Vous êtes sur la page 1sur 25

VALORIZACION DE OBRA Nro 03 MES DE DICIEMBRE DEL 2014

RESUMEN DE VALORIZACION N 03
OBRA

: INST. DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA CALLA STA ROSA, CALLE LIBERTAD, PROLG. Av. JORGE BASADRE
OVALO Av. JORGE BASADRE Y LA ASOC. EL COCO DISTRITO DE POCOLLAY - TACNA - TACNA

PROPIETARIO

: MUNICIPALIDAD DISTRITAL DE POCOLLAY

CONTRATISTA

: CONSORCIO SANEAMIENTO TACNA I

INSPECTOR

: ING.VICTOR VELASQUEZ YUPANQUI

RESIDENTE

: ING. ULISES E. FRANCO SOTO

P. DE EJECUCION

: 180 DIAS CALENDARIOS

AD. DIRECTO C/IGV:

S/.

579,053.28

FECHA DEPOSITO:

AD. DE MATER. C/IGV:

S/.

328,022.18

FECHA DEPOSITO:

P. CONTRATO CON I.G.V.

S/.

2,895,266.41

ITEM

P. CONTRATO SIN I.G.V.

DESCRIPCION

ACUM. ANT.

S/.

VALORIZACION
MES ACTUAL
ACUM ACTUAL

1.00
1.01

CONTRACTUAL
VALORIZACION CONTRATO PRINCIPAL SIN IGV ( V )
V - 03 DICIEMBRE DEL 2014

1,238,888.53

556,299.41

1,795,187.94

2.00

TOTAL CONTRACTUAL

1,238,888.53

556,299.41

1,795,187.94

50.49%

22.6726391%

73.17%

PORCENTAJE DE AVANCE
3.00
3.01

REAJUSTES ( R )
V - 03 DICIEMBRE DEL 2014

0.00
0.00

0.00
0.00

0.00
0.00

4.00
4.01
4.02

DEDUCCIONES ( D )
POR ADELANTO DIRECTO
POR ADELANTO MATERIALES

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

5.00

VALORIZACION BRUTA ( VB = V + R - D)

1,238,888.53

556,299.41

1,795,187.94

6.00
6.01
6.02

AMORTIZACIONES ( A )
AMORTIZACION DEL ADELANTO DIRECTO
AMORTIZACION DEL ADELANTO PARA MATERIALES

314,002.43
247,777.71
66,224.72

186,105.88
111,259.88
74,846.00

500,108.31
359,037.59
141,070.72

7.00

VALORIZACION NETA ( VN = VB - A )

924,886.10

370,193.53

1,295,079.63

8.00
8.01
8.02

MONTO A PAGAR AL CONTRATISTA


EN EFECTIVO ( VN - S)
MONTO POR I.G.V. ( VN * 18% )

924,886.10
166,479.50

370,193.53
66,634.84

1,295,079.63
233,114.33

9.00

MONTO TOTAL CON I.G.V.

1,091,365.60

436,828.37

1,528,193.96

S/.

436,828.37

TOTAL A FACTURAR

490,723.12
277,984.90

RA Nro 03 MES DE DICIEMBRE DEL 2014


N DE VALORIZACION N 03

NTARILLADO EN LA CALLA STA ROSA, CALLE LIBERTAD, PROLG. Av. JORGE BASADRE TRAMO
O DISTRITO DE POCOLLAY - TACNA - TACNA

10/22/2014
11/5/2014
S/.

