Chapter 5 :

Applications of
Money-Time Relationship
(Aplikasi Hubungan Uang dan Waktu)

Chapter 5 : Applications of Money-Time Relationship

1. Introduction

2. MARR
3. PW
4. FW

Introduction

5. AW
6. IRR
7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Introduction
1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR
7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

Basic Question
Apakah suatu penginvestasian modal
beserta pengeluarannya yang
berkaitan dapat diperoleh kembali
melalui pemasukan seiring waktu
sebagai tambahan selain
kembalinya modal, yang dinilai
menarik dari sisi resiko dan pilihan
alternatif potensial
28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Introduction
1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR
7. ERR

Dibutuhkan Evaluasi
Economic Profitability

8. Payback
9. Diagrams

10. Kesimpulan

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Introduction
1. Introduction

2. MARR

Metode-metode :

4. FW

1. Present Worth (PW)


2. Annual Worth (AW)

5. AW

3. Future Worth (FW)

6. IRR

4. Internal Rate of Return (IRR)

3. PW

7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

dengan

MARR

5. External Rate of Return (ERR)


dengan Annual RoR
6. Payback Period

Recovered Speed

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Introduction

Outline Presentasi

1. Introduction

5. AW

1.
2.
3.
4.

Introduction
Konsep MARR
Metode Present Worth (PW)
Metode Future Worth (FW)

6. IRR

5.

Metode Annual Worth (FW)

7. ERR

6.

Metode IRR

8. Payback

7.
8.
9.
10.

Metode ERR
Metode Payback Period
Investment Balance Diagrams
Kesimpulan

2. MARR
3. PW
4. FW

9. Diagrams

10. Kesimpulan

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR
7. ERR

Minimum Attractive
Rate of Return
(MARR)

8. Payback
9. Diagrams

10. Kesimpulan

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Minimum Attractive Rate of Return (MARR)


1. Introduction

2. MARR
3. PW
4. FW
5. AW

MARR, disebut juga hurdle rate,


yaitu

Besar rataan pengembalian


modal minimal yang secara
beralasan dinilai menarik

6. IRR
7. ERR
8. Payback
9. Diagrams

Salah satu pendekatan populer


dengan Opportunity Cost

10. Kesimpulan

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Minimum Attractive Rate of Return (MARR)


1. Introduction

2. MARR

Ilustrasi, FIGURE 5-1

Tujuh proyek, batas modal $6million,

3. PW
40%

4. FW

6. IRR
7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

Profit

5. AW

MARR =
16%

30% A

B
C

20%

Batas

16%

E
F

10%

Reject F
G

Reject G

0%
0

(million $)

Investasi kumulatif
9

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Minimum Attractive Rate of Return (MARR)


1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR
7. ERR
8. Payback

Metode PW, FW, dan AW


mengubah cash flow menjadi
suatu besaran nilai manfaat
(worth) menggunakan rataan
interest MARR

9. Diagrams

10. Kesimpulan

10

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR

Present Worth (PW)


Method

7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

11

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Present Worth (PW)

Konsep PW

1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR
7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

12

Besar nilai (worth) ekuivalen semua


cash flow relatif terhadap keadaan
pada titik awal yang disebut saat ini
(present)
Mencari Nilai PW
seluruh arus kas masuk dan keluar
diperhitungkan terhadap keadaan present
time, dengan tingkat bunga tertentu
(interest rate) yang pada umumnya
merupakan MARR
28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Present Worth (PW)


1. Introduction

2. MARR

PW dicari sebagai fungsi dari i% (perperiode bunga) dari suatu deretan kas
inflows dan outflows,

3. PW
4. FW
5. AW
6. IRR
7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

13

PW (i%) F0 (1 i)0 F1 (1 i)

Fk1 (1 i)

F2 (1 i)

.... FN (1 i)

...

Fk (1 i )

k 0

i = effective interest rate, or MARR, per compounding period


k = index for each compounding period (0<= k <= N)
Fk = future cash flow at the end of period k
N = number of compounding periods in the planning horizon
(i.e., study period)
28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Present Worth (PW)


1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR
7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

14

Ilustrasi, EXAMPLE 5-2

Diketahui suatu proyek :

Investasi $ 10,000
Pemasukan tahunan $ 5,311 untuk
5 tahun, setelahnya market
(salvage)value $ 2,000
Pengeluaran tahunan $ 3,000
Diterima bila keuntungan 10%
atau lebih pertahun
28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Present Worth (PW)


EXAMPLE 5-2
1. Introduction

PW
Cash outflows

2. MARR

Cash Inflows

Annual revenue:
$5,311 (P/A, 10%, 5)

$20,133

5. AW

Salvage Value:
$2,000 (P/F, 10%, 5)

