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

8012.67
3790.74
338.78
2006.12
3994.48
702.00
3695.80
6906.66
432.00
702.00
675.00
891.00
162.00
1377.00
2943.00

21.03
20.03
19.03
18.03
17.03
16.03
15.03
14.03
13.03
12.03
11.03
10.03
9.03
8.03
7.03

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

8012.67
3790.74
338.78
2006.12
3994.48
702.00
3695.80
6906.66
432.00
702.00
675.00
891.00
162.00
1377.00
2943.00

168506.45
75928.52
6446.98
36170.34
68025.99
11253.06
55547.87
96900.44
5628.96
8445.06
7445.25
8936.73
1462.86
11057.31
20689.29

8012.67
3790.74
338.78
2006.12
3994.48
702.00
3695.80
6906.66
432.00
702.00
675.00
891.00
162.00
1377.00
2943.00

160493.80
72137.80
6108.20
34164.20
64031.50
10551.10
51852.10
89993.80
5197.00
7743.10
6770.30
8045.70
1300.90
9680.30
17746.30

26.16
25.16
24.16
23.16
22.16
21.16
20.16
19.16
18.16
17.16
16.16
15.16
14.16
13.16
12.16

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

35.03
34.03
33.03
32.03
31.03
30.03
29.03
28.03
27.03
26.03
25.03
24.03
23.03
22.03
21.03

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

15+000
16+000
17+000
18+000
19+000
20+000
21+000
22+000
23+000
24+000
25+000
26+000
27+000
28+000
29+000
30+000
31+000
32+000
33+000
34+000
35+000
36+000
37+000

16+000
17+000
18+000
19+000
20+000
21+000
22+000
23+000
24+000
25+000
26+000
27+000
28+000
29+000
30+000
31+000
32+000
33+000
34+000
35+000
36+000
37+000
37+040

1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
40

15.50
16.50
17.50
18.50
19.50
20.50
21.50
22.50
23.50
24.50
25.50
26.50
27.50
28.50
29.50
30.50
31.50
32.50
33.50
34.50
35.50
36.50
37.02

0.00
0.00
0.00
0.00
1.47
0.00
0.00
9656.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28,332.50

1350.00
0.00
1350.00
0.00
0.00
540.00
2052.00
0.00
0.00
0.00
540.00
1080.00
648.00
1593.00
1242.00
378.00
162.00
810.00
297.00
1201.50
216.00
0.00
0.00
31,414.50

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
103.56
383.80
0.00
0.00
0.00
1842.84
0.00
292.62
1050.62
0.00
0.00
0.00
0.00
3,673.45

1350.00
0.00
1350.00
0.00
1.47
540.00
2052.00
9656.78
0.00
0.00
643.56
1463.80
648.00
1593.00
1242.00
2220.84
162.00
1102.62
1347.62
1201.50
216.00
0.00
0.00
63420.45

6.03
5.03
4.03
3.03
2.03
1.03
0.07
1.07
2.07
3.07
4.07
5.07
6.07
7.07
8.07
9.07
10.07
11.07
12.07
13.07
14.07
15.07
15.59

100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0.00

1350.00
0.00
1350.00
0.00
1.47
540.00
2052.00
9656.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
51,579.50

8140.50
0.00
5440.50
0.00
2.98
556.20
143.64
10332.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
607,061.71

1350.00
0.00
1350.00
0.00
1.47
540.00
143.64
9656.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
49,671.14

6790.50
0.00
4090.50
0.00
1.50
16.20
0.00
676.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
557,390.80

11.16
10.16
9.16
8.16
7.16
6.16
5.16
4.16
3.16
2.16
1.16
0.84
1.84
2.84
3.84
4.84
5.84
6.84
7.84
8.84
9.84
10.84
11.36

0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
643.56
1463.80
648.00
1593.00
1242.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5,590.36

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
746.54
1229.59
1192.32
4524.12
4769.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12,461.85

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
643.56
1229.59
648.00
1593.00
1242.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5,356.16

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
103.00
0.00
544.30
2931.10
3527.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,105.70

20.03
19.03
18.03
17.03
16.03
15.03
14.03
13.03
12.03
11.03
10.03
9.03
8.03
7.03
6.03
5.03
4.03
3.03
2.03
1.03
0.07
1.07
1.59

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
100%
100%
100%
100%
100%
100%
100%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2220.84
162.00
1102.62
1347.62
1201.50
216.00
0.00
0.00
6,250.59

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11170.84
652.86
3340.94
2735.67
1237.55
15.12
0.00
0.00
19,152.98

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2220.84
162.00
1102.62
1347.62
1201.50
15.12
0.00
0.00
6,049.71

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8950.00
490.90
2238.30
1388.10
36.00
0.00
0.00
0.00
13,103.30

TRANSPORTE DE
MATERIAL

DISTANCIA MEDIA

CANTERA

MATERIAL
TRANSPORTADO

D <= 1 KM

D >= 1 KM

KM

CANTERA LA ARENA II

51,579.50

49,671.14

557,390.80

11.81

CANTERA BARRO NEGRO

5,590.36

5,356.16

7,105.70

2.27

CANTERA LA COLPA I

6,250.59

6,049.71

13,103.30

3.10

TOTAL

63,420.45

61,077.00

577,599.80

10.11

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO


TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

METRADOS DE TRANSPORTE DE MATERIAL DE SUB-BASE GRANULAR


CANTERA RIO BADO
UBICACIN

INICIO

FINAL

LONG.

MATERIAL PARA SUB BASE

C.G.

PLATAFORMA

ACCESOS

UBICACIN (KM)
ACCESO (KM)

VOLUMEN
TOTAL

DISTANCIA
TRANSP.

22.900
1.800
MATERIAL

MOMENTO

CANTERA BARRO NEGRO


UBICACIN (KM)
ACCESO (KM)

TRANSPORTE DE
MATERIAL DE CANTERA

26.160
0.500
MOMENTO

TRANSPORTE DE
MATERIAL DE CANTERA

DISTANCIA
TRANSP.