2,453,615.60
SALDO POR
VALORIZAR

658,427.66

658,427.66
26.83%

0.00
0.00
0.00
658,427.66
268,599.71
131,685.53
136,914.18

927,027.36

927,027.36
166,864.94
1,093,892.30

VALORIZACION DE OBRA Nro 03 MES DE DICIEMBRE DEL 2014


RESUMEN DE MONTOS BRUTOS VALORIZADOS
OBRA

: INST. DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA CALLA STA ROSA, CALLE LIBERTAD, PROLG. Av. JORGE BASADRE TRAMO OVALO Av. JORGE BASADRE Y LA ASOC. EL COCO DISTRIT

PROPIETARIO

: MUNICIPALIDAD DISTRITAL DE POCOLLAY

CONTRATISTA

: CONSORCIO SANEAMIENTO TACNA I

INSPECTOR

: ING.VICTOR VELASQUEZ YUPANQUI

RESIDENTE

: ING. ULISES E. FRANCO SOTO

P. CONTRATO SIN I.G.V.

:1,478,758.734

P. DE EJECUCION

: 180 DIAS CALENDARIOS

F.P.Nro

DESCRIPCION

: INST. DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA


CALLA STA ROSA, CALLE LIBERTAD, PROLG. Av. JORGE BASADRE
TRAMO OVALO Av. JORGE BASADRE Y LA ASOC. EL COCO
DISTRITO DE POCOLLAY - TACNA - TACNA
SUB TOTAL

MONTO BASE
sin IGV
S/.

ACUM ANTERIOR
EN S/.
EN %

VALORIZADO
MES ACTUAL
ACUM ACTUAL
EN S/.
EN %
EN S/.
EN %

2,453,615.60

1,238,888.53

50.49%

556,299.41

22.67%

1,795,187.94

2,453,615.60

1,238,888.53

50.49%

556,299.41

22.67%

1,795,187.94

73.17%

Nro 03 MES DE DICIEMBRE DEL 2014


NTOS BRUTOS VALORIZADOS

E LIBERTAD, PROLG. Av. JORGE BASADRE TRAMO OVALO Av. JORGE BASADRE Y LA ASOC. EL COCO DISTRITO DE POCOLLAY - TACNA - TACNA

VALORIZADO
SALDO
EN S/.

EN %

658,427.66

26.83%

658,427.66

26.83%

VALORIZACION DE OBRA N 03 MES DICIEMBRE DEL 2014


OBRA
PROPIETARIO
CONTRATISTA
INSPECTOR
RESIDENTE
P. DE EJECUCION

PARTIDA
01.00.00
01.01.00
01.02.00
01.03.00
01.04.00
01.05.00
01.06.00
01.07.00
01.08.00
01.08.01
01.08.02
02.00.00
02.01.00
02.01.01
02.01.02
02.02.00
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.02.07
02.03.00
02.03.01
02.03.02
02.03.03
02.04.00
02.04.01
02.04.02
02.04.03
02.04.04
02.04.05
02.04.06
02.04.07
02.04.08
02.04.09
02.04.10
02.04.11
02.04.12
02.04.13
02.04.14
02.04.15
02.04.16
02.05.00
02.05.01
02.05.02
02.05.03
02.05.04
02.05.05
02.05.06
02.05.07
02.05.08
02.05.09
02.05.10
02.06.00
02.06.01

: INST. DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA CALLA STA ROSA, CALLE LIBERTAD, PROLG. Av. JORGE BASADRE TRAMO OVALO Av. JORGE BASADRE Y LA ASOC. EL COCO DISTRITO DE POCOLLAY - TACNA - TACNA
: MUNICIPALIDAD DISTRITAL DE POCOLLAY
: CONSORCIO SANEAMIENTO TACNA I
: ING.VICTOR VELASQUEZ YUPANQUI
: ING. ULISES E. FRANCO SOTO
: 180 DIAS CALENDARIOS