$1,242

6. IRR

Investment

-$10,000

7. ERR

-$11,372

8. Payback

Annual expenses:
$3,000 (P/A, 10%, 5)

9. Diagrams

Total

-$21,372

10. Kesimpulan

Total PW

3. PW
4. FW

$ 21,375
$3

The Project is Marginally Acceptable


15

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Present Worth (PW)


1. Introduction

2. MARR
3. PW
4. FW
5. AW

PW positif untuk suatu proyek


investasi merupakan besar
keuntungan ($$$) di atas besar
minimum yang diperlukan oleh
investor

6. IRR
7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

16

Lebih tinggi bunganya dan lebih


jauh ke depan (lebih lama) cash
flow terjadi, maka PW akan
menjadi lebih rendah

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Present Worth (PW)


1,000

1. Introduction

900

2. MARR

4. FW
5. AW
6. IRR
7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

Present Worth (PW) in $

3. PW

800

i=5%

700

$614

600

i=10%

500

PW of $1,000 received
At end of year 10

400

i=20%

300

$386

i=30%

200

$162

100

$73

9 10

End of year k
17

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR

Future Worth (FW)


Method

7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

18

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Future Worth (FW)

Konsep FW

1. Introduction

2. MARR
3. PW
4. FW
5. AW

Besar nilai (worth) ekuivalen semua


cash flow relatif terhadap keadaan
pada titik akhir studi yang disebut
masa depan (future)

6. IRR
7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

19

Seperti PW, seluruh arus kas masuk


dan keluar diperhitungkan, terhadap
keadaan future time, dengan MARR

FW ekuivalen dengan PW
28 Februari 2012

Chapter 5 : Applications of Money-Time Relationship

Future Worth (FW)


1. Introduction

FW sebagai fungsi i

2. MARR
3. PW
4. FW

N k

FW i%

5. AW

Fk 1 i
k 0

6. IRR
7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

20

Hubungan dengan PW

FW
28 Februari 2012

PW F / P, i%, N

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Contoh, EXAMPLE 5-8


1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR
7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

Proyek pada EXAMPLE 5-3,


Investasi $ 25,000
Pemasukan tahunan $ 8,000 untuk 5 tahun,
Market (salvage) value $ 5,000
MARR 20% per tahun
FW(20%) = - $25,000 (F/P,20%,5) +
$8000(F/A,20%,5) + $5,000
= $2,324.80
FW lebih besar, merupakan kelipatan dari PW.
Ini menunjukkan investasi yang baik.
PW(20%) = $ 2,324.80 (P/F,20%,5)
= $ 934.29

21

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR

Annual Worth (AW)


Method

7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

22

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Annual Worth (AW)


1. Introduction

AW dari suatu proyek

2. MARR
3. PW
4. FW
5. AW
6. IRR
7. ERR
8. Payback
9. Diagrams

Besar nilai (worth) ekuivalen semua


cash flow relatif terhadap keadaan
pada suatu periode yang ditentukan
dengan kata lain, merupakan besar
Capital Recovery (CR) tahunan
ekuivalen dikurang revenue tahunan
(R) dan expenses tahunan (E)

10. Kesimpulan

23

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Annual Worth (AW)


1. Introduction

AW juga sebagai fungsi i

2. MARR
3. PW

AW (i%) = R E CR (i%)

4. FW
5. AW
6. IRR
7. ERR
8. Payback

Hubungan dengan PW dan FW

AW

PW A / P , i%, N

AW

FW A / F , i%, N

9. Diagrams

10. Kesimpulan

24

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Annual Worth (AW)


1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR
7. ERR

Capital Recovery
Jumlah pengembalian modal tahunan
untuk suatu proyek adalah biaya ekuivalen
seragam tahunan dari modal yang
diinvestasikan

CR (i%) = I(A/P, i%, N) S(A/F, i%, N)

8. Payback
9. Diagrams

10. Kesimpulan

25

dengan I = investasi awal untuk proyek


S = nilai sisa (harga pasar) pada
akhir
periode studi
N = periode studi proyek
28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Annual Worth (AW)


Contoh, EXAMPLE 5-10
1. Introduction

2. MARR
3. PW
4. FW

Proyek komplek apartemen 25 unit,


Perkiraan pendudukan 90%
MARR diinginkan 12 %

5. AW
6. IRR

Investasi Tanah

$50,000

7. ERR

Investasi Bangunan

$225,000

8. Payback

Periode studi, N

20 tahun

9. Diagrams

Sewa per unit / bulan

10. Kesimpulan

Perawatan per unit / bulan

$35

Pajak & Asuransi per tahun

10% of total
investment

26

28 Februari 2012

? <ditanyakan>

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Annual Worth (AW)