MATERIAL

D > 1 KM

26.16

0%

0.00

TRANSPORTE
0.00

D <= 1 KM

44462.20

0.00

0.00

00+000

01+000

1000

0.50

1808.16

108.31

1916.47

24.20

100%

1916.47

TRANSPORTE
46378.64

01+000
02+000

02+000
03+000

1000
1000

1.50
2.50

1821.55
1756.32

0.00
14.26

1821.55
1770.58

23.20
22.20

100%
100%

1821.55
1770.58

42259.98
39306.88

1821.55
1770.58

40438.40
37536.30

25.16
24.16

0%
0%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

03+000
04+000

04+000
05+000

1000
1000

3.50
4.50

1837.74
1727.38

0.00
90.45

1837.74
1817.83

21.20
20.20

100%
100%

1837.74
1817.83

38960.11
36720.18

1837.74
1817.83

37122.40
34902.30

23.16
22.16

0%
0%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

05+000
06+000
07+000

06+000
07+000
08+000

1000
1000
1000

5.50
6.50
7.50

1730.68
1756.56
1727.88

31.58
0.00
0.00

1762.26
1756.56
1727.88

19.20
18.20
17.20

100%
100%
100%

1762.26
1756.56
1727.88

33835.35
31969.43
29719.51

1762.26
1756.56
1727.88

32073.10
30212.90
27991.60

21.16
20.16
19.16

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

08+000
09+000

09+000
10+000

1000
1000

8.50
9.50

1792.62
1751.00

0.00
0.00

1792.62
1751.00

16.20
15.20

100%
100%

1792.62
1751.00

29040.45
26615.20

1792.62
1751.00

27247.80
24864.20

18.16
17.16

0%
0%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

10+000
11+000

11+000
12+000

1000
1000

10.50
11.50

1774.30
1767.28

0.00
0.00

1774.30
1767.28

14.20
13.20

100%
100%

1774.30
1767.28

25195.07
23328.14

1774.30
1767.28

23420.80
21560.90

16.16
15.16

0%
0%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

12+000
13+000

13+000
14+000

1000
1000

12.50
13.50

1775.26
1726.66

0.00
0.00

1775.26
1726.66

12.20
11.20

100%
100%

1775.26
1726.66

21658.20
19338.54

1775.26
1726.66

19882.90
17611.90

14.16
13.16

0%
0%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

14+000
15+000

15+000
16+000

1000
1000

14.50
15.50

1851.06
1912.55

0.00
50.33

1851.06
1962.88

10.20
9.20

100%
100%

1851.06
1962.88

18880.78
18058.49

1851.06
1962.88

17029.70
16095.60

12.16
11.16

0%
0%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

16+000
17+000

17+000
18+000

1000
1000

16.50
17.50

1812.75
1880.78

0.00
7.24

1812.75
1888.02

8.20
7.20

100%
100%

1812.75
1888.02

14864.58
13593.74

1812.75
1888.02

13051.80
11705.70

10.16
9.16

0%
0%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

18+000
19+000

19+000
20+000

1000
1000

18.50
19.50

1753.75
1808.41

16.89
15.29

1770.64
1823.70

6.20
5.20

100%
100%

1770.64
1823.70

10977.94
9483.24

1770.64
1823.70

9207.30
7659.50

8.16
7.16

0%
0%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

20+000
21+000
22+000

21+000
22+000
23+000

1000
1000
1000

20.50
21.50
22.50

1858.31
1763.46
1699.07

0.00
29.05
17.25

1858.31
1792.51
1716.32

4.20
3.20
2.20

100%
100%
100%

1858.31
1792.51
1716.32

7804.91
5736.02
3775.90

1858.31
1792.51
1716.32

5946.60
3943.50
2059.60

6.16
5.16
4.16

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

23+000
24+000

24+000
25+000

1000
1000

23.50
24.50

1752.04
1808.22

12.65
0.00

1764.69
1808.22

2.40
3.40

100%
0%

1764.69
0.00

4235.24
0.00

1764.69
0.00

2470.60
0.00

3.16
2.16

0%
100%

0.00
1808.22

0.00
3905.75

0.00
1808.22

0.00
2097.50

25+000
26+000

26+000
27+000

1000
1000

25.50
26.50

1940.51
1953.46

0.00
24.96

1940.51
1978.42

4.40
5.40

0%
0%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

1.16
0.84

100%
100%

1940.51
1978.42

2250.99
1661.88

1940.51
1661.88

310.50
0.00

27+000
28+000

28+000
29+000

1000
1000

27.50
28.50

1942.43
1718.41

12.56
0.00

1954.99
1718.41

6.40
7.40

0%
0%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

1.84
2.84

100%
100%

1954.99
1718.41

3597.17
4880.28

1954.99
1718.41

1642.20
3161.90

29+000
30+000

30+000
31+000

1000
1000

29.50
30.50

1872.74
1919.54

27.42
50.86

1900.16
1970.40

8.40
9.40

0%
0%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

3.84
4.84

100%
100%

1900.16
1970.40

7296.61
9536.72

1900.16
1970.40

5396.40
7566.30

31+000
32+000

32+000
33+000

1000
1000

31.50
32.50

1922.27
1901.72

0.00
53.72

1922.27
1955.44

10.40
11.40

0%
0%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

5.84
6.84

100%
100%

1922.27
1955.44

11226.04
13375.19

1922.27
1955.44

9303.80
11419.80

33+000
34+000
35+000

34+000
35+000
36+000

1000
1000
1000

33.50
34.50
35.50

1866.65
1896.75
1813.37

0.00
12.00
0.00

1866.65
1908.75
1813.37

12.40
13.40
14.40

0%
0%
0%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

7.84
8.84
9.84

100%
100%
100%

1866.65
1908.75
1813.37

14634.53
16873.31
17843.53

1866.65
1908.75
1813.37

12767.90
14964.60
16030.20

36+000
37+000

37+000
37+040

1000
40

36.50
37.02

1768.69
62.37

15.00
0.00

1783.69
62.37

15.40
15.92

0%
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

10.84
11.36

100%
1.00

1783.69
62.37

19335.23
708.52

1783.69
62.37

17551.50
646.20

67,232.67

589.82

67822.49

43,238.86

508,497.60

24,267.08

102,858.80

CANTERA

MATERIAL TRANSPORTADO

TRANSPORTE DE
MATERIAL

43,238.86

D <= 1 KM

D > 1 KM

1916.47

DISTANCIA
MEDIA

D <= 1 KM

D > 1 KM

KM

BADO

43,238.86

43,238.86

508,497.60

12.76

BARRO NEGRO

24,583.63

24,267.08

102,858.80

5.18

TOTAL

67,822.49

67,505.95

611,356.40

10.01

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

24,583.63

MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO


TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

METRADOS DE TRANSPORTE DE MATERIAL DE BASE GRANULAR


CANTERA RIO BADO
UBICACIN

MATERIAL PARA BASE

UBICACIN (KM)
ACCESO (KM)

22.900
1.800

INICIO

FINAL

LONG.

C.G.

PLATAFORMA

ACCESOS

VOLUMEN
TOTAL

DISTANCIA
TRANSP.

MATERIAL

00+000
01+000
02+000
03+000
04+000
05+000
06+000
07+000
08+000
09+000
10+000
11+000
12+000
13+000
14+000
15+000
16+000
17+000
18+000
19+000
20+000
21+000
22+000
23+000
24+000
25+000
26+000
27+000
28+000
29+000
30+000
31+000
32+000
33+000
34+000
35+000
36+000
37+000

01+000
02+000
03+000
04+000
05+000
06+000
07+000
08+000
09+000
10+000
11+000
12+000
13+000
14+000
15+000
16+000
17+000
18+000
19+000
20+000
21+000
22+000
23+000
24+000
25+000
26+000
27+000
28+000
29+000
30+000
31+000
32+000
33+000
34+000
35+000
36+000
37+000
37+040

1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
40

0.50
1.50
2.50
3.50
4.50
5.50
6.50
7.50
8.50
9.50
10.50
11.50
12.50
13.50
14.50
15.50
16.50
17.50
18.50
19.50
20.50
21.50
22.50
23.50
24.50
25.50
26.50
27.50
28.50
29.50
30.50
31.50
32.50
33.50
34.50
35.50
36.50
37.02

1278.16
1288.20
1238.89
1299.38
1217.57
1219.65
1239.07
1217.95
1266.11
1234.89
1252.37
1249.07
1253.48
1219.20
1310.33
1355.66
1282.23
1331.44
1237.35
1277.95
1124.11
1244.24
1195.95
1236.06
1278.20
1377.42
1251.63
1229.21
1235.38
1326.59
1006.78
1363.34
1224.54
568.41
1014.23
1138.34
1248.56
44.02
45375.96

64.89
0.00
0.00
0.00
57.96
18.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
141.21

1343.05
1288.20
1238.89
1299.38
1275.53
1238.01
1239.07
1217.95
1266.11
1234.89
1252.37
1249.07
1253.48
1219.20
1310.33
1355.66
1282.23
1331.44
1237.35
1277.95
1124.11
1244.24
1195.95
1236.06
1278.20
1377.42
1251.63
1229.21
1235.38
1326.59
1006.78
1363.34
1224.54
568.41
1014.23
1138.34
1248.56
44.02
45517.17

24.20
23.20
22.20
21.20
20.20
19.20
18.20
17.20
16.20
15.20
14.20
13.20
12.20
11.20
10.20
9.20
8.20
7.20
6.20
5.20
4.20
3.20
2.20
2.40
3.40
4.40
5.40
6.40
7.40
8.40
9.40
10.40
11.40
12.40
13.40
14.40
15.40
15.92

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0.00

1343.05
1288.20
1238.89
1299.38
1275.53
1238.01
1239.07
1217.95
1266.11
1234.89
1252.37
1249.07
1253.48
1219.20
1310.33
1355.66
1282.23
1331.44
1237.35
1277.95
1124.11
1244.24
1195.95
1236.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30,210.52

TRANSPORTE DE
MATERIAL

MOMENTO
TRANSPORTE
32501.76
29886.26
27503.29
27546.83
25765.77
23769.78
22550.99
20948.68
20510.96
18770.38
17783.64
16487.79
15292.51
13655.00
13365.36
12472.09
10514.31
9586.37
7671.55
6645.35
4721.27
3981.56
2631.08
2966.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

CANTERA BARRO NEGRO


TRANSPORTE DE
MATERIAL DE CANTERA
D <= 1 KM

D > 1 KM

1343.05
1288.20
1238.89
1299.38
1275.53
1238.01
1239.07
1217.95
1266.11
1234.89
1252.37
1249.07
1253.48
1219.20
1310.33
1355.66
1282.23
1331.44
1237.35
1277.95
1124.11
1244.24
1195.95
1236.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30,210.52

31158.70
28598.10
26264.40
26247.50
24490.20
22531.80
21311.90
19730.70
19244.90
17535.50
16531.30
15238.70
14039.00
12435.80
12055.00
11116.40
9232.10
8254.90
6434.20
5367.40
3597.20
2737.30
1435.10
1730.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
357,318.60

DISTANCIA
MEDIA

CANTERA

MATERIAL TRANSPORTADO

D <= 1 KM

D > 1 KM

KM

BADO

30,210.52

30,210.52

357,318.60

12.83

BARRO NEGRO

15,306.65

15,106.39

61,036.40

4.99

TOTAL

45,517.17

45,316.91

418,355.00

10.19

UBICACIN (KM)
ACCESO (KM)

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

26.160
0.500

DISTANCIA
TRANSP.

MATERIAL

26.16
25.16
24.16
23.16
22.16
21.16
20.16
19.16
18.16
17.16
16.16
15.16
14.16
13.16
12.16
11.16
10.16
9.16
8.16
7.16
6.16
5.16
4.16
3.16
2.16
1.16
0.84
1.84
2.84
3.84
4.84
5.84
6.84
7.84
8.84
9.84
10.84
11.36

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
1.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1278.20
1377.42
1251.63
1229.21
1235.38
1326.59
1006.78
1363.34
1224.54
568.41
1014.23
1138.34
1248.56
44.02
15,306.65

MOMENTO
TRANSPORTE
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2760.91
1597.81
1051.37
2261.75
3508.47
5094.11
4872.83
7961.93
8375.88
4456.30
8965.79
11201.26
13534.36
500.08

TRANSPORTE DE
MATERIAL DE CANTERA
D <= 1 KM

D > 1 KM

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1278.20
1377.42
1051.37
1229.21
1235.38
1326.59
1006.78
1363.34
1224.54
568.41
1014.23
1138.34
1248.56
44.02
15,106.39

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1482.70
220.40
0.00
1032.50
2273.10
3767.50
3866.00
6598.60
7151.30
3887.90
7951.60
10062.90
12285.80
456.10
61,036.40

MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

METRADOS DE TRANSPORTE DE MATERIAL EXCEDENTE DE CORTE A BOTADEROS

ORIGEN

DESTINO
DIST.
TRANSP.

MATERIAL A
TRANSPORTAR

MOMENTO
M3-KM

TRANSPORTE DE
MATERIAL
EXCEDENTE

INICIO

FINAL

LONG.

C.G.

INICIO

FINAL

LONG.

C.G.