DESCRIPCION
OBRAS PROVISIONALES
CARTEL DE OBRA TIPO GIGANTOGRAFIA DE 7.20 m x 2.40 m
CASETA DE ALMACEN, GUARDIANIA Y OFICINA
TRANSPORTE DE MATERIALES Y HERRAMIENTAS
PROTECCION EN CRUCE CON RED EXISTENTE DE AGUA POTABLE
CERCO PROVISIONAL DE MALLA HDPE DE 1M DE ALTURA
MANTENIMIENTO DE TRANSITO DURANTE LA EJECUCION DE LA OBRA
SEALIZACIONES PARA DESVIOS EN VIA
SEGURIDAD E HIGUIENE EN OBRA
PLAN DE SEGURIDAD Y SALUD EN OBRA
IMPLEMENTACION DE SERVICIOS HIGUIENICOS PORTABLES
RED DE AGUA
TRABAJOS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO
ROTURA DE PAVIMENTO FLEXIBLE
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA A MAQUINARIA DN 110 MM - 160MM HASTA 1.50m
REFINE Y NIVELACION DE ZANJA A=0.60M
PREPARACION DE CAMA DE APOYO MAT PRESTAMO DE 0.60X0.10
RELLENO Y COMPACTADO DE ZANJA C/MAT. SELECCIONADO
RELLENO COMPACTADO DE ZANJA C/MAT PROPIO
ACARREO DE MATERIAL EXCEDENTE D=30
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
SUMINISTRO E INSTALACION DE TUBERIAS
SUM E INST TUBERIA 160MM UF PVC CLASE 7.5
SUM E INST TUBERIA 110MM UF PVC CLASE 7.5
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS DE PVC DE 110mm
Y 160mm
SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE VALVULA 6''
SUMINISTRO E INSTALACION VALVULA DE 4''
SUMINISTRO E INSTALACION DE CODO DE 6'' X 22.5
SUMINISTRO E INSTALACION DE CODO DE 4'' X 22.5
SUMINISTRO E INSTALACION DE CODO HD 6'' X 90
SUMINISTRO E INSTALACION DE CODO HD 4'' X 90
SUMINISTRO E INSTALACION DE TEE HD 8'' X 6''
SUMINISTRO E INSTALACION DE TEE HD 6'' X 4''
SUMINISTRO E INSTALACION TEE HD 4''X4''
DADO DE CONCRETO F'C=140 KG/CM2 P/ACC TUBERIA DN 4'' Y DN 6"
GRIFO CONTRA INCENDIO TIPO POSTE DE 2 BOCAS
SUMINISTRO E INSTALACION DE CRUZ HD 6'' X 6''
SUMINISTRO E INSTALACION DE TAPON
SUMINISTRO E INSTALACION REDUCCION 160MM a 110MM FF
CAMARA REDUCTORA DE PRESION 6" I/ACCESORIOS
CAMARA CONCRETO f'c=210 KG/CM2 INC. VALVUA DE AIRE
CONEXIONES DOMICILIARIAS
EXCAVACION DE ZANJA MANUAL
REFINE Y NIVELACION DE ZANJA A=0.60M
PREPARACION DE CAMA DE APOYO MAT PRESTAMO DE 0.60X0.10
RELLENO Y COMPACTADO DE ZANJA C/MAT. SELECCIONADO
RELLENO COMPACTADO DE ZANJA C/MAT PROPIO
ACARREO DE MATERIAL EXCEDENTE D=30
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
CONEXION DOMICILIARIA PVC AGUA POTABLE DE 6" A 1/2"
CONEXION DOMICILIARIA AGUA POTABLE DE 4" x 1/2"
SUMINISTRO E INSTALACION DE TUBERIA PVC 1/2''
EMPALME A RED EXISTENTE
EXCAVACION DE ZANJA MANUAL

UND

MET.

PRESUPUESTO
PRECIO
PRECIO
UNITARIO
PARCIAL

AVANCE ACUM. ANTERIOR


METRADO
VALORIZ.
%

METRADO

EJECUTADO
AVANCE ACTUAL
VALORIZ.

METRADO

AVANCE ACUMULADO
VALORIZ.

