Vous êtes sur la page 1sur 292

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA

A1:P14F

TARJETA DE LIQUIDACIN FINANCIERA


OBRA

EJECUTA
FTE. FTO.
META

:
:
:

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE L


PROVINCIA DE CUSCO-CUSCO"
SUB GERENCIA DE OBRAS
RECURSOS ORDINARIOS
011-2014

D O C U M E N T O
N

FECHA
SIAF

C/P N

DOC

PECOSA

FTE.
FTO.

DESCRIPCION

CANT.

300.00

UNID.
MEDIDA

11/17/2014

7767

RO003296

O/C.

B201980

9042

00

LASTRE PREPARADO DE LA CANTERA SENCCA

10/13/2014

7899

RO002912

O/C.

B202055

9149

00

TUBERIA DE HOPE,CORRUGADA, FLEXIBLE Y PERFORADA DE


4"INCLUYE UNION (TUBOS DE 5.90M C/.)

11.00

9/24/2014

7912

RO002759

O/C.

B202024

9120

00

PAPEL BOND A-4 75 GR.

11/7/2014

8082

RO003226

O/C.

B202092

4343

00

ARENA FINA DE CUNYAC

10/22/2014

8651

RO003024

O/C.

B003024

9350

00

TUBO DE FIERRO GALVANIZADO DE 2"X 6 MTS. X 2 MM PRECOR

11/11/2014

8654

RO003255

O/C.

B202174

9347

00

ALAMBRE NEGRO N16

5.00

KG.

11/11/2014

8654

RO003255

O/C.

B202174

9347

00

FIERRO CORRUGADO DE 1/2" AA

8.00

11/11/2014

8654

RO003255

O/C.

B202174

9347

00

ASFALTO RC-250 NACIONAL

11/11/2014

8654

RO003255

O/C.

B202174

9347

00

10

11/11/2014

8654

RO003255

O/C.

B202174

9347

11

11/11/2014

8654

RO003255

O/C.

B202174

12

10/30/2014

8658

RO003152

O/C.

13

10/23/2014

8659

RO003054

14

10/20/2014

8669

15

11/25/2014

8728

IMPORTE

28.60

8,580.00

UND.

100.40

1,104.40

10.00

MLL.

21.00

210.00

8.00

M3.

130.00

1,040.00

95.00

1,995.00

4.00

20.00

VRLL.

29.50

236.00

20.00

GLN.

18.00

360.00

LLANTA PARA BUGUIE COMPLETA TRUPER

8.00

UND.

52.00

416.00

00

ADITIVO IMPERMELIZANTE SIKA

2.00

GLN.

19.00

38.00

9347

00

SOLDADURA PA

KG.

12.50

312.50

B202189

9409

00

PETROLEO D-2 REPSOL

350.00

GLN.

13.60

4,760.00

O/C.

B202190

9340

00

GUANTES DE CUERO REFORZADO

30.00

PAR.

6.90

207.00

RO002976

O/C.

B202197

9364

00

CEMENTO PORTLAN TIPO IP 42.50 KLS. YURA

300.00

BLS.

25.00

7,500.00

RO003402

O/S.

B200548

00

SERVICIO DE DISEO DE MESCLA

1.00

SERV.

350.00

350.00

21.00

25.00

M3.

PRECIO
UNITARIO

UND.

TOTAL

Pgina 1

27,128.90

CIN DE PROYECTOS DE INVERSIN PBLICA

DIRECCIN DE LIQUIDACIN DE PROYECTOS

A DE LIQUIDACIN FINANCIERA

TARJETA DE LIQUIDACIN FINA

DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE LA A.P.V VILLA MARIA,


PROVINCIA DE CUSCO-CUSCO"

ESPECIFICA
FECHA

2.6. 2.3. 99 3

DEL

GASTO

2.6. 2.3. 994

PERSONAL

BIENES

2.6. 2.3. 995


SERVICIOS

11/17/2014

8,580.00

10/13/2014

1,104.40

9/24/2014

210.00

11/7/2014

1,040.00

10/22/2014

1,995.00

11/11/2014

20.00

11/11/2014

236.00

11/11/2014

360.00

11/11/2014

416.00

11/11/2014

38.00

11/11/2014

312.50

10/30/2014

4,760.00

10/23/2014

207.00

10/20/2014

7,500.00

11/25/2014

350.00
0.00

Pgina 2

26,778.90

350.00

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA DETERMINACION DE COSTOS DIRECTOS-GASTOS GENERALES
OBRA

EJECUTA
FTE. FTO.
META

:
:
:

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE LA A.P.V VILLA MARIA , PROVINCIA DE CUSCO-CUSCO"
SUB GERENCIA DE OBRAS
RECURSOS ORDINARIOS
011-2014

D O C U M E N T O
N

COSTO DIRECTO

FECHA

11/17/2014

DESCRIPCION

UNID.
MEDIDA

CANT.

PRECIO
UNITARIO

IMPORTE

SIAF

C/P N

DOC

PECOSA

FTE.
FTO.

7767

RO003296

O/C.

B201980

9042

00

LASTRE PREPARADO DE LA CANTERA SENCCA

11.00

UND.

10.00

MLL.

21.00

210.00

8.00

M3.

130.00

1,040.00

1,040.00
1,995.00

10/13/2014

7899

RO002912

O/C.

B202055

9149

00

TUBERIA DE HOPE,CORRUGADA, FLEXIBLE Y PERFORADA DE


4"INCLUYE UNION (TUBOS DE 5.90M C/.)

9/24/2014

7912

RO002759

O/C.

B202024

9120

00

PAPEL BOND A-4 75 GR.

11/7/2014

8082

RO003226

O/C.

B202092

4343

00

ARENA FINA DE CUNYAC

10/22/2014

8651

RO003024

O/C.

B003024

9350

00

TUBO DE FIERRO GALVANIZADO DE 2"X 6 MTS. X 2 MM PRECOR

10/30/2014

8658

RO003152

O/C.

B202189

9409

00

PETROLEO D-2 REPSOL

11/11/2014

8654

RO003255

O/C.

B202174

9347

00

ALAMBRE NEGRO N16

11/11/2014

8654

RO003255

O/C.

B202174

9347

00

FIERRO CORRUGADO DE 1/2" AA

11/11/2014

8654

RO003255

O/C.

B202174

9347

00

ASFALTO RC-250 NACIONAL

10

11/11/2014

8654

RO003255

O/C.

B202174

9347

00

11

11/11/2014

8654

RO003255

O/C.

B202174

9347

00

12

11/11/2014

8654

RO003255

O/C.

B202174

9347

00

SOLDADURA PA

13

10/23/2014

8659

RO003054

O/C.

B202190

9340

00

GUANTES DE CUERO REFORZADO

14

10/20/2014

8669

RO002976

O/C.

B202197

9364

00

CEMENTO PORTLAN TIPO IP 42.50 KLS. YURA

15

11/25/2014

8728

RO003402

O/S.

B200548

00

SERVICIO DE DISEO DE MESCLA

300.00

M3.

MANO DE
OBRA

MATERIALES

28.60

8,580.00

8,580.00

100.40

1,104.40

1,104.40

21.00

UND.

95.00

1,995.00

350.00

GLN.

13.60

4,760.00

4.00

20.00

20.00

5.00

KG.

8.00

VRLL.

29.50

236.00

236.00

GLN.

18.00

360.00

360.00

LLANTA PARA BUGUIE COMPLETA TRUPER

8.00

UND.

52.00

416.00

416.00

ADITIVO IMPERMELIZANTE SIKA

2.00

GLN.

19.00

38.00

38.00

25.00

KG.

12.50

312.50

312.50

30.00

PAR.

6.90

207.00

BLS.

25.00

7,500.00

1.00

SERV.

350.00

350.00

TOTAL

Pgina 3

27,128.90

COMBUSTI BLE

EQUIPO

SERVICIOS
DIVERSOS

RESIDENTE
DE OBRA

ASISTENTE
TECNICO

4,760.00

20.00

300.00

HERRAMIEN TAS

7,500.00
350.00

0.00

21,601.90

0.00

4,760.00

0.00

350.00

0.00

0.00

N DE PROYECTOS DE INVERSIN PBLICA

ERMINACION DE COSTOS DIRECTOS-GASTOS GENERALES

D EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE LA A.P.V VILLA MARIA , PROVINCIA DE CUSCO-CUSCO"

GASTOS GENERALES
ASIST.
ADMINISTRATI
VO

ALMACENERO

MAT. DE
ESCRITORIO

VESTUARIO

OTROS

210.00

207.00

0.00

0.00

210.00

Pgina 4

207.00

0.00

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE
PROVINCIA DE CUSCO-CUSCO"

OBRA

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

CANON Y SOBRE CANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

META

011-2014

D O C U M E N T O
N

FECHA
SIAF

C/P N

DOC

PECOSA

FTE.
FTO.

DESCRIPCION

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

9/4/2014

6666

RO002545

O/C.

B201613

8488

18

GUANTES DE CUERO REFORZADO NACIONAL

60.00

PAR.

6.80

408.00

9/4/2014

6666

RO002545

O/C.

B201613

8488

18

GUANTES DE JEBE CALIBRE 35 TALLA 7,8,9 VIRUTEX

15.00

PAR.

7.80

117.00

9/4/2014

6666

RO002545

O/C.

B201613

8488

18

CASCO TIPO JOKEY COLOR AMARILLO MASTER

30.00

UND.

5.00

150.00

9/4/2014

6666

RO002545

O/C.

B201613

8488

18

LENTES DE SEGURIDAD CON PROTECCION UV SKYBLUE

30.00

UND.

7.00

210.00

9/4/2014

6666

RO002545

O/C.

B201613

8488

18

PROTECTOR BUCAL DE LOS VIAS KAMASA

30.00

UND.

15.90

477.00

9/4/2014

6666

RO002545

O/C.

B201613

8488

18

PROTECTOR AUDITIVO TIPO TAPA ON LIBUS

30.00

PAR.

1.90

57.00

9/4/2014

6666

RO002545

O/C.

B201613

8488

18

BOTAS DE JEBE REFORZADO CON PUNTA DE ACERO (39,40,41)

30.00

PAR.

30.00

900.00

9/4/2014

6666

RO002545

O/C.

B201613

8488

18

PONCHO IMPERMEABLE DE TELA ENJEBADA.

30.00

UND.

16.80

504.00

8/14/2014

6667

RO002181

O/C.

B201613

8487

18

ALAMBRE NEGRO N 8 PRODUC.

170.00

KG.

3.80

646.00

10

8/14/2014

6667

RO002181

O/C.

B201613

8487

18

CLAVO PARA MADERA C/C 3"

100.00

KG.

3.80

380.00

11

8/14/2014

6667

RO002181

O/C.

B201613

8487

18

CLAVO PARA MADERA C/C 4"

50.00

KG.

3.80

190.00

12

12/22/2014

7016

RO003729

O/C.

B202629

10025

18

TAPA DE FG PARA DESASGUE PESADA,PRODUCTO NACIONAL.

3.00

UND.

32.00

96.00

13

12/22/2014

7016

RO003729

O/C.

B202629

10025

18

CAJAS DE CONCRETO SIMPLE DE DESAGUE 12"X24",PRODUCTO


NACIONAL.

6.00

UND.

11.00

66.00

14

12/22/2014

7016

RO003729

O/C.

B202629

10025

18

TUBERIA PCV UF 160MM SN-2 C/ANILLO NPT 4435,MARCA NACIONAL.

7.00

UND.

118.00

826.00

15

12/22/2014

7016

RO003729

O/C.

B202629

10025

18

TUBERIA PVC SAL 4"X6M8PESADO) NARANJA 110MM C/A.MARCO


PAVCO.

13.00

UND.

88.00

1,144.00

20

10/6/2014

8532

RO002865

81

18

PLANCHAS PARA LLANTAS VIPAL # 10

2.00

UND.

80.00

160.00

21

10/6/2014

8532

RO002865

81

18

ROLLOS DE MATERIAL- PARCHE CALIENTE

2.00

UND.

80.00

160.00

22

10/6/2014

8532

RO002865

81

18

CATERPILAR TRANS. TO 4 SAE 30 X 19 LTS.

2.00

BLD.

284.00

568.00

CAJACHICA
CAJACHICA
CAJACHICA

VAN ...

Pgina 5

SUBTOTAL

7,059.00

LA

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE
PROVINCIA DE CUSCO-CUSCO"

OBRA

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

CANON Y SOBRE CANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

META

011-2014

D O C U M E N T O
N

FECHA
SIAF

C/P N

DOC

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

...VIENEN
23

10/6/2014

8532

RO002865

24

10/6/2014

8532

RO002865

25

10/6/2014

8532

RO002865

26

10/6/2014

8532

RO002865

27

10/6/2014

8532

RO002865

28

10/6/2014

8532

RO002865

29

10/6/2014

8532

RO002865

30

10/6/2014

8532

RO002865

31

10/6/2014

8532

RO002865

32

12/4/2014

10579

RO003508

33

12/4/2014

10579

34

12/4/2014

35

CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA

UNID.
MEDIDA

PRECIO
UNITARIO

SUBTOTAL

IMPORTE

7,059.00

81

18

CATERPILAR FILTRO HIDRAULICO

1.00

PZA.

145.00

145.00

81

18

FILTRO DE COMBUSTIBLE PARA SEPARADOR DE AGUA

1.00

PZA.

170.90

170.90

81

18

DIESEL ENGINE OIL VDS3 SAE 15 W-40 40 X 20 LTS.

1.00

BDN.

399.00

399.00

81

18

TAPA DE TANQUE

1.00

PZA.

13.00

13.00

81

18

MANGUERA DE AGUA

1.00

MTS.

20.00

20.00

81

18

GOMA COJIN

1.00

KG.

20.00

20.00

81

18

VIPAL UD-OS

1.00

UND.

10.00

10.00

81

18

TARRAJA

1.00

UND.

4.00

4.00

81

18

LIQUIDO VIPAL

1.00

UND.

7.00

7.00

PLL.

1184

18

DESCUENTO PLANILLA PERSONAL OBRERO - NOVIEMBRE-2014

1.00

PLL.

5,165.60

5,165.60

RO003508

PLL.

1216

18

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI NOVIEMBRE-2014

1.00

PLL.

595.54

595.54

10579

RO003509

PLL.

1184

18

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO - NOVIEMBRE-2014

1.00

PLL.

31,659.08

31,659.08

12/4/2014

10579

RO003509

PLL.

1216

18

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI NOVIEMBRE-2014

1.00

PLL.

2,902.67

2,902.67

36

12/4/2014

10579

RO003510

PLL.

1184

18

ESSALUD PLANILLA PERSONAL OBRERO -NOVIEMBRE-2014

1.00

PLL.

3,643.50

3,643.50

37

12/4/2014

10579

RO003510

PLL.

1216

18

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALYNOVIEMBRE-2014

1.00

PLL.

342.06

342.06

38

12/4/2014

10584

RO003530

PLL.

811

18

LIQUIDO A PAGAR PLANILLA ASISTENTE ADMINISTRATIVO BACA


BUTINZA GILMAR-NOVIEMBRE -2014

1.00

PLL.

1,436.81

1,436.81

VAN ...

Pgina 6

SUBTOTAL

Err:522

LA

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE
PROVINCIA DE CUSCO-CUSCO"

OBRA

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

CANON Y SOBRE CANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

META

011-2014

D O C U M E N T O
N

FECHA
SIAF

C/P N

DOC

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

...VIENEN
39

12/4/2014

10584

RO003530

PLL.

811

18

40

12/4/2014

10584

RO003531

PLL.

811

18

41

12/4/2014

10584

RO003531

PLL.

811

18

42

12/4/2014

10584

RO003532

PLL.

811

18

43

12/4/2014

10584

RO003532

PLL.

811

18

44

12/19/2014

10825

RO003678

PLL.

1243

18

45

12/19/2014

10825

RO003679

PLL.

1243

46

12/24/2014

10825

RO003812

PLL.

1243

47

12/24/2014

11010

RO003815

O/S.

B200854

48

12/24/2014

10642

RO003829

O/S.

B200731

49

12/31/2014

11159

RO004138

O/C.

B202707

10142

50

12/31/2014

11159

RO004138

O/C.

B202707

10142

51

12/26/2014

11174

RO003896

PLL.

52

12/26/2014

11174

RO003896

53

12/29/2014

11174

RO003939

LIQUIDO A PAGAR PLANILLA ALMACENERO CHACON PALOMINO


GIOVANA-NOVIEMBRE -2014

UNID.
MEDIDA

PRECIO
UNITARIO

SUBTOTAL

IMPORTE

Err:522

1.00

PLL.

1,395.52

1,395.52

1.00

PLL.

213.19

213.19

1.00

PLL.

204.48

204.48

1.00

PLL.

148.50

148.50

1.00

PLL.

144.00

144.00

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO - NOVIEMBRE-2014

1.00

PLL.

2,485.49

2,485.49

18

ESSALUD PLANILLA OBREROS-NOVIEMBRE -2014

1.00

PLL.

432.84

432.84

18

DESCUENTO PLANILLA OBREROS - NOVIEMBRE-2014

1.00

PLL.

1,625.27

1,625.27

18

SERVICIO DE POLIZA DE SEGUROS

1.00

SERV.

4,768.40

4768.4

18

SERVICIO DE POLIZA DE SEGUROS

4768.4

18

PLANTAS DE FICUS

18

PLANTAS ORNAMENTALES DOGO CHINO

1291

18

PLL.

1325

18

PLL.

1291

18

DESCUENTO PLANILLA ASISTENTE ADMINISTRATIVO BACA BUTINZA


GILMAR-NOVIEMBRE -2014
DESCUENTO PLANILLA ALMACENERO CHACON PALOMINO GIOVANANOVIEMBRE -2014
ESSALUD PLANILLA ASISTENTE ADMINISTRATIVO BACA BUTINZA
GILMAR-NOVIEMBRE -2014
ESSALUD PLANILLA ALMACENERO CHACON PALOMINO GIOVANANOVIEMBRE -2014

1.00

SERV.

4,768.40

20.00

UND.

32.00

640.00

500.00

UND.

2.50

1,250.00

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO - DICIEMBRE-2014

1.00

PLL.

16,071.70

16,071.70

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI DICIEMBRE-2014

1.00

PLL.

3,632.42

3,632.42

DESCUENTO PLANILLA PERSONAL OBRERO - DICIEMBRE-2014

1.00

PLL.

2,671.01

2,671.01

1.00

PLL.

609.38

609.38

54

12/29/2014

11174

RO003939

PLL.

1325

18

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI DICIEMBRE-2014

55

12/29/2014

11174

RO003945

PLL.

1291

18

ESSALUD PLANILLA OBREROS-DICIEMBRE -2014

1.00

PLL.

1,880.84

1,880.84

18

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALI - DICIEMBRE2014

1.00

PLL.

353.46

353.46

56

12/29/2014

11174

RO003945

PLL.

1325

Pgina 7

LA

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE
PROVINCIA DE CUSCO-CUSCO"

OBRA

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

CANON Y SOBRE CANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

META

011-2014

D O C U M E N T O
N

FECHA
SIAF

C/P N

DOC

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

VAN ...

SUBTOTAL

Err:522

...VIENEN

SUBTOTAL

Err:522

57

12/26/2014

11211

RO003879

PLL.

879

18

LIQUIDO A PAGAR PLANILLA ASISTENTE ADMINISTRATIVO BACA


BUTINZA GILMAR-DICIEMBRE -2014

1.00

PLL.

2,063.81

58

12/26/2014

11211

RO003879

PLL.

879

18

LIQUIDO A PAGAR ALMACENERO CHACON PALOMINO GIOVANADICIEMBRE -2014

1.00

PLL.

2,022.52

2,022.52

59

12/26/2014

11211

RO003880

PLL.

879

18

DESCUENTO PLANILLA ASISTENTE ADMINISTRATIVO BACA BUTINZA


GILMAR-DICIEMBRE -2014

1.00

PLL.

213.19

213.19

60

12/26/2014

11211

RO003880

PLL.

879

18

DESCUENTO PLANILLA ALMACENERO CHACON PALOMINO GIOVANADICIEMBRE -2014

1.00

PLL.

204.48

204.48

61

12/26/2014

11211

RO003881

PLL.

879

18

DESCUENTO PLANILLA ASISTENTE ADMINISTRATIVO BACA BUTINZA


GILMAR-DICIEMBRE -2014

1.00

PLL.

144.00

144.00

62

12/26/2014

11211

RO003881

PLL.

879

18

ESSALUD PLANILLA ALMACENERO CHACON PALOMINO GIOVANADICIEMBRE -2014

1.00

PLL.

148.50

148.50

63

12/26/2014

11318

RO003888

PLL.

1370

18

LIQUIDO A PAGAR PLANILLA OBRERO - DICIEMBRE-2014

1.00

PLL.

3,845.14

3,845.14

64

12/26/2014

11318

RO003889

PLL.

1370

18

DESCUENTO PLANILLA OBREROS - DICIEMBRE-2014

1.00

PLL.

1,143.23

1,143.23

65

12/26/2014

11318

RO003890

PLL.

1370

18

ESSALUD PLANILLA OBREROS- DICIEMBRE -2014

1.00

PLL.

324.63

324.63

TOTAL

Pgina 8

2063.81

Err:522

LA

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE
PROVINCIA DE CUSCO-CUSCO"

OBRA

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

CANON Y SOBRE CANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

META

011-2014

D O C U M E N T O
SIAF

C/P N

DOC

PECOSA

FTE.
FTO.

DESCRIPCION

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

LA A.P.V VILLA MARIA ,

ESPECIFICA
IMPORTE

2.6. 2.3. 99 3
PERSONAL

DEL

GAS

2.6. 2.3. 994


BIENES

6666

RO002545

O/C.

B201613

8488

18

GUANTES DE CUERO REFORZADO NACIONAL

60.00

PAR.

6.80

408.00

408.00

6666

RO002545

O/C.

B201613

8488

18

GUANTES DE JEBE CALIBRE 35 TALLA 7,8,9 VIRUTEX

15.00

PAR.

7.80

117.00

117.00

6666

RO002545

O/C.

B201613

8488

18

CASCO TIPO JOKEY COLOR AMARILLO MASTER

30.00

UND.

5.00

150.00

150.00

6666

RO002545

O/C.

B201613

8488

18

LENTES DE SEGURIDAD CON PROTECCION UV SKYBLUE

30.00

UND.

7.00

210.00

210.00

6666

RO002545

O/C.

B201613

8488

18

PROTECTOR BUCAL DE LOS VIAS KAMASA

30.00

UND.

15.90

477.00

477.00

6666

RO002545

O/C.

B201613

8488

18

PROTECTOR AUDITIVO TIPO TAPA ON LIBUS

30.00

PAR.

1.90

57.00

57.00

6666

RO002545

O/C.

B201613

8488

18

BOTAS DE JEBE REFORZADO CON PUNTA DE ACERO (39,40,41)

30.00

PAR.

30.00

900.00

900.00

6666

RO002545

O/C.

B201613

8488

18

PONCHO IMPERMEABLE DE TELA ENJEBADA.

30.00

UND.

16.80

504.00

504.00

6667

RO002181

O/C.

B201613

8487

18

ALAMBRE NEGRO N 8 PRODUC.

170.00

KG.

3.80

646.00

646.00

6667

RO002181

O/C.

B201613

8487

18

CLAVO PARA MADERA C/C 3"

100.00

KG.

3.80

380.00

380.00

6667

RO002181

O/C.

B201613

8487

18

CLAVO PARA MADERA C/C 4"

50.00

KG.

3.80

190.00

190.00

7016

RO003729

O/C.

B202629

10025

18

TAPA DE FG PARA DESASGUE PESADA,PRODUCTO NACIONAL.

3.00

UND.

32.00

96.00

96.00

7016

RO003729

O/C.

B202629

10025

18

CAJAS DE CONCRETO SIMPLE DE DESAGUE 12"X24",PRODUCTO


NACIONAL.

6.00

UND.

11.00

66.00

66.00

7016

RO003729

O/C.

B202629

10025

18

TUBERIA PCV UF 160MM SN-2 C/ANILLO NPT 4435,MARCA NACIONAL.

7.00

UND.

118.00

826.00

826.00

7016

RO003729

O/C.

B202629

10025

18

TUBERIA PVC SAL 4"X6M8PESADO) NARANJA 110MM C/A.MARCO


PAVCO.

13.00

UND.

88.00

1,144.00

1,144.00

8532

RO002865

81

18

PLANCHAS PARA LLANTAS VIPAL # 10

2.00

UND.

80.00

160.00

160.00

8532

RO002865

81

18

ROLLOS DE MATERIAL- PARCHE CALIENTE

2.00

UND.

80.00

160.00

160.00

8532

RO002865

81

18

CATERPILAR TRANS. TO 4 SAE 30 X 19 LTS.

2.00

BLD.

284.00

568.00

568.00

CAJACHICA
CAJACHICA
CAJACHICA

VAN ...

SUBTOTAL

Pgina 9

7,059.00

0.00

7,059.00

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE
PROVINCIA DE CUSCO-CUSCO"

OBRA

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

CANON Y SOBRE CANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

META

011-2014

D O C U M E N T O
SIAF

C/P N

DOC

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

8532

RO002865

8532

RO002865

8532

RO002865

8532

RO002865

8532

RO002865

8532

RO002865

8532

RO002865

8532

RO002865

8532

RO002865

10579

RO003508

10579

PRECIO
UNITARIO

ESPECIFICA
IMPORTE

2.6. 2.3. 99 3
PERSONAL

...VIENEN
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA

UNID.
MEDIDA

LA A.P.V VILLA MARIA ,

SUBTOTAL

7,059.00

0.00

DEL

GAS

2.6. 2.3. 994


BIENES
7,059.00

81

18

CATERPILAR FILTRO HIDRAULICO

1.00

PZA.

145.00

145.00

145.00

81

18

FILTRO DE COMBUSTIBLE PARA SEPARADOR DE AGUA

1.00

PZA.

170.90

170.90

170.90

81

18

DIESEL ENGINE OIL VDS3 SAE 15 W-40 40 X 20 LTS.

1.00

BDN.

399.00

399.00

399.00

81

18

TAPA DE TANQUE

1.00

PZA.

13.00

13.00

13.00

81

18

MANGUERA DE AGUA

1.00

MTS.

20.00

20.00

20.00

81

18

GOMA COJIN

1.00

KG.

20.00

20.00

20.00

81

18

VIPAL UD-OS

1.00

UND.

10.00

10.00

10.00

81

18

TARRAJA

1.00

UND.

4.00

4.00

4.00

81

18

LIQUIDO VIPAL

1.00

UND.

7.00

7.00

7.00

PLL.

1184

18

DESCUENTO PLANILLA PERSONAL OBRERO - NOVIEMBRE-2014

1.00

PLL.

5,165.60

5,165.60

5,165.60

RO003508

PLL.

1216

18

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI NOVIEMBRE-2014

1.00

PLL.

595.54

595.54

595.54

10579

RO003509

PLL.

1184

18

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO - NOVIEMBRE-2014

1.00

PLL.

31,659.08

31,659.08

31,659.08

10579

RO003509

PLL.

1216

18

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI NOVIEMBRE-2014

1.00

PLL.

2,902.67

2,902.67

2,902.67

10579

RO003510

PLL.

1184

18

ESSALUD PLANILLA PERSONAL OBRERO -NOVIEMBRE-2014

1.00

PLL.

3,643.50

3,643.50

3,643.50

10579

RO003510

PLL.

1216

18

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALYNOVIEMBRE-2014

1.00

PLL.

342.06

342.06

342.06

10584

RO003530

PLL.

811

18

LIQUIDO A PAGAR PLANILLA ASISTENTE ADMINISTRATIVO BACA


BUTINZA GILMAR-NOVIEMBRE -2014

1.00

PLL.

1,436.81

1,436.81

1,436.81

VAN ...

SUBTOTAL

Pgina 10

Err:522

Err:522

Err:522

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE
PROVINCIA DE CUSCO-CUSCO"

OBRA

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

CANON Y SOBRE CANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

META

011-2014

D O C U M E N T O
SIAF

C/P N

DOC

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

RO003530

PLL.

811

18

10584

RO003531

PLL.

811

18

10584

RO003531

PLL.

811

18

10584

RO003532

PLL.

811

18

10584

RO003532

PLL.

811

18

10825

RO003678

PLL.

1243

18

10825

RO003679

PLL.

1243

10825

RO003812

PLL.

1243

11010

RO003815

O/S.

B200854

10642

RO003829

O/S.

B200731

11159

RO004138

O/C.

B202707

10142

11159

RO004138

O/C.

B202707

10142

11174

RO003896

PLL.

11174

RO003896

11174

RO003939

PRECIO
UNITARIO

ESPECIFICA
IMPORTE

2.6. 2.3. 99 3
PERSONAL

...VIENEN
10584

UNID.
MEDIDA

LA A.P.V VILLA MARIA ,

SUBTOTAL

LIQUIDO A PAGAR PLANILLA ALMACENERO CHACON PALOMINO


GIOVANA-NOVIEMBRE -2014

Err:522

Err:522

1.00

PLL.

1,395.52

1,395.52

1,395.52

1.00

PLL.

213.19

213.19

213.19

1.00

PLL.

204.48

204.48

204.48

1.00

PLL.

148.50

148.50

148.50

1.00

PLL.

144.00

144.00

144.00

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO - NOVIEMBRE-2014

1.00

PLL.

2,485.49

2,485.49

2,485.49

18

ESSALUD PLANILLA OBREROS-NOVIEMBRE -2014

1.00

PLL.

432.84

432.84

432.84

18

DESCUENTO PLANILLA OBREROS - NOVIEMBRE-2014

1.00

PLL.

1,625.27

1,625.27

1,625.27

18

SERVICIO DE POLIZA DE SEGUROS

1.00

SERV.

4,768.40

4768.4

18

SERVICIO DE POLIZA DE SEGUROS

4768.4

18

PLANTAS DE FICUS

18

PLANTAS ORNAMENTALES DOGO CHINO

1291

18

PLL.

1325

18

PLL.

1291

18

DESCUENTO PLANILLA ASISTENTE ADMINISTRATIVO BACA BUTINZA


GILMAR-NOVIEMBRE -2014
DESCUENTO PLANILLA ALMACENERO CHACON PALOMINO GIOVANANOVIEMBRE -2014
ESSALUD PLANILLA ASISTENTE ADMINISTRATIVO BACA BUTINZA
GILMAR-NOVIEMBRE -2014
ESSALUD PLANILLA ALMACENERO CHACON PALOMINO GIOVANANOVIEMBRE -2014

Err:522

4,768.40

UND.

32.00

640.00

640.00

500.00

UND.

2.50

1,250.00

1,250.00

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO - DICIEMBRE-2014

1.00

PLL.

16,071.70

16,071.70

16,071.70

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI DICIEMBRE-2014

1.00

PLL.

3,632.42

3,632.42

3,632.42

DESCUENTO PLANILLA PERSONAL OBRERO - DICIEMBRE-2014

1.00

PLL.

2,671.01

2,671.01

2,671.01

1.00

PLL.

609.38

609.38

609.38

PLL.

1325

18

11174

RO003945

PLL.

1291

18

ESSALUD PLANILLA OBREROS-DICIEMBRE -2014

1.00

PLL.

1,880.84

1,880.84

1,880.84

18

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALI - DICIEMBRE2014

1.00

PLL.

353.46

353.46

353.46

1325

BIENES

SERV.

RO003939

PLL.

2.6. 2.3. 994

1.00

11174

RO003945

GAS

20.00

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI DICIEMBRE-2014

11174

DEL

Pgina 11

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE
PROVINCIA DE CUSCO-CUSCO"

OBRA

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

CANON Y SOBRE CANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

META

011-2014

D O C U M E N T O
SIAF

C/P N

DOC

PECOSA

FTE.
FTO.

DESCRIPCION

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

LA A.P.V VILLA MARIA ,

ESPECIFICA
IMPORTE

2.6. 2.3. 99 3
PERSONAL

DEL

GAS

2.6. 2.3. 994


BIENES

VAN ...

SUBTOTAL

Err:522

Err:522

Err:522

...VIENEN

SUBTOTAL

Err:522

Err:522

Err:522

11211

RO003879

PLL.

879

18

LIQUIDO A PAGAR PLANILLA ASISTENTE ADMINISTRATIVO BACA


BUTINZA GILMAR-DICIEMBRE -2014

1.00

PLL.

2,063.81

11211

RO003879

PLL.

879

18

LIQUIDO A PAGAR ALMACENERO CHACON PALOMINO GIOVANADICIEMBRE -2014

1.00

PLL.

2,022.52

2,022.52

2,022.52

11211

RO003880

PLL.

879

18

DESCUENTO PLANILLA ASISTENTE ADMINISTRATIVO BACA BUTINZA


GILMAR-DICIEMBRE -2014

1.00

PLL.

213.19

213.19

213.19

11211

RO003880

PLL.

879

18

DESCUENTO PLANILLA ALMACENERO CHACON PALOMINO GIOVANADICIEMBRE -2014

1.00

PLL.

204.48

204.48

204.48

11211

RO003881

PLL.

879

18

DESCUENTO PLANILLA ASISTENTE ADMINISTRATIVO BACA BUTINZA


GILMAR-DICIEMBRE -2014

1.00

PLL.

144.00

144.00

144.00

11211

RO003881

PLL.

879

18

ESSALUD PLANILLA ALMACENERO CHACON PALOMINO GIOVANADICIEMBRE -2014

1.00

PLL.

148.50

148.50

148.50

11318

RO003888

PLL.

1370

18

LIQUIDO A PAGAR PLANILLA OBRERO - DICIEMBRE-2014

1.00

PLL.

3,845.14

3,845.14

3,845.14

11318

RO003889

PLL.

1370

18

DESCUENTO PLANILLA OBREROS - DICIEMBRE-2014

1.00

PLL.

1,143.23

1,143.23

1,143.23

11318

RO003890

PLL.

1370

18

ESSALUD PLANILLA OBREROS- DICIEMBRE -2014

1.00

PLL.

324.63

324.63

324.63

Err:522

Err:522

TOTAL

Pgina 12

2063.81

2,063.81

Err:522

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA DETERMINACION DE COSTOS DIRECTOS - GASTOS GENERALES
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE

SUB GERENCIA DE OBRAS

CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

011-2014

D O C U M E N T O
DESCRIPCION

CANT.

/P N

DOC

PECOSA FTE. FTO.

02545

O/C.

B201613

8488

18

GUANTES DE CUERO REFORZADO NACIONAL

60.00

02545

O/C.

B201613

8488

18

GUANTES DE JEBE CALIBRE 35 TALLA 7,8,9 VIRUTEX

02545

O/C.

B201613

8488

18

CASCO TIPO JOKEY COLOR AMARILLO MASTER

02545

O/C.

B201613

8488

18

02545

O/C.

B201613

8488

18

02545

O/C.

B201613

8488

02545

O/C.

B201613

8488

02545

O/C.

B201613

02181

O/C.

02181

O/C.

02181

O/C.

03729

O/C.

UNID.
MEDIDA

PRECIO
UNITARIO

COSTO DIRECTO
IMPORTE

MANO DE
OBRA

MATERIALES

PAR.

6.80

15.00

PAR.

7.80

117.00

30.00

UND.

5.00

150.00

LENTES DE SEGURIDAD CON PROTECCION UV SKYBLUE

30.00

UND.

7.00

210.00

PROTECTOR BUCAL DE LOS VIAS KAMASA

30.00

UND.

15.90

477.00

18

PROTECTOR AUDITIVO TIPO TAPA ON LIBUS

30.00

PAR.

1.90

57.00

18

BOTAS DE JEBE REFORZADO CON PUNTA DE ACERO (39,40,41)

30.00

PAR.

30.00

900.00

8488

18

PONCHO IMPERMEABLE DE TELA ENJEBADA.

30.00

UND.

16.80

504.00

B201613

8487

18

ALAMBRE NEGRO N 8 PRODUC.

170.00

KG.

3.80

646.00

646.00

B201613

8487

18

CLAVO PARA MADERA C/C 3"

100.00

KG.

3.80

380.00

380.00

B201613

8487

18

CLAVO PARA MADERA C/C 4"

50.00

3.80

190.00

190.00

B202629

10025

18

TAPA DE FG PARA DESASGUE PESADA,PRODUCTO NACIONAL.

3.00

UND.

32.00

96.00

96.00

6.00

UND.

11.00

66.00

66.00

7.00

UND.

118.00

826.00

826.00

13.00

UND.

88.00

1,144.00

1,144.00

KG.

LA A.P.V VILLA MARIA , PROVINCIA DE CUSCO-CUSCO"

HERRAMIEN TAS

GASTOS GENERALES

COMBUSTI BLE

EQUIPO

SERVICIOS
DIVERSOS

RESIDENTE DE
OBRA

ASISTENTE
TECNICO

ASIST.
ADMINIS.

ALMACENERO

MAT. DE
ESCRITORIO

408.00

03729

O/C.

B202629

10025

18

CAJAS DE CONCRETO SIMPLE DE DESAGUE 12"X24",PRODUCTO


NACIONAL.

03729

O/C.

B202629

10025

18

TUBERIA PCV UF 160MM SN-2 C/ANILLO NPT 4435,MARCA


NACIONAL.

03729

O/C.

B202629

10025

18

TUBERIA PVC SAL 4"X6M8PESADO) NARANJA 110MM C/A.MARCO


PAVCO.

02865

CAJACHICA

81

18

PLANCHAS PARA LLANTAS VIPAL #10

2.00

UND.

80.00

160.00

160.00

02865

CAJACHICA

81

18

ROLLOS DE MATERIAL- PARCHE CALIENTE

2.00

UND.

80.00

160.00

160.00

02865

CAJACHICA

81

18

CATERPILAR TRANS. TO 4 SAE 30X19 LTS.

2.00

BLD.

284.00

568.00

568.00

02865

CAJACHICA

81

18

CATERPILAR FILTRO HIDRAULICO

1.00

PZA.

145.00

145.00

145.00

02865

CAJACHICA

81

18

FILTRO DE COMBUSTIBLE PARA SEPARADOR DE AGUA

1.00

PZA.

170.90

170.90

02865

CAJACHICA

81

18

DIESEL ENGINE OIL VDS3 SAE 15 W-40 40 X 20 LTS.

1.00

BLN.

399.00

399.00

02865

CAJACHICA

81

18

TAPA DE TANQUE

1.00

PZA.

13.00

13.00

02865

CAJACHICA

81

18

MANGUERA DE AGUA

1.00

MTS.

20.00

20.00

02865

CAJACHICA

81

18

GOMA COJIN

1.00

KG.

20.00

20.00

20.00

02865

CAJACHICA

81

18

VIPAL UD-OS

1.00

UND.

10.00

10.00

10.00

02865

CAJACHICA

81

18

TARRAJA

1.00

UND.

4.00

4.00

4.00

02865

CAJACHICA

81

18

LIQUIDO VIPAL

1.00

UND.

7.00

7.00

7.00

170.90
399.00
13.00
20.00

VAN ...

SUBTOTAL

7,847.90

0.00

4,435.00

20.00

569.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

...VIENEN

SUBTOTAL

7,847.90

0.00

4,435.00

20.00

569.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Pgina 13

GAST
NOTARI

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA DETERMINACION DE COSTOS DIRECTOS - GASTOS GENERALES
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE

SUB GERENCIA DE OBRAS

CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

011-2014

D O C U M E N T O
DESCRIPCION

/P N

DOC

03508

PLL.

1184

CANT.

PECOSA FTE. FTO.

UNID.
MEDIDA

18

DESCUENTO PLANILLA PERSONAL OBRERO - NOVIEMBRE-2014

1.00

PLL.

PRECIO
UNITARIO

5,165.60

COSTO DIRECTO
IMPORTE

5,165.60

03508

PLL.

1216

18

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI NOVIEMBRE-2014

1.00

PLL.

595.54

595.54

03509

PLL.

1184

18

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO - NOVIEMBRE2014

1.00

PLL.

31,659.08

31,659.08

03509

PLL.

1216

18

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI NOVIEMBRE-2014

1.00

PLL.

2,902.67

2,902.67

03510

PLL.

1184

18

ESSALUD PLANILLA PERSONAL OBRERO -NOVIEMBRE-2014

1.00

PLL.

3,643.50

3,643.50

03510

PLL.

1216

18

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALYNOVIEMBRE-2014

1.00

PLL.

342.06

342.06

03530

PLL.

811

18

LIQUIDO A PAGAR PLANILLA ASISTENTE ADMINISTRATIVO BACA


BUTINZA GILMAR-NOVIEMBRE -2014

1.00

PLL.

1,436.81

1,436.81

LIQUIDO A PAGAR ALMACENERO CHACON PALOMINO GIOVANANOVIEMBRE -2014

MANO DE
OBRA

1,436.81

1.00

PLL.

1,395.52

1,395.52

18

DESCUENTO PLANILLA ASISTENTE ADMINISTRATIVO BACA


BUTINZA GILMAR-NOVIEMBRE -2014

1.00

PLL.

213.19

213.19

03531

PLL.

811

18

DESCUENTO PLANILLA ALMACENERO CHACON PALOMINO


GIOVANA-NOVIEMBRE -2014

1.00

PLL.

204.48

204.48

03532

PLL.

811

18

ESSALUD ASISTENTE ADMINISTRATIVO BACA BUTINZA GILMARNOVIEMBRE -2014

1.00

PLL.

148.50

148.50

03532

PLL.

811

18

ESSALUD PLANILLA ALMACENERO CHACON PALOMINO GIOVANANOVIEMBRE -2014

1.00

PLL.

144.00

144.00

03678

PLL.

1243

18

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO - NOVIEMBRE2014

1.00

PLL.

2,485.49

2,485.49

2,485.49

03679

PLL.

1243

18

ESSALUD PLANILLA OBREROS-NOVIEMBRE -2014

1.00

PLL.

432.84

432.84

432.84

03812

PLL.

1243

18

DESCUENTO PLANILLA OBREROS - NOVIEMBRE-2014

1.00

PLL.

1,625.27

1,625.27

1,625.27

03815

O/S.

B200854

18

SERVICIO DE POLIZA DE SEGUROS

1.00

SERV.

4,768.40

4768.4

03829

O/S.

B200731

18

SERVICIO DE POLIZA DE SEGUROS

04138

O/C.

B202707

10142

18

PLANTAS DE FICUS

04138

O/C.

B202707

10142

18

PLANTAS ORNAMENTALES DOGO CHINO

03896

PLL.

1291

18

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO - DICIEMBRE2014

03896

PLL.

1325

18

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI DICIEMBRE-2014

03939

PLL.

1291

18

03939

PLL.

1325

18

03945

PLL.

1291

03945

PLL.

1325

03879

PLL.

879

4768.4

32.00

640.00

500.00

UND.

2.50

1.00

PLL.

16,071.70

16,071.70

1.00

PLL.

3,632.42

3,632.42

1.00

PLL.

2,671.01

2,671.01

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI DICIEMBRE-2014

1.00

PLL.

609.38

609.38

18

ESSALUD PLANILLA OBREROS-DICIEMBRE -2014

1.00

PLL.

1,880.84

1,880.84

18

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALI DICIEMBRE-2014

1.00

PLL.

353.46

353.46

18

MAT. DE
ESCRITORIO

342.06

811

4,768.40

ALMACENERO

2,902.67

811

UND.

EQUIPO

ASIST.
ADMINIS.

3,643.50

PLL.

SERV.

COMBUSTI BLE

ASISTENTE
TECNICO

595.54

PLL.

1.00

HERRAMIEN TAS

RESIDENTE DE
OBRA

31,659.08

03531

20.00

MATERIALES

GASTOS GENERALES
SERVICIOS
DIVERSOS

5,165.60

03530

DESCUENTO PLANILLA PERSONAL OBRERO - DICIEMBRE-2014

LA A.P.V VILLA MARIA , PROVINCIA DE CUSCO-CUSCO"

1,395.52
213.19
204.48
148.50
144.00

4,768.40
4,768.40
640.00

1,250.00

1,250.00
16,071.70
3,632.42
2,671.01
609.38
1,880.84
353.46

VAN ...

SUBTOTAL

96,888.06

65,635.33

6,325.00

20.00

569.90

0.00

9,536.80

8,435.53

0.00

1,798.50

1,744.00

0.00

...VIENEN

SUBTOTAL

96,888.06

65,635.33

6,325.00

20.00

569.90

0.00

9,536.80

8,435.53

0.00

1,798.50

1,744.00

0.00

LIQUIDO A PAGAR PLANILLA ASISTENTE ADMINISTRATIVO BACA


BUTINZA GILMAR-DICIEMBRE -2014

1.00

PLL.

2,063.81

2063.81

2,063.81

Pgina 14

GAST
NOTARI

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA DETERMINACION DE COSTOS DIRECTOS - GASTOS GENERALES
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE

SUB GERENCIA DE OBRAS

CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

011-2014

D O C U M E N T O
DESCRIPCION

/P N

DOC

03879

PLL.

879

CANT.

PECOSA FTE. FTO.

UNID.
MEDIDA

PRECIO
UNITARIO

COSTO DIRECTO
IMPORTE

18

LIQUIDO A PAGAR ALMACENERO CHACON PALOMINO GIOVANADICIEMBRE -2014

1.00

PLL.

2,022.52

2,022.52

03880

PLL.

879

18

DESCUENTO PLANILLA ASISTENTE ADMINISTRATIVO BACA


BUTINZA GILMAR-DICIEMBRE -2014

1.00

PLL.

213.19

213.19

03880

PLL.

879

18

DESCUENTO PLANILLA ALMACENERO CHACON PALOMINO


GIOVANA-DICIEMBRE -2014

1.00

PLL.

204.48

204.48

MANO DE
OBRA

HERRAMIEN TAS

COMBUSTI BLE

EQUIPO

RESIDENTE DE
OBRA

ASISTENTE
TECNICO

ASIST.
ADMINIS.

ALMACENERO

MAT. DE
ESCRITORIO

213.19
204.48

03881

PLL.

879

18

1.00

PLL.

144.00

144.00

03881

PLL.

879

18

ESSALUD PLANILLA ALMACENERO CHACON PALOMINO GIOVANADICIEMBRE -2014

1.00

PLL.

148.50

148.50

03888

PLL.

1370

18

LIQUIDO A PAGAR PLANILLA OBRERO - DICIEMBRE-2014

1.00

PLL.

3,845.14

3,845.14

3,845.14

03889

PLL.

1370

18

DESCUENTO PLANILLA OBREROS - DICIEMBRE-2014

1.00

PLL.

1,143.23

1,143.23

1,143.23

03890

PLL.

1370

18

ESSALUD PLANILLA OBREROS- DICIEMBRE -2014

1.00

PLL.

324.63

324.63

324.63

106,997.56

MATERIALES

GASTOS GENERALES
SERVICIOS
DIVERSOS

2,022.52

DESCUENTO PLANILLA ASISTENTE ADMINISTRATIVO BACA


BUTINZA GILMAR-DICIEMBRE -2014

TOTAL

LA A.P.V VILLA MARIA , PROVINCIA DE CUSCO-CUSCO"

144.00
148.50

70,948.33

Pgina 15

6,325.00

20.00

569.90

0.00

9,536.80

8,435.53

0.00

4,219.50

4,119.50

0.00

GAST
NOTARI

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE
PROVINCIA DE CUSCO-CUSCO"

OBRA

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

RECURSOS DIRECTAMENTE RECAUDADOS

011-2014

META

D O C U M E N T O
N

FECHA
SIAF

7/30/2014

6670

C/P N
BG000025

DOC

PLL.

749

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

09

DESCUENTO PLANILLA PERSONAL OBRERO- JULIO-2014

1.00

PLL.

910.22

910.22

1.00

PLL.

226.03

226.03

7/30/2014

6670

BG000025

PLL.

782

09

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI - JULIO 2014

7/30/2014

6670

BG000026

PLL.

749

09

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO JULIO-2014

1.00

PLL.

4,853.12

4,853.12

1.00

PLL.

842.86

842.86

7/30/2014

6670

BG000026

PLL.

782

09

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI JULIO -2014

7/30/2014

6670

BG000027

PLL.

749

09

ESSALUD PLANILLA PERSONAL OBRERO - JULIO-2014

1.00

PLL.

639.76

639.76

09

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALI - JULIO


-2014

1.00

PLL.

104.52

104.52

1.00

UND.

380.00

380.00

20.00

UND.

24.00

480.00

7/30/2014

6670

BG000027

PLL.

782

10/15/2014

6783

BG000237

O/C.

B201641

8527

09

CARTEL DE OBRA 4.20MX2.80M SEGN MODELO

9/2/2014

6821

BG000118

O/C.

B201646

8532

09

RROLLIZOS DE EUCALIPTO DE 4"X5M.

9/3/2014

6822

BG000132

O/C.

B201840

8533

09

MADERA AGUANO DE 1 1/2"x 8"x10"

100.00

UND.

44.00

4,400.00

10

9/3/2014

6822

BG000132

O/C.

B201840

8533

09

MADERA AGUANO DE 2"x 3" x 10"

120.00

UND.

23.00

2,760.00

280.00

M2.

28.44

7,962.64

100.00

UND.

0.25

25.00

11

10/9/2014

6940

BG000371

O/C.

B201702

8627

09

GEOCOMPUESTO DE DRENAJE FLEXIBLE TIPO 2L SEGN


ESPECIFICACIONES TECNICAS.

12

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

FODER MANILA(INC FASTINER)GALLO

13

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

CINTA MASKIN DE 1"X40 YARS SHURTARE

2.00

UND.

3.50

7.00

14

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

CINTA DE EMBALAJE 2"X110 YARDAS

2.00

UND.

4.00

8.00

15

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

GOMA EN BARRA 40GR ARTESCO.

3.00

UND.

4.50

13.50

16

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

ARCHIVADORES LOMO GRUESO

8.00

UND.

3.80

30.40

17

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

CORECTOR ARTESCO

6.00

UND.

1.40

8.40

18

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

CUADERNO A-4 200HOJAS REFORZADO JUSTOS

3.00

UND.

7.50

22.50

19

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

PAPEL BOND A-4 DE 80 GR ATLAS

5.00

MLL.

26.50

132.50

Pgina 16

LA

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE
PROVINCIA DE CUSCO-CUSCO"

OBRA

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

RECURSOS DIRECTAMENTE RECAUDADOS

011-2014

META

D O C U M E N T O
N

FECHA
SIAF

C/P N

DOC

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

VAN ...

SUBTOTAL

23,806.45

...VIENEN

SUBTOTAL

23,806.45

20

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

PAPEL LUSTRE (QUINDA) 12 UND.

1.00

DOC.

3.60

3.60

21

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

MEMORIA USB DE 16GB.

4.00

UND.

38.00

152.00

22

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

LAPICERO (ROJO,AZUL,NEGRO)TINTA LIQUIDA

12.00

UND.

3.20

38.40

23

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

LAPICERO (ROJO,AZUL,NEGRO)PUNTA FINA

1.00

CAJ.

18.00

18.00

24

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

VINIFAN TAMAO OFICIO

1.00

UND.

6.00

6.00

25

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

LAPIZ PORTAMINAS LAYCONSA

6.00

UND.

1.00

6.00

26

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

RESALTADORES

3.00

UND.

1.80

5.40

27

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

CUADERNO A-4 100 HOJAS (CUADRICULADO)LORO

6.00

UND.

3.50

21.00

28

8/20/2014

7016

BG000052

PLL.

534

09

1.00

PLL.

67.50

67.50

29

8/20/2014

7016

BG000052

PLL.

534

09

1.00

PLL.

67.50

67.50

30

9/2/2014

7016

BG000053

PLL.

534

09

1.00

PLL.

71.07

71.07

31

9/2/2014

7016

BG000053

PLL.

534

09

1.00

PLL.

68.16

68.16

32

8/18/2014

7016

BG000054

PLL.

534

09

1.00

PLL.

478.93

478.93

33

8/18/2014

7016

BG000054

PLL.

534

09

1.00

PLL.

465.17

465.17

34

9/12/2014

7080

BG000236

O/C.

B201764

8717

09

30.00

UND.

28.00

840.00

35

10/9/2014

7114

BG000370

O/C.

B201789

8685

09

35.00

UND.

225.34

7,886.90

36

10/9/2014

7173

BG000372

O/C.

B201804

8740

09

30.00

UND.

185.24

5,557.20

37

9/2/2014

7175

BG000154

O/C.

B201807

8753

09

18.00

3,780.00

ESSALUD PLANILLA ASISTENTE ADMINISTRATIVO BACA BUTINZA


GILMAR-JULIO -2014
ESSALUD PLANILLA ALMACENERO CHACON PALOMINO GIOVANAJULIO -2014
DESCUENTO PLANILLA ASISTENTE ADMINISTRATIVO BACA BUTINZA
GILMAR-JULIO -2014
DESCUENTO PLANILLA ALMACENERO CHACON PALOMINO GIOVANAJULIO -2014
LIQUIDO A PAGAR PLANILLA ASISTENTE ADMINISTRATIVO BACA
BUTINZA GILMAR-JULIO -2014
LIQUIDO A PAGAR PLANILLA ALMACENERO CHACON PALOMINO
GIOVANA- JULIO -2014
LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI
-AGOSTO-2014
GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12
2.7MM ZN+5% AL GAFAN + PVC.
GAVION PARA SUELO REFORZADO 0.50X1.0X4.0 MALLA 10X12
2.7MM ZN+5% AL GAFAN + PVC.
GEOMALLA TEJIDA UNIAXIAL DE 120 KN/M SEGN
ESPECIFICACIONES DEBAJO NACIONAL

Pgina 17

210.00

M2.

LA

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE
PROVINCIA DE CUSCO-CUSCO"

OBRA

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

RECURSOS DIRECTAMENTE RECAUDADOS

011-2014

META

D O C U M E N T O
N

FECHA
SIAF

C/P N

DOC

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

VAN ...

SUBTOTAL

43,339.28

...VIENEN

SUBTOTAL

43,339.28

38

9/2/2014

7182

BG000123

O/C.

B201814

8760

09

GEOTEXTIL NO TEJIDO DE 200 GR/M2 MARCAFERRI

215.00

M2.

4.80

1,032.00

39

9/23/2014

7446

BG000277

O/C.

B201888

8917

09

SOGA DRIZA DE 3/4 COBRA

50.00

ML.

4.50

225.00

40

9/23/2014

7446

BG000277

O/C.

B201888

8917

09

SOGA DRIZA DE 1/2 COBRA

50.00

ML.

2.00

100.00

41

9/23/2014

7457

BG000279

O/C.

B201878

8900

09

GASOLINA DE 90 OCTANOS REPSOL

50.00

GLN.

14.95

747.50

42

9/23/2014

7457

BG000279

O/C.

B201878

8900

09

GASOLINA DE 84 OCTANOS REPSOL

50.00

GLN.

13.80

690.00

43

9/15/2014

7460

BG000251

O/C.

B201882

8912

09

PLASTICO NACIONAL DE 2M A 4M (DOBLE CARA) NACIONAL

100.00

MLL.

4.50

450.00

44

9/15/2014

7460

BG000251

O/C.

B201882

8912

09

POLYTARP DE 4X200 IMPORTADO

50.00

MLL.

24.00

1,200.00

45

9/24/2014

7463

BG000304

O/C.

