Description
2
Unit
Qty
3.64 Day
320.00
1164.80
291.20
1456.00
198.23
1654.23
165.42
8.32 Day
320.00
2662.40
665.60
2791.00
16746.00
6 Hour
20074.00
2733.08
22807.08
95.03
Rate
31.00
43.40
57.90
70.30
82.70
Loading
107.90
107.90
107.90
107.90
107.90
Page 1 of 145
25% MA
26.98
26.98
26.98
26.98
26.98
OH@13.615% Total
0.00
0.00
0.00
0.00
0.00
cost
165.88
178.28
192.78
205.18
217.58
Datas 2014-2015
Sn
1
3
Description
2
Unit
Qty
0.31 Day
6 Cum
320.00
99.20
24.80
1310.81
7864.86
7988.86
79.89
8068.75
1098.56
9167.31
1527.88
320.00
99.20
24.80
1119.94
6719.61
6843.61
68.44
6912.05
941.08
7853.12
1308.85
320.00
99.20
24.80
282.13
1692.81
1816.81
18.17
1834.97
249.83
2084.81
347.47
0.31 Day
6 Cum
0.31 Day
6 Cum
Page 2 of 145
Datas 2014-2015
Sn
Description
Unit
Qty
0.31
320.00
99.20
24.80
124.00
16.88
140.88
23.48
t
cum
cum
kl
0.22
0.45
0.90
1.20
5840.00
1460.81
1955.94
103.00
1284.80
657.36
1760.34
123.60
day
day
day
0.10
1.39
420.00
320.00
42.00
444.80
121.70
hour
0.40
338.60
135.44
hour
0.13
630.00
81.90
4651.95
Page 3 of 145
0.04
186.08
4838.02
658.70
5496.72
Datas 2014-2015
Sn
1
10B
Description
2
VCC (1:3:6) using 20 mm HBG graded metal machine
crushed granite from approved quarry including cost and
conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage
charges, on all materials and including all charges for
machine mixing, laying concrete in under bed, compacted
by vibration including curing for 14 days complete but
excluding cost of steel and its fabrication charges for
finished item of work as per drawings and technical
specifications Clause 802, 803, 1202 & 1203 MORD and
1500, 1700 & 2100 MORTH
Page 4 of 145
Unit
Qty
Datas 2014-2015
Sn
1
Description
2
Unit
Qty
P.C.C grade M 10
Nominal mix 1:3:6 without Formwork
(a) Material
Cement
Coarse sand
20 mm aggregate graded
Water
(b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
t
cum
cum
kl
0.22
0.45
0.90
1.20
5840.00
1460.81
1955.94
103.00
1284.80
657.36
1760.34
123.60
day
day
day
0.10
1.39
420.00
320.00
42.00
444.80
121.70
hour
0.40
338.60
135.44
hour
0.13
630.00
81.90
4651.95
633.36
5285.31
162
0.9
0.45
5.84
1607.94
1460.81
946.08
1447.14
657.36
338.60
338.60
0.1
1.39
420.00
320.00
1.2
103.00
42.00
444.80
121.70
123.60
4121.29
11
12
561.11
4682.40
kg
cum
cum
Page 5 of 145
129.6
0.9
0.45
5.84
1607.94
1460.81
756.86
1447.14
657.36
Datas 2014-2015
Sn
1
Description
Unit
Qty
2
Concrete mixer 10/7 cft(0.20/0.80cum) capacity
C.LABOUR
Mason 1st class -labour rates -skilled
Mazdoor unskilled
25% on labour as per premble area allowances
Water including curing
Grand total
13.615% over heads and contractors profit
Rate per 1Cum
Page 6 of 145
hour
day
day
kl
338.60
338.60
0.1
1.39
420.00
320.00
1.2
103.00
42.00
444.80
121.70
123.60
3932.07
535.35
4467.42
Datas 2014-2015
Sn
1
Description
Unit
Qty
13
Construction of un-reinforced, plain cement concrete
pavement, thickness as per design, over a prepared sub
base, with OPC M30 (Grade), coarse and fine aggregates
conforming to IS : 383, maximum in a concrete mixer of
not less than 0.2 cum capacity and appropeiate weigh
batcher using approved mix design, laid in approved fixed
side formwork (steel channel, laying and fixing wedges,
steel plates including levelling the formwork as per
drawing), spreading the concrete with sholvels, rakes,
compacted using
plate vibrators and finished in
continuous operation & curing of concrete slabs for 14days, curing compound (where specified) and water
finishing to lines and grade as per Standard specifications
excluding cost of polythene sheet and bitumen joints
Unit = cum
Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)
a) Labour
Mate
Mason (1st class)
Mason (2nd class)
Mazdoor (Unskilled)
Mazdoor (Skilled)
Surveyor
Mazdoor (Semi-Skilled)
25% on labour
b) Machinery
day
day
day
day
day
day
Page 7 of 145
5
5
150
6
2
6
420.00
375.00
320.00
320.00
600.00
320.00
2100.00
1875.00
48000.00
1920.00
1200.00
1920.00
14253.75
36
556.80
20044.80
9
5
185.50
630.00
1669.50
3150.00
67.5
1955.94
132025.64
33.75
1460.81
49302.32
30
5840.00
175200.00
452661.01
4526.61
13579.83
470767.45
64094.99
Datas 2014-2015
Sn
1
Description
Unit
Qty
6
534862.44
7131.50
14
Construction of un-reinforced, plain cement concrete
pavement, thickness as per design, over a prepared sub
base, with OPC M20 (Grade), coarse and fine aggregates
conforming to IS : 383, maximum in a concrete mixer of
not less than 0.2 cum capacity and appropeiate weigh
batcher using approved mix design, laid in approved fixed
side formwork (steel channel, laying and fixing wedges,
steel plates including levelling the formwork as per
drawing), spreading the concrete with sholvels, rakes,
compacted using
plate vibrators and finished in
continuous operation & curing of concrete slabs for 14days, curing compound (where specified) and water
finishing to lines and grade as per Standard specifications
excluding cost of polythene sheet and bitumen joints
Unit = cum
Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)
a) Labour
Mate
Mason (1st class)
Mason (2nd class)
Mazdoor (Unskilled)
Mazdoor (Skilled)
Surveyor
Mazdoor (Semi-Skilled)
25% on labour
b) Machinery
day
day
day
day
day
day
Page 8 of 145
5
5
150
6
2
6
420.00
375.00
320.00
320.00
600.00
320.00
2100.00
1875.00
48000.00
1920.00
1200.00
1920.00
14253.75
36
556.80
20044.80
9
5
185.50
630.00
1669.50
3150.00
67.5
1955.94
132025.64
33.75
1460.81
49302.32
26.25
5840.00
153300.00
430761.01
4307.61
12922.83
Datas 2014-2015
Sn
1
Description
2
Unit
Qty
6
447991.45
60994.04
508985.49
6786.47
Page 9 of 145
Datas 2014-2015
Sn
Description
15
16
Unit
Qty
Sqm
630.00
630.00
88.20
718.20
Kg
120.00
0.06
136.34
120.00
16.34
136.34
8.18
0.9 cum
0.45 cum
350 kgs
1955.94
1460.81
5.84
1760.34
657.36
2044.00
0.133 day
0.267 day
3.6 day
420.00
375.00
320.00
55.86
100.13
1152.00
327.00
338.60
57.00
69.00
103.00
338.60
7.58
46.02
123.60
6612.49
Rm
17
RCC using M-20 Nominal mix with OPC (cement,fine
aggregate,coarse aggregate) using 20 mm size graded
machine crushed hard granite metal (coarse agggregate)
from approved quarry including cost and conveyance of all
materials
like
cement,fine
aggregate(sand),coarse
aggregate ,water etc to site and including seigniorage
charges , on all materials including all operational
,incidental and labour charges such as machine mixing
,laying concrete ,curing etc complete but excluding cost of
steel and its fabrication charges for finished item of
work,including form work for culvert slabs
A. MATERIALS
20 mm graded HBG metal
sand
Cement
B. LABOUR
Mason 1st class -labour rates -skilled category
Mason 2nd class - semi skilled category
Mazdoor unskilled
25% on labour as per premble area allowances
C MACHINERY
Concrete mixer 10/7 cft(0.20/0.80cum) capacity
cost of diesel for miller
cost of petrol for vibrator
Water including curing
(d) Formwork @ 4% on cost of material, labour and
machinery (a+b+c)
hour
liters
liters
kl
1
0.133
0.667
1.2
264.50
6876.99
Page 10 of 145
936.30
7813.29
Datas 2014-2015
Sn
1
Description
2
Unit
Qty
18
RCC using M-30 Nominal mix with OPC (cement,fine
aggregate,coarse aggregate) using 20 mm size graded
machine crushed hard granite metal (coarse agggregate)
from approved quarry including cost and conveyance of all
materials
like
cement,fine
aggregate(sand),coarse
aggregate ,water etc to site and including seigniorage
