1.

Introduction ............................................................................................................................................ 3

2.

The Planning Application Specification.............................................................................................. 4

3.

Planning Application Package............................................................................................................ 6

4.

Development Overview ..................................................................................................................... 11

Appendices
Appendix A

Development Specification

Appendix B

Key Plans

Appendix C

Document/Plan Schedule

Contact:
Nick Alston
020 7911 2056
Nick.alston@gva.co.uk
For and on behalf of GVA Grimley Limited

April 2016 gva.co.uk

Stone Hill Park Planning Application Summary Document

1.

Introduction

1.1

The purpose of this document is to provide a summary of the planning application for the
redevelopment of the former Manston Airport site.

1.2

The document is structured as follows:

Section 2 sets out the application specification;

Section 3 provides a description of the planning application package (plans/documents


submitted for approval and/or in support of the application); and

Section 4 provides a high level description of the key strategies that form part of the
application proposals.

1.3

The Development Specification and plans submitted for approval are enclosed at Appendix
A and B for ease of reference. A document/plan schedule is provided at Appendix C.

April 2016 gva.co.uk

Stone Hill Park Planning Application Summary Document

2.

The Planning Application Specification


Type/Form of Application

2.1

The application is submitted in hybrid form (part-outline and part-detailed).

Site
2.2

The Site comprises the former Manston Airport and extends to 303ha. It is bounded by Spitfire
Way (B2190), Manston Road and Vincent Road to the north; Manston Court Road, existing
agricultural fields, and the fence line of the former airport to the west; Hengist Way (A299) to
the south; and Spitfire Way (B2190) to the west. The red line plan of the Site is attached at
Appendix B.

Description of Development
2.3

Planning permission is sought for the comprehensive redevelopment of the Site involving the
demolition of existing buildings and structures and removal of hard standing and associated
infrastructure, and provision of mixed use development.

2.4

The outline element comprises an outline planning application (with all matters except Access
reserved for future determination) for the provision of:

2.5

Buildings/floorspace for the following uses:


-

Employment (Use Classes B1a-c/B2/B8)

Residential (Use Classes C3/C2)

Retail (Use Classes A1-A5)

Education and other non-residential institutions (Use Class D1)

Sport and recreation (Use Class D2)

Hotel (Use Class C1)

Open space/landscaping (including outdoor sport/recreation facilities)

Car parking

Infrastructure (including roads and utilities)

Site preparation and other associated works

The full/detailed element of the application comprises:

Change of Use of retained existing buildings

Development of Phase 1 comprising four industrial units (Use Class B1c/B2/B8) with
ancillary car parking and associated infrastructure.

April 2016 gva.co.uk

Stone Hill Park Planning Application Summary Document

Access

April 2016 gva.co.uk

Stone Hill Park Planning Application Summary Document

3.

Planning Application Package

3.1

The planning application package comprises the relevant forms/notices/certificates (ref.


SHP1-2) and fee, alongside plans/documents for approval and other supporting information,
as explained below:

Details Submitted for Approval


3.2

Details submitted for approval comprise the following:

The amount of development and associated uses, as set out in a Development


Specification (ref. SHP1-B);

3.3

Development parameters, as set out in a suite of Parameter Plans (ref. SHP1-A); and

Detailed Plans for Phase 1 (ref.SHP1-C).

An overview of these details is set out below:

Development Specification
3.4

The amount of development and uses for which planning consent is sought is set out in the
Development Specification (ref. SHP1-B) (enclosed at Appendix A). It is anticipated that this
will be secured by means of condition. A summary is provided is Table 3.1, below:

Table 3.1 Hybrid Planning Application Total


Use Class
A1-A5

Maximum Quantum
3,100 sqm (GIA), of which:

B1(a-c)/B2/B8

Maximum 1,100sqm (net) Use Class A1 convenience sales area


Maximum 563sqm (net) Use Class A1 comparison sales area

85,000 sqm (GIA), of which:

Maximum 1,700sqm (GIA) for use as office (B1a/b)

[See Notes]
C1

120 hotel bedrooms

C3/C2

2,500 residential units, to comprise:

D1/D2

Maximum 2,500 dwellings (use class C3)


Maximum 250 units to be age-restricted for elderly persons (units to comprise bedspaces (use
class C2) or dwellings (use class C3))

2 primary schools, with combined capacity of up to 4 forms of entry


and
11,500sqm (GIA) of other D1/D2
[See Notes]

Notes
Combined total B1(a-c)/B2/B8/D1/D2 floorspace to not exceed 85,000sqm (GIA)(excluding primary schools)
Class D2 uses restricted to sport and recreation only

April 2016 gva.co.uk

Stone Hill Park Planning Application Summary Document

Parameter Plans
3.5

A set of parameter plans are submitted for approval (ref.SHP1-A). The plans set parameters
within which details of reserved matters and development subsequently brought forward must
comply. It is anticipated that these plans will be secured via means of condition.

3.6

The plans are described below:

Parameter Plan 1: Development Zones


This defines:
-

The extent of a series of Development Zones within which new built form
(buildings/structures) and associated infrastructure/open space is permitted.

The extent of a Structural Open Space and Infrastructure Zone where surface/subsurface fixed infrastructure, green infrastructure, and outdoor sport/recreation facilities
is allowed.

The extent of a Special Outdoor Water-Based Recreation Zone where a recreational


surface water body and associated built facilities (wave garden) is allowed (in
addition to the development allowed within the Structural Open Space and
Infrastructure Zone).

Parameter Plan 2: Access and Movement


This defines:
-

The locations of vehicular access points to the site.

Parameters for the alignment of primary and secondary routes within the site
(including allowable limits of deviation of the identified alignment).

The extent of existing roads to be subject to upgrade works.

Connection points to existing non-vehicular routes.

Safeguarded land for potential future highway infrastructure.

In addition it confirms that tertiary routes (estate roads) not spatially defined on the plan
are allowed within Development Zones, and that all routes are to include provision for
cyclists and pedestrians.

Parameter Plan 3: Land Use


This defines allowable land uses within the defined Development Zones.

Parameter Plan 4: Density and Height


This defines maximum building heights and allowable development densities.

Parameter Plan 5: Green Infrastructure


This defines landscape parameters including the spatial extent of different green
infrastructure typologies.

Parameter Plan 6: Demolition and Retention


This identifies existing buildings and areas of hardstanding to be retained and removed.

April 2016 gva.co.uk

Stone Hill Park Planning Application Summary Document

Detailed Plans for Phase 1


3.7

A set of detailed plans for Phase 1 are submitted for approval (ref.SHP1-C). It is anticipated
that these plans will be secured via means of condition.

3.8

Phase 1 comprises the provision of 10,224sqm of B1(c)/B2/B8 floorspace with associated car
parking

(300

spaces),

access/servicing

arrangements,

and

landscaping

works.

The

accommodation is spread across 4 industrial units comprising 3,716sqm (40,000sqft), 2,788sqm


(30,000sqft) and 2 units of 1,860sqm (20,000sqft) (all areas are GIA).

Supporting Information
3.9

A comprehensive package of supporting plans and documentation is submitted with the


planning

application.

The

purpose

of

this

documentation

is

to

assist

in

the

understanding/evaluation of the plans/details submitted for approval and to establish


commitments to control implementation (where appropriate).
3.10

An overview of each plan/document is provided below. Note that documents marked with
an asterix(*) include details of proposed commitments. Where this is the case these are clearly
identified within the relevant document. It is anticipated that these commitments will be
secured either via condition or (where appropriate) s.106 agreement.

Illustrative Masterplan
This illustrates how the development proposed by the planning application could be
delivered. It is submitted for illustrative purpose only.

Other Drawings for Information


Site Plan, Site Location Plan, Topographical Survey.

Design and Access Statement (ref. SHP1-3)*


Statement that sets out the design rationale underpinning the illustrative masterplan;
parameter plans; and detailed plans for Phase 1. It includes a sport/play strategy and a
set of design principles (commitments).

Planning Statement (ref. SHP1-4)*


This document sets out the planning justification for the proposed development. The
Statement is supported by the following appendices which set out land use related
evidence:
-

Loss of Existing Use Position Statement (ref. SHP1-4.1): provides an evidence base that
demonstrates that there is no reasonable prospect of the existing use recommencing.

Economic Need (ref. SHP1-4.2): provides an evidence base to justify the provision of
employment uses.

April 2016 gva.co.uk

Stone Hill Park Planning Application Summary Document

Housing Need (ref. SHP1-4.3): provides an evidence base to justify the provision of
housing.

Retail Assessment (ref.SHP1-4.4): provides details to satisfy the sequential test and
impact assessment requirements of NPPF paragraphs 24-27 (in respect of retail and
main town centre uses).

Outline Business Case (ref. SHP1-5)


This provides high level details of the applicants business plan in order to demonstrate the
commercial deliverability of the proposed development.

Outline Phasing and Delivery Strategy (ref. SHP1-6)*


This sets out an outline phasing and delivery strategy for the proposed development,
including:
-

Details of phasing/sequencing triggers that are necessary to define as part of the


outline consent; and

An indication of how the approved development could be implemented (in terms of


the spatial extent and composition of phases, and the sequence in which these come
forward).

Transport Assessment and Travel Plan (including Stage 1 Road Safety Audit) (ref. SHP1-7)*
This sets out the proposed access arrangements and sets out the outcomes of an
assessment of the transport impacts of the outline proposals. It includes:
-

Outline Travel Plan (it is anticipated that a detailed Travel Plan will be prepared prior
to implementation, and secured via condition)

Details of mitigation measures to support the development in transport terms and


detailed access works, which it is anticipated will be secured by condition/s.106
obligation.

Note that it is the applicants intention to submit supplementary supporting information


during the determination period to set out the results of further transport modelling, which
is intended to verify the assessment work set out in the Transport Assessment. This will be
presented as an addendum to the Transport Assessment, and is likely to be completed in
summer 2016.