B201885

8915

09

MANGUERA REFORZADA DE 3/4" IMPORTADO

1.00

RLL.

135.00

135.00

46

9/3/2014

7480

BG000163

PLL.

841

09

1.00

PLL.

3,859.71

3,859.71

47

9/3/2014

7480

BG000163

PLL.

875

09

1.00

PLL.

609.38

609.38

48

9/3/2014

7480

BG000164

PLL.

841

09

LIQUIDO A PAGAR PERSONAL EVENTUAL OBRERO AGOSTO -2014

1.00

PLL.

21,772.54

21,772.54

1.00

PLL.

3,005.42

3,005.42

1.00

PLL.

2,555.10

2,555.10

1.00

PLL.

353.46

353.46

2.00

UND.

300.28

600.55

DESCUENTO PLANILLA PERSONAL OBRERO EVENTUAL - AGOSTO


-2014
DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI
-AGOSTO-2014

49

9/3/2014

7480

BG000164

PLL.

875

09

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI


-AGOSTO-2014

50

8/18/2014

7480

BG000165

PLL.

841

09

ESSALUD PLANILLA PERSONAL OBRERO EVENTUAL-AGOSTO-2014

51

8/18/2014

7480

BG000165

PLL.

875

09

52

9/15/2014

7489

BG000253

O/C.

B201932

8986

09

53

9/29/2014

7722

BG000294

O/C.

B201958

9015

09

PIEDRA CHANCADA DE 1/2" DE LA CANTERA DE HUILLQUE

54

10/9/2014

8599

BG000376

PLL.

954

09
09

55

10/9/2014

8599

BG000376

PLL.

989

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALI -AGOSTO


-2014
TONER RENDIMIENTO 25000 PAG.COLOR NEGRO POLIMERIZADO
SIMITRI HD CAJA X 01UNIDAD CONICA MINOLTA TN 414 A202050.

25.00

M3.

60.00

1,500.00

DESCUENTO PLANILLA PERSONAL OBRERO - SETIEMBRE -2014

1.00

PLL.

6,644.46

6,644.46

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI SETIEMBRE-2014

1.00

PLL.

595.54

Pgina 18

595.54

LA

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE
PROVINCIA DE CUSCO-CUSCO"

OBRA

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

RECURSOS DIRECTAMENTE RECAUDADOS

011-2014

META

D O C U M E N T O
N

FECHA
SIAF

46

10/9/2014

8599

C/P N

BG000377

DOC

PLL.

PECOSA

954

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

VAN ...

SUBTOTAL

89,414.94

...VIENEN

SUBTOTAL

89,414.94

09

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO SETIEMBRE- 2014

1.00

PLL.

41,945.03

41,945.03

1.00

PLL.

2,902.67

2,902.67

1.00

PLL.

4,771.96

4,771.96

1.00

PLL.

342.06

342.06

1.00

SERV.

1,200.00

1,200.00

57

10/9/2014

8599

BG000377

PLL.

989

09

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI SETIEMBRE-2014

58

10/9/2014

8599

BG000378

PLL.

954

09

ESSALUD PLANILLA PERSONAL OBREROS - SETIEMBRE -2014

59

10/9/2014

8599

BG000378

PLL.

989

09

60

10/20/2014

8737

BS000592

O/S.

B200535

09

61

11/3/2014

8766

BG000439

O/C.

B202206

9380

09

62

11/4/2014

8992

BG000442

O/C.

B202297

9474

09

63

11/4/2014

8992

BG000442

O/C.

B202297

9474

64

11/10/2014

9022

BG000528

O/C.

B202308

9520

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALI SETIEMBRE -2014


SERVICIO POR SEGURO COMPLEMENTARIO FR DE TRABAJO DE
RIESGO SCTR OBREROS
ALAMBRE DE AMARRE PARA GAVIONES DE 2.20MM DE ZN-5 AL
MM.ASTM ( A856M-98)

20.00

KG.

9.00

180.00

ARENA GRUESA FINEADO DE MINA

30.00

M3.

63.00

1,890.00

09

PIEDRA CHANCADA DE 1/2" A 3/4".

36.00

M3.

62.00

2,232.00

09

PIEDRA GRANDE DE 8" A 10" DE PROCEDENCIA RUMICOLCA

300.00

M3.

49.90

14,970.00

09

TAPA PARA BUZON DESAGUE DE C A DE 0.60 CM. INCLUYE


ANILLO DE SOPORTE|

2.00

UND.

170.00

340.00

09

SERVICIO DE DENCIDAD DE CAMPO

1.00

SERV.

2,250.00

2,250.00

65

11/14/2014

9031

BG000556

O/C.

B202289

66

11/7/2014

9091

BS000759

O/S.

B200652

67

11/6/2014

9248

BG000484

O/C.

B202367

9602

09

VINCARD ( CONTROL VISIBLE DE ALMACEN)

15.00

MLL.

55.00

825.00

68

11/6/2014

9280

BG000485

O/C.

B202369

9604

09

CALAMINA DE 0.80 X3.60X0.14MM.

20.00

PLM.

26.00

520.00

69

10/30/2014

9302

BS000739

321

09

PLASTICO

10.00

MTS.

4.00

40.00

70

10/30/2014

9302

BS000739

321

09

YESO

1.00

BLS.

7.00

7.00

71

10/30/2014

9302

BS000739

321

09

CORREAS A-72

2.00

PZA.

18.00

36.00

72

10/30/2014

9302

BS000739

321

09

ARNES DE SEGURIDAD

4.00

UND.

70.00

280.00

73

10/30/2014

9302

BS000739

321

09

CACHIMBA DE 6X6

4.00

UND.

37.50

150.00

CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA

9467

Pgina 19

LA

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE
PROVINCIA DE CUSCO-CUSCO"

OBRA

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

RECURSOS DIRECTAMENTE RECAUDADOS

011-2014

META

D O C U M E N T O
N

FECHA
SIAF

C/P N

74

10/30/2014

9302

BS000739

75

10/30/2014

9302

BS000739

76

11/7/2014

9523

BS000763

77

12/3/2014

9662

78

12/3/2014

79

DOC

CAJACHICA
CAJACHICA

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

VAN ...

SUBTOTAL

164,296.66

...VIENEN

SUBTOTAL

164,296.66

321

09

LLANTAS BUGUI ( JUEGO COMPLETO)

8.00

JGOS.

50.00

400.00

321

09

LEGALIZACION DE LIBRO

1.00

SERV.

30.00

30.00

O/S.

B200677

09

SERVICIO PARA ROTURA DE BLOQUETAS

1.00

SERV.

450.00

450.00

BG000634

O/C.

B202468

9746

09

TAPA FG PARA AGUA NACIONAL

4.00

UND.

31.00

124.00

9662

BG000634

O/C.

B202468

9746

09

TAPON PVC SAP UF 75MM.PAVCO

1.00

UND.

23.00

23.00

12/3/2014

9662

BG000634

O/C.

B202468

9746

09

CAJA DE CONCRETO PARA AGUA NACIONAL

4.00

UND.

11.00

44.00

80

12/3/2014

9662

BG000634

O/C.

B202468

9746

09

TUBERIA PVC SAP NTP ISO 4422 DE 75MM C-10 PAVCO

8.00

UND.

74.00

592.00

81

12/3/2014

9662

BG000634

O/C.

B202468

9746

09

PEGAMENTO PARA TUBERIA PVC DATEY

0.50

GLN.

106.00

53.00

82

12/3/2014

9662

BG000634

O/C.

B202468

9746

09

TEE PVC SAP UF.75MM PAVCO.

1.00

UND.

73.00

73.00

83

11/7/2014

9760

BS000769

PLL.

1044

09

ESSALUD PLANILLA PERSONAL OBRERO-OCTUBRE-2014

1.00

PLL.

4,075.97

4,075.97

1.00

PLL.

353.46

353.46

84

11/7/2014

9760

BS000769

PLL.

1079

09

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALI - OCTUBRE


-2014

85

11/11/2014

9760

BS000784

PLL.

1044

09

DESCUENTO PLANILLA OBREROS -OCTUBRE -2014

1.00

PLL.

6,003.32

6,003.32

2.00

PLL.

609.38

609.38

1.00

PLL.

35,324.43

35,324.43

1.00

PLL.

3,005.42

3,005.42

1.00

PLL.

513.31

513.31

1.00

PLL.

3,460.43

3,460.43

1.00

PLL.

418.44

418.44

86

11/11/2014

9760

BS000784

PLL.

1079

09

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI


-OCTUBRE-2014

87

11/11/2014

9760

BS000977

PLL.

1044

09

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO OCTUBRE-2014

88

11/11/2014

9760

BS000977

PLL.

1079

09

89

11/14/2014

9928

BS000800

PLL.

1117

09

90

11/14/2014

9928

BS000801

PLL.

1117

09

91

11/14/2014

9928

BS000802

PLL.

1117

09

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI


-OCTUBRE-2014
DESCUENTO PLANILLA PERSONAL OBRERO REPUESTO JUDICIALOCTUBRE-2014
LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO REPUESTO
JUDICIAL- OCTUBRE-2014
ESSALUD PLANILLA PERSONAL REPUESTO JUDICIAL-OCTUBRE-2014

Pgina 20

LA

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE
PROVINCIA DE CUSCO-CUSCO"

OBRA

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

RECURSOS DIRECTAMENTE RECAUDADOS

011-2014

META

D O C U M E N T O
N

FECHA
SIAF

C/P N

92

12/4/2014

10581

BS000916

93

12/4/2014

10581

BS000916

94

12/4/2014

10581

BS000916

95

12/4/2014

10581

BS000916

96

12/4/2014

10581

BS000916

97

12/4/2014

10581

BS000916

98

12/4/2014

10581

BS000916

99

12/4/2014

10581

BS000916

100

12/4/2014

10581

BS000916

101

12/4/2014

10581

BS000916

102

12/4/2014

10581

BS000916

103

12/4/2014

10581

BS000916

104

12/4/2014

10581

BS000916

105

12/4/2014

10581

BS000916

106

12/4/2014

10581

BS000916

107

12/4/2014

10581

BS000916

108

12/4/2014

10581

BS000916

109

12/4/2014

10581

BS000916

DOC

CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA

406

PECOSA

4297

406

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

VAN ...

SUBTOTAL

219,849.82

...VIENEN

SUBTOTAL

219,849.82

09

UNION 1/2 CAJA CHICA 13/H 1412

1.00

UND.

1.50

1.50

09

LEGALIZACION DE LIBRO

1.00

SERV.

30.00

30.00

406

4284

09

483365 MOVIL SUPER 1000 SAE

2.00

UND.

18.50

37.00

406

4299

09

POR SERVICIO DE REPARACION Y CAMBIO DE CARBURADOR DE


MOTOR HONDA 6X160.

1.00

SERV.

350.00

350.00

406

09

PUNTOAGUSADO

10.00

UND.

2.00

20.00

406

09

PLOTEO DE PLANO

1.00

SERV.

4.50

4.50

406

09

PLOTEO PROGRAMADO

1.00

SERV.

3.50

3.50

406

51

09

FILTRO DE APIZONADOR C/CH 1789

1.00

UND.

75.00

75.00

406

51

09

BUJIA DE MOTOR GASOLINERO NGK ROSCA LARGA

1.00

PZA.

12.00

12.00

406

55

09

MASILLA PLASTICA VELOX FLEX X3

1.00

UND.

9.90

9.90

406

09

TONER LASER HP CF 280-A

1.00

UND.

290.00

290.00

406

09

HOJA DE SIERRA SAN FLEX

4.00

UND.

4.50

18.00

406

09

LIJA DE METAL N100

5.00

UND.

1.30

6.50

406

09

LIJA DE METAL N50

5.00

UND.

1.50

7.50

406

09

DISCO DE CORTE 9"

6.00

UND.

8.50

51.00

406

09

DISCO DE CORTE 1/2"

4.00

UND.

4.50

18.00

406

09

DISCO DE DESBASTE DE 7"

2.00

UND.

7.50

15.00

406

09

ALAMBRE AMARE DE 3.2 MM PVC.

8.00

UND.

12.00

96.00

Pgina 21

LA

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE
PROVINCIA DE CUSCO-CUSCO"

OBRA

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

RECURSOS DIRECTAMENTE RECAUDADOS

011-2014

META

D O C U M E N T O
N

FECHA
SIAF

C/P N

110

12/4/2014

10581

BS000916

111

12/4/2014

10581

BS000916

112

12/4/2014

10581

BS000916

113

12/4/2014

10581

BS000916

114

12/4/2014

10581

BS000916

115

12/4/2014

10581

BS000916

116

12/4/2014

10581

BS000916

117

12/4/2014

10581

BS000916

118

12/4/2014

10594

BS000920..

119

12/4/2014

10594

BS000920..

120

12/4/2014

10594

BS000920..

121

12/4/2014

10594

BS000920..

122

12/4/2014

10594

BS000920..

123

12/4/2014

10594

BS000920..

124

12/4/2014

10594

BS000920..

125

12/4/2014

10594

BS000920..

126

12/15/2014

10821

BS000984

127

12/15/2014

10821

BS000984

DOC

CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA

PECOSA

DESCRIPCION

FTE.
FTO.

406

09

ESPADRAPO

406

09

406

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

VAN ...

SUBTOTAL

220,895.22

...VIENEN

SUBTOTAL

220,895.22

1.00

UND.

8.00

8.00

DOLONET

10.00

UND.

1.00

10.00

09

TELAS

10.00

UND.

0.50

5.00

406

09

CURITAS

1.00

UND.

7.00

7.00

406

09

ALCOHOL YODO

2.00

UND.

2.50

5.00

406

09

AGUAOXIGENADA

1.00

UND.

2.00

2.00

406

09

ALCOHOL

1.00

UND.

12.00

12.00

406

09

483355 MOVIL SUPER 1000 SAE 10W-30

2.00

GLN.

18.50

37.00

124

09

1.00

SERV.

350.00

350.00

124

09

1.00

SERV.

250.00

250.00

124

09

SOLDAR Y FIJACION COLECTOR DE ARANCADOR.

1.00

SERV.

60.00

60.00

124

09

AUTOMATIO ARRANCADOR SCANIA V85

1.00

UND.

50.00

50.00

124

09

SENSOR RETRO V71

1.00

UND.

125.00

125.00

124

09

F01196024100 CHEVRON GRASA MARFAK HD 3B NL G13X 1 LIBRA.

8.00

POT.

12.00

96.00

124

09

RODAJE 6304/2RSH/C3

4.00

UND.

27.00

108.00

124

09

RODAJE POLEA TEMPLADOR FH-12

2.00

UND.

60.00

120.00

09

MANTENIMIENTO DE CANGURO CAMBIO DE ACEITE Y PONCHO


CON EMBRIAJE

1.00

SERV.

720.00

720.00

09

REDUCCION PVC SAP 150 4422 75MMX1 1/2"

1.00

UND.

9.20

9.20

SERVICIO DE DESMONTAJE DE CAJA Y REPARACION EN BRONCE


Y MONTAJE V 82.
SERVICIO PARA FABRICACION LLAVE PARA CILINDRO HIDRAULICO
EN PLANCHA DE ACERO .

Pgina 22

LA

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE
PROVINCIA DE CUSCO-CUSCO"

OBRA

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

RECURSOS DIRECTAMENTE RECAUDADOS

011-2014

META

D O C U M E N T O
N

FECHA
SIAF

C/P N

128

12/15/2014

10821

BS000984

129

12/15/2014

10821

BS000984

130

12/15/2014

10821

BS000984

131

12/15/2014

10821

BS000984

132

12/15/2014

10821

BS000984

133

12/15/2014

10821

BS000984

DOC

CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA
CAJACHICA

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

VAN ...

SUBTOTAL

222,869.42

...VIENEN

SUBTOTAL

222,869.42

09

REDUCCION PVC SAP 1 1/2"X1

1.00

UND.

2.00

2.00

09

ANILLO U/F PRESION 75MM

1.00

UND.

2.50

2.50

09

UNION PVC SAP S/P 1"

1.00

UND.

2.40

2.40

09

TRANSICION ADAPTADO UPR 1" PAVCO

2.00

UND.

1.70

3.40

09

LLAVE PASO PVC AGUA 1" VALVULA ESPECIFICA

1.00

UND.

7.50

7.50

09

TUBO PVC SAP C-10 C/R 1"

0.20

UND.

20.00

4.00

TOTAL

Pgina 23

222,891.22

LA

N DE PROYECTOS DE INVERSIN PBLICA


LIQUIDACIN FINANCIERA

TECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE


PROVINCIA DE CUSCO-CUSCO"

LA A.P.V VILLA MARIA ,

ESPECIFICA
2.6. 2.3. 99 3
PERSONAL

DEL

GASTO

2.6. 2.3. 994


BIENES

2.6. 2.3. 995


SERVICIOS

910.22
226.03
4,853.12
842.86
639.76
104.52
380.00
480.00
4,400.00
2,760.00
7,962.64
25.00
7.00
8.00
13.50
30.40
8.40
22.50
132.50

Pgina 24

N DE PROYECTOS DE INVERSIN PBLICA


LIQUIDACIN FINANCIERA

TECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE


PROVINCIA DE CUSCO-CUSCO"

LA A.P.V VILLA MARIA ,

ESPECIFICA
2.6. 2.3. 99 3
PERSONAL

DEL

GASTO

2.6. 2.3. 994


BIENES

2.6. 2.3. 995


SERVICIOS

7,576.51

16,229.94

0.00

7,576.51

16,229.94

0.00

3.60
152.00
38.40
18.00
6.00
6.00
5.40
21.00
67.50
67.50
71.07
68.16
478.93
465.17
840.00
7,886.90
5,557.20
3,780.00

Pgina 25

N DE PROYECTOS DE INVERSIN PBLICA


LIQUIDACIN FINANCIERA

TECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE


PROVINCIA DE CUSCO-CUSCO"

LA A.P.V VILLA MARIA ,

ESPECIFICA
2.6. 2.3. 99 3
PERSONAL

DEL

GASTO

2.6. 2.3. 994


BIENES

2.6. 2.3. 995


SERVICIOS

8,794.84

34,544.44

0.00

8,794.84

34,544.44

0.00

1,032.00
225.00
100.00
747.50
690.00
450.00
1,200.00
135.00
3,859.71
609.38
21,772.54
3,005.42
2,555.10
353.46
600.55
1,500.00
6,644.46
595.54

Pgina 26

N DE PROYECTOS DE INVERSIN PBLICA


LIQUIDACIN FINANCIERA

TECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE


PROVINCIA DE CUSCO-CUSCO"

LA A.P.V VILLA MARIA ,

ESPECIFICA
2.6. 2.3. 99 3
PERSONAL

DEL

GASTO

2.6. 2.3. 994


BIENES

2.6. 2.3. 995


SERVICIOS

48,190.45

41,224.49

0.00

48,190.45

41,224.49

0.00

41,945.03
2,902.67
4,771.96
342.06
1,200.00
180.00
1,890.00
2,232.00
14,970.00
340.00
2,250.00
825.00
520.00
40.00
7.00
36.00
280.00
150.00

Pgina 27

N DE PROYECTOS DE INVERSIN PBLICA


LIQUIDACIN FINANCIERA

TECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE


PROVINCIA DE CUSCO-CUSCO"

LA A.P.V VILLA MARIA ,

ESPECIFICA
2.6. 2.3. 99 3
PERSONAL

DEL

GASTO

2.6. 2.3. 994


BIENES

2.6. 2.3. 995


SERVICIOS

98,152.17

62,694.49

3,450.00

98,152.17

62,694.49

3,450.00

400.00
30.00
450.00
124.00
23.00
44.00
592.00
53.00
73.00
4,075.97
353.46
6,003.32
609.38
35,324.43
3,005.42
513.31
3,460.43
418.44

Pgina 28

N DE PROYECTOS DE INVERSIN PBLICA


LIQUIDACIN FINANCIERA

TECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE


PROVINCIA DE CUSCO-CUSCO"

LA A.P.V VILLA MARIA ,

ESPECIFICA
2.6. 2.3. 99 3
PERSONAL

DEL

GASTO

2.6. 2.3. 994


BIENES

2.6. 2.3. 995


SERVICIOS

151,916.33

64,003.49

3,930.00

151,916.33

64,003.49

3,930.00

1.50
30.00
37.00
350.00
20.00
4.50
3.50
75.00
12.00
9.90
290.00
18.00
6.50
7.50
51.00
18.00
15.00
96.00

Pgina 29

N DE PROYECTOS DE INVERSIN PBLICA


LIQUIDACIN FINANCIERA

TECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE


PROVINCIA DE CUSCO-CUSCO"

LA A.P.V VILLA MARIA ,

ESPECIFICA
2.6. 2.3. 99 3
PERSONAL

DEL

GASTO

2.6. 2.3. 994


BIENES

2.6. 2.3. 995


SERVICIOS

151,916.33

64,990.89

3,988.00

151,916.33

64,990.89

3,988.00

8.00
10.00
5.00
7.00
5.00
2.00
12.00
37.00
350.00
250.00
60.00
50.00
125.00
96.00
108.00
120.00
720.00
9.20

Pgina 30

N DE PROYECTOS DE INVERSIN PBLICA


LIQUIDACIN FINANCIERA

TECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE


PROVINCIA DE CUSCO-CUSCO"

LA A.P.V VILLA MARIA ,

ESPECIFICA
2.6. 2.3. 99 3
PERSONAL

DEL

GASTO

2.6. 2.3. 994


BIENES

2.6. 2.3. 995


SERVICIOS

151,916.33

65,585.09

5,368.00

151,916.33

65,585.09

5,368.00

2.00
2.50
2.40
3.40
7.50
4.00
151,916.33

65,606.89

Pgina 31

5,368.00

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA DETERMINACION DE COSTOS DIRECTOS - GASTOS GENERALES
OBRA

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

RECURSOS DIRECTAMENTE RECAUDADOS

META

011-2014

D O C U M E N T O
N

FECHA
SIAF

7/30/2014

6670

C/P N
BG000025

DOC

PLL.

749

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

COSTO DIRECTO
IMPORTE

09

DESCUENTO PLANILLA PERSONAL OBRERO- JULIO-2014

1.00

PLL.

910.22

910.22

1.00

PLL.

226.03

226.03

7/30/2014

6670

BG000025

PLL.

782

09

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI - JULIO 2014

7/30/2014

6670

BG000026

PLL.

749

09

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO JULIO-2014

1.00

PLL.

4,853.12

4,853.12

1.00

PLL.

842.86

842.86

MANO DE
OBRA

MATERIALES

6670

BG000026

PLL.

782

09

7/30/2014

6670

BG000027

PLL.

749

09

ESSALUD PLANILLA PERSONAL OBRERO - JULIO-2014

1.00

PLL.

639.76

639.76

09

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALI - JULIO


-2014

1.00

PLL.

104.52

104.52

1.00

UND.

380.00

380.00

20.00

UND.

24.00

480.00

480.00

BG000027

PLL.

782

10/15/2014

6783

BG000237

O/C.

B201641

8527

09

CARTEL DE OBRA 4.20MX2.80M SEGN MODELO

9/2/2014

6821

BG000118

O/C.

B201646

8532

09

RROLLIZOS DE EUCALIPTO DE 4"X5M.

RESIDENTE
DE OBRA

ASISTENTE
TECNICO

639.76
104.52
380.00

9/3/2014

6822

BG000132

O/C.

B201840

8533

09

MADERA AGUANO DE 1 1/2"x 8"x10"

100.00

UND.

44.00

4,400.00

4,400.00

9/3/2014

6822

BG000132

O/C.

B201840

8533

09

MADERA AGUANO DE 2"x 3" x 10"

120.00

UND.

23.00

2,760.00

2,760.00

11

10/9/2014

6940

BG000371

O/C.

B201702

8627

09

GEOCOMPUESTO DE DRENAJE FLEXIBLE TIPO 2L SEGN


ESPECIFICACIONES TECNICAS.

280.00

M2.

28.44

7,962.64

7,962.64

12

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

FOLDER MANILA(INC FASTINER)GALLO

100.00

UND.

0.25

25.00

13

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

CINTA MASKIN DE 1"X40 YARS SHURTARE

2.00

UND.

3.50

7.00

14

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

CINTA DE EMBALAJE 2"X110 YARDAS

2.00

UND.

4.00

8.00

15

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

GOMA EN BARRA 40GR ARTESCO.

3.00

UND.

4.50

13.50

16

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

ARCHIVADORES LOMO GRUESO

8.00

UND.

3.80

30.40

17

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

CORECTOR ARTESCO

6.00

UND.

1.40

8.40

18

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

CUADERNO A-4 200HOJAS REFORZADO JUSTOS

3.00

UND.

7.50

22.50

19

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

PAPEL BOND A-4 DE 80 GR ATLAS

5.00

MLL.

26.50

132.50

20

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

PAPEL LUSTRE (QUINDA) 12 UND.

1.00

DOC.

3.60

3.60

21

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

MEMORIA USB DE 16GB.

4.00

UND.

38.00

152.00

22

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

LAPICERO (ROJO,AZUL,NEGRO)TINTA LIQUIDA

12.00

UND.

3.20

38.40

23

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

LAPICERO (ROJO,AZUL,NEGRO)PUNTA FINA

18.00

18.00

CAJ.

SERVICIOS
DIVERSOS

842.86

10

1.00

EQUIPO

4,853.12

7/30/2014

6670

LUBRICANTE COMBUSTI BLE

226.03

7/30/2014

HERRAMIEN TAS

910.22

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI JULIO -2014

LA A.P.V VILLA MARIA, PROVINCIA DE CUSCO - CUSCO."

VAN ...

SUBTOTAL

24,018.45

6,403.10

15,602.64

0.00

0.00

0.00

380.00

1,173.41

0.00

...VIENEN

SUBTOTAL

24,018.45

6,403.10

15,602.64

0.00

0.00

0.00

380.00

1,173.41

0.00

Pgina 32

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA DETERMINACION DE COSTOS DIRECTOS - GASTOS GENERALES
OBRA

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

RECURSOS DIRECTAMENTE RECAUDADOS

META

011-2014

D O C U M E N T O
N

FECHA
SIAF

C/P N

DOC

PECOSA

FTE.
FTO.

DESCRIPCION

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

COSTO DIRECTO
IMPORTE

24

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

VINIFAN TAMAO OFICIO

1.00

UND.

6.00

6.00

25

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

LAPIZ PORTAMINAS LAYCONSA

6.00

UND.

1.00

6.00

26

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

RESALTADORES

3.00

UND.

1.80

5.40

27

9/15/2014

6992

BG000247

O/C.

B201728

8650

09

CUADERNO A-4 100 HOJAS (CUADRICULADO)LORO

6.00

UND.

3.50

21.00

09

ESSALUD PLANILLA ASISTENTE ADMINISTRATIVO BACA BUTINZA


GILMAR-JULIO -2014

1.00

PLL.

67.50

67.50

09

ESSALUD PLANILLA ALMACENERO CHACON PALOMINO GIOVANAJULIO -2014

1.00

PLL.

67.50

67.50

09

DESCUENTO PLANILLA ASISTENTE ADMINISTRATIVO BACA BUTINZA


GILMAR-JULIO -2014

1.00

PLL.

71.07

71.07

09

DESCUENTO PLANILLA ALMACENERO CHACON PALOMINO GIOVANAJULIO -2014

1.00

PLL.

68.16

68.16

1.00

PLL.

478.93

478.93

1.00

PLL.

465.17

465.17

28
29
30
31

8/20/2014
8/20/2014
9/2/2014
9/2/2014

7016
7016
7016
7016

BG000052
BG000052
BG000053
BG000053

PLL.
PLL.
PLL.
PLL.

534
534
534
534

LA A.P.V VILLA MARIA, PROVINCIA DE CUSCO - CUSCO."

MANO DE
OBRA

MATERIALES

HERRAMIEN TAS

LUBRICANTE COMBUSTI BLE

32

8/18/2014

7016

BG000054

PLL.

534

09

LIQUIDO A PAGAR PLANILLA ASISTENTE ADMINISTRATIVO BACA


BUTINZA GILMAR-JULIO -2014

33

8/18/2014

7016

BG000054

PLL.

534

09

LIQUIDO A PAGAR PLANILLA ALMACENERO CHACON PALOMINO


GIOVANA- JULIO -2014

34

9/12/2014

7080

BG000236

O/C.

B201764

8717

09

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI


-AGOSTO-2014

30.00

UND.

28.00

840.00

35

10/9/2014

7114

BG000370

O/C.

B201789

8685

09

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12


2.7MM ZN+5% AL GAFAN + PVC.

35.00

UND.

225.34

7,886.90

7,886.90

36

10/9/2014

7173

BG000372

O/C.

B201804

8740

09

GAVION PARA SUELO REFORZADO 0.50X1.0X4.0 MALLA 10X12


2.7MM ZN+5% AL GAFAN + PVC.

30.00

UND.

185.24

5,557.20

5,557.20

37

9/2/2014

7175

BG000154

O/C.

B201807

8753

09

GEOMALLA TEJIDA UNIAXIAL DE 120 KN/M SEGN


ESPECIFICACIONES DEBAJO NACIONAL

210.00

M2.

18.00

3,780.00

3,780.00

38

9/2/2014

7182

BG000123

O/C.

B201814

8760

09

GEOTEXTIL NO TEJIDO DE 200 GR/M2 MACCAFERRI

215.00

M2.

4.80

1,032.00

1,032.00

39

9/23/2014

7446

BG000277

O/C.

B201888

8917

09

SOGA DRIZA DE 3/4 COBRA

50.00

ML.

4.50

225.00

225.00

40

9/23/2014

7446

BG000277

O/C.

B201888

8917

09

SOGA DRIZA DE 1/2 COBRA

50.00

ML.

2.00

100.00

100.00

41

9/23/2014

7457

BG000279

O/C.

B201878

8900

09

GASOLINA DE 90 OCTANOS REPSOL

50.00

GLN.

14.95

747.50

747.50

42

9/23/2014

7457

BG000279

O/C.

B201878

8900

09

GASOLINA DE 84 OCTANOS REPSOL

50.00

GLN.

13.80

690.00

690.00

43

9/15/2014

7460

BG000251

O/C.

B201882

8912

09

PLASTICO NACIONAL DE 2M A 4M (DOBLE CARA) NACIONAL

100.00

MLL.

4.50

450.00

450.00

44

9/15/2014

7460

BG000251

O/C.

B201882

8912

09

POLYTARP DE 4X200 IMPORTADO

50.00

MLL.

24.00

1,200.00

1,200.00

45

9/24/2014

7463

BG000304

O/C.

B201885

8915

09

MANGUERA REFORZADA DE 3/4" IMPORTADO

1.00

RLL.

135.00

135.00

135.00

46

9/3/2014

7480

BG000163

PLL.

841

09

EQUIPO

SERVICIOS
DIVERSOS

RESIDENTE
DE OBRA

ASISTENTE
TECNICO

840.00

VAN ...

SUBTOTAL

47,918.78

6,403.10

35,968.74

0.00

1,437.50

0.00

380.00

2,013.41

0.00

...VIENEN

SUBTOTAL

47,918.78

6,403.10

35,968.74

0.00

1,437.50

0.00

380.00

2,013.41

0.00

3,859.71

3,859.71

DESCUENTO PLANILLA PERSONAL OBRERO EVENTUAL - AGOSTO


-2014

1.00

PLL.

Pgina 33

3,859.71

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA DETERMINACION DE COSTOS DIRECTOS - GASTOS GENERALES
OBRA

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

RECURSOS DIRECTAMENTE RECAUDADOS

META

011-2014

D O C U M E N T O
N

FECHA
SIAF

C/P N

DOC

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

COSTO DIRECTO
IMPORTE

47

9/3/2014

7480

BG000163

PLL.

875

09

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI


-AGOSTO-2014

1.00

PLL.

609.38

609.38

48

9/3/2014

7480

BG000164

PLL.

841

09

LIQUIDO A PAGAR PERSONAL EVENTUAL OBRERO AGOSTO -2014

1.00

PLL.

21,772.54

21,772.54

1.00

PLL.

3,005.42

3,005.42

49

9/3/2014

7480

BG000164

PLL.

875

09

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI


-AGOSTO-2014

50

8/18/2014

7480

BG000165

PLL.

841

09

ESSALUD PLANILLA PERSONAL OBRERO EVENTUAL-AGOSTO-2014

1.00

PLL.

2,555.10

2,555.10

09

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALI -AGOSTO


-2014

1.00

PLL.

353.46

353.46

2.00

UND.

300.28

600.55

51

8/18/2014

7480

BG000165

PLL.

875

52

9/15/2014

7489

BG000253

O/C.

B201932

8986

09

TONER RENDIMIENTO 25000 PAG.COLOR NEGRO POLIMERIZADO


SIMITRI HD CAJA X 01UNIDAD CONICA MINOLTA TN 414 A202050.

53

9/29/2014

7722

BG000294

O/C.

B201958

9015

09

PIEDRA CHANCADA DE 1/2" DE LA CANTERA DE HUILLQUE

54

10/9/2014

8599

BG000376

PLL.

954

09

25.00

M3.

60.00

1,500.00

DESCUENTO PLANILLA PERSONAL OBRERO - SETIEMBRE -2014

1.00

PLL.

6,644.46

6,644.46

MANO DE
OBRA

MATERIALES

6,644.46

BG000376

PLL.

989

09

1.00

PLL.

595.54

8599

BG000377

PLL.

954

09

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO SETIEMBRE- 2014

1.00

PLL.

41,945.03

41,945.03

57

10/9/2014

8599

BG000377

PLL.

989

09

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI SETIEMBRE-2014

1.00

PLL.

2,902.67

2,902.67

58

10/9/2014

8599

BG000378

PLL.

954

09

ESSALUD PLANILLA PERSONAL OBREROS - SETIEMBRE -2014

1.00

PLL.

4,771.96

4,771.96

59

10/9/2014

8599

BG000378

PLL.

989

09

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALI SETIEMBRE -2014

1.00

PLL.

342.06

342.06

60

10/20/2014

8737

BS000592

O/S.

B200535

09

SERVICIO POR SEGURO COMPLEMENTARIO FR DE TRABAJO DE


RIESGO SCTR OBREROS

1.00

SERV.

1,200.00

1,200.00

61

11/3/2014

8766

BG000439

O/C.

B202206

9380

09

ALAMBRE DE AMARRE PARA GAVIONES DE 2.20MM DE ZN-5 AL


MM.ASTM ( A856M-98)

20.00

KG.

9.00

180.00

180.00

62

11/4/2014

8992

BG000442

O/C.

B202297

9474

09

ARENA GRUESA FINEADO DE MINA

30.00

M3.

63.00

1,890.00

1,890.00

63

11/4/2014

8992

BG000442

O/C.

B202297

9474

09

PIEDRA CHANCADA DE 1/2" A 3/4".

36.00

M3.

62.00

2,232.00

2,232.00

64

11/10/2014

9022

BG000528

O/C.

B202308

9520

09

PIEDRA GRANDE DE 8" A 10" DE PROCEDENCIA RUMICOLCA

300.00

M3.

49.90

14,970.00

14,970.00

65

11/14/2014

9031

BG000556

B202289

9467

09

TAPA PARA BUZON DESAGUE DE C A DE 0.60 CM. INCLUYE


ANILLO DE SOPORTE|

2.00

UND.

170.00

340.00

66

11/7/2014

9091

BS000759

O/S.

B200652

09

SERVICIO DE DENCIDAD DE CAMPO

1.00

SERV.

2,250.00

2,250.00

67

11/6/2014

9248

BG000484

O/C.

B202367

09

VINCARD ( CONTROL VISIBLE DE ALMACEN)

15.00

MLL.

55.00

825.00

69

10/30/2014

9302

O/C.

B202369

BS000739

CAJACHICA

321

9604

ASISTENTE
TECNICO

1,500.00

8599

BG000485

RESIDENTE
DE OBRA

353.46

10/9/2014

9280

SERVICIOS
DIVERSOS

2,555.10

10/9/2014

11/6/2014

EQUIPO

3,005.42

56

68

LUBRICANTE COMBUSTI BLE

21,772.54

55

9602

HERRAMIEN TAS

609.38

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI SETIEMBRE-2014

O/C.

LA A.P.V VILLA MARIA, PROVINCIA DE CUSCO - CUSCO."

595.54

595.54
41,945.03
2,902.67
4,771.96
342.06
1,200.00

340.00
2,250.00

VAN ...

SUBTOTAL

163,263.66

87,951.90

57,080.74

0.00

1,437.50

0.00

3,830.00

9,821.94

0.00

...VIENEN

SUBTOTAL

163,263.66

87,951.90

57,080.74

0.00

1,437.50

0.00

3,830.00

9,821.94

0.00

09

CALAMINA DE 0.80 X3.60X0.14MM.

20.00

PLM.

26.00

520.00

09

PLASTICO

10.00

MTS.

4.00

40.00

Pgina 34

520.00
40.00

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA DETERMINACION DE COSTOS DIRECTOS - GASTOS GENERALES
OBRA

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

RECURSOS DIRECTAMENTE RECAUDADOS

META

011-2014

D O C U M E N T O
N

FECHA
SIAF

70

10/30/2014

9302

C/P N

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

COSTO DIRECTO
IMPORTE

DOC

BS000739

CAJACHICA

321

09

YESO

1.00

BLS.

7.00

7.00

321

09

CORREAS A-72

2.00

PZA.

18.00

36.00

71

10/30/2014

9302

BS000739

CAJACHICA

72

10/30/2014

9302

BS000739

CAJACHICA

321

09

ARNES DE SEGURIDAD

4.00

UND.

70.00

280.00

73

10/30/2014

9302

BS000739

CAJACHICA

321

09

CACHIMBA DE 6X6

4.00

UND.

37.50

150.00

321

09

LLANTAS BUGUI ( JUEGO COMPLETO)

8.00

JGOS.

50.00

400.00

74

10/30/2014

9302

BS000739

CAJACHICA

75

10/30/2014

9302

BS000739

CAJACHICA

321

09

LEGALIZACION DE LIBRO

1.00

SERV.

30.00

30.00

76

11/7/2014

9523

BS000763

O/S.

B200677

09

SERVICIO PARA ROTURA DE BLOQUETAS

1.00

SERV.

450.00

450.00

77

12/3/2014

9662

BG000634

O/C.

B202468

9746

09

TAPA FG PARA AGUA NACIONAL

4.00

UND.

31.00

124.00

78

12/3/2014

9662

BG000634

O/C.

B202468

9746

09

TAPON PVC SAP UF 75MM.PAVCO

1.00

UND.

23.00

23.00

79

12/3/2014

9662

BG000634

O/C.

B202468

9746

09

CAJA DE CONCRETO PARA AGUA NACIONAL

4.00

UND.

11.00

44.00

80

12/3/2014

9662

BG000634

O/C.

B202468

9746

09

TUBERIA PVC SAP NTP ISO 4422 DE 75MM C-10 PAVCO

8.00

UND.

74.00

592.00

81

12/3/2014

9662

BG000634

O/C.

B202468

9746

09

PEGAMENTO PARA TUBERIA PVC DATEY

0.50

GLN.

106.00

53.00

82

12/3/2014

9662

BG000634

O/C.

B202468

9746

09

TEE PVC SAP UF.75MM PAVCO.

1.00

UND.

73.00

73.00

83

11/7/2014

9760

BS000769

PLL.

1044

09

ESSALUD PLANILLA PERSONAL OBRERO-OCTUBRE-2014

1.00

PLL.

4,075.97

4,075.97

84

11/7/2014

9760

BS000769

PLL.

1079

09

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALI - OCTUBRE


-2014

1.00

PLL.

353.46

353.46

85

11/11/2014

9760

BS000784

PLL.

1044

09

DESCUENTO PLANILLA OBREROS -OCTUBRE -2014

1.00

PLL.

6,003.32

6,003.32

2.00

PLL.

609.38

609.38

86

11/11/2014

9760

BS000784

PLL.

1079

09

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI


-OCTUBRE-2014

87

11/11/2014

9760

BS000977

PLL.

1044

09

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO OCTUBRE-2014

1.00

PLL.

35,324.43

35,324.43

09

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI


-OCTUBRE-2014

1.00

PLL.

3,005.42

3,005.42

09

DESCUENTO PLANILLA PERSONAL OBRERO REPUESTO JUDICIALOCTUBRE-2014

1.00

PLL.

513.31

513.31

88
89

11/11/2014
11/14/2014

9760
9928

BS000977
BS000800

SERVICIOS
DIVERSOS

RESIDENTE
DE OBRA

ASISTENTE
TECNICO

7.00
36.00

150.00
400.00

450.00
124.00
23.00
44.00
592.00
53.00
73.00
4,075.97
353.46
6,003.32
609.38
35,324.43
3,005.42
513.31
400.00

1,437.50

0.00

4,280.00

13,790.20

0.00

...VIENEN

SUBTOTAL

215,970.95

133,868.93

58,742.74

400.00

1,437.50

0.00

4,280.00

13,790.20

0.00

1117

09

ESSALUD PLANILLA PERSONAL REPUESTO JUDICIAL-OCTUBRE-2014

1.00

PLL.

418.44

418.44

BS000916

406

09

UNION 1/2 CAJA CHICA 13/H 1412

1.00

UND.

1.50

1.50

4297

EQUIPO

58,742.74

PLL.

9928

LUBRICANTE COMBUSTI BLE

133,868.93

CAJACHICA

11/14/2014

HERRAMIEN TAS

215,970.95

BS000802

91

MATERIALES

SUBTOTAL

09

BS000801

MANO DE
OBRA

VAN ...

1117

9928

10581

1117

PLL.

11/14/2014

12/4/2014

PLL.

1079

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO REPUESTO


JUDICIAL- OCTUBRE-2014

90

92

PLL.

LA A.P.V VILLA MARIA, PROVINCIA DE CUSCO - CUSCO."

1.00

PLL.

3,460.43

3,460.43

3,460.43
418.44

Pgina 35

1.50

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA DETERMINACION DE COSTOS DIRECTOS - GASTOS GENERALES
OBRA

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

RECURSOS DIRECTAMENTE RECAUDADOS

META

011-2014

D O C U M E N T O
N

FECHA
SIAF

93
94

12/4/2014
12/4/2014

10581
10581

C/P N

DOC

BS000916

CAJACHICA

406

BS000916

CAJACHICA

406
406

PECOSA

4284

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

COSTO DIRECTO
IMPORTE

09

LEGALIZACION DE LIBRO

1.00

SERV.

30.00

30.00

09

483365 MOVIL SUPER 1000 SAE

2.00

UND.

18.50

37.00

09

POR SERVICIO DE REPARACION Y CAMBIO DE CARBURADOR DE


MOTOR HONDA 6X160.

1.00

SERV.

350.00

350.00

10.00

UND.

2.00

20.00

95

12/4/2014

10581

BS000916

CAJACHICA

96

12/4/2014

10581

BS000916

CAJACHICA

406

09

PUNTOAGUSADO

97

12/4/2014

10581

BS000916

CAJACHICA

406

09

PLOTEO DE PLANO

1.00

SERV.

4.50

4.50

BS000916

CAJACHICA

406

09

PLOTEO PROGRAMADO

1.00

SERV.

3.50

3.50

BS000916

CAJACHICA

406

51

09

FILTRO DE APIZONADOR C/CH 1789

1.00

UND.

75.00

75.00

406

51

09

BUJIA DE MOTOR GASOLINERO NGK ROSCA LARGA

1.00

PZA.

12.00

12.00

55

09

MASILLA PLASTICA VELOX FLEX X3

1.00

UND.

9.90

9.90

98
99

12/4/2014
12/4/2014

10581
10581

4299

100

12/4/2014

10581

BS000916

CAJACHICA

101

12/4/2014

10581

BS000916

CAJACHICA

406

102

12/4/2014

10581

BS000916

CAJACHICA

406

09

TONER LASER HP CF 280-A

1.00

UND.

290.00

290.00

103

12/4/2014

10581

BS000916

CAJACHICA

406

09

HOJA DE SIERRA SAN FLEX

4.00

UND.

4.50

18.00

104

12/4/2014

10581

BS000916

CAJACHICA

406

09

LIJA DE METAL N100

5.00

UND.

1.30

6.50

105

12/4/2014

10581

BS000916

CAJACHICA

406

09

LIJA DE METAL N50

5.00

UND.

1.50

7.50

106

12/4/2014

10581

BS000916

CAJACHICA

406

09

DISCO DE CORTE 9"

6.00

UND.

8.50

51.00

107

12/4/2014

10581

BS000916

CAJACHICA

406

09

DISCO DE CORTE 1/2"

4.00

UND.

4.50

18.00

108

12/4/2014

10581

BS000916

CAJACHICA

406

09

DISCO DE DESBASTE DE 7"

2.00

UND.

7.50

15.00

109

12/4/2014

10581

BS000916

CAJACHICA

406

09

ALAMBRE AMARE DE 3.2 MM PVC.

8.00

UND.

12.00

96.00

110

12/4/2014

10581

BS000916

CAJACHICA

406

09

ESPADRAPO

1.00

UND.

8.00

8.00

111

12/4/2014

10581

BS000916

CAJACHICA

406

09

DOLONET

10.00

UND.

1.00

10.00

112
113
114
115

12/4/2014
12/4/2014
12/4/2014
12/4/2014

10581
10581
10581
10581

BS000916

CAJACHICA

406

09

TELAS

BS000916

CAJACHICA

406

09

BS000916

CAJACHICA

406

BS000916

CAJACHICA

406

LA A.P.V VILLA MARIA, PROVINCIA DE CUSCO - CUSCO."

MANO DE
OBRA

MATERIALES

HERRAMIEN TAS

LUBRICANTE COMBUSTI BLE

EQUIPO

SERVICIOS
DIVERSOS

RESIDENTE
DE OBRA

ASISTENTE
TECNICO

37.00
350.00

75.00
12.00

18.00
6.50
7.50
51.00
18.00
15.00
96.00

VAN ...

SUBTOTAL

220,913.22

137,747.80

58,956.24

400.00

1,524.50

37.00

4,630.00

13,790.20

0.00

...VIENEN

SUBTOTAL

220,913.22

137,747.80

58,956.24

400.00

1,524.50

37.00

4,630.00

13,790.20

0.00

10.00

UND.

0.50

5.00

CURITAS

1.00

UND.

7.00

7.00

09

ALCOHOL YODO

2.00

UND.

2.50

5.00

09

AGUAOXIGENADA

1.00

UND.

2.00

2.00

Pgina 36

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA DETERMINACION DE COSTOS DIRECTOS - GASTOS GENERALES
OBRA

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE

EJECUTA

SUB GERENCIA DE OBRAS

FTE. FTO.

RECURSOS DIRECTAMENTE RECAUDADOS

META

011-2014

D O C U M E N T O
N

FECHA
SIAF

116
117

12/4/2014
12/4/2014

10581
10581

C/P N

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

COSTO DIRECTO
IMPORTE

DOC

BS000916

CAJACHICA

406

09

ALCOHOL

1.00

UND.

12.00

12.00

BS000916

CAJACHICA

406

09

483355 MOVIL SUPER 1000 SAE 10W-30

2.00

GLN.

18.50

37.00

124

09

SERVICIO DE DESMONTAJE DE CAJA Y REPARACION EN BRONCE


Y MONTAJE V 82.

1.00

SERV.

350.00

350.00

118

12/4/2014

10594

BS000920..

CAJACHICA

119

12/4/2014

10594

BS000920..

CAJACHICA

124

09

SERVICIO PARA FABRICACION LLAVE PARA CILINDRO HIDRAULICO


EN PLANCHA DE ACERO .

1.00

SERV.

250.00

250.00

120

12/4/2014

10594

BS000920..

CAJACHICA

124

09

SOLDAR Y FIJACION COLECTOR DE ARANCADOR.

1.00

SERV.

60.00

60.00

121

12/4/2014

10594

BS000920..

CAJACHICA

124

09

AUTOMATIO ARRANCADOR SCANIA V85

1.00

UND.

50.00

50.00

122

12/4/2014

10594

BS000920..

CAJACHICA

124

09

SENSOR RETRO V71

1.00

UND.

125.00

125.00

123

12/4/2014

10594

BS000920..

CAJACHICA

124

09

F01196024100 CHEVRON GRASA MARFAK HD 3B NL G13X 1 LIBRA.

8.00

POT.

12.00

96.00

124

12/4/2014

10594

BS000920..

CAJACHICA

124

09

RODAJE 6304/2RSH/C3

4.00

UND.

27.00

108.00

125

12/4/2014

10594

BS000920..

CAJACHICA

124

09

RODAJE POLEA TEMPLADOR FH-12

2.00

UND.

60.00

120.00

126

12/15/2014

10821

BS000984

CAJACHICA

09

MANTENIMIENTO DE CANGURO CAMBIO DE ACEITE Y PONCHO


CON EMBRIAJE

1.00

SERV.

720.00

720.00

127

12/15/2014

10821

BS000984

CAJACHICA

09

REDUCCION PVC SAP 150 4422 75MMX1 1/2"

1.00

UND.

9.20

9.20

128

12/15/2014

10821

BS000984

CAJACHICA

09

REDUCCION PVC SAP 1 1/2"X1

1.00

UND.

2.00

2.00

129

12/15/2014

10821

BS000984

CAJACHICA

09

ANILLO U/F PRESION 75MM

1.00

UND.

2.50

2.50

130

12/15/2014

10821

BS000984

CAJACHICA

09

UNION PVC SAP S/P 1"

1.00

UND.

2.40

2.40

131

12/15/2014

10821

BS000984

CAJACHICA

09

TRANSICION ADAPTADO UPR 1" PAVCO

2.00

UND.

1.70

3.40

132

12/15/2014

10821

BS000984

CAJACHICA

09

LLAVE PASO PVC AGUA 1" VALVULA ESPECIFICA

1.00

UND.

7.50

7.50

133

12/15/2014

10821

BS000984

CAJACHICA

09

TUBO PVC SAP C-10 C/R 1"

0.20

UND.

20.00

4.00

TOTAL

Pgina 37

LA A.P.V VILLA MARIA, PROVINCIA DE CUSCO - CUSCO."

222,891.22

MANO DE
OBRA

MATERIALES

HERRAMIEN TAS

LUBRICANTE COMBUSTI BLE

EQUIPO

SERVICIOS
DIVERSOS

RESIDENTE
DE OBRA

ASISTENTE
TECNICO

37.00
350.00
250.00
60.00
50.00
125.00
96.00
108.00
120.00
720.00
9.20
2.00
2.50
2.40
3.40
7.50
4.00
137,747.80

58,987.24

400.00

1,524.50

1,953.00

4,630.00

13,790.20

0.00

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA DETERMINACION DE COSTOS DIRECTOS - GASTOS GENERALES
:

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE

SUB GERENCIA DE OBRAS

RECURSOS DIRECTAMENTE RECAUDADOS

011-2014

D O C U M E N T O

C/P N

DOC

000025

PLL.

749

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

LA A.P.V VILLA MARIA, PROVINCIA DE CUSCO - CUSCO."

COSTO DIRECTO
IMPORTE

09

DESCUENTO PLANILLA PERSONAL OBRERO- JULIO-2014

1.00

PLL.

910.22

910.22

1.00

PLL.

226.03

226.03

000025

PLL.

782

09

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI - JULIO 2014

000026

PLL.

749

09

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO JULIO-2014

1.00

PLL.

4,853.12

4,853.12

1.00

PLL.

842.86

842.86

MANO DE
OBRA

MATERIALES

HERRAMIEN TAS

GASTOS GENERALES

LUBRICANTE COMBUSTI BLE

EQUIPO

SERVICIOS
DIVERSOS

RESIDENTE
DE OBRA

ASISTENTE
TECNICO

ASIST.
ADMINISTRATI
VO

ALMACENERO

MAT. DE
ESCRITORIO

GASTO
NOTARIAL

910.22
226.03
4,853.12

000026

PLL.

782

09

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI JULIO -2014

000027

PLL.

749

09

ESSALUD PLANILLA PERSONAL OBRERO - JULIO-2014

1.00

PLL.

639.76

639.76

09

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALI - JULIO


-2014

1.00

PLL.

104.52

104.52

1.00

UND.

380.00

380.00

20.00

UND.

24.00

480.00

480.00

842.86
639.76

000027

PLL.

782

104.52

000237

O/C.

B201641

8527

09

CARTEL DE OBRA 4.20MX2.80M SEGN MODELO

000118

O/C.

B201646

8532

09

RROLLIZOS DE EUCALIPTO DE 4"X5M.

000132

O/C.

B201840

8533

09

MADERA AGUANO DE 1 1/2"x 8"x10"

100.00

UND.

44.00

4,400.00

4,400.00

000132

O/C.

B201840

8533

09

MADERA AGUANO DE 2"x 3" x 10"

120.00

UND.

23.00

2,760.00

2,760.00

000371

O/C.

B201702

8627

09

GEOCOMPUESTO DE DRENAJE FLEXIBLE TIPO 2L SEGN


ESPECIFICACIONES TECNICAS.

280.00

M2.

28.44

7,962.64

7,962.64

000247

O/C.

B201728

8650

09

FOLDER MANILA(INC FASTINER)GALLO

100.00

UND.

0.25

25.00

25.00

000247

O/C.

B201728

8650

09

CINTA MASKIN DE 1"X40 YARS SHURTARE

2.00

UND.

3.50

7.00

7.00

000247

O/C.

B201728

8650

09

CINTA DE EMBALAJE 2"X110 YARDAS

2.00

UND.

4.00

8.00

8.00

000247

O/C.

B201728

8650

09

GOMA EN BARRA 40GR ARTESCO.

3.00

UND.

4.50

13.50

13.50

000247

O/C.

B201728

8650

09

ARCHIVADORES LOMO GRUESO

8.00

UND.

3.80

30.40

30.40

000247

O/C.

B201728

8650

09

CORECTOR ARTESCO

6.00

UND.

1.40

8.40

8.40

000247

O/C.

B201728

8650

09

CUADERNO A-4 200HOJAS REFORZADO JUSTOS

3.00

UND.

7.50

22.50

22.50

000247

O/C.

B201728

8650

09

PAPEL BOND A-4 DE 80 GR ATLAS

5.00

MLL.

26.50

132.50

132.50

000247

O/C.

B201728

8650

09

PAPEL LUSTRE (QUINDA) 12 UND.

1.00

DOC.

3.60

3.60

3.60

000247

O/C.

B201728

8650

09

MEMORIA USB DE 16GB.

4.00

UND.

38.00

152.00

152.00

000247

O/C.

B201728

8650

09

LAPICERO (ROJO,AZUL,NEGRO)TINTA LIQUIDA

12.00

UND.

3.20

38.40

38.40

000247

O/C.

B201728

8650

09

LAPICERO (ROJO,AZUL,NEGRO)PUNTA FINA

1.00

CAJ.

18.00

18.00

18.00

380.00

VAN ...

SUBTOTAL

24,018.45

6,403.10

15,602.64

0.00

0.00

0.00

380.00

1,173.41

0.00

0.00

0.00

459.30

...VIENEN

SUBTOTAL

24,018.45

6,403.10

15,602.64

0.00

0.00

0.00

380.00

1,173.41

0.00

0.00

0.00

459.30

Pgina 38

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA DETERMINACION DE COSTOS DIRECTOS - GASTOS GENERALES
:

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE

SUB GERENCIA DE OBRAS

RECURSOS DIRECTAMENTE RECAUDADOS

011-2014

D O C U M E N T O
DESCRIPCION

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

LA A.P.V VILLA MARIA, PROVINCIA DE CUSCO - CUSCO."