und
m2
glb
und
m
glb
glb

2.00
100.00
1.00
4.00
3,612.04
1.00
1.00

1,417.57
44.20
8,650.00
22.89
3.73
4,200.00
7,500.00

2,835.14
4,420.00
8,650.00
91.56
13,472.91
4,200.00
7,500.00

2.00
100.00
1.00
1.00
3,010.56
0.60
0.60

2835.14
4420.00
8650.00
22.89
11229.39
2520.00
4500.00

100.00%
100.00%
100.00%
25.00%
83.35%
60.00%
60.00%

0.00
0.00
0.00
2.00
310.33
0.13
0.13

0.00
0.00
0.00
45.78
1,157.53
525.00
937.50

0.00%
0.00%
0.00%
50.00%
8.59%
12.50%
12.50%

2.00
100.00
1.00
3.00
3,320.89
0.73
0.73

2,835.14
4,420.00
8,650.00
68.67
12,386.92
3,045.00
5,437.50

glb
und

1.00
3.00

2,500.00
1,650.00

2,500.00
4,950.00

1.00
3.00

2500.00
4950.00

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

1.00
3.00

2,500.00
4,950.00

m
m2

6,407.71
76.24

1.07
16.74

6,856.25
1,276.26

6,407.71
76.24

6856.25
1276.26

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

6,407.71
76.24

6,856.25
1,276.26

m
m
m
m
m
m3
m3

6,407.71
6,407.71
6,407.71
6,407.71
6,407.71
1,614.74
1,614.74

5.60
2.35
5.06
19.21
10.42
19.96
24.54

35,883.18
15,058.12
32,423.01
123,092.11
66,768.34
32,230.21
39,625.72

2,982.54
2,982.54
2,982.54
0.00
0.00
751.60
751.60

16702.22
7008.97
15091.65
0.00
0.00
15001.94
18444.26

46.55%
46.55%
46.55%
0.00%
0.00%
46.55%
46.55%

2,058.36
2,058.36
2,058.36
5,040.90
5,040.90
518.71
518.71

11,526.82
4,837.15
10,415.30
96,835.69
52,526.18
10,353.39
12,729.14

32.12%
32.12%
32.12%
78.67%
78.67%
32.12%
32.12%

5,040.90
5,040.90
5,040.90
5,040.90
5,040.90
1,270.31
1,270.31

28,229.04
11,846.12
25,506.95
96,835.69
52,526.18
25,355.32
31,173.41

m
m
m

2,550.89
3,856.82
6,407.71

37.53
22.55
2.98

95,734.90
86,971.29
19,094.98

728.21
1,320.05
0.00

27329.72
29767.13
0.00

28.55%
34.23%
0.00%

1,822.68
1,169.96
5,040.90

68,405.18
26,382.60
15,021.88

71.45%
30.33%
78.67%

2,550.89
2,490.01
5,040.90

95,734.90
56,149.73
15,021.88

und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und

3.00
23.00
11.00
12.00
1.00
5.00
2.00
15.00
8.00
80.00
10.00
1.00
9.00
3.00
2.00
2.00

892.19
619.54
267.60
197.11
299.00
200.73
614.97
506.22
265.01
122.34
1,525.23
243.35
135.06
217.10
6,386.91
2,041.08

2,676.57
14,249.42
2,943.60
2,365.32
299.00
1,003.65
1,229.94
7,593.30
2,120.08
9,787.20
15,252.30
243.35
1,215.54
651.30
12,773.82
4,082.16

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

3.00
16.00
11.00
9.00
1.00
3.00
1.00
4.00
7.00
55.00
5.00
1.00
5.00
3.00
0.00
0.00

2,676.57
9,912.64
2,943.60
1,773.99
299.00
602.19
614.97
2,024.88
1,855.07
6,728.70
7,626.15
243.35
675.30
651.30
0.00
0.00

100.00%
69.57%
100.00%
75.00%
100.00%
60.00%
50.00%
26.67%
87.50%
68.75%
50.00%
100.00%
55.56%
100.00%
0.00%
0.00%

3.00
16.00
11.00
9.00
1.00
3.00
1.00
4.00
7.00
55.00
5.00
1.00
5.00
3.00
0.00
0.00

2,676.57
9,912.64
2,943.60
1,773.99
299.00
602.19
614.97
2,024.88
1,855.07
6,728.70
7,626.15
243.35
675.30
651.30
0.00
0.00

m
m
m
m
m
m3
m3
und
und
m

418.20
418.20
418.20
418.20
418.20
90.33
90.33
19.00
60.00
418.20

17.10
2.35
5.06
19.21
10.42
19.96
24.54
346.00
337.28
3.50

7,151.22
982.77
2,116.09
8,033.62
4,357.64
1,802.99
2,216.70
6,574.00
20,236.80
1,463.70