Energy and Sustainability Statement (ref. SHP1-8)*


This sets out an outline energy and sustainability strategy for the site. It includes details of
mitigation

measures

and

other

commitments

to

support

the

development

in

energy/sustainability terms (which we anticipate will be secured by condition).

Waste Management Strategy (ref. SHP1-9)*


Sets out a waste management strategy for the proposed development.

Flood Risk Assessment and Surface Water Drainage Strategy (ref. SHP1-10)*
Sets out an assessment of the flood risk impact of the proposed development and an
outline surface water drainage strategy.

April 2016 gva.co.uk

Stone Hill Park Planning Application Summary Document

Statement of Community Involvement (ref. SHP1-11)


This provides details of how the applicant has informed, consulted, and involved the
community in the preparation of the development proposals.

Initial s.106 Heads of Terms and Viability Appraisal (ref. ref.SHP1-12)*


The purpose of this document is to set out initial heads of terms of proposed planning
obligations, in the context of a viability appraisal of the proposed development. It is the
applicants intention to submit a draft s.106 agreement during the determination period
once negotiations on the draft heads of terms has reached an appropriate stage.

Environmental Statement (ref. SHP1-13/14/15) (including non-technical summary)*


The Environmental Statement (ES) sets out the outcome of an Environmental Impact
Assessment (EIA) of the proposed development. It covers the following scope:
-

Air quality

Noise

Ecology and nature conservation

Landscape and visual impact

Traffic and transportation

Archaeology and cultural heritage

Water resources and flood risk

Socio-economics

Ground conditions, hydrogeology and contamination

Artificial lighting

Note that it is the applicants intention to submit supplementary supporting information


during the determination period to set out the results of further ecological survey work
being undertaken in Summer 2016. This will be presented as an addendum to the
Environmental Statement.

Utilities Statement (ref. SHP1-16)*


This

provides

an

outline

strategy

for

the

delivery

of

power,

gas,

water,

telecommunications, and other utility services.

Outline Construction Environmental Management Plan (ref. SHP1-17)


Provides outline construction management details.

Viability Assessment (ref. SHP1-18)


Provides an assessment of financial viability of the proposed development in order to
inform s.106 negotiations (particularly in respect of affordable housing). This will be
submitted to the LPA during the course of the determination period in follow-up to SHP112, above.

April 2016 gva.co.uk

Stone Hill Park Planning Application Summary Document

4.

Development Overview

4.1

The purpose of this section is to provide a high-level summary of some of the key ingredients
of the planning application proposals, as set out in the supporting documentation.

The Masterplan/Vision
4.2

The proposed development comprises 6 key components: (1) residential; (2) employment; (3)
sport/recreation facilities; (4) museums/cultural heritage uses; (5) village centre; and (6) open
space. The intention is that these components will function as an inter-dependent mutually
beneficial mix of uses that complement and support one another and create an integrated
mixed use new community. Critically, the aim is to blend this mix of uses with the sites
heritage, high quality design, effective estate management, sound environmental practice,
and a focussed delivery strategy to create a high quality and distinctive new place which
firmly accords with sustainable development principles.

Urban Design/Landscape Strategy


4.3

The Design and Access Statement presents, explains, and justifies the parameter plans and
illustrative masterplan. We propose that a condition be imposed that requires a Design Code
to be submitted/approved by the LPA prior to the commencement of development.

Phasing/Implementation
4.4

Planning permission will be sought for the approval of reserved matters to be made in a series
of phases within a period extending up to 15 years from the date of the planning consent (to
be formalised by condition). The assumed start date of the development is 2017, with an
assumed implementation period of 15-20 years.

4.5

The applicant intends to perform the role of master-developer. It will be responsible for site
preparation/enabling/infrastructure works and the development of some of the employment
and housing phases. Other phases will be sold as serviced development parcels to other
developers/housebuilders who will be responsible for delivering development.

4.6

As outlined above, the application is supported by an Outline Phasing and Delivery Strategy
(ref.SHP1-6). We propose a condition that requires a detailed Phasing Strategy to be
prepared/approved by the LPA prior to the commencement of development, which should
be in general accordance with the outline strategy and include provision for review during the
course of the implementation stage.

April 2016 gva.co.uk

Stone Hill Park Planning Application Summary Document

Housing
Unit Size and Type Mix
4.7

The housing (use class C3) component of the development will comprise a mix of sizes and
types, ranging from 1-5 bedrooms and including apartments and houses. An indicative unit
size mix is provided within the Planning Statement, which comprises:

One bed: 10-20%

Two bed: 30-40%

Three bed: 30-40%

Four+ bed: 15-20%

4.8

The C3 housing products may include self-build and custom-build.

4.9

The application proposes that up to 250 of the residential units can be provided as agerestricted C3 or C2 units (for elderly persons). These could comprise a number of products
including retirement housing, extra-care/assisted living, residential care, residential nursing (or
a blend of products provided as a retirement village).

4.10

The application proposes that a condition be imposed that requires a Housing Scheme to be
submitted/approved by the LPA prior to the commencement of development, which will
include provision for review during the course of the implementation stage.

Tenure Mix
4.11

The housing component of the development will include a mix of tenures. The Initial s.106
Heads of Terms and Viability Appraisal (ref. SHP1-12) proposes that 15% of C3 residential units
will be provided as affordable tenures, to comprise 60% Intermediate tenures and 40%
Affordable Rent (Intermediate tenures to comprise Shared Ownership and Discount Market
Sale/Starter Home). The affordable proportion and product mix will be controlled by a s.106
planning obligation.

4.12

It is anticipated that private units will be provided both for sale and for rent.

Employment
4.13

The application seeks planning consent for up to 85,000sqm of employment floorspace,


defined as B1(a-c), B2, and B8 use classes, of which a maximum 1,700sqm can be used for B1
(a/b) uses.

April 2016 gva.co.uk

Stone Hill Park Planning Application Summary Document

4.14

The employment uses are intended to focus on an Advanced Manufacturing Park and
therefore it is intended that the majority of floorspace will be taken up for B1(c) and B2 uses.
This will comprise a high quality managed/serviced environment which is intended to
complement the existing employment offer at Manston Business Park. This will involve the
reuse of some retained existing buildings and the provision of new development (including
10,244sqm of new floorspace as part of Phase 1, which comprises the detailed element of the
application). B1(a) uses are restricted to the Village Centre.

Retail
4.15

The application seeks planning consent for up to 3,100sqm of A class development. The
intention is that this will be sized to provide for the local shopping (A1) needs of future
residents/workers alongside a local-scale food/beverage (A3-5) and professional services (A2)
offer. Controls are proposed to ensure this, including a limit on the amount of A1 convenience
retail floorspace (1,100sqm) and A1 comparison retail floorspace (563sqm). A class uses are
restricted to a defined High Street area which is intended to form the heart of a new mixed
use village centre.

Social Infrastructure
4.16

The proposed development includes the provision of up to 11,500sqm of D1/D2 uses plus up to
2 primary schools with a combined capacity of up to 4-forms of entry. It is anticipated that the
D1 allowance will include a community centre and GP surgery, provided within the Village
Centre, which are intended to satisfy the social infrastructure needs generated by the
proposed development (as assessed in the Social Infrastructure Assessment provided in the
ES). The primary schools will be located either within the Village Centre or residential areas
(most accessible parts of the site which benefit from complementary adjacent uses, and
within walk distance of most/all homes).

Sport/Recreation/Play
4.17

A strategy for the provision of outdoor sport/recreation and play facilities to meet the needs of
future residents is provided in the Design and Access Statement (ref. SHP1-3). This commits to
the provision of 6ha of playing fields, 3 Neighbourhood Equipped Areas for Play (NEAPs), 4
Local Equipped Areas for Play (LEAPs) and 27 Local Areas for Play (LAP). We propose that a
Sports and Play Scheme is prepared/submitted to the LPA for approval prior to the
commencement of development (secured by condition). We note that these outdoor
sport/play facilities form part of a network of around 100ha of publicly accessible open space

April 2016 gva.co.uk

Stone Hill Park Planning Application Summary Document

(as controlled by the parameter plans), including the part-retained runway which is
anticipated to provide a unique outdoor recreation resource.
4.18

The planning application allows for up to 11,500sqm of D1/D2 uses (which includes indoor
sport and recreation uses). The intention is that this will allow for the provision of small scale
sport/recreation facilities to meet the local needs of residents/workers. In addition to this it
allows for the provision of a regionally significant sports facility (the applicants aspiration is for
this to be an indoor swimming pool).

4.19

Further to this, the application allows for the provision of an outdoor recreational surface
water body and associated built facilities to be provided. The Applicants aspiration is that
this will comprise a man-made surf lake (a wave garden) which it is anticipated will function
as a regionally significant visitor attraction. The vision is that the co-location of this with the
proposed swimming pool and some of the outdoor sports/recreation facilities will allow for the
establishment of a base for multi-sport activities such as triathlons.

Museums
4.20

The existing museums are incorporated into the masterplan. They are to continue operating
but the plans introduce opportunities to strengthen their offer via the inclusion of retained
airport related buildings/structures and the grass runway which it is anticipated will be used for
special historic/aviation related events.

Transport/Access
Vehicular
4.21

Vehicular access to the proposed development will be achieved from six main points of
access. These are depicted on Parameter Plan 2 and can be described as follows:

A fourth arm on the existing roundabout at the A299 Hengist Way/Canterbury Road West
junction to provide the principal point of access to the development.

A new roundabout on Spitfire Way at the existing junction of Alland Grange Lane and
Spitfire Way as the secondary point of access to the development.

New priority junctions on Spitfire Way to serve the Phase 1 employment land and
employment development in the west of the site.

A new roundabout to replace the existing Spitfire Corner junction with access provided to
the development from the north west.