charges , on all materials including all operational
,incidental and labour charges such as machine mixing
,laying concrete ,curing etc complete but excluding cost of
steel and its fabrication charges for finished item of
work,including form work for culvert slabs
A. MATERIALS
20 mm graded HBG metal
sand
Cement
B. LABOUR
Mason 1st class -labour rates -skilled category
Mason 2nd class - semi skilled
Mazdoor unskilled
25% on labour as per premble area allowances
C MACHINERY
Concrete mixer 10/7 cft(0.20/0.80cum) capacity
cost of diesel for miller
cost of petrol for vibrator
Water including curing
0.9 cum
0.45 cum
385 kgs
1955.94
1460.81
5.84
1760.34
657.36
2248.40
0.133 day
0.267 day
3.6 day
420.00
375.00
320.00
55.86
100.13
1152.00
327.00
338.60
57.00
69.00
103.00
338.60
7.58
46.02
123.60
6816.89
hour
liters
liters
kl
1
0.133
0.667
1.2
272.68
7089.57
Page 11 of 145
965.24
8054.81
1.05 MT
6 kgs
42000.00
70.00
44100.00
420.00
2 day
6.4 day
490.00
320.00
980.00
2048.00
757.00
48305.00
6576.73
54881.73
Datas 2014-2015
Sn
1
Description
2
Rate /kg
Unit
Qty
6
54.88
Page 12 of 145
Datas 2014-2015
Sn
Description
20
Unit
Qty
0.15 cum
4487.40
673.11
0.6 day
0.96 day
420.00
320.00
252.00
307.20
139.80
1372.11
13.72
1385.83
188.68
1574.51
157.45
0.15 cum
3786.60
567.99
0.6 day
0.96 day
420.00
320.00
252.00
307.20
139.80
1266.99
12.67
1279.66
174.23
1453.89
145.39
0.21 cum
3786.60
795.19
0.94 day
1.6 day
375.00
320.00
352.50
512.00
216.13
1875.81
18.76
1894.57
257.95
2152.51
215.25
0.21 cum
3366.12
706.89
0.94 day
1.6 day
375.00
320.00
352.50
512.00
216.13
1787.51
water charges 1%
21
22
23
Page 13 of 145
Datas 2014-2015
Sn
1
Description
Unit
Qty
water charges 1%
17.88
1805.39
245.80
2051.19
205.12
Unit = cum
day
day
b) Machinery
Tractor with trolley 3t
c&d) Overheads & Contractors Profit @13.615
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
25
27
hour
26
hour
1.3
320.00
416.00
104.00
520.00
0.27
415.00
112.05
86.05
718.10
574.48
0.4
3.5
420.00
320.00
168.00
1120.00
322.00
0.27
415.00
112.05
234.46
1956.51
1565.21
10
87.75
877.50
119.47
996.97
99.70
53.00
53.00
Cum
Page 14 of 145
Datas 2014-2015
Sn
1
Description
2
Unit
Qty
6
7.22
60.22
Cum
Page 15 of 145
39.00
39.00
5.31
44.31
Datas 2014-2015
Sn
1
Description
2
Unit
Qty
0.48
2
10
375.00
420.00
320.00
180.00
840.00
3200.00
1055.00
5275.00
6.6
6
6
6
3.9
3
1650.00
1320.00
1650.00
2250.00
2609.10
630.00
10890.00
7920.00
9900.00
13500.00
10175.49
1890.00
54275.49
29
Providing,laying, spreading and compating graded HBG
crushed stone aggregate to Wet mix macadam
specification incluidng cost, seignorage of all materials and
including premixing the material, with water at OMC in
mechanical mix plant carriage of mixed material by tipper
to site, laying in uniform layers with pavers in base courses
on well prepared surface and compacting with vibratory
roller to achieve the desired denisty etc., as directed by
the Engineer-in-Charge and as epr MoRT & H specificatio
406 (4th revision0 for finished item of work (payment
based on levels for finished item of work)
Unit = Cum
Taking output =225 Cum (495 Tn)
(A) Labour
Mate
Labour skilled
Mazdoor
Day
Day
Day
Total
(B) Machinery
Wet mix plant of 75 tonne/hr. capacity
Electric generating set 125 KVA
Front end loader 1 cum capacity
Mechanical Paver finisher
Vibratory roller 8-10 T
Water tanker
Total
hr
hr
hr
hr
hr
hr
(C ) Material
45 to 22.40mm IRC & MoRT&HBG M/C metal @ 30%
(Av.Of 40-45, 25-27, 19-22mm)
Cum
89.1
1907.94
169997.04
Cum
118.8
1676.94
199219.93
89.1
1200.94
4785.81
107003.34
476220.32
535770.81
72945.20
608716.00
2705.40
Page 16 of 145
Datas 2014-2015
Sn
1
30
Description
2
Unit
Qty
0.44
9
2
375.00
320.00
420.00
165.00
2880.00
840.00
971.25
4856.25
7.2
7.2
6
6
6
6
375.00
538.20
2695.00
1650.00
1500.00
1101.00
2700.00
3875.04
16170.00
9900.00
9000.00
6606.00
48251.04
6.75
32281.22
217898.24
36
1497.94
53925.67
Day
Day
Day
(B) Machinery
Mechanical broom @ 1250 Sqm / hr
Air compressor 250 cfm
Hydraulic chip spreader @ 1500 sqm/hr
front end loader 1cum bucket capacity
Bitumen pressure distributor @ 1750 Sqm/hr
Smooth wheeled roller 8 ton
hr
hr
hr
hr
hr
hr
(C ) Material
Bitumen 80/100 @ 0.75 Kg/sqm
Mt
Crushed stone chippipngs 6 mm nominal size @ 0.004
Cum
cum/sqm
Total
271823.91
324931.20
44239.38
369170.58
41.02
Day
Day
(B) Machinery
Mechanical broom Hydraulic @ 1250 Sqm/hr.
Air compressor 250 cfm
Bitumen pressure distributor
Total
(C ) Maaterial
Page 17 of 145
hr
hr
hr
0.08
2
375.00
320.00
30.00
640.00
167.50
837.50
2.8
2.8
2
375.00
538.20
1500.00
1050.00
1506.96
3000.00
5556.96
Datas 2014-2015
Sn
1
Description
Qty
2
Bitumen Emulsion(RS-I)
A+B+C
(D) Overheads & phofit @13.615%
Total for 3500sqm
Rate per 1 Sqm
32
Unit
MT
0.7
36435.25
25504.68
31899.14
4343.07
36242.20
10.35
0.84
375.00
315.00
16
320.00
5120.00
420.00
2100.00
Page 18 of 145
1883.75
9418.75
6
6
6
6
21700.00
2250.00
1850.00
1650.00
130200.00
13500.00
11100.00
9900.00
3.9
1101.00
4293.90
3.9
3.9
2609.10
1101.00
10175.49
4293.90
183463.29
20.25
32520.62
658542.56
165.2
1681.94
277855.73
Datas 2014-2015
Sn
1
Description
Unit
Qty
2
5.6 mm & below (41%)
Filler material at 2% (Dust)
1cum
1cum
117.5
5.7
1319.94
1119.94
33
6
155092.41
6383.63
1097874.33
1290756.37
6619.26
901.21
7520.48
Page 19 of 145
No
0.84
375.00
315.00
No
14
320.00
4480.00
No
420.00
2100.00
Hr
Hr
Hr
Hr
Hr
Hr
6
202
2.2
6
6
6
21700.00
375.00
538.20
2250.00
1850.00
1650.00
130200.00
75750.00
1184.04
13500.00
11100.00
9900.00
Hr
3.9
1101.00
4293.90
Hr
Hr
3.9
3.9
2609.10
1101.00
10175.49
4293.90
Mt
14.85
32520.62
482931.21
Cum
38.68
1865.94
72174.38
Datas 2014-2015
Sn
1
Description
Unit
Qty
2
12mm to 14mm @ 15.23 %
9.5mm to 11.2mm@ 15.23%
116.04 Cum of 10mm to 5mm @ 40 %
9.5mm to 11.2mm@20%
5mm to 7mm @ 20 %
58.02 Cum of 5mm and below @ 20 % of 290.1
5mm to 7mm @ 10 %
below 2.8mm @ 10 % ( stone dust)
Cum
Cum
38.68
38.66
1791.94
1681.94
69312.06
65023.62
Cum
Cum
58.02
58.02
1681.94
1497.94
97585.89
86910.21
Cum
Cum
29.01
29.01
1497.94
1119.94
43455.11
32489.33
34
1723.75
1218897.89
5945.84
809.53
6755.37
cum
Nos
Nos
Nos
Nos
1.1
0.12
0.28
1.1
0.7
731.40
351.13
420.00
375.00
320.00
320.00
386.25
50.40
105.00
352.00
224.00
182.85
1300.50
177.06
1477.56
Overheads @13.615%
Rate per 1 Cum
35
cum
1.16
282.13
327.28
day
1.1
320.00
352.00
88.00
767.28
104.46
871.74
4487.40
420.00
403.87
201.60
36
cum
Nos
Page 20 of 145
0.09
0.48
Datas 2014-2015
Sn
1
Description
2
Mason 2nd class
Men Mazdoor
women Mazdoor
Add 25% extra for labour
Unit
Qty
Nos
Nos
Nos
Overheads @13.615%
Rate per 10 Sqm
For Rock Toe Walls
Rate of rough stone
Labour charges (2/3 revetment
labour charges
25% on labour charges
Sundries
Rate per 1 Cum
Overheads @13.615%
Rate 1 Cum
1.12
0.5
1.8
1357.60
375.00
320.00
320.00
420.00
160.00
576.00
339.40
2100.87
286.03
2386.90
386.25
905.07
226.27
1517.58
206.62
1724.20
Page 21 of 145
Datas 2014-2015
Sn
1
37
Description
Unit
Qty
2
Providing RR Masonary work in CM (1:6) using quarry
rough stone from approved quarry including cost and
conveyance etc., complete
Cost of Rough stone for RR masonry
Cement Mortor 1:6
Mason 1st Class
Mazdoor (Unskilled)
Add 25% extra for labour
cum
cum
1.1
0.34
387.13
3085.80
420.00
320.00
425.85
1049.17
504.00
640.00
286.00
2905.02
395.52
3300.54
10.08
2
250
375.00
320.00
320.00
3780.00
640.00
80000.00
21105.00
0.00
hour
hour
hour
12
24