D <= 1 KM

D > 1 KM

00+020

00+020

0.00

0.02

00+160

00+160

0.00

0.16

0.14

27.66

3.87

3.87

0.00

01+180

01+200

20

1.19

01+020

01+020

1.02

1.03

95.55

98.42

95.55

2.90

01+200

01+220

20

1.21

01+380

01+410

30

1.40

1.05

101.57

106.65

101.57

5.10

01+200

01+220

20

1.21

01+620

01+620

1.62

1.05

17.74

18.63

17.74

0.90

01+200

01+220

20

1.21

01+880

01+890

10

1.89

1.05

13.16

13.82

13.16

0.70

03+100

03+370

270

3.24

02+430

03+040

610

2.74

3.08

657.10

2020.58

657.10

1363.50

03+450

03+480

30

3.47

03+600

03+620

20

3.61

3.31

148.44

490.59

148.44

342.20

03+730

03+770

40

3.75

03+600

03+620

20

3.61

3.59

148.61

533.51

148.61

384.90

03+770

03+820

50

3.80

03+920

03+930

10

3.93

3.64

88.76

322.64

88.76

233.90

04+760

04+890

130

4.83

04+520

04+540

20

4.53

4.67

406.60

1896.79

406.60

1490.20

05+440

05+570

130

5.51

05+160

05+360

200

5.26

5.35

1841.31

9841.80

1841.31

8000.50

05+680

05+940

260

5.81

06+000

06+540

540

6.27

5.65

4586.23

25912.20

4586.23

21326.00

06+680

06+810

130

6.75

06+940

07+100

160

7.02

6.59

1002.37

6600.61

1002.37

5598.20

08+400

08+960

560

8.68

07+640

07+880

240

7.76

8.52

1670.67

14234.11

1670.67

12563.40

09+060

09+160

100

9.11

09+280

09+330

50

9.31

8.95

180.25

1613.24

180.25

1433.00

09+060

09+160

100

9.11

09+680

09+690

10

9.69

8.95

17.33

155.10

17.33

137.80

15+260

15+300

40

15.28

15+560

15+720

160

15.64

15.12

636.25

9620.10

636.25

8983.90

15+430

15+440

10

15.44

15+560

15+720

160

15.64

15.28

49.96

763.14

49.96

713.20

17+080

17+210

130

17.15

17+320

17+340

20

17.33

16.99

306.93

5213.21

306.93

4906.30

17+840

17+860

20

17.85

17+560

17+740

180

17.65

17.69

305.93

5411.90

305.93

5106.00

19+120

19+140

20

19.13

19+280

19+380

100

19.33

18.97

134.34

2548.43

134.34

2414.10

19+510

19+660

150

19.59

17+790

19+820

2030

18.81

19.43

166.96

3243.20

166.96

3076.20

21+140

21+200

60

21.17

20+360

20+420

60

20.39

21.01

368.23

7736.51

368.23

7368.30

21+100

21+130

30

21.12

20+060

20+140

80

20.10

20.96

374.26

7842.62

374.26

7468.40

20+560

21+100

540

20.83

19+790

20+000

210

19.90

20.67

5233.00

108166.11

5233.00

102933.10

21+930

21+980

50

21.96

22+100

22+190

90

22.15

21.80

257.35

5608.94

257.35

5351.60

21+930

21+980

50

21.96

22+300

22+320

20

22.31

21.80

36.40

793.34

36.40

756.90

24+030

24+300

270

24.17

23+710

23+820

110

23.77

24.01

301.41

7235.35

301.41

6933.90

24+030

24+300

270

24.17

23+440

23+520

80

23.48

24.01

372.80

8949.06

372.80

8576.30

24+030

24+300

270

24.17

23+350

23+360

10

23.36

24.01

88.05

2113.64

88.05

2025.60

24+030

24+300

270

24.17

23+020

23+290

270

23.16

24.01

2052.54

49271.22

2052.54

47218.70

24+030

24+300

270

24.17

22+880

22+900

20

22.89

24.01

71.47

1715.64

71.47

1644.20

28+030

28+520

490

28.28

28+720

28+780

60

28.75

28.12

3496.63

98307.75

3496.63

94811.10

28+920

29+040

120

28.98

28+720

28+780

60

28.75

28.82

688.01

19828.45

688.01

19140.40

34+250

34+340

90

34.30

34+420

34+460

40

34.44

34.14

226.05

7716.22

226.05

7490.20

35+240

35+290

50

35.27

34+960

34+980

20

34.97

35.11

747.20

26230.46

747.20

25483.30

26,893.33

415,284.90

TOTAL

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO


TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

TRANSPORTE DE MATERIAL DE CANTERA DE ROCA


CANTERA DE ROCA AZUL
UBICACIN

INICIO

FINAL

LONG.

MATERIAL TRANSPORTADO

C.G.

ENROCADO DE
PROTECCION

VOLUMEN TOTAL

DISTANCIA
TRANSP.

ROCA ACOMODADA

m3

m3

m3

km

UBICACIN (KM)

5.500

ACCESO (KM)

0.100

MATERIAL

MOMENTO

m3

CANTERA DE RIO GRANDE


TRANSPORTE DE
MATERIAL DE CANTERA

DISTANCIA
TRANSP.

TRANSPORTE

D <= 1 KM

D > 1 KM

km

UBICACIN (KM)

36.900

ACCESO (KM)

0.000

MATERIAL

MOMENTO

m3

TRANSPORTE

TRANSPORTE DE
MATERIAL DE CANTERA

D <= 1 KM

D > 1 KM

28+520

28+720

200

28.62

4868.20

0.00

4868.20

23.22

100%

4868.20

113039.60

4868.20

108171.40

8.28

0%

0.00

0.00

0.00

0.00

25+595

35+310

9715

30.45

0.00

228.00

228.00

25.05

0%

0.00

0.00

0.00

0.00

6.45

100%

228.00

1470.03

228.00

1242.00

4,868.20

113,039.60

4,868.20

108,171.40

228.00

1,470.03

228.00

1,242.00

5,096.20

CANTERA

CANTERA DE ROCA AZUL


CANTERA DE RIO GRANDE
TOTAL

MATERIAL TRANSPORTADO

4,868.20
228.00
5,096.20

TRANSPORTE DE
MATERIAL

DISTANCIA MEDIA

D <= 1 KM

D > 1 KM

KM

4,868.20
228.00
5,096.20

108,171.40
1,242.00
109,413.40

23.22
6.45
22.47

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO


TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

TRANSPORTE DE MATERIAL DE PIEDRA PARA PEDRAPLEN, GAVIONES Y DISIPADORES


CANTERA ROCA AZUL
UBICACIN

MATERIAL TRANSPORTADO

PEDRAPLEN

GAVION TIPO
CAJA

GAVION TIPO
COLCHON

DISIPADORES

VOLUMEN
TOTAL

UBICACIN (KM)

5.500

ACCESO (KM)

0.100

DISTANCIA
TRANSP.

MATERIAL

MOMENTO

CANTERA RIO BADO


TRANSPORTE DE
MATERIAL DE CANTERA

UBICACIN (KM)

22.900

ACCESO (KM)

1.800

DISTANCIA
TRANSP.

MATERIAL

MOMENTO

CANTERA RIO GRANDE


UBICACIN (KM)
TRANSPORTE DE
MATERIAL DE CANTERA

36.900

ACCESO (KM)
DISTANCIA
TRANSP.

0.000

MATERIAL

MOMENTO

TRANSPORTE DE
MATERIAL DE CANTERA

INICIO

FINAL

LONG.

C.G.