A new priority junction on Manston Road to access the development from the north.

April 2016 gva.co.uk

Stone Hill Park Planning Application Summary Document

4.22

The development will include the provision of a new north-south link between the A299 Hengist
Way in the south and Manston Road in the north to facilitate the first phase of a potential link
towards Westwood Cross as identified in the Thanet Transport Strategy.

4.23

In order to control access to Manston Road to the north of the site bus gates will be
introduced within the development to restrict access. The placement of these bus gates will
be agreed with Kent County Council as part of reserved matters applications for the relevant
phase of the development.

Public Transport
4.24

Bus access to the site will be phased and secured through a comprehensive Public Transport
Strategy tied to the S106 agreement that has been agreed in principle with the operator
Stagecoach East Kent and Kent County Council.

4.25

Initially it is proposed to provide additional bus stops on the roads surrounding the site (Spitfire
Way and Canterbury Road West) to facilitate access to existing services. At an appropriate
trigger point it is then proposed to extend an existing route that serves Westwood Cross and
Ramsgate railway station to the site. Further triggers to then divert services within the site will
be secured through the S106 agreement. In the longer term implementation of a new service
to link the strategic sites on the Haine Road corridor with Westwood Cross, the proposed
Parkway Station and Discovery Park has been allowed for in the strategy.

Walking and Cycling


4.26

Pedestrian and cycle access to the site will be enhanced through the introduction of a series
of new permissive rights of ways that will cross the development connecting with existing
routes off-site. New crossing points will be introduced on the surrounding highway network to
facilitate onward connections including:

Minster Road to the west of the site to link with existing pedestrian/cycle facilities at the
Minster Roundabout

4.27

Manston Road to facilitate a crossing to link the public rights of way in the area

Improvement of bridleway TR10 will provide a high quality pedestrian and cycle link to the
east of the site to connect with Ramsgate and the railway station, and improved linkages
to/from the proposed Parkway Station will be delivered when the station is opened.

April 2016 gva.co.uk

Stone Hill Park Planning Application Summary Document

Environment
4.28

The Environmental Statement (ES) identifies a series of commitments and mitigation measures
to ensure that the environmental impact of the proposed development is acceptable. We
propose that these mitigation measures are secured by condition.

4.29

Refer to the Environmental Non-technical Summary for an overview of the Environmental


Impact Assessment.

Sustainability/Energy
4.30

With regards to the Energy Strategy, the development is required to meet minimum national
building regulations (Part L 2013). The current energy strategy aims to exceed this by ensuring
regulated carbon emissions for the buildings are 10% below these requirements. This will be
accomplished through a mixture of improving building fabric above notional values as well as
through the use of renewable energy most likely in the form of photovoltaic solar panels. This
strategy applies to both the domestic and commercial elements of the proposed
development. A condition is proposed that requires each reserved matters application (for a
phase of development) to be supported by a phase-specific energy and sustainability
strategy.

Surface Water Drainage


4.31

The proposed strategy is to attenuate flows via the use of SuDS features located within the
existing low spots of the site, and discharge to the existing surface water outfall that eventually
discharges to the Pegwell Bay. The outline strategy (which supports the application) details
the principles of the strategy, and a condition is proposed that requires a detailed strategy to
be submitted prior to the commencement of development.

Estate Management
4.32

The intention is to transfer Primary roads to the Highway Authority for adoption. All other
common areas (including estate roads and public open space) will be held in private
ownership.

4.33

Outline details of estate management arrangements are provided as part of the application
(in the Planning Statement). A condition is proposed that requires an Estate Management
Strategy to be submitted to/approved by the LPA prior to the commencement of
development.

April 2016 gva.co.uk

Appendix A: Development Specification

Stone Hill Park


Ref. SHP1-B

Development Specification

1. Description of Proposed Development


Comprehensive redevelopment of the site involving the demolition of existing buildings and
structures and removal of hard standing and associated infrastructure, and provision of mixed
use development. Application submitted in hybrid form (part-outline and part-detailed).
The outline element comprises an outline planning application (with all matters except Access
reserved for future determination) for the provision of:
Buildings/floorspace for the following uses:
o Employment (Use Classes B1a-c/B2/B8)
o Residential (Use Classes C3/C2)
o Retail (Use Classes A1-A5)
o Education and other non-residential institutions (Use Class D1)
o Sport and recreation (Use Class D2)
o Hotel (Use Class C1)
Open space/landscaping (including outdoor sport/recreation facilities)
Car parking
Infrastructure (including roads and utilities)
Site preparation and other associated works
The full/detailed element of the application comprises:
Change of Use of retained existing buildings
Development of Phase 1 comprising four industrial units (Use Class B1c/B2/B8) with
ancillary car parking and associated infrastructure.
Access

gva.co.uk

2. Development Quantum
Table 2.1 Hybrid Planning Application Total
Use Class

Maximum Quantum

A1-A5

3,100 sqm (GIA), of which:

B1(a-c)/B2/B8

Maximum 1,100 sqm (net) Use Class A1 convenience sales area


Maximum 563 sqm (net) Use Class A1 comparison sales area

85,000 sqm (GIA), of which:

Maximum 1,700 sqm (GIA) for use as office (B1a/b)

[See Notes]
C1

120 bedrooms

C3/C2

2,500 residential units, to comprise:

D1/D2

Maximum 2,500 dwellings (use class C3)


Maximum 250 units to be age-restricted for elderly persons (units to comprise
bedspaces (use class C2) or dwellings (use class C3))

2 primary schools, with combined capacity of up to 4 forms of entry


and
11,500sqm (GIA) of other D1/D2
[See Notes]

Notes
Combined total B1(a-c)/B2/B8/D1/D2 floorspace to not exceed 85,000sqm (GIA)(excluding primary schools)
Class D2 uses restricted to sport and recreation only

Table 2.2 Change of Use of Retained Existing Buildings


Building
Ref.**

Existing Lawful Use

Proposed Use

Floorspace (GIA)

B14& B14a

Sui Generis

D1/D2

846 sqm

B18

Sui Generis

B1(c)/B2/B8

551 sqm

B34

Sui Generis

B1(c)/B2/B8

50 sqm

B21

Sui Generis

B1(c)/B2/B8

417 sqm

B23

Sui Generis

B1(c)/B2/B8

175 sqm

B2

Sui Generis

B1(c)/B2/B8

3,530 sqm

B3

Sui Generis

B1(c)/B2/B8

1,765 sqm

B9

Sui Generis

D1/D2

233 sqm

B8

Sui Generis

D1/D2

750 sqm

B1(c)/B2/B8

6,488 sqm

D1/D2

1,829 sqm

Subtotal
Total

8,317 sqm

Notes
Class D2 uses restricted to sport and recreation only
See Parameter Plan 6 (Demolition and Retention PP6) for Building Refs.
Table 2.2 above only includes buildings/structures for which planning permission for change of use is sought.

gva.co.uk

Table 2.3 Detailed Element (Phase 1)


Use Classes

Floorspace (GIA)

B1(c)/B2/B8

10,224 sqm (GIA)

Table 2.4 Outline Element


Use Class

Maximum Quantum

A1-A5

3,100 sqm (GIA), of which:

B1(a-c)/B2/B8

Maximum 1,100 sqm (net) Use Class A1 convenience sales area


Maximum 563 sqm (net) Use Class A1 comparison sales area

68,288 sqm (GIA), of which:

Maximum 1,700 sqm (GIA) for use as office (B1a/b)

C1

120 bedrooms

C3/C2

2,500 residential units, to comprise:

D1/D2*

Maximum 2,500 dwellings (use class C3)


Maximum 250 units to be age-restricted for elderly persons (units to comprise
bedspaces (use class C2) or dwellings (use class C3))

2 primary schools, with combined capacity of up to 4 forms of entry


and
Up to 9,671sqm (GIA)

Notes
Combined total B1(a-c)/B2/B8/D1/D2 floorspace to not exceed 66,459sqm (GIA)(excluding primary schools)
Class D2 uses restricted to sport and recreation only

gva.co.uk

Appendix B: Key Plans


Site Plan (red-line)
Illustrative Masterplan
Parameter Plans

T RO
AD

THIS DRAWING IS COPYRIGHT AND MAY NOT BE REPRODUCED IN


WHOLE OR PART WITHOUT WRITTEN AUTHORITY.
DO NOT SCALE OFF THIS DRAWING

Track

C
C

MANSTON

ROAD

VINC
EN

LB

PLANNING APPLICATION SITE BOUNDARY


OTHER LAND OWNED BY APPLICANT

Stone

W
B
Stone

Stone

G
P

Mast
NS

N
TO

EXTENT OF PHASE 1 (DETAILED APPLICATION)

AD
RO

T
UR
CO

MA

in

Reservoir
(covered)

Dra

Stone

Reservoir
(covered)
Stone

Letter
Box

Tra
c

PR

Stone

Stone

ES
TO
N

Stone
RO
AD

Stones

Stone

Pylon

PR

Electricity Sub Station

ES
TO
N

Pylon

RO
AD

Tennis
Court

El
Sub Sta

Silo

Stone

El
Sub Sta

TON

ROA
D

MANS

Stone

Letter
Box

MUSGRAVE

LB

El Sub
Sta

CLOSE

(Telec

El Sub Sta

on)

US AV
EN

UE

SPRA
TLING

STRE
ET

LL

IE
AV

DR

INVI
CTA

90
21

-D

COLU
MB

BE

RE
ITFI

WAY

SP

Ca

MINSTE

IVE

Track

WAY

ESTO
N R
OAD

nicati

Stone

MAN

Court

CL

ON
T

Tennis

AD
RO

TOLLEMACHE

N
O
ST

DRIVE

BEAM

ve

R ROAD

PR

Tank

STO
N CO
UR
T RO
AD

AN

ALLAND

GRANGE

El Sub Sta
E
CLOS

ESMON
D
E

ommu

FS
20
50

Stone

Manston Park

Mast

Wind
Sock
B

90
B 21

Path

B 205
0

MANSTON

ROAD

The Leys
Pond

Lighting Tower

El Sub Sta
Ruin
TCB
Icehouse
(disused)

