Evenly broadcast about 60% of the material onto the base substrate.
2.
Wait until the colour of the PYEFLOOR HARDENER NS darkens from the absorption of the
moisture from the base substrate.
3.
Lightly compact the material using a mechanical power floating machine, at a low
speed, to prepare the surface for the second application of PYEFLOOR HARDENER NS. Do
not overwork the surface at this stage.
4.
Repeat the process again with the balance 40% of the material.
5.
Compact with mechanical power floating machine at a high speed until a dense finish is
achieved.
4.3 Curing
1.
2.
Polyethylene sheet must be used to protect the floor finish surface in case of rain.
All workers shall provide with PPE (Personal Protective Equipment) and shall be
Impervious gloves and barrier cream should be used when handling these
products.
If the product contacted with skin occurs, it must be removed before curing takes
place. Wash out with an industrial skin cleaner followed by plenty of soap & water.
The Safety Supervisor / Safety Officer shall ensure the workers understand the
safety regulations and explain in detail in particular hazards, where the workers are
working and the precaution to be taken their safety.
5.2 Environmental
All workers shall educate on good environmental management practices and well-
disciplined to environment.
The garbage bin shall be provided at the working area and Supervisor shall ensure
Safety team shall ensure that no open burning of construction or domestic wastes
is practiced.
All workers shall ensure that all tools and equipment machinery are in good
Spillage of component products should be absorbed onto earth, sand or other inert