COSTO DIRECTO
IMPORTE

GASTOS GENERALES
ASIST.
ADMINISTRATI
VO

C/P N

DOC

PECOSA

FTE.
FTO.

000247

O/C.

B201728

8650

09

VINIFAN TAMAO OFICIO

1.00

UND.

6.00

6.00

6.00

000247

O/C.

B201728

8650

09

LAPIZ PORTAMINAS LAYCONSA

6.00

UND.

1.00

6.00

6.00

000247

O/C.

B201728

8650

09

RESALTADORES

3.00

UND.

1.80

5.40

5.40

000247

O/C.

B201728

8650

09

CUADERNO A-4 100 HOJAS (CUADRICULADO)LORO

6.00

UND.

3.50

21.00

21.00

09

ESSALUD PLANILLA ASISTENTE ADMINISTRATIVO BACA BUTINZA


GILMAR-JULIO -2014

1.00

PLL.

67.50

67.50

09

ESSALUD PLANILLA ALMACENERO CHACON PALOMINO GIOVANAJULIO -2014

1.00

PLL.

67.50

67.50

09

DESCUENTO PLANILLA ASISTENTE ADMINISTRATIVO BACA BUTINZA


GILMAR-JULIO -2014

1.00

PLL.

71.07

71.07

09

DESCUENTO PLANILLA ALMACENERO CHACON PALOMINO GIOVANAJULIO -2014

1.00

PLL.

68.16

68.16

1.00

PLL.

478.93

478.93

1.00

PLL.

465.17

465.17

000052

000052

000053

000053

PLL.
PLL.
PLL.
PLL.

534
534
534
534

MANO DE
OBRA

MATERIALES

HERRAMIEN TAS

LUBRICANTE COMBUSTI BLE

ALMACENERO

MAT. DE
ESCRITORIO

GASTO
NOTARIAL

68.16

PLL.

534

09

PLL.

534

09

LIQUIDO A PAGAR PLANILLA ALMACENERO CHACON PALOMINO


GIOVANA- JULIO -2014

000236

O/C.

B201764

8717

09

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI


-AGOSTO-2014

30.00

UND.

28.00

840.00

000370

O/C.

B201789

8685

09

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12


2.7MM ZN+5% AL GAFAN + PVC.

35.00

UND.

225.34

7,886.90

7,886.90

000372

O/C.

B201804

8740

09

GAVION PARA SUELO REFORZADO 0.50X1.0X4.0 MALLA 10X12


2.7MM ZN+5% AL GAFAN + PVC.

30.00

UND.

185.24

5,557.20

5,557.20

000154

O/C.

B201807

8753

09

GEOMALLA TEJIDA UNIAXIAL DE 120 KN/M SEGN


ESPECIFICACIONES DEBAJO NACIONAL

210.00

M2.

18.00

3,780.00

3,780.00

000123

O/C.

B201814

8760

09

GEOTEXTIL NO TEJIDO DE 200 GR/M2 MACCAFERRI

215.00

M2.

4.80

1,032.00

1,032.00

000277

O/C.

B201888

8917

09

SOGA DRIZA DE 3/4 COBRA

50.00

ML.

4.50

225.00

225.00

000277

O/C.

B201888

8917

09

SOGA DRIZA DE 1/2 COBRA

50.00

ML.

2.00

100.00

100.00

000279

O/C.

B201878

8900

09

GASOLINA DE 90 OCTANOS REPSOL

50.00

GLN.

14.95

747.50

747.50

000279

O/C.

B201878

8900

09

GASOLINA DE 84 OCTANOS REPSOL

50.00

GLN.

13.80

690.00

690.00

000251

O/C.

B201882

8912

09

PLASTICO NACIONAL DE 2M A 4M (DOBLE CARA) NACIONAL

100.00

MLL.

4.50

450.00

450.00

000251

O/C.

B201882

8912

09

POLYTARP DE 4X200 IMPORTADO

50.00

MLL.

24.00

1,200.00

1,200.00

000304

O/C.

B201885

8915

09

MANGUERA REFORZADA DE 3/4" IMPORTADO

1.00

RLL.

135.00

135.00

135.00

09

ASISTENTE
TECNICO

71.07

000054

841

RESIDENTE
DE OBRA

67.50

000054

PLL.

SERVICIOS
DIVERSOS

67.50

LIQUIDO A PAGAR PLANILLA ASISTENTE ADMINISTRATIVO BACA


BUTINZA GILMAR-JULIO -2014

000163

EQUIPO

478.93
465.17
840.00

VAN ...

SUBTOTAL

47,918.78

6,403.10

35,968.74

0.00

1,437.50

0.00

380.00

2,013.41

0.00

617.50

600.83

497.70

...VIENEN

SUBTOTAL

47,918.78

6,403.10

35,968.74

0.00

1,437.50

0.00

380.00

2,013.41

0.00

617.50

600.83

497.70

3,859.71

3,859.71

DESCUENTO PLANILLA PERSONAL OBRERO EVENTUAL - AGOSTO


-2014

1.00

PLL.

3,859.71

Pgina 39

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA DETERMINACION DE COSTOS DIRECTOS - GASTOS GENERALES
:

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE

SUB GERENCIA DE OBRAS

RECURSOS DIRECTAMENTE RECAUDADOS

011-2014

D O C U M E N T O
PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

COSTO DIRECTO
IMPORTE

C/P N

DOC

000163

PLL.

875

09

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI


-AGOSTO-2014

1.00

PLL.

609.38

609.38

000164

PLL.

841

09

LIQUIDO A PAGAR PERSONAL EVENTUAL OBRERO AGOSTO -2014

1.00

PLL.

21,772.54

21,772.54

1.00

PLL.

3,005.42

3,005.42

000164

PLL.

875

09

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI


-AGOSTO-2014

000165

PLL.

841

09

ESSALUD PLANILLA PERSONAL OBRERO EVENTUAL-AGOSTO-2014

1.00

PLL.

2,555.10

2,555.10

09

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALI -AGOSTO


-2014

1.00

PLL.

353.46

353.46

2.00

UND.

300.28

600.55

000165

PLL.

875

000253

O/C.

B201932

8986

09

TONER RENDIMIENTO 25000 PAG.COLOR NEGRO POLIMERIZADO


SIMITRI HD CAJA X 01UNIDAD CONICA MINOLTA TN 414 A202050.

000294

O/C.

B201958

9015

09

PIEDRA CHANCADA DE 1/2" DE LA CANTERA DE HUILLQUE

000376

PLL.

954

09

25.00

M3.

60.00

1,500.00

DESCUENTO PLANILLA PERSONAL OBRERO - SETIEMBRE -2014

1.00

PLL.

6,644.46

6,644.46

MANO DE
OBRA

MATERIALES

1.00

PLL.

595.54

09

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO SETIEMBRE- 2014

1.00

PLL.

41,945.03

41,945.03

000377

PLL.

989

09

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI SETIEMBRE-2014

1.00

PLL.

2,902.67

2,902.67

000378

PLL.

954

09

ESSALUD PLANILLA PERSONAL OBREROS - SETIEMBRE -2014

1.00

PLL.

4,771.96

4,771.96

000378

PLL.

989

09

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALI SETIEMBRE -2014

1.00

PLL.

342.06

342.06

00592

O/S.

B200535

09

SERVICIO POR SEGURO COMPLEMENTARIO FR DE TRABAJO DE


RIESGO SCTR OBREROS

1.00

SERV.

1,200.00

1,200.00

000439

O/C.

B202206

9380

09

ALAMBRE DE AMARRE PARA GAVIONES DE 2.20MM DE ZN-5 AL


MM.ASTM ( A856M-98)

20.00

KG.

9.00

180.00

180.00

000442

O/C.

B202297

9474

09

ARENA GRUESA FINEADO DE MINA

30.00

M3.

63.00

1,890.00

1,890.00

000442

O/C.

B202297

9474

09

PIEDRA CHANCADA DE 1/2" A 3/4".

36.00

M3.

62.00

2,232.00

2,232.00

000528

O/C.

B202308

9520

09

PIEDRA GRANDE DE 8" A 10" DE PROCEDENCIA RUMICOLCA

300.00

M3.

49.90

14,970.00

14,970.00

B202289

9467

09

TAPA PARA BUZON DESAGUE DE C A DE 0.60 CM. INCLUYE


ANILLO DE SOPORTE|

2.00

UND.

170.00

340.00

09

SERVICIO DE DENCIDAD DE CAMPO

1.00

SERV.

2,250.00

2,250.00

09

VINCARD ( CONTROL VISIBLE DE ALMACEN)

15.00

MLL.

55.00

825.00

000485

O/C.

B202369

00739

CAJACHICA

321

9602

9604

ALMACENERO

MAT. DE
ESCRITORIO

GASTO
NOTARIAL

6,644.46

09

B202367

ASIST.
ADMINISTRATI
VO

1,500.00

954

O/C.

ASISTENTE
TECNICO

600.55

989

000484

RESIDENTE
DE OBRA

353.46

PLL.

B200652

SERVICIOS
DIVERSOS

2,555.10

PLL.

O/S.

EQUIPO

3,005.42

000377

00759

GASTOS GENERALES

LUBRICANTE COMBUSTI BLE

21,772.54

000376

O/C.

HERRAMIEN TAS

609.38

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI SETIEMBRE-2014

000556

LA A.P.V VILLA MARIA, PROVINCIA DE CUSCO - CUSCO."

595.54

595.54
41,945.03
2,902.67
4,771.96
342.06
1,200.00

340.00
2,250.00

825.00

VAN ...

SUBTOTAL

163,263.66

87,951.90

57,080.74

0.00

1,437.50

0.00

3,830.00

9,821.94

0.00

617.50

600.83

1,923.25

...VIENEN

SUBTOTAL

163,263.66

87,951.90

57,080.74

0.00

1,437.50

0.00

3,830.00

9,821.94

0.00

617.50

600.83

1,923.25

09

CALAMINA DE 0.80 X3.60X0.14MM.

20.00

PLM.

26.00

520.00

09

PLASTICO

10.00

MTS.

4.00

40.00

520.00
40.00

Pgina 40

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA DETERMINACION DE COSTOS DIRECTOS - GASTOS GENERALES
:

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE

SUB GERENCIA DE OBRAS

RECURSOS DIRECTAMENTE RECAUDADOS

011-2014

D O C U M E N T O

C/P N

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

COSTO DIRECTO
IMPORTE

DOC

00739

CAJACHICA

321

09

YESO

1.00

BLS.

7.00

7.00

00739

CAJACHICA

321

09

CORREAS A-72

2.00

PZA.

18.00

36.00

00739

CAJACHICA

321

09

ARNES DE SEGURIDAD

4.00

UND.

70.00

280.00

00739

CAJACHICA

321

09

CACHIMBA DE 6X6

4.00

UND.

37.50

150.00

00739

CAJACHICA

321

09

LLANTAS BUGUI ( JUEGO COMPLETO)

8.00

JGOS.

50.00

400.00

00739

CAJACHICA

321

09

LEGALIZACION DE LIBRO

1.00

SERV.

30.00

30.00

00763

O/S.

B200677

09

SERVICIO PARA ROTURA DE BLOQUETAS

1.00

SERV.

450.00

450.00

000634

O/C.

B202468

9746

09

TAPA FG PARA AGUA NACIONAL

4.00

UND.

31.00

124.00

000634

O/C.

B202468

9746

09

TAPON PVC SAP UF 75MM.PAVCO

1.00

UND.

23.00

23.00

000634

O/C.

B202468

9746

09

CAJA DE CONCRETO PARA AGUA NACIONAL

4.00

UND.

11.00

44.00

000634

O/C.

B202468

9746

09

TUBERIA PVC SAP NTP ISO 4422 DE 75MM C-10 PAVCO

8.00

UND.

74.00

592.00

000634

O/C.

B202468

9746

09

PEGAMENTO PARA TUBERIA PVC DATEY

0.50

GLN.

106.00

53.00

000634

O/C.

B202468

9746

09

TEE PVC SAP UF.75MM PAVCO.

1.00

UND.

73.00

73.00

00769

PLL.

1044

09

ESSALUD PLANILLA PERSONAL OBRERO-OCTUBRE-2014

1.00

PLL.

4,075.97

4,075.97

00769

PLL.

1079

09

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALI - OCTUBRE


-2014

1.00

PLL.

353.46

353.46

00784

PLL.

1044

09

DESCUENTO PLANILLA OBREROS -OCTUBRE -2014

1.00

PLL.

6,003.32

6,003.32

2.00

PLL.

609.38

609.38

00784

PLL.

1079

09

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI


-OCTUBRE-2014

00977

PLL.

1044

09

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO OCTUBRE-2014

1.00

PLL.

35,324.43

35,324.43

09

LIQUIDO A PAGAR PLANILLA RESIDENTE LOPEZ CABRERA NATALI


-OCTUBRE-2014

1.00

PLL.

3,005.42

3,005.42

09

DESCUENTO PLANILLA PERSONAL OBRERO REPUESTO JUDICIALOCTUBRE-2014

1.00

PLL.

513.31

513.31

00977

00800

PLL.
PLL.

1079
1117

MATERIALES

HERRAMIEN TAS

GASTOS GENERALES

LUBRICANTE COMBUSTI BLE

EQUIPO

SERVICIOS
DIVERSOS

RESIDENTE
DE OBRA

ASISTENTE
TECNICO

ASIST.
ADMINISTRATI
VO

ALMACENERO

MAT. DE
ESCRITORIO

GASTO
NOTARIAL

7.00
36.00

150.00
400.00

450.00
124.00
23.00
44.00
592.00
53.00
73.00
4,075.97
353.46
6,003.32
609.38
35,324.43
3,005.42
513.31

SUBTOTAL

215,970.95

133,868.93

58,742.74

400.00

1,437.50

0.00

4,280.00

13,790.20

0.00

617.50

600.83

1,923.25

...VIENEN

SUBTOTAL

215,970.95

133,868.93

58,742.74

400.00

1,437.50

0.00

4,280.00

13,790.20

0.00

617.50

600.83

1,923.25

PLL.

1117

09

00802

PLL.

1117

09

ESSALUD PLANILLA PERSONAL REPUESTO JUDICIAL-OCTUBRE-2014

1.00

PLL.

418.44

418.44

00916

CAJACHICA

406

09

UNION 1/2 CAJA CHICA 13/H 1412

1.00

UND.

1.50

1.50

4297

MANO DE
OBRA

VAN ...

LIQUIDO A PAGAR PLANILLA PERSONAL OBRERO REPUESTO


JUDICIAL- OCTUBRE-2014

00801

LA A.P.V VILLA MARIA, PROVINCIA DE CUSCO - CUSCO."

1.00

PLL.

3,460.43

3,460.43

3,460.43
418.44

1.50

Pgina 41

C/P N

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA DETERMINACION DE COSTOS DIRECTOS - GASTOS GENERALES
:

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE

SUB GERENCIA DE OBRAS

RECURSOS DIRECTAMENTE RECAUDADOS

011-2014

D O C U M E N T O
DOC

00916

CAJACHICA

406

00916

CAJACHICA

406

00916

CAJACHICA

406

00916

CAJACHICA

00916

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

COSTO DIRECTO
IMPORTE

09

LEGALIZACION DE LIBRO

1.00

SERV.

30.00

30.00

09

483365 MOVIL SUPER 1000 SAE

2.00

UND.

18.50

37.00

09

POR SERVICIO DE REPARACION Y CAMBIO DE CARBURADOR DE


MOTOR HONDA 6X160.

1.00

SERV.

350.00

350.00

406

09

PUNTOAGUSADO

10.00

UND.

2.00

20.00

CAJACHICA

406

09

PLOTEO DE PLANO

1.00

SERV.

4.50

4.50

00916

CAJACHICA

406

09

PLOTEO PROGRAMADO

1.00

SERV.

3.50

3.50

00916

CAJACHICA

406

51

09

FILTRO DE APIZONADOR C/CH 1789

1.00

UND.

75.00

75.00

00916

CAJACHICA

406

51

09

BUJIA DE MOTOR GASOLINERO NGK ROSCA LARGA

1.00

PZA.

12.00

12.00

00916

CAJACHICA

406

55

09

MASILLA PLASTICA VELOX FLEX X3

1.00

UND.

9.90

9.90

00916

CAJACHICA

406

09

TONER LASER HP CF 280-A

1.00

UND.

290.00

290.00

00916

CAJACHICA

406

09

HOJA DE SIERRA SAN FLEX

4.00

UND.

4.50

18.00

00916

CAJACHICA

406

09

LIJA DE METAL N100

5.00

UND.

1.30

6.50

00916

CAJACHICA

406

09

LIJA DE METAL N50

5.00

UND.

1.50

7.50

00916

CAJACHICA

406

09

DISCO DE CORTE 9"

6.00

UND.

8.50

51.00

00916

CAJACHICA

406

09

DISCO DE CORTE 1/2"

4.00

UND.

4.50

18.00

00916

CAJACHICA

406

09

DISCO DE DESBASTE DE 7"

2.00

UND.

7.50

15.00

00916

CAJACHICA

406

09

ALAMBRE AMARE DE 3.2 MM PVC.

8.00

UND.

12.00

96.00

00916

CAJACHICA

406

09

ESPADRAPO

1.00

UND.

8.00

8.00

00916

CAJACHICA

406

09

DOLONET

10.00

UND.

1.00

10.00

4284
4299

00916

CAJACHICA

406

09

TELAS

00916

CAJACHICA

406

09

00916

CAJACHICA

406

00916

CAJACHICA

406

LA A.P.V VILLA MARIA, PROVINCIA DE CUSCO - CUSCO."

MANO DE
OBRA

MATERIALES

HERRAMIEN TAS

GASTOS GENERALES

LUBRICANTE COMBUSTI BLE

EQUIPO

SERVICIOS
DIVERSOS

RESIDENTE
DE OBRA

ASISTENTE
TECNICO

ASIST.
ADMINISTRATI
VO

ALMACENERO

MAT. DE
ESCRITORIO

GASTO
NOTARIAL

37.00
350.00

75.00
12.00

18.00
6.50
7.50
51.00
18.00
15.00
96.00

VAN ...

SUBTOTAL

220,913.22

137,747.80

58,956.24

400.00

1,524.50

37.00

4,630.00

13,790.20

0.00

617.50

600.83

1,923.25

...VIENEN

SUBTOTAL

220,913.22

137,747.80

58,956.24

400.00

1,524.50

37.00

4,630.00

13,790.20

0.00

617.50

600.83

1,923.25

10.00

UND.

0.50

5.00

CURITAS

1.00

UND.

7.00

7.00

09

ALCOHOL YODO

2.00

UND.

2.50

5.00

09

AGUAOXIGENADA

1.00

UND.

2.00

2.00

Pgina 42

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA DETERMINACION DE COSTOS DIRECTOS - GASTOS GENERALES
:

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE

SUB GERENCIA DE OBRAS

RECURSOS DIRECTAMENTE RECAUDADOS

011-2014

D O C U M E N T O

C/P N

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

COSTO DIRECTO
IMPORTE

DOC

00916

CAJACHICA

406

09

ALCOHOL

1.00

UND.

12.00

12.00

00916

CAJACHICA

406

09

483355 MOVIL SUPER 1000 SAE 10W-30

2.00

GLN.

18.50

37.00

00920..

CAJACHICA

124

09

SERVICIO DE DESMONTAJE DE CAJA Y REPARACION EN BRONCE


Y MONTAJE V 82.

1.00

SERV.

350.00

350.00

00920..

CAJACHICA

124

09

SERVICIO PARA FABRICACION LLAVE PARA CILINDRO HIDRAULICO


EN PLANCHA DE ACERO .

1.00

SERV.

250.00

250.00

00920..

CAJACHICA

124

09

SOLDAR Y FIJACION COLECTOR DE ARANCADOR.

1.00

SERV.

60.00

60.00

00920..

CAJACHICA

124

09

AUTOMATIO ARRANCADOR SCANIA V85

1.00

UND.

50.00

50.00

00920..

CAJACHICA

124

09

SENSOR RETRO V71

1.00

UND.

125.00

125.00

00920..

CAJACHICA

124

09

F01196024100 CHEVRON GRASA MARFAK HD 3B NL G13X 1 LIBRA.

8.00

POT.

12.00

96.00

00920..

CAJACHICA

124

09

RODAJE 6304/2RSH/C3

4.00

UND.

27.00

108.00

00920..

CAJACHICA

124

09

RODAJE POLEA TEMPLADOR FH-12

2.00

UND.

60.00

120.00

00984

CAJACHICA

09

MANTENIMIENTO DE CANGURO CAMBIO DE ACEITE Y PONCHO


CON EMBRIAJE

1.00

SERV.

720.00

720.00

00984

CAJACHICA

09

REDUCCION PVC SAP 150 4422 75MMX1 1/2"

1.00

UND.

9.20

9.20

00984

CAJACHICA

09

REDUCCION PVC SAP 1 1/2"X1

1.00

UND.

2.00

2.00

00984

CAJACHICA

09

ANILLO U/F PRESION 75MM

1.00

UND.

2.50

2.50

00984

CAJACHICA

09

UNION PVC SAP S/P 1"

1.00

UND.

2.40

2.40

00984

CAJACHICA

09

TRANSICION ADAPTADO UPR 1" PAVCO

2.00

UND.

1.70

3.40

00984

CAJACHICA

09

LLAVE PASO PVC AGUA 1" VALVULA ESPECIFICA

1.00

UND.

7.50

7.50

00984

CAJACHICA

09

TUBO PVC SAP C-10 C/R 1"

0.20

UND.

20.00

4.00

TOTAL

LA A.P.V VILLA MARIA, PROVINCIA DE CUSCO - CUSCO."

222,891.22

MANO DE
OBRA

MATERIALES

HERRAMIEN TAS

GASTOS GENERALES

LUBRICANTE COMBUSTI BLE

EQUIPO

SERVICIOS
DIVERSOS

RESIDENTE
DE OBRA

ASISTENTE
TECNICO

ASIST.
ADMINISTRATI
VO

ALMACENERO

MAT. DE
ESCRITORIO

GASTO
NOTARIAL

37.00
350.00
250.00
60.00
50.00
125.00
96.00
108.00
120.00
720.00
9.20
2.00
2.50
2.40
3.40
7.50
4.00
137,747.80

Pgina 43

58,987.24

400.00

1,524.50

1,953.00

4,630.00

13,790.20

0.00

617.50

600.83

1,923.25

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
OBRA

EJECUTA
FTE. FTO.
META

:
:
:

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C D


MARIA , PROVINCIA DE CUSCO-CUSCO"
SUB GERENCIA DE OBRAS
CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES
012 - 2015

D O C U M E N T O
N

FECHA

SIAF

C/P N

DOC

PECOSA

DESCRIPCION

FTE.
FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

2/27/2015

241

RO000011

PLLA.

57

18

LIQUIDO A PAGAR RESIDENTE LOPEZ CABRERA NATALI - ENERO2015

1.00

PLL.

3,400.34

3,400.34

2/27/2015

241

RO000011

PLLA.

36

18

LIQUIDO A PAGAR PLANILLA OBREROS - ENERO-2015

1.00

PLL.

1,994.95

1,994.95

2/27/2015

241

RO000012

PLLA.

57

18

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA NATALI ENERO-2015

1.00

PLL.

1,404.65

1,404.65

2/27/2015

241

RO000012

PLLA.

36

18

DESCUENTO PLANILLA OBREROS - ENERO-2015

1.00

PLL.

614.46

614.46

1.00

PLL.

353.46

353.46

1.00

PLL.

330.87

330.87

1.00

PLL.

1,117.16

1,117.16

1.00

PLL.

107.84

107.84

1.00

PLL.

74.25

74.25

2/27/2015

241

RO000013

PLLA.

57

18

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALI ENERO-2015

2/27/2015

241

RO000013

PLLA.

36

18

ESSALUD PLANILLA OBREROS - ENERO-2015

2/26/2015

253

RO000008

PLLA.

48

18

2/26/2015

253

RO000009

PLLA.

48

18

2/26/2015

253

RO000010

PLLA.

48

18

LIQUIDO A PAGAR PLANILLA ASISTENTE ADMINISTRATIVO BACA


BUTINZA GILMAR- ENERO -2015
DESCUENTO PLANILLA ASISTENTE ADMINISTRATIVO BACA
BUTINZA GILMAR-ENERO -2015
ESSALUD PLANILLA ASISTENTE ADMINISTRATIVO BACA BUTINZA
GILMAR-ENERO -2015

TOTAL

Pgina 44

9,397.98

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
OBRA

EJECUTA
FTE. FTO.
META

:
:
:

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C D


MARIA , PROVINCIA DE CUSCO-CUSCO"
SUB GERENCIA DE OBRAS
CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES
012 - 2015

D O C U M E N T O
N

FECHA

SIAF

C/P N

DOC

PECOSA

DESCRIPCION

FTE.
FTO.

Pgina 45

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

N DE PROYECTOS DE INVERSIN PBLICA

LIQUIDACIN FINANCIERA

ROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE


MARIA , PROVINCIA DE CUSCO-CUSCO"

LA A.P.V VILLA

ESPECIFICA
2.6. 2.3. 99 3
PERSONAL

DEL

GASTO

2.6. 2.3. 994


BIENES

2.6. 2.3. 995


SERVICIOS

3,400.34
1,994.95
1,404.65
614.46
353.46
330.87
1,117.16
107.84
74.25
9,397.98

0.00

Pgina 46

0.00

N DE PROYECTOS DE INVERSIN PBLICA

LIQUIDACIN FINANCIERA

ROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE


MARIA , PROVINCIA DE CUSCO-CUSCO"

LA A.P.V VILLA

ESPECIFICA
2.6. 2.3. 99 3
PERSONAL

DEL

2.6. 2.3. 994


BIENES

Pgina 47

GASTO
2.6. 2.3. 995
SERVICIOS

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA DETERMINACION DE COSTOS DIRECTOS - GASTOS GENERALES
OBRA

EJECUTA
FTE. FTO.
META

:
:
:

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE

D O C U M E N T O
N

FECHA

SIAF

C/P N

LA A.P.V VILLA MARIA, PROVINCIA DE CUSCO - CUSCO."

SUB GERENCIA DE OBRAS


CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES
012-2015

DOC

PECOSA

FTE.
FTO.

DESCRIPCION

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

COSTO DIRECTO

GASTOS
GENERALES

2/27/2015

241

RO000011

PLLA.

57

18

LIQUIDO A PAGAR RESIDENTE LOPEZ CABRERA NATALI ENERO-2015

1.00

PLL.

3,400.34

3,400.34

2/27/2015

241

RO000011

PLLA.

36

18

LIQUIDO A PAGAR PLANILLA OBREROS - ENERO-2015

1.00

PLL.

1,994.95

1,994.95

2/27/2015

241

RO000012

PLLA.

57

18

DESCUENTO PLANILLA RESIDENTE LOPEZ CABRERA


NATALI - ENERO-2015

1.00

PLL.

1,404.65

1,404.65

2/27/2015

241

RO000012

PLLA.

36

18

DESCUENTO PLANILLA OBREROS - ENERO-2015

1.00

PLL.

614.46

614.46

2/27/2015

241

RO000013

PLLA.

57

18

ESSALUD PLANILLA RESIDENTE LOPEZ CABRERA NATALI ENERO-2015

1.00

PLL.

353.46

353.46

2/27/2015

241

RO000013

PLLA.

36

18

ESSALUD PLANILLA OBREROS - ENERO-2015

1.00

PLL.

330.87

330.87

2/26/2015

253

RO000008

PLLA.

48

18

LIQUIDO A PAGAR PLANILLA ASISTENTE ADMINISTRATIVO


BACA BUTINZA GILMAR- ENERO -2015

1.00

PLL.

1,117.16

1,117.16

1,117.16

2/26/2015

253

RO000009

PLLA.

48

18

DESCUENTO PLANILLA ASISTENTE ADMINISTRATIVO BACA


BUTINZA GILMAR-ENERO -2015

1.00

PLL.

107.84

107.84

107.84

2/26/2015

253

RO000010

PLLA.

48

18

ESSALUD PLANILLA ASISTENTE ADMINISTRATIVO BACA


BUTINZA GILMAR-ENERO -2015

1.00

PLL.

74.25

74.25

74.25

TOTAL

Pgina 48

9,397.98

GASTOS DE
SUPERVISION

OBREROS

MATERIALES

HERRAMIENTAS

EQUIPO

3,400.34
1,994.95

1,994.95
1,404.65

614.46

614.46
353.46

330.87

2,940.28

330.87

6,457.70

0.00

2,940.28

0.00

0.00

0.00

N DE PROYECTOS DE INVERSIN PBLICA

RMINACION DE COSTOS DIRECTOS - GASTOS GENERALES

L PASAJE F ENTRE LAS MANZANAS E Y C DE

LA A.P.V VILLA MARIA, PROVINCIA DE CUSCO - CUSCO."

RESIDENTE
DE OBRA

ASISTADMINIST

GASTOS
NOTARIALES

VESTUARIO

OTROS

3,400.34

1,404.65

353.46

1,117.16

107.84

74.25

5,158.45

1,299.25

0.00

Pgina 49

0.00

0.00

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBL


DESAGREGADO DE GASTOS
OBRA

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL


PASAJE F ENTRE LAS MANZANAS E Y C DE LA A.P.V VILLA MARIA , PROVINCIA
CUSCO -CUSCO"

EJECUTA

: SUB GERENCIA DE OBRAS

FTE. FTO.

: RECURSOS ORDINARIOS

META

: 011 (2014)

ESPECIFICA DE
GASTO
2.6.2 3.9
2.6. 2.3. 99 3

DETALLE
EDIFICIOS Y ESTRUCTURAS
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL

2.6. 2.3. 99 4 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES


2.6. 2.3. 99 5 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS
2.6. 2.3. 99 6 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - OTROS

TOTAL

RESUMEN
N
1

ESPECIFICAS CONSOLIDADAS
COSTO DIRECTO
MANO DE OBRA
MATERIALES
HERRAMIENTAS
COMBUSTIBLE
SERVICIOS DIVERSOS

GASTOS GENERALES
RESIDENTE DE OBRA
ASISTENTE TECNICO
ASISTENTE ADMINISTRATIVO
ALMACENERO
MATERIALES DE ESCRITORIO
GASTOS NOTARIALES
VESTUARIO
OTROS

TOTAL

OS DE INVERSIN PBLICA

DE INVERSIN PBLICA
OS

ROTECCION DE TALUD EN EL
V VILLA MARIA , PROVINCIA DE

PORCENTAJE
%
100.00

2014
27,128.90

0.00

0.00

98.71

26,778.90

1.29

350.00

0.00

0.00

100.00

27,128.90

PORCENTAJE

2014

%
98.46

26,711.90

0.00
79.63
0.00

0.00
21,601.90
0.00

17.55
1.29

4,760.00
350.00

1.54
0.00

417.00
0.00

0.00
0.00

0.00
0.00

0.00
0.77

0.00
210.00

0.00
0.76

0.00
207.00

0.00

0.00

100.00

27,128.90

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PB


DESAGREGADO DE GASTOS
OBRA

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL P


F ENTRE LAS MANZANAS E Y C DE LA A.P.V VILLA MARIA , PROVINCIA DE CUS
CUSCO"

EJECUTA

: SUB GERENCIA DE OBRAS

FTE. FTO.

CANON Y SOBRE CANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

META

: 011 (2014)

ESPECIFICA DE
GASTO
2.6.2 3.9
2.6. 2.3. 99 3

DETALLE
EDIFICIOS Y ESTRUCTURAS
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL

2.6. 2.3. 99 4 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES


2.6. 2.3. 99 5 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS
2.6. 2.3. 99 6 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - OTROS
TOTAL

RESUMEN
RESUMEN
N
1

ESPECIFICAS CONSOLIDADAS
COSTO DIRECTO
MANO DE OBRA
MATERIALES
HERRAMIENTAS
COMBUSTIBLE

SERVICIOS DIVERSOS
GASTOS GENERALES
RESIDENTE DE OBRA
ASISTENTE TECNICO
ASISTENTE ADMINISTRATIVO
ALMACENERO
MATERIALES DE ESCRITORIO
GASTOS NOTARIALES
VESTUARIO
OTROS

TOTAL

OS DE INVERSIN PBLICA

DE INVERSIN PBLICA
OS

TECCION DE TALUD EN EL PASAJE


MARIA , PROVINCIA DE CUSCO-

ONES

PORCENTAJE
%

2014

Err:522

Err:522

Err:522

Err:522

Err:522

Err:522

Err:522

Err:522

Err:522
Err:522

PORCENTAJE

0.00
Err:522

2014

%
81.68

87,400.03

66.31
5.91

70,948.33
6,325.00

0.02
0.53

20.00
569.90

8.91
18.32

9,536.80
19,597.53

7.88
0.00

8,435.53
0.00

3.94
3.85
0.00

4,219.50
4,119.50
0.00

0.00
2.64

0.00
2,823.00

0.00

0.00

100.00 106,997.56

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PB


DESAGREGADO DE GASTOS
OBRA

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PA


F ENTRE LAS MANZANAS E Y C DE LA A.P.V VILLA MARIA DEL DISTRITO DE CU
PROVINCIA DE CUSCO-CUSCO"

EJECUTA

: SUB GERENCIA DE OBRAS

FTE. FTO.

: RECURSOS DIRECTAMENTE RECAUDADOS

META

: 011 (2014)

ESPECIFICA DE
GASTO
2.6.2 3.9
2.6. 2.3. 99 3

DETALLE
EDIFICIOS Y ESTRUCTURAS
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL

2.6. 2.3. 99 4 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES


2.6. 2.3. 99 5 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS
2.6. 2.3. 99 6 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - OTROS
TOTAL

RESUMEN
N
1

ESPECIFICAS CONSOLIDADAS
COSTO DIRECTO
MANO DE OBRA
MATERIALES
HERRAMIENTAS
COMBUSTIBLE - LUBRICANTES
EQUIPO

SERVICIOS DIVERSOS
GASTOS GENERALES
RESIDENTE DE OBRA
ASISTENTE TECNICO
ASISTENTE ADMINISTRATIVO
ALMACENERO
MATERIALES DE ESCRITORIO
GASTOS NOTARIALES
VESTUARIO
OTROS

TOTAL

TOS DE INVERSIN PBLICA

DE INVERSIN PBLICA
OS

ECCION DE TALUD EN EL PASAJE


MARIA DEL DISTRITO DE CUSCO,
USCO"

PORCENTAJE %
100.00

2014
222,891.22

68.16

151,916.33

29.43

65,606.89

2.41

5,368.00

0.00

0.00

100.00

222,891.22

PORCENTAJE

2014

%
92.08
61.80

205,242.54
137,747.80

26.46
0.18

58,987.24
400.00

0.68
0.88

1,524.50
1,953.00

2.08
7.92

4,630.00
17,648.68

6.19
0.00

13,790.20
0.00

0.28
0.27
0.86

617.50
600.83
1,923.25

0.00
0.26

0.00
570.00

0.07

146.90

100.00

222,891.22

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PB


DESAGREGADO DE GASTOS
OBRA

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL P


F ENTRE LAS MANZANAS E Y C DE LA A.P.V VILLA MARIA , PROVINCIA DE CU
CUSCO"

EJECUTA

: SUB GERENCIA DE OBRAS

FTE. FTO.

CANON Y SOBRE CANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

META

: 012(2015)

ESPECIFICA DE
GASTO
2.6.2 3.9
2.6. 2.3. 99 3

DETALLE
EDIFICIOS Y ESTRUCTURAS

PORCENTAJE %
100.00

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL

100.00

2.6. 2.3. 99 4 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES

0.00

2.6. 2.3. 99 5 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS

0.00

2.6. 2.3. 99 6 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - OTROS

0.00

TOTAL

100.00

RESUMEN
RESUMEN
N

ESPECIFICAS CONSOLIDADAS

PORCENTAJE
%

COSTO DIRECTO
MANO DE OBRA

31.29
31.29

MATERIALES
HERRAMIENTAS

0.00
0.00

COMBUSTIBLE
SERVICIOS DIVERSOS

0.00
0.00

GASTOS GENERALES
RESIDENTE DE OBRA

68.71
54.89

ASISTENTE TECNICO
ASISTENTE ADMINISTRATIVO

0.00
13.82

ALMACENERO
MATERIALES DE ESCRITORIO
GASTOS NOTARIALES

0.00
0.00
0.00

VESTUARIO
OTROS

0.00
0.00

TOTAL

100.00

VERSIN PBLICA

ERSIN PBLICA

E TALUD EN EL PASAJE
PROVINCIA DE CUSCO-

2015
9,397.98
9,397.98
0.00
0.00
0.00

9,397.98

2015
2,940.28
2,940.28
0.00
0.00
0.00
0.00
6,457.70
5,158.45
0.00
1,299.25
0.00
0.00
0.00
0.00
0.00

9,397.98

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA

SALDO DE ALMACEN
OBRA

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS


MANZANAS E Y C DE LA A.P.V VILLA MARIA,PROVINCIA DE CUSCO - CUSCO. "

METAS : 011 (2014) - 012(2015)


N

DESCRIPCION

CANTIDAD.

UND. DE
MEDIDA

PRECIO
UNITARIO

ALAMBRE NEGRO N8

76.00

KG.

3.80

CLAVO PARA MADERA C/C DE 3"

30.00

KG.

3.80

GASOLINA DE 90 OCTANOS.

13.00

GLN.

14.95

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

UND.

225.34

GEOCOMPUESTO DE DRENAJE FLEXIBLE TIPO 2L

60.00

M2

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5%
PVC

13.00

UND.

185.24

PETROLEO D-2

103.00

GLN.

13.60

ASFALTO RC-250

13.00

GLN.

18.00

SOLDADURA

5.00

KG.

12.50

TAPA FG PARA AGUA

2.00

UND

31.00

10

TOTAL

28.44

AJE F ENTRE LAS


SCO. "

IMPORTE

ARTICULO

288.80 MATERIALES
114.00 MATERIALES
194.35 COMBUSTIBLE
225.34 MATERIALES
1,706.40 MATERIALES
2,408.12 MATERIALES
1,400.80 COMBUSTIBLE
234.00 MATERIALES
62.50 MATERIALES
62.00 MATERIALES
6,696.31

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


MOVIMIENTO DE ALMACEN
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE
VILLA MARIA , PROVINCIA DE CUSCO-CUSCO"

OBRA
METAS

: 011 (2014) - 012(2015).


DOCUMENTO

MOVIMIENTO
DESCRIPCION

FECHA

N/ENT.

30-07-14

4254

N/SAL.

ENTRADA
GUANTES DE CUERO REFORZADO NACIONAL

SALIDA

SALDO

60.00

60.00

30-07-14

1604

GUANTES DE CUERO REFORZADO NACIONAL

12.00

48.00

18-08-14

1615

GUANTES DE CUERO REFORZADO NACIONAL

8.00

40.00

27-08-14

1621

GUANTES DE CUERO REFORZADO NACIONAL

1.00

39.00

01-09-14

1624

GUANTES DE CUERO REFORZADO NACIONAL

9.00

30.00

17-09-14

1641

GUANTES DE CUERO REFORZADO NACIONAL

6.00

24.00

18-09-14

1643

GUANTES DE CUERO REFORZADO NACIONAL

4.00

20.00

27-09-14

1650

GUANTES DE CUERO REFORZADO NACIONAL

20.00

60.00

TOTAL

16-10-14

4290

GUANTES DE CUERO REFORZADO

60.00

30.00

30.00

27-10-14

74

GUANTES DE CUERO REFORZADO

3.00

27.00

28-10-14

75

GUANTES DE CUERO REFORZADO

2.00

25.00

29-10-14

76

GUANTES DE CUERO REFORZADO

1.00

24.00

08-11-14

85

GUANTES DE CUERO REFORZADO

3.00

21.00

11-11-14

87

GUANTES DE CUERO REFORZADO

4.00

17.00

13-11-14

89

GUANTES DE CUERO REFORZADO

4.00

13.00

15-11-14

91

GUANTES DE CUERO REFORZADO

4.00

9.00

18-11-14

93

GUANTES DE CUERO REFORZADO

5.00

4.00

19-11-14

94

GUANTES DE CUERO REFORZADO

4.00

0.00

30.00

0.00

TOTAL

30.00

LA A.P.V

30-07-14

4254

GUANTES DE JEBE CALIBRE 35 TALLA 7,8,9 VIRUTEX

15.00

15.00

01-09-14

1624

GUANTES DE JEBE CALIBRE 35 TALLA 7,8,9 VIRUTEX

5.00

25.00

02-09-14

1625

GUANTES DE JEBE CALIBRE 35 TALLA 7,8,9 VIRUTEX

2.00

23.00

17-09-14

1641

GUANTES DE JEBE CALIBRE 35 TALLA 7,8,9 VIRUTEX

4.00

19.00

19-09-14

1644

GUANTES DE JEBE CALIBRE 35 TALLA 7,8,9 VIRUTEX

2.00

17.00

22-09-14

1646

GUANTES DE JEBE CALIBRE 35 TALLA 7,8,9 VIRUTEX

2.00

15.00

75.00

0.00

TOTAL

30-07-14

4254

CASCOS TIPO JOKEY COLOR AMARILLO

75.00

30.00

30.00

30-07-14

1604

CASCOS TIPO JOKEY COLOR AMARILLO

10.00

20.00

18-08-14

1615

CASCOS TIPO JOKEY COLOR AMARILLO

5.00

15.00

01-09-14

1624

CASCOS TIPO JOKEY COLOR AMARILLO

10.00

5.00

27-09-14

1650

CASCOS TIPO JOKEY COLOR AMARILLO

5.00

0.00

30.00

0.00

TOTAL

30-07-14

4254

LENTES DE SEGURIDAD CON PROTECCION UV

30.00

30.00

30.00

18-08-14

1615

LENTES DE SEGURIDAD CON PROTECCION UV

7.00

23.00

26-08-14

1620

LENTES DE SEGURIDAD CON PROTECCION UV

1.00

22.00

02-09-14

1625

LENTES DE SEGURIDAD CON PROTECCION UV

9.00

13.00

25-09-14

1648

LENTES DE SEGURIDAD CON PROTECCION UV

13.00

0.00

30.00

0.00

TOTAL

30.00

26-08-14

4268

CHALECOS CON TELA DRILL SEGN DISEO CON LOGO

10.00

10.00

27-08-14

4269

CHALECOS CON TELA DRILL SEGN DISEO CON LOGO

5.00

15.00

27-08-14
04-09-14

1621
4275

CHALECOS CON TELA DRILL SEGN DISEO CON LOGO


CHALECOS CON TELA DRILL SEGN DISEO CON LOGO

9.00
15.00

6.00
21.00

01-09-14

1624

CHALECOS CON TELA DRILL SEGN DISEO CON LOGO

6.00

15.00

08-09-14

1632

CHALECOS CON TELA DRILL SEGN DISEO CON LOGO

4.00

11.00

10-10-14

53

CHALECOS CON TELA DRILL SEGN DISEO CON LOGO

1.00

10.00

04-11-14

81

CHALECOS CON TELA DRILL SEGN DISEO CON LOGO

10.00

0.00

30.00

0.00

TOTAL

30-07-14

4254

PROTECTOR BUCAL DE DOS VIAS

30.00

30.00

30.00

18-08-14

1615

PROTECTOR BUCAL DE DOS VIAS

5.00

25.00

23-08-14

1618

PROTECTOR BUCAL DE DOS VIAS

3.00

22.00

26-08-14

1620

PROTECTOR BUCAL DE DOS VIAS

2.00

20.00

01-09-14

1624

PROTECTOR BUCAL DE DOS VIAS

4.00

16.00

02-09-14

1625

PROTECTOR BUCAL DE DOS VIAS

11.00

5.00

06-09-14

1631

PROTECTOR BUCAL DE DOS VIAS

1.00

4.00

20-09-14

1645

PROTECTOR BUCAL DE DOS VIAS

2.00

2.00

27-09-14

1650

PROTECTOR BUCAL DE DOS VIAS

2.00

0.00

30.00

0.00

TOTAL

30-07-14

4254

PROTECTOR ADITIVO TIPO TAPON LIBUS

30.00

30.00

30.00

29-08-14

1623

PROTECTOR ADITIVO TIPO TAPON LIBUS

10.00

20.00

01-09-14

1624

PROTECTOR ADITIVO TIPO TAPON LIBUS

9.00

11.00

02-09-14

1625

PROTECTOR ADITIVO TIPO TAPON LIBUS

3.00

8.00

20-09-14

1645

PROTECTOR ADITIVO TIPO TAPON LIBUS

4.00

4.00

22-09-14

1646

PROTECTOR ADITIVO TIPO TAPON LIBUS

4.00

0.00

30.00

0.00

TOTAL
30-07-14

4254

BOTAS DE JEBE REFORZADO CON PUNTA DE ACERO (39,40.41)

30.00
30.00

30.00

30-07-14

1604

BOTAS DE JEBE REFORZADO CON PUNTA DE ACERO (39,40.41)

10.00

20.00

18-08-14

1615

BOTAS DE JEBE REFORZADO CON PUNTA DE ACERO (39,40.41)

1.00

19.00

27-08-14

1621

BOTAS DE JEBE REFORZADO CON PUNTA DE ACERO (39,40.41)

1.00

18.00

01-09-14

1624

BOTAS DE JEBE REFORZADO CON PUNTA DE ACERO (39,40.41)

9.00

9.00

23-09-14

1647

BOTAS DE JEBE REFORZADO CON PUNTA DE ACERO (39,40.41)

9.00

0.00

30.00

0.00

TOTAL

30.00

30-07-14

4254

PONCHOS IMPERMIABLES DE TELA ENJEBADA

30

30

05-09-14

1630

PONCHOS IMPERMIABLES DE TELA ENJEBADA

22

23-09-14

1647

PONCHOS IMPERMIABLES DE TELA ENJEBADA

30

TOTAL

31-07-14

4255

MADERA AGUANO DE 2"X3"X10"

30

120

120

04-08-14

1606

MADERA AGUANO DE 2"X3"X10"

25

95

08-08-14

1608

MADERA AGUANO DE 2"X3"X10"

87

11-08-14

1609

MADERA AGUANO DE 2"X3"X10"

18

69

12-08-14

1610

MADERA AGUANO DE 2"X3"X10"

10

59

20-08-14

1616

MADERA AGUANO DE 2"X3"X10"

53

22-08-14

1617

MADERA AGUANO DE 2"X3"X10"

48

10-09-14

1635

MADERA AGUANO DE 1 1/2X8"X10"

18

30

90

TOTAL

31-07-14

4255

MADERA AGUANO DE 1 1/2X8"X10"

120

100

100

04-08-14

1606

MADERA AGUANO DE 1 1/2X8"X10"

28

72

12-08-14

1610

MADERA AGUANO DE 1 1/2X8"X10"

40

32

22-08-14

1617

MADERA AGUANO DE 1 1/2X8"X10"

25

10-09-14

1635

MADERA AGUANO DE 1 1/2X8"X10"

55

-30

130

-30

TOTAL

100

07-08-14

4258

CLAVO PARA MADERA C/C DE 3"

100

100

11-08-14

1609

CLAVO PARA MADERA C/C DE 3"

98

13-08-14

1611

CLAVO PARA MADERA C/C DE 3"

97

20-08-14

1616

CLAVO PARA MADERA C/C DE 3"

94

25-08-14

1619

CLAVO PARA MADERA C/C DE 3"

92

28-08-14

1622

CLAVO PARA MADERA C/C DE 3"

90

02-09-14

1625

CLAVO PARA MADERA C/C DE 3"

87

03-09-14

1628

CLAVO PARA MADERA C/C DE 3"

85

04-09-14

1629

CLAVO PARA MADERA C/C DE 3"

83

05-09-14

1630

CLAVO PARA MADERA C/C DE 3"

82

06-09-14

1631

CLAVO PARA MADERA C/C DE 3"

80

08-09-14

1632

CLAVO PARA MADERA C/C DE 3"

79

13-09-14

1638

CLAVO PARA MADERA C/C DE 3"

78

16-09-14

1640

CLAVO PARA MADERA C/C DE 3"

76

18-09-14

1643

CLAVO PARA MADERA C/C DE 3"

73

19-09-14

1644

CLAVO PARA MADERA C/C DE 3"

71

20-09-14

1645

CLAVO PARA MADERA C/C DE 3"

70

25-09-14

1648

CLAVO PARA MADERA C/C DE 3"

69

26-09-14

1649

CLAVO PARA MADERA C/C DE 3"

68

01-10-14

53

CLAVO PARA MADERA C/C DE 3"

67

06-10-14

57

CLAVO PARA MADERA C/C DE 3"

66

09-10-14

59

CLAVO PARA MADERA C/C DE 3"

65

13-10-14

62

CLAVO PARA MADERA C/C DE 3"

64

14-10-14

63

CLAVO PARA MADERA C/C DE 3"

63

17-10-14

66

CLAVO PARA MADERA C/C DE 3"

62

18-10-14

67

CLAVO PARA MADERA C/C DE 3"

61

20-10-14

68

CLAVO PARA MADERA C/C DE 3"

60

23-10-14

71

CLAVO PARA MADERA C/C DE 3"

59

30-10-14

78

CLAVO PARA MADERA C/C DE 3"

58

31-10-14

79

CLAVO PARA MADERA C/C DE 3"

56

03-11-14

80

CLAVO PARA MADERA C/C DE 3"

53

04-11-14

81

CLAVO PARA MADERA C/C DE 3"

52

20-11-14

95

CLAVO PARA MADERA C/C DE 3"

50

21-11-14

96

CLAVO PARA MADERA C/C DE 3"

49

26-11-14

100

CLAVO PARA MADERA C/C DE 3"

47

02-12-14

1656

CLAVO PARA MADERA C/C DE 3"

45

04-12-14

1657

CLAVO PARA MADERA C/C DE 3"

41

09-12-14

1662

CLAVO PARA MADERA C/C DE 3"

37

10-12-14

1663

CLAVO PARA MADERA C/C DE 3"

34

11-12-14

1664

CLAVO PARA MADERA C/C DE 3"

32

15-12-14

1668

CLAVO PARA MADERA C/C DE 3"

30

70

30

TOTAL

22-07-14

4252

22-07-14

CLAVO DE 3" C/CH B/CH 10208


1602

CLAVO DE 3" C/CH B/CH 10208


TOTAL

22-07-14

4252

22-07-14

CLAVO DE CALAMINA C/CH B/CH 10208


1602

4253

23-07-14

CLAVO DE CALAMINA C/CH B/CH 10208

HOJA COLOR C/CH B/H 583785


1603

4257

HOJA COLOR C/CH B/H 583785

CINTA AISLANTE

1
1

TOTAL

06-08-14

TOTAL

23-07-14

100

1
1

06-08-14

1607

CINTA AISLANTE
TOTAL

23-07-14

4253

23-07-14

PAPEL FIESTA COLOR C/CH B/H 583786


1603

4253

23-07-14

PAPEL FIESTA COLOR C/CH B/H 583786

CINTA 2X55 C/CH B/H 583787


1603

4258

12

CINTA 2X55 C/CH B/H 583787

CLAVO PARA MADERA C/C 4"

12
12

12

TOTAL

07-08-14

12

TOTAL

23-07-14

1
1

50

50

04-09-14

1629 CLAVO PARA MADERA C/C 4"

49

05-09-14

1630 CLAVO PARA MADERA C/C 4"

48

06-09-14

1631 CLAVO PARA MADERA C/C 4"

46

08-09-14

1632 CLAVO PARA MADERA C/C 4"

45

12-09-14

1637 CLAVO PARA MADERA C/C 4"

43

13-09-14

1638 CLAVO PARA MADERA C/C 4"

42

16-09-14

1640 CLAVO PARA MADERA C/C 4"

40

18-09-14

1643 CLAVO PARA MADERA C/C 4"

37

20-09-14

1644 CLAVO PARA MADERA C/C 4"

36

26-09-14

1649 CLAVO PARA MADERA C/C 4"

35

01-10-14

53 CLAVO PARA MADERA C/C 4"

34

06-10-14

57 CLAVO PARA MADERA C/C 4"

33

09-10-14

59 CLAVO PARA MADERA C/C 4"

32

13-10-14

62 CLAVO PARA MADERA C/C 4"

31

14-10-14

63 CLAVO PARA MADERA C/C 4"

30

17-10-14

66 CLAVO PARA MADERA C/C 4"

29

18-10-14

67 CLAVO PARA MADERA C/C 4"

28

20-10-14

68 CLAVO PARA MADERA C/C 4"

27

21-10-14

69 CLAVO PARA MADERA C/C 4"

26

23-10-14

71 CLAVO PARA MADERA C/C 4"

25

24-10-14

73 CLAVO PARA MADERA C/C 4"

24

28-10-14

75 CLAVO PARA MADERA C/C 4"

23

30-10-14

78 CLAVO PARA MADERA C/C 4"

21

31-10-14

79 CLAVO PARA MADERA C/C 4"

20

03-11-14

80 CLAVO PARA MADERA C/C 4"

17

04-11-14

81 CLAVO PARA MADERA C/C 4"

16

15-11-14

91 CLAVO PARA MADERA C/C 4"

15

20-11-14

95 CLAVO PARA MADERA C/C 4"

13

21-11-14

96 CLAVO PARA MADERA C/C 4"

12

26-11-14

100 CLAVO PARA MADERA C/C 4"

10

02-12-14

1656 CLAVO PARA MADERA C/C 4"

04-12-14

1657 CLAVO PARA MADERA C/C 4"

09-12-14

1662 CLAVO PARA MADERA C/C 4"

10-12-14

1663 CLAVO PARA MADERA C/C 4"

15-12-14

1668 CLAVO PARA MADERA C/C 4"

50

TOTAL

21-07-14

4251

CLAVO PARA MADERA C/C 4" PRODAC

50

30

30

21-07-14

1601 CLAVO PARA MADERA C/C 4" PRODAC

26

22-07-14

1602 CLAVO PARA MADERA C/C 4" PRODAC

22

23-07-14

1603 CLAVO PARA MADERA C/C 4" PRODAC

19

02-08-14

1605 CLAVO PARA MADERA C/C 4" PRODAC

15

04-08-14

1606 CLAVO PARA MADERA C/C 4" PRODAC

12

11-08-14

1609 CLAVO PARA MADERA C/C 4" PRODAC

10

13-08-14

1611 CLAVO PARA MADERA C/C 4" PRODAC

25-08-14

1619 CLAVO PARA MADERA C/C 4" PRODAC

27-08-14

1621 CLAVO PARA MADERA C/C 4" PRODAC

28-08-14

1622 CLAVO PARA MADERA C/C 4" PRODAC

02-09-14

1625 CLAVO PARA MADERA C/C 4" PRODAC

04-09-14

1629 CLAVO PARA MADERA C/C 4" PRODAC

-1

31

TOTAL

07-08-14

4258

ALAMBRE NEGRO N8

30

170

170

11-08-14

1609

ALAMBRE NEGRO N8

169

25-08-14

1619

ALAMBRE NEGRO N8

166

28-08-14

1622

ALAMBRE NEGRO N8

164

01-09-14

1624

ALAMBRE NEGRO N8

162

02-09-14

1625

ALAMBRE NEGRO N8

161

03-09-14

1628

ALAMBRE NEGRO N8

159

04-09-14

1629

ALAMBRE NEGRO N8

157

05-09-14

1630

ALAMBRE NEGRO N8

155

06-09-14

1631

ALAMBRE NEGRO N8

153

09-09-14

1632

ALAMBRE NEGRO N8

151

10-09-14

1635

ALAMBRE NEGRO N8

148

11-09-14

1636

ALAMBRE NEGRO N8

145

12-09-14

1637

ALAMBRE NEGRO N8

141

13-09-14

1638

ALAMBRE NEGRO N8

138

16-09-14

1640

ALAMBRE NEGRO N8

135

18-09-14

1643

ALAMBRE NEGRO N8

132

19-09-14

1644

ALAMBRE NEGRO N8

130

20-09-14

1645

ALAMBRE NEGRO N8

129

25-09-14

1648

ALAMBRE NEGRO N8

128

26-09-14

1649

ALAMBRE NEGRO N8

126

01-10-14

53

ALAMBRE NEGRO N8

123

09-10-14

59

ALAMBRE NEGRO N8

121

14-10-14

63

ALAMBRE NEGRO N8

119

17-10-14

66

ALAMBRE NEGRO N8

117

23-10-14

67

ALAMBRE NEGRO N8

116

19-10-14

71

ALAMBRE NEGRO N8

115

24-10-14

73

ALAMBRE NEGRO N8

114

28-10-14

75

ALAMBRE NEGRO N8

111

29-10-14

76

ALAMBRE NEGRO N8

108

30-10-14

78

ALAMBRE NEGRO N8

105

03-11-14

80

ALAMBRE NEGRO N8

102

04-11-14

81

ALAMBRE NEGRO N8

100

05-11-14

83

ALAMBRE NEGRO N8

98

10-11-14

86

ALAMBRE NEGRO N8

97

25-11-14

99

ALAMBRE NEGRO N8

95

26-11-14

100

ALAMBRE NEGRO N8

94

03-12-14

1657

ALAMBRE NEGRO N8

91

04-12-14

1658

ALAMBRE NEGRO N8

89

09-12-14

1662

ALAMBRE NEGRO N8

87

10-12-14

1663

ALAMBRE NEGRO N8

85

11-12-14

1664

ALAMBRE NEGRO N8

81

12-12-14

1666

ALAMBRE NEGRO N8

79

15-12-14

1668

ALAMBRE NEGRO N8

77

93

77

TOTAL

10-10-14

4286

13-10-14

ALAMBRE NEGRO N16


62

ALAMBRE NEGRO N16


TOTAL

15-10-14
03-11-14

4289

ALAMBRE DE AMARRE PARA GAVIONES DE 2.2 MM


80

170

ALAMBRE DE AMARRE PARA GAVIONES DE 2.2 MM

5
5

20

20
3

17

04-11-14

81

ALAMBRE DE AMARRE PARA GAVIONES DE 2.2 MM

13

05-11-14

82

ALAMBRE DE AMARRE PARA GAVIONES DE 2.2 MM

10

08-11-14

85

ALAMBRE DE AMARRE PARA GAVIONES DE 2.2 MM

10-11-14

86

ALAMBRE DE AMARRE PARA GAVIONES DE 2.2 MM

12-11-14

88

ALAMBRE DE AMARRE PARA GAVIONES DE 2.2 MM

14-11-14

90

ALAMBRE DE AMARRE PARA GAVIONES DE 2.2 MM

15-11-14

91

ALAMBRE DE AMARRE PARA GAVIONES DE 2.2 MM

20

TOTAL

10-10-14

4286

FIERRO CORRUGADO DE 1/2"

20

22-11-14

97

FIERRO CORRUGADO DE 1/2"

28-11-14

1653

FIERRO CORRUGADO DE 1/2"

06-12-14

1661

FIERRO CORRUGADO DE 1/2"

09-12-14

1662

FIERRO CORRUGADO DE 1/2"

10-12-14

1663

FIERRO CORRUGADO DE 1/2"

12-12-14

1666

FIERRO CORRUGADO DE 1/2"

TOTAL

27-10-14

4294

27-10-14

CALAMINA DE 0.80X3.60X0.14 MM
74

20

CALAMINA DE 0.80X3.60X0.14 MM
TOTAL

25-08-14

1758

25-08-14

CACHIMBAS DE 6X6
3445

02-08-14

4257

CACHIMBAS DE 6X6

CLAVO PARA CALAMINA


1605

20

20
20

20

TOTAL

02-08-14

4
4

CLAVO PARA CALAMINA


TOTAL

1
1

12-08-14

4259

12-08-14

PLASTICO
1610

10

PLASTICO
TOTAL

06-09-14

4278

10-09-14

PLASTICO NACIONAL DE 2M A 4M
1635

4260

10

10

100

PLASTICO NACIONAL DE 2M A 4M
TOTAL

13-08-14

10

10

ROLLIZO DE EUCALIPTO 4"X5M

100

100
100

100

20

20

02-09-14

1625

ROLLIZO DE EUCALIPTO 4"X5M

16

03-10-14

55

ROLLIZO DE EUCALIPTO 4"X5M

16

20

TOTAL

14-08-14

4261

14-08-14

YESO DOBLE
1612

YESO DOBLE
TOTAL

10-10-14

4286

20

SOLDADURA

1
1

25

25

03-12-14

1657

SOLDADURA

23

04-12-14

1658

SOLDADURA

20

05-12-14

1660

SOLDADURA

17

06-12-14

1661

SOLDADURA

16

10-12-14

1663

SOLDADURA

13

11-12-14

1664

SOLDADURA

11

12-12-14

1666

SOLDADURA

13-12-14

1667

SOLDADURA

20

TOTAL

25

15-08-14

4262

15-08-14

FOLDER MANILA (INC. FASTENER)


1613

100

FOLDER MANILA (INC. FASTENER)

100
TOTAL

15-08-14

4262

15-08-14

CINTA MASKIN DE 1" X 40 YARS


1613

4262

15-08-14

CINTA MASKIN DE 1" X 40 YARS

CINTA DE EMBALAJE 2" X 110


1613

4262

15-08-14

CINTA DE EMBALAJE 2" X 111

GOMA EN BARRA 40 GR.