Lighting Tower
GR
OV
E

E
GR

RIN

EN

CA
TH
E

G
War Meml
P
Track

ST

ELM GRO
VE

WAY

E'S

IN
MERL

TH
E

Y
IRE WA
SPITF

90
B 21

HIG

Tra
ck

ST
RE

TCB

ET

Lighting Tower

SPITF
IRE WA
Y

DA

R
O
IG

LA

NE

0
B 219

B 21
90

20
50

Sports Ground
(private)

Runway Approach Lights

Sports Ground
(private)
Mast

Runway Approach Lights


ET

RE
ST

MINSTER

ROA
D

HIG

Telegraph Hill

Wind Sock

Trac

Track

Mast (Telecommunication)

A299

MINSTER
ROUNDABOUT
A299

Stones

Dunstrete

Masts (Telecommunication)
Gas Govn

Dunstre

SEMPLE
CLOSE

te

CO
TT
AG
E
IV

DRY
ROAD

Mast

Stone

Y
WA

L
HIL

G
P
A29

CLIFFSEND
ROUNDABOUT

E
RN
O
TH
L
HIL

Tank

TCB

Date

CANTERBURY ROAD WEST

LB
El Sub
Sta

Reservoir

Planit - IE LLP

FOADS HILL

SEA VIEW

ROAD

CLIFF VIEW
ROAD

Status and Description Drawn Apprvd.

NOTE:
1. Do not scale from this drawing unless for planning
2. All setting out, levels and dimensions to be agreed on site.
3. The dimensions of all materials must be checked on site
before being laid out.
4. This drawing must be read with the relevant specification
clauses and detail drawings
5. Order of construction and setting out to be agreed on site.
6. This drawing is copyright protected and may not be
reproduced in whole or part without written authority.
7. All Dimensions are in millimetres unless Otherwise Stated

WINDSOR ROAD

ARUNDEL ROAD

KING ARTHUR

ROAD

Rev

MP 84.25

2 Back Grafton St Altrincham WA14 1DY


0161 928 9281
18 Bowling Green Lane London EC1R 0BW
020 7430 0754

SL

CLIVE ROAD

A299

Project

Cliffsend Crossing

Client

Tunnel

A299

Stone Hill Park


Stone Hill Park Limited

El Sub Sta

SEVENSCORE
ROUNDABOUT

MP 84

Drg title

Red Line Plan

Drg nr

PL1436-VW-017

DRIVE

US
HO

A25

HILL

Runway Approach Lights

LAUN

DR

IVE

STREET

HIL
L

LB

SO
UTHA
LL

CLO
SE

HENGIST WAY

Scale

1:5500@A1

Date:

Status

Planning

Revision

12.05.16
03

Drawn

MP

Checked

JW

C
C

Ru
nw
ay

THIS DRAWING IS COPYRIGHT AND MAY NOT BE REPRODUCED IN


WHOLE OR PART WITHOUT WRITTEN AUTHORITY.
DO NOT SCALE OFF THIS DRAWING

PA
RK

He
rit
ag
e

MOD site

Spitfire
Museum

Heritage
Center
Meadow Edge
Park

Managed entrance
Pocket
Park

New
Entrance

EMPLOYMENT
Woodland
Walks

Allotments

New
Entrance

EMPLOYMENT
PHASE 1

TA
L
DE

Pocket
Park

Grassland
Meadow

EMPLOYMENT

Pocket
Park

Sports
fields

RK
A
P

St
re
et

MANSTON ROAD

Pocket
Park
Pocket
Park

Pocket
Park

Pocket
Park

Grassland/
Ecology Pa
rk

A299 Heng
ist Way

Manston
Village

Sports
fields

Sports
Village
Control
Tower Park

Entrance
Square
Pocket
Park

Grassland
Meadow

Primary
School

Firehouse
Square

Telegraph
Hill Park
Pedestrian
entrance

Pedestrian
entrance

Pocket
Park

Shops

Pocket
Park

Pocket
Park

lake

The Me
adow
Edge

Food Store

Pocket
Park

s
nue
Ave
eld
Airfi

New
Entrance

Pedestrian
entrance

ed
in
a
t
Re

Meadow Edge
Park

Hi
gh

Pocket
Park

He
rit
ag
e

EMPLOYMENT
gs
in
li d
Bu

Pocket
Park

Primary
School

Ga
rd
en
s

radar

Woodl
and Ed
ge

Manston Business

Control
Tower

Park

Improved
Spitfire Way
Junction

Woodl
and Ed
ge

Park

SP
IT
FI
RE

Pedestrian
entrance

Pocket
Park

The Tax
iways

Hotel

Courts
Pedestrian
entrance

Wavegarden

Sports
fields

RUNWA
Y PARK

Grasslan
d/ Ecolo
gy Park

Swimming pool

Woo
dlan
d Ed
ge P
ark

Hub
Entrance
Square

Sports area / event parking

Lookout

Minster Village

Gras
sland
New
/ Eco
logy
Park
Entrance

Outfall

01 13.05.16

Second Issue

MP

JW

00 05.05.16

First Issue

MP

JW

Rev

Date

Planit - IE LLP
2 Back Grafton St Altrincham WA14 1DY
0161 928 9281
18 Bowling Green Lane London EC1R 0BW
020 7430 0754

Status and Description Drawn Apprvd.

NOTE:
1. Do not scale from this drawing unless for planning
2. All setting out, levels and dimensions to be agreed on site.
3. The dimensions of all materials must be checked on site
before being laid out.
4. This drawing must be read with the relevant specification
clauses and detail drawings
5. Order of construction and setting out to be agreed on site.
6. This drawing is copyright protected and may not be
reproduced in whole or part without written authority.
7. All Dimensions are in millimetres unless Otherwise Stated

Project

Stone Hill Park

Client

Stone Hill Park Limited

Drg title

Illustrative MasterPlan

Drg nr

PL1436-VW-020

Scale

n.t.s

Date:

Status

Planning

Revision

13.05.16
01

Drawn

MP

Checked

JW

T RO
AD

THIS DRAWING IS COPYRIGHT AND MAY NOT BE REPRODUCED IN


WHOLE OR PART WITHOUT WRITTEN AUTHORITY.
DO NOT SCALE OFF THIS DRAWING

Track

C
C

MANSTON

ROAD

VINC
EN

LB

Stone

PLANNING APPLICATION SITE BOUNDARY

W
B
Stone

Stone

G
P

OTHER LAND OWNED BY APPLICANT


Mast
NS

N
TO

AD
RO

T
UR
CO

EXTENT OF PHASE 1 (DETAILED APPLICATION)

MA

in

Reservoir
(covered)

Dra

Stone

Reservoir
(covered)
Stone

DEVELOPMENT ZONES
Land where new built form (buildings
/ structures) and associated
infrastructure and open space is
permitted

Letter
Box

Tra
c

PR

Stone

Stone

ES
TO
N

Stone
RO
AD

Stones

Stone

Pylon

PR

Electricity Sub Station

ES
TO
N

Pylon

STRUCTURAL OPEN SPACE AND


INFRASTRUCTURE ZONE

RO
AD

Land where surface and sub-surface


fixed infrastructure (including roads
and sustainable urban drainage
systems) and green infrastructure
(including structural landscape,
planting, parks), and outdoor
sport/recreation facilities (including
playing fields, sports courts, play
areas and associated small scale built
facilities, but excluding recreational
surface water body (wave garden))

Tennis
Court

El
Sub Sta

Silo

Stone

El
Sub Sta

TON

ROA
D

MANS

Stone

Letter
Box

MUSGRAVE

LB

BEAM

Stone

MAN

ZONE 9

El Sub
Sta

CLOSE

Boundary of Development Zone

El Sub Sta

on)

US AV
EN

UE

COLU
MB

BE

90
21

SPRA
TLING

STRE
ET

DR

RE
ITFI

WAY

ESTO
N R
OAD

IE
AV

SP

IVE

Track

WAY

Ca

MINSTE

Indicative Boundary of Development


Zone with exact location to follow Limit
of Deviation tolerance of proposed
road set by Parameter Plan 2.

LL
-D

INVI
CTA

ve

R ROAD

PR

Tank

Court

CL

ON
T

Tennis

AD
RO

TOLLEMACHE

N
O
ST

DRIVE

(Telec

nicati

STO
N CO
UR
T RO
AD

AN

ALLAND

GRANGE

El Sub Sta
E
CLOS

ESMON
D
E

ommu

FS
20
50

Stone

Manston Park

Mast

Wind
Sock
B

90
B 21

Path

B 205
0

ZONE 5

Pond

MANSTON

ROAD

The Leys

Lighting Tower

El Sub Sta

No Development

Ruin
TCB
Icehouse
(disused)

Lighting Tower

RIN

EN

CA
TH
E

G
War Meml
P

ST

ELM GRO
VE

ZONE 8

90
B 21

E'S

E
GR

WAY

GR
OV
E

TH
E

Track

IN
MERL

ZONE 10

Y
IRE WA
SPITF

HIG

Tra
ck

ZONE 4

0
B 219

B 21
90

ST
RE

TCB

ET

Lighting Tower

SPITF
IRE WA
Y

DA

ZONE 6

ZONE 1

R
O
IG

LA

NE

SPECIAL OUTDOOR
WATER-BASED RECREATION
ZONE

20
50

Sports Ground
(private)

Runway Approach Lights

Mast

ZONE 2

Runway Approach Lights

Sports Ground
(private)

As per Structural Open Space and


infrastructure Zone but also
where recreational surface water
body and associated built facilities
allowed (wave garden)

ET

RE
ST

MINSTER

ROA
D

HIG

Telegraph Hill

Wind Sock

Trac

Track

A299

ZONE 3

MINSTER
ROUNDABOUT

Mast (Telecommunication)

A299

Stones

ZONE 7

Dunstrete

Masts (Telecommunication)
Gas Govn

Dunstre

SEMPLE
CLOSE

te

CO
TT
AG
E
IV

DRY
ROAD

Mast

Stone

Y
WA

L
HIL

G
P
A29

CLIFFSEND
ROUNDABOUT

E
RN
O
TH
L
HIL

Tank

TCB

CANTERBURY ROAD WEST

LB
El Sub
Sta

Reservoir

SEA VIEW

FOADS HILL

Status and Description Drawn Apprvd.