1101.00
630.00
13212.00
15120.00
133857.00
cum
435.6
1397.94
608940.66
cum
97.2
0.00
0.00
cum
108
282.13
30470.51
day
1.20
day
2.00
1144.00
Overheads @13.615%
Rate per 1 Cum
38
By Manual Means
Taking output = 360 cum
a) Labour
Mate
Mazdoor skilled
Mazdoor
25% MA
b)
Machinery
day
day
day
Page 22 of 145
Datas 2014-2015
Sn
1
Description
Unit
Qty
2
Binding Material @ 0.08cum per 10 sqm for grading I
material
Cost of water
Sub Total
d)Overheads & Contractors Profit
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
cum
28.8
282.13
8125.47
KL
144
103.00
14832.00
662368.64
796225.64
108406.12
904631.76
2512.87
0.13615
Page 23 of 145
Datas 2014-2015
Sn
1
Description
Unit
Qty
39
133857.00
cum
435.6
1424.94
620701.86
cum
57.6
0.00
0.00
cum
105.59
282.13
29790.56
cum
86.4
0.00
0.00
cum
28.8
282.13
8125.47
KL
144
103.00
0.13615
14832.00
673449.89
807306.89
109914.83
917221.73
2547.84
OR
Page 24 of 145
Datas 2014-2015
Sn
1
Description
Unit
Qty
40
435.6
1634.94
712177.86
cum
86.4
0.00
0.00
cum
105.59
282.13
29790.56
cum
28.8
282.13
8125.47
KL
144
103.00
14832.00
764925.89
898782.89
122369.29
1021152.18
2836.53
0.13615
Page 25 of 145
133857.00
Datas 2014-2015
Sn
1
41
Description
Unit
Qty
Cum
Cum
Cum
0.4
2
8
375.00
420.00
320.00
150.00
840.00
2560.00
887.50
4437.50
6.6
6
6
6
3.9
3
1650.00
1320.00
1650.00
2250.00
2609.10
630.00
10890.00
7920.00
9900.00
13500.00
10175.49
1890.00
54275.49
100.8
36
151.2
1323.94
1236.94
1200.94
133452.69
44529.67
181581.43
359563.80
418276.79
56948.38
475225.17
2112.11
320.00
Man day
1280.00
6786.47
1 Cum
2035.94
157.45
1 Sqm
217.28
42
1.38
3533.22
Page 26 of 145
Datas 2014-2015
Sn
1
43
Description
2
Qty
44
Unit
1.2
42
0.13
2.86
0.27
Cum
Kgs
Cum
Nos
Hours
1607.94
32281.22
1791.94
320.00
1101.00
1929.52
1355.81
232.95
915.20
297.27
228.80
4959.56
396
28.8
3.02
7.06
252
Cum
Cum
Nos
Nos
Nos
890.94
282.13
420.00
375.00
320.00
Hrs
1101.00
352810.42
8125.47
1268.40
2647.50
80640.00
21138.98
6606.00
Quarry spall
Gravel
Mason 1st class
Mason 2nd class
Mazdoor
25% on labour
PRR (8-10t) @ 60 cum/Hr
473236.76
64431.19
537667.95
1493.52
Page 27 of 145
Datas 2014-2015
Sn
Description
45
Unit
Qty
Mate
Mazdoor (Unskilled)
day
day
0.26
320.00
83.20
0.08
425.00
0.2
1650.00
34.00
330.00
0.23
909.70
209.23
2.5
1119.94
2799.84
3456.27
470.57
b) Machinery
3926.84
39.27
10.00
40.00
5.45
45.45
4.54
40.00
47
Page 28 of 145
day
day
day
2.48
10.00
hour
hour
hour
hour
6.00
30.00
12.00
5.00
cum
384.00
375.00
320.00
1101.00
282.13
930.00
3200.00
0.00
33030.00
0.00
0.00
108339.58
Datas 2014-2015
Sn
1
Description
Unit
Qty
Water
kl
30.00
Page 29 of 145
6
3090.00
148589.58
20230.47
168820.05
562.73
Datas 2014-2015
Sn
Description
Unit
Qty
48
49
50
Page 30 of 145
25.60
25.60
1.75
0.24
1.99
656.00
89.31
745.31
1822.00
248.07
2070.07
224.00
30.50
254.50
Datas 2014-2015
Description
2
Unit
Qty
13
Construction of un-reinforced, plain cement concrete
pavement, thickness as per design, over a prepared sub
base, with OPC M30 (Grade), coarse and fine aggregates
conforming to IS : 383, maximum in a concrete mixer of
not less than 0.2 cum capacity and appropeiate weigh
batcher using approved mix design, laid in approved fixed
side formwork (steel channel, laying and fixing wedges,
steel plates including levelling the formwork as per
drawing), spreading the concrete with sholvels, rakes,
compacted using
plate vibrators and finished in
continuous operation & curing of concrete slabs for 14days, curing compound (where specified) and water
finishing to lines and grade as per Standard specifications
including cost of polythene sheet and bitumen joints
Unit = cum
Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)
a) Labour
Mate
Mason (1st class)
Mason (2nd class)
Mazdoor (Unskilled)
Mazdoor (Skilled)
Surveyor
Mazdoor (Semi-Skilled)
25% on labour
b) Machinery
day
day
day
day
day
day
5
5
150
6
2
6
420.00
375.00
320.00
320.00
600.00
320.00
0.00
0.00
2100.00
1875.00
48000.00
1920.00
1200.00
1920.00
14253.75
36
556.80
20044.80
9
5
185.50
630.00
0.00
1669.50
3150.00
0.00
67.5
1955.94
132025.64
33.75
1460.81
49302.32
30
412.5
5
5840.00
12.00
120.00
175200.00
4950.00
600.00
630.00
1890.00
460101.01
Page 31 of 145
Datas 2014-2015
Sn
1
Description
2
Unit
Qty
water @1%
d) Formwork @ 3% of (a+b+c)
4601.01
13803.03
478505.05
65148.46
543653.52
7248.71
day
day
day
day
day
day
Page 32 of 145
5
5
150
6
2
6
420.00
375.00
320.00
320.00
600.00
320.00
0.00
0.00
2100.00
1875.00
48000.00
1920.00
1200.00
1920.00
14253.75
36
556.80
20044.80
9
5
185.50
630.00
0.00
1669.50
3150.00
0.00
67.5
1955.94
132025.64
33.75
1460.81
49302.32
26.25
412.5
5840.00
12.00
153300.00
4950.00
Datas 2014-2015
Sn
1
Description
Unit
Qty
2
Bitumen primer at 200ml per joint for 23 joint
Joint filler board 20mm thick as per
(4x3.75x0.20=3)
IS
1838
Kg
120.00
600.00
Sqm
630.00
1890.00
438201.01
4382.01
13146.03
455729.05
62047.51
517776.57
6903.69
water @1%
d) Formwork @ 3% of (a+b+c)
e&f) Overheads & Contractors Profit
Cost for 75 cum = a+b+c+d+e+f
Rate per cum = (a+b+c+d+e+f)/75
Page 33 of 145
SL.
No.
Sl.No. of
SSR
Name of
Quary
Unit
M-043
EGK
1 cum
M-044
EGK
M-050
M-030
M-051
M-052
M-053
M-054
M-055
10
M039
11
M038
12
M036
13
M-022
14
M-024
11
12
13
919.00
72
825.30
112.36
50.00
1681.94
1 cum
1029.00
72
825.30
112.36
50.00
1791.94
EGK
1 cum
735.00
72
825.30
112.36
50.00
1497.94
EGK
1 cum
557.00
72
825.30
112.36
50.00
1319.94
EGK
1 cum
935.00
72
825.30
112.36
50.00
1697.94
EGK
1 cum
1097.00
72
825.30
112.36
50.00
1859.94
EGK
1 cum
1365.00
72
825.30
112.36
50.00
2127.94
EGK
1 cum
1313.00
72
825.30
112.36
50.00
2075.94
EGK
1 cum
845.00
72
825.30
112.36
50.00
1607.94
EGK
1 cum
635.00
72
825.30
112.36
50.00
1397.94
EGK
1 cum
662.00
72
825.30
112.36
50.00
1424.94
EGK
1 cum
872.00
72
825.30
112.36
50.00
1634.94
EGK
1 cum
438.00
72
825.30
112.36
50.00
1200.94
EGK
1 cum
474.00
72
825.30
112.36
50.00
1236.94
Page 34 of 145
Ded.
Lead
13.615%
Seigniorag Total Amt
Amount of OH and
e Charges
Rs.
Rs.
profit on
(7+8+ 11)
SL.
No.
Sl.No. of
SSR
15
M-025
16
M-048
17
M-031
18
M-034
19
M-033
29
M-021
Granular Sub-base
material 9.5mm to
4.75mm
Aggregates 37.5mm to
19mm
Aggregates 22.4mm to
2.36mm
Aggregates 45mm to
22.40mm
Aggregates 45 to 2.80
mm
Stone crusher Dust
(finer than 3 mm)
Ded.
Lead
13.615%
Seigniorag Total Amt
Amount of OH and
e Charges
Rs.
Rs.
profit on
(7+8+ 11)
Name of
Quary
Unit
EGK
1 cum
561.00
72
825.30
112.36
50.00
1323.94
EGK
1 cum
1103.00
72
825.30
112.36
50.00
1865.94
EGK
1 cum
914.00
72
825.30
112.36
50.00
1676.94
EGK
1 cum
1145.00
72
825.30
112.36
50.00
1907.94
EGK
1 cum
667.00
72
825.30
112.36
50.00
1429.94
EGK
1 Cum
357.00
72
825.30
112.36
50.00
1119.94
21
M-004/P 309
Sand for filling
I.27(b)
Godavari
1 cum
460.00
83
938.60
127.79
40.00
1310.81
22
Godavari
1 cum
610.00
83
938.60
127.79
40.00
1460.81
83
938.60
127.79
40.00
1527.81
23
28 P: 309
Godavari
1 cum
677.00
24
BMT-A01
Local
1000
no
5200.00
424.00
106.00
132.90
90.25
5772.65
25
BMT-A11
Local
Each
23.00
0.42
0.11
0.133
0.09
23.57
Local
Each
20.00
0.42
0.11
0.133
0.09
20.57
Local
Each
14.00
0.42
0.11
0.133
0.09
14.57
103.00
13
181.90
24.77
22.00
282.13
128.00
13
825.30
112.36
50.00
890.94
26
27
28
30
Flyash Bricks - 50
KSC(29x20x14)
Flyash Solid Bricks
BMT-A12
(29x15x14)
Flyash Solid Bricks
BMT-A13
(29x10x14) Cm
M- 008
M-007/ /Murrum/Quarry
P310 I 56 rebbish
1 Cum
Page 35 of 145
SL.