1613

4262

15-08-14

4262

15-08-14

4262

15-08-14

4262

CUADERNO A-4 200 HOJAS

PAPEL LUSTRE

2
2

3
3

8
8

6
6

TOTAL

15-08-14

CORRECTOR

CUADERNO A-4 200 HOJAS


1613

TOTAL

15-08-14

ARCHIVADORES LOMO GRUESO

CORRECTOR
1613

TOTAL

15-08-14

GOMA EN BARRA 40 GR.

ARCHIVADORES LOMO GRUESO


1613

TOTAL

15-08-14

100

TOTAL

15-08-14

100

TOTAL

15-08-14

100

3
3

15-08-14

1613

PAPEL LUSTRE
TOTAL

15-08-14

4262

15-08-14

MEMORIA USB DE 16 GB
1613

4262

15-08-14

MEMORIA USB DE 16 GB

LAPICEROS TINTA LIQUIDA (ROJO, AZUL,NEGRO)


1613

4262

15-08-14

LAPICEROS PUNTA FINA (ROJO, AZUL,NEGRO)


1613

4262

15-08-14

VINIFAN TAMAO OFICIO


1613

4262

15-08-14

4263

15-08-14

4263

12

12

RESALTADORES

CUADERNO A-4 100 HOJAS

1
1

1
1

6
6

TOTAL

15-08-14

12

LAPIZ PORTAMINAS LAYCONSA

RESALTADORES
1614

TOTAL

15-08-14

12

VINIFAN TAMAO OFICIO

LAPIZ PORTAMINAS LAYCONSA


1613

TOTAL

15-08-14

12

LAPICEROS PUNTA FINA (ROJO, AZUL,NEGRO)


TOTAL

15-08-14

LAPICEROS TINTA LIQUIDA (ROJO, AZUL,NEGRO)


TOTAL

15-08-14

TOTAL

15-08-14

3
3

15-08-14

1614

CUADERNO A-4 100 HOJAS


TOTAL

15-08-14

4263

15-08-14

CARTEL DE OBRA 4.20MX2.80M


1614

4263

15-08-14

CARTEL DE OBRA 4.20MX2.80M

PAPEL BOND A-4 DE 80 GR.


1614

4281

17-09-14

4295

28-10-14

PAPEL BOND A-4 DE 75 GR.

VINKARD (CONTROL VISIBLE DE ALMACEN)


75

1
1

5
5

10.00

TOTAL

28-10-14

PAPEL BOND A-4 DE 80 GR.

PAPEL BOND A-4 DE 75 GR.


1641

TOTAL

17-09-14

TOTAL

15-08-14

10.00

10.00

0.00

10.00

0.00

15

VINKARD (CONTROL VISIBLE DE ALMACEN)


TOTAL

10.00

15

15
15

15

22-08-14

4266

CEMENTO PORTLAND IP 42.50 KG.

150

150

02-09-14

4274

CEMENTO PORTLAND IP 42.50 KG.

248

398

14-10-14

4288

CEMENTO PORTLAND IP 42.50 KG.

42

440

23-08-14

1618

CEMENTO PORTLAND IP 42.50 KG.

19

421

26-08-14

1620

CEMENTO PORTLAND IP 42.50 KG.

36

385

27-08-14

1621

CEMENTO PORTLAND IP 42.50 KG.

26

359

28-08-14

1622

CEMENTO PORTLAND IP 42.50 KG.

11

348

29-08-14

1623

CEMENTO PORTLAND IP 42.50 KG.

16

332

01-09-14

1624

CEMENTO PORTLAND IP 42.50 KG.

327

02-09-14

1625

CEMENTO PORTLAND IP 42.50 KG.

19

308

03-09-14

1628

CEMENTO PORTLAND IP 42.50 KG.

19

289

04-09-14

1629

CEMENTO PORTLAND IP 42.50 KG.

18

271

05-09-14

1630

CEMENTO PORTLAND IP 42.50 KG.

10

261

06-09-14

1631

CEMENTO PORTLAND IP 42.50 KG.

258

08-09-14

1632

CEMENTO PORTLAND IP 42.50 KG.

250

09-09-14

1634

CEMENTO PORTLAND IP 42.50 KG.

248

10-09-14

1635

CEMENTO PORTLAND IP 42.50 KG.

247

11-09-14

1636

CEMENTO PORTLAND IP 42.50 KG.

245

12-09-14

1637

CEMENTO PORTLAND IP 42.50 KG.

20

225

15-09-14

1639

CEMENTO PORTLAND IP 42.50 KG.

36

189

17-09-14

1641

CEMENTO PORTLAND IP 42.50 KG.

27

162

19-09-14

1644

CEMENTO PORTLAND IP 42.50 KG.

10

152

20-09-14

1645

CEMENTO PORTLAND IP 42.50 KG.

151

22-09-14

1646

CEMENTO PORTLAND IP 42.50 KG.

150

23-09-14

1647

CEMENTO PORTLAND IP 42.50 KG.

149

25-09-14

1648

CEMENTO PORTLAND IP 42.50 KG.

148

26-09-14

1649

CEMENTO PORTLAND IP 42.50 KG.

147

29-09-14

51

CEMENTO PORTLAND IP 42.50 KG.

14

133

30-09-14

52

CEMENTO PORTLAND IP 42.50 KG.

21

112

02-10-14

54

CEMENTO PORTLAND IP 42.50 KG.

111

03-10-14

55

CEMENTO PORTLAND IP 42.50 KG.

110

04-10-14

56

CEMENTO PORTLAND IP 42.50 KG.

109

06-10-14

57

CEMENTO PORTLAND IP 42.50 KG.

17

92

07-10-14

58

CEMENTO PORTLAND IP 42.50 KG.

24

68

15-10-14

64

CEMENTO PORTLAND IP 42.50 KG.

67

17-10-14

66

CEMENTO PORTLAND IP 42.50 KG.

15

52

18-10-14

67

CEMENTO PORTLAND IP 42.50 KG.

20

32

20-10-14

68

CEMENTO PORTLAND IP 42.50 KG.

23

21-10-14

69

CEMENTO PORTLAND IP 42.50 KG.

22-10-14

70

CEMENTO PORTLAND IP 42.50 KG.

24-10-14

73

CEMENTO PORTLAND IP 42.50 KG.

27-10-14

74

CEMENTO PORTLAND IP 42.50 KG.

29-10-14

76

CEMENTO PORTLAND IP 42.50 KG.

440

0.00

TOTAL

440

14-10-14

4288

CEMENTO PORTLAND IP 42.50 KG.

158

158

17-11-14

53

CEMENTO PORTLAND IP 42.50 KG.

142

300

15-12-14

62

CEMENTO PORTLAND IP 42.50 KG.

10

310

29-10-14

76

CEMENTO PORTLAND IP 42.50 KG.

307

31-10-14

79

CEMENTO PORTLAND IP 42.50 KG.

22

285

03-11-14

80

CEMENTO PORTLAND IP 42.50 KG.

10

275

10-11-14

86

CEMENTO PORTLAND IP 42.50 KG.

274

11-11-14

88

CEMENTO PORTLAND IP 42.50 KG.

273

22-11-14

98

CEMENTO PORTLAND IP 42.50 KG.

26

247

25-11-14

99

CEMENTO PORTLAND IP 42.50 KG.

11

236

26-11-14

100

CEMENTO PORTLAND IP 42.50 KG.

16

220

27-11-14

1652

CEMENTO PORTLAND IP 42.50 KG.

17

203

28-11-14

1653

CEMENTO PORTLAND IP 42.50 KG.

194

29-11-14

1654

CEMENTO PORTLAND IP 42.50 KG.

11

183

01-12-14

1655

CEMENTO PORTLAND IP 42.50 KG.

181

CEMENTO PORTLAND IP 42.50 KG.

35

146

02-12-14
03-12-14

1657

CEMENTO PORTLAND IP 42.50 KG.

139

04-12-14

1658

CEMENTO PORTLAND IP 42.50 KG.

133

05-12-14

1660

CEMENTO PORTLAND IP 42.50 KG.

17

116

06-12-14

1661

CEMENTO PORTLAND IP 42.50 KG.

108

09-12-14

1662

CEMENTO PORTLAND IP 42.50 KG.

14

94

10-12-14

1663

CEMENTO PORTLAND IP 42.50 KG.

10

84

11-12-14

1664

CEMENTO PORTLAND IP 42.50 KG.

20

64

12-12-14

1666

CEMENTO PORTLAND IP 42.50 KG.

62

13-12-14

1667

CEMENTO PORTLAND IP 42.50 KG.

10

52

15-12-14

1668

CEMENTO PORTLAND IP 42.50 KG.

48

16-12-14

1669

CEMENTO PORTLAND IP 42.50 KG.

10

38

17-12-14

1674

CEMENTO PORTLAND IP 42.50 KG.

17

21

17-12-14

1674

CEMENTO PORTLAND IP 42.50 KG. TRANSFERENCIA

10

11

299

11

TOTAL

290

21-08-14

4265

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

45

45.00

22-08-14

4266

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

45

90.00

23-08-14
23-08-14

1618
4267

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)


PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.40
29

84.60
113.60

26-08-14

1620

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

10.15

103.45

27-08-14

1621

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.20

98.25

28-08-14

4270

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

58

156.25

28-08-14

1622

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

4.15

152.10

29-08-14

1623

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

4.15

147.95

01-09-14

1624

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

1.60

146.35

02-09-14

1627

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

6.55

139.80

03-09-14

1628

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.70

134.10

04-09-14

1629

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

9.00

125.10

05-09-14

1630

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

3.80

121.30

06-09-14

1631

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

1.30

120.00

08-09-14

1633

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

3.00

117.00

12-09-14

1637

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

6.30

110.70

07-10-14

4285

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

30

140.70

10-10-14

4286

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

15

155.70

14-10-14

4288

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

15

170.70

15-10-14

4289

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

15

185.70

16-10-14

4290

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

15

200.70

21-10-14

4292

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

15

215.70

24-10-14

4293

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

18

233.70

15-09-14

1639

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

13.23

220.47

17-09-14

1642

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

16.30

204.17

19-09-14

1644

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

3.95

200.22

29-09-14

51

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

4.20

196.02

30-09-14

52

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

7.35

188.67

01-10-14

53

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.00

183.67

04-10-14

56

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.00

178.67

06-10-14

57

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

4.70

173.97

07-10-14

3446

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

10.00

163.97

09-10-14

59

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

2.50

161.47

10-10-14

60

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

2.50

158.97

13-10-14

62

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.00

153.97

15-10-14

64

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

10.00

143.97

17-10-14

66

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

4.70

139.27

18-10-14

67

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

4.90

134.37

20-10-14

68

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

10.25

124.12

22-10-14

69

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.00

119.12

23-10-14

71

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.00

114.12

24-10-14

73

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

0.70

113.42

27-10-14

74

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.25

108.17

29-10-14

76

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

10.40

97.77

30-10-14

78

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.40

92.37

31-10-14

79

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

12.85

79.52

03-11-14

80

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

4.40

75.12

04-11-14

81

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

2.50

72.62

05-11-14

82

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

2.50

70.12

06-11-14

83

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

10.00

60.12

08-11-14

85

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

2.50

57.62

10-11-14

86

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

7.50

50.12

12-11-14

88

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.00

45.12

15-11-14

91

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

6.25

38.87

18-11-14

93

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

3.75

35.12

19-11-14

94

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

3.75

31.37

20-11-14

95

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

2.75

28.62

24-11-14

98

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

3.40

25.22

26-11-14

1651

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.25

19.97

28-11-14

1653

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

6.55

13.42

01-12-14

1655

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

7.80

5.62

02-12-14

1656

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.30

0.32

03-12-14

1657

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

1.52

-1.20

301.20

-1.20

TOTAL

300

15-10-14

4289

PIEDRA CHANCADA DE 1/2" A 3/4"

19.5

19.50

21-10-14

4292

PIEDRA CHANCADA DE 1/2" A 3/4"

16.5

36.00

06-10-14

57

PIEDRA CHANCADA DE 1/2" A 3/4"

0.88

35.12

07-10-14

3446

PIEDRA CHANCADA DE 1/2" A 3/4"

1.89

33.23

17-10-14

66

PIEDRA CHANCADA DE 1/2" A 3/4"

0.88

32.35

18-10-14

67

PIEDRA CHANCADA DE 1/2" A 3/4"

1.85

30.50

20-10-14

68

PIEDRA CHANCADA DE 1/2" A 3/4"

2.50

28.00

24-10-14

73

PIEDRA CHANCADA DE 1/2" A 3/4"

0.25

27.75

27-10-14

74

PIEDRA CHANCADA DE 1/2" A 3/4"

3.00

24.75

29-10-14

76

PIEDRA CHANCADA DE 1/2" A 3/4"

1.60

23.15

31-10-14

79

PIEDRA CHANCADA DE 1/2" A 3/4"

2.12

21.03

03-11-14

80

PIEDRA CHANCADA DE 1/2" A 3/4"

0.84

20.19

05-11-14

83

PIEDRA CHANCADA DE 1/2" A 3/4"

2.60

17.59

24-11-14

98

PIEDRA CHANCADA DE 1/2" A 3/4"

3.30

14.29

25-11-14

99

PIEDRA CHANCADA DE 1/2" A 3/4"

0.62

13.67

26-11-14

1651

PIEDRA CHANCADA DE 1/2" A 3/4"

2.30

11.37

27-11-14

1652

PIEDRA CHANCADA DE 1/2" A 3/4"

3.60

7.77

28-11-14

1653

PIEDRA CHANCADA DE 1/2" A 3/4"

0.80

6.97

29-11-14

1654

PIEDRA CHANCADA DE 1/2" A 3/4"

1.12

5.85

01-12-14

1655

PIEDRA CHANCADA DE 1/2" A 3/4"

0.15

5.70

02-12-14

1656

PIEDRA CHANCADA DE 1/2" A 3/4"

2.80

2.90

03-12-14

1657

PIEDRA CHANCADA DE 1/2" A 3/4"

0.80

2.10

04-12-14

1659

PIEDRA CHANCADA DE 1/2" A 3/4"

0.40

1.70

05-12-14

1660

PIEDRA CHANCADA DE 1/2" A 3/4"

0.60

1.10

06-12-14

1661

PIEDRA CHANCADA DE 1/2" A 3/4"

0.40

0.70

09-12-14

1662

PIEDRA CHANCADA DE 1/2" A 3/4"

0.70

0.00

36

0.00

TOTAL

02-09-14

4274

ARENA FINA DE CUNYAC

36

09-09-14

1634

ARENA FINA DE CUNYAC

0.20

7.80

10-09-14

1635

ARENA FINA DE CUNYAC

0.10

7.70

11-09-14

1636

ARENA FINA DE CUNYAC

0.20

7.50

20-09-14

1645

ARENA FINA DE CUNYAC

0.50

7.00

02-10-14

54

ARENA FINA DE CUNYAC

0.20

6.80

03-10-14

55

ARENA FINA DE CUNYAC

0.20

6.60

04-10-14

56

ARENA FINA DE CUNYAC

0.20

6.40

21-10-14

69

ARENA FINA DE CUNYAC

0.10

6.30

22-10-14

70

ARENA FINA DE CUNYAC

0.10

6.20

27-10-14

74

ARENA FINA DE CUNYAC

0.50

5.70

10-11-14

86

ARENA FINA DE CUNYAC

0.20

5.50

12-11-14

88

ARENA FINA DE CUNYAC

0.20

5.30

24-11-14

98

ARENA FINA DE CUNYAC

0.10

5.20

25-11-14

99

ARENA FINA DE CUNYAC

0.20

5.00

26-11-14

1651

ARENA FINA DE CUNYAC

0.20

4.80

02-12-14

1656

ARENA FINA DE CUNYAC

0.90

3.90

03-12-14

1657

ARENA FINA DE CUNYAC

0.30

3.60

05-12-14

1660

ARENA FINA DE CUNYAC

0.30

3.30

06-12-14

1661

ARENA FINA DE CUNYAC

0.30

3.00

09-12-14

1662

ARENA FINA DE CUNYAC

0.70

2.30

10-12-14

1663

ARENA FINA DE CUNYAC

0.30

2.00

11-12-14

1665

ARENA FINA DE CUNYAC

0.40

1.60

12-12-14

1666

ARENA FINA DE CUNYAC

0.35

1.25

13-12-14

1667

ARENA FINA DE CUNYAC

0.35

0.90

15-12-14

1668

ARENA FINA DE CUNYAC

0.35

0.55

17-12-14

1674

ARENA FINA DE CUNYAC

0.65

-0.10

8.10

0.10

TOTAL

22-08-14

ARENA GRUESA FINEADA DE MINA

4266

39.5

39.50

23-08-14

1618

ARENA GRUESA FINEADA DE MINA

1.95

37.55

26-08-14

1620

ARENA GRUESA FINEADA DE MINA

3.15

34.40

27-08-14

1621

ARENA GRUESA FINEADA DE MINA

1.35

33.05

28-08-14

1622

ARENA GRUESA FINEADA DE MINA

0.91

32.14

29-08-14

1623

ARENA GRUESA FINEADA DE MINA

1.30

30.84

01-09-14

1624

ARENA GRUESA FINEADA DE MINA

0.45

30.39

02-09-14

1627

ARENA GRUESA FINEADA DE MINA

1.85

28.54

03-09-14

1628

ARENA GRUESA FINEADA DE MINA

2.00

26.54

04-09-14

1629

ARENA GRUESA FINEADA DE MINA

2.55

23.99

05-09-14

1630

ARENA GRUESA FINEADA DE MINA

1.08

22.91

06-09-14

1631

ARENA GRUESA FINEADA DE MINA

0.36

22.55

08-09-14

1633

ARENA GRUESA FINEADA DE MINA

0.88

21.67

12-09-14

1637

ARENA GRUESA FINEADA DE MINA

2.30

19.37

15-09-14

1639

ARENA GRUESA FINEADA DE MINA

3.78

15.59

17-09-14

1642

ARENA GRUESA FINEADA DE MINA

4.66

10.93

19-09-14

1644

ARENA GRUESA FINEADA DE MINA

1.15

9.78

29-09-14

51

ARENA GRUESA FINEADA DE MINA

1.50

8.28

30-09-14

52

ARENA GRUESA FINEADA DE MINA

2.10

6.18

06-10-14

57

ARENA GRUESA FINEADA DE MINA

1.77

4.41

07-10-14

3446

ARENA GRUESA FINEADA DE MINA

2.94

1.47

17-10-14

66

ARENA GRUESA FINEADA DE MINA

1.47

0.00

39.5

0.00

TOTAL

39.5

17-10-14

4291

ARENA GRUESA FINEADA DE MINA

19.5

19.50

21-10-14

4292

ARENA GRUESA FINEADA DE MINA

10.5

30.00

18-10-14

67

ARENA GRUESA FINEADA DE MINA

2.50

27.50

20-10-14

68

ARENA GRUESA FINEADA DE MINA

3.20

24.30

24-10-14

73

ARENA GRUESA FINEADA DE MINA

0.25

24.05

29-10-14

76

ARENA GRUESA FINEADA DE MINA

1.90

22.15

31-10-14

79

ARENA GRUESA FINEADA DE MINA

2.40

19.75

03-11-14

80

ARENA GRUESA FINEADA DE MINA

1.26

18.49

24-11-14

98

ARENA GRUESA FINEADA DE MINA

4.40

14.09

25-11-14

99

ARENA GRUESA FINEADA DE MINA

0.83

13.26

26-11-14

1651

ARENA GRUESA FINEADA DE MINA

2.90

10.36

27-11-14

1652

ARENA GRUESA FINEADA DE MINA

1.95

8.41

28-11-14

1653

ARENA GRUESA FINEADA DE MINA

1.07

7.34

29-11-14

1654

ARENA GRUESA FINEADA DE MINA

1.60

5.74

01-12-14

1655

ARENA GRUESA FINEADA DE MINA

0.20

5.54

02-12-14

1656

ARENA GRUESA FINEADA DE MINA

3.40

2.14

03-12-14

1657

ARENA GRUESA FINEADA DE MINA

1.00

1.14

04-12-14

1658

ARENA GRUESA FINEADA DE MINA

0.60

0.54

05-12-14

1660

ARENA GRUESA FINEADA DE MINA

0.54

0.00

30.0

0.00

TOTAL

14-11-14

52

ARENA GRUESA FINEADA DE MINA

30.0

05-12-14

1660

ARENA GRUESA FINEADA DE MINA

0.80

2.20

06-12-14

1661

ARENA GRUESA FINEADA DE MINA

0.60

1.60

09-12-14

1662

ARENA GRUESA FINEADA DE MINA

1.60

0.00

TOTAL

14-11-14

52

ARENA GRUESA FINEADA DE MINA

8.00

10-12-14

1663

ARENA GRUESA FINEADA DE MINA

1.50

6.50

11-12-14

1665

ARENA GRUESA FINEADA DE MINA

1.90

4.60

13-12-14

1667

ARENA GRUESA FINEADA DE MINA

1.00

3.60

15-12-14

1668

ARENA GRUESA FINEADA DE MINA

0.20

3.40

16-12-14

1669

ARENA GRUESA FINEADA DE MINA

0.95

2.45

17-12-14

1674

ARENA GRUESA FINEADA DE MINA

2.45

0.00

0.00

TOTAL

04-10-14

4283

02-10-14

LASTRE PREPARADO EN LA CANTERA SENCCA


54

36

LASTRE PREPARADO EN LA CANTERA SENCCA

36.00
18.00

18.00

06-10-14

4284

LASTRE PREPARADO EN LA CANTERA SENCCA

36

54.00

07-10-14

4285

LASTRE PREPARADO EN LA CANTERA SENCCA

36

90.00

13-10-14

4287

LASTRE PREPARADO EN LA CANTERA SENCCA

36

126.00

15-10-14

4289

LASTRE PREPARADO EN LA CANTERA SENCCA

36

162.00

16-10-14

4290

LASTRE PREPARADO EN LA CANTERA SENCCA

36

198.00

17-10-14

4291

LASTRE PREPARADO EN LA CANTERA SENCCA

36

234.00

21-10-14

4292

LASTRE PREPARADO EN LA CANTERA SENCCA

36

270.00

24-10-14

4293

LASTRE PREPARADO EN LA CANTERA SENCCA

12

282.00

03-10-14

55

LASTRE PREPARADO EN LA CANTERA SENCCA

18.00

264.00

06-10-14

57

LASTRE PREPARADO EN LA CANTERA SENCCA

15.00

249.00

07-10-14

3446

LASTRE PREPARADO EN LA CANTERA SENCCA

10.00

239.00

09-10-14

59

LASTRE PREPARADO EN LA CANTERA SENCCA

5.00

234.00

10-10-14

60

LASTRE PREPARADO EN LA CANTERA SENCCA

7.00

227.00

11-10-14

61

LASTRE PREPARADO EN LA CANTERA SENCCA

10.00

217.00

13-10-14

62

LASTRE PREPARADO EN LA CANTERA SENCCA

10.00

207.00

14-10-14

63

LASTRE PREPARADO EN LA CANTERA SENCCA

11.00

196.00

15-10-14

64

LASTRE PREPARADO EN LA CANTERA SENCCA

10.00

186.00

16-10-14

65

LASTRE PREPARADO EN LA CANTERA SENCCA

30.00

156.00

17-10-14

66

LASTRE PREPARADO EN LA CANTERA SENCCA

28.00

128.00

21-10-14

69

LASTRE PREPARADO EN LA CANTERA SENCCA

16.00

112.00

22-10-14

70

LASTRE PREPARADO EN LA CANTERA SENCCA

10.00

102.00

23-10-14

71

LASTRE PREPARADO EN LA CANTERA SENCCA

7.50

94.50

24-10-14

73

LASTRE PREPARADO EN LA CANTERA SENCCA

8.00

86.50

27-10-14

74

LASTRE PREPARADO EN LA CANTERA SENCCA

8.00

78.50

28-10-14

75

LASTRE PREPARADO EN LA CANTERA SENCCA

20.00

58.50

29-10-14

76

LASTRE PREPARADO EN LA CANTERA SENCCA

15.00

43.50

30-10-14

78

LASTRE PREPARADO EN LA CANTERA SENCCA

10.00

33.50

31-10-14

79

LASTRE PREPARADO EN LA CANTERA SENCCA

4.00

29.50

07-11-14

84

LASTRE PREPARADO EN LA CANTERA SENCCA

10.00

19.50

12-11-14

88

LASTRE PREPARADO EN LA CANTERA SENCCA

5.00

14.50

13-11-14

89

LASTRE PREPARADO EN LA CANTERA SENCCA

5.00

9.50

19-11-14

94

LASTRE PREPARADO EN LA CANTERA SENCCA

9.50

0.00

300

0.00

TOTAL

10-10-14

4286

ASFALTO RC-250

300

20.00

20.00

03-11-14

80

ASFALTO RC-250

2.00

18.00

04-11-14

82

ASFALTO RC-250

1.00

17.00

17-12-14

1674

ASFALTO RC-250

4.00
TOTAL

21-08-14

4265

GEOTEXTIL HO TEJIDO DE 200 GR/M2

20.00

13.00

7.00

215.00

215.00

02-10-14

54

GEOTEXTIL HO TEJIDO DE 200 GR/M2

8.00

207.00

04-10-14

56

GEOTEXTIL HO TEJIDO DE 200 GR/M2

14.40

192.60

16-10-14

65

GEOTEXTIL HO TEJIDO DE 200 GR/M2

36.00

156.60

21-10-14

69

GEOTEXTIL HO TEJIDO DE 200 GR/M2

8.00

148.60

27-10-14

74

GEOTEXTIL HO TEJIDO DE 200 GR/M2

11.00

137.60

28-10-14

75

GEOTEXTIL HO TEJIDO DE 200 GR/M2

28.00

109.60

03-11-14

80

GEOTEXTIL HO TEJIDO DE 200 GR/M2

8.00

101.60

05-11-14

82

GEOTEXTIL HO TEJIDO DE 200 GR/M2

12.00

89.60

06-11-14

83

GEOTEXTIL HO TEJIDO DE 200 GR/M2

19.60

70.00

07-11-14

84

GEOTEXTIL HO TEJIDO DE 200 GR/M2

3.60

66.40

10-11-14

86

GEOTEXTIL HO TEJIDO DE 200 GR/M2

12.80

53.60

18-11-14

93

GEOTEXTIL HO TEJIDO DE 200 GR/M2

12.80

40.80

20-11-14

95

GEOTEXTIL HO TEJIDO DE 200 GR/M3

20.70

20.10

22-11-14

97

GEOTEXTIL HO TEJIDO DE 200 GR/M4

20.10

0.00

215.00

0.00

TOTAL

21-08-14

4265

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

215.00

210.00

210.00

01-10-14

53

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

17.00

193.00

09-10-14

59

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

18.00

175.00

13-10-14

62

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

18.00

157.00

21-10-14

69

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

16.00

141.00

22-10-14

70

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

16.00

125.00

23-10-14

71

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

16.00

109.00

27-10-14

74

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

16.80

92.20

06-11-14

83

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

36.00

56.20

11-11-14

87

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

18.00

38.20

12-11-14

88

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

18.00

20.20

19-11-14

94

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

20.20

0.00

210.00

0.00

TOTAL

26-08-14

4268

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

210.00

35.00

35.00

01-10-14

53

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

2.00

33.00

09-10-14

59

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

32.00

16-10-14

63

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

31.00

14-10-14

65

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

3.00

28.00

21-10-14

69

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

4.00

24.00

22-10-14

70

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

3.00

21.00

28-10-14

75

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

3.00

18.00

29-10-14

75

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

17.00

03-11-14

80

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

3.00

14.00

04-11-14

81

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

13.00

05-11-14

82

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

2.00

11.00

06-11-14

84

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

10.00

08-11-14

85

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

2.00

8.00

11-11-14

87

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

7.00

12-11-14

88

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

2.00

5.00

13-11-14

89

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

4.00

1.00

34.00

1.00

TOTAL

08-09-14

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

4279

35.00

30.00

30.00

03-10-14

55

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

2.00

28.00

09-10-14

59

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

4.00

24.00

20-10-14

68

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

2.00

22.00

28-10-14

75

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

2.00

20.00

04-11-14

81

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

2.00

18.00

05-11-14

82

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

17.00

06-11-14

83

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

16.00

15-11-14

85

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

15.00

18-11-14

91

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

14.00

18-11-14

93

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

13.00

17.00

13.00

29-08-14

4271

TOTAL

30.00

GEOCOMPUESTO DE DRENAJE FLEXIBLE TIPO 2L

280.00

280.00

17-09-14

1641

GEOCOMPUESTO DE DRENAJE FLEXIBLE TIPO 2L

60.00

220.00

03-10-14

55

GEOCOMPUESTO DE DRENAJE FLEXIBLE TIPO 2L

60.00

160.00

13-10-14

62

GEOCOMPUESTO DE DRENAJE FLEXIBLE TIPO 2L

100.00

60.00

220.00

60.00

TOTAL

02-09-14

4272

02-09-14

RROLLOS DE MATERIAL PARCHE CALIENTE - EQUIPO MECANICO


1626

4272

02-09-14

8T-9572 CATERPILLAR TRANS. TO4 SAG 30X19


1626

4272

02-09-14

1R - 0722 CATERPILLAR FILTRO HIDRAULICO


1626

02-09-14

4272

VOE 21380488 VOLVO FILTRO COMBUSTIBLE PARA SEPARADOR DE AGUA


1626

2.00

2.00

0.00

2.00

0.00

2.00
2.00

0.00

2.00

0.00

1.00

1.00

1.00
1.00

0.00

1.00

0.00

1.00

VOE 21380488 VOLVO FILTRO COMBUSTIBLE PARA SEPARADOR DE AGUA


TOTAL

2.00

2.00

1R - 0722 CATERPILLAR FILTRO HIDRAULICO


TOTAL

02-09-14

2.00

8T-9572 CATERPILLAR TRANS. TO4 SAG 30X20


TOTAL

02-09-14

2.00

RROLLOS DE MATERIAL PARCHE CALIENTE - EQUIPO MECANICO


TOTAL

02-09-14

280.00

1.00

1.00
1.00

0.00

1.00

0.00

02-09-14

4272

02-09-14

02-09-14

VOE 85102464 VOLVO DIESELGHOIHE OIL VAS 3 SAE 15W-40X20 LTS.


1626

4272

02-09-14

1626

VOE 85102464 VOLVO DIESELGHOIHE OIL VAS 3 SAE 15W-40X20 LTS.


TOTAL

1.00

TAPA DE TANQUE ORIGINAL - EQUIPO MECANICO

1.00

TAPA DE TANQUE ORIGINAL - EQUIPO MECANICO


TOTAL

02-09-14

4272

02-09-14

MANGUERA DE AGUA EQUIPO MECANICO


1626

4281

17-09-14

MANGUERA REFORZADA DE 3/4"


1641

4286

11-10-14

4272

02-09-14

GOMA COJIN
1626

02-09-14

4272

1.00

1.00

0.00

1.00

8.00

1.00

1.00
1.00

0.00

1.00

0.00

1.00
1.00

0.00

1.00

0.00

8.00
8.00

0.00

8.00

0.00

1.00
1.00

0.00

1.00

0.00

1.00

LIQUIDO VIPAL BV-O3


TOTAL

1.00

0.00

1.00

8.00

GOMA COJIN

LIQUIDO VIPAL BV-O3


1626

1.00

1.00

TOTAL

02-09-14

0.00

1.00

LLANTA PARA BUGUI (COMPLETO TRUPER)


TOTAL

02-09-14

1.00

MANGUERA REFORZADA DE 3/4"

LLANTA PARA BUGUI (COMPLETO TRUPER)


61

1.00

1.00

TOTAL

10-10-14

1.00

1.00

MANGUERA DE AGUA EQUIPO MECANICO


TOTAL

17-09-14

1.00

1.00
1.00

0.00

1.00

0.00

02-09-14

4272

02-09-04

VIPAL N # 10PARCHES PARA LLANTAS


1626

2.00

VIPAL N # 10PARCHES PARA LLANTAS


TOTAL

02-09-14

4272

02-09-14

TARRAJA
1626

4273

02-09-14

TARRAJA

VIPAL UD-05
1626

4266

1.00

VIPAL UD-05

GASOLINA DE 84 OCT.

0.00

2.00

0.00

1.00
1.00

0.00

1.00

0.00

1.00

TOTAL

22-08-14

2.00

1.00

TOTAL

02-09-14

2.00

2.00

1.00

1.00
1.00

0.00

1.00

0.00

5.00

5.00

23-08-14

1618

GASOLINA DE 84 OCT.

3.00

2.00

26-08-14

1620

GASOLINA DE 84 OCT.

1.00

1.00

29-08-14

1623

GASOLINA DE 84 OCT.

1.00

0.00

02-09-14

4274

GASOLINA DE 84 OCT.

2.00

2.00

02-09-14

1625

GASOLINA DE 84 OCT.

1.00

1.00

04-09-14

1629

GASOLINA DE 84 OCT.

1.00

0.00

05-09-14

4277

GASOLINA DE 84 OCT.

5.00

5.00

05-09-14

1630

GASOLINA DE 84 OCT.

1.00

4.00

08-09-14

1632

GASOLINA DE 84 OCT.

1.00

3.00

12-09-14

1637

GASOLINA DE 84 OCT.

2.00

1.00

15-09-14

1639

GASOLINA DE 84 OCT.

1.00

0.00

17-09-14

4281

GASOLINA DE 84 OCT.

38.00

38.00

17-09-14

1641

GASOLINA DE 84 OCT.

2.00

36.00

19-09-14

1644

GASOLINA DE 84 OCT.

1.00

35.00

06-10-14

57

GASOLINA DE 84 OCT.

1.00

34.00

07-10-14

58

GASOLINA DE 84 OCT.

1.00

33.00

18-10-14

67

GASOLINA DE 84 OCT.

1.00

32.00

20-10-14

68

GASOLINA DE 84 OCT.

1.00

31.00

24-10-14

73

GASOLINA DE 84 OCT.

1.00

30.00

31-10-14

79

GASOLINA DE 84 OCT.

1.00

29.00

03-11-14

80

GASOLINA DE 84 OCT.

2.00

27.00

24-11-14

98

GASOLINA DE 84 OCT.

2.00

25.00

25-11-14

99

GASOLINA DE 84 OCT.

2.00

23.00

26-11-14

100

GASOLINA DE 84 OCT.

2.00

21.00

27-11-14

1652

GASOLINA DE 84 OCT.

1.00

20.00

28-11-14

1653

GASOLINA DE 84 OCT.

1.00

19.00

29-11-14

1654

GASOLINA DE 84 OCT.

2.00

17.00

01-12-14

1655

GASOLINA DE 84 OCT.

1.00

16.00

02-12-14

1656

GASOLINA DE 84 OCT.

2.00

14.00

05-12-14

1660

GASOLINA DE 84 OCT.

3.00

11.00

09-12-14

1662

GASOLINA DE 84 OCT.

1.00

10.00

10-12-14

1663

GASOLINA DE 84 OCT.

2.00

8.00

13-12-14

1667

GASOLINA DE 84 OCT.

2.00

6.00

17-12-14

1674

GASOLINA DE 84 OCT.

1.00

5.00

18-12-14

1673

GASOLINA DE 84 OCT.

7.00

-2.00

TOTAL

17-09-14

4281

GASOLINA DE 90 OCT.

50.00

52.00

50.00

50.00

17-09-14

1641

GASOLINA DE 90 OCT.

1.00

49.00

18-09-14

1643

GASOLINA DE 90 OCT.

1.00

48.00

19-09-14

1644

GASOLINA DE 90 OCT.

1.00

47.00

20-09-14

1646

GASOLINA DE 90 OCT.

1.00

46.00

21-09-14

1647

GASOLINA DE 90 OCT.

1.00

45.00

03-10-14

55

GASOLINA DE 90 OCT.

1.00

44.00

06-10-14

57

GASOLINA DE 90 OCT.

1.00

43.00

07-10-14

58

GASOLINA DE 90 OCT.

1.00

42.00

09-10-14

59

GASOLINA DE 90 OCT.

1.00

41.00

10-10-14

60

GASOLINA DE 90 OCT.

2.00

39.00

11-10-14

61

GASOLINA DE 90 OCT.

1.00

38.00

13-10-14

62

GASOLINA DE 90 OCT.

1.00

37.00

15-10-14

64

GASOLINA DE 90 OCT.

2.00

35.00

16-10-14

65

GASOLINA DE 90 OCT.

2.00

33.00

17-10-14

66

GASOLINA DE 90 OCT.

2.00

31.00

20-10-14

68

GASOLINA DE 90 OCT.

1.00

30.00

21-10-14

69

GASOLINA DE 90 OCT.

2.00

28.00

27-10-14

74

GASOLINA DE 90 OCT.

1.00

27.00

31-10-14

79

GASOLINA DE 90 OCT.

1.00

26.00

07-11-14

84

GASOLINA DE 90 OCT.

1.00

25.00

10-11-14

86

GASOLINA DE 90 OCT.

1.00

24.00

11-11-14

87

GASOLINA DE 90 OCT.

2.00

22.00

12-11-14

88

GASOLINA DE 90 OCT.

1.00

21.00

13-11-14

89

GASOLINA DE 90 OCT.

1.00

20.00

15-11-14

91

GASOLINA DE 90 OCT.

1.00

19.00

18-11-14

93

GASOLINA DE 90 OCT.

1.00

18.00

19-11-14

94

GASOLINA DE 90 OCT.

1.00

17.00

21-11-14

96

GASOLINA DE 90 OCT.

1.00

16.00

13-12-14

1667

GASOLINA DE 90 OCT.

3.00

13.00

TOTAL

50.00

37.00

21-07-14

4251

PETROLEO DIESEL D-2

10.00

10.00

16-08-14

4264

PETROLEO DIESEL D-2

130.00

140.00

21-07-14

1601

PETROLEO DIESEL D-2

10.00

130.00

15-08-14

1614

PETROLEO DIESEL D-2

10.00

120.00

20-08-14

1614

PETROLEO DIESEL D-2

3.00

117.00

22-08-14

1617

PETROLEO DIESEL D-2

52.00

65.00

23-08-14

1618

PETROLEO DIESEL D-2

2.00

63.00

25-08-14

1619

PETROLEO DIESEL D-2

2.00

61.00

26-08-14

1620

PETROLEO DIESEL D-2

2.00

59.00

28-08-14

1622

PETROLEO DIESEL D-2

1.00

58.00

02-09-14

1625

PETROLEO DIESEL D-2

7.00

51.00

03-09-14

1628

PETROLEO DIESEL D-2

1.00

50.00

04-09-14

1629

PETROLEO DIESEL D-2

2.00

48.00

05-09-14

1630

PETROLEO DIESEL D-2

2.00

46.00

06-09-14

1631

PETROLEO DIESEL D-2

1.00

45.00

08-09-14

1632

PETROLEO DIESEL D-2

1.00

44.00

10-09-14

1635

PETROLEO DIESEL D-2

1.00

43.00

13-09-14

1638

PETROLEO DIESEL D-2

1.00

42.00

16-09-14

1640

PETROLEO DIESEL D-2

2.00

40.00

17-09-14

1641

PETROLEO DIESEL D-2

5.00

35.00

03-10-14

55

PETROLEO DIESEL D-2

35.00

0.00

140.00

0.00

TOTAL

140.00

01-10-14

4283

PETROLEO D-2

50.00

50.00

24-10-14

4293

PETROLEO D-2

50.00

100.00

11-12-14

61

PETROLEO D-2

100.00

200.00

15-12-14

62

PETROLEO D-2

5.00

205.00

18-12-14

63

PETROLEO D-2

17.00

222.00

20-12-14

64

PETROLEO D-2

128.00

350.00

03-10-14

55

PETROLEO D-2

32.00

318.00

14-10-14

63

PETROLEO D-2

5.00

313.00

24-10-14

73

PETROLEO D-2

5.00

308.00

07-11-14

84

PETROLEO D-2

41.00

267.00

11-11-14

87

PETROLEO D-2

4.00

263.00

17-11-14

92

PETROLEO D-2

10.00

253.00

09-12-14

1662

PETROLEO D-2

1.00

252.00

10-12-14

1663

PETROLEO D-2

1.00

251.00

11-12-14

1664

PETROLEO D-2

65.00

186.00

12-12-14

1666

PETROLEO D-2

5.00

181.00

13-12-14

1667

PETROLEO D-2

31.00

150.00

15-12-14

1668

PETROLEO D-2

5.00

145.00

18-12-14

1673

PETROLEO

17.00

128.00

20-12-14

1672

PETROLEO D-3

25.00

103.00

TOTAL

04-09-14

4275

08-09-14

SOGA DRIZA DE 3/4"


1632

4275

08-09-14

SOGA DRIZA DE 3/4"

SOGA DRIZA DE 1/2"


1632

4276

08-09-14

SOGA DRIZA DE 1/2"

CORREAS A-72
1632

4278

10-09-14

17-09-14

4280

2.00

POLYTARP DE 40X201

TUBERIA DE HAPE ,CORRUGADO FLEXIBLE Y REFORZADO DE 4"


1641

0.00

50.00

0.00

50.00
50.00

0.00

50.00

0.00

2.00
2.00

0.00

2.00

0.00

50.00

TOTAL

16-09-14

50.00

CORREAS A-72

POLYTARP DE 40X200
1635

50.00

2.00

TOTAL

06-09-14

50.00

50.00

50.00

TOTAL

04-09-14

247.00

50.00

TOTAL

04-09-14

350.00

TUBERIA DE HAPE ,CORRUGADO FLEXIBLE Y REFORZADO DE 4"

50.00

50.00
50.00

0.00

50.00

0.00

3.00

3.00
3.00

0.00

30-09-14

4282

TUBERIA DE HAPE ,CORRUGADO FLEXIBLE Y REFORZADO DE 4"

8.00

8.00

01-10-14

54

TUBERIA DE HAPE ,CORRUGADO FLEXIBLE Y REFORZADO DE 4"

1.00

7.00

03-10-14

55

TUBERIA DE HAPE ,CORRUGADO FLEXIBLE Y REFORZADO DE 4"

2.00

5.00

18-10-14

67

TUBERIA DE HAPE ,CORRUGADO FLEXIBLE Y REFORZADO DE 4"

3.00

2.00

24-10-14

73

TUBERIA DE HAPE ,CORRUGADO FLEXIBLE Y REFORZADO DE 4"

1.00

1.00

05-11-14

82

TUBERIA DE HAPE ,CORRUGADO FLEXIBLE Y REFORZADO DE 4"

1.00

0.00

11.00

0.00

TOTAL

27-10-14

4294

TUBERIA PVC UF 160 MM SH-2 CON ANILLO HTP

11.00

7.00

7.00

20-11-14

95

TUBERIA PVC UF 160 MM SH-2 CON ANILLO HTP

3.00

4.00

22-11-14

97

TUBERIA PVC UF 160 MM SH-2 CON ANILLO HTP

2.00

2.00

24-11-14

98

TUBERIA PVC UF 160 MM SH-2 CON ANILLO HTP

1.00

1.00

25-11-14

99

TUBERIA PVC UF 160 MM SH-2 CON ANILLO HTP

1.00

0.00

7.00

0.00

TOTAL

27-10-14

4294

TUBERIA PVC SAL DE 4"(PESADO X 6 MTS.)

7.00

13.00

13.00

27-10-14

74

TUBERIA PVC SAL DE 4"(PESADO X 6 MTS.)

3.00

10.00

31-10-14

79

TUBERIA PVC SAL DE 4"(PESADO X 6 MTS.)

1.00

9.00

06-11-14

83

TUBERIA PVC SAL DE 4"(PESADO X 6 MTS.)

2.00

7.00

22-11-14

97

TUBERIA PVC SAL DE 4"(PESADO X 6 MTS.)

1.00

6.00

09-12-14

1662

TUBERIA PVC SAL DE 4"(PESADO X 6 MTS.)

1.00

5.00

10-12-14

1663

TUBERIA PVC SAL DE 4"(PESADO X 6 MTS.)

2.00

3.00

12-12-14

1666

TUBERIA PVC SAL DE 4"(PESADO X 6 MTS.)

1.00

2.00

13-12-14

1667

TUBERIA PVC SAL DE 4"(PESADO X 6 MTS.)