Planit - IE LLP

ROAD

CLIFF VIEW
ROAD

Date

NOTE:
1. Do not scale from this drawing unless for planning
2. All setting out, levels and dimensions to be agreed on site.
3. The dimensions of all materials must be checked on site
before being laid out.
4. This drawing must be read with the relevant specification
clauses and detail drawings
5. Order of construction and setting out to be agreed on site.
6. This drawing is copyright protected and may not be
reproduced in whole or part without written authority.
7. All Dimensions are in millimetres unless Otherwise Stated

WINDSOR ROAD

ARUNDEL ROAD

KING ARTHUR

ROAD

Rev

MP 84.25

2 Back Grafton St Altrincham WA14 1DY


0161 928 9281
18 Bowling Green Lane London EC1R 0BW
020 7430 0754

SL

CLIVE ROAD

Project

Stone Hill Park

Client

Stone Hill Park Limited

Drg title

Parameter Plan 1: Development Zones

Drg nr

PL1436-VW-011

A299

Cliffsend Crossing
Tunnel

A299

El Sub Sta

SEVENSCORE
ROUNDABOUT

MP 84

DRIVE

US
HO

A25

HILL

Runway Approach Lights

LAUN

DR

IVE

STREET

HIL
L

LB

SO
UTHA
LL

CLO
SE

HENGIST WAY

Scale

1:5500@A1

Date:

Status

Planning

Revision

12.05.16
N

Drawn

MP

Checked

JW

2
3

2
1

THIS DRAWING IS COPYRIGHT AND MAY NOT BE REPRODUCED IN


WHOLE OR PART WITHOUT WRITTEN AUTHORITY.
DO NOT SCALE OFF THIS DRAWING

45.8m
Flete Farm
Cottages
T RO
AD

Track

ROAD

VINC
EN

C
C

MANSTON

42 .1m

Caravan Site

KEY:

LB

Flete Farm

47.1m
43.3m

Fleet Farm
Bungalow

47.2m

PLANNING APPLICATION SITE BOUNDARY

Flete Lodge

Stone

Waste Processing Site


W
B

45.7m

Stone

Stone

G
P

Brooklands

Cottage
Nurseries

OTHER LAND OWNED BY APPLICANT

47.0m

Mast
Tank
Mushroom Farm

NS

N
TO

EXTENT OF PHASE 1 (DETAILED APPLICATION)

AD
RO

T
UR
CO

MA

Pumping Station

50.6m

in
FF

Stone
BP

in V
iew

Fai
rway
Ros
em s
ary

Coal Yard

Hoppers

Acres

Reservoir
(covered)

Nursery
Pla

Small

Reservoir
(covered)

Dra

Stone

Pen
Per

elop

Ard
ua

Fleete Court Farm


De

ef

Dro

Tra
c

d
Un

Stone

Sa
Ste

El Sub Sta

FF
Die

Ne

PR

wla

nd

ud

on

Existing road (retained)

46.6m
Stone

te

The
Chippings

sto

ne

Stone
RO
AD

ne

thco

FF

ES
TO
N

49.4m

47.5m
e

Nor

The
C

nz

rqu

rs

onife

De

inke

SR

Stones

De

Letter
Box

mes

ide

Stone

Depot

er
pp

Garage

Ho

Ta
nk

47.0m

Glen

Stone

Shanklin

Pylon

The
Coach
House

De
De

Primary Vehicular Route


Hatched Area shows allowable limit
of deviation.

f
PR

Electricity Sub Station

Pylon

ES
TO
N

RO
AD

Solar Power
Generating Station

Tennis
Court
48.0m
Barn Owls

Leo Cottage

45.8m
Preston
Farm Cottages

BP

Silo

Pouces
Nursery

Secondary Vehicular Route


Hatched Area shows allowable limit
of deviation.

El
Sub Sta

Stone

El
6

Sub Sta

45.0m

Shelter

Vehicular access point - refer to


technical drawing ref SHP1-9 for
further details

40.2m
TON

ROA
D

Manston Court
Cottages

MANS

El Sub Sta

Park
Lodge
Annies Cottage

Well
House

Stone

Letter

47.2m
18

Box
LB

Wind
Sock

38.6m
12

40.3m

GRANGE

19

ALLAND

STO
N CO
UR
T RO
AD

AD
RO

13

N
O
ST

Stone
Pre

Caravan
Park

Orc
h

Caravan Park
El Sub Sta

14

on)

Co

sto
n

Vill
a

Pre

ard

Ferndale Lodge
sto

Co

tt

urt

48.0m
Caravan Park

12

Sta

El Sub
Sta

nicati

El Sub

15

ommu

12

(Telec

CLOSE

14

Mast

Court

The Courtyard

Holmecroft

CL

ON
T

Tennis

47.5m

MAN

AN

19

BEAM

TOLLEMACHE

17

DRIVE

Zone for localised upgrade of existing


roadways

38.6m

23

Caravan Park

Stone

Memorials Museum

Court

Spitfire and
Hurricane

El Sub Sta
E
CLOS

ESMON
D

10

20
50

17

Manston Park

Manston

C
R

MUSGRAVE

14

12

14

FS

39.3m

Existing footpath retained

RAF Manston
History Museum

12

39.4m

Cleve Court Farm


8

RE
ITFI

DR

WAY

SP

Wood Farm

Wood Farm
Cottage

IVE

Track

44.7m

90
B 21

PR

ve

R ROAD

48.1m

19
20

14

The
Coach
House

field
7

IE
AV

Silos

ESTO
49.0
N R
m
OAD

Silos

WAY

STRE
ET

1a

25
26

12

Ca

MINSTE

Tank

Path

B 205
0

Cleve Cottage

16
17

18

44.8m

Telephone Exchange

14
15

Lodg

13

Cleve

10

El Sub Sta

Magpies

41.3m
Shelter
LL
-D

INVI
CTA

SPRA
TLING

Ther

UE
US AV
EN

90
21

Centre

BE

COLU
MB

Riding

45.4m

MANSTON

ROAD

46.9m

Connection point to existing non


vehicular routes

11
12

Cleve Court

The Leys
Pond

Alland
C
R

Grange

Works

Lighting Tower

Jubilee
Cottages

El Sub Sta
4

Ruin

Icehouse

TCB

Garden Cottage

Safeguarded route for potential


future highway (dashed area shows
allowed limit of deviation)

Hall

(disused)

15

Manston
Green Farm

44.8m

stl

ing

Tre-Hern
1

Wo
Co odb
tta ine
ge

ELM GRO
VE

Ru

Grosvenor
6

10

LA

NE

NOTES:

Oaklands

Grove House
Lyngro

The

Cheviots

ve

49.6m

0
B 219

Cedarwood

20
50

Tertiary routes (estate roads) allowed


throughout defined development
zones (in addition to primary /
secondary routes identified on this
plan).

32

B 21
90

Club

HIGHLANDS GLADE

18

17

R
O
AIG

Def

15

HIG

Tra
ck

ST
RE

ET

TCB

46.9m
SPITF
IRE WA
Y

Hedger
ow

Jo
lly
(P Fa
H) rm
er

er
elt

Track

E'S
RIN

Sh

Lighting Tower

CA
TH
E

EN

G
War Meml
P

90
B 21

Ho

47.9m

Grenham
Lodge

44.3m

e
Old org
F

E
GR

WAY

Works

rch

GR
OV
E

u
Ch

ST

TH
E

10

Y
IRE WA
SPITF

se

Farthings

Lighting Tower

Pouces Cottages

IN
MERL

C Tk

18

C Tk

8
1

Rose Farm

Sports Ground
(private)

36

50 .7m

38

Runway Approach Lights

Manston
Methodist
Church

Runway Approach Lights

Mast

ET

RE
ST

MINSTER

ROA
D

HIG

21

22

Chapel Farm

Willow Bank
Nursery

26
37

Whitebeams

Mount Pleasant

24
25

Tan-Et
Lodge

Sports Ground
(private)

Tall Trees

Rowan
Cottage

39

Telegraph Hill

28

Willowbank

All routes to incorporate provision for


pedestrians. Primary and Secondary
Routes to incorporate cycle provision
either on or off carriageway.