No.
Sl.No. of
SSR
31
M-003
Monthly
Name of
Quary
Unit
1 Cum
1 Cum
1 Cum
164.00
144.00
164.00
180.00
Ded.
Lead
13.615%
Seigniorag Total Amt
Amount of OH and
e Charges
Rs.
Rs.
profit on
(7+8+ 11)
13
181.90
24.77
13
181.90
24.77
50.00
351.13
13
181.90
24.77
50.00
371.13
13
181.90
24.77
50.00
387.13
5840.00
Local
1 Mt
5840.00
Local
1 Mt
42000.00
Monthly
Cement (OPC)
HYSD bar (Steel)
Fe415
MS Channels, Angles
etc.
Local
1 Mt
45000.00
Monthly
Bitumen 60/70
(01.12.2013)
HPCL
11/2015
1 Mt
32011.37
509.25
Bitumen 80/100
Bitumen Emulsion
(RS-1)
HPCL
1 Mt
31771.97
509.25
HINCOL
1 Mt
35926.00
509.25
Monthly
Monthly
Monthly
Page 36 of 145
321.13
42000.00
45000.00
32520.62
32281.22
36435.25
Datas 2014-2015
Cement Mortars
Page 37 of 145
Kg
Cum
1440.00
1.05
5.84
1527.81
8409.60
1604.20
Cum
1.05
0.00
0.00
0.00
0.00
0.00
Day
0.20
320.00
64.00
16.00
10093.80
Kg
Cum
960.00
1.05
5.84
1527.81
5606.40
1604.20
Cum
1.05
0.00
0.00
0.00
0.00
0.00
Day
0.20
320.00
64.00
16.00
7290.60
kg
cum
720.00
1.05
5.84
1527.81
4204.80
1604.20
cum
1.05
0.00
0.00
0.00
0.00
0.00
day
0.20
320.00
64.00
16.00
5889.00
kg
cum
480.00
1.05
5.84
1527.81
2803.20
1604.20
cum
1.05
0.00
0.00
0.00
0.00
0.00
0.20
320.00
64.00
16.00
4487.40
day
Datas 2014-2015
Cement Mortars
kg
cum
360.00
1.05
5.84
1527.81
2102.40
1604.20
cum
1.05
0.00
0.00
0.00
0.00
0.00
day
0.20
320.00
64.00
16.00
3786.60
kg
cum
288.00
1.05
5.84
1527.81
1681.92
1604.20
cum
1.05
0.00
0.00
0.00
0.00
0.00
day
0.20
320.00
64.00
16.00
3366.12
kg
cum
240.00
1.05
5.84
1527.81
1401.60
1604.20
cum
1.05
0.00
0.00
0.00
0.00
0.00
0.20
320.00
64.00
16.00
3085.80
day
1 Tn
1 Kg
5840.00
5.84
0.40
0.40
0.20
1607.94
2127.94
1697.94
643.17
851.17
339.59
1833.94
0.60
0.40
2127.94
1697.94
1276.76
679.17
1955.94
Page 38 of 145
Datas 2014-2015
Cement Mortars
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
GF
FF
SF
TF
61.00
244.00
277.00
473.00
315.00
753.00
1335.00
1141.00
229.00
1338.00
229.00
1338.00
229.00
1472.00
229.00
1606.00
760.00
953.00
760.00
953.00
760.00
1048.00
760.00
1144.00
1342.00
1122.00
1342.00
1122.00
1342.00
1234.00
1342.00
1346.00
152.00
127.00
152.00
127.00
152.00
140.00
152.00
152.00
150.00
146.00
150.00
146.00
150.00
161.00
150.00
175.00
9.93
61.83
9.93
87.78
9.93
113.70
0.99
6.18
0.99
8.78
0.99
11.37
Page 39 of 145
Datas 2014-2015
Buildings
Description
Unit
Qty
Rate in Rs.
3.64
Day
320.00
8.32
Day
320.00
Hour
2791.00
Mechanical Means
Upto 3 m depth
Unit = cum
Taking output = 240 cum
a) Labour
Mate
Mazdoor (Unskilled)
25% on labour
b) Machinery
Hydraulic Excavator 1 cum bucket capacity (shovel
0.85 cum capacity)
c&d) Overheads & Contractors Profit 13.615%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Page 40 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
2
Earthwork in excavation for structures as per
drawing and technical specifications Clause 305.1
including setting out, construction of shoring and
bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing
of sides and bottom and backfilling in trenches with
excavated suitable material as per Technical
Specification 305 MORD / 304 MORTH for
foundations for Footings
a
3.64
Day
320.00
0.31
Day
320.00
Cum
1310.81
day
0.31
320.00
Total/cum
Filling in foundation trenches as per drawing and
technical specification Clause 305.3.9 MORD & 304
MORTH
for foundations of buildings with
excavated earth
earth filling (refilling excavated earth)
Taking output = 6 cum
a) Labour
Mate
Mazdoor (Unskilled)
25% on labour
b&c) Overheads & Contractors Profit @ 13.615%
Page 41 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
kg
cum
cum
162
0.9
0.45
5.84
1607.94
1460.81
cum
0.9
cum
0.45
hour
338.60
day
day
0.1
1.39
420.00
320.00
kl
1.2
103.00
kg
cum
cum
129.6
0.9
0.45
5.84
1607.94
1460.81
cum
0.9
cum
0.45
hour
338.60
day
day
0.1
1.39
420.00
320.00
kl
1.2
103.00
Page 42 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
7A
0.9
0.45
350
cum
cum
kgs
1955.94
1460.81
5.84
0.133
0.267
3.6
day
day
day
420.00
375.00
320.00
hour
liters
liters
kl
1
0.133
0.667
1.2
338.60
57.00
69.00
103.00
cum
cum
1
1
277.00
473.00
Page 43 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
7B
cum
cum
1
1
1335.00
1141.00
cum
cum
1
1
315.00
753.00
0.9
0.45
350
cum
cum
kgs
1955.94
1460.81
5.84
0.167
0.167
4.7
day
day
day
420.00
375.00
320.00
hour
liters
liters
kl
1
0.133
0.667
1.2
338.60
57.00
69.00
103.00
7D
Page 44 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
7E
cum
cum
1
1
229.00
1338.00
cum
cum
1
1
229.00
1338.00
1
1
229.00
1472.00
1
1
760.00
953.00
1636.77
7H
Page 45 of 145
cum
cum
180.04
cum
cum
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
7i
cum
cum
1
1
760.00
953.00
cum
cum
1
1
760.00
1048.00
0.9
0.45
350
cum
cum
kgs
1955.94
1460.81
5.84
0.067
0.133
2.5
878.02
day
day
day
420.00
375.00
320.00
1
0.133
0.667
1.2
hour
liters
liters
kl
338.60
57.00
69.00
103.00
cum
6075.03
Sqm
Sqm
6.67
6.67
152.00
127.00
180.04
Page 46 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
Page 47 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
7K
cum
6075.03
Sqm
Sqm
6.67
6.67
152.00
127.00
cum
6075.03
Sqm
Sqm
6.67
6.67
152.00
140.00
1.1
cum
87.80
1
Sqm
Sqm
cum
12.5
12.5
6075.03
150.00
146.00
1
Sqm
Sqm
cum
12.5
12.5
6075.03
150.00
146.00
0.1
cum
878.02
878.02
7L
7M
7N
Page 48 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
1
Sqm
Sqm
cum
12.5
12.5
6075.03
150.00
161.00
1.1
cum
87.80
cum
cum
1
1
1342.00
1122.00
cum
cum
1
1
1342.00
1122.00
878.02
0.1
cum
cum
1
1
1342.00
1234.00
1.1
Cum
87.80
cum
cum
1
1
1342.00
1346.00
1.1
Cum
96.58
7P
7Q
7R
Page 49 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
48
kgs
5.84
5772.65
0.2
cum
1460.81
0.24
0.56
1.89
day
day
day
420.00
375.00
320.00
48
kgs
5.84
5772.65
water charges 1%
13.615% over heads and contractors profit
First floor
materials
cement
Bricks traditional size 23x11x7 cm 2nd class
512+2.4% wastage =524.29
sand
labour
mason 1st class
mason 2nd class
Mazdoor unskilled item 111(4) SSR 2009-10
25% on labour as per premble area allowances
scafolding charges- Quantity for sqm with 0.23 cm
brick wall = 4.35Sqm
material charges
labour charges
25% on labour as per premble area allowances
lift charges
Add lift charges at 10% on labour charges of basic
rate
water charges 1%
13.615% over heads and contractors profit -note
item 5 of standard data
Page 50 of 145
0.2
cum 1460.8096
0.24
0.56
1.89
day
day
day
420.00
375.00
320.00
Sqm
Sqm
4.35
4.35
9.93
61.83
0.1
915.60
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
2nd floor
materials
cement
Bricks traditional size 23x11x7 cm 2nd class
512+2.4% wastage =524.29
sand
labour
mason 1st class
mason 2nd class
Mazdoor unskilled
25% on labour as per premble area allowances
scafolding charges- Quantity for sqm with 0.23 cm
brick wall = 4.35Sqm
material charges
labour charges
25% on labour as per premble area allowances
lift charges
Add lift charges on FF lift charges
48
kgs
5.84
5772.65
0.2
cum 1460.8096
0.24
0.56
1.89
day
day
day
420.00
375.00
320.00
Sqm
Sqm
4.35
4.35
9.93
87.78
1.1
91.56
0.15
cum
4487.40
0.6
0.96
day
day
420.00
320.00
water charges 1%
13.615% over heads and contractors profit -note
item 5 of standard data
9
Page 51 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
10
0.15
cum
4487.40
0.6
0.96
day
day
420.00
320.00
Sqm
Sqm
10
10
0.99
6.18
0.1
559.20
0.15
cum
4487.40
0.6
0.96
day
day
420.00
320.00
Sqm
Sqm
10
10
0.99
8.78
1.1
55.92
Page 52 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
12
0.15
cum
3786.60
0.6
0.96
day
day
420.00
320.00
0.15
cum
3786.60
0.6
0.96
day
day
420.00
320.00
Sqm
Sqm
10
10
0.99
6.18
0.1
559.20
water charges 1%
13
Page 53 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
14
0.15
cum
3786.60
0.6
0.96
day
day
420.00
320.00
Sqm
Sqm
10
10
0.99
8.78
1.1
55.92
sqm
cum
17.00
0
21.8 10.00sqm
567.99
21.8 10.00sqm
883.35
water charges 1%
13.615% over heads and contractors profit
Rate for 10 Sqm
Rate for 1 Sqm
15
RCM facia 5 cm thick in CM(1:3) drop walls, fins
with rabbit wire mesh and nominal reinforcement as
directed by the engineer-in-chargewith dubara
sponge finishing,including cost and conveyance of
all materials to site, seignioRate charges,sales and
other taxes on all materials,operational and
incidental,cost and conveyance of cement,wire
mesh,water to work site ,centering,scafolding and