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

72.00

17.10

1,231.20

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

VALORIZACION DE OBRA N 03 MES DICIEMBRE DEL 2014


OBRA
PROPIETARIO
CONTRATISTA
INSPECTOR
RESIDENTE
P. DE EJECUCION

PARTIDA
02.06.02
02.06.03

: INST. DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA CALLA STA ROSA, CALLE LIBERTAD, PROLG. Av. JORGE BASADRE TRAMO OVALO Av. JORGE BASADRE Y LA ASOC. EL COCO DISTRITO DE POCOLLAY - TACNA - TACNA
: MUNICIPALIDAD DISTRITAL DE POCOLLAY
: CONSORCIO SANEAMIENTO TACNA I
: ING.VICTOR VELASQUEZ YUPANQUI
: ING. ULISES E. FRANCO SOTO
: 180 DIAS CALENDARIOS

DESCRIPCION
REFINE Y NIVELACION DE ZANJA A=0.60M
PREPARACION DE CAMA DE APOYO MAT PRESTAMO DE 0.60X0.10

UND
m
m

MET.
72.00
72.00

PRESUPUESTO
PRECIO
PRECIO
UNITARIO
PARCIAL
2.35
169.20
5.06
364.32

AVANCE ACUM. ANTERIOR


METRADO
VALORIZ.
%
0.00
0.00
0.00%
0.00
0.00
0.00%

EJECUTADO
AVANCE ACTUAL
METRADO
VALORIZ.
0.00
0.00
0.00
0.00

%
0.00%
0.00%

AVANCE ACUMULADO
METRADO
VALORIZ.
0.00
0.00
0.00
0.00

VALORIZACION DE OBRA N 03 MES DICIEMBRE DEL 2014


OBRA
PROPIETARIO
CONTRATISTA
INSPECTOR
RESIDENTE
P. DE EJECUCION

PARTIDA
02.06.04
02.06.05
02.06.06
02.06.07
02.06.08
02.07.00
02.07.01
02.07.02
02.07.03
03.00.00
03.01.00
03.01.01
03.01.02
03.01.03
03.02.00
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.02.07
03.02.08
03.02.09
03.02.10
03.02.11
03.02.12
03.02.13
03.03.00
03.03.01
03.03.02
03.04.00
03.04.01
03.04.02
03.04.03
03.04.04
03.04.05
03.04.06
03.04.07
03.05.00
03.05.01
03.05.02
03.05.03
03.05.04
03.05.05
03.05.06
03.05.07
03.05.08
03.05.09
03.06.00
03.06.01
03.06.02
03.06.03
04.00.00
04.01.00
04.02.00
04.03.00
04.03.01
04.03.02
04.03.03

: INST. DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA CALLA STA ROSA, CALLE LIBERTAD, PROLG. Av. JORGE BASADRE TRAMO OVALO Av. JORGE BASADRE Y LA ASOC. EL COCO DISTRITO DE POCOLLAY - TACNA - TACNA
: MUNICIPALIDAD DISTRITAL DE POCOLLAY
: CONSORCIO SANEAMIENTO TACNA I
: ING.VICTOR VELASQUEZ YUPANQUI
: ING. ULISES E. FRANCO SOTO
: 180 DIAS CALENDARIOS