Wind Sock

40

17

Und

35
32
11
36

38

f
De

Smugglers Leap
Caravan Park

12
12a

Trac

Bush Farm

Track
3

7
6a

31

31a

The
House

12b

Mast (Telecommunication)
Sun
Villa

5a

A299

MINSTER
ROUNDABOUT
A299

53.7m

Stones

Filling Station

Boundary Stone
49.5m
49.1m

Minster Services

Smugglers
Retreat
(PH)

49.6m

Dunstrete
Hotel

Chapel

Def

Boundary Stone

Masts (Telecommunication)
Shelter

11

Ashenmeade

15

Gas Govn

27

1 to 9

HIL
L
CO
TT
AG
E

Runway Approach Lights

Mill
Cottage

LAUN

28 to 32

105

Mast
Larksfield

Stone
46.6m
Primrose Cottage
The Mill House

Y
WA

L
HIL

Boundary Stone

G
P
CLIFFSEND
ROUNDABOUT

E
RN
O
TH
L
HIL

Und

Tank
28

San Remo

Heimetli

21

FF
26

Casa
Mia

24

42.6m

Bayview

Ohio

Chez Nous

NOTE:
1. Do not scale from this drawing unless for planning
2. All setting out, levels and dimensions to be agreed on site.
3. The dimensions of all materials must be checked on site
before being laid out.
4. This drawing must be read with the relevant specification
clauses and detail drawings
5. Order of construction and setting out to be agreed on site.
6. This drawing is copyright protected and may not be
reproduced in whole or part without written authority.
7. All Dimensions are in millimetres unless Otherwise Stated

Martrice
Ronalds
Way
Nursery
House

Mansfield Villas

8a

Patrol

The Homestead

40.2m

Parkville

WINDSOR ROAD

ROAD

11

The
Bungalow

Co Const, ED &
Ward Bdy

Lamorna

Tanks

ARUNDEL ROAD

C
R
Bdy

12

&W
ard

KING ARTHUR

st, E
D

Und

54

Bra

44

ate

Nursery

40

dg

Katrina

38.0m

Garage

C
R

Shelter
TCB

CANTERBURY ROAD WEST

22

39.3m
2

18

14

LB

10

20

El Sub
Sta

14
17

Nursery

22

26

25

19

22

17a

21

17

14

10

15

11

12

11

10

Cliff
House

Status and Description Drawn Apprvd.

White-Walls

Miltom

Con

Date

Boundary Stone

Bayview

Billion

Co

Rev

Cedar
Top

Oil Storage Depot

Planit - IE LLP

27

SEA VIEW

34

ROAD

26
28

37

31

27

CLIFF VIEW
ROAD

30

28

22

Reservoir

2 Back Grafton St Altrincham WA14 1DY


0161 928 9281
18 Bowling Green Lane London EC1R 0BW
020 7430 0754

FOADS HILL

MP 84.25

SL

22.3m

24.4m

51

11

48

13

46

17

49

47

39

46

43

41

38

39

36

31

Und

37a

5a

5
1

CLIVE ROAD
24
14
50

24a

56

26

10
2

55

Project

Stone Hill Park

Client

Stone Hill Park Limited

Drg title

Parameter Plan 2: Access and Movement

Drg nr

PL1436-VW-012

60

63

58

56

Cliffsend Crossing
Tunnel

A299

El Sub Sta

SEVENSCORE
ROUNDABOUT

MP 84

El Sub Sta
19.8m

24

12

Def

18

17

11

DRIVE

A29

A25

Depot

A299

US
HO

INDUSTRIAL PARK

HILL

te

IV

14

22

19

DRY
ROAD

35

TELEGRAPH HILL

IVE
DR

11

Dunstre

Tank

21

1 3

b St
a

21b

14 to 27

109

STREET

10

35

34

8
4
2

33

CLO
SE
SO
UTHA
LL

19
11

111

21a

El Su

50.6m

SEMPLE
CLOSE

15

115

LB

49.3m

Dellside
2

39.7m

12

HENGIST WAY

Tank

17
15

Scale

1:5500@A1

Date:

Status

Planning

Revision

12.05.16
N

Drawn

MP

Checked

JW

T RO
AD

THIS DRAWING IS COPYRIGHT AND MAY NOT BE REPRODUCED IN


WHOLE OR PART WITHOUT WRITTEN AUTHORITY.
DO NOT SCALE OFF THIS DRAWING

Track

C
C

MANSTON

ROAD

VINC
EN

LB

Stone

PLANNING APPLICATION SITE BOUNDARY

W
B
Stone

Stone

G
P

OTHER LAND OWNED BY APPLICANT


Mast
NS

N
TO

AD
RO

T
UR
CO

EXTENT OF PHASE 1 (DETAILED APPLICATION)

MA

in

Reservoir
(covered)

Dra

Stone

Reservoir
(covered)
Stone

Letter
Box

Tra
c

PR

Stone

Stone

ES
TO
N

Stone
RO
AD

Stones

Stone

Residential
Use Classes: C2, C3, D1 (Primary
School)

Pylon

PR

Electricity Sub Station

ES
TO
N

Pylon

RO
AD

Local Centre
Use Classes: A1-5, B1(a), C1, C2, C3, D1,
D2

Tennis
Court

El
Sub Sta

Silo

High Street
Predominant ground floor use to
comprise use classes: A1-5, C1, D1

Stone

El
Sub Sta

TON

ROA
D

MANS

Employment
Use Classes: B1(B-C), B2, B8, D1
(Higher / Further Education)

Stone

Letter
Box

MUSGRAVE

LB

El Sub
Sta

CLOSE

(Telec

El Sub Sta

on)

US AV
EN

UE
COLU
MB

BE

SPRA
TLING

Mixed-Use
Use Classes: C1, C2, C3, B1, D1
(Higher / Further Education)

STRE
ET

LL
-D
S

IE
AV

DR

INVI
CTA

90
21

RE
ITFI

WAY

SP

Ca

MINSTE

IVE

Track

WAY

ESTO
N R
OAD

nicati

Cultural & Heritage


Use Classes: D1

Stone

MAN

Court

CL

ON
T

Tennis

AD
RO

TOLLEMACHE

N
O
ST

DRIVE

BEAM

ve

R ROAD

PR

Tank

STO
N CO
UR
T RO
AD

AN

ALLAND

GRANGE

El Sub Sta
E
CLOS

ESMON
D
E

ommu

FS
20
50

Stone

Manston Park

Mast

Wind
Sock
B

90
B 21

Path

B 205
0

MANSTON

ROAD

The Leys
Pond

Lighting Tower

El Sub Sta
Ruin
TCB
Icehouse
(disused)

Lighting Tower
GR
OV
E

E
GR

RIN

EN

CA
TH
E

G
War Meml
P
Track

ST

ELM GRO
VE

WAY

Special Outdoor-based Recreation

E'S

IN
MERL

TH
E

Y
IRE WA
SPITF

As per Structural Open Space and


infrastructure Zone but also
where recreational surface water
body allowed (wave garden)

90
B 21

HIG

Tra
ck

ST
RE

TCB

ET

Lighting Tower

SPITF
IRE WA
Y

DA

R
O
IG

LA

NE

0
B 219

B 21
90

20
50

Sports Ground
(private)

Runway Approach Lights

Sports Ground
(private)
Mast

Runway Approach Lights


ET

RE
ST

MINSTER

ROA
D

HIG

Telegraph Hill

Boundary of Development Zone

Wind Sock

Trac

Track

Indicative Boundary of Development


Zone with exact location to follow Limit
of Deviation tolerance of proposed road
set by Parameter Plan 2

Mast (Telecommunication)

A299

MINSTER
ROUNDABOUT
A299

Stones

Dunstrete

Masts (Telecommunication)
Gas Govn

Dunstre

SEMPLE
CLOSE

te

CO
TT
AG
E
IV

DRY
ROAD

Mast

Stone

Y
WA

L
HIL

G
P
A29

CLIFFSEND
ROUNDABOUT

E
RN
O
TH
L
HIL

Tank

TCB

CANTERBURY ROAD WEST

LB
El Sub
Sta

Reservoir

SEA VIEW

FOADS HILL

Status and Description Drawn Apprvd.

Planit - IE LLP

ROAD

CLIFF VIEW
ROAD

Date

NOTE:
1. Do not scale from this drawing unless for planning
2. All setting out, levels and dimensions to be agreed on site.
3. The dimensions of all materials must be checked on site
before being laid out.
4. This drawing must be read with the relevant specification
clauses and detail drawings
5. Order of construction and setting out to be agreed on site.
6. This drawing is copyright protected and may not be
reproduced in whole or part without written authority.
7. All Dimensions are in millimetres unless Otherwise Stated

WINDSOR ROAD

ARUNDEL ROAD

KING ARTHUR

ROAD

Rev

MP 84.25

2 Back Grafton St Altrincham WA14 1DY


0161 928 9281
18 Bowling Green Lane London EC1R 0BW
020 7430 0754

SL

CLIVE ROAD

Project

Stone Hill Park

Client

Stone Hill Park Limited

Drg title

Parameter Plan 3: Land Use

Drg nr

PL1436-VW-013

A299

Cliffsend Crossing
Tunnel

A299

El Sub Sta

SEVENSCORE
ROUNDABOUT

MP 84

DRIVE

US
HO

A25

HILL

Runway Approach Lights

LAUN

DR

IVE

STREET

HIL
L

LB

SO
UTHA
LL

CLO
SE

HENGIST WAY

Scale

1:5500@A1

Date:

Status

Planning

Revision

12.05.16
N

Drawn

MP

Checked

JW

T RO
AD

THIS DRAWING IS COPYRIGHT AND MAY NOT BE REPRODUCED IN


WHOLE OR PART WITHOUT WRITTEN AUTHORITY.
DO NOT SCALE OFF THIS DRAWING

Track

C
C

MANSTON

ROAD

VINC
EN

LB

PLANNING APPLICATION SITE BOUNDARY


OTHER LAND OWNED BY APPLICANT

Stone

W
B
Stone

Stone

G
P

Mast
NS

N
TO

EXTENT OF PHASE 1 (DETAILED APPLICATION)

AD
RO

T
UR
CO

MA

in

Reservoir
(covered)

Dra

Stone

Reservoir
(covered)
Stone

Maximum building height 13m


(Finished Floor Level to ridge) Max Plot
Ratio 1:2

Letter
Box

Tra
c

PR

Stone

Stone

ES
TO
N

Stone
RO
AD

Stones

Maximum building height 12m


(Finished Floor Level to ridge).
Maximum average density of 45 DPH
with area tolerance between 40-50
DPH.