form work lift charges etc complete
Materials
Rabbit wire mesh 1.00m panna for 0.60m drop
cement mortar 1:3 excluding labour
12mm plastering two coats CM(1:4) motar only
excluding labour 0.15x3630.96
12mm plastering two coats CM(1:2) motar only
excluding labour 0.15x5646.96
Labour
Mason 1st class
Miller operator included in hire charges of millar
Mazdoor unskilled
25% on labour as per premble area allowances
Machinery
Machine Mixing Mortar with Miller -hire charges
water charges 1%
13.615% over heads and contractors profit
Page 54 of 145
13.3
0.25
8
1
10
day
day
day
420.00
0
320.00
hr
338.60
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
Total/10.00 sqm
Rate for 1 Sqm
16
Providing impervious coat to exposed RCC roof
slab surface with CM(1:3), 20mm thick with 1kg of
water proof compound per bag of cement laid over
roof when it is green including cost of all materials,
seignioRate
charges,
excluding conveyance
charges of materials and including all operational,
incidental and labour charges for mixing mortar,
laying, rendering smooth and thread lining, curing,
rounding off junctions of wall and slab etc,,
complete for finished item of work
A. MATERIALS: Unit = 10 sqm
Cement Mortal 1:3
Water proofing compound
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
25% on labour
cum
kg
0.21
2
4487.40
75.00
day
day
day
0.66
1.54
3.7
420.00
375.00
320.00
Nos
cum
110
0.1
23.57
3085.80
day
day
day
0.24
0.56
1.89
420.00
375.00
320.00
Water charges 1%
Overheads & Contractors Profit 13.615%
Rate for 10Sqm
Rate for 1 Sqm
17
Page 55 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
Nos
110
23.57
cum
0.1
3085.80
day
day
day
0.24
0.56
1.89
420.00
375.00
320.00
Sqm
Sqm
4.35
4.35
9.93
61.83
0.1
915.60
Nos
cum
110
0.1
23.57
3085.80
day
day
day
0.24
0.56
1.89
420.00
375.00
320.00
Sqm
Sqm
4.35
4.35
9.93
87.78
1.1
91.56
water charges 1%
13.615% over heads and contractors profit -note
item 5 of standard data
Rate for 1 Cum
For 2nd Floor
Unit = 1 cum
A. MATERIALS:
No of blocks required for one cum of Masonry
Cost of Cement Mortar (1:6)
B. LABOUR
Mason 1st class
Mason 2nd class
Man Mazdoor
25% on labour
scafolding charges- Quantity for sqm with 0.23 cm
brick wall = 4.35Sqm
material charges
labour charges
25% on labour as per premble area allowances
lift charges
Add lift charges on FF lift charges 75.96 x 1.10
water charges 1%
13.615% over heads and contractors profit -note
item 5 of standard data
Rate for 1 Cum
Page 56 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
18
Manufacture,supply,delivery
of
MS
grill
gates,window ornamental safety grill, made with MS
flats,MS angles,MS squares etc including welding,
finishing, applying red oxide paint as primary coat
etc complete
Material
MS flats,MS angles,etc (As per Circular Memo
issued)
Labour for cutting bending shifting to site tying and
placing in position
labour charges for fixing
25% on labour as per premble area allowances
1.05
MT
45000.00
MT
24000
MT
4000
sqm
11
165.40
kg.
kg.
kg.
cum
cum
21.6
33
20
0.12
0.12
5.84
5.84
5.84
1460.81
0
day
day
day
3.1
1.1
0.86
420.00
375.00
320.00
Unit = 10 sqm
Page 57 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
20
sqm
10.5
96.00
kg.
kg.
cum
cum
cum
21.6
9.6
0.12
0.02
0.14
5.84
5.84
1460.81
1460.81
0
day
day
day
0.96
2.24
3.3
420.00
375.00
320.00
sqm
kg.
kg.
cum
cum
cum
10.5
21.6
9.6
0.12
0.02
0.14
96.10
5.84
5.84
1460.81
1460.81
0
day
day
day
0.96
2.24
3.3
420.00
375.00
320.00
Page 58 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
sqm
10.5
275.60
kg.
kg.
cum
cum
cum
21.6
9.6
0.12
0.02
0.14
5.84
0
1460.81
1460.81
0
day
day
day
0.96
2.24
3.3
420.00
375.00
320.00
sqm
10.05
314.00
kg.
kg.
kg.
kg.
cum
28.8
33
6
5.84
5.84
5.84
0
1460.81
Page 59 of 145
0.12
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
cum
0.12
day
day
day
0.96
2.24
3.3
375.00
320.00
320.00
sqm
10.1
1123.00
kg.
kg.
kg.
cum
cum
cum
21.6
33
6
0.12
0.02
0.14
5.84
5.84
5.84
1460.81
1460.81
day
day
day
0.96
2.24
3.3
420.00
375.00
320.00
Page 60 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
25
Flooring with ceramic tiles, set over base coat of
cement mortar (1:8), 12 mm thick over CC bed
already laid or RCC roof slab, including neat cement
slurry of honey like consistency spread @ 3.3.kgs
per sqm & jointed neatly with white cement paste to
full depth mixed with pigment of matching shade,
including cost of all materials like cement, sand
water and tiles etc., complete, including seignioRate
charges, etc., complete for finished item of work,
Unit = 10 sqm
A. MATERIALS:
Ceramic tiles
Cement for CM (1:8) for base coat
Cement for slurry
White cement P104
Sand for CM (1:8)
SeignioRate charges of sand
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
25% on labour on Rs. 1237.48 x 25%
sqm
kg.
kg.
kg.
cum
cum
10.1
21.6
33
2
0.12
0.12
660.00
5.84
5.84
36.00
1460.81
day
day
day
0.96
2.24
3.3
420.00
375.00
320.00
sqm
10.1
0.00
kg.
kg.
kg.
cum
cum
28.8
33
6
0.12
0.12
5.84
5.84
36.00
1460.81
Page 13
Page 61 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
day
day
day
0.96
2.24
3.3
420.00
375.00
320.00
sqm
10.05
0.00
kg.
kg.
kg.
kg.
cum
cum
28.8
33
6
0.12
0.12
5.84
5.84
5.84
0
1460.81
0
day
day
day
0.96
2.24
3.3
375.00
320.00
320.00
Page 62 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
28
sqm
kg.
kg.
cum
cum
cum
10.5
21.6
9.6
0.12
0.02
0.14
2767.00
5.84
5.84
1460.81
1460.81
0
day
day
day
0.96
2.24
3.3
420.00
375.00
320.00
30
Page 63 of 145
cum
10 sqm
1
4467.42
1 1574.5121
cum
10 sqm
kg
1
1
10
4467.42
1574.51
50.00
Nos
1.1
320.00
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
31
Providing skirting to internal walls to 15 cm
height/risers of steps with ceramic tiles 7.30 mm
thick length equal to flooring stones, set over base
coat of CM (1:3) 12 mm thick with cement slurry of
honey like consistency spread at the rate of 3.30
kgs per sqm and jointed with white cement paste
mixed with pigment of matching shade to full depth,
including cost of all materials like tiles, cement,
sand and water etc., complete including seignioRate
charges, etc., complete for finished item of work,
Unit = 10 sqm
A. MATERIALS:
Ceramic tiles 7.30 mm thick Page 13 item 37
Sand for cm 1:3 base coat
Cement for cm 1:3 base coat
Cement for slurry
White cement for jointing & pointing
SeignioRate charges of sand
B. LABOUR
Mason 1st class
Mazdoor (unskiled)
25% on labour
sqm
cum
kgs
kgs
kgs
cum
10
0.12
57.6
33
6
0.12
660.00
1460.81
5.84
5.84
36.00
day
day
0.77
0.8
420.00
320.00
kg
1.7
90.00
day
1.2
420.00
0.01
504.00
Page 64 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
Page 65 of 145
Lts
Nos
Nos
Lts
Nos
Nos
571.05
0.5
0.08
0.19
1.7
0.36
0.84
0.25
210.00
420.00
375.00
90.00
420.00
375.00
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
Page 66 of 145
kg
165.00
day
0.7
420.00
0.005
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
35
Page 67 of 145
kg
53.00
day
day
606.00
0.3
1.5
0.25
0.01
420.00
320.00
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
36
B. LABOUR
Painter
Mazdoor (unskilled)
25% on labour
Sundries including brushes, soaps, putty etc.,
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
First Floor
Basic Rate
Scaffolding charges
Material
Labour
25% on labour
13.615% over heads and contractors profit
Rate for 1 0 Sqm
Rate for 1 Sqm
Second Floor
Basic Rate
Scaffolding charges
Material
Labour
25% on labour
13.615% over heads and contractors profit
Rate for 1 0 Sqm
Rate for 1 Sqm
Page 68 of 145
kg
3.5
53.00
day
day
690.00
0.5
1.5
0.25
0.01
420.00
320.00
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
37
Page 69 of 145
kg
day
day
1
0.21
0.49
165.00
420.00
375.00
kg
3.5
53.00
day
day
day
946.20
0.15
0.35
1.5
0.25
420.00
375.00
320.00
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
38
0.7
158.00
day
110.60
0.7
0.25
420.00
0.01
Page 70 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
39
Page 71 of 145
0.7
142.00
day
0.7
420.00
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
40
Painting with Synthetic Enamel paints - One Coat for New Wood Work, Old Wood Work & New Iron
Work including cost and conveyance of all materials
to work site and all operational, incidental, labour
charges etc. complete for finished item of work as
per SS
A. MATERIALS :
Synthetic Emamel paint (at 20 sqm / litre as per
British Paints (I) Ltd.
