Vous êtes sur la page 1sur 2

BUCKET ELEVATOR CALCULATION

yellow cell to be filled


No of buckets per sec

No of bucket per meter

Total No. of buckets

83.333

Filling precent, %

70.8

Bucket Volume in litre

32.1

Specific Weight of material, t/m3

Bucket Spacing (m)

0.6

Centre to Centre Height,m

25

Belt Speed (m/sec), V

1.65

Head Pulley Dia (m)

0.555

Pulley RPM

56.775

Capacity, TPH

224.995

Power Rerquired, (kW)

30.653

Bucket Load, N

2.75

89 buckets
0.062499

or

1.65

Density x Vol of Bucket x No of Buckets x 9.81


13120.88

Dredging Load, N

90 x Weight of material in each bucket, kg


bucket spacing,m
4815

Total Load, N

17935.88