Vous êtes sur la page 1sur 617

Clear

(Identify by contractor/subcontractor. Use the No. from ab


Sub No.

Not: Use the following abbreviation:

(Identify contractor/ subcontractor by number, from subcon


Sub No.

1
2
3
4

5
6

Sub contractors

Jezan company for general c


Eng
Tech.
field lab/ man
Eng.
Tech.

Akad/ manp
Safety manag.
Safety off.
Health ass. Off

Al-Rookal / Ma
Eng.
Admin

Shams Al-Sura / M
Eng.
Admin
Foreman
Tech.
Workers

Daily Site Report


Site:
Date:

Saturday

No.
Weather
Cloudy-dusty

EQUIPMENT

No. from above)


Equipment

Daily- shift
crane(2),flat loader(0)compactor(4) water tanker(1)cemen
(2),digger(0)shovel (1 )excavator (0)

Daily- shift
shovel (1), level device(0) , excavator(1 ),dump trucks(0)
tanker(1),bulldozer(0 ),crane(0),flat loader (0),grader(0)Digger(1
cement mixer (3) , concrete pump (1)

WORK PERFORMED TODAY

from subcontractor section)


Feature and description
TBC
Jezan company for general contracts
field lab
Akad

Al-Rookal
Shams AL-Sura

ractors Man/Power

r general contracts / man power


1
1

d lab/ man power


1
1

kad/ manpower
1
1
1

ookal / Manpower
2
1

Al-Sura / Manpower
1
2
3
10
12

te Report

Haydaria 4xGE Fr.9E Gas Power Plan


1-Dec-12
298

eather
Rain

Temp. ( C ): - Min11 Max 26

EQUIPMENT

ipment

hrs./day

y- shift
r(4) water tanker(1)cement mixer
vel (1 )excavator (0)

Day-shift
10

y- shift
avator(1 ),dump trucks(0),water
ader (0),grader(0)Digger(1)compactor(0),
, concrete pump (1)

Day-shift
10

FORMED TODAY

d description

BC

or general contracts

d lab

kad

Rookal

AL-Sura

Gas Power Plant

Temp. ( C ): - Min11 Max 26

hrs./day

hrs./day

Day-shift
10

Day-shift
10

Location
site camp
supervision civil works
civil works
saftey works

QC/QA
site civil works

Section

No.

8
9

10

11

12

13

14
15
16
17

18

19

20

21

22

23

24
25
26
27
28
29
30

29

30

31

32

1
2
3
4

Job description
Civil

Activities(TBC)

Surveying work in site.


Activities in site:

Tanks activities
Compaction 4-8 layers of sub base works for tanks
Tank 41 ( Compaction 6th layer )
Tank 42 ( Compaction 6th layer)
Tank 51 (Compaction 7th layer) finished
Tank 52 (Compaction 7th layer) finished
Tank 61 (Compaction 6th layer) finished
Tank 62 ( Compaction 6th layer) finished
Tank 63 (Compacting 6th layer) finished
Tank 71 ( Compaction 6th layer) finished
Tank 72 ( Compacting 6th layer) finished
Tank 73 (Compacting 8th layer) finished
Tank 81 (compaction 6th layer) finished
Tank 82 ( Compacting 6th layer) finished
Tank 90 ( Compaction 4th layer)
Tank100 ( Compaction 4th layer)
Casting lean concrete layer for tanks
Tank 52
Tank 61
Tank 62
Tank 63
Tank 71
Tank 72
Tank 73
tank 51
tank 81
tank 41
tank 42
tank 82
Rebar work for foundation of tanks
tank 61
tank 62
tank 63
tank 71
tank 72
tank 51

tank 52
tank 73
tank 81
tank 41
tank 42
tank 82
Installation wooden formwork for fondation of tanks
tank 63
tank 62
tank 71
tank 72
tank 61
tank 52
tank 51
tank 73
tank 81
tank 41
tank 42
tank 82
Pouring main foundation
tank 63
tank 62
tank 71
tank 72
tank 52
tank 61
tank 51
tank 41
tank 42
tank 81
Removing wooden formwork of tanks foundation
tank 63
tank 62
tank 71
tank 52
tank 61
tank 72
tank 51
tank 41
tank 42
tank 81
Curing of tanks foundation
tank 63

tank 62
tank 71
tank 72
tank 52
tank 61
tank 51
tank 41
tank 42
Excavation work for tank 90
Tanks foundation sub base layers compaction inside tanks area
tank 52 (1st layer compaction)
tank 72 (1st layer compaction)
tank 62 (Compaction 1st layer)