2.00

0.00

13.00

0.00

TOTAL

27-10-14

4294

TUBERIA PVC SAL HTP 150 4422 UF DE 75MM-C-10

13.00

8.00

8.00

22-11-14

97

TUBERIA PVC SAL HTP 150 4422 UF DE 75MM-C-11

3.00

5.00

24-11-14

98

TUBERIA PVC SAL HTP 150 4422 UF DE 75MM-C-12

2.00

3.00

26-11-14

100

TUBERIA PVC SAL HTP 150 4422 UF DE 75MM-C-13

2.00

1.00

16-12-14

1669

TUBERIA PVC SAL HTP 150 4422 UF DE 75MM-C-14

1.00

0.00

8.00

0.00

TOTAL

26-11-14

57

26-11-14

TUBO PVC SAP C-10 C/R 1"


1651

0.20

TUBO PVC SAP C-10 C/R 1"


TOTAL

13-10-11

4287

8.00

TUBO DE FIERRO GALVANIZADO DE 2"X6 MTS X 2MM

0.20

0.20
0.20

0.00

0.20

0.00

21.00

21.00

28-11-14

1653

TUBO DE FIERRO GALVANIZADO DE 2"X6 MTS X 2MM

2.00

19.00

29-11-14

1654

TUBO DE FIERRO GALVANIZADO DE 2"X6 MTS X 2MM

1.00

18.00

03-12-14

1657

TUBO DE FIERRO GALVANIZADO DE 2"X6 MTS X 2MM

3.00

15.00

04-12-14

1658

TUBO DE FIERRO GALVANIZADO DE 2"X6 MTS X 2MM

7.00

8.00

05-12-14

1660

TUBO DE FIERRO GALVANIZADO DE 2"X6 MTS X 2MM

3.00

5.00

11-12-14

1664

TUBO DE FIERRO GALVANIZADO DE 2"X6 MTS X 2MM

2.00

3.00

12-12-14

1666

TUBO DE FIERRO GALVANIZADO DE 2"X6 MTS X 2MM

3.00

0.00

21.00

0.00

TOTAL

27-10-14

4294

29-11-14

TEE PVC SAP UF 75 MM


1654

1.00

TEE PVC SAP UF 75 MM


TOTAL

27-10-14

4294

29-11-14

TAPON PVC SAP UF 75 MM


1654

4287

1.00

1.00
1.00

0.00

1.00

0.00

1.00

TAPON PVC SAP UF 75 MM


TOTAL

13-10-14

21.00

CAJA DE CONCRETO SIMPLE PARA DESAGUE 12" X 24"

1.00

1.00
1.00

0.00

1.00

0.00

6.00

6.00

01-12-14

1655

CAJA DE CONCRETO SIMPLE PARA DESAGUE 12" X 24"

3.00

3.00

11-12-14

1664

CAJA DE CONCRETO SIMPLE PARA DESAGUE 12" X 24"

3.00

0.00

TOTAL

27-10-14

4294

CAJA DE CONCRETO PARA AGUA

6.00

6.00

4.00

0.00

4.00

01-12-14

1655

CAJA DE CONCRETO PARA AGUA

3.00

1.00

11-12-14

1664

CAJA DE CONCRETO PARA AGUA

1.00

0.00

4.00

0.00

TOTAL

27-10-14

4294

16-12-14

TAPA FG PARA AGUA


1669

4.00

TAPA FG PARA AGUA

4294

16-12-14

TAPA FF PARA DESAGUE


1669

4297

13-12-14

TAPA FF PARA DESAGUE

TAPA PARA BUZON DE DESAGUE


1667

4286

3.00

TAPA PARA BUZON DE DESAGUE

ADITIVO IMPERMEABILIZANTE SIKA

2.00

2.00

2.00

3.00
3.00

0.00

3.00

0.00

2.00

TOTAL

10-10-14

4.00

3.00

TOTAL

31-10-14

4.00
2.00

TOTAL

27-10-14

4.00

2.00
2.00

0.00

2.00

0.00

2.00

2.00

20-10-14

68

ADITIVO IMPERMEABILIZANTE SIKA

1.00

1.00

21-10-14

69

ADITIVO IMPERMEABILIZANTE SIKA

1.00

0.00

2.00

0.00

TOTAL

13-11-14

51

13-11-14

BUGIA DE MOTOR GASOLINERO HGK ROSCA LARGA


89

56

1.00

BUGIA DE MOTOR GASOLINERO HGK ROSCA LARGA


TOTAL

21-11-14

2.00

RODAJE 6304 4/2 RSH/C3

1.00

4.00

1.00
1.00

0.00

1.00

0.00

4.00

21-11-14

4 RODAJE 6304 4/2 RSH/C4


TOTAL

21-11-14

56

RODAJE POLEA TEMPLADOR FN-12

21-11-14

96 RODAJE POLEA TEMPLADOR FN-12

56

21-11-14

CHEVRON GRASA MARFAK HD 3BHL 613 X 1 LIBRA


96

56

21-11-14

SENSOR RETRO V-71


96

57

26-11-14

57

26-11-14

REDUCCION PVC SAP 1.1/2" X 1"


100

57

26-11-14

26-11-14

57
79

UNION PVC SAP S/P 1"

0.00

2.00

0.00

8.00
8.00

0.00

8.00

0.00

1.00
1.00

0.00

1.00

0.00

1.00

1.00

1.00

ANILLO UFL PRESION 75MM

UNION PVC SAP S/P 1"

2.00

1.00
1.00

0.00

1.00

0.00

1.00
1.00

0.00

1.00

0.00

1.00

TOTAL

26-11-14

1.00

REDUCCION PVC SAP 1.1/2" X 1"

ANILLO UFL PRESION 75MM


100

2.00

1.00

TOTAL

26-11-14

8.00

REDUCCION PVC SAP 150 4422 75MM X 1.1/2"


TOTAL

26-11-14

0.00

8.00

SENSOR RETRO V-72

REDUCCION PVC SAP 150 4422 75MM X 1.1/2"


100

4.00

1.00

TOTAL

26-11-14

2.00

CHEVRON GRASA MARFAK HD 3BHL 613 X 1 LIBRA


TOTAL

21-11-14

0.00

2.00

TOTAL

21-11-14

4.00

4.00

1.00

1.00
1.00

0.00

1.00

0.00

1.00

1.00
1.00

0.00

TOTAL

31-10-14

4297

31-10-14

UNION PVC SAP S/P 1/2"


79

57

26-11-14

UNION PVC SAP S/P 1/2"

TRANSICION ADAPTADOR UPR 1" PAVCO


100

57

26-11-14

TRANSICION ADAPTADOR UPR 1" PAVCO

LLAVE DE PASO PVC AGUA 1"


100

61

16-12-14

61

16-12-14

4275

1.00

0.00

2.00
2.00

0.00

2.00

0.00

1.00
1.00

0.00

1.00

0.00

20.00

20.00
20.00

0.00

20.00

0.00

20.00

PLANTAS DE FICUS
TOTAL

04-09-14

1.00

PLANTAS ORNAMENTALES DOGOCHINO

PLANTAS DE FICUS
1669

0.00

20.00

TOTAL

11-12-14

2.00

LLAVE DE PASO PVC AGUA 1"

PLANTAS ORNAMENTALES DOGOCHINO


1669

1.00

1.00

TOTAL

11-12-14

1.00

TECKNOPOR DE 1/2"

0.00

0.00

1.00

2.00

TOTAL

26-11-14

1.00

1.00

TOTAL

26-11-14

1.00

20.00
20.00

0.00

20.00

0.00

3.00

3.00

04-09-14

1629

TECKNOPOR DE 1/2"

1.00

2.00

07-10-14

58

TECKNOPOR DE 1/2"

2.00

0.00

3.00

0.00

TOTAL

17-09-14
17-09-14

4281

APISONADOR TIPO CANGURO


1641

APISONADOR TIPO CANGURO

3.00

1.00

1.00
1.00

0.00

TOTAL

17-09-14

4281

TONER RENDIMIENTO 1200


1642

17-09-14

55

TONER RENDIMIENTO 1200

4264

2.00

TONER LASER HP-CF 280 A

SILICONA PARA PEGAR PVC

1.00

0.00
0.00

1.00
1.00

TOTAL

10/1/2014

2.00

0.00

2.00
2.00

TONER LASER HP-CF 280 A


96

20-11-14

1.00

TOTAL

20-11-14

1.00

1.00

0.00
0.00

10/1/2014

53

SILICONA PARA PEGAR PVC

10/2/2014

54

SILICONA PARA PEGAR PVC

11/25/2014

99

SILICONA PARA PEGAR PVC

12/3/2014

1657

SILICONA PARA PEGAR PVC

12/11/2014

1664

SILICONA PARA PEGAR PVC

5.00

0.00

TOTAL

8/25/2014

1758

8/25/2014

ARNES DE SEGURIDAD
3445

ARNES DE SEGURIDAD
TOTAL

10/6/2014

4284

10/7/2014

ESPARADRAPO
58

10/7/2014

4284

ESPARADRAPO

DOLONET
58

9.00

4
4

4.00

0.00

TOTAL

10/6/2014

5.00

1.00

1
1

1.00

0.00

10

DOLONET
TOTAL

11.00

10
10

10.00

0.00

10/6/2014

4284

10/7/2014

PARACETAMOL
58

10

PARACETAMOL
TOTAL

10/6/2014

4284

10/7/2014

CURITAS
58

10.00

4284

10/7/2014

CURITAS

ALCOHOL YODADA
58

4284

10/7/2014

ALCOHOL YODADA

AGUA OXIGENADA
58

4284

10/7/2014

4251

0.00

1
1

2
2

2.00

0.00

1.00

1
1

1.00

0.00

ALCOHOL
TOTAL

7/21/2014

3.00

AGUA OXIGENADA

ALCOHOL
58

10.00

TOTAL

10/6/2014

TOTAL

10/6/2014

10

10/6/2014

10

ACEITE DE MOTOR

1.00

1
1

1.00

0.00

9/4/2014

1629

ACEITE DE MOTOR

9/5/2014

82

ACEITE DE MOTOR

11/25/2014

99

ACEITE DE MOTOR

TOTAL

11/6/2014
11/6/2014

4299

CARBURADOR DE MOTOR HONDA 6X160.


83

CARBURADOR DE MOTOR HONDA 6X160.

1
1

TOTAL

11/10/2014

4300

11/10/2014

483364 MOVIL SUPER 1000


1011

4284

10/7/2014

483364 MOVIL SUPER 1000

483365 MOVIL SUPER 1000


58

51

11/13/2014

483365 MOVIL SUPER 1000

FILTRO APIZONANTE
89

55

2.00

0.00

2.00

2
2

2.00

0.00

FILTRO APIZONANTE
TOTAL

11/20/2014

7.00

ALAMBRE DE AMARRE DE 3.20 MM. GRIS

1.00

TOTAL

11/13/2014

TOTAL

10/6/2014

1
1

1.00

0.00

11/20/2014

95

ALAMBRE DE AMARRE DE 3.20 MM. GRIS

11/21/2014

96

ALAMBRE DE AMARRE DE 3.20 MM. GRIS

8.00

0.00

TOTAL

11/21/2014

56

11/21/2014

AUTOMATICO RANCADOR SCANIA


96

AUTOMATICO RANCADOR SCANIA


TOTAL

9/17/2014

4281

9/17/2014

TONER RENDIMIENTO 1200


1642

8/6/2014

4257

TONER RENDIMIENTO 1200

TOMACORRIENTE TRIPLE TICINO


1607

1.00

TOMACORRIENTE TRIPLE TICINO

1
1

1.00

0.00

TOTAL

8/6/2014

10.00

2.00

2
2

2.00

0.00

2
2

TOTAL

11/22/2014

97

PEGAMENTO PARA TUBERIA PVC

11/22/2014

4294

PEGAMENTO PARA TUBERIA PVC

4264

2.00

0.5

TOTAL

11/26/2014

2.00

CINTA TEFLON

0.50

0.00

0.5
0.5

0.50

0.00

11

11

11/26/2014

100

CINTA TEFLON

10

11/28/2014

1653

CINTA TEFLON

12/3/2014

1657

CINTA TEFLON

12/11/2014

1664

CINTA TEFLON

11.00

0.00

TOTAL

7/21/2014

4251

THINER FM

11.00

12/12/2014

1666

THINER FM

12/13/2014

1667

THINER FM

12/15/2014

1668

THINER FM

TOTAL

8/16/2014

4264

LLAVE DE PASO 1/2"

11/28/2014

1653

LLAVE DE PASO 1/2"

12/11/2014

1664

LLAVE DE PASO 1/2"

2.00

0.00

TOTAL

8/16/2014

4264

12/11/2014

LLAVE COORPORATION DE BRONCE DE 1/2"


1664

4264

LLAVE COORPORATION DE BRONCE DE 1/2"


TOTAL

8/16/2014

2.00

ABRAZADERA DE FIERRO

3.00

3
3

3.00

0.00

11/29/2014

1654

ABRAZADERA DE FIERRO
TOTAL

11/20/2014

55

DISC0 9 5/64 x 7/8

3.00

3.00

0.00

12/3/2014

1657

DISC0 9 5/64 x 7/8

12/4/2014

1659

DISC0 9 5/64 x 7/8

12/5/2014

1660

DISC0 9 5/64 x 7/8

12/6/2014

1661

DISC0 9 5/64 x 7/8

6.00

0.00

TOTAL

11/20/2014

55

DISC0 4 1/2" x 1/4" x 7/8

6.00

12/3/2014

1657

DISC0 4 1/2" x 1/4" x 7/8

12/4/2014

1658

DISC0 4 1/2" x 1/4" x 7/8

12/6/2014

1661

DISC0 4 1/2" x 1/4" x 7/8

4.00

0.00

TOTAL

11/20/2014

55

DISC0 DE DESBASTER DE 7 X1/4" X 7/8 F/H 3105

4.00

12/3/2014

1657

DISC0 DE DESBASTER DE 7 X1/4" X 7/8 F/H 3105

12/5/2014

1660

DISC0 DE DESBASTER DE 7 X1/4" X 7/8 F/H 3105

2.00

0.00

TOTAL

10/10/2014

4286

12/4/2014

STRON GRASS INGLES DE EEUU


1658

STRON GRASS INGLES DE EEUU


TOTAL

8/6/2014
8/6/2014

4257

SOQUET LOSA
1607

4.00

11.00

5
5

7.00

0.00

SOQUET LOSA
TOTAL

6.00

1
1

6.00

0.00

11/20/2014

55

12/4/2014

MASILLA PLASTICA VELOX FLEX


1658

MASILLA PLASTICA VELOX FLEX


TOTAL

11/20/2014

1658

HOJA DE SIERRA SANFLEX

7.00

1
1

7.00

0.00

11/24/2014

98

HOJA DE SIERRA SANFLEX

11/28/2014

1653

HOJA DE SIERRA SANFLEX

12/4/2014

1658

HOJA DE SIERRA SANFLEX

4.00

0.00

TOTAL

8/6/2014

4257

INTERRUPTOR TICINO
1607

INTERRUPTOR TICINO
TOTAL

12/20/2014

WWWW

4.00

LIJA DE METAL N 100

1.00

1
1

0.00

1.00

0.00

5.00

12/4/2014

1658

LIJA DE METAL N 100

12/5/2014

1660

LIJA DE METAL N 100

5.00

0.00

TOTAL

11/20/2014

5.00

WWWW

LIJA DE METAL N 50

12/4/2014

1659

LIJA DE METAL N 50

12/5/2014

1660

LIJA DE METAL N 50

5.00

0.00

TOTAL

11/17/2014

53

PIEDRA GRANDE 4"

5.00

12

12

12/4/2014

1659

PIEDRA GRANDE 4"

1.5

10.5

12/5/2014

1660

PIEDRA GRANDE 4"

1.2

9.3

12/9/2014

1662

PIEDRA GRANDE 4"

8.3

12/10/2014

1663

PIEDRA GRANDE 4"

1.7

6.6

12/11/2014

1665

PIEDRA GRANDE 4"

4.4

2.2

12/16/2014

1669

PIEDRA GRANDE 4"

1.1

1.1

12/17/2014

1674

PIEDRA GRANDE 4"

1.1

12.00

0.00

TOTAL

7/21/2014

4251

PINTURA BASE ZINCROMATO CPP

12.00

8/8/2014

1615

PINTURA BASE ZINCROMATO CPP

12/12/2014

1666

PINTURA BASE ZINCROMATO CPP

12/13/2014

1667

PINTURA BASE ZINCROMATO CPP

12/15/2014

1668

PINTURA BASE ZINCROMATO CPP

TOTAL

7/21/2014

4251

PINTURA ESMALTE VERDE CROMO

12/12/2014

1666

PINTURA ESMALTE VERDE CROMO

12/13/2014

1667

PINTURA ESMALTE VERDE CROMO

12/15/2014

1668

PINTURA ESMALTE VERDE CROMO

TOTAL

8/21/2014

4265

PIEDRA CHANCADA DE 1/2"

19

19

8/22/2014

4267

PIEDRA CHANCADA DE 1/2"

25

8/23/2014

1618

PIEDRA CHANCADA DE 1/2"

2.1

22.9

8/26/2014

1620

PIEDRA CHANCADA DE 1/2"

2.9

20

8/27/2014

1621

PIEDRA CHANCADA DE 1/2"

1.25

18.75

8/28/2014

1622

PIEDRA CHANCADA DE 1/2"

0.84

17.91

8/29/2014

1623

PIEDRA CHANCADA DE 1/2"

1.2

16.71

9/1/2014

1624

PIEDRA CHANCADA DE 1/2"

0.29

16.42

9/2/2014

1625

PIEDRA CHANCADA DE 1/2"

1.25

15.17

9/3/2014

1628

PIEDRA CHANCADA DE 1/2"

1.35

13.82

9/4/2014

1629

PIEDRA CHANCADA DE 1/2"

1.75

12.07

9/5/2014

1630

PIEDRA CHANCADA DE 1/2"

0.75

11.32

9/6/2014

1631

PIEDRA CHANCADA DE 1/2"

0.24

11.08

9/8/2014

1633

PIEDRA CHANCADA DE 1/2"

0.59

10.49

9/12/2014

1637

PIEDRA CHANCADA DE 1/2"

1.5

8.99

9/15/2014

1639

PIEDRA CHANCADA DE 1/2"

2.52

6.47

9/17/2014

1642

PIEDRA CHANCADA DE 1/2"

3.1

3.37

9/19/2014

1644

PIEDRA CHANCADA DE 1/2"

0.75

2.62

9/29/2014

51

PIEDRA CHANCADA DE 1/2"

1.62

9/30/2014

52

PIEDRA CHANCADA DE 1/2"

1.4

0.22

10/6/2014

57

PIEDRA CHANCADA DE 1/2"

0.22

TOTAL

25

25

N PBLICA

ZANAS E Y C DE

LA A.P.V

OBSERVACIONES
UND. DE MEDIDA

PAR.
PAR.
PAR.
PAR.
PAR.
PAR.
PAR.
PAR.

PAR.
PAR.
PAR.
PAR.
PAR.
PAR.
PAR.
PAR.
PAR.
PAR.

PAR.
PAR.
PAR.
PAR.
PAR.
PAR.

UND.
UND.
UND.
UND.
UND.

PAR.
PAR.
PAR.
PAR.
PAR.

UND.
UND.
UND.
UND.
UND.
UND.

UND.
UND.

PAR.
PAR.
PAR.
PAR.
PAR.
PAR.
PAR.
PAR.
PAR.

PAR.
PAR.
PAR.
PAR.
PAR.
PAR.

PAR.
PAR.
PAR.
PAR.
PAR.
PAR.

UND.
UND.
UND.

UND.
UND.
UND.
UND.
UND.

40

UND.
UND.
UND.
ERROR VINCAR

UND.
UND.
UND.

10

UND.
UND.
ERROR VINCAR

KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.

KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.

KG.
KG.

KG.
KG.

UND.
UND.

UND.

UND.

UND.
UND.

KG.
KG.

KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.

B/N 10208

KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.

KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.

1 VINCAR

KG.
KG.
KG.
KG.

KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.

KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.

ERROR VINCAR 3
1

KG.
KG.

KG.
KG.

KG.
KG.
KG.
KG.
KG.
KG.
KG.

VLL.
VLL.
VLL.
VLL.
VLL.
VLL.
VLL.

PLCH.
PLCH.

KG.
KG.

KG.
KG.

MTS.
MTS.

MTS.
MTS.

UND.
UND.
UND.

SCO.
SCO.

KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

DOC.

DOC.

UND.
UND.

UND.
UND.

CJA.
CJA.

UND.
UND.

UND.
UND.

UND
UND

UND

UND

UND
UND

MLL.
MLL.

MLL.
MLL.

MLL.
MLL.

BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.

BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.

BLS.
BLS.
BLS.
BLS.

BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.

BLS.
BLS.
BLS.
BLS.
BLS.
BLS.
BLS.

M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.

2.95

M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.

M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.

M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.

M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.

M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.

M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.

M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.

0.10 VINCAR

M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.

M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.

M3.
M3.

M3.

APORTE BENEFICIARIO

M3.

APORTE BENEFICIARIO

M3.

APORTE BENEFICIARIO

M3.

APORTE BENEFICIARIO

M3.

TRANSFERENCIA

M3.

TRANSFERENCIA

M3.

TRANSFERENCIA

M3.

TRANSFERENCIA

M3.

TRANSFERENCIA

M3.

TRANSFERENCIA

M3.

TRANSFERENCIA

M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.

M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.

GLN.
GLN.
GLN.

GLN.

M2.
M2.
M2.
M2.
M2.
M2.
M2.
M2.
M2.
M2.
M2.
M2.
M2.
M2.
M2.

M2.
M2.
M2.
M2.
M2.
M2.
M2.
M2.
M2.

M2.
M2.
M2.

UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.

UND.
UND.
UND.
UND.
UND.

UND.
UND.
UND.
UND.
UND.
UND.

M2.
M2.
M2.
M2.

UND.
UND.

BLD.
BLD.

PZA.
PZA.

PZA.
PZA.

BCLN.
BCLN.

UND.
UND.

UND.
UND.

RLL.
RLL.

JGO.
JGO.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.

GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.

GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.

GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.

GLN.
GLN.
GLN.
GLN.
GLN.

GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.

GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.

GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.
GLN.

ML.
ML.

ML.
ML.

PZA.
PZA.

ML.
ML.

UND.
UND.

UND.
UND.
UND.
UND.
UND.
UND.

UND.
UND.
UND.
UND.
UND.

UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.

UND.
UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.
UND.

CAJA CHICA

UND.
UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

GLN.
GLN.
GLN.

PZA.
PZA.

UND.

UND.

UND.
UND.

UND.
UND.

UND.

CAJA CHICA

UND.

CAJA CHICA

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.

CAJA CHICA

UND.

CAJA CHICA

UND.
UND.

UND.
UND.

UND.
UND.

PLCH.

APORTE BENEFICIARIO

PLCH.

APORTE BENEFICIARIO

PLCH.

APORTE BENEFICIARIO

UND.
UND.

UND.
UND.

UND.
UND.

UND.

TRANSFERENCIA

UND.

TRANSFERENCIA

UND.

TRANSFERENCIA

UND.

TRANSFERENCIA

UND.

TRANSFERENCIA

UND.

TRANSFERENCIA
TRANSFERENCIA

UND.
UND.

UND.
UND.

UND.
UND.

CJA

UND.
UND.

CJA.
CJA.
CJA.

FRASCO
FRASCO

FRASCO
FRASCO

LT.
LT.

GLN.
GLN.
GLN.
GLN.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

KG.
KG.
KG.

UND.
UND.

UND.
UND.

UND.
UND.

GL.
GL.

UND.
UND.
UND.
UND.
UND.

GLN.
GLN.
GLN.
GLN.

UND.
UND.
UND.

UND.
UND.
UND.

UND.

UND.

UND.
UND.
UND.
UND.
UND.

UND.
UND.
UND.
UND.

UND.
UND.
UND.

KG.
KG.
KG.

UND.
UND.
UND.

UND.
UND.
UND.

UND.
UND.
UND.
UND.

UND.
UND.

UND.
UND.
UND.

UND.
UND.
UND.

M3.
M3.
M3.
M3.
M3.

M3.
M3.
M3.

GLN.
GLN.
GLN.
GLN.
GLN.

GLN.
GLN.
GLN.
GLN.

M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.

M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


MOVIMIENTO DE ALMACEN
"CONSTRUCCION DE

OBRA
METAS

LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE


VILLA MARIA , PROVINCIA DE CUSCO-CUSCO"

LA A.P.V

: 011 (2014) - 012(2015).


DOCUMENTO

MOVIMIENTO
DESCRIPCION

FECHA

N/ENT.

30-07-14

4254

N/SAL.

UND. DE MEDIDA
ENTRADA

GUANTES DE CUERO REFORZADO NACIONAL

SALIDA

SALDO

60.00

60.00

PAR.

30-07-14

1604

GUANTES DE CUERO REFORZADO NACIONAL

12.00

48.00

PAR.

18-08-14

1615

GUANTES DE CUERO REFORZADO NACIONAL

8.00

40.00

PAR.

27-08-14

1621

GUANTES DE CUERO REFORZADO NACIONAL

1.00

39.00

PAR.

01-09-14

1624

GUANTES DE CUERO REFORZADO NACIONAL

9.00

30.00

PAR.

17-09-14

1641

GUANTES DE CUERO REFORZADO NACIONAL

6.00

24.00

PAR.

18-09-14

1643

GUANTES DE CUERO REFORZADO NACIONAL

4.00

20.00

PAR.

27-09-14

1650

GUANTES DE CUERO REFORZADO NACIONAL


TOTAL

16-10-14

4290

GUANTES DE CUERO REFORZADO

60.00

20.00

0.00

60.00

0.00

30.00

PAR.

30.00

PAR.

27-10-14

74

GUANTES DE CUERO REFORZADO

3.00

27.00

PAR.

28-10-14

75

GUANTES DE CUERO REFORZADO

2.00

25.00

PAR.

29-10-14

76

GUANTES DE CUERO REFORZADO

1.00

24.00

PAR.

08-11-14

85

GUANTES DE CUERO REFORZADO

3.00

21.00

PAR.

11-11-14

87

GUANTES DE CUERO REFORZADO

4.00

17.00

PAR.

13-11-14

89

GUANTES DE CUERO REFORZADO

4.00

13.00

PAR.

15-11-14

91

GUANTES DE CUERO REFORZADO

4.00

9.00

PAR.

18-11-14

93

GUANTES DE CUERO REFORZADO

5.00

4.00

PAR.

19-11-14

94

GUANTES DE CUERO REFORZADO

4.00

0.00

PAR.

30.00

0.00

TOTAL
30-07-14

4254

GUANTES DE JEBE CALIBRE 35 TALLA 7,8,9 VIRUTEX

30.00

15.00

PAR.

01-09-14

1624

GUANTES DE JEBE CALIBRE 35 TALLA 7,8,9 VIRUTEX

15.00
5.00

25.00

PAR.

02-09-14

1625

GUANTES DE JEBE CALIBRE 35 TALLA 7,8,9 VIRUTEX

2.00

23.00

PAR.

17-09-14

1641

GUANTES DE JEBE CALIBRE 35 TALLA 7,8,9 VIRUTEX

4.00

19.00

PAR.

19-09-14

1644

GUANTES DE JEBE CALIBRE 35 TALLA 7,8,9 VIRUTEX

2.00

17.00

PAR.

22-09-14

1646

GUANTES DE JEBE CALIBRE 35 TALLA 7,8,9 VIRUTEX


TOTAL

30-07-14

4254

CASCOS TIPO JOKEY COLOR AMARILLO

2.00
75.00

75.00

30.00

15.00

PAR.

0.00
30.00

UND.

30-07-14

1604

CASCOS TIPO JOKEY COLOR AMARILLO

10.00

20.00

UND.

18-08-14

1615

CASCOS TIPO JOKEY COLOR AMARILLO

5.00

15.00

UND.

01-09-14

1624

CASCOS TIPO JOKEY COLOR AMARILLO

10.00

5.00

UND.

27-09-14

1650

CASCOS TIPO JOKEY COLOR AMARILLO

5.00

0.00

UND.

30.00

0.00

TOTAL

30-07-14

4254

LENTES DE SEGURIDAD CON PROTECCION UV

30.00

30.00

30.00

PAR.

18-08-14

1615

LENTES DE SEGURIDAD CON PROTECCION UV

7.00

23.00

PAR.

26-08-14

1620

LENTES DE SEGURIDAD CON PROTECCION UV

1.00

22.00

PAR.

02-09-14

1625

LENTES DE SEGURIDAD CON PROTECCION UV

9.00

13.00

PAR.

25-09-14

1648

LENTES DE SEGURIDAD CON PROTECCION UV

13.00

0.00

PAR.

30.00

0.00

TOTAL

30.00

26-08-14

4268

CHALECOS CON TELA DRILL SEGN DISEO CON LOGO

10.00

10.00

UND.

27-08-14

4269

CHALECOS CON TELA DRILL SEGN DISEO CON LOGO

5.00

15.00

UND.

27-08-14
04-09-14

1621
4275

CHALECOS CON TELA DRILL SEGN DISEO CON LOGO


CHALECOS CON TELA DRILL SEGN DISEO CON LOGO

9.00
15.00

6.00

UND.

21.00

UND.

01-09-14

1624

CHALECOS CON TELA DRILL SEGN DISEO CON LOGO

6.00

15.00

UND.

08-09-14

1632

CHALECOS CON TELA DRILL SEGN DISEO CON LOGO

4.00

11.00

UND.

10-10-14

53

CHALECOS CON TELA DRILL SEGN DISEO CON LOGO

1.00

10.00

UND.

04-11-14

81

CHALECOS CON TELA DRILL SEGN DISEO CON LOGO

10.00

0.00

UND.

30.00

0.00

TOTAL

30-07-14

4254

PROTECTOR BUCAL DE DOS VIAS

30.00

30.00

PAR.

18-08-14

1615

PROTECTOR BUCAL DE DOS VIAS

30.00
5.00

25.00

PAR.

23-08-14

1618

PROTECTOR BUCAL DE DOS VIAS

3.00

22.00

PAR.

26-08-14

1620

PROTECTOR BUCAL DE DOS VIAS

2.00

20.00

PAR.

01-09-14

1624

PROTECTOR BUCAL DE DOS VIAS

4.00

16.00

PAR.

02-09-14

1625

PROTECTOR BUCAL DE DOS VIAS

11.00

5.00

PAR.

06-09-14

1631

PROTECTOR BUCAL DE DOS VIAS

1.00

4.00

PAR.

20-09-14

1645

PROTECTOR BUCAL DE DOS VIAS

2.00

2.00

PAR.

27-09-14

1650

PROTECTOR BUCAL DE DOS VIAS


TOTAL

30-07-14

4254

PROTECTOR ADITIVO TIPO TAPON LIBUS

30.00

2.00

0.00

30.00

0.00

30.00

PAR.

30.00

PAR.

29-08-14

1623

PROTECTOR ADITIVO TIPO TAPON LIBUS

10.00

20.00

PAR.

01-09-14

1624

PROTECTOR ADITIVO TIPO TAPON LIBUS

9.00

11.00

PAR.

02-09-14

1625

PROTECTOR ADITIVO TIPO TAPON LIBUS

3.00

8.00

PAR.

20-09-14

1645

PROTECTOR ADITIVO TIPO TAPON LIBUS

4.00

4.00

PAR.

22-09-14

1646

PROTECTOR ADITIVO TIPO TAPON LIBUS

4.00

0.00

PAR.

30.00

0.00

TOTAL

30-07-14

4254

BOTAS DE JEBE REFORZADO CON PUNTA DE ACERO (39,40.41)

30.00

30.00

PAR.

30-07-14

1604

BOTAS DE JEBE REFORZADO CON PUNTA DE ACERO (39,40.41)

10.00

20.00

PAR.

18-08-14

1615

BOTAS DE JEBE REFORZADO CON PUNTA DE ACERO (39,40.41)

1.00

19.00

PAR.

27-08-14

1621

BOTAS DE JEBE REFORZADO CON PUNTA DE ACERO (39,40.41)

1.00

18.00

PAR.

01-09-14

1624

BOTAS DE JEBE REFORZADO CON PUNTA DE ACERO (39,40.41)

9.00

9.00

PAR.

23-09-14

1647

BOTAS DE JEBE REFORZADO CON PUNTA DE ACERO (39,40.41)

9.00

0.00

PAR.

30.00

0.00

TOTAL

30-07-14

4254

PONCHOS IMPERMIABLES DE TELA ENJEBADA

05-09-14

1630

PONCHOS IMPERMIABLES DE TELA ENJEBADA

23-09-14

1647

PONCHOS IMPERMIABLES DE TELA ENJEBADA


TOTAL

31-07-14

4255

MADERA AGUANO DE 2"X3"X10"

30.00

30.00

30.00
22.00

30.00

30.00

UND.

8.00

UND.

8.00

0.00

30.00

0.00

120.00

UND.

120.00

UND.

25.00

95.00

UND.

04-08-14

1606

MADERA AGUANO DE 2"X3"X10"

08-08-14

1608

MADERA AGUANO DE 2"X3"X10"

8.00

87.00

UND.

11-08-14

1609

MADERA AGUANO DE 2"X3"X10"

18.00

69.00

UND.

12-08-14

1610

MADERA AGUANO DE 2"X3"X10"

40.00

29.00

UND.

20-08-14

1616

MADERA AGUANO DE 2"X3"X10"

6.00

23.00

UND.

22-08-14

1617

MADERA AGUANO DE 2"X3"X10"

5.00

18.00

UND.

10-09-14

1635

MADERA AGUANO DE 2"X3"X10"

18.00
TOTAL

120.00

120.00

0.00

UND.

31-07-14

4255

MADERA AGUANO DE 1 1/2X8"X10"

100

100

UND.

04-08-14

1606

MADERA AGUANO DE 1 1/2X8"X10"

28.00

72.00

UND.

12-08-14

1610

MADERA AGUANO DE 1 1/2X8"X10"

10.00

62.00

UND.

22-08-14

1617

MADERA AGUANO DE 1 1/2X8"X10"

7.00

55.00

UND.

10-09-14

1635

MADERA AGUANO DE 1 1/2X8"X10"

55.00
TOTAL

07-08-14

4258

CLAVO PARA MADERA C/C DE 3"

100

100.00

100

UND.

0.00

100.00

KG.

11-08-14

1609

CLAVO PARA MADERA C/C DE 3"

2.00

98.00

KG.

13-08-14

1611

CLAVO PARA MADERA C/C DE 3"

1.00

97.00

KG.

20-08-14

1616

CLAVO PARA MADERA C/C DE 3"

3.00

94.00

KG.

25-08-14

1619

CLAVO PARA MADERA C/C DE 3"

2.00

92.00

KG.

28-08-14

1622

CLAVO PARA MADERA C/C DE 3"

2.00

90.00

KG.

02-09-14

1625

CLAVO PARA MADERA C/C DE 3"

3.00

87.00

KG.

03-09-14

1628

CLAVO PARA MADERA C/C DE 3"

2.00

85.00

KG.

04-09-14

1629

CLAVO PARA MADERA C/C DE 3"

2.00

83.00

KG.

05-09-14

1630

CLAVO PARA MADERA C/C DE 3"

1.00

82.00

KG.

06-09-14

1631

CLAVO PARA MADERA C/C DE 3"

2.00

80.00

KG.

08-09-14

1632

CLAVO PARA MADERA C/C DE 3"

1.00

79.00

KG.

13-09-14

1638

CLAVO PARA MADERA C/C DE 3"

1.00

78.00

KG.

16-09-14

1640

CLAVO PARA MADERA C/C DE 3"

2.00

76.00

KG.

18-09-14

1643

CLAVO PARA MADERA C/C DE 3"

3.00

73.00

KG.

19-09-14

1644

CLAVO PARA MADERA C/C DE 3"

2.00

71.00

KG.

20-09-14

1645

CLAVO PARA MADERA C/C DE 3"

1.00

70.00

KG.

25-09-14

1648

CLAVO PARA MADERA C/C DE 3"

1.00

69.00

KG.

26-09-14

1649

CLAVO PARA MADERA C/C DE 3"

1.00

68.00

KG.

01-10-14

53

CLAVO PARA MADERA C/C DE 3"

1.00

67.00

KG.

06-10-14

57

CLAVO PARA MADERA C/C DE 3"

1.00

66.00

KG.

09-10-14

59

CLAVO PARA MADERA C/C DE 3"

1.00

65.00

KG.

13-10-14

62

CLAVO PARA MADERA C/C DE 3"

1.00

64.00

KG.

14-10-14

63

CLAVO PARA MADERA C/C DE 3"

1.00

63.00

KG.

17-10-14

66

CLAVO PARA MADERA C/C DE 3"

1.00

62.00

KG.

18-10-14

67

CLAVO PARA MADERA C/C DE 3"

1.00

61.00

KG.

20-10-14

68

CLAVO PARA MADERA C/C DE 3"

1.00

60.00

KG.

VAN
..VIENEN
23-10-14

71

CLAVO PARA MADERA C/C DE 3"

1.00

59.00

KG.

30-10-14

78

CLAVO PARA MADERA C/C DE 3"

1.00

58.00

KG.

31-10-14

79

CLAVO PARA MADERA C/C DE 3"

2.00

56.00

KG.

03-11-14

80

CLAVO PARA MADERA C/C DE 3"

3.00

53.00

KG.

04-11-14

81

CLAVO PARA MADERA C/C DE 3"

1.00

52.00

KG.

20-11-14

95

CLAVO PARA MADERA C/C DE 3"

2.00

50.00

KG.

21-11-14

96

CLAVO PARA MADERA C/C DE 3"

1.00

49.00

KG.

26-11-14

100

CLAVO PARA MADERA C/C DE 3"

2.00

47.00

KG.

02-12-14

1656

CLAVO PARA MADERA C/C DE 3"

2.00

45.00

KG.

04-12-14

1657

CLAVO PARA MADERA C/C DE 3"

4.00

41.00

KG.

09-12-14

1662

CLAVO PARA MADERA C/C DE 3"

4.00

37.00

KG.

10-12-14

1663

CLAVO PARA MADERA C/C DE 3"

3.00

34.00

KG.

11-12-14

1664

CLAVO PARA MADERA C/C DE 3"

2.00

32.00

KG.

15-12-14

1668

CLAVO PARA MADERA C/C DE 3"

2.00

30.00

KG.

70.00

30.00

TOTAL

22-07-14

4252

22-07-14

CLAVO DE 3" C/CH B/CH 10208


1602

2.00

CLAVO DE 3" C/CH B/CH 10208


TOTAL

22-07-14

4252

22-07-14

CLAVO DE CALAMINA C/CH B/CH 10208


1602

23-07-14

4253

2.00
2.00

0.00

2.00

0.00

1.00

HOJA COLOR C/CH B/H 583785


1603

2.00

CLAVO DE CALAMINA C/CH B/CH 10208


TOTAL

23-07-14

100.00

1.00

1.00
1.00

0.00

1.00

0.00

0.50

HOJA COLOR C/CH B/H 583785


TOTAL

0.50

0.50
0.50

0.00

0.50

0.00

KG.
KG.

KG.
KG.

UND.
UND.

06-08-14

4257

06-08-14

CINTA AISLANTE
1607

1.00

CINTA AISLANTE
TOTAL

23-07-14

4253

23-07-14

PAPEL FIESTA COLOR C/CH B/H 583786


1603

4253

23-07-14

CINTA 2X55 C/CH B/H 583787


1603

4258

12.00

CINTA 2X55 C/CH B/H 583787

CLAVO PARA MADERA C/C 4"

0.00
0.00

1.00

UND.
UND.

12.00

UND.

12.00

0.00

UND.

12.00

0.00

1.00

TOTAL

07-08-14

1.00
1.00

12.00

PAPEL FIESTA COLOR C/CH B/H 583786


TOTAL

23-07-14

1.00

1.00

1.00

KG.

1.00

0.00

KG.

1.00

0.00

50.00

50.00

KG.

04-09-14

1629 CLAVO PARA MADERA C/C 4"

1.00

49.00

KG.

05-09-14

1630 CLAVO PARA MADERA C/C 4"

1.00

48.00

KG.

06-09-14

1631 CLAVO PARA MADERA C/C 4"

2.00

46.00

KG.

08-09-14

1632 CLAVO PARA MADERA C/C 4"

1.00

45.00

KG.

12-09-14

1637 CLAVO PARA MADERA C/C 4"

2.00

43.00

KG.

13-09-14

1638 CLAVO PARA MADERA C/C 4"

1.00

42.00

KG.

16-09-14

1640 CLAVO PARA MADERA C/C 4"

2.00

40.00

KG.

18-09-14

1643 CLAVO PARA MADERA C/C 4"

3.00

37.00

KG.

20-09-14

1644 CLAVO PARA MADERA C/C 4"

1.00

36.00

KG.

26-09-14

1649 CLAVO PARA MADERA C/C 4"

1.00

35.00

KG.

01-10-14

53 CLAVO PARA MADERA C/C 4"

1.00

34.00

KG.

06-10-14

57 CLAVO PARA MADERA C/C 4"

1.00

33.00

KG.

09-10-14

59 CLAVO PARA MADERA C/C 4"

1.00

32.00

KG.

13-10-14

62 CLAVO PARA MADERA C/C 4"

1.00

31.00

KG.

14-10-14

63 CLAVO PARA MADERA C/C 4"

1.00

30.00

KG.

17-10-14

66 CLAVO PARA MADERA C/C 4"

1.00

29.00

KG.

18-10-14

67 CLAVO PARA MADERA C/C 4"

1.00

28.00

KG.

20-10-14

68 CLAVO PARA MADERA C/C 4"

1.00

27.00

KG.

21-10-14

69 CLAVO PARA MADERA C/C 4"

1.00

26.00

KG.

23-10-14

71 CLAVO PARA MADERA C/C 4"

1.00

25.00

KG.

24-10-14

73 CLAVO PARA MADERA C/C 4"

1.00

24.00

KG.

28-10-14

75 CLAVO PARA MADERA C/C 4"

1.00

23.00

KG.

30-10-14

78 CLAVO PARA MADERA C/C 4"

2.00

21.00

KG.

31-10-14

79 CLAVO PARA MADERA C/C 4"

1.00

20.00

KG.

80 CLAVO PARA MADERA C/C 4"

3.00

17.00

KG.

03-11-14

VAN
..VIENEN
04-11-14

81 CLAVO PARA MADERA C/C 4"

1.00

16.00

KG.

15-11-14

91 CLAVO PARA MADERA C/C 4"

1.00

15.00

KG.

20-11-14

95 CLAVO PARA MADERA C/C 4"

2.00

13.00

KG.

21-11-14

96 CLAVO PARA MADERA C/C 4"

1.00

12.00

KG.

26-11-14

100 CLAVO PARA MADERA C/C 4"

2.00

10.00

KG.

02-12-14

1656 CLAVO PARA MADERA C/C 4"

1.00

9.00

KG.

04-12-14

1657 CLAVO PARA MADERA C/C 4"

1.00

8.00

KG.

09-12-14

1662 CLAVO PARA MADERA C/C 4"

4.00

4.00

KG.

10-12-14

1663 CLAVO PARA MADERA C/C 4"

3.00

1.00

KG.

15-12-14

1668 CLAVO PARA MADERA C/C 4"

1.00

0.00

KG.

50.0

0.0

TOTAL

21-07-14

4251

CLAVO PARA MADERA C/C 4" PRODAC

50.0

30.0

30.00

KG.

21-07-14

1601 CLAVO PARA MADERA C/C 4" PRODAC

4.00

26.00

KG.

22-07-14

1602 CLAVO PARA MADERA C/C 4" PRODAC

4.00

22.00

KG.

23-07-14

1603 CLAVO PARA MADERA C/C 4" PRODAC

3.00

19.00

KG.

02-08-14

1605 CLAVO PARA MADERA C/C 4" PRODAC

4.00

15.00

KG.

04-08-14

1606 CLAVO PARA MADERA C/C 4" PRODAC

3.00

12.00

KG.

11-08-14

1609 CLAVO PARA MADERA C/C 4" PRODAC

2.00

10.00

KG.

13-08-14

1611 CLAVO PARA MADERA C/C 4" PRODAC

1.00

9.00

KG.

25-08-14

1619 CLAVO PARA MADERA C/C 4" PRODAC

4.00

5.00

KG.

27-08-14

1621 CLAVO PARA MADERA C/C 4" PRODAC

1.00

4.00

KG.

28-08-14

1622 CLAVO PARA MADERA C/C 4" PRODAC

2.00

2.00

KG.

02-09-14

1625 CLAVO PARA MADERA C/C 4" PRODAC

1.00

1.00

KG.

04-09-14

1629 CLAVO PARA MADERA C/C 4" PRODAC

2.00

-1.00

KG.

31.00

1.00

TOTAL

30.0

07-08-14

170.00

KG.

11-08-14

4258
1609

ALAMBRE NEGRO N8
ALAMBRE NEGRO N8

170.00
1.00

169.00

KG.

25-08-14

1619

ALAMBRE NEGRO N8

3.00

166.00

KG.

28-08-14

1622

ALAMBRE NEGRO N8

2.00

164.00

KG.

01-09-14

1624

ALAMBRE NEGRO N8

2.00

162.00

KG.

02-09-14

1625

ALAMBRE NEGRO N8

1.00

161.00

KG.

03-09-14

1628

ALAMBRE NEGRO N8

2.00

159.00

KG.

04-09-14

1629

ALAMBRE NEGRO N8

2.00

157.00

KG.

05-09-14

1630

ALAMBRE NEGRO N8

2.00

155.00

KG.

06-09-14

1631

ALAMBRE NEGRO N8

2.00

153.00

KG.

09-09-14

1632

ALAMBRE NEGRO N8

2.00

151.00

KG.

10-09-14

1635

ALAMBRE NEGRO N8

3.00

148.00

KG.

11-09-14

1636

ALAMBRE NEGRO N8

3.00

145.00

KG.

12-09-14

1637

ALAMBRE NEGRO N8

4.00

141.00

KG.

13-09-14

1638

ALAMBRE NEGRO N8

3.00

138.00

KG.

16-09-14

1640

ALAMBRE NEGRO N8

3.00

135.00

KG.

18-09-14

1643

ALAMBRE NEGRO N8

3.00

132.00

KG.

19-09-14

1644

ALAMBRE NEGRO N8

2.00

130.00

KG.

20-09-14

1645

ALAMBRE NEGRO N8

1.00

129.00

KG.

25-09-14

1648

ALAMBRE NEGRO N8

1.00

128.00

KG.

26-09-14

1649

ALAMBRE NEGRO N8

2.00

126.00

KG.

01-10-14

53

ALAMBRE NEGRO N8

3.00

123.00

KG.

09-10-14

59

ALAMBRE NEGRO N8

2.00

121.00

KG.

14-10-14

63

ALAMBRE NEGRO N8

2.00

119.00

KG.

17-10-14

66

ALAMBRE NEGRO N8

2.00

117.00

KG.

23-10-14

67

ALAMBRE NEGRO N8

1.00

116.00

KG.

19-10-14

71

ALAMBRE NEGRO N8

1.00

115.00

KG.

24-10-14

73

ALAMBRE NEGRO N8

1.00

114.00

KG.

28-10-14

75

ALAMBRE NEGRO N8

3.00

111.00

KG.

29-10-14

76

ALAMBRE NEGRO N8

3.00

108.00

KG.

30-10-14

78

ALAMBRE NEGRO N8

3.00

105.00

KG.

03-11-14

80

ALAMBRE NEGRO N8

3.00

102.00

KG.

04-11-14

81

ALAMBRE NEGRO N8

2.00

100.00

KG.

05-11-14

83

ALAMBRE NEGRO N8

2.00

98.00

KG.

VAN
..VIENEN
10-11-14

86

ALAMBRE NEGRO N8

1.00

97.00

KG.

25-11-14

99

ALAMBRE NEGRO N8

2.00

95.00

KG.

26-11-14

100

ALAMBRE NEGRO N8

1.00

94.00

KG.

03-12-14

1657

ALAMBRE NEGRO N8

3.00

91.00

KG.

04-12-14

1658

ALAMBRE NEGRO N8

2.00

89.00

KG.

09-12-14

1662

ALAMBRE NEGRO N8

2.00

87.00

KG.

10-12-14

1663

ALAMBRE NEGRO N8

2.00

85.00

KG.

11-12-14

1664

ALAMBRE NEGRO N8

4.00

81.00

KG.

12-12-14

1666

ALAMBRE NEGRO N8

2.00

79.00

KG.

15-12-14

1668

ALAMBRE NEGRO N8

2.00

77.00

KG.

93.00

77.00

TOTAL

10-10-14

4286

13-10-14

15-10-14

ALAMBRE NEGRO N16


62

4289

170.00

5.00

ALAMBRE NEGRO N16


TOTAL

5.00

ALAMBRE DE AMARRE PARA GAVIONES DE 2.2 MM

20.00

5.00

KG.

5.00

0.00

KG.

5.00

0.00

20.00

KG.

03-11-14

80

ALAMBRE DE AMARRE PARA GAVIONES DE 2.2 MM

3.00

17.00

KG.

04-11-14

81

ALAMBRE DE AMARRE PARA GAVIONES DE 2.2 MM

4.00

13.00

KG.

05-11-14

82

ALAMBRE DE AMARRE PARA GAVIONES DE 2.2 MM

3.00

10.00

KG.

08-11-14

85

ALAMBRE DE AMARRE PARA GAVIONES DE 2.2 MM

2.00

8.00

KG.

10-11-14

86

ALAMBRE DE AMARRE PARA GAVIONES DE 2.2 MM

1.00

7.00

KG.

12-11-14

88

ALAMBRE DE AMARRE PARA GAVIONES DE 2.2 MM

4.00

3.00

KG.

14-11-14

90

ALAMBRE DE AMARRE PARA GAVIONES DE 2.2 MM

2.00

1.00

KG.

15-11-14

91

ALAMBRE DE AMARRE PARA GAVIONES DE 2.2 MM


TOTAL

10-10-14

4286

FIERRO CORRUGADO DE 1/2"

20.00

1.00

0.00

20.00

0.00

8.00

KG.

8.00

VLL.

22-11-14

97

FIERRO CORRUGADO DE 1/2"

2.00

6.00

VLL.

28-11-14

1653

FIERRO CORRUGADO DE 1/2"

1.00

5.00

VLL.

06-12-14

1661

FIERRO CORRUGADO DE 1/2"

2.00

3.00

VLL.

09-12-14

1662

FIERRO CORRUGADO DE 1/2"

1.00

2.00

VLL.

10-12-14

1663

FIERRO CORRUGADO DE 1/2"

1.00

1.00

VLL.

12-12-14

1666

FIERRO CORRUGADO DE 1/2"

1.00

0.00

VLL.

8.00

0.00

TOTAL

27-10-14

4294

27-10-14

CALAMINA DE 0.80X3.60X0.14 MM
74

20.00

CALAMINA DE 0.80X3.60X0.14 MM
TOTAL

25-08-14

1758

25-08-14

CACHIMBAS DE 6X6
3445

4257

02-08-14

CACHIMBAS DE 6X6

CLAVO PARA CALAMINA


1605

4259

12-08-14

4278

10-09-14

4260

10.00

PLASTICO NACIONAL DE 2M A 4M

ROLLIZO DE EUCALIPTO 4"X5M

20.00

0.00

4.00

KG.

4.00

0.00

KG.

4.00

0.00

1.00

KG.

1.00

0.00

KG.

1.00

0.00

10.00

MTS.

10.00

0.00

MTS.

10.00

0.00

100.00

TOTAL

13-08-14

PLCH.

10.00

PLASTICO NACIONAL DE 2M A 4M
1635

1.00

PLASTICO
TOTAL

06-09-14

4.00

CLAVO PARA CALAMINA

PLASTICO
1610

PLCH.

0.00

1.00

TOTAL

12-08-14

20.00

20.00
20.00

4.00

TOTAL

02-08-14

8.00

100.00

100.00

MTS.

100.00

0.00

MTS.

100.00

0.00

20.00

UND.

02-09-14

1625

ROLLIZO DE EUCALIPTO 4"X5M

20.00
4.00

16.00

UND.

03-10-14

55

ROLLIZO DE EUCALIPTO 4"X5M

16.00

0.00

UND.

TOTAL

14-08-14

4261

14-08-14

YESO DOBLE
1612

4286

20.00

1.00

YESO DOBLE
TOTAL

10-10-14

20.00

SOLDADURA

1.00

0.00

1.00

SCO.

1.00

0.00

SCO.

1.00

0.00

25.00

KG.

03-12-14

1657

SOLDADURA

25.00
2.00

23.00

KG.

04-12-14

1658

SOLDADURA

3.00

20.00

KG.

05-12-14

1660

SOLDADURA

3.00

17.00

KG.

06-12-14

1661

SOLDADURA

1.00

16.00

KG.

10-12-14

1663

SOLDADURA

3.00

13.00

KG.

11-12-14

1664

SOLDADURA

2.00

11.00

KG.

12-12-14

1666

SOLDADURA

3.00

8.00

KG.

13-12-14

1667

SOLDADURA

3.00

5.00

KG.

20.00

5.00

TOTAL

15-08-14

4262

15-08-14

FOLDER MANILA (INC. FASTENER)


1613

100

FOLDER MANILA (INC. FASTENER)


TOTAL

15-08-14

4262

15-08-14

CINTA MASKIN DE 1" X 40 YARS


1613

15-08-14

4262

100

UND.

100

0.00

UND.

100

0.00

2.00

CINTA DE EMBALAJE 2" X 110


1613

100

CINTA MASKIN DE 1" X 40 YARS


TOTAL

15-08-14

25.00

2.00

2.00

UND.

2.00

0.00

UND.

2.00

0.00

2.00

CINTA DE EMBALAJE 2" X 111


TOTAL

2.00

2.00

UND.

2.00

0.00

UND.

2.00

0.00

15-08-14

4262

15-08-14

GOMA EN BARRA 40 GR.


1613

3.00

GOMA EN BARRA 40 GR.


TOTAL

15-08-14

4262

15-08-14

ARCHIVADORES LOMO GRUESO


1613

4262

15-08-14

ARCHIVADORES LOMO GRUESO

CORRECTOR
1613

4262

15-08-14

4262

15-08-14

4262

15-08-14

4262

15-08-14

4262

15-08-14

LAPICEROS PUNTA FINA (ROJO, AZUL,NEGRO)


1613

15-08-14

4262

VINIFAN TAMAO OFICIO


1613

VINIFAN TAMAO OFICIO

UND.

8.00

0.00

UND.

8.00

0.00

6.00

UND.

6.00

0.00

UND.

6.00

0.00

3.00

UND.

3.00

0.00

UND.

3.00

0.00

1.00

DOC.

1.00

0.00

DOC.

1.00

0.00

4.00

UND.

4.00

0.00

UND.

4.00

0.00

12.00

12.00

12.00

UND.

12.00

0.00

UND.

12.00

0.00

1.00

LAPICEROS PUNTA FINA (ROJO, AZUL,NEGRO)


TOTAL

15-08-14

4.00

LAPICEROS TINTA LIQUIDA (ROJO, AZUL,NEGRO)


TOTAL

15-08-14

1.00

MEMORIA USB DE 16 GB

LAPICEROS TINTA LIQUIDA (ROJO, AZUL,NEGRO)


1613

8.00

4.00

TOTAL

15-08-14

UND.

1.00

MEMORIA USB DE 16 GB
1613

3.00

PAPEL LUSTRE
TOTAL

15-08-14

6.00

CUADERNO A-4 200 HOJAS

PAPEL LUSTRE
1613

0.00
0.00

3.00

TOTAL

15-08-14

3.00
3.00

6.00

CUADERNO A-4 200 HOJAS


1613

8.00

CORRECTOR
TOTAL

15-08-14

UND.

8.00

TOTAL

15-08-14

3.00

3.00

1.00

1.00

CJA.

1.00

0.00

CJA.

1.00

0.00

1.00
1.00

1.00

UND.

0.00

UND.

TOTAL

15-08-14

4262

15-08-14

LAPIZ PORTAMINAS LAYCONSA


1613

4263

15-08-14

LAPIZ PORTAMINAS LAYCONSA

RESALTADORES
1614

4263

15-08-14

4263

15-08-14

CARTEL DE OBRA 4.20MX2.80M


1614

4263

15-08-14

4281

17-09-14

4295

28-10-14

4266

10.00

VINKARD (CONTROL VISIBLE DE ALMACEN)

CEMENTO PORTLAND IP 42.50 KG.

3.00
3.00

0.00

3.00

0.00

15.00

150.00

UND
UND

6.00

UND

6.00

0.00

UND

6.00

0.00

1.00

UND

1.00

0.00

UND

1.00

0.00

5.00

MLL.

5.00

0.00

MLL.

5.00

0.00

10.00

MLL.

10.00

0.00

MLL.

10.00

0.00

15.00

TOTAL

22-08-14

5.00

PAPEL BOND A-4 DE 75 GR.

VINKARD (CONTROL VISIBLE DE ALMACEN)


75

UND.

10.00

TOTAL

28-10-14

0.00
0.00

5.00

PAPEL BOND A-4 DE 75 GR.


1641

1.00

PAPEL BOND A-4 DE 80 GR.


TOTAL

17-09-14

6.00

CARTEL DE OBRA 4.20MX2.80M

PAPEL BOND A-4 DE 80 GR.


1614

6.00
6.00

1.00

TOTAL

15-08-14

UND.

6.00

CUADERNO A-4 100 HOJAS


TOTAL

15-08-14

3.00

0.00

6.00

3.00

CUADERNO A-4 100 HOJAS


1614

6.00

RESALTADORES
TOTAL

15-08-14

1.00

6.00

TOTAL

15-08-14

1.00

15.00

MLL.

15.00

0.00

MLL.

15.00

0.00

150.00

BLS.

02-09-14

4274

14-10-14

4288

CEMENTO PORTLAND IP 42.50 KG.

248.00

CEMENTO PORTLAND IP 42.50 KG.

42.00

398.00

BLS.

440.00

BLS.

23-08-14

1618

CEMENTO PORTLAND IP 42.50 KG.

19.00

421.00

BLS.

26-08-14

1620

CEMENTO PORTLAND IP 42.50 KG.

36.00

385.00

BLS.

27-08-14

1621

CEMENTO PORTLAND IP 42.50 KG.

26.00

359.00

BLS.

28-08-14

1622

CEMENTO PORTLAND IP 42.50 KG.

11.00

348.00

BLS.

29-08-14

1623

CEMENTO PORTLAND IP 42.50 KG.

16.00

332.00

BLS.

01-09-14

1624

CEMENTO PORTLAND IP 42.50 KG.

5.00

327.00

BLS.

02-09-14

1625

CEMENTO PORTLAND IP 42.50 KG.

19.00

308.00

BLS.

03-09-14

1628

CEMENTO PORTLAND IP 42.50 KG.

19.00

289.00

BLS.

04-09-14

1629

CEMENTO PORTLAND IP 42.50 KG.

18.00

271.00

BLS.

05-09-14

1630

CEMENTO PORTLAND IP 42.50 KG.

10.00

261.00

BLS.

06-09-14

1631

CEMENTO PORTLAND IP 42.50 KG.

3.00

258.00

BLS.

VAN
..VIENEN
08-09-14

1632

CEMENTO PORTLAND IP 42.50 KG.

8.00

250.00

BLS.

09-09-14

1634

CEMENTO PORTLAND IP 42.50 KG.

2.00

248.00

BLS.

10-09-14

1635

CEMENTO PORTLAND IP 42.50 KG.

1.00

247.00

BLS.

11-09-14

1636

CEMENTO PORTLAND IP 42.50 KG.

2.00

245.00

BLS.

12-09-14

1637

CEMENTO PORTLAND IP 42.50 KG.

20.00

225.00

BLS.

15-09-14

1639

CEMENTO PORTLAND IP 42.50 KG.