m3

m3

m3

m3

m3

km

m3

TRANSPORTE

D <= 1 KM

D > 1 KM

km

m3

TRANSPORTE

D <= 1 KM

D > 1 KM

km

m3

TRANSPORTE

D <= 1 KM

00+000

01+622

1622

1.62

0.00

0.00

0.00

2.52

2.52

3.98

100%

2.52

10.02

2.52

7.50

23.08

0%

0.00

0.00

0.00

0.00

35.28

0%

0.00

0.00

0.00

00+000

01+787

1787

1.79

0.00

0.00

0.00

2.16

2.16

3.81

100%

2.16

8.24

2.16

6.10

22.91

0%

0.00

0.00

0.00

0.00

35.11

0%

0.00

0.00

0.00

00+000

14+775

14775

14.78

0.00

0.00

0.00

2.70

2.70

9.38

100%

2.70

25.31

2.70

22.60

9.93

0%

0.00

0.00

0.00

0.00

22.13

0%

0.00

0.00

0.00

00+000

15+140

15140

15.14

0.00

0.00

0.00

2.52

2.52

9.74

0%

0.00

0.00

0.00

0.00

9.56

100%

2.52

24.09

2.52

21.60

21.76

0%

0.00

0.00

0.00

00+000

15+970

15970

15.97

0.00

0.00

0.00

5.80

5.80

10.57

0%

0.00

0.00

0.00

0.00

8.73

100%

5.80

50.60

5.80

44.80

20.93

0%

0.00

0.00

0.00

00+000

16+835

16835

16.84

0.00

0.00

0.00

3.78

3.78

11.44

0%

0.00

0.00

0.00

0.00

7.86

100%

3.78

29.73

3.78

25.90

20.06

0%

0.00

0.00

0.00

00+000

18+870

18870

18.87

0.00

0.00

0.00

2.16

2.16

13.47

0%

0.00

0.00

0.00

0.00

5.83

100%

2.16

12.59

2.16

10.40

18.03

0%

0.00

0.00

0.00

00+000

19+255

19255

19.26

0.00

0.00

0.00

2.70

2.70

13.86

0%

0.00

0.00

0.00

0.00

5.44

100%

2.70

14.70

2.70

12.00

17.64

0%

0.00

0.00

0.00

00+000

20+250

20250

20.25

0.00

0.00

0.00

2.16

2.16

14.85

0%

0.00

0.00

0.00

0.00

4.45

100%

2.16

9.61

2.16

7.50

16.65

0%

0.00

0.00

0.00

00+000

20+903

20903

20.90

0.00

0.00

0.00

5.76

5.76

15.50

0%

0.00

0.00

0.00

0.00

3.80

100%

5.76

21.87

5.76

16.10

16.00

0%

0.00

0.00

0.00

00+000

21+449

21449

21.45

0.00

0.00

0.00

2.81

2.81

16.05

0%

0.00

0.00

0.00

0.00

3.25

100%

2.81

9.13

2.81

6.30

15.45

0%

0.00

0.00

0.00

00+000

25+311

25311

25.31

0.00

0.00

0.00

2.16

2.16

19.91

0%

0.00

0.00

0.00

0.00

4.21

100%

2.16

9.10

2.16

6.90

11.59

0%

0.00

0.00

0.00

00+000

25+897

25897

25.90

0.00

0.00

0.00

5.94

5.94

20.50

0%

0.00

0.00

0.00

0.00

4.80

100%

5.94

28.49

5.94

22.60

11.00

0%

0.00

0.00

0.00

00+000

26+730

26730

26.73

0.00

0.00

0.00

4.50

4.50

21.33

0%

0.00

0.00

0.00

0.00

5.63

100%

4.50

25.34

4.50

20.80

10.17

0%

0.00

0.00

0.00

00+000

28+148

28148

28.15

0.00

0.00

0.00

2.88

2.88

22.75

0%

0.00

0.00

0.00

0.00

7.05

100%

2.88

20.30

2.88

17.40

8.75

0%

0.00

0.00

0.00

00+000

28+637

28637

28.64

0.00

0.00

0.00

5.76

5.76

23.24

0%

0.00

0.00

0.00

0.00

7.54

100%

5.76

43.41

5.76

37.70

8.26

0%

0.00

0.00

0.00

00+000

29+334

29334

29.33

0.00

0.00

0.00

2.16

2.16

23.93

0%

0.00

0.00

0.00

0.00

8.23

0%

0.00

0.00

0.00

0.00

7.57

100%

2.16

16.34

2.16

00+000

29+590

29590

29.59

0.00

0.00

0.00

7.34

7.34

24.19

0%

0.00

0.00

0.00

0.00

8.49

0%

0.00

0.00

0.00

0.00

7.31

100%

7.34

53.68

7.34

00+000

30+580

30580

30.58

0.00

0.00

0.00

13.68

13.68

25.18

0%

0.00

0.00

0.00

0.00

9.48

0%

0.00

0.00

0.00

0.00

6.32

100%

13.68

86.46

13.68

00+000

30+645

30645

30.65

0.00

0.00

0.00

8.64

8.64

25.25

0%

0.00

0.00

0.00

0.00

9.55

0%

0.00

0.00

0.00

0.00

6.26

100%

8.64

54.04

8.64

00+000

31+207

31207

31.21

0.00

0.00

0.00

2.88

2.88

25.81

0%

0.00

0.00

0.00

0.00

10.11

0%

0.00

0.00

0.00

0.00

5.69

100%

2.88

16.40

2.88

00+000

31+606

31606

31.61

0.00

0.00

0.00

2.16

2.16

26.21

0%

0.00

0.00

0.00

0.00

10.51

0%

0.00

0.00

0.00

0.00

5.29

100%

2.16

11.44

2.16

00+000

32+210

32210

32.21

0.00

0.00

0.00

3.89

3.89

26.81

0%

0.00

0.00

0.00

0.00

11.11

0%

0.00

0.00

0.00

0.00

4.69

100%

3.89

18.23

3.89

00+000

32+641

32641

32.64

0.00

0.00

0.00

8.75

8.75

27.24

0%

0.00

0.00

0.00

0.00

11.54

0%

0.00

0.00

0.00

0.00

4.26

100%

8.75

37.26

8.75

00+000

33+020

33020

33.02

0.00

0.00

0.00

2.59

2.59

27.62

0%

0.00

0.00

0.00

0.00

11.92

0%

0.00

0.00

0.00

0.00

3.88

100%

2.59

10.06

2.59

00+000

33+198

33198

33.20

0.00

0.00

0.00

6.05

6.05

27.80

0%

0.00

0.00

0.00

0.00

12.10

0%

0.00

0.00

0.00

0.00

3.70

100%

6.05

22.39

6.05

00+000

33+263

33263

33.26

0.00

0.00

0.00

21.60

21.60

27.86

0%

0.00

0.00

0.00

0.00

12.16

0%

0.00

0.00

0.00

0.00

3.64

100%

21.60

78.56

21.60

00+000

33+783

33783

33.78

0.00

0.00

0.00

22.68

22.68

28.38

0%

0.00

0.00

0.00

0.00

12.68

0%

0.00

0.00

0.00

0.00

3.12

100%

22.68

70.69

22.68

00+000

33+967

33967

33.97

0.00

0.00

0.00

6.48

6.48

28.57

0%

0.00

0.00

0.00

0.00

12.87

0%

0.00

0.00

0.00

0.00

2.93

100%

6.48

19.01

6.48

00+000

35+960

35960

35.96

0.00

0.00

0.00

2.16

2.16

30.56

0%

0.00

0.00

0.00

0.00

14.86

0%

0.00

0.00

0.00

0.00

0.94

100%

2.16

2.03

2.03

00+150

00+280

130

0.22

408.41

0.00

0.00

0.00

408.41

5.39

100%

408.41

2199.29

408.41

1790.90

24.49

0%

0.00

0.00

0.00

0.00

36.69

0%

0.00

0.00

0.00

20+550

20+680

130

20.62

0.00

70.17

560.30

0.00

630.47

15.22

0%

0.00

0.00

0.00

0.00

4.09

100%

630.47

2575.48

630.47

1945.00

16.29

0%

0.00

0.00

0.00

20+880

20+920

40

20.90

0.00

209.85

0.00

0.00

209.85

15.50

0%

0.00

0.00

0.00

0.00

3.80

100%

209.85

797.42

209.85

587.60

16.00

0%

0.00

0.00

0.00

21+060

21+100

40

21.08

0.00

46.60

8.00

0.00

54.61

15.68

0%

0.00

0.00

0.00

0.00

3.62

100%

54.61

197.68

54.61

143.10

15.82

0%

0.00

0.00

0.00

24+270

24+280

10

24.28

0.00

42.59

0.00

0.00

42.59

18.88

0%

0.00

0.00

0.00

0.00

3.18

100%

42.59

135.21

42.59

92.60

12.63

0%

0.00

0.00

0.00

24+750

24+760

10

24.76

0.00

80.35

0.00

0.00

80.35

19.36

0%

0.00

0.00

0.00

0.00

3.66

100%

80.35

293.68

80.35

213.30

12.15

0%

0.00

0.00

0.00

24+790

24+820

30

24.81

0.00

39.10

320.17

0.00

359.28

19.41

0%

0.00

0.00

0.00

0.00

3.71

100%

359.28

1331.11

359.28

971.80

12.10

0%

0.00

0.00

0.00

25+730

25+740

10

25.74

0.00

133.92

976.52

0.00

1110.44

20.34

0%

0.00

0.00

0.00

0.00

4.64

100%

1110.44

5146.89

1110.44

4036.40

11.17

0%

0.00

0.00

0.00

25+870

25+910

40

25.89

0.00

163.38

0.00

0.00

163.38

20.49

0%

0.00

0.00

0.00

0.00

4.79

100%

163.38

782.58

163.38

619.20

11.01

0%

0.00

0.00

0.00

26+680

26+740

60

26.71

0.00

40.17

0.00

0.00

40.17

21.31

0%

0.00

0.00

0.00

0.00

5.61

100%

40.17

225.38

40.17

185.20

10.19

0%

0.00

0.00

0.00

30+250

30+320

70

30.29

0.00

40.71

0.00

0.00

40.71

24.89

0%

0.00

0.00

0.00

0.00

9.19

0%

0.00

0.00

0.00

0.00

6.62

100%

40.71

269.30

40.71

30+620

30+680

60

30.65

0.00

48.21

0.00

0.00

48.21

25.25

0%

0.00

0.00

0.00

0.00

9.55

0%

0.00

0.00

0.00

0.00

6.25

100%

48.21

301.31

48.21

32+460

32+510

50

32.49

0.00

18.75

0.00

0.00

18.75

27.09

0%

0.00

0.00

0.00

0.00

11.39

0%

0.00

0.00

0.00

0.00

4.42

100%

18.75

82.77

18.75

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO


TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

TRANSPORTE DE MATERIAL DE PIEDRA PARA PEDRAPLEN, GAVIONES Y DISIPADORES


CANTERA ROCA AZUL
UBICACIN

MATERIAL TRANSPORTADO

PEDRAPLEN

GAVION TIPO
CAJA

GAVION TIPO
COLCHON

DISIPADORES

VOLUMEN
TOTAL

UBICACIN (KM)

5.500

ACCESO (KM)

0.100

DISTANCIA
TRANSP.

MATERIAL

MOMENTO

CANTERA RIO BADO


TRANSPORTE DE
MATERIAL DE CANTERA

UBICACIN (KM)

22.900

ACCESO (KM)

1.800

DISTANCIA
TRANSP.

MATERIAL

MOMENTO

CANTERA RIO GRANDE


UBICACIN (KM)
TRANSPORTE DE
MATERIAL DE CANTERA

36.900

ACCESO (KM)
DISTANCIA
TRANSP.

0.000

MATERIAL

MOMENTO

TRANSPORTE DE
MATERIAL DE CANTERA

INICIO

FINAL

LONG.