GTs activities
GTs rebar and wooden formwork works for GTs foundation
GT21
GT22
GT23
GT24
casting work for GT24 Foundation
curing work for GT24 foundation
completion removing wooden framework for GT24
casting work for GT23 Foundation
curing work for GT23 foundation
curing work for GT22 foundation
removing framework from GT23 foundation
casting treatment for GT24 foundation
casting treatment for GT23 foundation
casting treatment for GT22 foundation
casting work for GT21 Foundation
curing work for GT21 foundation
removing framework from GT21 foundation
Excavation works for stacks foundation
Excavation works for stacks foundation ( GT23)
Excavation works for stacks foundation ( GT24)
Excavation works for stacks foundation ( GT22)
Excavation works for stacks foundation ( GT21)
Compaction works of sub base for stacks foundation
GT21 (Compaction 4th layer)
GT22 (Compaction 4th layer)
GT23 (Compaction 4th layer)
GT24 (Compaction 4th layer)

Pouring lean concrete layer for stacks foundation


GT22
GT23
GT24
Pouring screed layer for stack of GTs
GT24
GT22
GT21
Repar works for stacks foundation of GTs
GT21
GT22
GT23
GT24
Installation wooden formwork for stacks foundation of GTs
GT21
GT22
GT23
GT24
Backfilling & compaction arround GT for heavy lift preparation
coating work for GT22 & 21
civil works as preparation for heavy lift
for GT21 (compaction 14th layer)
for GT22 (compaction 14th layer)
for GT23 (compaction 14th layer)
for GT24 ( compaction 14th layer)
Excavation works for fin fan coolers foundation
GT21
GT22
GT23
GT24
Compation fin fan cooler foundation
GT21 (Compaction 4th layer )
GT22 (Compaction 4th layer)
GT23 (Compaction 4th layer )
GT24 (Backfilling 4th layer )
Grouting sole plate buckets
GT21
GT22
GT23
GT24
Floating slab casting
GT21
GT22

GT23
GT24
Curing floating slab for GTs
Re-Grouting sole plate for GTs and exhaust plenum foundations
Coating stack foundation of GT22 with hot asphalt bitumen layer
Re-Grouting for Generator and exhaust plenum foundations of GT22
Excavation for foundation of PECC & CO2 for GT21
Excavation for foundation of PECC & CO2 for GT23

Roads activities
Ground compaction works for roads
for road No.1
for road No.2
for road No.3
for road No.4
1st layer sub base compaction works for roads
for road No.1
for road No.2
for road No.3
for road No.4

Fence
Boundary fence
Installation works for precast fence( basements, columns, panels)
(Details in table bellow)
Delivering (30) panels, (36)bases, (36) columns
Installing (30) panels at north side
installing (10) bases & (10) columns at east side

other works
Surveying work in site.

Buildings
Buildings foundation progress
Single rooms building
Compaction 4 layers sube base
Lean concrete casting
Curing lean concrete casting
Rebar works for foundation
Wooden formwork for foundation

Main foundation pouring


Administration building
Compaction 4 layers sube base
Lean concrete casting
Curing lean concrete casting
Rebar works for foundation
Wooden formwork for foundation
Main foundation pouring
Canteen building
Compaction 4 layers sube base
Lean concrete casting
Curing lean concrete casting
Rebar works for foundation
Wooden formwork for foundation
Main foundation pouring
Elect & Control Building
Compaction 3 layers sube base
Lean concrete casting
Curing lean concrete casting
Rebar works for foundation
Wooden formwork for foundation
Main foundation pouring
Fire fighting building
Compaction 4 layers sube base
Lean concrete casting
Curing lean concrete casting
Rebar works for foundation
Wooden formwork for foundation
Main foundation pouring
Other
Extra excavation for E&C building

Fence Sides

Fence Sides
North side
Progress
West side
Progress
South Side
Progress
East Side

Progress

Eng. in charge
Eng.wasam
Eng.Ali
SURV.Karar

No. of
Persons

Actual
working
hours

Progres
%

Plan
Start

11/6/2012
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
80%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
50%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