36.00

189.00

BLS.

17-09-14

1641

CEMENTO PORTLAND IP 42.50 KG.

27.00

162.00

BLS.

19-09-14

1644

CEMENTO PORTLAND IP 42.50 KG.

10.00

152.00

BLS.

20-09-14

1645

CEMENTO PORTLAND IP 42.50 KG.

1.00

151.00

BLS.

22-09-14

1646

CEMENTO PORTLAND IP 42.50 KG.

1.00

150.00

BLS.

23-09-14

1647

CEMENTO PORTLAND IP 42.50 KG.

1.00

149.00

BLS.

25-09-14

1648

CEMENTO PORTLAND IP 42.50 KG.

1.00

148.00

BLS.

26-09-14

1649

CEMENTO PORTLAND IP 42.50 KG.

1.00

147.00

BLS.

29-09-14

51

CEMENTO PORTLAND IP 42.50 KG.

14.00

133.00

BLS.

30-09-14

52

CEMENTO PORTLAND IP 42.50 KG.

21.00

112.00

BLS.

02-10-14

54

CEMENTO PORTLAND IP 42.50 KG.

1.00

111.00

BLS.

03-10-14

55

CEMENTO PORTLAND IP 42.50 KG.

1.00

110.00

BLS.

04-10-14

56

CEMENTO PORTLAND IP 42.50 KG.

1.00

109.00

BLS.

06-10-14

57

CEMENTO PORTLAND IP 42.50 KG.

17.00

92.00

BLS.

07-10-14

58

CEMENTO PORTLAND IP 42.50 KG.

24.00

68.00

BLS.

15-10-14

64

17-10-14

66

CEMENTO PORTLAND IP 42.50 KG.

1.00

67.00

BLS.

CEMENTO PORTLAND IP 42.50 KG.

15.00

52.00

BLS.

18-10-14
20-10-14

67

CEMENTO PORTLAND IP 42.50 KG.

20.00

32.00

BLS.

68

CEMENTO PORTLAND IP 42.50 KG.

23.00

9.00

BLS.

21-10-14

69

CEMENTO PORTLAND IP 42.50 KG.

1.00

8.00

BLS.

22-10-14

70

CEMENTO PORTLAND IP 42.50 KG.

1.00

7.00

BLS.

24-10-14

73

CEMENTO PORTLAND IP 42.50 KG.

4.00

3.00

BLS.

27-10-14

74

CEMENTO PORTLAND IP 42.50 KG.

2.00

1.00

BLS.

29-10-14

76

CEMENTO PORTLAND IP 42.50 KG.

1.00

0.00

BLS.

440.00

0.00

TOTAL

440.00

14-10-14

4288

CEMENTO PORTLAND IP 42.50 KG.

158.00

158.00

BLS.

17-11-14

53

CEMENTO PORTLAND IP 42.50 KG.

142.00

300.00

BLS.

15-12-14

62

CEMENTO PORTLAND IP 42.50 KG.

10.00

310.00

BLS.

29-10-14

76

CEMENTO PORTLAND IP 42.50 KG.

3.00

307.00

BLS.

31-10-14

79

CEMENTO PORTLAND IP 42.50 KG.

22.00

285.00

BLS.

03-11-14

80

CEMENTO PORTLAND IP 42.50 KG.

10.00

275.00

BLS.

10-11-14

86

CEMENTO PORTLAND IP 42.50 KG.

1.00

274.00

BLS.

11-11-14

88

CEMENTO PORTLAND IP 42.50 KG.

1.00

273.00

BLS.

22-11-14

98

CEMENTO PORTLAND IP 42.50 KG.

26.00

247.00

BLS.

25-11-14

99

CEMENTO PORTLAND IP 42.50 KG.

11.00

236.00

BLS.

26-11-14

100

CEMENTO PORTLAND IP 42.50 KG.

16.00

220.00

BLS.

27-11-14

1652

CEMENTO PORTLAND IP 42.50 KG.

17.00

203.00

BLS.

28-11-14

1653

CEMENTO PORTLAND IP 42.50 KG.

9.00

194.00

BLS.

29-11-14

1654

CEMENTO PORTLAND IP 42.50 KG.

11.00

183.00

BLS.

01-12-14

1655

CEMENTO PORTLAND IP 42.50 KG.

2.00

181.00

BLS.

CEMENTO PORTLAND IP 42.50 KG.

35.00

146.00

BLS.

02-12-14
03-12-14

1657

CEMENTO PORTLAND IP 42.50 KG.

7.00

139.00

BLS.

04-12-14

1658

CEMENTO PORTLAND IP 42.50 KG.

6.00

133.00

BLS.

05-12-14

1660

CEMENTO PORTLAND IP 42.50 KG.

17.00

116.00

BLS.

06-12-14

1661

CEMENTO PORTLAND IP 42.50 KG.

8.00

108.00

BLS.

09-12-14

1662

CEMENTO PORTLAND IP 42.50 KG.

14.00

94.00

BLS.

10-12-14

1663

CEMENTO PORTLAND IP 42.50 KG.

10.00

84.00

BLS.

11-12-14

1664

CEMENTO PORTLAND IP 42.50 KG.

20.00

64.00

BLS.

12-12-14

1666

CEMENTO PORTLAND IP 42.50 KG.

2.00

62.00

BLS.

13-12-14

1667

CEMENTO PORTLAND IP 42.50 KG.

10.00

52.00

BLS.

15-12-14

1668

CEMENTO PORTLAND IP 42.50 KG.

4.00

48.00

BLS.

16-12-14

1669

CEMENTO PORTLAND IP 42.50 KG.

10.00

38.00

BLS.

17-12-14

1674

CEMENTO PORTLAND IP 42.50 KG.

17.00

21.00

BLS.

17-12-14

1674

CEMENTO PORTLAND IP 42.50 KG. TRANSFERENCIA

10.00

11.00

BLS.

299.00

11.00

TOTAL

290.00

21-08-14

4265

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

45.00

45.00

M3.

22-08-14

4266

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

45.00

90.00

M3.

23-08-14
23-08-14

1618
4267

26-08-14
27-08-14
28-08-14

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)


PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

1620

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

1621

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

4270

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.40
29.00
10.15
5.20
58.00

84.60

M3.

113.60

M3.

103.45

M3.

98.25

M3.

156.25

M3.

28-08-14

1622

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

4.15

152.10

M3.

29-08-14

1623

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

4.15

147.95

M3.

01-09-14

1624

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

1.60

146.35

M3.

02-09-14

1627

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

6.55

139.80

M3.

03-09-14

1628

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.70

134.10

M3.

04-09-14

1629

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

9.00

125.10

M3.

05-09-14

1630

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

3.80

121.30

M3.

06-09-14

1631

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

1.30

120.00

M3.

08-09-14

1633

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

3.00

117.00

M3.

12-09-14

1637

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

6.30

110.70

M3.

140.70

M3.

07-10-14

4285

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

30.00

10-10-14

4286

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

15.00

155.70

M3.

14-10-14

4288

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

15.00

170.70

M3.

15-10-14

4289

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

15.00

185.70

M3.

16-10-14

4290

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

15.00

200.70

M3.

21-10-14

4292

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

15.00

215.70

M3.

24-10-14

4293

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

18.00

233.70

M3.

15-09-14

1639

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

13.23

220.47

M3.

17-09-14

1642

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

16.30

204.17

M3.

19-09-14

1644

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

3.95

200.22

M3.

29-09-14

51

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

4.20

196.02

M3.

30-09-14

52

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

7.35

188.67

M3.

01-10-14

53

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.00

183.67

M3.

04-10-14

56

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.00

178.67

M3.

06-10-14

57

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

4.70

173.97

M3.

07-10-14

3446

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

10.00

163.97

M3.

09-10-14

59

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

2.50

161.47

M3.

VAN
..VIENEN
10-10-14

60

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

2.50

158.97

M3.

13-10-14

62

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.00

153.97

M3.

15-10-14

64

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

10.00

143.97

M3.

17-10-14

66

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

4.70

139.27

M3.

18-10-14

67

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

4.90

134.37

M3.

20-10-14

68

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

10.25

124.12

M3.

22-10-14

69

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.00

119.12

M3.

23-10-14

71

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.00

114.12

M3.

24-10-14

73

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

0.70

113.42

M3.

27-10-14

74

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.25

108.17

M3.

29-10-14

76

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

10.40

97.77

M3.

30-10-14

78

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.40

92.37

M3.

31-10-14

79

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

12.85

79.52

M3.

03-11-14

80

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

4.40

75.12

M3.

04-11-14

81

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

2.50

72.62

M3.

05-11-14

82

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

2.50

70.12

M3.

06-11-14

83

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

10.00

60.12

M3.

08-11-14

85

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

2.50

57.62

M3.

10-11-14

86

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

7.50

50.12

M3.

12-11-14

88

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.00

45.12

M3.

15-11-14

91

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

6.25

38.87

M3.

18-11-14

93

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

3.75

35.12

M3.

19-11-14

94

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

3.75

31.37

M3.

20-11-14

95

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

2.75

28.62

M3.

24-11-14

98

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

3.40

25.22

M3.

26-11-14

1651

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.25

19.97

M3.

28-11-14

1653

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

6.55

13.42

M3.

01-12-14

1655

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

7.80

5.62

M3.

02-12-14

1656

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

5.30

0.32

M3.

03-12-14

1657

PIEDRA GRANDE DE 8" A 10" (RUMICOLCA)

1.52

-1.20

M3.

301.20

-1.20

TOTAL

300

15-10-14

4289

PIEDRA CHANCADA DE 1/2" A 3/4"

19.50

19.50

M3.

21-10-14

4292

PIEDRA CHANCADA DE 1/2" A 3/4"

16.50

36.00

M3.

06-10-14

57

PIEDRA CHANCADA DE 1/2" A 3/4"

0.88

35.12

M3.

07-10-14

3446

PIEDRA CHANCADA DE 1/2" A 3/4"

1.89

33.23

M3.

17-10-14

66

PIEDRA CHANCADA DE 1/2" A 3/4"

0.88

32.35

M3.

18-10-14

67

PIEDRA CHANCADA DE 1/2" A 3/4"

1.85

30.50

M3.

20-10-14

68

PIEDRA CHANCADA DE 1/2" A 3/4"

2.50

28.00

M3.

24-10-14

73

PIEDRA CHANCADA DE 1/2" A 3/4"

0.25

27.75

M3.

27-10-14

74

PIEDRA CHANCADA DE 1/2" A 3/4"

3.00

24.75

M3.

29-10-14

76

PIEDRA CHANCADA DE 1/2" A 3/4"

1.60

23.15

M3.

31-10-14

79

PIEDRA CHANCADA DE 1/2" A 3/4"

2.12

21.03

M3.

03-11-14

80

PIEDRA CHANCADA DE 1/2" A 3/4"

0.84

20.19

M3.

05-11-14

83

PIEDRA CHANCADA DE 1/2" A 3/4"

2.60

17.59

M3.

24-11-14

98

PIEDRA CHANCADA DE 1/2" A 3/4"

3.30

14.29

M3.

25-11-14

99

PIEDRA CHANCADA DE 1/2" A 3/4"

0.62

13.67

M3.

26-11-14

1651

PIEDRA CHANCADA DE 1/2" A 3/4"

2.30

11.37

M3.

27-11-14

1652

PIEDRA CHANCADA DE 1/2" A 3/4"

3.60

7.77

M3.

28-11-14

1653

PIEDRA CHANCADA DE 1/2" A 3/4"

0.80

6.97

M3.

29-11-14

1654

PIEDRA CHANCADA DE 1/2" A 3/4"

1.12

5.85

M3.

01-12-14

1655

PIEDRA CHANCADA DE 1/2" A 3/4"

0.15

5.70

M3.

02-12-14

1656

PIEDRA CHANCADA DE 1/2" A 3/4"

2.80

2.90

M3.

03-12-14

1657

PIEDRA CHANCADA DE 1/2" A 3/4"

0.80

2.10

M3.

04-12-14

1659

PIEDRA CHANCADA DE 1/2" A 3/4"

0.40

1.70

M3.

05-12-14

1660

PIEDRA CHANCADA DE 1/2" A 3/4"

0.60

1.10

M3.

06-12-14

1661

PIEDRA CHANCADA DE 1/2" A 3/4"

0.40

0.70

M3.

09-12-14

1662

PIEDRA CHANCADA DE 1/2" A 3/4"

0.70

0.00

M3.

36.00

0.00

TOTAL

02-09-14

4274

ARENA FINA DE CUNYAC

36.00

M3.

09-09-14

1634

ARENA FINA DE CUNYAC

0.20

7.80

M3.

10-09-14

1635

ARENA FINA DE CUNYAC

0.10

7.70

M3.

11-09-14

1636

ARENA FINA DE CUNYAC

0.20

7.50

M3.

20-09-14

1645

ARENA FINA DE CUNYAC

0.50

7.00

M3.

02-10-14

54

ARENA FINA DE CUNYAC

0.20

6.80

M3.

VAN
..VIENEN
03-10-14

55

ARENA FINA DE CUNYAC

0.20

6.60

M3.

04-10-14

56

ARENA FINA DE CUNYAC

0.20

6.40

M3.

21-10-14

69

ARENA FINA DE CUNYAC

0.10

6.30

M3.

22-10-14

70

ARENA FINA DE CUNYAC

0.10

6.20

M3.

27-10-14

74

ARENA FINA DE CUNYAC

0.50

5.70

M3.

10-11-14

86

ARENA FINA DE CUNYAC

0.20

5.50

M3.

12-11-14

88

ARENA FINA DE CUNYAC

0.20

5.30

M3.

24-11-14

98

ARENA FINA DE CUNYAC

0.10

5.20

M3.

25-11-14

99

ARENA FINA DE CUNYAC

0.20

5.00

M3.

26-11-14

1651

ARENA FINA DE CUNYAC

0.20

4.80

M3.

02-12-14

1656

ARENA FINA DE CUNYAC

0.90

3.90

M3.

03-12-14

1657

ARENA FINA DE CUNYAC

0.30

3.60

M3.

05-12-14

1660

ARENA FINA DE CUNYAC

0.30

3.30

M3.

06-12-14

1661

ARENA FINA DE CUNYAC

0.30

3.00

M3.

09-12-14

1662

ARENA FINA DE CUNYAC

0.70

2.30

M3.

10-12-14

1663

ARENA FINA DE CUNYAC

0.30

2.00

M3.

11-12-14

1665

ARENA FINA DE CUNYAC

0.40

1.60

M3.

12-12-14

1666

ARENA FINA DE CUNYAC

0.35

1.25

M3.

13-12-14

1667

ARENA FINA DE CUNYAC

0.35

0.90

M3.

15-12-14

1668

ARENA FINA DE CUNYAC

0.35

0.55

M3.

17-12-14

1674

ARENA FINA DE CUNYAC

0.65

-0.10

M3.

8.10

0.10

TOTAL

22-08-14

ARENA GRUESA FINEADA DE MINA

4266

39.5

39.50

M3.

23-08-14

1618

ARENA GRUESA FINEADA DE MINA

1.95

37.55

M3.

26-08-14

1620

ARENA GRUESA FINEADA DE MINA

3.15

34.40

M3.

27-08-14

1621

ARENA GRUESA FINEADA DE MINA

1.35

33.05

M3.

28-08-14

1622

ARENA GRUESA FINEADA DE MINA

0.91

32.14

M3.

29-08-14

1623

ARENA GRUESA FINEADA DE MINA

1.30

30.84

M3.

01-09-14

1624

ARENA GRUESA FINEADA DE MINA

0.45

30.39

M3.

02-09-14

1627

ARENA GRUESA FINEADA DE MINA

1.85

28.54

M3.

03-09-14

1628

ARENA GRUESA FINEADA DE MINA

2.00

26.54

M3.

04-09-14

1629

ARENA GRUESA FINEADA DE MINA

2.55

23.99

M3.

VAN
..VIENEN
05-09-14

1630

ARENA GRUESA FINEADA DE MINA

1.08

22.91

M3.

06-09-14

1631

ARENA GRUESA FINEADA DE MINA

0.36

22.55

M3.

08-09-14

1633

ARENA GRUESA FINEADA DE MINA

0.88

21.67

M3.

12-09-14

1637

ARENA GRUESA FINEADA DE MINA

2.30

19.37

M3.

15-09-14

1639

ARENA GRUESA FINEADA DE MINA

3.78

15.59

M3.

17-09-14

1642

ARENA GRUESA FINEADA DE MINA

4.66

10.93

M3.

19-09-14

1644

ARENA GRUESA FINEADA DE MINA

1.15

9.78

M3.

29-09-14

51

ARENA GRUESA FINEADA DE MINA

1.50

8.28

M3.

30-09-14

52

ARENA GRUESA FINEADA DE MINA

2.10

6.18

M3.

06-10-14

57

ARENA GRUESA FINEADA DE MINA

1.77

4.41

M3.

07-10-14

3446

ARENA GRUESA FINEADA DE MINA

2.94

1.47

M3.

17-10-14

66

ARENA GRUESA FINEADA DE MINA

1.47

0.00

M3.

39.5

0.00

TOTAL

39.5

17-10-14

4291

ARENA GRUESA FINEADA DE MINA

19.5

19.50

M3.

21-10-14

4292

ARENA GRUESA FINEADA DE MINA

10.5

30.00

M3.

18-10-14

67

ARENA GRUESA FINEADA DE MINA

2.50

27.50

M3.

20-10-14

68

ARENA GRUESA FINEADA DE MINA

3.20

24.30

M3.

24-10-14

73

ARENA GRUESA FINEADA DE MINA

0.25

24.05

M3.

29-10-14

76

ARENA GRUESA FINEADA DE MINA

1.90

22.15

M3.

31-10-14

79

ARENA GRUESA FINEADA DE MINA

2.40

19.75

M3.

03-11-14

80

ARENA GRUESA FINEADA DE MINA

1.26

18.49

M3.

24-11-14

98

ARENA GRUESA FINEADA DE MINA

4.40

14.09

M3.

25-11-14

99

ARENA GRUESA FINEADA DE MINA

0.83

13.26

M3.

26-11-14

1651

ARENA GRUESA FINEADA DE MINA

2.90

10.36

M3.

27-11-14

1652

ARENA GRUESA FINEADA DE MINA

1.95

8.41

M3.

28-11-14

1653

ARENA GRUESA FINEADA DE MINA

1.07

7.34

M3.

29-11-14

1654

ARENA GRUESA FINEADA DE MINA

1.60

5.74

M3.

01-12-14

1655

ARENA GRUESA FINEADA DE MINA

0.20

5.54

M3.

02-12-14

1656

ARENA GRUESA FINEADA DE MINA

3.40

2.14

M3.

03-12-14

1657

ARENA GRUESA FINEADA DE MINA

1.00

1.14

M3.

04-12-14

1658

ARENA GRUESA FINEADA DE MINA

0.60

0.54

M3.

05-12-14

1660

ARENA GRUESA FINEADA DE MINA

0.54

0.00

M3.

30.0

0.00

TOTAL
14-11-14

52

ARENA GRUESA FINEADA DE MINA

30.0

3.00

M3.

05-12-14

1660

ARENA GRUESA FINEADA DE MINA

3.00
0.80

2.20

M3.

06-12-14

1661

ARENA GRUESA FINEADA DE MINA

0.60

1.60

M3.

09-12-14

1662

ARENA GRUESA FINEADA DE MINA

1.60

0.00

M3.

3.00

0.00

TOTAL

14-11-14

52

ARENA GRUESA FINEADA DE MINA

3.00

8.00

8.00

M3.

10-12-14

1663

ARENA GRUESA FINEADA DE MINA

1.50

6.50

M3.

11-12-14

1665

ARENA GRUESA FINEADA DE MINA

1.90

4.60

M3.

13-12-14

1667

ARENA GRUESA FINEADA DE MINA

1.00

3.60

M3.

15-12-14

1668

ARENA GRUESA FINEADA DE MINA

0.20

3.40

M3.

16-12-14

1669

ARENA GRUESA FINEADA DE MINA

0.95

2.45

M3.

17-12-14

1674

ARENA GRUESA FINEADA DE MINA

2.45

0.00

M3.

TOTAL

04-10-14

4283

02-10-14

LASTRE PREPARADO EN LA CANTERA SENCCA


54

8.00

8.00

36.0

LASTRE PREPARADO EN LA CANTERA SENCCA

18.0

0.00

36.0

M3.

18.0

M3.

06-10-14

4284

LASTRE PREPARADO EN LA CANTERA SENCCA

36.0

54.0

M3.

07-10-14

4285

LASTRE PREPARADO EN LA CANTERA SENCCA

36.0

90.0

M3.

13-10-14

4287

LASTRE PREPARADO EN LA CANTERA SENCCA

36.0

126.0

M3.

15-10-14

4289

LASTRE PREPARADO EN LA CANTERA SENCCA

36.0

162.0

M3.

16-10-14

4290

LASTRE PREPARADO EN LA CANTERA SENCCA

36.0

198.0

M3.

17-10-14

4291

LASTRE PREPARADO EN LA CANTERA SENCCA

36.0

234.0

M3.

21-10-14

4292

LASTRE PREPARADO EN LA CANTERA SENCCA

36.0

270.0

M3.

24-10-14

4293

LASTRE PREPARADO EN LA CANTERA SENCCA

12.0

282.0

M3.

55

LASTRE PREPARADO EN LA CANTERA SENCCA

18.0

264.0

M3.

06-10-14

57

LASTRE PREPARADO EN LA CANTERA SENCCA

15.0

249.0

M3.

07-10-14

3446

LASTRE PREPARADO EN LA CANTERA SENCCA

10.0

239.0

M3.

09-10-14

59

LASTRE PREPARADO EN LA CANTERA SENCCA

5.0

234.0

M3.

10-10-14

60

LASTRE PREPARADO EN LA CANTERA SENCCA

7.0

227.0

M3.

11-10-14

61

LASTRE PREPARADO EN LA CANTERA SENCCA

10.0

217.0

M3.

13-10-14

62

LASTRE PREPARADO EN LA CANTERA SENCCA

10.0

207.0

M3.

14-10-14

63

LASTRE PREPARADO EN LA CANTERA SENCCA

11.0

196.0

M3.

15-10-14

64

LASTRE PREPARADO EN LA CANTERA SENCCA

10.0

186.0

M3.

03-10-14

VAN
..VIENEN
16-10-14

65

LASTRE PREPARADO EN LA CANTERA SENCCA

30.00

156.00

M3.

17-10-14

66

LASTRE PREPARADO EN LA CANTERA SENCCA

28.00

128.00

M3.

21-10-14

69

LASTRE PREPARADO EN LA CANTERA SENCCA

16.00

112.00

M3.

22-10-14

70

LASTRE PREPARADO EN LA CANTERA SENCCA

10.00

102.00

M3.

23-10-14

71

LASTRE PREPARADO EN LA CANTERA SENCCA

7.50

94.50

M3.

24-10-14

73

LASTRE PREPARADO EN LA CANTERA SENCCA

8.00

86.50

M3.

27-10-14

74

LASTRE PREPARADO EN LA CANTERA SENCCA

8.00

78.50

M3.

28-10-14

75

LASTRE PREPARADO EN LA CANTERA SENCCA

20.00

58.50

M3.

29-10-14

76

LASTRE PREPARADO EN LA CANTERA SENCCA

15.00

43.50

M3.

30-10-14

78

LASTRE PREPARADO EN LA CANTERA SENCCA

10.00

33.50

M3.

31-10-14

79

LASTRE PREPARADO EN LA CANTERA SENCCA

4.00

29.50

M3.

07-11-14

84

LASTRE PREPARADO EN LA CANTERA SENCCA

10.00

19.50

M3.

12-11-14

88

LASTRE PREPARADO EN LA CANTERA SENCCA

5.00

14.50

M3.

13-11-14

89

LASTRE PREPARADO EN LA CANTERA SENCCA

5.00

9.50

M3.

19-11-14

94

LASTRE PREPARADO EN LA CANTERA SENCCA

9.50

0.00

M3.

300.0

0.0

TOTAL

10-10-14

4286

20.00

GLN.

80

ASFALTO RC-250

2.00

18.00

GLN.

04-11-14

82

ASFALTO RC-250

1.00

17.00

GLN.

17-12-14

1674

ASFALTO RC-250

4.00

13.00

GLN.

7.00

13.00

03-11-14

ASFALTO RC-250

300.0

20.00

TOTAL

21-08-14

4265

GEOTEXTIL HO TEJIDO DE 200 GR/M2

20.00

215.00

215.00

M2.

02-10-14

54

GEOTEXTIL HO TEJIDO DE 200 GR/M2

8.00

207.00

M2.

04-10-14

56

GEOTEXTIL HO TEJIDO DE 200 GR/M2

14.40

192.60

M2.

16-10-14

65

GEOTEXTIL HO TEJIDO DE 200 GR/M2

36.00

156.60

M2.

21-10-14

69

GEOTEXTIL HO TEJIDO DE 200 GR/M2

8.00

148.60

M2.

27-10-14

74

GEOTEXTIL HO TEJIDO DE 200 GR/M2

11.00

137.60

M2.

28-10-14

75

GEOTEXTIL HO TEJIDO DE 200 GR/M2

28.00

109.60

M2.

03-11-14

80

GEOTEXTIL HO TEJIDO DE 200 GR/M2

8.00

101.60

M2.

05-11-14

82

GEOTEXTIL HO TEJIDO DE 200 GR/M2

12.00

89.60

M2.

06-11-14

83

GEOTEXTIL HO TEJIDO DE 200 GR/M2

19.60

70.00

M2.

VAN
..VIENEN
07-11-14

84

GEOTEXTIL HO TEJIDO DE 200 GR/M2

3.60

66.40

M2.

10-11-14

86

GEOTEXTIL HO TEJIDO DE 200 GR/M2

12.80

53.60

M2.

18-11-14

93

GEOTEXTIL HO TEJIDO DE 200 GR/M2

12.80

40.80

M2.

20-11-14

95

GEOTEXTIL HO TEJIDO DE 200 GR/M3

20.70

20.10

M2.

22-11-14

97

GEOTEXTIL HO TEJIDO DE 200 GR/M4

20.10

0.00

M2.

215.00

0.00

TOTAL

21-08-14

4265

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

215.00

210.00

M2.

01-10-14

53

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

210.00
17.00

193.00

M2.

09-10-14

59

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

18.00

175.00

M2.

13-10-14

62

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

18.00

157.00

M2.

21-10-14

69

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

16.00

141.00

M2.

22-10-14

70

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

16.00

125.00

M2.

23-10-14

71

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

16.00

109.00

M2.

27-10-14

74

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

16.80

92.20

M2.

06-11-14

83

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

36.00

56.20

M2.

11-11-14

87

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

18.00

38.20

M2.

12-11-14

88

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

18.00

20.20

M2.

19-11-14

94

GEOMALLA TEJIDA UNIAXIAL DE 120 KN

20.20

0.00

M2.

210.00

0.00

TOTAL

26-08-14

4268

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

210.00

35.00

35.00

UND.

01-10-14

53

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

2.00

33.00

UND.

09-10-14

59

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

32.00

UND.

16-10-14

63

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

31.00

UND.

14-10-14

65

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

3.00

28.00

UND.

21-10-14

69

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

4.00

24.00

UND.

22-10-14

70

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

3.00

21.00

UND.

28-10-14

75

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

3.00

18.00

UND.

29-10-14

75

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

17.00

UND.

03-11-14

80

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

3.00

14.00

UND.

VAN
..VIENEN
04-11-14

81

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

13.00

UND.

05-11-14

82

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

2.00

11.00

UND.

06-11-14

84

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

10.00

UND.

08-11-14

85

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

2.00

8.00

UND.

11-11-14

87

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

7.00

UND.

12-11-14

88

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC

2.00

5.00

UND.

13-11-14

89

GAVION PARA SUELO REFORZADO 1.0X1.0X4.0 MALLA 10X12, 2.7MM+5% PVC


TOTAL

08-09-14

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

4279

35.00

4.00

1.00

34.00

1.00

30.00

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

UND.

30.00

UND.

2.00

28.00

UND.

03-10-14

55

09-10-14

59

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

4.00

24.00

UND.

20-10-14

68

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

2.00

22.00

UND.

28-10-14

75

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

2.00

20.00

UND.

04-11-14

81

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

2.00

18.00

UND.

05-11-14

82

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

17.00

UND.

06-11-14

83

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

16.00

UND.

15-11-14

85

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

15.00

UND.

18-11-14

91

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

14.00

UND.

18-11-14

93

GAVION PARA SUELO REFORZADO 0.50 X 1.0 X 4.0 MALLA 10X12, 2.7MM+5% PVC

1.00

13.00

UND.

17.00

13.00

TOTAL

29-08-14

4271

GEOCOMPUESTO DE DRENAJE FLEXIBLE TIPO 2L

30.00

280.00

280.00

M2.

60.00

220.00

M2.

17-09-14

1641

GEOCOMPUESTO DE DRENAJE FLEXIBLE TIPO 2L

03-10-14

55

GEOCOMPUESTO DE DRENAJE FLEXIBLE TIPO 2L

60.00

160.00

M2.

13-10-14

62

GEOCOMPUESTO DE DRENAJE FLEXIBLE TIPO 2L

100.00

60.00

M2.

220.00

60.00

TOTAL

02-09-14

4272

02-09-14

RROLLOS DE MATERIAL PARCHE CALIENTE - EQUIPO MECANICO


1626

4272

2.00

RROLLOS DE MATERIAL PARCHE CALIENTE - EQUIPO MECANICO


TOTAL

02-09-14

280.00

8T-9572 CATERPILLAR TRANS. TO4 SAG 30X19

2.00

2.00

2.00

UND.

2.00

0.00

UND.

2.00

0.00

2.00

BLD.

02-09-14

1626

8T-9572 CATERPILLAR TRANS. TO4 SAG 30X20


TOTAL

02-09-14

4272

02-09-14

1R - 0722 CATERPILLAR FILTRO HIDRAULICO


1626

4272

02-09-14

VOE 21380488 VOLVO FILTRO COMBUSTIBLE PARA SEPARADOR DE AGUA


1626

02-09-14

4272

02-09-14

VOE 85102464 VOLVO DIESELGHOIHE OIL VAS 3 SAE 15W-40X20 LTS.


1626

4272

02-09-14

TAPA DE TANQUE ORIGINAL - EQUIPO MECANICO


1626

02-09-14

4272

02-09-14

MANGUERA DE AGUA EQUIPO MECANICO


1626

4281

17-09-14

4286

11-10-14

02-09-14

4272

1.00

1.00

1.00

LLANTA PARA BUGUI (COMPLETO TRUPER)

GOMA COJIN
1626

PZA.

1.00

0.00

1.00

PZA.

1.00

0.00

PZA.

1.00

0.00

1.00

BCLN.

1.00

0.00

BCLN.

1.00

0.00

1.00

UND.

1.00

0.00

UND.

1.00

0.00

1.00

UND.

1.00

0.00

UND.

1.00

0.00

1.00

RLL.

1.00

0.00

RLL.

1.00

0.00

8.00

TOTAL

02-09-14

PZA.

0.00

1.00

LLANTA PARA BUGUI (COMPLETO TRUPER)


61

1.00

1.00

MANGUERA REFORZADA DE 3/4"


TOTAL

10-10-14

1.00

8.00

8.00

JGO.

8.00

0.00

JGO.

8.00

0.00

1.00

GOMA COJIN
TOTAL

1.00

BLD.

1.00

1.00

MANGUERA DE AGUA EQUIPO MECANICO

MANGUERA REFORZADA DE 3/4"


1641

0.00

1.00

TOTAL

17-09-14

1.00

TAPA DE TANQUE ORIGINAL - EQUIPO MECANICO


TOTAL

2.00

1.00

VOE 85102464 VOLVO DIESELGHOIHE OIL VAS 3 SAE 15W-40X20 LTS.


TOTAL

02-09-14

1.00

VOE 21380488 VOLVO FILTRO COMBUSTIBLE PARA SEPARADOR DE AGUA


TOTAL

0.00

1.00

1R - 0722 CATERPILLAR FILTRO HIDRAULICO


TOTAL

02-09-14

2.00

2.00

1.00

UND.

1.00

0.00

UND.

1.00

0.00

02-09-14

4272

02-09-14

LIQUIDO VIPAL BV-O3


1626

1.00

LIQUIDO VIPAL BV-O3


TOTAL

02-09-14

4272

02-09-04

VIPAL N # 10PARCHES PARA LLANTAS


1626

4272

02-09-14

VIPAL N # 10PARCHES PARA LLANTAS

TARRAJA
1626

4273

02-09-14

4266

1.00

1.00

0.00

2.00

UND.

2.00

0.00

UND.

2.00

0.00

1.00

UND.

1.00

0.00

UND.

1.00

0.00

1.00

VIPAL UD-05
TOTAL

22-08-14

2.00

TARRAJA

VIPAL UD-05
1626

UND.

1.00

TOTAL

02-09-14

UND.

0.00

2.00

TOTAL

02-09-14

1.00

1.00
1.00

GASOLINA DE 84 OCT.

1.00

1.00

UND.

1.00

0.00

UND.

1.00

0.00

5.00

5.00

GLN.

23-08-14

1618

GASOLINA DE 84 OCT.

3.00

2.00

GLN.

26-08-14

1620

GASOLINA DE 84 OCT.

1.00

1.00

GLN.

29-08-14

1623

GASOLINA DE 84 OCT.

1.00

0.00

GLN.

02-09-14

4274

02-09-14
04-09-14
05-09-14

GASOLINA DE 84 OCT.
1625

GASOLINA DE 84 OCT.

1629

GASOLINA DE 84 OCT.

4277

2.00

GASOLINA DE 84 OCT.

05-09-14

1630

GASOLINA DE 84 OCT.

08-09-14

1632

GASOLINA DE 84 OCT.

2.00

GLN.

1.00

1.00

GLN.

1.00

0.00

GLN.

5.00

GLN.

1.00

4.00

GLN.

1.00

3.00

GLN.

5.00

VAN
..VIENEN
12-09-14

1637

GASOLINA DE 84 OCT.

2.00

1.00

GLN.

15-09-14

1639

GASOLINA DE 84 OCT.

1.00

0.00

GLN.

17-09-14

38.00

GLN.

17-09-14

4281
1641

GASOLINA DE 84 OCT.
GASOLINA DE 84 OCT.

38.00
2.00

36.00

GLN.

19-09-14

1644

GASOLINA DE 84 OCT.

1.00

35.00

GLN.

06-10-14

57

GASOLINA DE 84 OCT.

1.00

34.00

GLN.

07-10-14

58

GASOLINA DE 84 OCT.

1.00

33.00

GLN.

18-10-14

67

GASOLINA DE 84 OCT.

1.00

32.00

GLN.

20-10-14

68

GASOLINA DE 84 OCT.

1.00

31.00

GLN.

24-10-14

73

GASOLINA DE 84 OCT.

1.00

30.00

GLN.

31-10-14

79

GASOLINA DE 84 OCT.

1.00

29.00

GLN.

03-11-14

80

GASOLINA DE 84 OCT.

2.00

27.00

GLN.

24-11-14

98

GASOLINA DE 84 OCT.

2.00

25.00

GLN.

25-11-14

99

GASOLINA DE 84 OCT.

2.00

23.00

GLN.

26-11-14

100

GASOLINA DE 84 OCT.

2.00

21.00

GLN.

27-11-14

1652

GASOLINA DE 84 OCT.

1.00

20.00

GLN.

28-11-14

1653

GASOLINA DE 84 OCT.

1.00

19.00

GLN.

29-11-14

1654

GASOLINA DE 84 OCT.

2.00

17.00

GLN.

01-12-14

1655

GASOLINA DE 84 OCT.

1.00

16.00

GLN.

02-12-14

1656

GASOLINA DE 84 OCT.

2.00

14.00

GLN.

05-12-14

1660

GASOLINA DE 84 OCT.

3.00

11.00

GLN.

09-12-14

1662

GASOLINA DE 84 OCT.

1.00

10.00

GLN.

10-12-14

1663

GASOLINA DE 84 OCT.

2.00

8.00

GLN.

13-12-14

1667

GASOLINA DE 84 OCT.

2.00

6.00

GLN.

17-12-14

1674

GASOLINA DE 84 OCT.

1.00

5.00

GLN.

18-12-14

1673

GASOLINA DE 84 OCT.

7.00

-2.00

GLN.

52.00

-2.00

TOTAL

17-09-14

4281

GASOLINA DE 90 OCT.

50.00

50.00

GLN.

17-09-14

1641

GASOLINA DE 90 OCT.

50.00
1.00

49.00

GLN.

18-09-14

1643

GASOLINA DE 90 OCT.

1.00

48.00

GLN.

19-09-14

1644

GASOLINA DE 90 OCT.

1.00

47.00

GLN.

20-09-14

1646

GASOLINA DE 90 OCT.

1.00

46.00

GLN.

VAN
..VIENEN
21-09-14

1647

GASOLINA DE 90 OCT.

1.00

45.00

GLN.

03-10-14

55

GASOLINA DE 90 OCT.

1.00

44.00

GLN.

06-10-14

57

GASOLINA DE 90 OCT.

1.00

43.00

GLN.

07-10-14

58

GASOLINA DE 90 OCT.

1.00

42.00

GLN.

09-10-14

59

GASOLINA DE 90 OCT.

1.00

41.00

GLN.

10-10-14

60

GASOLINA DE 90 OCT.

2.00

39.00

GLN.

11-10-14

61

GASOLINA DE 90 OCT.

1.00

38.00

GLN.

13-10-14

62

GASOLINA DE 90 OCT.

1.00

37.00

GLN.

15-10-14

64

GASOLINA DE 90 OCT.

2.00

35.00

GLN.

16-10-14

65

GASOLINA DE 90 OCT.

2.00

33.00

GLN.

17-10-14

66

GASOLINA DE 90 OCT.

2.00

31.00

GLN.

20-10-14

68

GASOLINA DE 90 OCT.

1.00

30.00

GLN.

21-10-14

69

GASOLINA DE 90 OCT.

2.00

28.00

GLN.

27-10-14

74

GASOLINA DE 90 OCT.

1.00

27.00

GLN.

31-10-14

79

GASOLINA DE 90 OCT.

1.00

26.00

GLN.

07-11-14

84

GASOLINA DE 90 OCT.

1.00

25.00

GLN.

10-11-14

86

GASOLINA DE 90 OCT.

1.00

24.00

GLN.

11-11-14

87

GASOLINA DE 90 OCT.

2.00

22.00

GLN.

12-11-14

88

GASOLINA DE 90 OCT.

1.00

21.00

GLN.

13-11-14

89

GASOLINA DE 90 OCT.

1.00

20.00

GLN.

15-11-14

91

GASOLINA DE 90 OCT.

1.00

19.00

GLN.

18-11-14

93

GASOLINA DE 90 OCT.

1.00

18.00

GLN.

19-11-14

94

GASOLINA DE 90 OCT.

1.00

17.00

GLN.

21-11-14

96

GASOLINA DE 90 OCT.

1.00

16.00

GLN.

13-12-14

1667

GASOLINA DE 90 OCT.

3.00

13.00

GLN.

37.00

13.00

GLN.

10.00

GLN.

TOTAL

21-07-14

4251

16-08-14

4264

50.00

PETROLEO DIESEL D-2

10.00

PETROLEO DIESEL D-2

130.00

140.00

GLN.

21-07-14

1601

PETROLEO DIESEL D-2

10.00

130.00

GLN.

15-08-14

1614

PETROLEO DIESEL D-2

10.00

120.00

GLN.

20-08-14

1614

PETROLEO DIESEL D-2

3.00

117.00

GLN.

22-08-14

1617

PETROLEO DIESEL D-2

52.00

65.00

GLN.

23-08-14

1618

PETROLEO DIESEL D-2

2.00

63.00

GLN.

25-08-14

1619

PETROLEO DIESEL D-2

2.00

61.00

GLN.

26-08-14

1620

PETROLEO DIESEL D-2

2.00

59.00

GLN.

28-08-14

1622

PETROLEO DIESEL D-2

1.00

58.00

GLN.

02-09-14

1625

PETROLEO DIESEL D-2

7.00

51.00

GLN.

03-09-14

1628

PETROLEO DIESEL D-2

1.00

50.00

GLN.

04-09-14

1629

PETROLEO DIESEL D-2

2.00

48.00

GLN.

05-09-14

1630

PETROLEO DIESEL D-2

2.00

46.00

GLN.

06-09-14

1631

PETROLEO DIESEL D-2

1.00

45.00

GLN.

08-09-14

1632

PETROLEO DIESEL D-2

1.00

44.00

GLN.

10-09-14

1635

PETROLEO DIESEL D-2

1.00

43.00

GLN.

13-09-14

1638

PETROLEO DIESEL D-2

1.00

42.00

GLN.

16-09-14

1640

PETROLEO DIESEL D-2

2.00

40.00

GLN.

17-09-14

1641

PETROLEO DIESEL D-2

5.00

35.00

GLN.

03-10-14

55

PETROLEO DIESEL D-2

35.00

0.00

GLN.

140.00

0.00

TOTAL

140.00

01-10-14

4283

PETROLEO D-2

50.00

50.00

GLN.

24-10-14

4293

PETROLEO D-2

50.00

100.00

GLN.

11-12-14

61

PETROLEO D-2

100.00

200.00

GLN.

15-12-14

62

PETROLEO D-2

5.00

205.00

GLN.

18-12-14

63

PETROLEO D-2

17.00

222.00

GLN.

20-12-14

64

PETROLEO D-2

128.00

350.00

GLN.

03-10-14

55

PETROLEO D-2

32.00

318.00

GLN.

14-10-14

63

PETROLEO D-2

5.00

313.00

GLN.

24-10-14

73

PETROLEO D-2

5.00

308.00

GLN.

07-11-14

84

PETROLEO D-2

41.00

267.00

GLN.

11-11-14

87

PETROLEO D-2

4.00

263.00

GLN.

VAN
..VIENEN
17-11-14

92

PETROLEO D-2

10.00

253.00

GLN.

09-12-14

1662

PETROLEO D-2

1.00

252.00

GLN.

10-12-14

1663

PETROLEO D-2

1.00

251.00

GLN.

11-12-14

1664

PETROLEO D-2

65.00

186.00

GLN.

12-12-14

1666

PETROLEO D-2

5.00

181.00

GLN.

13-12-14

1667

PETROLEO D-2

31.00

150.00

GLN.

15-12-14

1668

PETROLEO D-2

5.00

145.00

GLN.

18-12-14

1673

PETROLEO

17.00

128.00

GLN.

20-12-14

1672

PETROLEO D-3

25.00

103.00

GLN.

247.00

103.00

TOTAL

04-09-14

4275

08-09-14

SOGA DRIZA DE 3/4"


1632

50.00

SOGA DRIZA DE 3/4"


TOTAL

04-09-14

4275

08-09-14

SOGA DRIZA DE 1/2"


1632

4276

08-09-14

4278

10-09-14

17-09-14

4280

50.00

0.00

ML.

50.00

0.00

50.00

ML.

50.00

0.00

ML.

50.00

0.00

2.00

PZA.

2.00

0.00

PZA.

2.00

0.00

50.00

TUBERIA DE HAPE ,CORRUGADO FLEXIBLE Y REFORZADO DE 4"


1641

2.00

POLYTARP DE 40X201
TOTAL

16-09-14

50.00

CORREAS A-72

POLYTARP DE 40X200
1635

ML.

2.00

TOTAL

06-09-14

50.00

50.00

CORREAS A-72
1632

50.00

SOGA DRIZA DE 1/2"


TOTAL

04-09-14

350.00

TUBERIA DE HAPE ,CORRUGADO FLEXIBLE Y REFORZADO DE 4"

50.00

50.00

ML.

50.00

0.00

ML.

50.00

0.00

3.00
3.00

3.00

UND.

0.00

UND.

30-09-14

4282

TUBERIA DE HAPE ,CORRUGADO FLEXIBLE Y REFORZADO DE 4"

8.00

8.00

UND.

01-10-14

54

TUBERIA DE HAPE ,CORRUGADO FLEXIBLE Y REFORZADO DE 4"

1.00

7.00

UND.

03-10-14

55

TUBERIA DE HAPE ,CORRUGADO FLEXIBLE Y REFORZADO DE 4"

2.00

5.00

UND.

18-10-14

67

TUBERIA DE HAPE ,CORRUGADO FLEXIBLE Y REFORZADO DE 4"

3.00

2.00

UND.

24-10-14

73

TUBERIA DE HAPE ,CORRUGADO FLEXIBLE Y REFORZADO DE 4"

1.00

1.00

UND.

05-11-14

82

TUBERIA DE HAPE ,CORRUGADO FLEXIBLE Y REFORZADO DE 4"

1.00

0.00

UND.

11.00

0.00

TOTAL

27-10-14

4294

TUBERIA PVC UF 160 MM SH-2 CON ANILLO HTP

11.00

7.00

UND.

20-11-14

95

TUBERIA PVC UF 160 MM SH-2 CON ANILLO HTP

3.00

4.00

UND.

22-11-14

97

TUBERIA PVC UF 160 MM SH-2 CON ANILLO HTP

2.00

2.00

UND.

24-11-14

98

TUBERIA PVC UF 160 MM SH-2 CON ANILLO HTP

1.00

1.00

UND.

25-11-14

99

TUBERIA PVC UF 160 MM SH-2 CON ANILLO HTP

1.00

0.00

UND.

TOTAL
27-10-14

4294

TUBERIA PVC SAL DE 4"(PESADO X 6 MTS.)

7.00

7.00

7.00

13.00

0.00
13.00

UND.

27-10-14

74

TUBERIA PVC SAL DE 4"(PESADO X 6 MTS.)

3.00

10.00

UND.

31-10-14

79

TUBERIA PVC SAL DE 4"(PESADO X 6 MTS.)

1.00

9.00

UND.

06-11-14

83

TUBERIA PVC SAL DE 4"(PESADO X 6 MTS.)

2.00

7.00

UND.

22-11-14

97

TUBERIA PVC SAL DE 4"(PESADO X 6 MTS.)

1.00

6.00

UND.

09-12-14

1662

TUBERIA PVC SAL DE 4"(PESADO X 6 MTS.)

1.00

5.00

UND.

10-12-14

1663

TUBERIA PVC SAL DE 4"(PESADO X 6 MTS.)

2.00

3.00

UND.

12-12-14

1666

TUBERIA PVC SAL DE 4"(PESADO X 6 MTS.)

1.00

2.00

UND.

13-12-14

1667

TUBERIA PVC SAL DE 4"(PESADO X 6 MTS.)

2.00

0.00

UND.

13.00

0.00

TOTAL

27-10-14

4294

TUBERIA PVC SAL HTP 150 4422 UF DE 75MM-C-10

13.00

8.00

8.00

UND.

22-11-14

97

TUBERIA PVC SAL HTP 150 4422 UF DE 75MM-C-11

3.00

5.00

UND.

24-11-14

98

TUBERIA PVC SAL HTP 150 4422 UF DE 75MM-C-12

2.00

3.00

UND.

26-11-14

100

TUBERIA PVC SAL HTP 150 4422 UF DE 75MM-C-13

2.00

1.00

UND.

16-12-14

1669

TUBERIA PVC SAL HTP 150 4422 UF DE 75MM-C-14

1.00

0.00

UND.

8.00

0.00

TOTAL

8.00

26-11-14

57

26-11-14

TUBO PVC SAP C-10 C/R 1"


1651

0.20

TUBO PVC SAP C-10 C/R 1"


TOTAL

13-10-11

4287

TUBO DE FIERRO GALVANIZADO DE 2"X6 MTS X 2MM

0.20

0.20

UND.

0.20

0.00

UND.

0.20

0.00

21.00

21.00

UND.

28-11-14

1653

TUBO DE FIERRO GALVANIZADO DE 2"X6 MTS X 2MM

2.00

19.00

UND.

29-11-14

1654

TUBO DE FIERRO GALVANIZADO DE 2"X6 MTS X 2MM

1.00

18.00

UND.

03-12-14

1657

TUBO DE FIERRO GALVANIZADO DE 2"X6 MTS X 2MM

3.00

15.00

UND.

04-12-14

1658

TUBO DE FIERRO GALVANIZADO DE 2"X6 MTS X 2MM

7.00

8.00

UND.

05-12-14

1660

TUBO DE FIERRO GALVANIZADO DE 2"X6 MTS X 2MM

3.00

5.00

UND.

11-12-14

1664

TUBO DE FIERRO GALVANIZADO DE 2"X6 MTS X 2MM

2.00

3.00

UND.

12-12-14

1666

TUBO DE FIERRO GALVANIZADO DE 2"X6 MTS X 2MM

3.00

0.00

UND.

21.00

0.00

TOTAL

27-10-14

4294

29-11-14

TEE PVC SAP UF 75 MM


1654

1.00

TEE PVC SAP UF 75 MM


TOTAL

27-10-14

4294

29-11-14

TAPON PVC SAP UF 75 MM


1654

4287

1.00

1.00

UND.

1.00

0.00

UND.

1.00

0.00

1.00

TAPON PVC SAP UF 75 MM


TOTAL

13-10-14

21.00

CAJA DE CONCRETO SIMPLE PARA DESAGUE 12" X 24"

1.00

1.00

UND.

1.00

0.00

UND.

1.00

0.00

6.00

6.00

UND.

01-12-14

1655

CAJA DE CONCRETO SIMPLE PARA DESAGUE 12" X 24"

3.00

3.00

UND.

11-12-14

1664

CAJA DE CONCRETO SIMPLE PARA DESAGUE 12" X 24"

3.00

0.00

UND.

6.00

0.00

TOTAL

27-10-14

4294

CAJA DE CONCRETO PARA AGUA

6.00

4.00

4.00

UND.

01-12-14

1655

CAJA DE CONCRETO PARA AGUA

3.00

1.00

UND.

11-12-14

1664

CAJA DE CONCRETO PARA AGUA

1.00

0.00

UND.

4.00

0.00

TOTAL

4.00

27-10-14

4294

16-12-14

TAPA FG PARA AGUA


1669

4.00

TAPA FG PARA AGUA


TOTAL

27-10-14

4294

16-12-14

TAPA FF PARA DESAGUE


1669

4297

13-12-14

TAPA FF PARA DESAGUE

TAPA PARA BUZON DE DESAGUE


1667

4286

3.00

2.00

2.00

UND.

2.00

2.00

3.00

UND.

3.00

0.00

UND.

3.00

0.00

2.00

TAPA PARA BUZON DE DESAGUE


TOTAL

10-10-14

UND.

3.00

TOTAL

31-10-14

4.00

4.00

ADITIVO IMPERMEABILIZANTE SIKA

2.00

2.00

UND.

2.00

0.00

UND.

2.00

0.00

2.00

2.00

GLN.

20-10-14

68

ADITIVO IMPERMEABILIZANTE SIKA

1.00

1.00

GLN.

21-10-14

69

ADITIVO IMPERMEABILIZANTE SIKA

1.00

0.00

GLN.

2.00

0.00

TOTAL

13-11-14

51

13-11-14

BUGIA DE MOTOR GASOLINERO HGK ROSCA LARGA


89

56

RODAJE 6304 4/2 RSH/C3

21-11-14

56

21-11-14

4.00

96

PZA.

1.00

0.00

PZA.

1.00

0.00

4.00

UND.

4.00

0.00

UND.

4.00

0.00

2.00

96 RODAJE POLEA TEMPLADOR FN-12

56

1.00

4.00

RODAJE POLEA TEMPLADOR FN-12

21-11-14

21-11-14

1.00

4 RODAJE 6304 4/2 RSH/C4


TOTAL

21-11-14

1.00

BUGIA DE MOTOR GASOLINERO HGK ROSCA LARGA


TOTAL

21-11-14

2.00

TOTAL

2.00

CHEVRON GRASA MARFAK HD 3BHL 613 X 1 LIBRA

8.00

CHEVRON GRASA MARFAK HD 3BHL 613 X 1 LIBRA


TOTAL

8.00

2.00

UND.

2.00

0.00

UND.

2.00

0.00

8.00

UND.

8.00

0.00

UND.

8.00

0.00

21-11-14

56

21-11-14

SENSOR RETRO V-71


96

1.00

SENSOR RETRO V-72


TOTAL

26-11-14

57

26-11-14

REDUCCION PVC SAP 150 4422 75MM X 1.1/2"


100

57

26-11-14

REDUCCION PVC SAP 1.1/2" X 1"


100

57

26-11-14

57

26-11-14

4297

31-10-14

57

26-11-14

26-11-14

57

1.00

TRANSICION ADAPTADOR UPR 1" PAVCO

LLAVE DE PASO PVC AGUA 1"


100

UND.

1.00

0.00

UND.

1.00

0.00

1.00

UND.

1.00

0.00

UND.

1.00

0.00

1.00

UND.

1.00

0.00

UND.

1.00

0.00

1.00

UND.

1.00

0.00

UND.

1.00

0.00

1.00

UND.

1.00

0.00

UND.

1.00

0.00

2.00

TOTAL

26-11-14

1.00

1.00

TRANSICION ADAPTADOR UPR 1" PAVCO


100

1.00

UNION PVC SAP S/P 1/2"


TOTAL

26-11-14

1.00

UNION PVC SAP S/P 1"

UNION PVC SAP S/P 1/2"


79

0.00

1.00

TOTAL

31-10-14

1.00

1.00

UNION PVC SAP S/P 1"


79

1.00

ANILLO UFL PRESION 75MM


TOTAL

26-11-14

1.00

REDUCCION PVC SAP 1.1/2" X 1"

ANILLO UFL PRESION 75MM


100

UND.

1.00

TOTAL

26-11-14

UND.

0.00

1.00

REDUCCION PVC SAP 150 4422 75MM X 1.1/2"


TOTAL

26-11-14

1.00

1.00
1.00

2.00

2.00

UND.

2.00

0.00

UND.

2.00

0.00

1.00

LLAVE DE PASO PVC AGUA 1"


TOTAL

1.00

1.00

UND.

1.00

0.00

UND.

1.00

0.00

11-12-14

61

16-12-14

PLANTAS ORNAMENTALES DOGOCHINO


1669

20.00

PLANTAS ORNAMENTALES DOGOCHINO


TOTAL

11-12-14

61

16-12-14

PLANTAS DE FICUS
1669

4275

UND.

20.00

0.00

UND.

20.00

0.00

20.00

PLANTAS DE FICUS
TOTAL

04-09-14

20.00

20.00

TECKNOPOR DE 1/2"

20.00

20.00

UND.

20.00

0.00

UND.

20.00

0.00

3.00

3.00

PLCH.

04-09-14

1629

TECKNOPOR DE 1/2"

1.00

2.00

PLCH.

07-10-14

58

TECKNOPOR DE 1/2"

2.00

0.00

PLCH.

3.00

0.00

TOTAL

17-09-14

4281

17-09-14

APISONADOR TIPO CANGURO


1641

1.00

APISONADOR TIPO CANGURO


TOTAL

17-09-14

4281

17-09-14

TONER RENDIMIENTO 1200


1642

55

20-11-14

TONER RENDIMIENTO 1200

TONER LASER HP-CF 280 A


96

4264

2.00

UND.

1.00

0.00

UND.

1.00

0.00

2.00

UND.

2.00

0.00

UND.