C.G.

m3

m3

m3

m3

m3

km

m3

TRANSPORTE

D <= 1 KM

D > 1 KM

km

m3

TRANSPORTE

D <= 1 KM

D > 1 KM

km

m3

TRANSPORTE

D <= 1 KM

33+180

33+240

60

33.21

0.00

83.30

0.00

0.00

83.30

27.81

0%

0.00

0.00

0.00

0.00

12.11

0%

0.00

0.00

0.00

0.00

3.69

100%

83.30

307.36

83.30

33+270

33+340

70

33.31

0.00

15.53

0.00

0.00

15.53

27.91

0%

0.00

0.00

0.00

0.00

12.21

0%

0.00

0.00

0.00

0.00

3.60

100%

15.53

55.85

15.53

33+420

33+480

60

33.45

0.00

48.21

0.00

0.00

48.21

28.05

0%

0.00

0.00

0.00

0.00

12.35

0%

0.00

0.00

0.00

0.00

3.45

100%

48.21

166.32

48.21

33+830

33+910

80

33.87

0.00

43.92

0.00

0.00

43.92

28.47

0%

0.00

0.00

0.00

0.00

12.77

0%

0.00

0.00

0.00

0.00

3.03

100%

43.92

133.09

43.92

34+140

34+220

80

34.18

0.00

38.03

0.00

0.00

38.03

28.78

0%

0.00

0.00

0.00

0.00

13.08

0%

0.00

0.00

0.00

0.00

2.72

100%

38.03

103.45

38.03

35+870

35+970

100

35.92

0.00

123.20

0.00

0.00

123.20

30.52

0%

0.00

0.00

0.00

0.00

14.82

0%

0.00

0.00

0.00

0.00

0.98

100%

123.20

120.74

120.74

36+540

36+545

36.54

150.00

0.00

0.00

0.00

150.00

31.14

0%

15.44

0%

0.36

100%

150.00

53.63

53.63

3,876.77

225.72

720.93

2,090.41

621.96

CANTERA

CANTERA ROCA AZUL


CANTERA RIO BADO
CANTERA RIO GRANDE
TOTAL

MATERIAL
TRANSPORTADO

415.79
2,740.05
720.93
3,876.77

TRANSPORTE DE
MATERIAL

0.00

0.00

0.00

0.00

415.79

2,242.86

415.79

1,827.10

DISTANCIA MEDIA

D <= 1 KM

D > 1 KM

KM

415.79
2,740.05
621.96
3,777.81

1,827.10
9,044.20
1,468.40
12,339.70

5.39
4.30
3.04
4.18

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

0.00

0.00

0.00

0.00

2,740.05

11,784.40

2,740.05

9,044.20

MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO


TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

TRANSPORTE DE MATERIAL DE PIEDRA PARA PEDRAPLEN, GAVIONES Y DISIPADORES

TRANSPORTE DE MATERIAL DE PIEDRA PARA PEDRAPLEN, GAVIONES Y DISIPADORES


CANTERA RIO GRANDE

UBICACIN

MATERIAL TRANSPORTADO

CANTERA ROCA AZUL


UBICACIN (KM)
ACCESO
(KM) DE
TRANSPORTE

PEDRAPLEN

GAVION TIPO
CAJA

GAVION TIPO
COLCHON

DISIPADORES

VOLUMEN
TOTAL

DISTANCIA
TRANSP.

MATERIAL DE CANTERA

INICIO

FINAL

LONG.

C.G.

m3

m3

m3

m3

m3

km

00+000

01+622

1622

1.62

0.00

0.00

0.00

2.52

2.52

3.98

100%

0.00

00+000

01+787

1787

1.79

0.00

0.00

0.00

2.16

2.16

3.81

100%

0.00

00+000

14+775

14775

14.78

0.00

0.00

0.00

2.70

2.70

9.38

100%

0.00

00+000

15+140

15140

15.14

0.00

0.00

0.00

2.52

2.52

9.74

0%

0.00

00+000

15+970

15970

15.97

0.00

0.00

0.00

5.80

5.80

10.57

0%

0.00

00+000

16+835

16835

16.84

0.00

0.00

0.00

3.78

3.78

11.44

0%

0.00

00+000

18+870

18870

18.87

0.00

0.00

0.00

2.16

2.16

13.47

0%

0.00

00+000

19+255

19255

19.26

0.00

0.00

0.00

2.70

2.70

13.86

0%

0.00

00+000

20+250

20250

20.25

0.00

0.00

0.00

2.16

2.16

14.85

0%

0.00

00+000

20+903

20903

20.90

0.00

0.00

0.00

5.76

5.76

15.50

0%

0.00

00+000

21+449

21449

21.45

0.00

0.00

0.00

2.81

2.81

16.05

0%

0.00

00+000

25+311

25311

25.31

0.00

0.00

0.00

2.16

2.16

19.91

0%

0.00

00+000

25+897

25897

25.90

0.00

0.00

0.00

5.94

5.94

20.50

0%

0.00

00+000

26+730

26730

26.73

0.00

0.00

0.00

4.50

4.50

21.33

0%

0.00

00+000

28+148

28148

28.15

0.00

0.00

0.00

2.88

2.88

22.75

0%

0.00

00+000

28+637

28637

28.64

0.00

0.00

0.00

5.76

5.76

23.24

0%

0.00

00+000

29+334

29334

29.33

0.00

0.00

0.00

2.16

2.16

23.93

0%

14.20

00+000

29+590

29590

29.59

0.00

0.00

0.00

7.34

7.34

24.19

0%

46.30

00+000

30+580

30580

30.58

0.00

0.00

0.00

13.68

13.68

25.18

0%

72.80

00+000

30+645

30645

30.65

0.00

0.00

0.00

8.64

8.64

25.25

0%

45.40

00+000

31+207

31207

31.21

0.00

0.00

0.00

2.88

2.88

25.81

0%

13.50

00+000

31+606

31606

31.61

0.00

0.00

0.00

2.16

2.16

26.21

0%

9.30

00+000

32+210

32210

32.21

0.00

0.00

0.00

3.89

3.89

26.81

0%

14.30

00+000

32+641

32641

32.64

0.00

0.00

0.00

8.75

8.75

27.24

0%

28.50

00+000

33+020

33020

33.02

0.00

0.00

0.00

2.59

2.59

27.62

0%

7.50

00+000

33+198

33198

33.20

0.00

0.00

0.00

6.05

6.05

27.80

0%

16.30

00+000

33+263

33263

33.26

0.00

0.00

0.00

21.60

21.60

27.86

0%

57.00

00+000

33+783

33783

33.78

0.00

0.00

0.00

22.68

22.68

28.38

0%

48.00

00+000

33+967

33967

33.97

0.00

0.00

0.00

6.48

6.48

28.57

0%

12.50

00+000

35+960

35960

35.96

0.00

0.00

0.00

2.16

2.16

30.56

0%

0.00

00+150

00+280

130

0.22

408.41

0.00

0.00

0.00

408.41

5.39

100%

0.00

20+550

20+680

130

20.62

0.00

70.17

560.30

0.00

630.47

15.22

0%

0.00

20+880

20+920

40

20.90

0.00

209.85

0.00

0.00

209.85

15.50

0%

0.00

21+060

21+100

40

21.08

0.00

46.60

8.00

0.00

54.61

15.68

0%

0.00

24+270

24+280

10

24.28

0.00

42.59

0.00

0.00

42.59

18.88

0%

0.00

24+750

24+760

10

24.76

0.00

80.35

0.00

0.00

80.35

19.36

0%

0.00

24+790

24+820

30

24.81

0.00

39.10

320.17

0.00

359.28

19.41

0%

0.00

25+730

25+740

10

25.74

0.00

133.92

976.52

0.00

1110.44

20.34

0%

0.00

25+870

25+910

40

25.89

0.00

163.38

0.00

0.00

163.38

20.49

0%

0.00

26+680

26+740

60

26.71

0.00

40.17

0.00

0.00

40.17

21.31

0%

0.00

30+250

30+320

70

30.29

0.00

40.71

0.00

0.00

40.71

24.89

0%

228.60

30+620

30+680

60

30.65

0.00

48.21

0.00

0.00

48.21

25.25

0%

253.10

32+460

32+510

50

32.49

0.00

18.75

0.00

0.00

18.75

27.09

0%

64.00

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

D > 1 KM

MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO


TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

TRANSPORTE DE MATERIAL DE PIEDRA PARA PEDRAPLEN, GAVIONES Y DISIPADORES

TRANSPORTE DE MATERIAL DE PIEDRA PARA PEDRAPLEN, GAVIONES Y DISIPADORES


CANTERA RIO GRANDE

UBICACIN

MATERIAL TRANSPORTADO

CANTERA ROCA AZUL


UBICACIN (KM)
ACCESO
(KM) DE
TRANSPORTE

PEDRAPLEN

GAVION TIPO
CAJA

GAVION TIPO
COLCHON

DISIPADORES

VOLUMEN
TOTAL

DISTANCIA
TRANSP.

MATERIAL DE CANTERA

INICIO

FINAL

LONG.