Stone

Pylon

PR

Electricity Sub Station

ES
TO
N

Pylon

RO
AD

Maximum building height 10m


(Finished Floor Level to ridge).
Maximum average density of 35 DPH
with area tolerance between 30-40
DPH.

Tennis
Court

El
Sub Sta

Silo

Stone

El
Sub Sta

TON

Maximum height 10m (Finished Floor


Level to ridge). Maximum average
density of 25 DPH with area tolerance
between 20-30 DPH.

ROA
D

MANS

Stone

Letter
Box

MUSGRAVE

LB

El Sub
Sta

CLOSE

(Telec

El Sub Sta

US AV
EN
COLU
MB

BE

90
21

SPRA
TLING

STRE
ET

LL
-D

DR

RE
ITFI

WAY

SP

IVE

Track

WAY

ESTO
N R
OAD

IE
AV

INVI
CTA

Ca

MINSTE

Special Control Area


The southern edge of the development
zones (in terms of where new
buildings are allowed) within this area
should be staggered.
The actual positioning of the edge(s)
and the form of development in this
area (in terms of scale and density)
should ensure that significant adverse
visual impacts from viewpoints to the
south are avoided. This should be
defined as part of reserved matters
applications and be informed by a
Landscape and Visual Impact
Assessment.

on)

UE

nicati

Stone

MAN

Court

CL

ON
T

Tennis

AD
RO

TOLLEMACHE

N
O
ST

DRIVE

BEAM

ve

R ROAD

PR

Tank

STO
N CO
UR
T RO
AD

AN

ALLAND

GRANGE

El Sub Sta
E
CLOS

ESMON
D
E

ommu

FS
20
50

Stone

Manston Park

Mast

Wind
Sock
B

90
B 21

Path

B 205
0

MANSTON

ROAD

The Leys
Pond

Lighting Tower

El Sub Sta
Ruin
TCB
Icehouse
(disused)

Lighting Tower
GR
OV
E

E
GR

RIN

EN

CA
TH
E

G
War Meml
P
Track

ST

ELM GRO
VE

WAY

E'S

IN
MERL

TH
E

Y
IRE WA
SPITF

90
B 21

HIG

Tra
ck

ST
RE

TCB

ET

Lighting Tower

SPITF
IRE WA
Y

DA

R
O
IG

LA

NE

0
B 219

B 21
90

Boundary of Development Zone

20
50

Sports Ground
(private)

Runway Approach Lights

Indicative Boundary of Development


Zone with exact location to follow
Limit of Deviation tolerance of road
set by Parameter Plan 2.

Sports Ground
(private)
Mast

Runway Approach Lights


ET

RE
ST

MINSTER

ROA
D

HIG

Telegraph Hill

Wind Sock

NOTES:

Trac

Track

Mast (Telecommunication)

A299

Finished Floor Level to be within 2m of


existing site level shown on Topo Survey
(drawing reference SHP 1-9)

MINSTER
ROUNDABOUT
A299

Stones

Dunstrete

Masts (Telecommunication)
Gas Govn

Dunstre

SEMPLE
CLOSE

te

CO
TT
AG
E
IV

DRY
ROAD

Mast

Stone

Y
WA

L
HIL

G
P
A29

CLIFFSEND
ROUNDABOUT

E
RN
O
TH
L
HIL

Tank

TCB

CANTERBURY ROAD WEST

LB
El Sub
Sta

Reservoir

SEA VIEW

FOADS HILL

Status and Description Drawn Apprvd.

Planit - IE LLP

ROAD

CLIFF VIEW
ROAD

Date

NOTE:
1. Do not scale from this drawing unless for planning
2. All setting out, levels and dimensions to be agreed on site.
3. The dimensions of all materials must be checked on site
before being laid out.
4. This drawing must be read with the relevant specification
clauses and detail drawings
5. Order of construction and setting out to be agreed on site.
6. This drawing is copyright protected and may not be
reproduced in whole or part without written authority.
7. All Dimensions are in millimetres unless Otherwise Stated

WINDSOR ROAD

ARUNDEL ROAD

KING ARTHUR

ROAD

Rev

MP 84.25

2 Back Grafton St Altrincham WA14 1DY


0161 928 9281
18 Bowling Green Lane London EC1R 0BW
020 7430 0754

SL

CLIVE ROAD

Project

Stone Hill Park

Client

Stone Hill Park Limited

Drg title

Parameter Plan 4: Density and Height

Drg nr

PL1436-VW-014

A299

Cliffsend Crossing
Tunnel

A299

El Sub Sta

SEVENSCORE
ROUNDABOUT

MP 84

DRIVE

US
HO

A25

HILL

Runway Approach Lights

LAUN

DR

IVE

STREET

HIL
L

LB

SO
UTHA
LL

CLO
SE

HENGIST WAY

Scale

1:5500@A1

Date:

Status

Planning

Revision

12.05.16
N

Drawn

MP

Checked

JW

VINC
EN

T RO
AD

THIS DRAWING IS COPYRIGHT AND MAY NOT BE REPRODUCED IN


WHOLE OR PART WITHOUT WRITTEN AUTHORITY.
DO NOT SCALE OFF THIS DRAWING

Track

C
C

MANSTON

ROAD

PLANNING APPLICATION SITE BOUNDARY


LB

OTHER LAND OWNED BY APPLICANT


EXTENT OF PHASE 1 (DETAILED APPLICATION)

Stone

W
B
Stone

Stone

G
P

Mast
NS

N
TO

STRUCTURAL OPEN SPACE AND


INFRASTRUCTURE ZONE

AD
RO

T
UR
CO

MA

Land where surface and sub-surface


fixed infrastructure (including roads
and sustainable urban drainage
systems) and green infrastructure
(including ecological mitigation and
enhancement, structural landscape,
planting, parks), and outdoor
sport/recreation facilities (including
playing fields, sports courts, play
areas and associated small scale built
facilities, but excluding recreational
surface water body (wave garden))

in

Reservoir
(covered)

Dra

Stone

Reservoir
(covered)
Stone

Letter
Box

Tra
c

PR

Stone

Stone

ES
TO
N

Stone
RO
AD

Stones

Stone

Pylon

PR

Electricity Sub Station

ES
TO
N

Pylon

RO
AD

DEVELOPMENT ZONE
Tennis
Court

To include structural landscaping


(which includes tree planting,
landscaped areas, pocket
parks,play areas and SUDS
infrastructure).

El
Sub Sta

Silo

Stone

El
Sub Sta

STRUCTURE PLANTING
TON

ROA
D

MANS

Comprising linear belt of native


woodland - minimum width 40m

Stone

Letter
Box

MUSGRAVE

LB

Stone

AD
RO

Court

El Sub
Sta

CLOSE

(Telec

El Sub Sta

Area of open parkland managed as


informal grassland which allows
occassional use as a heritage
grass runway when required.

on)

US AV
EN

UE

SPRA
TLING

STRE
ET

LL

IE
AV

DR

INVI
CTA

90
21

-D

COLU
MB

BE

RE
ITFI

WAY

SP

Ca

MINSTE

IVE

Track

WAY

ESTO
N R
OAD

nicati

HERITAGE PARK OPEN SPACE


INFRASTRUCTURE ZONE

Stone

CL

ON
T

ve

R ROAD

PR

Tank

STO
N CO
UR
T RO
AD

N
O
ST

TOLLEMACHE

BEAM

Tennis

MAN

ALLAND

GRANGE

AN

DRIVE

Manston Park

ommu

FS
20
50

El Sub Sta
E
CLOS

ESMON
D
E

Mast

Wind
Sock

90
B 21

FIELD OPEN SPACE ZONE

Path

B 205
0

MANSTON

ROAD

Area of existing fields where


agricultural uses will be maintained.

The Leys
Pond

Lighting Tower

El Sub Sta
Ruin
TCB
Icehouse
(disused)

HABITAT OPEN SPACE ZONE

Lighting Tower
GR
OV
E

E
GR

RIN

EN

CA
TH
E

G
War Meml
P

ST

Track

Area of land to be managed to


promote a range of new habitats
and ecological areas.

ELM GRO
VE

WAY

E'S

IN
MERL

TH
E

Y
IRE WA
SPITF

90
B 21

HIG

SPITF
IRE WA
Y

Tra
ck

ST
RE

TCB

ET

Lighting Tower

DA

R
O
IG

LA

NE

ATTENUATION AREA

0
B 219

B 21
90

20
50

Sports Ground
(private)

Area of open space and


infrastructure for sustainable urban
drainage features.

Runway Approach Lights

Sports Ground
(private)
Mast

Runway Approach Lights


ET

ROA
D

HIG

RE
ST

MINSTER

No Development
Telegraph Hill

Wind Sock

SPECIAL OUTDOOR
WATER-BASED RECREATION
ZONE
As per Structural Open Space and
infrastructure Zone but also
where recreational surface water
body and associated built facilities
allowed (wave garden)

Trac

Track

Mast (Telecommunication)

A299

MINSTER
ROUNDABOUT
A299

Stones

Dunstrete

Masts (Telecommunication)
Gas Govn

Dunstre

SEMPLE
CLOSE

te

CO
TT
AG
E
IV

DRY
ROAD

Mast

Stone

Y
WA

L
HIL

G
P
A29

CLIFFSEND
ROUNDABOUT

E
RN
O
TH
L
HIL

Tank

TCB

CANTERBURY ROAD WEST

LB
El Sub
Sta

Reservoir

SEA VIEW

FOADS HILL

Status and Description Drawn Apprvd.