Page 26 item
378
B. LABOUR
Painter
25% on labour
Sundries including brushes, soap, putty etc.,
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
First Floor
Basic Rate
Scaffolding charges
Material
Labour
25% on labour
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
Second Floor
Basic Rate
Scaffolding charges
Material
Labour
25% on labour
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
Page 72 of 145
0.7
276.00
day
0.7
420.00
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
41
Painting with Synthetic Enamel paints - One Coat For Old Iron Work including cost and conveyance of
all materials to work site and all operational,
incidental, labour charges etc. complete for finished
item of work as per SS
A. MATERIALS :
Synthetic Emamel paint (at 20 sqm / litre as per
British Paints (I) Ltd.
B. LABOUR
Painter
25% on labour
Sundries including brushes, soap, putty etc.,
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
First Floor
Basic Rate
Scaffolding charges
Material
Labour
25% on labour
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
Second Floor
Basic Rate
Scaffolding charges
Material
Labour
25% on labour
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
Page 73 of 145
0.5
276.00
day
0.7
420.00
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
42
Painting with Synthetic Enamel paints - Two Coats for New Wood Work including cost and conveyance
of all materials to work site and all operational,
incidental, labour charges etc. complete for finished
item of work as per SS
A. MATERIALS :
Synthetic Emamel paint (at 20 sqm / litre as per
British Paints (I) Ltd.
B. LABOUR
Painter
25% on labour
Sundries including brushes, soap, putty etc.,
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
First Floor
Basic Rate
Scaffolding charges
Material
Labour
25% on labour
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
Second Floor
Basic Rate
Scaffolding charges
Material
Labour
25% on labour
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
Page 74 of 145
1.2
276.00
day
1.2
420.00
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
43
Painting with Synthetic Enamel paints - Two Coats For Old Wood Work including cost and conveyance
of all materials to work site and all operational,
incidental, labour charges etc. complete for finished
item of work as per SS
A. MATERIALS :
Synthetic Emamel paint (at 20 sqm / litre as per
British Paints (I) Ltd.
B. LABOUR
Painter
25% on labour
Sundries including brushes, soap, putty etc.,
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
First Floor
Basic Rate
Scaffolding charges
Material
Labour
25% on labour
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
Second Floor
Basic Rate
Scaffolding charges
Material
Labour
25% on labour
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
Page 75 of 145
1.1
276.00
day
1.2
420.00
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
44
Painting with Synthetic Enamel paints - Two Coats For New Iron Work including cost and conveyance
of all materials to work site and all operational,
incidental, labour charges etc. complete for finished
item of work as per SS
A. MATERIALS :
A. MATERIALS :
Synthetic Emamel paint (at 20 sqm / litre as per
British Paints (I) Ltd.
B. LABOUR
Painter
25% on labour
Sundries including brushes, soap, putty etc.,
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
First Floor
Basic Rate
Scaffolding charges
Material
Labour
25% on labour
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
Second Floor
Basic Rate
Scaffolding charges
Material
Labour
25% on labour
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
Page 76 of 145
1.1
276.00
day
1.1
420.00
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
45
Painting with Synthetic Enamel paints - Two Coats For Old Iron Work including cost and conveyance
of all materials to work site and all operational,
incidental, labour charges etc. complete for finished
item of work as per SS
A. MATERIALS :
Synthetic Emamel paint (at 20 sqm / litre as per
British Paints (I) Ltd.
B. LABOUR
Painter
25% on labour
Sundries including brushes, soap, putty etc.,
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
First Floor
Basic Rate
Scaffolding charges
Material
Labour
25% on labour
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
Second Floor
Basic Rate
Scaffolding charges
Material
Labour
25% on labour
13.615% over heads and contractors profit
Total cost for 10 sqm
Rate for 1 Sqm
Page 77 of 145
0.9
276.00
day
1.1
420.00
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
46
Page 78 of 145
kg
36.00
day
day
0.3
1.5
420.00
320.00
678.00
0.01
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
47
Page 79 of 145
kg
3.5
36.00
day
day
0.5
1.5
420.00
320.00
690.00
0.01
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
48
Page 80 of 145
6.5
1.1
0.15
10
2
Kg
Sq.m
Kg
Rm
Nos.
321.00
644.00
600.00
2.00
60.00
0.096
0.289
0.096
0.096
0.289
0.096
0.25
day
day
day
day
day
day
420.00
375.00
375.00
375.00
320.00
400.00
351.58
0.771
0.771
0.01
Hrs
Hrs
125.00
116.00
185.81
0.13615
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
49
Page 81 of 145
7
0.55
0.55
10
0.15
Kg
Sq.m
Kg
Rm
Kg
321.00
762.00
558.00
2.00
600.00
0.434
0.434
0.043
0.058
0.145
0.072
0.25
day
day
day
day
day
day
420.00
375.00
375.00
375.00
320.00
400.00
458.11
0.347
0.463
0.01
Hrs
Hrs
125.00
116.00
97.08
0.13615
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
50
Page 82 of 145
7
0.55
0.55
10
0.15
Kg
Sq.m
Sq.m
Rm
Kg
321.00
762.00
644.00
2.00
600.00
0.434
0.434
0.043
0.058
0.145
0.072
0.25
day
day
day
day
day
day
420.00
375.00
375.00
375.00
320.00
400.00
458.11
0.347
0.463
0.01
Hrs
Hrs
125.00
116.00
97.08
0.13615
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
51
8
0.55
0.55
10
0.15
2
0
3
Kg
Sq.m
Sq.m
Rm
Kg
Nos
0.099
0.198
0.099
0.099
0.297
0.099
0.25
day
day
day
day
day
day
420.00
375.00
375.00
375.00
320.00
400.00
324.72
0.793
0.793
0.01
Hrs
Hrs
125.00
116.00
191.11
0.13615
Door-Single
Page 83 of 145
Nos
321
762
644
2
650
82
0
128
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
52
Output
a) Material
Cost of Precast RCC Door Frame (LR)
30 mm thick Solid Block Board Shutter with
Commercial Ply on both sides
Sal Wood Reaper (50x30 mm)
Aluminium Butt Hinges,125 mm
Aluminium Handles,125mm
Aluminium Aldrops,250 mm
Aluminium Tower Bolts, 150 mm
MS Screws 40 mm
b) Labour
Carpenter-I Class
Carpenter-II Class
Mazdoor
25% on labour
Sub Total
c) Overheads & Contractors Profit
Total
Rate per Sq.m for Precast Door Frame with 30 mm
thick Flush Shutter
Page 84 of 145
Sqm
Rm
325.00
2.2
Sq.m
1314.00
0.007
6
2
2
2
40
Cum
Nos
Nos
Nos
Nos
Nos
51994.00
159.00
126.00
391.00
114.00
0.20
0.165
0.385
0.55
0.25
Day
Day
Day
420.00
375.00
320.00
389.68
0.13615
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
53
Page 85 of 145
1.68
Sq.m
1.68
Sq.m
1250.00
2.2
Sq.m
1088.00
0.007
6
2
2
40
3
Cum
Nos
Nos
Nos
Nos
Nos
51994.00
111.00
75.00
77.00
0.20
144.00
0.165
0.385
0.55
0.25
Day
Day
Day
420.00
375.00
320.00
1583.68
0.13615
sqm
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
54
55
0.127
2
Cum
Sqm
51994.00
685.00
0.01
Ls
7973.24
Nos
159.00
Nos
141.00
1
1
No
No
391.00
84.00
0.072
0.92
Cum
Sqm
51994.00
441.00
1.8
Sqm
685.00
0.01
Ls
5382.29
6
12
3
Nos
Nos
No
141.00
165.00
144.00
Page 86 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
56
11
22.03
22.03
22.03
Sqm
Nos
Nos
Nos
222.00
10.00
1.00
1.00
B) Labour
Carpenter II Class
Man Mazdoor
0.43
0.54
Day
Day
375.00
320.00
0.25
334.05
57
1
2
3
4
A) Materials
1 mm thick PVC sheet
8 mm dia , G.I J Bolts & Nuts
G.I. washers
Bitemen Washers.