C.G.

m3

m3

m3

m3

m3

km

33+180

33+240

60

33.21

0.00

83.30

0.00

0.00

83.30

27.81

0%

224.10

33+270

33+340

70

33.31

0.00

15.53

0.00

0.00

15.53

27.91

0%

40.30

33+420

33+480

60

33.45

0.00

48.21

0.00

0.00

48.21

28.05

0%

118.10

33+830

33+910

80

33.87

0.00

43.92

0.00

0.00

43.92

28.47

0%

89.20

34+140

34+220

80

34.18

0.00

38.03

0.00

0.00

38.03

28.78

0%

65.40

35+870

35+970

100

35.92

0.00

123.20

0.00

0.00

123.20

30.52

0%

0.00

36+540

36+545

36.54

150.00

0.00

0.00

0.00

150.00

31.14

0%

3,876.77

225.72

CANTERA

CANTERA ROCA AZUL


CANTERA RIO BADO
CANTERA RIO GRANDE
TOTAL

MATERIAL
TRANSPORTADO

415.79
2,740.05
720.93
3,876.77

TRANSPORTE DE
MATERIAL

DISTANCIA MEDIA

D <= 1 KM

D > 1 KM

KM

415.79
2,740.05
621.96
3,777.81

1,827.10
9,044.20
1,468.40
12,339.70

5.39
4.30
3.04
4.18

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

D > 1 KM

0.00
1,468.40

MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO


TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

TRANSPORTE DE MATERIAL DE FILTRO DRENANTE

CANTERA RIO BADO


UBICACIN (KM)
ACCESO (KM)
MATERIAL
Material granular para Filtro Drenante

22.900
1.800

VOLUMEN
TOTAL

DISTANCIA
MEDIA
TRANSP.

MATERIAL

21691.77

7.50

100%

21691.77
21,691.77

21691.77

MOMENTO
TRANSPORTE
162688.28

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

TRANSPORTE DE
MATERIAL DE CANTERA
D <= 1 KM

D > 1 KM

21691.77
21,691.77

140996.50
140,996.50

MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO


TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

TRANSPORTE DE AGREGADOS PARA CONCRETO HIDRAULICO

CANTERA RIO BADO


UBICACIN (KM)
ACCESO (KM)
MATERIAL
Material granular para Concreto Hidrulico

22.900
1.800

VOLUMEN
TOTAL

DISTANCIA
MEDIA
TRANSP.

MATERIAL

28793.36

7.50

100%

28793.36
28,793.36

28793.36

MOMENTO
TRANSPORTE
215950.22

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

TRANSPORTE DE
MATERIAL DE CANTERA
D <= 1 KM

D > 1 KM

28793.36
28,793.36

187156.90
187,156.90

MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO


TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

METRADOS DE TRANSPORTE DE MATERIAL DE CARPETA ASFALTICA


CANTERA RIO BADO
UBICACIN

INICIO
00+000
01+000
02+000
03+000
04+000
05+000
06+000
07+000
08+000
09+000
10+000
11+000
12+000
13+000
14+000
15+000
16+000
17+000
18+000
19+000
20+000
21+000
22+000
23+000
24+000
25+000
26+000
27+000
28+000
29+000
30+000
31+000
32+000
33+000
34+000
35+000
36+000
37+000

FINAL
01+000
02+000
03+000
04+000
05+000
06+000
07+000
08+000
09+000
10+000
11+000
12+000
13+000
14+000
15+000
16+000
17+000
18+000
19+000
20+000
21+000
22+000
23+000
24+000
25+000
26+000
27+000
28+000
29+000
30+000
31+000
32+000
33+000
34+000
35+000
36+000
37+000
37+040

LONG.
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
40

CARPETA ASFALTICA

C.G.
0.50
1.50
2.50
3.50
4.50
5.50
6.50
7.50
8.50
9.50
10.50
11.50
12.50
13.50
14.50
15.50
16.50
17.50
18.50
19.50
20.50
21.50
22.50
23.50
24.50
25.50
26.50
27.50
28.50
29.50
30.50
31.50
32.50
33.50
34.50
35.50
36.50
37.02

PLATAFORMA
423.19
422.16
404.06
423.73
398.72
397.51
0.00
0.00
412.63
402.20
408.42
409.63
411.14
397.04
429.38
460.62
418.30
435.14
420.56
417.97
358.89
405.43
406.84
404.90
418.91
452.18
401.04
394.02
423.78
468.10
312.79
444.79
394.54
170.85
322.12
364.83
409.05
16.32
14061.78

ACCESOS
17.92
0.00
0.00
0.00
16.95
4.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39.79

UBICACIN (KM)
ACCESO (KM)
VOLUMEN
TOTAL

DISTANCIA
TRANSP.

441.11
422.16
404.06
423.73
415.67
402.44
0.00
0.00
412.63
402.20
408.42
409.63
411.14
397.04
429.38
460.62
418.30
435.14
420.56
417.97
358.89
405.43
406.84
404.90
418.91
452.18
401.04
394.02
423.78
468.10
312.79
444.79
394.54
170.85
322.12
364.83
409.05
16.32
14101.57

24.20
23.20
22.20
21.20
20.20
19.20
18.20
17.20
16.20
15.20
14.20
13.20
12.20
11.20
10.20
9.20
8.20
7.20
6.20
5.20
4.20
3.20
2.20
2.40
3.40
4.40
5.40
6.40
7.40
8.40
9.40
10.40
11.40
12.40
13.40
14.40
15.40
15.92

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100.00

TRANSPORTE DE
MATERIAL

22.900
1.800
MATERIAL
441.11
422.16
404.06
423.73
415.67
402.44
0.00
0.00
412.63
402.20
408.42
409.63
411.14
397.04
429.38
460.62
418.30
435.14
420.56
417.97
358.89
405.43
406.84
404.90
418.91
452.18
401.04
394.02
423.78
468.10
312.79
444.79
394.54
170.85
322.12
364.83
409.05
1632.00
15,717.25

MOMENTO
TRANSPORTE
10674.75
9794.11
8970.13
8983.08
8396.43
7726.81
0.00
0.00
6684.61
6113.44
5799.56
5407.12
5015.91
4446.85
4379.68
4237.70
3430.06
3133.01
2607.47
2173.44
1507.34
1297.38
895.05
971.76
1424.29
1989.59
2165.62
2521.73
3135.97
3932.04
2940.23
4625.82
4497.76
2118.54
4316.41
5253.55
6299.37
25981.44

CANTERA BARRO NEGRO


TRANSPORTE DE
MATERIAL DE CANTERA
D <= 1 KM

D > 1 KM

441.11
422.16
404.06
423.73
415.67
402.44
0.00
0.00
412.63
402.20
408.42
409.63
411.14
397.04
429.38
460.62
418.30
435.14
420.56
417.97
358.89
405.43
406.84
404.90
418.91
452.18
401.04
394.02
423.78
468.10
312.79
444.79
394.54
170.85
322.12
364.83
409.05
1632.00
15,717.25

10233.60
9372.00
8566.10
8559.30
7980.80
7324.40
0.00
0.00
6272.00
5711.20
5391.10
4997.50
4604.80
4049.80
3950.30
3777.10
3011.80
2697.90
2186.90
1755.50
1148.40
891.90
488.20
566.90
1005.40
1537.40
1764.60
2127.70
2712.20
3463.90
2627.40
4181.00
4103.20
1947.70
3994.30
4888.70
5890.30
24349.40
168,130.70

DISTANCIA
MEDIA

CANTERA

MATERIAL TRANSPORTADO

D <= 1 KM

D > 1 KM

KM

BADO

15,717.25

15,717.25

168,130.70

10.70

BARRO NEGRO

0.00

0.00

0.00

UBICACIN (KM)
ACCESO (KM)

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

26.160
0.500

DISTANCIA
TRANSP.

MATERIAL

26.16
25.16
24.16
23.16
22.16
21.16
20.16
19.16
18.16
17.16
16.16
15.16
14.16
13.16
12.16
11.16
10.16
9.16
8.16
7.16
6.16
5.16
4.16
3.16
2.16
1.16
0.84
1.84
2.84
3.84
4.84
5.84
6.84
7.84
8.84
9.84
10.84
11.36

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MOMENTO
TRANSPORTE
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TRANSPORTE DE
MATERIAL DE CANTERA
D <= 1 KM

D > 1 KM

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO


TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

METRADOS DE TRANSPORTE DE MATERIAL DE CARPETA ASFALTICA


CANTERA RIO BADO
UBICACIN

INICIO

FINAL

TOTAL

LONG.

CARPETA ASFALTICA

C.G.

PLATAFORMA

15,717.25

ACCESOS

15,717.25

UBICACIN (KM)
ACCESO (KM)
VOLUMEN
TOTAL

DISTANCIA
TRANSP.

168,130.70

10.70

22.900
1.800
MATERIAL

MOMENTO
TRANSPORTE

CANTERA BARRO NEGRO


TRANSPORTE DE
MATERIAL DE CANTERA
D <= 1 KM

D > 1 KM

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

UBICACIN (KM)
ACCESO (KM)
DISTANCIA
TRANSP.

26.160
0.500
MATERIAL

MOMENTO
TRANSPORTE

TRANSPORTE DE
MATERIAL DE CANTERA
D <= 1 KM

D > 1 KM

MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO


TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

METRADOS DE TRANSPORTE DE MATERIAL EXCEDENTE DE CORTE A DME


BOTADERO 1 "QUESQUENDA"
UBICACIN

MATERIAL A ELIMINAR

UBICACIN (KM)

4.00

ACCESO (KM)

0.200

MATERIAL

INICIO

FINAL

LONG.

C.G.

VIA PRINCIPAL

ACCESOS

MEJORAM.

TOTAL

DIST.
TRANSP.

00+000

01+000

1000

0.50

3285.12

0.00

540.00

3825.12

3.70

100%

3825.12

01+000

02+000

1000

1.50

12046.29

0.00

2214.00

14260.29

2.70

100%

02+000

03+000

1000

2.50

3713.49

0.00

0.00

3713.49

1.70

03+000

04+000

1000

3.50

3196.32

0.00

1296.00

4492.32

04+000

05+000

1000

4.50

1078.85

0.00

2376.00

05+000

06+000

1000

5.50

7509.11

0.00

06+000

07+000

1000

6.50

4063.82

07+000

08+000

1000

7.50

08+000

09+000

1000

09+000

10+000

10+000

UBICACIN (KM)

9.35

ACCESO (KM)

0.200

MATERIAL

DIST.
TRANSP.