Planit - IE LLP

ROAD

CLIFF VIEW
ROAD

Date

NOTE:
1. Do not scale from this drawing unless for planning
2. All setting out, levels and dimensions to be agreed on site.
3. The dimensions of all materials must be checked on site
before being laid out.
4. This drawing must be read with the relevant specification
clauses and detail drawings
5. Order of construction and setting out to be agreed on site.
6. This drawing is copyright protected and may not be
reproduced in whole or part without written authority.
7. All Dimensions are in millimetres unless Otherwise Stated

WINDSOR ROAD

ARUNDEL ROAD

KING ARTHUR

ROAD

Rev

MP 84.25

2 Back Grafton St Altrincham WA14 1DY


0161 928 9281
18 Bowling Green Lane London EC1R 0BW
020 7430 0754

SL

CLIVE ROAD

Project

Stone Hill Park

Client

Stone Hill Park Limited

Drg title

Parameter Plan 5: Green Infrastructure

Drg nr

PL1436-VW-015

A299

Cliffsend Crossing
Tunnel

A299

El Sub Sta

SEVENSCORE
ROUNDABOUT

MP 84

DRIVE

US
HO

A25

HILL

Runway Approach Lights

LAUN

DR

IVE

STREET

HIL
L

LB

SO
UTHA
LL

CLO
SE

HENGIST WAY

Scale

1:5500@A1

Date:

Status

Planning

Revision

12.05.16
N

Drawn

MP

Checked

JW

T RO
AD

THIS DRAWING IS COPYRIGHT AND MAY NOT BE REPRODUCED IN


WHOLE OR PART WITHOUT WRITTEN AUTHORITY.
DO NOT SCALE OFF THIS DRAWING

Track

C
C

MANSTON

ROAD

VINC
EN

LB

PLANNING APPLICATION SITE BOUNDARY


OTHER LAND OWNED BY APPLICANT

Stone

W
B
Stone

Stone

G
P

Mast
NS

N
TO

EXTENT OF PHASE 1 (DETAILED APPLICATION)

AD
RO

T
UR
CO

MA

in

Reservoir
(covered)

Dra

Stone

Reservoir
(covered)
Stone

EXISTING BUILDINGS RETAINED


Letter
Box

Tra
c

PR

Stone

Stone

ES
TO
N

EXISTING HARDSTANDING AREAS RETAINED

Stone
RO
AD

Stones

EXISTING BUILDINGS TO BE DEMOLISHED

Stone

Pylon

PR

Electricity Sub Station

ES
TO
N

Pylon

EXISTING AREAS OF HARDSTANDING TO BE


REMOVED

RO
AD

B40

Tennis

B39

Court

El
Sub Sta

Silo

Stone

El
Sub Sta

B41
TON
MANS

ROA
D

B38

B37

Stone

Letter
Box

GRANGE

AN
N
O
ST

Court

B36
B57

CLOSE
B

90
21

SPRA
TLING

LL

IE
AV

DR

RE
ITFI

B25

WAY

SP

B35

Ca

B26

ve
s

R ROAD

90
B 21

B61

B18

PR

MINSTE

IVE

Track

B43

B 205
0

B21 B34

Path

B60

MANSTON

ROAD

The Leys

B23

Pond

Lighting Tower

B62
El Sub Sta

Icehouse
(disused)

B32

B4

STRE
ET

ESTO
N R
OAD

US AV
EN

B13

B64
B31

-D

COLU
MB

BE

WAY

Stone

El Sub Sta

B24

on)

UE

nicati

INVI
CTA
Tank

B20

El Sub
Sta

CL

ON
T

Tennis

AD
RO

TOLLEMACHE

BEAM

(Telec

ommu

B14

ALLAND

B27

DRIVE

Stone

B19
STO
N CO
UR
T RO
AD

B14a

Manston Park

Wind
Sock

FS
20
50

El Sub Sta
E
CLOS

ESMON
D
E

Mast

B22
B

MAN

MUSGRAVE

LB

B6

Ruin
TCB

B2
Lighting Tower

B55

B56

GR
OV
E
RIN

ELM GRO
VE

HIG

Tra
ck

ST
RE

TCB

ET

B11

Lighting Tower

SPITF
IRE WA
Y

CA
TH
E

G
War Meml
P

ST

B17

EN

B12

E'S

E
GR

WAY

B16

B54

90
B 21

TH
E

B63 B3

Track

IN
MERL

Y
IRE WA
SPITF

DA

R
O
IG

LA

NE

0
B 219

B 21
90

B1

B53

20
50

Sports Ground
(private)

Runway Approach Lights

Mast

B45

Runway Approach Lights

Sports Ground
(private)

B10
ET

MINSTER

ROA
D

HIG

RE
ST

B8
B52

Telegraph Hill

B51

B47

Wind Sock

B9

Trac

B30
B48

A299

Track

B46

Mast (Telecommunication)

MINSTER
ROUNDABOUT
A299

Stones

B49

Dunstrete

Masts (Telecommunication)
Gas Govn

Dunstre

SEMPLE
CLOSE

te

CO
TT
AG
E
IV

DRY
ROAD

B50

Mast

Stone

Y
WA

L
HIL

G
P
A29

CLIFFSEND
ROUNDABOUT

E
RN
O
TH
L
HIL

Tank

TCB

CANTERBURY ROAD WEST

LB
El Sub
Sta

Reservoir

SEA VIEW

FOADS HILL

Status and Description Drawn Apprvd.

Planit - IE LLP

ROAD

CLIFF VIEW
ROAD

Date

NOTE:
1. Do not scale from this drawing unless for planning
2. All setting out, levels and dimensions to be agreed on site.
3. The dimensions of all materials must be checked on site
before being laid out.
4. This drawing must be read with the relevant specification
clauses and detail drawings
5. Order of construction and setting out to be agreed on site.
6. This drawing is copyright protected and may not be
reproduced in whole or part without written authority.
7. All Dimensions are in millimetres unless Otherwise Stated

WINDSOR ROAD

ARUNDEL ROAD

KING ARTHUR

ROAD

Rev

MP 84.25

2 Back Grafton St Altrincham WA14 1DY


0161 928 9281
18 Bowling Green Lane London EC1R 0BW
020 7430 0754

SL

CLIVE ROAD

Project

Stone Hill Park

Client

Stone Hill Park Limited

Drg title

Parameter Plan 6: Demolition and Retention

Drg nr

PL1436-VW-016

A299

Cliffsend Crossing
Tunnel

A299

El Sub Sta

SEVENSCORE
ROUNDABOUT

MP 84

DRIVE

US
HO

A25

HILL

Runway Approach Lights

LAUN

DR

IVE

STREET

HIL
L

LB

SO
UTHA
LL

CLO
SE

HENGIST WAY

Scale

1:5500@A1

Date:

Status

Planning

Revision

12.05.16
L

Drawn

MP

Checked

JW

Appendix C: Document/Plan Schedule

Ref.
SHP1-A
SHP1-B
SHP1-C
SHP1-1
SHP1-2
SHP1-3
SHP1-4
SHP1-4.1
SHP1-4.2
SHP1-4.3
SHP1-4.4
SHP1-5
SHP1-6
SHP1-7
SHP1-7.1
SHP1-8
SHP1-9
SHP1-10
SHP1-11
SHP1-12
SHP1-13
SHP1-14
SHP1-15
SHP1-16
SHP1-17
SHP1-18

Document title
Parameter Plans
Development Specification
Drawings for Approval
Planning Application Summary Document
Drawings for Information
Design and Access Statement
Planning Statement
Planning Statement Addendum: Loss of Existing Use Position Statement
Planning Statement Addendum: Economic Need
Planning Statement Addendum: Housing Need
Planning Statement Addendum: Retail Assessment
Outline Business Case
Outline Phasing and Delivery Strategy
Transport Assessment
Framework Travel Plan
Energy and Sustainability Strategy
Waste Management Strategy
Flood Risk Assessment and Outline Drainage Strategy
Statement of Community Involvement
Initial s.106 Heads of Terms and Viability Appraisal
Environment Statement (Volume 1): Main Text
Environment Statement (Volume 2): Technical Appendices
Environment Statement (Volume 3): Non-Technical Summary
Utilities Strategy
Outline Construction Environmental Management Plan
Viability Assessment

Parameter Plans (ref. SHP1-A)


Ref.
PL1436-VW-011
PL1436-VW-012
PL1436-VW-013
PL1436-VW-014
PL1436-VW-015
PL1436-VW-016

Drawing title
Parameter Plan 1 - Development Zones
Parameter Plan 2 - Access and Movement
Parameter Plan 3 - Land Use
Parameter Plan 4 - Density and Height
Parameter Plan 5 - Green Infrastructure
Parameter Plan 6 - Demolition and Retention

Drawings for Approval (ref. SHP1-C)


Ref.
Drawing title
A10-00-01
Site Plan Rev A
A20-00-101
Unit 1 floor plans & elevations Rev A
A20-00-201
Unit 2 floor plans & elevations Rev A
A20-00-301
Unit 3 floor plans & elevations Rev A
A20-00-401
Unit 4 floor plans & elevations Rev A
A20-00-102
Unit 1 roof plan & section
A20-00-202
Unit 2 roof plan & section
A20-00-302
Unit 3 roof plan & section
A20-00-402
Unit 4 roof plan & section
PL1436-VW-019-00
Soft Works Plan
60340453-M001-SKE-0030
Phase 1 Employment Access Temporary Tie in
60340453-M001-SKE-0026
Phase 1 Employment Access_GA
60340453-M001-SKE-0024
Spitfire Way Priority Junction with Ghost Island_GA
60340453-M001-SKE-0028
Alland Grange Lane Roundabout_GA
60340453-M001-SKE-0031
New Arm on Cliffsend Roundabout_GA
60340453-M001-SKE-0033
Spitfire Corner Roundabout_GA
60340453-M001-SKE-0035
Manston Road Priority Junction_GA
Drawings for Info (ref. SHP1-2)
Ref.
PL1436-VW-017-01
PL1436-VW-018-01
PL1436-VW-020
PL1436-VW-021

Drawing title
Red Line Plan (Site Plan)
Site Location Plan
Illustrative Masterplan
Topographical Survey

Vous aimerez peut-être aussi