Class AA (1 : 1 - 1/2 : 3)

Total No. of Bags Cement


Total No. of Cubic Meters Sand
Total No. of Cubic Meters Gravel

98.8
4.0
7.9

Class A (1 : 2 : 4)
Total No. of Bags Cement
Total No. of Cubic Meters Sand
Total No. of Cubic Meters Gravel

74.2
4.0
7.9

Class B (1 : 2 - 1/2 : 5)
Total No. of Bags Cement
Total No. of Cubic Meters Sand
Total No. of Cubic Meters Gravel

61.3
4.2
8.2

Class C (1 : 3 : 6)
Total No. of Bags Cement
Total No. of Cubic Meters Sand
Total No. of Cubic Meters Gravel

51.9
4.2
8.4

Class D (1 : 3 - 1/2 : 7)
Total No. of Bags Cement
Total No. of Cubic Meters Sand
Total No. of Cubic Meters Gravel

45.5
4.3
8.6

Slab
Length (m)
Width (m)
Thickness (m)
CV
Allowance for Wastage
Total Estimated CV

Slab
Length (m)
Width (m)
Thickness (m)
CV
Allowance for Wastage
Total Estimated CV

12
7.5
0.1
9.00
0.450
9.45

90%
45%

Class AA (1 : 1 - 1/2 : 3)
Total No. of Bags Cement
Total No. of Cubic Meters Sand
Total No. of Cubic Meters Gravel
Class A (1 : 2 : 4)
Total No. of Bags Cement
Total No. of Cubic Meters Sand
Total No. of Cubic Meters Gravel

29.7
1.2
2.4

22.3
1.2
2.4

Class B (1 : 2 - 1/2 : 5)
Total No. of Bags Cement
Total No. of Cubic Meters Sand
Total No. of Cubic Meters Gravel

18.4
1.25
2.5

Class C (1 : 3 : 6)
Total No. of Bags Cement
Total No. of Cubic Meters Sand
Total No. of Cubic Meters Gravel

15.6
1.2
2.5

Class D (1 : 3 - 1/2 : 7)
Total No. of Bags Cement
Total No. of Cubic Meters Sand
Total No. of Cubic Meters Gravel

13.7
1.3
2.6

Dimensions of Column
Width (m)
Length (m)
Column
Height of Column (m)
No. of Columns
Total Length of Columns
CV
Allowance for Wastage (m)
Total Estimated CV (m)

Dimensions of Column
Width (m)
Length (m)

Column
Height of Column (m)
No. of Columns
otal Length of Columns

CV
owance for Wastage (m)
Total Estimated CV (m)

0.3
0.3

3
10
30
2.7
0.135
2.84

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

0.27
0.135