2.00

0.00

1.00

TONER LASER HP-CF 280 A


TOTAL

10/1/2014

1.00

1.00

2.00

TOTAL

20-11-14

3.00

SILICONA PARA PEGAR PVC

1.00

1.00

UND.

1.00

0.00

UND.

1.00

0.00

5.00

5.00

UND.

10/1/2014

53

SILICONA PARA PEGAR PVC

1.00

4.00

UND.

10/2/2014

54

SILICONA PARA PEGAR PVC

1.00

3.00

UND.

11/25/2014

99

SILICONA PARA PEGAR PVC

1.00

2.00

UND.

12/3/2014

1657

SILICONA PARA PEGAR PVC

1.00

1.00

UND.

12/11/2014

1664

SILICONA PARA PEGAR PVC

1.00

0.00

UND.

5.00

0.00

TOTAL

5.00

8/25/2014

1758

8/25/2014

ARNES DE SEGURIDAD
3445

4.00

ARNES DE SEGURIDAD
TOTAL

10/6/2014

4284

10/7/2014

ESPARADRAPO
58

4284

10/7/2014

ESPARADRAPO

DOLONET
58

4284

10/7/2014

4284

10/7/2014

11.00

PARACETAMOL

CURITAS
58

10.00

4284

10/7/2014

CURITAS

ALCOHOL YODADA
58

4284

10/7/2014

AGUA OXIGENADA
58

10/7/2014

4284

3.00

AGUA OXIGENADA

ALCOHOL
58

UND.

1.00

0.00

UND.

1.00

0.00

10.00

UND.

10.00

0.00

UND.

10.00

0.00

10.00

UND.

10.00

0.00

UND.

10.00

0.00

1.00

CJA.

1.00

0.00

CJA.

1.00

0.00

CJA.

2.00

FRASCO

2.00

0.00

FRASCO

2.00

0.00

1.00

TOTAL

10/6/2014

1.00

2.00

ALCOHOL YODADA
TOTAL

10/6/2014

0.00

1.00

1.00

10/6/2014

4.00

10.00

TOTAL

10/6/2014

UND.

10.00

PARACETAMOL
58

1.00

DOLONET
TOTAL

10/6/2014

UND.

0.00

1.00

TOTAL

10/6/2014

4.00

4.00
4.00

1.00

1.00

FRASCO

1.00

0.00

FRASCO

1.00

0.00

1.00

ALCOHOL
TOTAL

1.00

1.00

LT.

1.00

0.00

LT.

1.00

0.00

7/21/2014

4251

ACEITE DE MOTOR

3.00

3.00

GLN.

9/4/2014

1629

ACEITE DE MOTOR

1.00

2.00

GLN.

9/5/2014

82

ACEITE DE MOTOR

1.00

1.00

GLN.

11/25/2014

99

ACEITE DE MOTOR

1.00

0.00

GLN.

3.00

0.00

TOTAL

11/6/2014

4299

11/6/2014

CARBURADOR DE MOTOR HONDA 6X160.


83

1.00

CARBURADOR DE MOTOR HONDA 6X160.


TOTAL

11/10/2014

4300

11/10/2014

483364 MOVIL SUPER 1000


1011

4284

10/7/2014

483364 MOVIL SUPER 1000

483365 MOVIL SUPER 1000


58

51

11/13/2014

55

ALAMBRE DE AMARRE DE 3.20 MM. GRIS


95

ALAMBRE DE AMARRE DE 3.20 MM. GRIS

11/21/2014

96

ALAMBRE DE AMARRE DE 3.20 MM. GRIS

11/21/2014

56

UND.

2.00

UND.

2.00

0.00

UND.

2.00

0.00

2.00

UND.

2.00

0.00

UND.

2.00

0.00

1.00

1.00

UND.

1.00

0.00

UND.

1.00

0.00

8.00

KG.

4.00

KG.

4.00

0.00

KG.

8.00

0.00

4.00

AUTOMATICO RANCADOR SCANIA


96

0.00
0.00

8.00

TOTAL

11/21/2014

2.00

FILTRO APIZONANTE

11/20/2014

1.00
1.00

1.00

TOTAL

11/20/2014

UND.

2.00

FILTRO APIZONANTE
89

7.00

483365 MOVIL SUPER 1000


TOTAL

11/13/2014

1.00

1.00

2.00

TOTAL

10/6/2014

3.00

8.00

1.00

AUTOMATICO RANCADOR SCANIA


TOTAL

9.00

1.00

UND.

1.00

0.00

UND.

1.00

0.00

9/17/2014

4281

9/17/2014

TONER RENDIMIENTO 1200


1642

2.00

TONER RENDIMIENTO 1200


TOTAL

8/6/2014

4257

8/6/2014

TOMACORRIENTE TRIPLE TICINO


1607

TOMACORRIENTE TRIPLE TICINO

11/22/2014

97

PEGAMENTO PARA TUBERIA PVC

11/22/2014

4294

PEGAMENTO PARA TUBERIA PVC

UND.

2.00

0.00

2.00

2.00

UND.

2.00

0.00

UND.

2.00

0.00

0.50

TOTAL

4264

UND.

0.00

2.00

TOTAL

11/26/2014

2.00

2.00
2.00

CINTA TEFLON

0.50

0.50

GL.

0.50

0.00

GL.

0.50

0.00

11.00

UND.

11/26/2014

100

CINTA TEFLON

11.00
1.00

10.00

UND.

11/28/2014

1653

CINTA TEFLON

1.00

9.00

UND.

12/3/2014

1657

CINTA TEFLON

1.00

8.00

UND.

12/11/2014

1664

CINTA TEFLON

8.00

0.00

UND.

11.00

0.00

TOTAL

7/21/2014

4251

THINER FM

11.00

9.00

9.00

GLN.

12/12/2014

1666

THINER FM

3.00

6.00

GLN.

12/13/2014

1667

THINER FM

3.00

3.00

GLN.

12/15/2014

1668

THINER FM

3.00

0.00

GLN.

9.00

0.00

TOTAL

8/16/2014

4264

LLAVE DE PASO 1/2"

11/28/2014

1653

LLAVE DE PASO 1/2"

12/11/2014

1664

LLAVE DE PASO 1/2"

2.00

8/16/2014

4264

LLAVE COORPORATION DE BRONCE DE 1/2"


1664

2.00

UND.

1.00

UND.

1.00

0.00

UND.

2.00

0.00

1.00

TOTAL

12/11/2014

9.00

2.00

3.00

LLAVE COORPORATION DE BRONCE DE 1/2"


TOTAL

3.00

3.00

UND.

3.00

0.00

UND.

3.00

0.00

UND.

8/16/2014

4264

11/29/2014

ABRAZADERA DE FIERRO
1654

3.00

ABRAZADERA DE FIERRO
TOTAL

11/20/2014

55

DISC0 9 5/64 x 7/8

3.00

3.00

UND.

3.00

0.00

UND.

3.00

0.00

6.00

UND.

12/3/2014

1657

DISC0 9 5/64 x 7/8

6.00
1.00

5.00

UND.

12/4/2014

1659

DISC0 9 5/64 x 7/8

2.00

3.00

UND.

12/5/2014

1660

DISC0 9 5/64 x 7/8

2.00

1.00

UND.

12/6/2014

1661

DISC0 9 5/64 x 7/8

1.00

0.00

UND.

6.00

0.00

TOTAL

11/20/2014

55

DISC0 4 1/2" x 1/4" x 7/8

6.00

4.00

UND.

12/3/2014

1657

DISC0 4 1/2" x 1/4" x 7/8

4.00
1.00

3.00

UND.

12/4/2014

1658

DISC0 4 1/2" x 1/4" x 7/8

2.00

1.00

UND.

12/6/2014

1661

DISC0 4 1/2" x 1/4" x 7/8

1.00

0.00

UND.

4.00

0.00

TOTAL

11/20/2014

55

DISC0 DE DESBASTER DE 7 X1/4" X 7/8 F/H 3105

12/3/2014

1657

DISC0 DE DESBASTER DE 7 X1/4" X 7/8 F/H 3105

12/5/2014

1660

DISC0 DE DESBASTER DE 7 X1/4" X 7/8 F/H 3105


TOTAL

10/10/2014

4286

12/4/2014

STRON GRASS INGLES DE EEUU


1658

4257

8/6/2014

55

4.00

11.00

MASILLA PLASTICA VELOX FLEX

UND.

1.00

UND.

1.00

0.00

UND.

2.00

0.00

5.00

KG.

5.00

0.00

KG.

7.00

0.00

KG.

1.00

SOQUET LOSA
TOTAL

11/20/2014

2.00
1.00

STRON GRASS INGLES DE EEUU

SOQUET LOSA
1607

2.00

5.00

TOTAL

8/6/2014

4.00

6.00

1.00

1.00

UND.

1.00

0.00

UND.

6.00

0.00

UND.

1.00

UND.

12/4/2014

1658

MASILLA PLASTICA VELOX FLEX


TOTAL

11/20/2014

1658

HOJA DE SIERRA SANFLEX

7.00

1.00

0.00

UND.

7.00

0.00

UND.

4.00

UND.

4.00

11/24/2014

98

HOJA DE SIERRA SANFLEX

1.00

3.00

UND.

11/28/2014

1653

HOJA DE SIERRA SANFLEX

1.00

2.00

UND.

12/4/2014

1658

HOJA DE SIERRA SANFLEX

2.00

0.00

UND.

4.00

0.00

TOTAL

8/6/2014

4257

INTERRUPTOR TICINO
1607

1.00

INTERRUPTOR TICINO
TOTAL

12/20/2014

WWWW

4.00

LIJA DE METAL N 100

1.00

1.00

UND.

1.00

0.00

UND.

1.00

0.00

5.00

5.00

UND.

12/4/2014

1658

LIJA DE METAL N 100

3.00

2.00

UND.

12/5/2014

1660

LIJA DE METAL N 100

2.00

0.00

UND.

5.00

0.00

TOTAL

11/20/2014

WWWW

LIJA DE METAL N 50

12/4/2014

1659

LIJA DE METAL N 50

12/5/2014

1660

LIJA DE METAL N 50

5.00

TOTAL

11/17/2014

53

PIEDRA GRANDE 4"

5.00

5.00

5.00

UND.

3.00

2.00

UND.

2.00

0.00

UND.

5.00

0.00

12.00

12.00

M3.

12/4/2014

1659

PIEDRA GRANDE 4"

1.50

10.50

M3.

12/5/2014

1660

PIEDRA GRANDE 4"

1.20

9.30

M3.

12/9/2014

1662

PIEDRA GRANDE 4"

1.00

8.30

M3.

12/10/2014

1663

PIEDRA GRANDE 4"

1.70

6.60

M3.

12/11/2014

1665

PIEDRA GRANDE 4"

4.40

2.20

M3.

12/16/2014

1669

PIEDRA GRANDE 4"

1.10

1.10

M3.

12/17/2014

1674

PIEDRA GRANDE 4"


TOTAL

7/21/2014

4251

PINTURA BASE ZINCROMATO CPP

12.00

1.10

0.00

12.00

0.00

5.00

M3.

5.00

GLN.

8/8/2014

1615

PINTURA BASE ZINCROMATO CPP

1.00

4.00

GLN.

12/12/2014

1666

PINTURA BASE ZINCROMATO CPP

2.00

2.00

GLN.

12/13/2014

1667

PINTURA BASE ZINCROMATO CPP

1.00

1.00

GLN.

12/15/2014

1668

PINTURA BASE ZINCROMATO CPP

1.00

0.00

GLN.

5.00

0.00

TOTAL

7/21/2014

4251

PINTURA ESMALTE VERDE CROMO

5.00

4.00

4.00

GLN.

12/12/2014

1666

PINTURA ESMALTE VERDE CROMO

2.00

2.00

GLN.

12/13/2014

1667

PINTURA ESMALTE VERDE CROMO

1.00

1.00

GLN.

12/15/2014

1668

PINTURA ESMALTE VERDE CROMO

1.00

0.00

GLN.

4.00

0.00

TOTAL

4.00

8/21/2014

4265

PIEDRA CHANCADA DE 1/2"

19.00

19.00

M3.

8/22/2014

4267

PIEDRA CHANCADA DE 1/2"

6.00

25.00

M3.

8/23/2014

1618

PIEDRA CHANCADA DE 1/2"

2.10

22.90

M3.

8/26/2014

1620

PIEDRA CHANCADA DE 1/2"

2.90

20.00

M3.

8/27/2014

1621

PIEDRA CHANCADA DE 1/2"

1.25

18.75

M3.

8/28/2014

1622

PIEDRA CHANCADA DE 1/2"

0.84

17.91

M3.

8/29/2014

1623

PIEDRA CHANCADA DE 1/2"

1.20

16.71

M3.

9/1/2014

1624

PIEDRA CHANCADA DE 1/2"

0.29

16.42

M3.

9/2/2014

1625

PIEDRA CHANCADA DE 1/2"

1.25

15.17

M3.

9/3/2014

1628

PIEDRA CHANCADA DE 1/2"

1.35

13.82

M3.

9/4/2014

1629

PIEDRA CHANCADA DE 1/2"

1.75

12.07

M3.

9/5/2014

1630

PIEDRA CHANCADA DE 1/2"

0.75

11.32

M3.

9/6/2014

1631

PIEDRA CHANCADA DE 1/2"

0.24

11.08

M3.

9/8/2014

1633

PIEDRA CHANCADA DE 1/2"

0.59

10.49

M3.

9/12/2014

1637

PIEDRA CHANCADA DE 1/2"

1.50

8.99

M3.

9/15/2014

1639

PIEDRA CHANCADA DE 1/2"

2.52

6.47

M3.

9/17/2014

1642

PIEDRA CHANCADA DE 1/2"

3.10

3.37

M3.

9/19/2014

1644

PIEDRA CHANCADA DE 1/2"

0.75

2.62

M3.

9/29/2014

51

PIEDRA CHANCADA DE 1/2"

1.00

1.62

M3.

9/30/2014

52

PIEDRA CHANCADA DE 1/2"

1.40

0.22

M3.

10/6/2014

57

PIEDRA CHANCADA DE 1/2"

0.22

0.00

M3.

25.00

0.00

TOTAL

25.00

BLICA

OBSERVACIONES

ERROR VINCAR VERIFICAR CUADERNO

ERROR VINCAR VERIFICAR CUADERNO

SALDO

B/N 10208

1 VINCAR

ERROR VINCAR 3
SALDO

SALDO

2.95

0.10 VINCAR

APORTE BENEFICIARIO
APORTE BENEFICIARIO
APORTE BENEFICIARIO
APORTE BENEFICIARIO

TRANSFERENCIA
TRANSFERENCIA
TRANSFERENCIA
TRANSFERENCIA
TRANSFERENCIA
TRANSFERENCIA
TRANSFERENCIA

SALDO

SALDO

SALDO

SALDO

SALDO

SALDO

CAJA CHICA

SALDO

CAJA CHICA
CAJA CHICA

CAJA CHICA
CAJA CHICA

APORTE BENEFICIARIO
APORTE BENEFICIARIO
APORTE BENEFICIARIO

TRANSFERENCIA
TRANSFERENCIA
TRANSFERENCIA
TRANSFERENCIA
TRANSFERENCIA
TRANSFERENCIA
TRANSFERENCIA

CJA

TRANSFERENCIAS DE MATERIALES RECIBIDAS


OBRA:

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS


A.P.V VILLA MARIA, PROVINCIA DE CUSCO - CUSCO."
DESCRIPCION

UND. DE
MEDIDA

DOC.

N.

PECOSA

N RESOLUCION

CANT.

NEA

114

2411

053-2014-GI-MDC

CEMENTO PORLANT TIPO IPPOR 42.50KG.

240.00

BLS.

NEA

114

2412

053-2014-GI-MDC

CEMENTO PORLANT TIPO IPPOR 42.50KG.

200.00

BLS.

NEA

114

2411

053-2014-GI-MDC

ARENA GRUESA DE MINA SIN BOTONERIA

39.50

M3.

NEA

114

2411

053-2014-GI-MDC

ABRAZADERA DE FF DE 2" 1/2"

NEA

114

2411

053-2014-GI-MDC

CINTA TEFLON

NEA

114

2411

053-2014-GI-MDC

NEA

114

2411

NEA

114

NEA

3.00

UND.

11.00

UND.

LLAVE COORPORATION DE BRONCE DE 1/2"

3.00

UND.

053-2014-GI-MDC

LLAVE DE PASO DE 1/2"

2.00

UND.

2411

053-2014-GI-MDC

SILICONA PARA PEGAR PVC

5.00

UND.

114

2412

053-2014-GI-MDC

CLAVO PARA MADERA C/C DE 4"

30.00

KLG.

NEA

114

2412

053-2014-GI-MDC

ACEITE PARA MOTOR ESTACIONARIO SAE 15W 40

3.00

GLN.

NEA

114

2412

053-2014-GI-MDC

PETROLEO DIESEL D-2

140.00

GLN.

NEA

114

2412

053-2014-GI-MDC

PINTURA BASE ZICROMATO CPP

5.00

GLN.

NEA

114

2412

053-2014-GI-MDC

PINTURA ESMALTE VERDE CROMO CPP

4.00

GLN.

NEA

114

2412

053-2014-GI-MDC

THINER FM

9.00

GLN.

NEA

114

2412

053-2014-GI-MDC

STRONG GRASS INGLES DE EEUU

5.00

KG.
TOTAL

Pgina 240

CIAS DE MATERIALES RECIBIDAS

E PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE


USCO."
PRECIO
UNITARIO

LA

IMPORTE

24.70

5,928.00

24.70

4,940.00

65.00

2,567.50

15.50

46.50

1.50

16.50

56.00

168.00

6.00

12.00

10.00

50.00

4.40

132.00

68.00

204.00

14.10

1,974.00

48.00

240.00

37.00

148.00

14.50

130.50

20.00

100.00

TOTAL

16,657.00

Pgina 241

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN

DESAGREGADO DE GASTOS - BIENES PATRIMONIALES


OBRA

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F E


MANZANAS E Y C DE LA A.P.V VILLA MARIA ,PROVINCIA DE CUSCO - CUSCO."

EJECUTA

: SUB GERENCIA DE OBRAS

FTE. FTO.

: RECURSOS ORDINARIOS

META

: 011 (2014)

ESPECIFICA DE
GASTO
2.6.2 3.9

DETALLE
EDIFICIOS Y ESTRUCTURAS

2.6. 2.3. 99 3

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL

2.6. 2.3. 99 4

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES

2.6. 2.3. 99 5

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS

2.6. 2.3. 99 6

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - OTROS

TOTAL

RESUMEN
N
1

ESPECIFICAS CONSOLIDADAS
COSTO DIRECTO
MANO DE OBRA
MATERIALES
HERRAMIENTAS
COMBUSTIBLE - LUBRICANTES
EQUIPO
SERVICIOS DIVERSOS

GASTOS GENERALES
RESIDENTE DE OBRA
ASISTENTE TECNICO
ASISTENTE ADMINISTRATIVO
ALMACENERO
MATERIALES DE ESCRITORIO
GASTOS NOTARIALES
VESTUARIO
OTROS
TOTAL

UIDACIN DE PROYECTOS DE INVERSIN PBLICA

DE GASTOS - BIENES PATRIMONIALES

TRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS


LLA MARIA ,PROVINCIA DE CUSCO - CUSCO."

PORCENTAJE
%

2014

4,000.00

4,000.00

0.00

0.00

4000.00

4,000.00

0.00

0.00

0.00

0.00

4000.00

4,000.00

RESUMEN
PORCENTAJE
2014
%
100.00

4,000.00

0.00

0.00

100.00

4,000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100.00

4,000.00

BIENES
BIENES ADQUIRIDOS AO - 2014
APISONADOR TIPO CANGURO DE 5.5 HP

UNIDAD DE BIENES PATRIMONIALES

ADQUIRID

BIENES

ADQUIRIDOS

C/P
RO002788

0/C
B201992

PECOSA
9074

FTE FTO
00

IMPORTE
4,000.00

OFICINA DE LIQUIDACION DE OBRAS

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA - BIENES PATRIMONIALES
OBRA

EJECUTA
FTE. FTO.
META

:
:
:

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE

LA A.P.V VILLA MARIA ,PROVINCIA DE CUSCO - CUSCO."

SUB GERENCIA DE OBRAS


RECURSOS ORDINARIOS
011-2014

D O C U M E N T O
N

FECHA

9/29/2014

ESPECIFICA

SIAF

C/P N

DOC

PECOSA

FTE.
FTO.

7834

RO002788

O/C.

B201992

9074

00

DESCRIPCION

APISONADOR TIPO CANGURO DE 5.5 HP

CANT.

1.00

UNID.
MEDIDA

UND.

TOTAL

Pgina 248

PRECIO
UNITARIO

4,000.00

IMPORTE

GASTO

2.6. 2.3. 994

2.6. 2.3. 995

PERSONAL

BIENES

SERVICIOS

4,000.00

4,000.00

DEL

2.6. 2.3. 99 3

4,000.00

0.00

4,000.00

0.00

DE PROYECTOS DE INVERSIN PBLICA

NANCIERA - BIENES PATRIMONIALES

GASTOS GENERALES
EQUIPO INFORM. Y
COMUN.

MOBILIARIO

4,000.00

0.00

Pgina 249

4,000.00

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
OBRA

MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO D

EJECUTA
FTE. FTO.
META

:
:
:

SUB GERENCIA DE OBRAS


POR TODA FUENTE
0121-2014

1501 EDIFICIOS Y ESTRUCTURAS


1501.080502 AGUA Y SANEAMIENT

D O C U M E N T O
N

FECHA

SIAF

C/P N

DOC

PECOSA

DESCRIPCION

FTE. FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

PLANILLA RESIDENTE DE OBRA MES DE ENERO GOMEZ QUIROGA


ANTHONY E.
PLANILLA RESIDENTE DE OBRA MES DE ENERO GOMEZ QUIROGA
ANTHONY E. - DESCUENTOS
PLANILLA RESIDENTE DE OBRA MES DE ENERO GOMEZ QUIROGA
ANTHONY E. - APORTES
PLANILLA ASISTENTE TECNICO MES DE ENERO PONCE CORDOVA
MANUEL E.
PLANILLA ASISTENTE TECNICO MES DE ENERO PONCE CORDOVA
MANUEL E. - DESCUENTOS
PLANILLA ASISTENTE TECNICO MES DE ENERO PONCE CORDOVA
MANUEL E. - APORTES

IMPORTE

10-02-14

252

RO000041

PLL.

81

C.S.C.

3,403.74

10-02-14

252

RO000042

PLL.

81

C.S.C.

10-02-14

252

RO000043

PLL.

81

C.S.C.

10-02-14

252

RO000041

PLL.

81

C.S.C.

10-02-14

252

RO000042

PLL.

81

C.S.C.

10-02-14

252

RO000043

PLL.

81

C.S.C.

10-02-14

252

RO000041

PLL.

37

C.S.C.

PLANILLA PERSONAL OBRERO MES DE ENERO-2014

9,579.59

611.06
353.46
2,155.81
258.51
212.17
49,769.30

10-02-14

252

RO000042

PLL.

37

C.S.C.

DESCUENTO DE PLANILLA PERSONAL OBRERO MES DE ENERO2014

10-02-14

252

RO000043

PLL.

37

C.S.C.

APORTE DE PLANILLA PERSONAL OBRERO MES DE ENERO-2014

5,865.43

10

14-02-14

259

RO000074

PLL.

55

C.S.C.

PLANILLA MES DE ENERO QUISPE CONCHA MABELINA

1,834.34
215.66
148.50

11

14-02-14

259

RO000075

PLL.

55

C.S.C.

PLANILLA MES DE ENERO QUISPE CONCHA MABELINA DESCUENTOS

12

14-02-14

259

RO000076

PLL.

55

C.S.C.

PLANILLA MES DE ENERO QUISPE CONCHA MABELINA - APORTES

13

14-02-14

259

RO000074

PLL.

55

C.S.C.

PLANILLA MES DE ENERO ALVAREZ TTITO MARY SOL

14

14-02-14

259

RO000075

PLL.

55

C.S.C.

PLANILLA MES DE ENERO ALVAREZ TTITO MARY SOL DESCUENTOS

208.00

15

14-02-14

259

RO000076

PLL.

55

C.S.C.

PLANILLA MES DE ENERO ALVAREZ TTITO MARY SOL - APORTES

144.00

16

02-04-14

750

RD000087

O/C.

B200099

C.S.C.

CEMENTO PORTLAND TIPO IP 42.5 KGR.

913

RO000323

O/S.

B200028

C.S.C.

SERVICIO DE POLIZAS DE SEGUROS PATRIMONIALES

O/C.

B203992-13

C.S.C.

ARENA GRUESA (HUANBUTIO)

145.00

M3.

O/C.

B204536-13

C.S.C.

ARCHIVADOR D/CARTON PLASTIFICADO T. OFICIO IMPREZA

100.00
100.00

17 016-03-14
18

06-03-14

957

RO000167
RO000168

19

13-03-14

1158

RO000625

6373

5370

20

13-03-14

1158

RO000625

O/C.

B204536-13

C.S.C.

21

20-03-14

1608

RD000007

PLL.

133

C.S.C.

22

20-03-14

1608

RD000008

PLL.

133

C.S.C.

PAPEL BOND FOTOCOPIA D/75GR T. A4 (PAQUETE DE 500


UNIDADES)
PLANILLA MES DE FEBRERO QUISPE CONCHA MABELINA APORTES
PLANILLA MES DE FEBRERO QUISPE CONCHA MABELINA DESCUENTOS

Pgina 250

1,792.00

2,185.00

BLS.

25.30

55,280.50

1.00

SERV.

1,968.00

1,968.00

63.00

9,135.00

UND.

3.08

308.00

PAQ.

10.54

1,054.00
148.50
215.66

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
OBRA

MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO D

EJECUTA
FTE. FTO.
META

:
:
:

SUB GERENCIA DE OBRAS


POR TODA FUENTE
0121-2014

1501 EDIFICIOS Y ESTRUCTURAS


1501.080502 AGUA Y SANEAMIENT

D O C U M E N T O
N

FECHA

SIAF

C/P N

DOC

PECOSA

DESCRIPCION

FTE. FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

23

20-03-14

1608

RD000009

PLL.

133

C.S.C.

PLANILLA MES DE FEBRERO QUISPE CONCHA MABELINA

24

20-03-14

1608

RD000007

PLL.

133

C.S.C.

PLANILLA MES DE FEBRERO ALVAREZ TTITO MARY SOL - APORTES

144.00
208.00

25

20-03-14

1608

RD000008

PLL.

133

C.S.C.

PLANILLA MES DE FEBRERO ALVAREZ TTITO MARY SOL DESCUENTOS

26

20-03-14

1608

RD000009

PLL.

133

C.S.C.

PLANILLA MES DE FEBRERO ALVAREZ TTITO MARY SOL

1,434.34

1,392.00

PLANILLA ASISTENTE TECNICO MES DE FEBRERO PONCE


CORDOVA MANUEL E. APORTES
PLANILLA ASISTENTE TECNICO MES DE FEBRERO PONCE
CORDOVA MANUEL E. - DESCUENTOS
PLANILLA ASISTENTE TECNICO MES DE FEBRERO PONCE
CORDOVA MANUEL E.

27

20-03-14

1634

RD000001

PLL.

198

C.S.C.

28

20-03-14

1634

RD000002

PLL.

198

C.S.C.

29

20-03-14

1634

RD000003

PLL.

198

C.S.C.

30

20-03-14

1634

RD000001

PLL.

154

C.S.C.

APORTE DE PLANILLA PERSONAL OBRERO MES FEBRERO

31

20-03-14

1634

RD000002

PLL.

154

C.S.C.

DESCUENTO DE PLANILLA PERSONAL OBRERO MES DE FEBRERO

10,450.00

32

20-03-14

1634

RD000003

PLL.

154

C.S.C.

PLANILLA PERSONAL OBRERO MES DE FEBRERO-2014

50,804.29

33

02-04-14

1747

RD000066

O/C.

B200192

6529

C.S.C.

CALAMINA DE 0.80 X 3.6 X 0.18M AA

70.00

UND.

21.50

1,505.00

34

02-04-14

1769

RD000063

O/C.

B200245

6569

C.S.C.

GUANTES DE CUERO REFORZADO NACIONAL

50.00

PAR.

8.00

400.00

35

02-04-14

1769

RD000063

O/C.

B200245

6569

C.S.C.

GUANTES DE JEBE PARA ALBAIL (ALTA CALIDAD) MASTER

50.00

PAR.

8.30

415.00

36

02-04-14

1769

RD000063

O/C.

B200245

6569

C.S.C.

LENTES DE PROTECCION COLOR NEGRO 3M

30.00

UND.

11.50

345.00

37

21-04-14

1773

RD000417

O/C.

B200253

6575

C.S.C.

MADERA AGUANO 1 1/2" X 8" X 10

40.00

UND.

45.50

1,820.00

38

21-04-14

1773

RD000417

O/C.

B200253

6575

C.S.C.

MADERA AGUANO 2" X 3" X 10

20.00

UND.

24.00

480.00

39

25-04-14

1784

RD000488

O/C.

B200237

6561

C.S.C.

CAJA DE CONCRETO PREFABRICADO PARA MEDIDORES DE AGUA

22.00

UND.

10.00

220.00

40

25-04-14

1784

RD000488

O/C.

B200237

6561

C.S.C.

TAPA DE FIERRO GALVANIZADO PARA MEDIDORES DE AGUA

22.00

UND.

35.00

770.00

41

02-04-14

1785

RD000064

O/C.

B200236

6550

C.S.C.

60.00

KG.

14.50

870.00

42

02-04-14

1785

RD000064

O/C.

B200236

6550

C.S.C.

200.00

KG.

14.20

2,840.00

43

11-04-14

1791

RD000331

O/C.

B200292

6625

C.S.C.

20.00

PAR.

35.00

700.00

44

17-03-14

1793

RO000645

C. CH.

1.00

SERV.

30.00

30.00

C.S.C.

SOLDADURA SELLOCORD SEGN NORMA TECNICA E6011 1/8"


OERLICON
SOLDADURA SUPERCITO SEGN NORMA TECNICA E6011 1/8"
OERLICON
ZAPATOS PUNTA DE ACERO PARA PERSONAL OBRERO TALLAS 3940-41 Y 42 INDUSTRIAL AREQUIPEO
LEGALIZACION DE CUADERNO DE OBRAS

Pgina 251

191.64
233.50
1,726.38
5,978.26

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
OBRA

MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO D

EJECUTA
FTE. FTO.
META

:
:
:

SUB GERENCIA DE OBRAS


POR TODA FUENTE
0121-2014

1501 EDIFICIOS Y ESTRUCTURAS


1501.080502 AGUA Y SANEAMIENT

D O C U M E N T O
N

FECHA

SIAF

C/P N

DOC

PECOSA

DESCRIPCION

FTE. FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

45

17-03-14

1793

RO000645

C. CH.

C.S.C.

TEE SP 1" SAP PACCO VINDUIT

6.00

UND.

3.35

20.10

46

17-03-14

1793

RO000645

C. CH.

C.S.C.

REDUCCION SP 1" S 1/2" LIV PAVCO

6.00

UND.

1.50

9.00

47

17-03-14

1793

RO000645

C. CH.

C.S.C.

DISCO INDUSTRIAL KRALLE 14 X 32

1.00

UND.

280.00

280.00

48

17-03-14

1793

RO000645

C. CH.

C.S.C.

DISCO INDUSTRIAL KRALLE 12

1.00

UND.

260.00

260.00

49

17-03-14

1793

RO000645

C. CH.

C.S.C.

CUCHILLA MEIJENS 12 X 20 MM.

2.00

JGO.

151.00

302.00

50

17-03-14

1793

RO000645

C. CH.

C.S.C.

FAJA A41 PARA CEPILLADORA

2.00

UND.

18.00

36.00

51

17-03-14

1793

RO000645

C. CH.

C.S.C.

FAJA A42 PARA CIRCULAR

2.00

UND.

18.00

36.00

52

17-03-14

1793

RO000645

C. CH.

C.S.C.

CASCO PARA SOLDAR

1.00

UND.

30.00

30.00

53

17-03-14

1793

RO000645

C. CH.

C.S.C.

PINZA PARA SOLDAR

1.00

UND.

25.00

25.00

54

11-04-14

1796

RD000330

O/C.

B200291

6626

C.S.C.

DISCO DE CORTE PARA FIERRO DE 7 ''

40.00

UND.

8.00

320.00

55

11-04-14

1796

RD000330

O/C.

B200291

6626

C.S.C.

DISCO DE CORTE PARA CONCRETO DE 7 ''

10.00

UND.

20.00

200.00

56

10-04-14

1797

RD000335

O/C.

B200290

6627

C.S.C.

ACERO CORRUGADO DE 3/8" GRADO 60 FY=4200 KG/CM2 A A

170.00

VRLL.

16.50

2,805.00

57

10-04-14

1797

RD000335

O/C.

B200290

6627

C.S.C.

ANGULAR DE ACERO DE 3" X 3" X 3/8" X 6M A A

24.00

UND.

245.00

5,880.00

58

09-04-14

1821

RD000195

O/C.

B200288

6613

C.S.C.

GASOLINA DE 84 OCTANOS

185.00

GLN.

13.70

2,534.50

59

02-04-14

1847

RD000058

O/C.

B200312

6596

C.S.C.

MALLA ARPILLERA DE 3M DE ANCHO COLOR BLANCO NACIONAL

150.00

MTRS.

4.50

675.00

5.00

RLL.

375.00

1,875.00

60

02-04-14

1847

RD000058

O/C.

B200312

6596

C.S.C.

PLASTICO TRIPLE ANCHO POR ROLLO DE 100M NEGRO/AZUL


NACIONAL

61

25-04-14

1850

RD000490

O/C.

B200309

6592

C.S.C.

PINSA PARA SOLDAR NACIONAL

2.00

UND.

35.00

70.00

62

25-04-14

1850

RD000490

O/C.

B200309

6592

C.S.C.

LUNAS DE VIDRIO N 11 PARA MASCARA DE SOLDAR

6.00

UND.

4.00

24.00

63

25-04-14

1850

RD000490

O/C.

B200309

6592

C.S.C.

MASCARA DE PROTECCION PARA SOLDAR NACIONAL

2.00

UND.

20.00

40.00

64

25-04-14

1850

RD000490

O/C.

B200309

6592

C.S.C.

MANDIL DE CUERO PARA SOLDAR NACIONAL

2.00

UND.

49.00

98.00

65

02-05-14

1956

RD000554

O/C.

B200354

6697

C.S.C.

TUBERIA PVC- SAP C-10 DE 1/2" X 5 M NICOLL

40.00

UND.

13.50

540.00

C.S.C.

TUBERIA PVC- SAP UF INCLUYE ANILLO P/AGUA DE 63MM -2" X 6M


NTP ISO 1452 NICOLL

45.00

UND.

46.50

2,092.50

66

02-05-14

1956

RD000554

O/C.

B200354

6697

Pgina 252

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
OBRA

MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO D

EJECUTA
FTE. FTO.
META

:
:
:

SUB GERENCIA DE OBRAS


POR TODA FUENTE
0121-2014

1501 EDIFICIOS Y ESTRUCTURAS


1501.080502 AGUA Y SANEAMIENT

D O C U M E N T O
N

FECHA

SIAF

C/P N

DOC

PECOSA

FTE. FTO.

DESCRIPCION

67

02-05-14

1956

RD000554

O/C.

B200354

6697

C.S.C.

TUBERIA PVC- SAP C-10 CON ROSCA 3/4" X 5 M NICOLL

68

02-05-14

1956

RD000554

O/C.

B200354

6697

C.S.C.

TUBERIA PVC- SAP C-10 CR DE 1" X 5 M NICOLL

69

02-05-14

1956

RD000554

O/C.

B200354

6697

C.S.C.

TUBERIA PVC- SAP C-10 C/R DE 1 1/2" X 5 M NICOLL

70

02-05-14

1956

RD000554

O/C.

B200354

6697

C.S.C.

71

02-05-14

1956

RD000554

O/C.

B200354

6697

C.S.C.

6697

C.S.C.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

1.00

UND.

16.00

16.00

50.00

UND.

26.00

1,300.00

1.00

UND.

48.00

48.00

SELLADOR DE EMPAQUETADURA 1/16 GLN NICOLL

20.00

UND.

7.40

148.00

CINTA TEFLON

50.00

UND.

1.50

75.00

1.00

UND.

217.00

217.00

1.00

SERV.

196.80

196.80

50.00

BLS.

10.00

500.00

9.00

UND.

150.00

1,350.00

100.00

TAL.

18.00

1,800.00

CODO PVC SAL UF DE 300MM - 12" X 45 INCLUYE ANILLOS


NICOLL
SERVICIO DE CONTRATACION DE SEGURO OBLIGATORIO DE SCRTR
PENSION Y SCTR PARA PERSONAL OBRERO DICIEMBRE-2013

72

02-05-14

1956

RD000554

O/C.

B200354

73

27-03-14

1958

RO000691

O/S.

B200117

74

15-05-14

2015

RO001172

O/C.

B200366

6720

C.S.C.

YESO POR 28 KG. NACIONAL

75

09-04-14

2293

RD000288

O/C.

B204592-13

6249

C.S.C.

CASACAS INSTITUCIONALES CON LOGO SEGN DISEO

76

10-04-14

2301

RD000281

O/C.

B204463-13

6189

C.S.C.

CUADERNO DE OBRA AUTOCOPIATIVO (1 ORIGINAL Y 3 COPIAS)

77

14-04-14

2354

RD000389

O/C.

B200406

6808

C.S.C.

PLANCHAS DE TRIPLAY DE 1.22 X 2.44 E. 6MM NACIONAL

30.00

UND.

52.00

1,560.00

78

25-04-14

2494

RD000496

O/C.

B200451

6833

C.S.C.

ACEITE LUBRICANTE PARA MOTORES A GASOLINA 20W-50 MOBIL

20.00

GLN.

78.00

1,560.00

1.00

SERV.

232.60

232.60

1.00

SERV.

2,326.00

2,326.00

C.S.C.

79

04-04-14

2641

RO000861

O/S.

B200253

C.S.C.

SERVICIO DE CONTRATACION DE SEGURO OBLIGATORIO SCRTR


PENSION Y SCTR SALUD PARA PERSONAL OBRERO ENERO-2014

80

04-04-14

2656

RO000864

O/S.

B200242

C.S.C.

SERVICIO DE POLIZAS DE SEGUROS PATRIMONIALES


PLANILLA ASISTENTE TECNICO MES DE MARZO ZEVALLOS QUISPE
ROBERT J.
PLANILLA ASISTENTE TECNICO MES DE MARZO ZEVALLOS QUISPE
ROBERT J.
PLANILLA ASISTENTE TECNICO MES DE MARZO ZEVALLOS QUISPE
ROBERT J.

81

10-04-14

2911

RD000350

PLL.

327

C.S.C.

82

10-04-14

2911

RD000351

PLL.

327

C.S.C.

83

10-04-14

2911

RD000352

PLL.

327

C.S.C.

84

10-04-14

2911

RD000350

PLL.

282

C.S.C.

PLANILLA PERSONAL OBRERO MES DE MARZO-2014

85

10-04-14

2911

RD000351

PLL.

282

C.S.C.

DESCUENTO DE PLANILLA PERSONAL OBRERO MES DE MARZO2014

9,998.26

86

10-04-14

2911

RD000352

PLL.

282

C.S.C.

APORTE DE PLANILLA PERSONAL OBRERO MES DE MARZO-2014

6,592.35

87

10-04-14

3108

RD000341

PLL.

210

C.S.C.

PLANILLA MES DE MARZO ALVAREZ TTITO MARY SOL

1,392.00

C.S.C.

PLANILLA MES DE MARZO ALVAREZ TTITO MARY SOL DESCUENTOS

88

10-04-14

3108

RD000342

PLL.

210

Pgina 253

1,541.41
208.49
171.11
57,318.48

208.00

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
OBRA

MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO D

EJECUTA
FTE. FTO.
META

:
:
:

SUB GERENCIA DE OBRAS


POR TODA FUENTE
0121-2014

1501 EDIFICIOS Y ESTRUCTURAS


1501.080502 AGUA Y SANEAMIENT

D O C U M E N T O
N

89

FECHA

10-04-14

SIAF

C/P N

DOC

3108

RD000343

PLL.

210

O/C.

B200649

PECOSA

DESCRIPCION

FTE. FTO.
C.S.C.

PLANILLA MES DE MARZO ALVAREZ TTITO MARY SOL - APORTES

7166

C.S.C.

TUBERIA PVC DE 300MM - 12" X 6M S-25 (INCLUIDO ANILLO


FLEXIBLE)

90

21-07-14

3276

RO001798
RO001802

91

15-07-14

3277

RO001777

O/C.

B200647

7164

C.S.C.

PLATINA DE FIERRO 2 1/2" X 1/2" X 6 MTS

92

25-04-14

3278

RD000505

O/C.

B200648

7165

C.S.C.

93

25-04-14

3278

RD000505

O/C.

B200648

7165

3279

RD000762
RD000763

O/C.

B200657

7183

94

15-05-14

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

144.00
65.00

UND.

403.00

26,195.00

175.00

VRLL.

131.50

23,012.50

MARCO DE FIERRO FUNDIDO PARA BUZON D. 0.60M

74.00

UND.

254.63

18,842.62

C.S.C.

TAPA DE CONCRETO REFORZADO PARA BUZON DE 60MM

74.00

UND.

109.13

8,075.62

C.S.C.

PIEDRA CHANCADA DE 1/2" (HUILLQUE)

63.00

10,080.00

C.S.C.

NEUMATICOS POSTERIORES G677 MSD CON PROTECTOR Y


CAMARA GOODYEAR

95

12-05-14

3310

RD000618

O/C.

B200696

96

02-05-14

3339

RD000543

O/C.

B200675

7212

C.S.C.

VALVULA TIPO GLOBO PVC DE 1/2"

97

02-05-14

3339

RD000543

O/C.

B200675

7212

C.S.C.

98

02-05-14

3339

RD000543

O/C.

B200675

7212

99

02-05-14

3339

RD000543

O/C.

B200675

100

02-05-14

3339

RD000543

O/C.

B200675

101

18-03-14

3356

RO001020

C. CH.

102

18-03-14

3356

RO001020

103

18-03-14

3356

RO001020

160.00

M3.

4.00

UND.

2,825.00

11,300.00

24.00

UND.

6.70

160.80

TEE PVC SAP UF 63MM CON ANILLO NICOLL

1.00

UND.

25.50

25.50

C.S.C.

REDUCCION DE PVC SAP UF DE 63 MM A 1" C/R NICOLL

2.00

UND.

13.90

27.80

7212

C.S.C.

TEE PVC SAP C/R DE 1" NICOLL

24.00

UND.

3.40

81.60

7212

C.S.C.

REDUCCION DE PVC SAP C/R DE 1" A 1/2" NICOLL

24.00

UND.

2.10

50.40

C.S.C.

UNION DE 1" C/R

30.00

PZA.

3.00

90.00

C. CH.

C.S.C.

UNION DE 1/2" C/R

20.00

PZA.

1.50

30.00

C. CH.

C.S.C.

LEGALIZACION DE CUADERNO DE OBRAS

1.00

SERV.

30.00

30.00

1.00

UND.

400.00

400.00

1.00

UND.

400.00

400.00

CONFECCION DE CARTEL DE OBRA DE 5.4 X 2.4 MTS CON MARCO


DE METAL
CONFECCION DE CARTEL DE OBRA DE 5.4 X 2.4 MTS CON MARCO
DE METAL

104

18-03-14

3356

RO001020

C. CH.

C.S.C.

105

18-03-14

3356

RO001020

C. CH.

C.S.C.

106

18-03-14

3356

RO001020

C. CH.

C.S.C.

BATERIA DE 1/2" COMSYSSA DE PVC

5.00

KIT.

25.00

125.00

107

18-03-14

3356

RO001020

C. CH.

C.S.C.

ABRAZADERA 63 MM - A1/2" DE PVC

5.00

UND.

18.00

90.00

108

18-03-14

3356

RO001020

C. CH.

C.S.C.

TARRAJA DE 1/2" DE PVC

1.00

UND.

15.00

15.00

109

18-03-14

3356

RO001020

C. CH.

C.S.C.

LLAVE CORPORATION DE 1/2" DE PVC

5.00

UND.

16.00

80.00

110

18-03-14

3356

RO001020

C. CH.

C.S.C.

REDUCCION DE 2" A 1" DE PVC

1.00

UND.

7.00

7.00

Pgina 254

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
OBRA

MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO D

EJECUTA
FTE. FTO.
META

:
:
:

SUB GERENCIA DE OBRAS


POR TODA FUENTE
0121-2014

1501 EDIFICIOS Y ESTRUCTURAS


1501.080502 AGUA Y SANEAMIENT

D O C U M E N T O
N

FECHA

111

PECOSA

DESCRIPCION

FTE. FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

SIAF

C/P N

DOC

18-03-14

3356

RO001020

C. CH.

C.S.C.

TAPONES DE 63 MM

3.00

PZA.

19.00

57.00

112

22-04-14

3364

RO001018

C. CH.

C.S.C.

MANGUERA CON ABRAZADERA C-21

1.00

PZA.

110.00

110.00

113

22-04-14

3364

RO001018

C. CH.

C.S.C.

MANGUERA HIDRAULICO 1/2 CON CONEXIONES

1.00

PZA.

198.00

198.00

114

22-04-14

3364

RO001018

C. CH.

C.S.C.

MANGUERA HIDRAULICO 3/4 X 145 R2

1.00

PZA.

240.00

240.00

115

22-04-14

3364

RO001018

C. CH.

C.S.C.

FILTRO DE ACEITE

1.00

UND.

68.00

68.00

116

22-04-14

3364

RO001018

C. CH.

C.S.C.

FILTRO PARA COMBUSTIBLE C/SEPARADOR DE AGUA

1.00

UND.

128.50

128.50

117

22-04-14

3364

RO001018

C. CH.

C.S.C.

FILTRO COMBUSTIBLE AT-365870

1.00

UND.

425.00

425.00

118

22-04-14

3364

RO001018

C. CH.

C.S.C.

COPIA DE PLANOS Y ANILLADO DE EXPEDIENTE TECNICO

1.00

SERV.

211.50

211.50

119

22-04-14

3364

RO001018

C. CH.

C.S.C.

MOBIL DIESEL TURBO SAE 25W-50X5GLN

2.00

BLD.

247.50

495.00

120

22-04-14

3364

RO001018

C. CH.

C.S.C.

CAMARA 14 CAMELL

1.00

UND.

30.00

30.00

121

22-04-14

3364

RO001018

C. CH.

C.S.C.

CAMARAS 750X16 CAMELL

4.00

UND.

40.00

160.00

122

22-04-14

3364

RO001018

C. CH.

C.S.C.

PITONES

5.00

UND.

3.00

15.00

123

12-05-14

4001

RD000733

PLL.

285

C.S.C.

PLANILLA MES DE ABRIL QUISPE CONCHA MABELINA

124

12-05-14

4001

RD000733

PLL.

285

C.S.C.

PLANILLA MES DE ABRIL QUISPE CONCHA MABELINA DESCUENTOS

426.36

125

12-05-14

4001

RD000733

PLL.

285

C.S.C.

PLANILLA MES DE ABRIL QUISPE CONCHA MABELINA - APORTES

297.00
6.00

UND.

24.00

144.00

2,873.64

126

02-06-14

4040

RD000848

O/C.

B200945

7544

C.S.C.

UNION CORREDIZA DE 63MM EN PVC-SAP UF INCLUYE ANILLO


P/AGUA NTP ISO 1452 PSVCO

127

02-06-14

4040

RD000848

O/C.

B200945

7544

C.S.C.

TUBERIA DE 1 1/2 EN PVC-SAP P/AGUA NTP ISO 1452 PAVCO

2.00

UND.

54.00

108.00

128

02-06-14

4040

RD000848

O/C.

B200945

7544

C.S.C.

TUBERIA DE 63MM PVC-SAP P/AGUA NTP ISO 1452 PAVCO

4.00

UND.

56.00

224.00

129

02-06-14

4040

RD000848

O/C.

B200945

7544

C.S.C.

TUBERIA DE 1" EN PVC-SAP P/AGUA NTP ISO 1452 PAVCO

10.00

UND.

32.00

320.00

130

02-06-14

4040

RD000848

O/C.

B200945

7544

C.S.C.

UNIONES DE 1" PAVCO

10.00

UND.

3.00

30.00

2.00

UND.

4.70

9.40

1.00

UND.

9.00

9.00

131

02-06-14

4040

RD000848

O/C.

B200945

7544

C.S.C.

CODOS DE 45 DE 1 1/2" EN PVC-SAP P/AGUA NTP ISO 1452


PAVCO

132

02-06-14

4040

RD000848

O/C.

B200945

7544

C.S.C.

BROCA DE 3/8 GERMANI

Pgina 255

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
OBRA

MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO D

EJECUTA
FTE. FTO.
META

:
:
:

SUB GERENCIA DE OBRAS


POR TODA FUENTE
0121-2014

1501 EDIFICIOS Y ESTRUCTURAS


1501.080502 AGUA Y SANEAMIENT

D O C U M E N T O
N

FECHA

133

DESCRIPCION

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

SIAF

C/P N

DOC

PECOSA

FTE. FTO.

02-06-14

4040

RD000848

O/C.

B200945

7544

C.S.C.

TARRAJA DE 1" MIXTA 1/2" 3/4" 1"

1.00

UND.

28.00

28.00

134

02-06-14

4040

RD000848

O/C.

B200945

7544

C.S.C.

VALVULA DE 1" CIM

1.00

UND.

48.00

48.00

135

02-06-14

4041

RD000850

O/C.

B200956

7555

C.S.C.

VALVULA DE 63 MM FIERRO FUNDIDO

1.00

UND.

340.00

340.00

136

02-06-14

4041

RD000850

O/C.

B200956

7555

C.S.C.

LLAVE DE PASO DE 1/2"

2.00

UND.

30.00

60.00

1.00

UND.

35.00

35.00

2.00

UND.

97.00

194.00

14.00

UND.

1.50

21.00

137

02-06-14

4041

RD000850

O/C.

B200956

7555

C.S.C.

TEE DE 63 MM EN PVC-SAP INCLUYE ANILLOS P/AGUA NTP ISO


1452

138

02-06-14

4041

RD000850

O/C.

B200956

7555

C.S.C.

PEGAMENTO PARA PVC OATEY

139

02-06-14

4041

RD000850

O/C.

B200956

7555

C.S.C.

CODOS DE 90 DE 1/2" EN PVC-SAP P/AGUA NTP ISO 1452 PAVCO

140

02-06-14

4041

RD000850

O/C.

B200956

7555

C.S.C.

NIPLE GALVANIZADO DE 1/2" LONGITUD 6"

3.00

UND.

7.00

21.00

141

02-06-14

4041

RD000850

O/C.

B200956

7555

C.S.C.

REDUCCION DE 1 1/2" A 1" PAVCO

1.00

UND.

3.00

3.00

142

02-06-14

4041

RD000850

O/C.

B200956

7555

C.S.C.

UNION UNIVERSAL DE 1" PAVCO

1.00

UND.

8.00

8.00

143

11-07-14

4424

RO001684

O/C.

B201107

C.S.C.

TURBO COMPRESOR ARMADO MARCA CATERPILLAR COD 1981845

1.00

UND.

11,332.00

11,332.00

2.00

UND.

3,425.00

6,850.00

144

09-06-14

4425

RD000939

O/C.

B201108

C.S.C.

NEUMATICOS POSTERIORES G177 MSD CON PROTECCION Y


CAMARA MARCA GOODYEAR

145

03-06-14

4523

RO001245

C. CH.

139

C.S.C.

LEGALIZACION DE CUADERNO DE OBRAS

1.00

SERV.

30.00

30.00

146

03-06-14

4523

RO001245

C. CH.

139

C.S.C.

MANTENIMIENTO CANGURO COMPACTOR

1.00

SERV.

250.00

250.00

147

03-06-14

4523

RO001245

C. CH.

139

C.S.C.

ZAPATAS DE FRENO

1.00

JGO.

228.00

228.00

148

03-06-14

4523

RO001245

C. CH.

139

C.S.C.

CORREA DE SINCRONIZACION

1.00

UND.

144.30

144.30

149

03-06-14

4523

RO001245

C. CH.

139

C.S.C.

TENSOR DE CORREA DE DISTRIBUCION

1.00

UND.

157.20

157.20

150

03-06-14

4523

RO001245

C. CH.

140

C.S.C.

GOMAS BARRA ESTABILIZADORA

2.00

UND.

54.60

109.20

151

03-06-14

4523

RO001245

C. CH.

140

C.S.C.

GOMAS DE MUELLE POSTERIOR

8.00

UND.

12.80

102.40

152

03-06-14

4523

RO001245

C. CH.

140

C.S.C.

BUJES DE MUELLE POSTERIOR

2.00

UND.

90.90

181.80

153

03-06-14

4523

RO001245

C. CH.

140

C.S.C.

TEMPLADOR DE CORREA DISTRIBUCION

1.00

UND.

204.60

204.60

C.S.C.

PLANILLA ASISTENTE TECNICO MES DE MAYO ZEVALLOS QUISPE


ROBERT J. - DESCUENTOS

154

05-06-14

4729

RO001291

PLL.

540

Pgina 256

258.51

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
OBRA

MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO D

EJECUTA
FTE. FTO.
META

:
:
:

SUB GERENCIA DE OBRAS


POR TODA FUENTE
0121-2014

1501 EDIFICIOS Y ESTRUCTURAS


1501.080502 AGUA Y SANEAMIENT

D O C U M E N T O
N

FECHA

155

PECOSA

DESCRIPCION

FTE. FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

SIAF

C/P N

DOC

05-06-14

4729

RO001292

PLL.

540

C.S.C.

156

05-06-14

4729

RO001293

PLL.

540

C.S.C.

157

05-06-14

4729

RO001291

PLL.

502

C.S.C.

DESCUENTO DE PLANILLA PERSONAL OBRERO MES DE MAYO-2014

11,955.96

158

05-06-14

4729

RO001292

PLL.

502

C.S.C.

PLANILLA PERSONAL OBRERO MES DE MAYO-2014

64,708.75

159

05-06-14

4729

RO001293

PLL.

502

C.S.C.

APORTE DE PLANILLA PERSONAL OBRERO MES DE MAYO-2014

160

09-06-14

4914

RO001315

C. CH.

10

C.S.C.

PASTILLAS DE FRENO

1.00

JGO.

357.00

357.00

1.00

SERV.

120.00

120.00

PLANILLA ASISTENTE TECNICO MES DE MAYO ZEVALLOS QUISPE


ROBERT J.
PLANILLA ASISTENTE TECNICO MES DE MAYO ZEVALLOS QUISPE
ROBERT J. - APORTES

1,911.37
212.17

7,527.11

161

09-06-14

4914

RO001315

C. CH.

10

C.S.C.

MANTENIMIENTO Y REPARACION DE IMPRESORAS LASERJET


P2035N

162

09-06-14

5066

RD000962

PLL.

358

C.S.C.

PLANILLA MES DE MAYO QUISPE CONCHA MABELINA

163

09-06-14

5066

RD000963

PLL.