1
2
11
22.03
22.03
22.03
Sqm
Nos
Nos
Nos
320.00
10.00
1.00
1.00
B) Labour
Carpenter II Class
Man Mazdoor
0.43
0.54
Day
Day
375.00
320.00
0.25
334.05
Page 87 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
48
524.29
Kgs
Nos
18.70
18.25
0.24
0.56
1.89
0.25
Day
Day
Day
420.00
375.00
320.00
705.60
Kgs
82.00
0.155
0.155
Kg/Rmt
Kg
82.00
22.00
1
1
1
0.25
Kg
Kg
Kg
45.00
21.00
19.00
40.00
Basic
Rate
13.615%
OH
water charges 1%
c) Overheads & Contractors Profit
Rate per 1 cum
59
60
Page 88 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
61
226.00
293.00
402.00
30.77
39.89
54.73
Sqm
Sqm
Sqm
62
2861.00
389.53
Sqm
63
2503.00
340.78
Sqm
Man hours
21.00
27.00
Page 89 of 145
Labour
charges
per 8 Hr/
day
320.00
320.00
Rate per
3.5M incl.
25% MA
1050.00
1350.00
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
26.00
34.00
35.00
47.00
320.00
320.00
320.00
320.00
1300.00
1700.00
1750.00
2350.00
Unit : 10 Sqmts.
a.Material
2nd class bricks
CM (1:6)
Nos
Cum
512.00
0.20
0.00
0.00
b.Labour
Mason 1st Class
Mason 2nd Class
Mazdoor (Un skilled)
Add Agency Allowance
Day
Day
Day
25%
0.600
0.600
2.750
1249.25
385.00
345.00
295.00
Page 90 of 145
Datas 2014-2015
Buildings
Sl.no
Description
Unit
Qty
Rate in Rs.
Page 91 of 145
Datas 2014-2015
Buildings
1164.80
291.20
1456.00
198.23
1654.23
165.42
2662.40
665.60
16746.00
20074.00
2733.08
22807.08
95.03
Page 92 of 145
Datas 2014-2015
Buildings
Amount in
Rs.
6
1164.80
873.60
291.20
2329.60
317.18
2646.78
264.68
99.20
24.80
7864.86
7988.86
79.89
8068.75
1098.56
9167.31
1527.88
99.20
24.80
124.00
16.88
Page 93 of 145
Datas 2014-2015
Buildings
Amount in
Rs.
6
140.88
23.48
946.08
1447.14
657.36
0.00
0.00
338.60
42.00
444.80
121.70
123.60
4121.29
561.11
4682.40
756.86
1447.14
657.36
0.00
0.00
338.60
42.00
444.80
121.70
123.60
3932.07
535.35
4467.42
Page 94 of 145
Datas 2014-2015
Buildings
Amount in
Rs.
6
1760.34
657.36
2044.00
55.86
100.13
1152.00
327.00
338.60
7.58
46.02
123.60
6612.49
6612.49
277.00
473.00
118.25
7480.74
1018.50
8499.24
Page 95 of 145
Datas 2014-2015
Buildings
Amount in
Rs.
6
6612.49
1335.00
1141.00
285.25
9373.74
1276.23
10649.98
6612.49
315.00
753.00
188.25
7868.74
1071.33
8940.07
6612.49
900.29
7512.78
1760.34
657.36
2044.00
70.14
62.63
1504.00
409.19
338.60
7.58
46.02
123.60
7023.47
Page 96 of 145
Datas 2014-2015
Buildings
Amount in
Rs.
6
7023.47
229.00
1338.00
334.50
8924.97
1215.13
10140.10
7023.47
229.00
1338.00
334.50
8924.97
163.68
9088.64
1237.42
10326.06
7023.47
229.00
1472.00
368.00
9092.47
180.04
9272.51
1262.45
10534.96
7023.47
760.00
953.00
238.25
8974.72
1221.91
10196.62
Page 97 of 145
Datas 2014-2015
Buildings
Amount in
Rs.
6
7023.47
760.00
953.00
238.25
8974.72
163.68
9138.39
1244.19
10382.59
7023.47
760.00
1048.00
262.00
9093.47
180.04
9273.51
1262.59
10536.10
1760.34
657.36
2044.00
28.14
49.88
800.00
219.50
338.60
7.58
46.02
123.60
6075.03
6075.03
1013.84
847.09
211.77
8147.73
1109.31
Page 98 of 145
Datas 2014-2015
Buildings
Amount in
Rs.
6
9257.05
Page 99 of 145
Datas 2014-2015
Buildings
Amount in
Rs.
6
6075.03
1013.84
847.09
211.77
8147.73
87.80
8235.53
1121.27
9356.80
6075.03
1013.84
933.80
233.45
96.58
8352.70
1137.22
9489.92
6075.03
1875.00
1825.00
456.25
10231.28
1392.99
11624.27
6075.03
1875.00
1825.00
456.25
87.80
10319.08
1404.94
11724.02
Datas 2014-2015
Buildings
Amount in
Rs.
6
6075.03
1875.00
2012.50
503.13
96.58
10562.24
1438.05
12000.28
6075.03
1342.00
1122.00
280.50
8819.53
1200.78
10020.31
6075.03
1342.00
1122.00
280.50
8819.53
87.80
8907.33
1212.73
10120.06
6075.03
1342.00
1234.00
308.50
96.58
9056.11
1232.99
10289.10
6075.03
1342.00
1346.00
336.50
106.24
9205.77
Datas 2014-2015
Buildings
Amount in
Rs.
6
1253.37
10459.13
280.32
3026.54
292.16
100.80
210.00
604.80
228.90
4743.52
47.44
4790.96
652.29
5443.25
280.32
3026.54
292.16
100.80
210.00
604.80
228.90
43.20
268.96
67.24
91.56
5214.48
52.14
5266.62
717.05
5983.67
Datas 2014-2015
Buildings
Amount in
Rs.
6
280.32
3026.54
292.16
100.80
210.00
604.80
228.90
43.20
381.84
95.46
100.72
5364.74
53.65
5418.39
737.71
6156.10
673.11
252.00
307.20
139.80
1372.11
13.72
1385.83
188.68
1574.51
157.45
Datas 2014-2015
Buildings
Amount in
Rs.
6
673.11
252.00
307.20
139.80
9.90
61.80
15.45
55.92
1515.18
15.15
1530.33
208.35
1738.69
173.87
673.11
252.00
307.20
139.80
9.90
87.80
21.95
61.51
1553.27
15.53
1568.80
213.59
1782.40
178.24
Datas 2014-2015
Buildings
Amount in
Rs.
6
567.99
252.00
307.20
139.80
1266.99
12.67
1279.66
174.23
1453.89
145.39
567.99
252.00
307.20
139.80
9.90
61.80
15.45
55.92
1410.06
14.10
1424.16
193.90
1618.06
161.81
Datas 2014-2015
Buildings
Amount in
Rs.
6
567.99
252.00
307.20
139.80
9.90
87.80
21.95
61.51
1448.15
14.48
1462.63
199.14
1661.77
166.18
226.10
0.00
1238.22
1925.70
3360.00
0.00
3200.00
1640.00
677.20
12267.22
122.67
12389.89
1686.88
Datas 2014-2015
Buildings
Amount in
Rs.
6
14076.78
1407.68
942.35
150.00
277.20
577.50
1184.00
509.68
3640.73
36.41
3677.14
500.64
4177.78
417.78
2592.52
308.58
100.80
210.00
604.80
228.90
4045.60
550.81
4596.40
Datas 2014-2015
Buildings
Amount in
Rs.
6
2592.52
308.58
100.80
210.00
604.80
228.90
43.20
268.96
67.24
91.56
4516.55
45.17
4561.72
621.08
5182.80
2592.52
308.58
100.80
210.00
604.80
228.90
43.20
381.84
95.46
100.72
4666.81
46.67
4713.48
641.74
5355.22
Datas 2014-2015
Buildings
Amount in
Rs.
6
47250.00
24000.00
4000.00
7000.00
82250.00
11198.34
93448.34
93.45
1819.40
126.14
192.72
116.80
175.30
0.00
1302.00
412.50
275.20
497.43
4917.49
49.17
4966.66
676.21
5642.87
564.29
Datas 2014-2015
Buildings
Amount in
Rs.
6
1008.00
126.14
56.06
175.30
29.22
0.00
0.00
403.20
840.00
1056.00
574.80
4268.72
42.69
4311.41
587.00
4898.41
489.84
1009.05
126.14
56.06
175.30
29.22
0.00
0.00
403.20
840.00
1056.00
574.80
4269.77
42.70
4312.47
587.14
Datas 2014-2015
Buildings
Amount in
Rs.
6
4899.61
489.96
2893.80
126.14
0.00
175.30
29.22
0.00
0.00
403.20
840.00
1056.00
574.80
6098.46
60.98
6159.44
838.61
6998.05
699.80
3155.70
168.19
192.72
35.04
0.00
175.30
Datas 2014-2015
Buildings
Amount in
Rs.
6
0.00
360.00
716.80
1056.00
533.20
6392.95
63.93
6456.88
879.10
7335.98
733.60
11342.30
126.14
192.72
35.04
175.30
29.22
0.00
0.00
403.20
840.00
1056.00
574.80
14774.72
147.75
14922.46
2031.69
16954.16
1695.42
Datas 2014-2015
Buildings
Amount in
Rs.
6
6666.00
126.14
192.72
72.00
175.30
0.00
0.00
403.20
840.00
1056.00
574.80
10106.16
101.06
10207.22
1389.71
11596.94
1159.69
0.00
168.19
192.72
216.00
175.30
0.00
0.00
Datas 2014-2015
Buildings
Amount in
Rs.
6
403.20
840.00
1056.00
574.80
3626.21
36.26
3662.47
498.65
4161.12
416.11
0.00
168.19
192.72
35.04
0.00
175.30
0.00
360.00
716.80
1056.00
533.20
3237.25
32.37
3269.62
445.16
3714.78
371.48
Datas 2014-2015
Buildings
Amount in
Rs.