EXAMPLE 5-10
1. Introduction Initial investment cost = Land + Building investment cost
= $50,000 + $225,000 = $275,000

2. MARR
3. PW
4. FW
5. AW

Taxes/insurance/year = 0.1($275,000) = $27,500


Upkeep/year = $35(12 x 25)(0.9) = $9,450
CR cost/year = I(A/P,12%,N) S(A/F,12%,N)
= $36,123

6. IRR
7. ERR
8. Payback

Equivalent AW (of costs)


= Rent - $27,500 - $9,450 - $36,123
= Rent - $73,073

9. Diagrams

10. Kesimpulan

Rent =

$73,073

= $270.64

(12 x 25)(0.9)
27

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR

Internal Rate of Return


(IRR) Method

7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

28

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Internal Rate of Return (IRR)

Konsep IRR

1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR
7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

29

Memberikan solusi untuk tingkat bunga


yang menunjukan persamaan dari nilai
ekuivalen dari penerimaan pada
pengeluaran.

Tingkat bunga yang didapatkan disebut


sebagai tingkat pengembalian internal
(Internal Rate of Return, IRR)

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Internal Rate of Return (IRR)


1. Introduction

2. MARR

Dengan formula PW, IRR merupakan i%


pada:

3. PW
4. FW

Rk ( P / F , i '%, k )

5. AW
6. IRR
7. ERR
8. Payback

k 0

Ek ( P / F , i '%, k )
k 0

Suatu alternatif investasi dapat diterima,


apabila:

9. Diagrams

IRR (i) MARR

10. Kesimpulan

30

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Internal Rate of Return (IRR)


1. Introduction

Penghitungan IRR dapat dilakukan


dengan berbagai metode:

2. MARR
3. PW
4. FW
5. AW
6. IRR
7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

31

Dengan formula Present Worth (PW = 0)


PW = Rk(P/F,i%,k) - Ek(P/F,i%,k) = 0
Dengan formula Future Worth (FW = 0)

FW = Rk(F/P,i%,N - k) - Ek(F/P,i%,N - k) = 0
kedua di atas dilakukan secara Trial & Error

Menggunakan Investment Balance Diagram

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Internal Rate of Return (IRR)


Contoh, EXAMPLE 5-12 (dari 5-3)
1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR
7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

32

Investasi mesin baru $ 25,000,


5 tahun, salvage $ 5000, Revenue $8,000
pertahun, MARR 20%
PW = 0
$8,000(P/A,i%,5) + $5,000(P/F,i%,5) - $25,000 = 0
i ?

Dengan Trial & Error :


i = 20% PW =
8,000(2.9906)+5,000(0.4019)-25,000
= $ 934.30
i = 25% PW =
8,000(2.6893)+5,000(0.3277)-25,000
= $ -1,847.10
28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Internal Rate of Return (IRR)


EXAMPLE 5-11
1. Introduction

$934.30

2. MARR

3. PW
4. FW

7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

33

20%

5. AW
6. IRR

25%
-$1,847.10

BA
=
BC

dA
de

Bx Ax
dx - Ax
=
By Cy
dy - i

i%
C

Dari perpotongan,
didapat:

i = 21.577 %

Karena i > MARR, diketahui ini


merupakan investasi yang baik
28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR

External Rate of Return


(ERR) Method

7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

34

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

External Rate of Return (ERR)


1. Introduction

2. MARR
3. PW
4. FW

memperhitungkan tingkat bunga


eksternal dimana arus kas netto
yang dihasilkan dapat diinvestasikan
kembali

5. AW
6. IRR
7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

35

Keuntungan metode ERR :


Dapat memecahkan masalah secara
langsung tanpa trial and error.
Tidak bermasalah dalam menganalisa
rata-rata pengembalian berganda.

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

External Rate of Return (ERR)


1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR
7. ERR
8. Payback

Tiga langkah umum perhitungan ERR


1.Semua pengeluaran bersih dinyatakan
pada waktu saat ini.
2.Semua penerimaan bersih digabung
pada periode N.
3.Tentukan ERR yang merupakan ratarata bunga dinyatakan diantara dua
kuantitas.

9. Diagrams

10. Kesimpulan

36

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

External Rate of Return (ERR)


1. Introduction

2. MARR

Persamaan ERR (i)

3. PW
4. FW
5. AW

Ek ( P / F , %, k )( F / P, i '%, N )
k 0

6. IRR

Rk ( F / P, %, N k )

7. ERR

k 0

8. Payback
9. Diagrams

10. Spreadsheet

37

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

External Rate of Return (ERR)


1. Introduction

Secara grafik:

2. MARR

Rk ( F / P, %, N k )

3. PW

k 0

4. FW

i%=?