26-07-2012
27-07-2012
31-07-2012
6/8/2012
7/8/2012
13/08/2012
9/8/2012

16-08-2012
17-08-2012

29/08/2012
29/08/2012
12/9/2012

100%
100%
100%
100%
100%
100%
100%
12%
70%
35%
87%
0%
0%
0%
20%
100%
100%
100%
100%
100%
100%
100%
100%
100%
60%
60%
60%
50%
100%
100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
100%
50%
50%

100%
100%
100%
100%
100%
50%
100%
100%
0%
0%

10/10/2012

SURV.Karar

100%
100%
100%
0%
0%

0%
100%
100%
0%
0%
0%
0%
100%
100%
0%
0%
0%
0%
100%
0%
0%
0%
0%
0%
100%
0%
0%
0%
0%
0%
100%

Length

Precast Foundation

(m)

Holes
Cleaned

Holes Pourd

Adding Gravels

Total Bases Required

900.38

267
100%
281
100%
119
100%
170

236
88%

236
88%

267

39
33%
148

100%

100%

87%

87%

946.9
400
574

281
39%
119
170

Progress
Plan

Actual
Finish

Start

18/09/2012

11/6/2012

Man Power
Finish

27/7/2012
3/8/2012
8/1/2012
7/8/2012
14/08/2012
20/08/2012
11/8/2012

26-07-2012
27-07-2012
31-07-2012
6/8/2012
7/8/2012
13/08/2012
9/8/2012

27-07-2012
3/8/2012
8/1/2012
7/8/2012

17-08-2012
23-08-2012

16-08-2012
17-08-2012

17-08-2012

2/9/2012
2/9/2012
19/09/2012

29/08/2012
29/08/2012
9/12/2012

13/09/2012

recast Foundation

Fence

Progress

Table

Precast Column

Bases Delivered

Bases Installed

266
100%

220
82%

36

10

20%

6%

Holes Backfilling

Panel Pour Lean


Concrete

Remarks

DAY (53)
Oct. 2012

Precast Columns

Star

Precast Panels

Total Columns Required

Columns
Deliverd

267

261
98%

Columns
Installing

220
82%

Total
Panels
Required

266

281

280

119

118

170

36

10

20%

6%

169

(53)
2012

Start Date 10

Precast Panels

Panels Deliverd

Panels Installing

Total Meters Installed

200
75%

199
75%

Total Meters of Fence Installed to


Date

672.62

672

Section

No.

1
2
3

Job description
Electrical Activities

Grounding grid laying for stack of GT24


Fabrication electrical service boards
Maintenance for sockets & lighting

Eng. in charge

No. of
Persons

Eng.Shawkat
8

Actual
working
hours

Pro
%

Plan
Start

Progress
Plan

Actual
Finish

Start

Finish

Remarks
Man Power

No.

Job description

piping activities
Stack pre assemble
Stack support shaft for GT21
Stack support shaft for GT24
Stack support shaft for GT21- fabricating works for gangways
Stack thermal shield for GT21 ( (hold)
Stack support shaft for GT22
Stack support shaft for GT23
Transition duct GT21 70%
Transition duct GT22 50%
Transition duct GT23 50%
Transition duct GT24 30%
Protection duct GT21,GT22,GT23,GT24 (50%)

Eng. in charge

No. of
Persons

Actual
working
hours

Prog
%

Plan
Start

Eng. Muaied
Eng.Muhamad
100%
100%
40%
1%
60%
95%
70%
50%
50%
30%
50%

Progress
Plan

Actual
Finish

Start

Man Power
Finish

Remarks

Activity ID

No.

1
1
2
3
1
2

1
2
1
2
3
1
1
2

3
4
5

Manpower

Activity description
Mechanical Activities

Inventory of the generator accessories


Preparations to install the Aux. compartment
Transport of the exhaust frame parts
Installation of the extension duct
Preparations to install the extension duct
Preparations to install the Aux. compartment

Preparations to install the Aux. compartment


Installation of the upper exhaust plenum
Preparations to install the Aux. compartment
Preparations to install the extension ducts
Installation of the upper exhaust plenum
Preparations to construct the mechanical workshop
Assembly of axis acoustical structure for GT24

Preparation to assemble axis acoustical structure for GT22

Preparation to assemble axis acoustical structure for GT2


Inventory For acoustical structure for GT22
Insulation of Transition duct-for GT-23

Site:
Date:
Arrival Time:

TA

2
Mech. Manager
TA

Zeki Al Saadi
Eng. in charge
Zeki Al Saadi + Waleed Jameel Hassen

Minister of Electricity Visit

GT22

Mechanic

Suspe

GT21

Mech.D

1-Dec-12
7:00 AM

Engineer

14

Mech. Manager
TA

eki Al Saadi
No. of Persons

aadi + Waleed Jameel Hassen

er of Electricity Visit

store
3
Unit-21
3
3
4
Unit-22
4
2
Unit-23

2
4
Unit-24
3
4
4
Mechanical workshop
Suspended Jobs

Mech.Daily Progress Report

Hayderia site -Me

MCH. Technicians

15

Actual working
hours

tore

nit-21

nit-22

nit-23

nit-24

al workshop

nded Jobs

Mech.Daily Progress Report

Hayderia site -Mechanical de


Departure Time:
Overtime:

WELDER

50
100
100
100
100
100

100
90
100
90
90
40
75
10

5
25
50

chanical department
5:00 PM
5 hours

labors

17
Signature

Progress
Plan
Start

Total

51

re

ogress
Plan
Finish

M
a
n
Plan
Start

Finish

P
o
w
e
r

###

Workers Names

hold need crane


hold need crane

Section

No.

Job description
documents

IT

Eng. in charge
Eng. Ali Hanoon + eng.ali dhia

Eng. Abdulhadi + eng.ahmed

No. of
Persons

Actual
working
hours

Plan
Start

Progress
Plan

Actual
Finish

Start

Finish

Man
Power

Remarks

Section

Section

No.

1
2
3
4

Store Activities
Time Start : 00:07
No. of Engineers : 2
Date : 01 /12/2012

Time Finish 00:05


No. of Technicians : 4

Job description
Storage Activities
Preparation to do the Inspection thermoshied
inspection and inventory for EXTENSION EXHAUST for
GT23 and GT 21
inspection and inventory for Generators parts boxes
for GT21,22,23,24
inspection and inventory for transition duct for GT
24,21

ies

:05
ans : 4

No. of

Eng. in charge

Eng.Mohammed Rashed

No. of
Persons

Actual
working
hours

10

100%

10

100%

10

100%

10

100%

Progress
Plan

Actual

Man Power

Start

Finish

Start

Finish

1/11/2012

1/11/2012

1/11/2012

1/11/2012

30

1/11/2012

1/11/2012

1/11/2012

1/11/2012

40

1/11/2012

1/11/2012

1/11/2012

1/11/2012

50

1/11/2012

1/11/2012

1/11/2012

1/11/2012

30

Remarks

No.

Visitor Name

Eng. Kareem Aftan

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Visitor Position

Reason of visit

Minister of Electricity

Following up progress of work


in project

Visitor remarks

No.

Materials description
Purchased Materials from local markets

1
2
3
4
5
6
7
8
Arrived Materials for TBC
1
2
3
4
5
6
7
8
9
Arrived Materials for AUC
1

sub base

sand

cement

steel bar 10

steel bar 12

steel bar 16

steel bar 20

gravel

plywood

10

wood

11

casting additional materials

12

jacks

12

grouting cement

QTY
markets

1544 +322+ 1766 = 3632 m3+ 200 m3


500 m3

46 ton

17,5 ton
17,5 ton
15 ton
500 m3

20 ton

Remarks

TBC Schedule Progress


Progress Work for the Activites Identified by Primavera Schedule
MATERIALS RECEIVED TODAY
Description

Qty.

Inspection #

Submittal Reference

Accept / Reject

SUBMITTALS TODAY
Item

Specification Reference

Action Taken

SAFETY REPORT
FIRST AID
ACCIDENT
DOCTOR CASE
TRAINING (OJT)

None
None
None
None

SECURITY STATUS
ACTIVITY

The security status at site is good.


DIRECTIONS.MISCELLANEOUS REMARKS FROM CLIENT
(verbal instructions received or given by MOE personnel)

CONFLICTS WITH PLANS OR SPECIFICATIONS


I Certify that the above report is a true and accurate record . All material and equipment used ,work performed
and tests conducted during the period covered by this report were in strict compliance with the contract plans
and specifications,expect where noted above.
Prepared
Date
01-Dec-12
Site Planning and Scheduling ManaEng.Abdulhadi Rashid
Date
Eng.Riyadh Al Haboob
01-Dec-12
Site Project Manager
Date
Attachment List:
Attachment A:

Photos

chedule
Accept / Reject

Action Taken

LIENT
)

used ,work performed


with the contract plans

01-Dec-12
01-Dec-12