10327.80

9.05

0%

0.00

14260.29

24242.50

8.05

0%

6312.93

3713.49

2599.40

7.05

4492.32

3144.62

3144.62

0.00

100%

3454.85

2418.40

2418.40

1.70

100%

8211.11

13958.89

7708.82

2.70

100%

7708.82

0.00

785.95

3.70

100%

0.00

432.00

10600.49

4.70

6936.60

0.00

702.00

7638.60

10.50

14564.52

0.00

675.00

1000

11.50

14139.06

0.00

13+000

1000

12.50

24640.10

13+000

14+000

1000

13.50

14+000

15+000

1000

15+000

16+000

16+000

UBICACIN (KM)

12.70

ACCESO (KM)

0.100

MATERIAL

0.00

12.30

0%

0.00

0.00

0.00

11.30

0%

0.00

0.00

0.00

10.30

0.00

0.00

0.00

0.00

0%

0.00

0.00

0.00

4.05

0%

0.00

0.00

13105.00

3.05

0%

0.00

785.95

2122.10

2.05

0%

0.00

0.00

0.00

1.05

0.00

0.00

0.00

0.00

0%

0.00

0.00

0.00

7.70

0%

0.00

0.00

24802.10

8.70

0%

0.00

1377.00

26860.22

9.70

0%

0.00

2943.00

19680.12

10.70

21074.77

0.00

1350.00

22424.77

16.50

15014.20

0.00

0.00

1000

17.50

20942.57

0.00

19+000

1000

18.50

6954.38

19+000

20+000

1000

19.50

20+000

21+000

1000

21+000

22+000

22+000

UBICACIN (KM)

23.30

ACCESO (KM)

0.200

MATERIAL

0.00

23.00

0%

0.00

0.00

0.00

22.00

0%

0.00

0.00

0.00

21.00

0.00

0.00

0.00

0.00

0%

0.00

0.00

0.00

7.30

0%

0.00

0.00

0.00

6.30

0%

0.00

0.00

0.00

5.30

0%

11130.51

10600.49

530.00

4.30

7638.60

2673.51

2673.51

0.00

100%

15239.52

20573.35

15239.52

2.35

0%

0.00

0.00

0.00

3.35

0%

0.00

0.00

0.00

4.35

0%

0.00

0.00

0.00

5.35

0.00

0.00

0.00

0.00

0%

0.00

0.00

0.00

13.70

0%

0.00

0.00

6954.38

14.70

0%

0.00

0.00

3986.54

15.70

0%

0.00

540.00

12312.86

16.70

8399.74

0.00

2052.00

10451.74

22.50

5295.45

0.00

0.00

1000

23.50

4194.74

0.00

25+000

1000

24.50

32419.10

25+000

26+000

1000

25.50

26+000

27+000

1000

27+000

28+000

28+000

UBICACIN (KM)

36.70

ACCESO (KM)