358

C.S.C.

PLANILLA MES DE MAYO QUISPE CONCHA MABELINA DESCUENTOS

213.19

164

09-06-14

5066

RD000964

PLL.

358

C.S.C.

PLANILLA MES DE MAYO QUISPE CONCHA MABELINA - APORTES

148.50

165

09-06-14

5066

RD000962

PLL.

358

C.S.C.

PLANILLA MES DE MAYO ALVAREZ TTITO MARY SOL

166

09-06-14

5066

RD000963

PLL.

358

C.S.C.

PLANILLA MES DE MAYO ALVAREZ TTITO MARY SOL - DESCUENTOS

416.00

167

09-06-14

5066

RD000964

PLL.

358

C.S.C.

PLANILLA MES DE MAYO ALVAREZ TTITO MARY SOL - APORTES

288.00

168

07-07-14

5728

BG000007

PLL.

615

R.D.R.

PLANILLA PERSONAL OBRERO MES DE JUNIO

169

07-07-14

5728

BG000008

PLL.

615

R.D.R.

PLANILLA PERSONAL OBRERO MES DE JUNIO - DESCUENTOS

3,815.07

170

07-07-14

5728

BG000009

PLL.

615

R.D.R.

PLANILLA PERSONAL OBRERO MES DE JUNIO - APORTES

2,469.41

PLANILLA ASISTENTE TECNICO MES DE JUNIO ZEVALLOS QUISPE


ROBERT J.
PLANILLA ASISTENTE TECNICO MES DE JUNIO ZEVALLOS QUISPE
ROBERT J. - DECUENTOS
PLANILLA ASISTENTE TECNICO MES DE JUNIO ZEVALLOS QUISPE
ROBERT J. - APORTES

1,436.81

2,784.00

21,192.75

171

07-07-14

5728

BG000007

PLL.

651

R.D.R.

172

07-07-14

5728

BG000008

PLL.

651

R.D.R.

173

07-07-14

5728

BG000009

PLL.

651

R.D.R.

174

07-07-14

5761

BG000010

PLL.

428

R.D.R.

PLANILLA MES DE JUNIO QUISPE CONCHA MABELINA

213.19
148.50

175

07-07-14

5761

BG000011

PLL.

428

R.D.R.

PLANILLA MES DE JUNIO QUISPE CONCHA MABELINA DESCUENTOS

176

07-07-14

5761

BG000012

PLL.

428

R.D.R.

PLANILLA MES DE JUNIO QUISPE CONCHA MABELINA - APORTES

Pgina 257

1,849.71
250.17
205.32
1,436.81

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


TARJETA DE LIQUIDACIN FINANCIERA
OBRA

MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO D

EJECUTA
FTE. FTO.
META

:
:
:

SUB GERENCIA DE OBRAS


POR TODA FUENTE
0121-2014

1501 EDIFICIOS Y ESTRUCTURAS


1501.080502 AGUA Y SANEAMIENT

D O C U M E N T O
N

FECHA

177

PECOSA

DESCRIPCION

FTE. FTO.

CANT.

UNID.
MEDIDA

PRECIO
UNITARIO

IMPORTE

SIAF

C/P N

DOC

07-07-14

5761

BG000010

PLL.

428

R.D.R.

PLANILLA MES DE JUNIO ALVAREZ TTITO MARY SOL

696.00

178

07-07-14

5761

BG000011

PLL.

428

R.D.R.

PLANILLA MES DE JUNIO ALVAREZ TTITO MARY SOL - DESCUENTOS

104.00

179

07-07-14

5761

BG000012

PLL.

428

R.D.R.

PLANILLA MES DE JUNIO ALVAREZ TTITO MARY SOL - APORTES

180

16-07-14

6261

RO001809

C. CH.

192

C.S.C.

TAMBOR DE IMPRESORA BROTHER MFC

1.00

UND.

180.00

180.00

181

16-07-14

6261

RO001809

C. CH.

192

C.S.C.

COMBO TECLADO Y MOUSE

1.00

UND.

30.00

30.00

182

16-07-14

6261

RO001809

C. CH.

192

C.S.C.

MANTENIMIENTO DE COMPUTADORAS

5.00

SERV.

30.00

150.00

183

16-07-14

6261

RO001809

C. CH.

192

C.S.C.

LIMPIEZA DE IMPRESORA EPSON L355 MAS CABEZAL

1.00

SERV.

80.00

80.00

184

16-07-14

6261

RO001809

C. CH.

192

C.S.C.

CABLEADO Y CONFIGURACION DE RED

1.00

SERV.

50.00

50.00

185

16-07-14

6261

RO001809

C. CH.

192

C.S.C.

LEGALIZACION DE CUADERNO DE OBRAS

1.00

SERV.

30.00

30.00

186

25-07-14

6643

BG000020

PLL.

728

R.D.R.

PLANILLA PERSONAL OBRERO MES DE JULIO-2014

187

25-07-14

6643

BG000019

PLL.

728

R.D.R.

DESCUENTO DE PLANILLA PERSONAL OBRERO MES DE JULIO-2014

2,030.97

188

25-07-14

6643

BG000021

PLL.

728

R.D.R.

APORTE DE PLANILLA PERSONAL OBRERO MES DE JULIO-2014

1,411.01

189

04-08-14

6764

BG000031

PLL.

503

R.D.R.

PLANILLA MES DE JULIO QUISPE CONCHA MABELINA - APORTES

148.50

190

04-08-14

6764

BG000032

PLL.

503

R.D.R.

PLANILLA MES DE JULIO QUISPE CONCHA MABELINA DESCUENTOS

213.19

191

04-08-14

6764

BG000033

PLL.

503

R.D.R.

PLANILLA MES DE JULIO QUISPE CONCHA MABELINA

192

18-08-14

7016

BG000052-T

PLL.

528

R.D.R.

PLANILLA MES DE JULIO ALVAREZ TTITO MARY SOL -APORTES

216.00

193

18-08-14

7016

BG000053

PLL.

528

R.D.R.

PLANILLA MES DE JULIO ALVAREZ TTITO MARY SOL - DESCUENTOS

312.00

194

18-08-14

7016

BG000054

PLL.

528

R.D.R.

PLANILLA MES DE JULIO ALVAREZ TTITO MARY SOL

2,615.00

195

09-09-14

7709

RO002591

PLL.

606

R.O.

PLANILLA MES DE AGOSTO QUISPE CONCHA MABELINA

1,436.81
213.19
148.50

196

09-09-14

7709

RO002592

PLL.

606

R.O.

PLANILLA MES DE AGOSTO QUISPE CONCHA MABELINA DESCUENTOS

197

09-09-14

7709

RO002593

PLL.

606

R.O.

PLANILLA MES DE AGOSTO QUISPE CONCHA MABELINA - APORTES

72.00

12,344.65

1,963.81

TOTAL

Pgina 258

609,083.91

N DE PROYECTOS DE INVERSIN PBLICA

LIQUIDACIN FINANCIERA

AS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO


1501 EDIFICIOS Y ESTRUCTURAS
1501.080502 AGUA Y SANEAMIENTO
ESPECIFICA

DEL

2.6. 2.3. 5 3

2.6. 2.3. 5 4

PERSONAL

BIENES

GASTO
2.6. 2.3. 5 5
SERVICIOS

3,403.74
611.06
353.46
2,155.81
258.51
212.17
49,769.30
9,579.59
5,865.43
1,834.34
215.66
148.50
1,792.00
208.00
144.00
55,280.50
1,968.00
9,135.00
308.00
1,054.00
148.50
215.66

Pgina 259

N DE PROYECTOS DE INVERSIN PBLICA

LIQUIDACIN FINANCIERA

AS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO


1501 EDIFICIOS Y ESTRUCTURAS
1501.080502 AGUA Y SANEAMIENTO
ESPECIFICA

DEL

2.6. 2.3. 5 3

2.6. 2.3. 5 4

PERSONAL

BIENES

GASTO
2.6. 2.3. 5 5
SERVICIOS

1,434.34
144.00
208.00
1,392.00
191.64
233.50
1,726.38
5,978.26
10,450.00
50,804.29
1,505.00
400.00
415.00
345.00
1,820.00
480.00
220.00
770.00
870.00
2,840.00
700.00
30.00

Pgina 260

N DE PROYECTOS DE INVERSIN PBLICA

LIQUIDACIN FINANCIERA

AS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO


1501 EDIFICIOS Y ESTRUCTURAS
1501.080502 AGUA Y SANEAMIENTO
ESPECIFICA

DEL

GASTO

2.6. 2.3. 5 3

2.6. 2.3. 5 4

PERSONAL

BIENES

2.6. 2.3. 5 5
SERVICIOS

20.10
9.00
280.00
260.00
302.00
36.00
36.00
30.00
25.00
320.00
200.00
2,805.00
5,880.00
2,534.50
675.00
1,875.00
70.00
24.00
40.00
98.00
540.00
2,092.50

Pgina 261

N DE PROYECTOS DE INVERSIN PBLICA

LIQUIDACIN FINANCIERA

AS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO


1501 EDIFICIOS Y ESTRUCTURAS
1501.080502 AGUA Y SANEAMIENTO
ESPECIFICA

DEL

GASTO

2.6. 2.3. 5 3

2.6. 2.3. 5 4

PERSONAL

BIENES

2.6. 2.3. 5 5
SERVICIOS

16.00
1,300.00
48.00
148.00
75.00
217.00
196.80
500.00
1,350.00
1,800.00
1,560.00
1,560.00
232.60
2,326.00
1,541.41
208.49
171.11
57,318.48
9,998.26
6,592.35
1,392.00
208.00

Pgina 262

N DE PROYECTOS DE INVERSIN PBLICA

LIQUIDACIN FINANCIERA

AS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO


1501 EDIFICIOS Y ESTRUCTURAS
1501.080502 AGUA Y SANEAMIENTO
ESPECIFICA

DEL

GASTO

2.6. 2.3. 5 3

2.6. 2.3. 5 4

PERSONAL

BIENES

2.6. 2.3. 5 5
SERVICIOS

144.00
26,195.00
23,012.50
18,842.62
8,075.62
10,080.00
11,300.00
160.80
25.50
27.80
81.60
50.40
90.00
30.00
30.00
400.00
400.00
125.00
90.00
15.00
80.00
7.00

Pgina 263

N DE PROYECTOS DE INVERSIN PBLICA

LIQUIDACIN FINANCIERA

AS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO


1501 EDIFICIOS Y ESTRUCTURAS
1501.080502 AGUA Y SANEAMIENTO
ESPECIFICA

DEL

GASTO

2.6. 2.3. 5 3

2.6. 2.3. 5 4

PERSONAL

BIENES

2.6. 2.3. 5 5
SERVICIOS

57.00
110.00
198.00
240.00
68.00
128.50
425.00
211.50
495.00
30.00
160.00
15.00
2,873.64
426.36
297.00
144.00
108.00
224.00
320.00
30.00
9.40
9.00

Pgina 264

N DE PROYECTOS DE INVERSIN PBLICA

LIQUIDACIN FINANCIERA

AS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO


1501 EDIFICIOS Y ESTRUCTURAS
1501.080502 AGUA Y SANEAMIENTO
ESPECIFICA

DEL

GASTO

2.6. 2.3. 5 3

2.6. 2.3. 5 4

PERSONAL

BIENES

2.6. 2.3. 5 5
SERVICIOS

28.00
48.00
340.00
60.00
35.00
194.00
21.00
21.00
3.00
8.00
11,332.00
6,850.00
30.00
250.00
228.00
144.30
157.20
109.20
102.40
181.80
204.60
258.51

Pgina 265

N DE PROYECTOS DE INVERSIN PBLICA

LIQUIDACIN FINANCIERA

AS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO


1501 EDIFICIOS Y ESTRUCTURAS
1501.080502 AGUA Y SANEAMIENTO
ESPECIFICA

DEL

2.6. 2.3. 5 3

2.6. 2.3. 5 4

PERSONAL

BIENES

GASTO
2.6. 2.3. 5 5
SERVICIOS

1,911.37
212.17
11,955.96
64,708.75
7,527.11
357.00
120.00
1,436.81
213.19
148.50
2,784.00
416.00
288.00
21,192.75
3,815.07
2,469.41
1,849.71
250.17
205.32
1,436.81
213.19
148.50

Pgina 266

N DE PROYECTOS DE INVERSIN PBLICA

LIQUIDACIN FINANCIERA

AS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO


1501 EDIFICIOS Y ESTRUCTURAS
1501.080502 AGUA Y SANEAMIENTO
ESPECIFICA

DEL

GASTO

2.6. 2.3. 5 3

2.6. 2.3. 5 4

PERSONAL

BIENES

2.6. 2.3. 5 5
SERVICIOS

696.00
104.00
72.00
180.00
30.00
150.00
80.00
50.00
30.00
12,344.65
2,030.97
1,411.01
148.50
213.19
1,963.81
216.00
312.00
2,615.00
1,436.81
213.19
148.50
378,016.17

225,362.84

Pgina 267

5,704.90

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


MOVIMIENTO DE ALMACEN - TRANSFERENCIA DE MATERIALES RECIBIDOS
OBRA

: MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO

META

: 0216 (2013) - 0121(2014).

DOCUMENTO
FECHA

07-11-13
07-11-13
15-11-13
18-11-13
10-12-13
14-12-13
17-12-13
30-01-14
20-02-14
01-04-14

28-02-14
28-02-14

28-02-14
28-02-14

N/ENT.

DESCRIPCION

N/SAL.

2812
3255
3262
3265
3283
3287
3290
2175
2192
576

4803
2197

4803
2197

DISCO
DISCO
DISCO
DISCO
DISCO
DISCO
DISCO
DISCO
DISCO
DISCO

DE
DE
DE
DE
DE
DE
DE
DE
DE
DE

CORTE
CORTE
CORTE
CORTE
CORTE
CORTE
CORTE
CORTE
CORTE
CORTE

DIAMANTADO
DIAMANTADO
DIAMANTADO
DIAMANTADO
DIAMANTADO
DIAMANTADO
DIAMANTADO
DIAMANTADO
DIAMANTADO
DIAMANTADO

PARA
PARA
PARA
PARA
PARA
PARA
PARA
PARA
PARA
PARA

CONCRETO DE 18"
CONCRETO DE 18"
CONCRETO DE 18"
CONCRETO DE 18"
CONCRETO DE 18"
CONCRETO DE 18"
CONCRETO DE 18"
CONCRETO DE 18"
CONCRETO DE 18"
CONCRETO DE 18"
TOTAL

CEMENTO YURA
CEMENTO PORTLAND TIPO IP 42.5 KGR.

CANTI

CANTI

ENTRADA

SALIDA

9.00

9.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
9.00

11.00
TOTAL

11.00

TOTAL

1.00

ABRAZADERA DE POLIPROPILENO
ABRAZADERA DE POLIPROPILENO

11.00
11.00

1.00

Pgina 268

1.00
1.00

SALDO

9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00

11.00
0.00

1.00
0.00

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


MOVIMIENTO DE ALMACEN - TRANSFERENCIA DE MATERIALES RECIBIDOS
OBRA

: MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO

META

: 0216 (2013) - 0121(2014).

DOCUMENTO
FECHA

N/ENT.

DESCRIPCION

N/SAL.

Pgina 269

CANTI

CANTI

ENTRADA

SALIDA

SALDO

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


MOVIMIENTO DE ALMACEN - TRANSFERENCIA DE MATERIALES RECIBIDOS
OBRA

: MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO

META

: 0216 (2013) - 0121(2014).

DOCUMENTO
FECHA

N/ENT.

DESCRIPCION

N/SAL.

Pgina 270

CANTI

CANTI

ENTRADA

SALIDA

SALDO

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


MOVIMIENTO DE ALMACEN - TRANSFERENCIA DE MATERIALES RECIBIDOS
OBRA

: MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO

META

: 0216 (2013) - 0121(2014).

DOCUMENTO
FECHA

N/ENT.

DESCRIPCION

N/SAL.

Pgina 271

CANTI

CANTI

ENTRADA

SALIDA

SALDO

N PBLICA

LES RECIBIDOS

RITO DE CUSCO - CUSCO

UNID.

OBSERVACIONES

MEDIDA

UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
BLS.
BLS.
BLS.
UND.
UND.

Pgina 272

N PBLICA

LES RECIBIDOS

RITO DE CUSCO - CUSCO

UNID.

OBSERVACIONES

MEDIDA

Pgina 273

N PBLICA

LES RECIBIDOS

RITO DE CUSCO - CUSCO

UNID.

OBSERVACIONES

MEDIDA

Pgina 274

N PBLICA

LES RECIBIDOS

RITO DE CUSCO - CUSCO

UNID.

OBSERVACIONES

MEDIDA

Pgina 275

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


MOVIMIENTO DE ALMACEN - CAJA CHICA
OBRA

: MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO

META

: 0216 (2013) - 0121(2014).

DOCUMENTO
FECHA

N/ENT.

25-10-13
07-11-13

2808

DESCRIPCION

N/SAL.

3255

PINTURA BLANCO HUMO


PINTURA BLANCO HUMO

2808

25-10-13
07-11-13

2808

3255

RODILLOS P/PINTAR
RODILLOS P/PINTAR

3255

BROCHAS DE 2" Y 1"


BROCHAS DE 2" Y 1"

25-10-13
08-11-13

25-10-13
08-11-13

3256

2808
3256

2808
3256

AHORRADORES DE 36 WATTS
AHORRADORES DE 36 WATTS

25-10-13
08-11-13

25-10-13
08-11-13

2808
3255

2808
3256

2808
3256

TOTAL

3.00

TOTAL

2.00

MOUSE
MOUSE

2808

SUPRESOR DE PICOS
SUPRESOR DE PICOS

06-11-13
11-11-13

2811

TOTAL

2.00

TOTAL

2.00

3258

3258

2811

ACEITE 030
ACEITE 030

06-11-13
11-11-13

2811

3258

TEE DE 1/2"
TEE DE 1/2"

3258

PEGAMENTO
PEGAMENTO

3261

14-11-13
14-11-13

2815
3261

2815
3261

SELLOS EN TRODAX
SELLOS EN TRODAX

2816
3263

LINTERNA RECARGABLE CON A CCESORIOS INCLUIDOS


LINTERNA RECARGABLE CON A CCESORIOS INCLUIDOS
TOTAL
CARBON VEGETAL
CARBON VEGETAL

14-11-13
16-11-13

2816
3263

2816
3263

14-11-13
16-11-13

2816

14-11-13
16-11-13

2816

3263

3263

5.00

5.00
5.00

3.00
3.00

3.00
3.00

1.00

VOE20976003 VOLVO FILTRO PARA PETROLEO


VOE20976003 VOLVO FILTRO PARA PETROLEO

1.00

1.00
1.00

1.00
TOTAL

14-11-13
16-11-13

1.00

1.00
1.00

5.00

TOTAL
14-11-13
16-11-13

1.00

1.00
1.00

1.00

TOTAL
14-11-13
14-11-13

1.00

1.00
1.00

1.00

TOTAL
2814

2.00

2.00
2.00

1.00

TOTAL

12-11-13
14-11-13

3.00

3.00
3.00

2.00

TOTAL
06-11-13
11-11-13

2.00

2.00
2.00

3.00

TOTAL
2811

2.00
2.00

2.00

TOTAL

06-11-13
11-11-13

2.00
2.00

2.00

PINTURA ESMALTE BLANCO ROJO DE 1/4 GLN


PINTURA ESMALTE BLANCO ROJO DE 1/4 GLN

VISAGRAS
VISAGRAS

3.00

3.00
3.00

2.00

CINTAS DE EMBALAJE GRANDE


CINTAS DE EMBALAJE GRANDE

CUTER KAMASA CON REPUESTOS


CUTER KAMASA CON REPUESTOS

2.00
2.00

3.00

CHAPA DE 3 GOLPES
CHAPA DE 3 GOLPES

3257

3.00
3.00

2.00

TOTAL
25-10-13
09-11-13

2.00

2.00
2.00

3.00

TOTAL
25-10-13
07-11-13

2.00

2.00
2.00

2.00
TOTAL

2808

2.00

2.00
2.00

2.00
TOTAL

25-10-13
08-11-13

CANTI
SALIDA

2.00
TOTAL

25-10-13
07-11-13

CANTI
ENTRADA

VOE213804883 VOLVO FILTRO COMBUSTIBLE SEPARADOR DE AGUA


VOE213804883 VOLVO FILTRO COMBUSTIBLE SEPARADOR DE AGUA
TOTAL
VOE21707132 VOLVO FILTRO PARA ACEITE DE MOTOR BY-PASS 177556
VOE21707132 VOLVO FILTRO PARA ACEITE DE MOTOR BY-PASS 177557
TOTAL
519815 MOBIL MOBILUBE HD GL 5 SAE 85W-140 X 19 LITROS
519815 MOBIL MOBILUBE HD GL 5 SAE 85W-140 X 19 LITROS
TOTAL
CABLE DE ACELERADOR CON ACOPLE
CABLE DE ACELERADOR CON ACOPLE

1.00

1.00
1.00

1.00
1.00

1.00
1.00

1.00
1.00

1.00
1.00

1.00
1.00

1.00
1.00

1.00
TOTAL

Pgina 276

1.00

1.00
1.00

SALDO

2.00
0.00

2.00
0.00

2.00
0.00

3.00
0.00

2.00
0.00

3.00
0.00

2.00
0.00

2.00
0.00

2.00
0.00

3.00
0.00

2.00
0.00
0.00
1.00
0.00

1.00
0.00

1.00
0.00

5.00
0.00

3.00
0.00

1.00
0.00

1.00
0.00

1.00
0.00

1.00
0.00

1.00
0.00

1.00
0.00

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


MOVIMIENTO DE ALMACEN - CAJA CHICA
OBRA

: MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO

META

: 0216 (2013) - 0121(2014).

DOCUMENTO
FECHA

N/ENT.

14-11-13
16-11-13

2816

14-11-13
16-11-13

2816

DESCRIPCION

N/SAL.

3263

PORTA CARBON DE ARRANCADOR


PORTA CARBON DE ARRANCADOR

3263

GRASA SKF
GRASA SKF

3263

CONTACTOR
CONTACTOR

2816
3263

FOCOS DE FARO H7 24V


FOCOS DE FARO H7 24V

2821
3268
3281
3290
3294

YESO
YESO
YESO
YESO
YESO

2821

22-11-13
22-11-13

2821

CABLE DE ALUMINIO 2 X 25 M2
3268 CABLE DE ALUMINIO 2 X 25 M2

LLAVES TERMICAS DE FUERZA 3 X 50


3268 LLAVES TERMICAS DE FUERZA 3 X 50

LLAVE TERMICA DE CARRIL 2 X 32


3268 LLAVE TERMICA DE CARRIL 2 X 32

2821

26-11-13
26-11-13

2823

CINTA DE 3 M.
3268 CINTA DE 3 M.

CABLE THW N10 CABLEADO


3271 CABLE THW N10 CABLEADO

TUBO PVC SAP 350 4422 110 MM S-10


3268 TUBO PVC SAP 350 4422 110 MM S-10

2821

22-11-13
22-11-13

2821

ANILLO U/F PRESION 110 MM


3269 ANILLO U/F PRESION 110 MM

CABLE THW N 10 NEGRO


3268 CABLE THW N 10 NEGRO

3273
3276
3284
3286
3290
3298
2154
2163
2174
2185
2197
558
561
566
570
580
585
598
600

31-05-14

HOJA
HOJA
HOJA
HOJA
HOJA
HOJA
HOJA
HOJA
HOJA
HOJA
HOJA
HOJA
HOJA
HOJA
HOJA
HOJA
HOJA
HOJA
HOJA
HOJA

DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE

SIERRA
SIERRA
SIERRA
SIERRA
SIERRA
SIERRA
SIERRA
SIERRA
SIERRA
SIERRA
SIERRA
SIERRA
SIERRA
SIERRA
SIERRA
SIERRA
SIERRA
SIERRA
SIERRA
SIERRA

BACCO
BACCO
BACCO
BACCO
BACCO
BACCO
BACCO
BACCO
BACCO
BACCO
BACCO
BACCO
BACCO
BACCO
BACCO
BACCO
BACCO
BACCO
BACCO
BACCO

2.00
1.00
2.00
2.00
5.00
5.00
3.00
5.00
2.00
2.00
1.00
2.00
2.00
3.00
2.00
2.00
1.00
3.00
4.00

HOJA DE SIERRA BACCO

2825

PEGAMENTO OATEY
3273 PEGAMENTO OATEY

2828

50.00

1.00
50.00

1.00
TOTAL

10-12-13

1.00

1.00
1.00

50.00

TOTAL
28-11-13
28-11-13

1.00

1.00
1.00

1.00
TOTAL

2825

1.00

1.00
1.00

1.00
TOTAL

28-11-13
28-11-13
02-12-13
11-12-13
13-12-13
17-12-13
26-12-13
03-01-14
14-01-14
29-01-14
11-02-14
28-02-14
13-03-14
17-03-14
20-03-14
25-03-14
07-04-14
12-04-14
30-04-14
05-05-14

200.00

200.00
200.00

1.00
TOTAL

22-11-13
22-11-13

1.00

1.00
1.00

200.00
TOTAL

2821

1.00

1.00
1.00

1.00
TOTAL

22-11-13
22-11-13

2.00

2.00
2.00

1.00
TOTAL

22-11-13
22-11-13

50.00

50.00
50.00

2.00
TOTAL

2821

5.00

1.00
1.00
1.00
2.00
5.00

50.00
TOTAL

22-11-13
22-11-13

10.00

10.00
10.00

5.00

TOTAL
22-11-13
22-11-13

2.00

2.00
2.00

10.00
TOTAL

22-11-13
22-11-13
07-12-13
17-12-13
20-12-13

1.00

1.00
1.00

2.00
TOTAL

14-11-13
16-11-13

1.00

1.00
1.00

1.00
TOTAL

2816

CANTI
SALIDA

1.00
TOTAL

14-11-13
16-11-13

CANTI
ENTRADA

PARCHE DE LLANTA RETROEXCAVADORA

1.00
1.00

Pgina 277

1.00
1.00

SALDO

1.00
0.00

1.00
0.00

2.00
0.00

10.00
0.00

5.00
4.00
3.00
2.00
0.00

50.00
0.00

2.00
0.00

1.00
0.00

1.00
0.00

200.00
0.00

1.00
0.00

1.00
0.00

1.00
0.00

50.00
48.00
47.00
45.00
43.00
38.00
33.00
30.00
25.00
23.00
21.00
20.00
18.00
16.00
13.00
11.00
9.00
8.00
5.00
1.00
0.00

1.00
0.00

1.00

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


MOVIMIENTO DE ALMACEN - CAJA CHICA
OBRA

: MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO

META

: 0216 (2013) - 0121(2014).

DOCUMENTO
FECHA

N/ENT.

10-12-13

DESCRIPCION

N/SAL.

11-12-13
11-12-13

2829

11-12-13
11-12-13

2829

BROCA DE 1/4
3284 BROCA DE 1/4
TOTAL

1.00
0.50

TOTAL

0.50

MANGUERA
3284 MANGUERA

2840
2160

10-01-14
10-01-14

2840

17-02-14
17-02-14

2848

TEE SP 1" SAP PACCO VINDUIT


TEE SP 1" SAP PACCO VINDUIT

REDUCCION SP 1" S 1/2" LIV PAVCO


REDUCCION SP 1" S 1/2" LIV PAVCO

2189

CUCHILLA MEIJENS 12 X 20 MM.


CUCHILLA MEIJENS 12 X 20 MM.

FAJA A41 PARA CEPILLADORA


FAJA A41 PARA CEPILLADORA

17-02-14
17-02-14

2848

2189

FAJA A42 PARA CIRCULAR


FAJA A42 PARA CIRCULAR

2189

CASCO PARA SOLDAR


CASCO PARA SOLDAR

2189

PINZA PARA SOLDAR


PINZA PARA SOLDAR

2849
2189

DISCO INDUSTRIAL KRALLE 14 X 32


DISCO INDUSTRIAL KRALLE 14 X 32

2849
2189

DISCO INDUSTRIAL KRALLE 12


DISCO INDUSTRIAL KRALLE 12

4806
561
563
565
566
567

UNION
UNION
UNION
UNION
UNION
UNION

DE
DE
DE
DE
DE
DE

1"
1"
1"
1"
1"
1"

C/R
C/R
C/R
C/R
C/R
C/R

4806
561
563
565
566

UNION
UNION
UNION
UNION
UNION

DE
DE
DE
DE
DE

1/2"
1/2"
1/2"
1/2"
1/2"

C/R
C/R
C/R
C/R
C/R

4811
573
2360

BATERIA DE 1/2" COMSYSSA DE PVC


BATERIA DE 1/2" COMSYSSA DE PVC
BATERIA DE 1/2" COMSYSSA DE PVC

4811
569
572
575

ABRAZADERA
ABRAZADERA
ABRAZADERA
ABRAZADERA

63
63
63
63

MM
MM
MM
MM

A1/2"
A1/2"
A1/2"
A1/2"

DE
DE
DE
DE

PVC
PVC
PVC
PVC

4811
563

TARRAJA DE 1/2" DE PVC


TARRAJA DE 1/2" DE PVC

4811
573
575

LLAVE CORPORATION DE 1/2" DE PVC


LLAVE CORPORATION DE 1/2" DE PVC
LLAVE CORPORATION DE 1/2" DE PVC

4811

17-03-14
02-04-14

4812

2360

REDUCCION DE 2" A 1" DE PVC


REDUCCION DE 2" A 1" DE PVC

1.00

1.00
1.00

5.00

2.00
3.00
5.00

1.00
TOTAL

577

5.00

2.00
2.00
1.00
5.00

5.00

TOTAL
17-03-14
14-05-14

5.00

2.00
3.00
5.00

1.00
TOTAL

17-03-14
28-03-14
31-03-14

20.00

9.00
6.00
2.00
3.00
20.00

5.00

TOTAL
17-03-14
18-03-14

30.00

9.00
6.00
11.00
2.00
2.00
30.00

5.00

TOTAL
17-03-14
24-03-14
27-03-14
31-03-14

1.00

1.00
1.00

20.00

TOTAL
17-03-14
28-03-14
14-05-14

1.00

1.00
1.00

30.00

TOTAL
10-03-14
17-03-14
18-03-14
19-03-14
20-03-14

1.00

1.00
1.00

1.00
TOTAL

10-03-14
17-03-14
18-03-14
19-03-14
20-03-14
21-03-14

1.00

1.00
1.00

1.00
TOTAL

17-02-14
17-02-14

2.00

2.00
2.00

1.00
TOTAL

17-02-14
17-02-14

2.00

2.00
2.00

1.00
TOTAL

2848

2.00

2.00
2.00

2.00
TOTAL

17-02-14
17-02-14

6.00

6.00
6.00

2.00
TOTAL

2848

6.00

6.00
6.00

2.00
TOTAL

17-02-14
17-02-14

0.50
0.50

6.00
TOTAL

2189

1.00
1.00

6.00

2160

2848

1.00

1.00
1.00

1.00

TOTAL

17-02-14
17-02-14

CANTI
SALIDA

3283 PARCHE DE LLANTA RETROEXCAVADORA


TOTAL

10-01-14
10-01-14

CANTI
ENTRADA

CONFECCION DE CARTEL DE 5.4 X 2.4 MTS CON MARCO DE METAL


CONFECCION DE CARTEL DE 5.4 X 2.4 MTS CON MARCO DE METAL

Pgina 278

1.00

1.00
1.00

1.00
1.00

SALDO

0.00

1.00
0.00
0.50
0.00

6.00
0.00

6.00
0.00

2.00
0.00

2.00
0.00

2.00
0.00

1.00
0.00

1.00
0.00

1.00
0.00

1.00
0.00

30.00
21.00
15.00
4.00
2.00
0.00

20.00
11.00
5.00
3.00
0.00

5.00
3.00
0.00

5.00
3.00
1.00
0.00

1.00
0.00

5.00
3.00
0.00

1.00
0.00

1.00
0.00

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


MOVIMIENTO DE ALMACEN - CAJA CHICA
OBRA

: MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO

META

: 0216 (2013) - 0121(2014).

DOCUMENTO
FECHA

N/ENT.

DESCRIPCION

N/SAL.

TOTAL
17-03-14
02-04-14

19-03-14
20-03-14
24-03-14

4813
577

4815
566
569

CONFECCION DE CARTEL DE 5.4 X 2.4 MTS CON MARCO DE METAL


CONFECCION DE CARTEL DE 5.4 X 2.4 MTS CON MARCO DE METAL
TOTAL

TAPONES DE 63 MM
TAPONES DE 63 MM
TAPONES DE 63 MM

4820

27-03-14
27-03-14

4820

572

CAMARA 14 CAMELL
CAMARA 14 CAMELL

572

CAMARAS 750X16 CAMELL


CAMARAS 750X16 CAMELL

572

PITONES
PITONES

4821

27-03-14
27-03-14

4821

27-03-14
27-03-14

572

572

4821
572

FILTRO DE ACEITE
FILTRO DE ACEITE

27-03-14
27-03-14

27-03-14
27-03-14

4822
572

4822
572

4822
572

4823
572

4839
2352

4839

06-05-14
06-05-14

4839

1.00

FILTRO COMBUSTIBLE AT-365870


FILTRO COMBUSTIBLE AT-365870

MANGUERA CON ABRAZADERA C-21


MANGUERA CON ABRAZADERA C-21

1.00

MANGUERA HIDRAULICO 3/4 X 145 R2


MANGUERA HIDRAULICO 3/4 X 145 R2

ZAPATAS DE FRENO
ZAPATAS DE FRENO

06-05-14
06-05-14

4840

GOMAS DE MUELLE POSTERIOR


GOMAS DE MUELLE POSTERIOR

2352

BUJES DE MUELLE POSTERIOR


BUJES DE MUELLE POSTERIOR

2352

4841
2352

4850

2.00

2.00
2.00

1.00

1.00
1.00

1.00

1.00
1.00

1.00

1.00
1.00

2.00

2.00
2.00

8.00

8.00
8.00

2.00

TEMPLADOR DE CORREA DISTRIBUCION


TEMPLADOR DE CORREA DISTRIBUCION

2.00

2.00
2.00

1.00

PASTILLAS DE FRENO
PASTILLAS DE FRENO

1.00

1.00
1.00

1.00
TOTAL

04-06-14

1.00

1.00
1.00

8.00

TOTAL
06-05-14
06-05-14

1.00
1.00

2.00

TOTAL
4840

1.00

1.00
1.00

1.00

TOTAL

06-05-14
06-05-14

1.00
1.00

1.00

GOMAS BARRA ESTABILIZADORA


GOMAS BARRA ESTABILIZADORA

2352

1.00
1.00

1.00

TOTAL
4840

1.00
1.00

2.00

TOTAL

06-05-14
06-05-14

5.00
5.00

1.00

MOBIL DIESEL TURBO SAR 25W-50X5GLN


MOBIL DIESEL TURBO SAR 25W-50X5GLN

2352

4.00
4.00

1.00
1.00

TENSOR DE CORREA DE DISTRIBUCION


TENSOR DE CORREA DE DISTRIBUCION

2352

1.00

MANGUERA HIDRAULICO 1/2 CON CONEXIONES


MANGUERA HIDRAULICO 1/2 CON CONEXIONES
TOTAL

CORREA DE SINCRONIZACION
CORREA DE SINCRONIZACION

4840

1.00

TOTAL

2352

1.00
1.00

1.00

TOTAL

06-05-14
06-05-14

5.00

1.00

TOTAL
06-05-14
06-05-14

4.00

TOTAL

TOTAL
06-05-14
06-05-14

1.00

FILTRO PARA COMBUSTIBLE C/SEPARADOR DE AGUA


FILTRO PARA COMBUSTIBLE C/SEPARADOR DE AGUA
TOTAL

TOTAL
27-03-14
27-03-14

3.00

1.00
2.00
3.00

1.00

TOTAL
27-03-14
27-03-14

1.00
1.00

5.00
TOTAL

27-03-14
27-03-14

1.00
1.00

COMBO TECLADO Y MOUSE

1.00
1.00

Pgina 279

SALDO

1.00

4.00
TOTAL

4820

1.00

1.00
TOTAL

27-03-14
27-03-14

CANTI
SALIDA

3.00

TOTAL
27-03-14
27-03-14

CANTI
ENTRADA

1.00
1.00

1.00
0.00

3.00
2.00
0.00

1.00
0.00
0.00
4.00
0.00

5.00
0.00

1.00
0.00
0.00
1.00
0.00

1.00
0.00

1.00
0.00

1.00
0.00
0.00
1.00
0.00

2.00
0.00

1.00
0.00

1.00
0.00

1.00
0.00

2.00
0.00

8.00
0.00

2.00
0.00

1.00
0.00

1.00
0.00

1.00

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


MOVIMIENTO DE ALMACEN - CAJA CHICA
OBRA

: MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO

META

: 0216 (2013) - 0121(2014).

DOCUMENTO
FECHA

N/ENT.

04-06-14

04-06-14
04-06-14

15-10-13
04-11-13
05-11-13

DESCRIPCION

N/SAL.

2384

4850

COMBO TECLADO Y MOUSE

2384

TAMBOR DE IMPRESORA BROTHER MFC


TAMBOR DE IMPRESORA BROTHER MFC

3251
3252

CALAMINA DE 0.22 X 1.8 X 3.6 JR


CALAMINA DE 0.22 X 1.8 X 3.6 JR
CALAMINA DE 0.22 X 1.8 X 3.6 JR

2802

TOTAL

2802
3251
3252

TOTAL

15-10-13
04-11-13
05-11-13

2803
3251
3252

2803
3251
3252

INTERRUPTORES SIMPLE BTICINO


INTERRUPTORES SIMPLE BTICINO
INTERRUPTORES SIMPLE BTICINO

2803
3251
3252

1.00

1.00
1.00

40.00

20.00
20.00
40.00

5.00

CABLE N TW 12 (X 100MTS C/RLL.) UNIPOLAR INDECO


CABLE N TW 12 (X 100MTS C/RLL.) UNIPOLAR INDECO
CABLE N TW 12 (X 100MTS C/RLL.) UNIPOLAR INDECO
TOTAL
TOMACORRIENTE SIMPLE BTICINO
TOMACORRIENTE SIMPLE BTICINO
TOMACORRIENTE SIMPLE BTICINO

5.00

3.00
2.00
5.00

2.00

2.00

1.00
1.00
2.00

10.00

TOTAL
15-10-13
04-11-13
05-11-13

1.00

1.00
1.00

40.00

TOTAL
15-10-13
04-11-13
05-11-13

CANTI
SALIDA

1.00

TOTAL
15-10-13
04-11-13
05-11-13

CANTI
ENTRADA

FLORECENTE ARMADO PHILLIPS


FLORECENTE ARMADO PHILLIPS
FLORECENTE ARMADO PHILLIPS

10.00

5.00
5.00
10.00

8.00

TOTAL

Pgina 280

8.00

4.00
4.00
8.00

SALDO

0.00

1.00
0.00

40.00
20.00
0.00

5.00
2.00
0.00

2.00
1.00
0.00

10.00
5.00
0.00

8.00
4.00
0.00

N PBLICA

RITO DE CUSCO - CUSCO

UNID.

OBSERVACIONES

MEDIDA

GLN.
GLN.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

PAR.
PAR.

LT.
LT.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

SAC.
SAC.

PZA.
PZA.

PZA.
PZA.

PZA.
PZA.

BLD.
BLD.

PZA.
PZA.

Pgina 281

N PBLICA

RITO DE CUSCO - CUSCO

UNID.

OBSERVACIONES

MEDIDA

PZA.
PZA.

KL.
KL.

PZA.
PZA.

PZA.
PZA.

SCO.
SCO.
SCO.
SCO.
SCO.

MTS.
MTS.

UND.
UND.

UND.
UND.

RLL.
RLL.

MTS.
MTS.

UND.
UND.

UND.
UND.

RLL.
RLL.

UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.

REGISTRADO SOLO EN EL CONTROL


VISIBLE DE ALMACEN

GLN.
GLN.

UND.

Pgina 282

N PBLICA

RITO DE CUSCO - CUSCO

UNID.

OBSERVACIONES

MEDIDA

UND.

UND.
UND.
MTS.
MTS.

UND.
UND.

UND.
UND.

JGO.
JGO.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

PZA.
PZA.
PZA.
PZA.
PZA.
PZA.

PZA.
PZA.
PZA.
PZA.
PZA.

KIT.
KIT.
KIT.

UND.
UND.
UND.
UND.

UND.
UND.

UND.
UND.
UND.

UND.
UND.

UND.
UND.

Pgina 283

N PBLICA

RITO DE CUSCO - CUSCO

UNID.

OBSERVACIONES

MEDIDA

UND.
UND.

PZA.
PZA.
PZA.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

PZA.
PZA.

PZA.
PZA.

PZA.
PZA.

BLD.
BLD.

JGO.
JGO.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

JGO.
JGO.

UND.

Pgina 284

N PBLICA

RITO DE CUSCO - CUSCO

UNID.

OBSERVACIONES

MEDIDA

UND.

UND.
UND.

UND.
UND.
UND.

UND.
UND.
UND.

RLL.
RLL.
RLL.

UND.
UND.
UND.

UND.
UND.
UND.

Pgina 285

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


MOVIMIENTO DE ALMACEN - BIENES PATRIMONIALES
OBRA

MEJORAMIENTO DE LA RED COLECTORA PRINCIPAL EN LAS ZONAS CORRESPONDIENTES A LA VIA PRINCIPAL PUQUIN - ARCO TICATICA EN EL DISTRITO DE CUSCO - CUSCO

META

DOCUMENTO
FECHA

N/ENT.

15-10-13
10-12-13
18-12-13

2802
3283
3291

17-10-13
12-11-13

2804

19-12-13
19-12-13

2833

DESCRIPCION

N/SAL.

3259

3293

AMOLADORA DE 7" DE 2200 WATTS MARCA BOSCH


AMOLADORA DE 7" DE 2200 WATTS MARCA BOSCH
AMOLADORA DE 7" DE 2200 WATTS MARCA BOSCH
TOTAL
CANGURO COMPACTADOR APISONADOR MARCA MASALA CON MOTOR HONDA MODELO 6X160 5.5HP
CANGURO COMPACTADOR APISONADOR MARCA MASALA CON MOTOR HONDA MODELO 6X160 5.5HP
TOTAL
CAMARA DIGITAL SONY CYBER SHOT DSC WX60 DE 16.2 MP ZOOM 8X FULL HD
CAMARA DIGITAL SONY CYBER SHOT DSC WX60 DE 16.2 MP ZOOM 8X FULL HD

CANTI

CANTI

ENTRADA

SALIDA

3.00

3.00
1.00
1.00

02-01-14
02-01-14

08-04-14
08-04-14

2836
2153

4827
581

ESCRITORIO DE MELANINA DE 70CM X 120CM CON 4 CAJONES


ESCRITORIO DE MELANINA DE 70CM X 120CM CON 4 CAJONES

4827
581

SILLON GERENCIAL ALTO CON CODERAS ANATOMICO


SILLON GERENCIAL ALTO CON CODERAS ANATOMICO

1.00

3454
2394

ESCRITORIO DE MELANINA CON 3 CAJONES GRANDES Y 1 CAJON MEDIO DE 0.7M X 1.2M DE 18MM
ESCRITORIO DE MELANINA CON 3 CAJONES GRANDES Y 1 CAJON MEDIO DE 0.7M X 1.2M DE 18MM

13-06-14
13-06-14

3454
2394

3454
2394

SILLON GERENCIAL ALTO CON CODERAS ANATOMICO


SILLON GERENCIAL ALTO CON CODERAS ANATOMICO
TOTAL
LAPTOP CORE I7 LENOVO
LAPTOP CORE I7 LENOVO

3454

07-05-14
07-05-14

4842

2.00
2.00

1.00
1.00
1.00

1.00
1.00

1.00
1.00

1.00
TOTAL

13-06-14
13-06-14

2.00
2.00

2.00

1.00
13-06-14
13-06-14

1.00
1.00

2.00

2.00
13-06-14
13-06-14

1.00
1.00

1.00

2.00
08-04-14
08-04-14

1.00
1.00

1.00
1.00

COMPUTADORA PARA TRABAJO DE INGENIERIA PROFECIONAL INTEL CORE I3 3.4 GHZ MOTHERBOARD
INTEL LGA 1150 PARA TRABAJO DE INGENIERIA PROFECIONAL INTEL CORE I3 3.4 GHZ MOTHERBOARD
COMPUTADORA
INTEL LGA 1150
TOTAL

2.00
1.00
3.00

2394

FOTOCOPIADORA MULTIFUNCIONAL KONICA MINOLTA BIZHUB 363


FOTOCOPIADORA MULTIFUNCIONAL KONICA MINOLTA BIZHUB 363
TOTAL

2353

IMPRESORA MULTIFUNCIONAL SISTEMA CONTINUO CON CONEXIN EN RED EPSON L355


IMPRESORA MULTIFUNCIONAL SISTEMA CONTINUO CON CONEXIN EN RED EPSON L355
TOTAL

Pgina 286

1.00

1.00
1.00

1.00
1.00

1.00
1.00

1.00
1.00

1.00
1.00

SALDO

3.00
1.00
0.00

1.00
0.00

1.00
0.00

1.00
0.00

2.00
0.00
0.00
2.00
0.00

1.00
0.00

1.00
0.00

1.00
0.00

1.00
0.00

1.00
0.00

N PBLICA

ALES

TO DE CUSCO - CUSCO

UNID.

OBSERVACIONES

MEDIDA

UND.
UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.
UND.

UND.

UND.
UND.

UND.
UND.

Pgina 287

ACTA DE CONCILIACION FINANCIERA


PARA EFECTOS DE LIQUIDACIN FINANCIERA DE OBRAS
En la Ciudad del Cusco, a los 14 dias del mes de Julio del 2015, en el local de la Municipalidad Provincial del Cusco, siendo las
08:00 a.m, se reunieron en la Oficina de Contabilidad, por una parte Representando a la Oficina de Contabilidad la Sr. C.P.C.
JULIO CESAR VILLA VILLAGRA, por otra parte en representacin de la Direccin de Liquidacin de Proyectos de Inversin
Pblica, la seora C.P.C. MARY ENCISO ALTAMIRANO, con la finalidad de efectuar la CONCILIACIN FINANCIERA de la Obra
:
"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS
E Y C DE LA A.P.V VILLA MARIA DEL DISTRITO DE CUSCO ,PROVINCIA DE CUSCO - CUSCO."
META : 011(2014) - 12 (2015)
1.- IMPORTE SEGN ANALISIS EN TARJETA DE LIQUIDACION FINANCIERA
011-14

012-15

EJECUCION FINACIERA 2014


1501 Edificios y Estructuras
1501.08 Construccin de Estructuras
1501.08.05 gua y Saneamiento
1501.08.99.02 Por Administracin Directa
1501.08.99.03 Por Administracin Directa
1501.08.99.03 Por Administracin Directa
1501.08.99.04 Por Administracin Directa

S/.
S/

Personal
Bienes
Bienes - Transferencias
Servicios

EJECUCION FINACIERA 2015


1501 Edificios y Estructuras
1501.08 Construccin de Estructuras
1501.08.05 Agua y Saneamiento
1501.08.99.02 Por Administracin Directa - Personal
SALDO DE ALMACEN SEGN NEA 131-2014

Err:522
102,123.69
16,657.00
15,254.80
S/

9,397.98
S/

2.- IMPORTE SEGN AUXILIAR POR PROYECTO DE CONTABILIDAD


011-14

012-15

EJECUCION FINACIERA 2014


1501 Edificios y Estructuras
1501.08 Construccin de Estructuras
1501.08.05 Agua y Saneamiento
1501.08.05.02 Por Administracin Directa - Personal
1501.08.05.03 Por Administracin Directa - Bienes
1501.08.05.04 Por Administracin Directa - Servicios
EJECUCION FINANCIERA 2015
1501 Edificios y Estructuras
1501.08 Construccin de Estructuras
1501.08.05 Agua y Saneamiento
1501.08.99.02 Por Administracin Directa - Personal
(+) TRANSFERENCIA
(-) SALDO DE ALMACEN SEGN NEA 131-2014
DIFERENCIA POR CONCILIAR

Err:522

Err:522

9,397.98

-6,696.19
S/.

S/

Err:522
102,123.69
15,254.80
S/

Err:522

Err:522

9,397.98

9,397.98
16,657.00
-6,696.19
Err:522

Nota: Se tiene adquisicin de Bienes Patrimoniales del ejercicio 2014 por un monto total de S/.4000.00 Nuevo
Soles.
Concluyendo la Conciliacin, siendo las 08:30 a.m. del mismo da, no habiendo observacin alguna, en seal de conformidad,
procedieron a firmar los participantes.

OFICINA DE CONTABILIDAD

C.P.C MARY ENCISO ALTAMIRANO


DE INVERSION PUBLICA

OBRA

"CONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECC


EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE LA
MARIA , PROVINCIA DE CUSCO-CUSCO"

EJECUTA

: SUB GERENCIA DE OBRAS

FTE. FTO.

POR TODA FUENTE

META

: 011 (2014) 12 (2015)

DESCRIPCION
RESUMEN
EJECUCION FINANCIERA 2014-RO
EJECUCION FINANCIERA 2014-RDR
EJECUCION FINANCIERA 2014- CSC
EJECUCION FINANCIERA 2015- CSC
BIENES PATRIMONIALES
TOTAL EJECUCION FINANCIERA
(- )
(+)
(-)

SALDO DE ALMACEN
TRANSFERENCIAS RECIBIDAS
TOTAL COSTO HISTORICO
BIENES PATRIMONIALES
COSTO TOTAL DE LA OBRA

ONSTRUCCION DE LA INFRAESTRUCTURA DE PROTECCION DE TALUD


EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE LA A.P.V VILLA
MARIA , PROVINCIA DE CUSCO-CUSCO"

B GERENCIA DE OBRAS
TODA FUENTE

1 (2014) 12 (2015)

DESCRIPCION
RESUMEN

CIERA 2014-RO
CIERA 2014-RDR
CIERA 2014- CSC
CIERA 2015- CSC
NIALES
TOTAL EJECUCION FINANCIERA

ALMACEN
ENCIAS RECIBIDAS
TOTAL COSTO HISTORICO
RIMONIALES
COSTO TOTAL DE LA OBRA

IMPORTE
27,128.90
222,891.22
Err:522
9,397.98
4,000.00
Err:522
-6,696.19
16,657.00
Err:522
4,000.00
Err:522

DIRECCIN DE LIQUIDACIN DE PROYECTOS DE INVERSIN PBLICA


CONSOLIDADO DE GASTOS
"CONSTRUCCION DE INFRAESTRUCTURA DE PROTECCION DE TALUD EN EL PASAJE F ENTRE LAS MANZANAS E Y C DE
CUSCO - CUSCO."

OBRA
EJECUTA
FTE. FTO.
META
ESPECIFICA DE
GASTO
2.6.2 3.9
2.6. 2.3. 99 3
2.6. 2.3. 99 4
2.6. 2.3. 99 5
2.6. 2.3. 99 6

: SUB GERENCIA DE OBRAS


: POR TODA FUENTE
: 011 (2014) - 012 (2015)
DETALLE
EDIFICIOS Y ESTRUCTURAS
COSTO DE CONSTRUCCION POR
COSTO DE CONSTRUCCION POR
COSTO DE CONSTRUCCION POR
COSTO DE CONSTRUCCION POR

ADMINISTRACION
ADMINISTRACION
ADMINISTRACION
ADMINISTRACION

DIRECTA
DIRECTA
DIRECTA
DIRECTA

SUB TOTAL

PERSONAL
BIENES
SERVICIOS
OTROS

PORCENTAJE %
100.00
Err:522
Err:522
Err:522
Err:522

R.O
27,128.90
0.00
26,778.90
350.00
0.00

2014
R.D.R.
222,891.22
151,916.33
65,606.89
5,368.00
0.00

C.S.C.
Err:522
Err:522
Err:522
Err:522
0.00

2015
C.S.C.
9,397.98
9,397.98
0.00
0.00
0.00

TRANSF.
RECIBIDAS
16,657.00
0.00
16,657.00
0.00
0.00

SALDO
MATERIALES
6,696.19
0.00
6,696.19
0.00
0.00

100.00

27,128.90

222,891.22

Err:522

9,397.98

16,657.00

6,696.19

4,000.00
31,128.90

222,891.22

Err:522

9,397.98

16,657.00

6,696.19

RESUMEN
PORCENTAJE
%
R.O
50.71
26,711.90
31.29
0.00
6.99
21,601.90
0.02
0.00
0.63
4,760.00
1.26
0.00
10.53
350.00
74.53
417.00
54.89
0.00
Err:522
0.00
13.82
0.00
1.25
0.00
1.24
210.00
Err:522
0.00
0.21
207.00
3.12
0.00
0.00
0.00
Err:522
0.00

2014
R.D.R.
205,242.54
137,747.80
58,987.24
400.00
1,524.50
1,953.00
4,630.00
17,648.68
13,790.20
0.00
617.50
600.83
1,923.25
0.00
570.00
146.90
0.00
0.00

C.S.C.
87,400.03
70,948.33
6,325.00
20.00
569.90
0.00
9,536.80
19,597.53
8,435.53
0.00
4,219.50
4,119.50
0.00
0.00
0.00
2,823.00
0.00
0.00

2015
C.S.C.
2,940.28
2,940.28
0.00
0.00
0.00
0.00
0.00
6,457.70
5,158.45
0.00
1,299.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TRANSF.
RECIBIDAS
16,657.00
0.00
16,657.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SALDO
MATERIALES
6,696.19
0.00
6,696.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

BIENES PATRIMONIALES
TOTAL

N
1

LA A.P.V VILLA MARIA, PROVINCIA DE

ESPECIFICAS CONSOLIDADAS
COSTO DIRECTO
MANO DE OBRA
MATERIALES
HERRAMIENTAS
COMBUSTIBLE - LUBRICANTES
EQUIPO
SERVICIOS DIVERSOS
GASTOS GENERALES
RESIDENTE DE OBRA
ASISTENTE TECNICO
ASISTENTE ADMINISTRATIVO
ALMACENERO
MATERIALES DE ESCRITORIO
GASTOS NOTARIALES
VESTUARIO
OTROS
SUPERVISOR DE OBRA
SUPERVISOR DE OBRA
COSTO TOTAL DE OBRA
BIENES PATRIMONIALES
APISONADOR
MOBILIARIO
EQUIPOS INFORMATICOS Y COMUNICACIONES
TOTAL

125.24

417.00

155,396.48

90,545.86

9,397.98

0.00

0.00

4,000.00
4,000.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

4,417.00

155,396.48

90,545.86

9,397.98

0.00

0.00

N PBLICA

OVINCIA DE

TOTAL
Err:522
Err:522
92,162.88
Err:522
0.00
Err:522
Err:522

TOTAL
332,255.56
211,636.41
96,874.95
420.00
6,854.40
1,953.00
14,516.80
44,120.91
26,544.18
0.00
6,136.25
4,720.33
2,133.25
0.00
777.00
2,969.90
0.00
0.00
376,376.47
4,000.00
0.00
0.00
0.00
380,376.47