Académique Documents
Professionnel Documents
Culture Documents
00
01
11
(B)
L = A, stock lengths
L=A
12
L = A + (B) - 0.5 r - d
(C)
13
R
14
B
Semi circular
(B)
L = A + (C) - 4 d
15
21
22
(C)
Semi circular
(C)
23
24
L = A + B + C + (D) - 1.5 r - 3 d
(C)
25
A
B
D
(C)
B
(E)
A
L = A + B + (E)
L = A + B + (C)
L = A + B + (C) - r - 2 d
(C)
27
(D)
L = A + B + (C) - r - 2 d
L = A + (C)
26
(C)
28
(C)
(C) D
A
L = A + B + (C) - 0.5 r - d
L = A + B + (C)
29
(C)
L = A + B + (C) - 0.5 r - d
31
32
B
D
(D)
B
(D)
L = A + B + (C) - r - 2 d
Semi circular
L = A + B + C + (D) - 1.5 r - 3 d
L = A + B + C + (D) - 1.5 r - 3 d
(C)
33
Semi circular
34
A
L =2 A + 1.7 B + 2 (C) - 4 d
For a bar scheduling spreadsheet for Microsoft Excel visit
this web site: www.structural-engineering.fsnet.co.uk
B
(E)
B
A
L = A + B + C + (E) - 0.5 r - d
35
B
D
D
A
L = A + B + C + (E) - 0.5 r - d
(E)
sheet 2 of 2
(D)
36
41
(E)
44
(E)
A
C
L = A + B + C + (D) - r - 2 d
L = A + B + C + D + (E) - 2 r - 4 d
46
47
(E)
A
B
(C)
L = A + B + C + D + (E) - 2 r - 4 d
C
51
(D)
(D)
C
B
L = 2 A + B + max(21 d, 240)
L = A + 2 B + C + (E)
56
A
*see note
64
63
L = 2 A + 2 B + max(16 d, 160)
A
(D)
(C)
(D)
*see note
B
(F)
(E)
E
C
L = 2 A + 3 B + max(14 d, 150)
67
77
(F)
*see note
L = A + B + C + 2 D + E + (F) - 3 r - 6 d
98
A
B
L=A
75
R
A
B
C = no. of turns
(B)
L = 3.14 [A - d] + (B)
99
L = 3.14 (A - d) C
where B > A/5
L =sqrt {(3.14 [A - d]) + B} C
(D)
C
L = A + 2 B + C + (D) - 2 r - 4 d
Notes
The length equations for shape codes
47, 51 and 63 are for when dimensions
C and D are to be minimised.
'+ max(14 d, 150)' means add the greater
value of either 14 d or 150mm.
The author grants free use of these drawings provided they remain unmodified
and copyright acknowledgement is clearly indicated. The author disclaims all
warranties relating to fitness and to use of these tables. The user bears all risks
as to the accuracy of the information contained within and any liabilites arising.