0.250

MATERIAL

D <= 1 KM

D > 1 KM

0.00

36.45

0%

0.00

0.00

0.00

0.00

0.00

0.00

35.45

0%

0.00

0.00

0.00

0.00

0.00

0.00

0.00

34.45

0%

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

33.45

0%

0.00

0.00

0.00

0.00

0%

0.00

0.00

0.00

0.00

32.45

0%

0.00

0.00

0.00

0.00

18.00

0%

0.00

0.00

0.00

0.00

31.45

0%

0.00

0.00

0.00

0.00

0.00

17.00

0%

0.00

0.00

0.00

0.00

30.45

0%

0.00

0.00

0.00

0.00

0.00

0.00

16.00

0%

0.00

0.00

0.00

0.00

29.45

0%

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15.00

0%

0.00

0.00

0.00

0.00

28.45

0%

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14.00

0%

0.00

0.00

0.00

0.00

27.45

0%

0.00

0.00

0.00

0.00

0%

0.00

0.00

0.00

0.00

13.00

0%

0.00

0.00

0.00

0.00

26.45

0%

0.00

0.00

0.00

0.00

1.30

100%

15030.06

19539.08

15030.06

4509.00

12.00

0%

0.00

0.00

0.00

0.00

25.45

0%

0.00

0.00

0.00

0.00

0.00

0.30

100%

24802.10

7440.63

7440.63

0.00

11.00

0%

0.00

0.00

0.00

0.00

24.45

0%

0.00

0.00

0.00

0.00

0.00

0.00

0.90

100%

26860.22

24174.20

24174.20

0.00

10.00

0%

0.00

0.00

0.00

0.00

23.45

0%

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.90

100%

19680.12

37392.23

19680.12

17712.10

9.00

0%

0.00

0.00

0.00

0.00

22.45

0%

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.90

100%

22424.77

65031.83

22424.77

42607.10

8.00

0%

0.00

0.00

0.00

0.00

21.45

0%

0.00

0.00

0.00

0.00

0%

0.00

0.00

0.00

0.00

3.90

100%

15014.20

58555.38

15014.20

43541.20

7.00

0%

0.00

0.00

0.00

0.00

20.45

0%

0.00

0.00

0.00

0.00

8.35

0%

0.00

0.00

0.00

0.00

4.90

0%

0.00

0.00

0.00

0.00

6.00

100%

22292.57

133755.42

22292.57

111462.90

19.45

0%

0.00

0.00

0.00

0.00

0.00

9.35

0%

0.00

0.00

0.00

0.00

5.90

0%

0.00

0.00

0.00

0.00

5.00

100%

6954.38

34771.90

6954.38

27817.50

18.45

0%

0.00

0.00

0.00

0.00

0.00

0.00

10.35

0%

0.00

0.00

0.00

0.00

6.90

0%

0.00

0.00

0.00

0.00

4.00

100%

3986.54

15946.16

3986.54

11959.60

17.45

0%

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.35

0%

0.00

0.00

0.00

0.00

7.90

0%

0.00

0.00

0.00

0.00

3.00

100%

12312.86

36938.58

12312.86

24625.70

16.45

0%

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12.35

0%

0.00

0.00

0.00

0.00

8.90

0%

0.00

0.00

0.00

0.00

2.00

100%

10451.74

20903.48

10451.74

10451.70

15.45

0%

0.00

0.00

0.00

0.00

0%

0.00

0.00

0.00

0.00

13.35

0%

0.00

0.00

0.00

0.00

9.90

0%

0.00

0.00

0.00

0.00

1.00

100%

5295.45

5295.45

5295.45

0.00

14.45

0%

0.00

0.00

0.00

0.00

19.70

0%

0.00

0.00

0.00

0.00

14.35

0%

0.00

0.00

0.00

0.00

10.90

0%

0.00

0.00

0.00

0.00

0.40

100%

4194.74

1677.90

1677.90

0.00

13.45

0%

0.00

0.00

0.00

0.00

32419.10

20.70

0%

0.00

0.00

0.00

0.00

15.35

0%

0.00

0.00

0.00

0.00

11.90

0%

0.00

0.00

0.00

0.00

1.40

100%

32419.10

45386.74

32419.10

12967.60

12.45

0%

0.00

0.00

0.00

0.00

540.00

30966.32

21.70

0%

0.00

0.00

0.00

0.00

16.35

0%

0.00

0.00

0.00

0.00

12.90

0%

0.00

0.00

0.00

0.00

2.40

100%

30966.32

74319.17

30966.32

43352.80

11.45

0%

0.00

0.00

0.00

0.00

0.00

1080.00

15587.13

22.70

0%

0.00

0.00

0.00

0.00

17.35

0%

0.00

0.00

0.00

0.00

13.90

0%

0.00

0.00

0.00

0.00

3.40

100%

15587.13

52996.24

15587.13

37409.10

10.45

0%

0.00

0.00

0.00

0.00

32899.75

0.00

648.00

33547.75

23.70

0%

0.00

0.00

0.00

0.00

18.35

0%

0.00

0.00

0.00

0.00

14.90

0%

0.00

0.00

0.00

0.00

4.40

100%

33547.75

147610.10

33547.75

114062.40

9.45

0%

0.00

0.00

0.00

0.00

28.50

12354.17

0.00

1593.00

13947.17

24.70

0%

0.00

0.00

0.00

0.00

19.35

0%

0.00

0.00

0.00

0.00

15.90

0%

0.00

0.00

0.00

0.00

5.40

100%

13947.17

75314.72

13947.17

61367.50

8.45

0%

0.00

0.00

0.00

0.00

1000

29.50

17890.40

0.00

1242.00

19132.40

25.70

0%

0.00

0.00

0.00

0.00

20.35

0%

0.00

0.00

0.00

0.00

16.90

0%

0.00

0.00

0.00

0.00

6.40

100%

19132.40

122447.36

19132.40

103315.00

7.45

0%

0.00

0.00

0.00

0.00

31+000

1000

30.50

14189.42

0.00

378.00

14567.42

26.70

0%

0.00

0.00

0.00

0.00

21.35

0%

0.00

0.00

0.00

0.00

17.90

0%

0.00

0.00

0.00

0.00

7.40

0%

0.00

0.00

0.00

0.00

6.45

100%

14567.42

93959.86

14567.42

79392.40

31+000

32+000

1000

31.50

20205.49

0.00

162.00

20367.49

27.70

0%

0.00

0.00

0.00

0.00

22.35

0%

0.00

0.00

0.00

0.00

18.90

0%

0.00

0.00

0.00

0.00

8.40

0%

0.00

0.00

0.00

0.00

5.45

100%

20367.49

111002.82

20367.49

90635.30

32+000

33+000

1000

32.50

13927.25

0.00

810.00

14737.25

28.70

0%

0.00

0.00

0.00

0.00

23.35

0%

0.00

0.00

0.00

0.00

19.90

0%

0.00

0.00

0.00

0.00

9.40

0%

0.00

0.00

0.00

0.00

4.45

100%

14737.25

65580.76

14737.25

50843.50

33+000

34+000

1000

33.50

25641.43

0.00

297.00

25938.43

29.70

0%

0.00

0.00

0.00

0.00

24.35

0%

0.00

0.00

0.00

0.00

20.90

0%

0.00

0.00

0.00

0.00

10.40

0%

0.00

0.00

0.00

0.00

3.45

100%

25938.43

89487.58

25938.43

63549.20

34+000

35+000

1000

34.50

7703.45

0.00

1201.50

8904.95

30.70

0%

0.00

0.00

0.00

0.00

25.35

0%

0.00

0.00

0.00

0.00

21.90

0%

0.00

0.00

0.00

0.00

11.40

0%

0.00

0.00

0.00

0.00

2.45

100%

8904.95

21817.13

8904.95

12912.20

35+000

36+000

1000

35.50

17344.75

0.00

216.00

17560.75

31.70

0%

0.00

0.00

0.00

0.00

26.35

0%

0.00

0.00

0.00

0.00

22.90

0%

0.00

0.00

0.00

0.00

12.40

0%

0.00

0.00

0.00

0.00

1.45

100%

17560.75

25463.09

17560.75

7902.30

36+000

37+000

1000

36.50

11750.68

0.00

0.00

11750.68

32.70

0%

0.00

0.00

0.00

0.00

27.35

0%

0.00

0.00

0.00

0.00

23.90

0%

0.00

0.00

0.00

0.00

13.40

0%

0.00

0.00

0.00

0.00

0.45

100%

11750.68

5287.81

5287.81

0.00

37+000

37+040

40

37.02

0.00

0.00

0.00

0.00

33.22

0%

0.00

0.00

0.00

0.00

27.87

0%

0.00

0.00

0.00

0.00

24.42

0%

0.00

0.00

0.00

0.00

13.92

0%

0.00

0.00

0.00

0.00

0.57

100%

0.00

0.00

0.00

0.00

497,242.65

0.00

31,414.50

528,657.15

46,451.95

102,212.40

44,067.80

58,144.60

33,478.61

34,377.38

28,513.52

5,863.80

123,811.47

212,133.35

103,763.98

108,369.40

211,088.15

767,363.21

208,571.31

558,791.80

113,826.97

412,599.05

107,364.10

305,234.90

D <= 1 KM

D > 1 KM

14152.94

3825.12

0.00

0.00

14260.29

38502.78

0.00

0.00

100%

3713.49

0%

0.00

0.70

100%

6.05

0%

3454.85

0.70

0.00

5.05

702.00

8211.11

8211.11

5747.80

0.00

3645.00

20813.81

7708.82

785.95

0.00

785.95

2908.02

8.50

10168.49

0%

0.00

1000

9.50

5.70

0%

11+000

1000

15239.52

6.70

11+000

12+000

891.00

15030.06

12+000

0.00

162.00

25483.22

0.00

14.50

16737.12

1000

15.50

17+000

1000

17+000

18+000

18+000

D <= 1 KM

D > 1 KM

D <= 1 KM

D > 1 KM

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0%

0.00

0%

0.00

9.30

0%

20.00

0%

0.00

8.30

0.00

19.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100%

10600.49

0%

0.00

0.35

100%

3.30

0%

0.00

1.35

5333.80

2.30

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0%

0.00

0%

0.00

11.70

0%

6.35

0%

15014.20

12.70

0.00

7.35

1350.00

22292.57

0.00

0.00

0.00

0.00

0.00

0.00

3986.54

0.00

0.00

0.00

20.50

11772.86

0%

0.00

1000

21.50

17.70

0%

23+000

1000

5295.45

18.70

23+000

24+000

0.00

4194.74

24+000

0.00

0.00

30426.32

0.00

26.50

14507.13

1000

27.50

29+000

1000

29+000

30+000

30+000

BOTADERO

VOLUMEN
A
ELIMINAR
(m3)

D <= 1 KM

D > 1 KM

KM

BOTADERO 1 "QUESQUENDA"

46,451.95

44,067.80

58,144.60

2.20

TRANSPORTE DE
MATERIAL EXCEDENTE

ELIMINAR

DISTANCIA
MEDIA

BOTADERO 2 "FRAILONES"

33,478.61

28,513.52

5,863.80

1.03

BOTADERO 3 "S/N"

123,811.47

103,763.98

108,369.40

1.71

BOTADERO 4 "SAYAPAMPA"

211,088.15

208,571.31

558,791.80

3.64

BOTADERO 5 "EL TUNEL"

113,826.97

107,364.10

305,234.90

3.62

TOTAL

528,657.15

492,280.70

1,036,404.50

2.89

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

ELIMINAR

ELIMINAR

MOMENTO
M3-KM

TRANSPORTE DE
MATERIAL
EXCEDENTE

ELIMINAR

MOMENTO
M3-KM

BOTADERO 5 "EL TUNEL"

TRANSPORTE DE
MATERIAL
EXCEDENTE

DIST.
TRANSP.

D > 1 KM

MOMENTO
M3-KM

BOTADERO 4 "SAYAPAMPA"
TRANSPORTE DE
MATERIAL
EXCEDENTE

DIST.
TRANSP.

D <= 1 KM

MOMENTO
M3-KM

BOTADERO 3 "S/N"

TRANSPORTE DE
MATERIAL
EXCEDENTE

DIST.
TRANSP.

ELIMINAR

MOMENTO
M3-KM

BOTADERO 2 "LOS FRAILONES"

TRANSPORTE DE
MATERIAL
EXCEDENTE

MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO


TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

TRANSPORTE DE MATERIAL DE DERRUMBE A DME


BOTADERO 3 "SAYAPAMPA"
UBICACIN

MATERIAL A ELIMINAR

UBICACIN (KM)

23.30

ACCESO (KM)

0.200

MATERIAL

INICIO

FINAL

LONG.

C.G.

DERRUMBE
m3

TOTAL
m3

DIST.
TRANSP.

20+640

20+680

40

20.66

1486.65

1486.65

2.84

100%

1486.65

24+860

24+920

60

24.89

1835.00

1835.00

1.79

100%

25+300

25+340

40

25.32

2187.05

2187.05

2.22

25+740

25+780

40

25.76

2237.25

2237.25

25+940

26+000

60

25.97

3261.15

27+320

27+360

40

27.34

29+620

29+680

60

32+450

32+470

32+940
33+060

TRANSPORTE DE
MATERIAL
EXCEDENTE

UBICACIN (KM)

36.70

ACCESO (KM)

0.250
MATERIAL

D <= 1 KM

D > 1 KM

2735.40

16.29

0%

0.00

0.00

0.00

0.00

1835.00

1449.70

12.06

0%

0.00

0.00

0.00

0.00

4855.25

2187.05

2668.20

11.63

0%

0.00

0.00

0.00

0.00

2237.25

5951.09

2237.25

3713.80

11.19

0%

0.00

0.00

0.00

0.00

100%

3261.15

9359.50

3261.15

6098.40

10.98

0%

0.00

0.00

0.00

0.00

4.24

100%

2238.00

9489.12

2238.00

7251.10

9.61

0%

0.00

0.00

0.00

0.00

3178.00

6.55

100%

3178.00

20815.90

3178.00

17637.90

7.30

0%

0.00

0.00

0.00

0.00

1026.80

1026.80

9.36

0%

0.00

0.00

0.00

0.00

4.49

100%

1026.80

4610.33

1026.80

3583.50

32.96

2356.00

2356.00

9.86

0%

0.00

0.00

0.00

0.00

3.99

100%

2356.00

9400.44

2356.00

7044.40

33.09

4541.00

4541.00

9.99

0%

0.00

0.00

0.00

0.00

3.86

100%

4541.00

17528.26

4541.00

12987.30

30

33.31

1373.00

1373.00

10.21

0%

0.00

0.00

0.00

0.00

3.65

100%

1373.00

5004.59

1373.00

3631.60

50

35.73

4274.95

4274.95

12.63

0%

0.00

0.00

0.00

0.00

1.23

100%

4274.95

5236.81

4274.95

961.90

100

35.91

6419.75

6419.75

12.81

0%

0.00

0.00

0.00

0.00

1.04

100%

6419.75

6676.54

6419.75

256.80

36,414.60

36,414.60

16,423.10

41,554.50

19,991.50

28,465.50

D <= 1 KM

D > 1 KM

4222.09

1486.65

1835.00

3284.65

100%

2187.05

2.66

100%

3261.15

2.87

2238.00

2238.00

29.65

3178.00

20

32.46

32+980

40

33+120

60

33+290

33+320

35+700

35+750

35+860

35+960

16,423.10

BOTADERO

VOLUMEN
A
ELIMINAR
(m3)

TRANSPORTE DE
MATERIAL DERRUMBE
D <= 1 KM

D > 1 KM

BOTADERO 3 "SAYAPAMPA"

16,423.10

16,423.10

41,554.50

BOTADERO 4 "EL TUNEL"

19,991.50

19,991.50

28,465.50

TOTAL

36,414.60

36,414.60

70,020.00

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLLO-SHIRAN-HUAMACHUCO
TRAMO: ALTO CHICAMA(CALLACUYAN) - HUAMACHUCO

ELIMINAR

19,991.50

MOMENTO
M3-KM

TRANSPORTE DE
MATERIAL
EXCEDENTE

DIST.
TRANSP.

ELIMINAR

MOMENTO
M3-KM

BOTADERO 4 "EL TUNEL"

Vous aimerez peut-être aussi