6
29053.50
126.14
56.06
175.30
29.22
0.00
0.00
403.20
840.00
1056.00
574.80
32314.22
323.14
32637.36
4443.58
37080.94
3708.09
4467.42
1574.51
6041.93
604.19
4467.42
1574.51
500.00
0.00
352.00
6893.93
689.39
Datas 2014-2015
Buildings
Amount in
Rs.
6
6600.00
175.30
336.38
192.72
216.00
0.00
323.40
256.00
144.85
8244.65
1122.51
9367.16
936.72
153.00
504.00
126.00
5.04
788.04
107.29
895.33
89.53
788.04
0.99
6.18
1.55
796.76
108.48
Datas 2014-2015
Buildings
Amount in
Rs.
6
905.23
90.52
788.04
0.99
8.78
1.93
740.55
100.83
841.38
84.14
105.00
33.60
71.25
153.00
151.20
315.00
142.76
971.81
132.31
1104.12
110.41
971.81
0.99
6.18
1.55
980.53
133.50
1114.03
111.40
971.81
0.99
8.78
2.20
Datas 2014-2015
Buildings
Amount in
Rs.
6
983.78
133.94
1117.72
111.77
165.00
294.00
73.50
1.30
533.80
72.68
606.48
60.65
533.80
0.99
6.18
1.55
542.52
73.86
616.38
61.64
533.80
0.99
8.78
2.20
545.77
74.31
620.07
62.01
Datas 2014-2015
Buildings
Amount in
Rs.
6
106.00
126.00
480.00
151.50
1.06
864.56
117.71
982.27
98.23
864.56
0.99
6.18
1.55
873.28
118.90
992.17
99.22
864.56
0.99
8.78
2.20
876.53
119.34
995.86
99.59
Datas 2014-2015
Buildings
Amount in
Rs.
6
185.50
210.00
480.00
172.50
1.86
1049.86
142.94
1192.79
119.28
1049.86
0.99
6.18
1.55
1058.57
144.12
1202.69
120.27
1049.86
0.99
8.78
2.20
1061.82
144.57
1206.39
120.64
Datas 2014-2015
Buildings
Amount in
Rs.
6
165.00
88.20
183.75
185.50
63.00
131.25
480.00
236.55
1533.25
208.75
1742.00
174.20
1533.25
0.99
6.18
1.55
1541.97
209.94
1751.90
175.19
1533.25
0.99
8.78
2.20
1545.22
210.38
1755.60
175.56
Datas 2014-2015
Buildings
Amount in
Rs.
6
110.60
294.00
27.65
432.25
1.11
433.36
59.00
492.36
49.24
432.25
0.99
6.18
1.55
440.97
60.04
501.00
50.10
432.25
0.99
8.78
2.20
444.22
60.48
504.69
50.47
Datas 2014-2015
Buildings
Amount in
Rs.
6
99.40
294.00
73.50
466.90
0.99
467.89
63.70
531.60
53.16
467.89
0.99
6.18
1.55
476.61
64.89
541.50
54.15
467.89
0.99
8.78
2.20
479.86
65.33
545.19
54.52
Datas 2014-2015
Buildings
Amount in
Rs.
6
193.20
294.00
73.50
560.70
5.61
566.31
77.10
643.41
64.34
566.31
0.99
6.18
1.55
575.02
78.29
653.31
65.33
566.31
0.99
8.78
2.20
578.27
78.73
657.00
65.70
Datas 2014-2015
Buildings
Amount in
Rs.
6
138.00
294.00
73.50
505.50
5.06
510.56
69.51
580.07
58.01
510.56
0.99
6.18
1.55
519.27
70.70
589.97
59.00
510.56
0.99
8.78
2.20
522.52
71.14
593.66
59.37
Datas 2014-2015
Buildings
Amount in
Rs.
6
331.20
504.00
126.00
961.20
9.61
970.81
132.18
1102.99
110.30
970.81
0.99
6.18
1.55
979.53
133.36
1112.89
111.29
970.81
0.99
8.78
2.20
982.78
133.81
1116.58
111.66
Datas 2014-2015
Buildings
Amount in
Rs.
6
303.60
504.00
126.00
933.60
9.34
942.94
128.38
1071.32
107.13
942.94
0.99
6.18
1.55
951.65
129.57
1081.22
108.12
942.94
0.99
8.78
2.20
954.90
130.01
1084.91
108.49
Datas 2014-2015
Buildings
Amount in
Rs.
6
303.60
462.00
115.50
881.10
8.81
889.91
121.16
1011.07
101.11
889.91
0.99
6.18
1.55
898.63
122.35
1020.97
102.10
889.91
0.99
8.78
2.20
901.88
122.79
1024.67
102.47
Datas 2014-2015
Buildings
Amount in
Rs.
6
248.40
462.00
115.50
825.90
8.26
834.16
113.57
947.73
94.77
834.16
0.99
6.18
1.55
842.87
114.76
957.63
95.76
834.16
0.99
8.78
2.20
846.12
115.20
961.32
96.13
Datas 2014-2015
Buildings
Amount in
Rs.
6
72.00
126.00
480.00
151.50
6.78
836.28
113.86
950.14
95.01
836.28
0.99
6.18
1.55
845.00
115.05
960.04
96.00
836.28
0.99
8.78
2.20
848.25
115.49
963.73
96.37
Datas 2014-2015
Buildings
Amount in
Rs.
6
126.00
210.00
480.00
172.50
6.90
995.40
135.52
1130.92
113.09
995.40
0.99
6.18
1.55
1004.12
136.71
1140.83
114.08
995.40
0.99
8.78
2.20
1007.37
137.15
1144.52
114.45
Datas 2014-2015
Buildings
Amount in
Rs.
6
2086.50
708.40
90.00
20.00
120.00
40.32
108.38
36.00
36.00
92.48
38.40
87.89
96.38
89.44
1.86
3652.04
497.22
4149.26
4149.26
Sq.m
Datas 2014-2015
Buildings
Amount in
Rs.
6
2247.00
419.10
306.90
20.00
90.00
182.28
162.75
16.13
21.75
46.40
28.80
114.53
43.38
53.71
0.97
3753.69
511.06
4264.75
4264.75
Sq.m
Datas 2014-2015
Buildings
Amount in
Rs.
6
2247.00
419.10
354.20
20.00
90.00
182.28
162.75
16.13
21.75
46.40
28.80
114.53
43.38
53.71
0.97
3800.99
517.50
4318.49
4318.49
Sq.m
Datas 2014-2015
Buildings
Amount in
Rs.
6
2568.00
419.10
354.20
20.00
97.50
164.00
0.00
384.00
0.00
41.58
74.25
37.13
37.13
95.04
39.60
81.18
99.13
91.99
1.91
4605.72
627.07
5232.79
5232.79
Sq.m
Datas 2014-2015
Buildings
Amount in
Rs.
6
1950.00
2890.80
363.96
954.00
252.00
782.00
228.00
8.00
0.00
69.30
144.38
176.00
97.42
7915.85
1077.74
8993.59
4496.80
Sq.m
Datas 2014-2015
Buildings
Amount in
Rs.
6
2100.00
2393.60
363.96
666.00
150.00
154.00
8.00
432.00
0.00
69.30
144.38
176.00
395.92
7053.15
960.29
8013.44
4006.72
Datas 2014-2015
Buildings
Amount in
Rs.
6
6603.24
1370.00
79.73
342.50
954.00
423.00
391.00
84.00
10247.47
4066.46
553.65
4620.10
3743.57
405.72
1233.00
53.82
308.25
846.00
1980.00
432.00
9002.36
5001.31
680.93
5682.24
Datas 2014-2015
Buildings
Amount in
Rs.
6
2442.00
220.30
22.03
22.03
161.25
172.80
83.51
3123.92
425.32
3549.24
10 Sqm
354.92
3520.00
220.30
22.03
22.03
161.25
172.80
83.51
4201.92
572.09
4774.01
10 Sqm
477.40
Datas 2014-2015
Buildings
Amount in
Rs.
6
897.60
9568.29
100.80
210.00
604.80
176.40
11557.89
115.58
11673.47
1589.34
13262.81
12.71
3.41
0.85
16.97
2.31
19.28
45.00
21.00
19.00
10.00
95.00
12.93
107.93
Total Cost
Datas 2014-2015
Buildings
Amount in
Rs.
6
256.77
332.89
456.73
3250.53
2843.78
Rate per 1 M
incl. 25% MA
300.00
385.71
Datas 2014-2015
Buildings
Amount in
Rs.
6
371.43
485.71
500.00
671.43
0.00
0.00
0.00
231.00
207.00
811.25
312.31
1561.56
Datas 2014-2015
Buildings
Amount in
Rs.
6
Sl.No.
Description of item
Pg.No
39 of C/c
Sand
Upto 5 KM
Beyond 5KM i.e. 6-30KM (25KM)
Beyond 30KM i.e. 31-83KM (53KM)
Total
39 of C/c
Bricks
Upto 5 KM
Total
39 of C/c
Fal-G Bricks
Upto 5 KM
Total
39 of C/c
Gravel/Morrum/Boulder (OTG)
Upto 5 KM
Beyond 5KM i.e. 6-13KM (8KM)
Total
39 of C/c
Lead in
KM
Rate per
KM
72
1
25
42
82.70
12.40
10.30
83
1
25
53
82.70
12.40
10.30
5
1
132.90
5
1
0.13
13
1
8
82.70
12.40
Amount
82.70
310.00
432.60
825.30
82.70
310.00
545.90
938.60
132.90
132.90
0.13
0.13
82.70
99.20
181.90
102.80
15.70
118.50
51.40
15.70
67.10
212.00
212.00
424.00
0.424