5. AW
6. IRR

time

7. ERR

8. Payback
9. Diagrams

10. Kesimpulan

38

Ek ( P / F , %, k )
k 0

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR

Payback (Payout) Period


Method

7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

39

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Payback Period
1. Introduction

2. MARR
3. PW
4. FW

metode pengembalian menghitung


jumlah tahun yang diperlukan untuk
arus kas masuk agar sama dengan
arus kas keluar

5. AW
6. IRR
7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

40

Metode ini lebih merefleksikan likuiditas


proyek dibandingkan profitabilitas
Tujuan utama:
Periode pengembalian secepatnya

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Payback Period
1. Introduction

2. MARR
3. PW
4. FW
5. AW

Metode ini tidak dapat digunakan untuk


membuat keputusan investasi secara
umum,
Hanya sebagai indikator resiko dari suatu
proyek

6. IRR
7. ERR
8. Payback
9. Diagrams

Semakin lama waktu yang diperlukan


untuk mengembalikan modal investasi
maka semakin besar resiko yang
dihadapi oleh proyek tersebut

10. Kesimpulan

41

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Payback Period
1. Introduction

1. Simple Payback Period, ,

2. MARR
3. PW

( Rk Ek ) I 0

4. FW
5. AW
6. IRR
7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

42

k 1

mengabaikan nilai uang terhadap


waktu dan seluruh cash flow yang
terjadi setelah .

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Payback Period
1. Introduction

2. Discounted Payback Period, ,

2. MARR
3. PW
4. FW
5. AW

'

( Rk Ek )( P / F , i %, k ) I 0
k 1

6. IRR
7. ERR
8. Payback
9. Diagrams

memperhitungkan nilai uang terhadap


waktu.

10. Kesimpulan

43

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR

Investment Balance
Diagram

7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

44

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Investment Balance Diagram


1. Introduction

2. MARR
3. PW
4. FW
5. AW

Diagram Keseimbangan Investasi adalah


metode untuk menggambarkan seberapa
banyak uang yang dikeluarkan untuk
suatu proyek dan bagaimana
pengembalian dana yang diperkirakan.

6. IRR
7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

45

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Investment Balance Diagram


Gambar investment balance diagram

1. Introduction

2. MARR

4. FW
5. AW
6. IRR
7. ERR
8. Payback
9. Diagrams

P(1+i)
Unrecovered Invesment Balance, S

3. PW

P(1+i)-(R1-E1)(1+i)

1+i
(R1-E1)

1+i
(R2-E2)

1+i

Initial Invesment = P

(RN-1-EN-1)

10. Kesimpulan

1+i
(RN-EN)

Years

46

(R3-E3)

28 Februari 2012

$0

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR
7. ERR
8. Payback

Contoh, untuk EXAMPLE 5-11, dari 5-2


Diketahui suatu proyek :
Investasi $ 10,000
Pemasukan tahunan $ 5,311 untuk 5 tahun,
setelahnya market (salvage)value $ 2,000
Pengeluaran tahunan $ 3,000
Diterima bila keuntungan 10% atau lebih
pertahun

9. Diagrams

10. Kesimpulan

47

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

1. Introduction

investment balance diagram untuk 5-10

2. MARR
$2,001 (=FW)

3. PW

MARR = 5%

4. FW

6. IRR

Investment
Balance,S

5. AW

+$4,310

Years

(Area of Negative Investment Balance)


-$2,199

7. ERR

-$4,294

8. Payback

-$6,290

9. Diagrams

-$8,190

10. Kesimpulan
-10,000

+$2,310

+$2,310

+$2,310

+$2,310
-$4,509

-$6,604

-$8,600

-$10,500

48

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

1. Introduction

2. MARR
3. PW
4. FW
5. AW
6. IRR

Kesimpulan

7. ERR
8. Payback
9. Diagrams

10. Kesimpulan

49

28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Kesimpulan
1. Introduction

Lima metode dasar untuk mengevaluasi tingkat


keuntungan dari keuangan suatu proyek :

2. MARR
3. PW
4. FW
5. AW
6. IRR

Present worth method


Annual worth method
Future worth method
Internal rate of return
External rate of return

7. ERR
8. Payback

Tiga metode tambahan untuk memastikan


likuiditas proyek :

9. Diagrams

10. Kesimpulan

50

Payback (payout) period method


Discounted payback period
Investment balanced diagrams
28 Februari 2012

Amien Rahardjo

Chapter 5 : Applications of Money-Time Relationship

Terima Kasih

51

28 Februari 2012

Tim Kepodang

Vous aimerez peut-être aussi