PRESUPUESTO
PRECIO
PRECIO
UNITARIO
PARCIAL
19.16
1,379.52
10.42
750.24
485.24
2,426.20
194.46
388.92
1,663.90
3,327.80

UND

SOBRECAMA COMPACTADA DE ZANJA C/MAT PRESTAMO


RELLENO COMPACTADO DE ZANJA C/MAT PROPIO
EMPALME A RED DE AGUA POTABLE PVC - PVC D= 4"
EMPALME A RED DE AGUA POTABLE AC - PVC D= 6"
EMPALME A RED EXISTENTE DE 8''
REPOSICION DE PAVIMENTO FLEXIBLE EN FORMA MANUAL
BASE GRANULAR e=0.20m
IMPRIMACION ASFALTICA
CARPETA ASFALTICA DE 2"
RED DE DESAGUE
TRABAJOS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO
ROTURA DE PAVIMENTO FLEXIBLE
ENTIBADO DE ZANJAS EXCAVADAS (DOBLE CARA) 1.50 PROF PROMEDIO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA A MAQ. EN T. NORMAL TUB. DN=200mm HASTA
EXCAVACION DE ZANJA A MAQ. EN T. NORMAL TUB. DN=200mm HASTA
H=1.20
H=1.21 - 1.50mDE ZANJA A MAQ. EN T. NORMAL TUB. DN=200mm HASTA
EXCAVACION
H=1.51 - 1.75mDE ZANJA A MAQ. EN T. NORMAL TUB. DN=200mm HASTA
EXCAVACION
H=1.76 - 2.00mDE ZANJA A MAQ. EN T. NORMAL TUB. DN=200mm HASTA
EXCAVACION
H=2.01 - 2.50mDE ZANJA A MAQ. EN T. NORMAL TUB. DN=200mm HASTA
EXCAVACION
H=2.51 - 3.00m
REFINE Y NIVELACION FONDO ZANJA ALCANT. A=0.80
PREPARACION CAMA DE APOYO C/MAT. DE PRESTAMO 0.80X0.10M
SOBRECAMA COMPACTADA DE ZANJA C/MAT PRESTAMO
RELLENO CON MATERIAL PROPIO ZARANDEADO
EXCAVACION DE BUZONES A MANO
ACARREO DE MATERIAL EXCEDENTE D=30
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
SUMINISTRO E INSTALACION DE TUBERIAS
SUMINISTRO E INSTALACION DE TUB. PVC P/ALCANT. D=200mm UF
PRUEBA HIDRAULICA+DESINFECCION DE TUBERIA 200MM
BUZONES SANITARIOS DE INSPECCION
BUZON DE CONCRETO EN T. NORMAL H=1.01 - 1.25m
BUZON DE CONCRETO T. NORMAL H=1.26 - 1.50m
BUZON DE CONCRETO T. NORMAL H=1.51 - 1.75M
BUZON DE CONCRETO EN T. NORMAL H=1.76 - 2.00M
BUZON DE CONCRETO T. NORMAL H= 2.01 - 2.50M
BUZON DE CONCRETO T. NORMAL H=2.51 - 3.00M
EMPALME A BUZON EXISTENTE TUBERIA 8''
CONEXIONES DOMICILIARIAS
EXCAVACION DE ZANJA PARA DESAGUE
REFINE Y NIVELACION FONDO ZANJA ALCANT. A=0.80
PREPARACION CAMA DE APOYO C/MAT. DE PRESTAMO 0.80X0.10M
RELLENO COMPACTADO DE ZANJA C/MAT PRESTADO 0.80X0.30
RELLENO CON MATERIAL PROPIO ZARANDEADO
ACARREO DE MATERIAL EXCEDENTE D=30
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
CONEXION DOMICILIARIA DESAGUE PVC 6''
SUMINISTRO E INSTALACION DE TUBERIA PVC 6''
REPOSICION DE PAVIMENTO FLEXIBLE EN FORMA MANUAL
BASE GRANULAR e=0.20m
IMPRIMACION ASFALTICA
CARPETA ASFALTICA DE 2"
OBRAS DE ARTE
DEMOLICION DECANAL EXISTENTE
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA
REPOSICION DE CANAL EXISTENTE
CONCRETO f'c=210 kg/cm2 CANAL
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO DE CANAL

m
m
und
und
und

72.00
72.00
5.00
2.00
2.00

m2
m2
m2

76.24
76.24
76.24

20.52
12.82
41.91

1,564.44
977.40
3,195.22

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

m
m2
m

6,078.69
2,827.55
3,039.35

1.07
16.74
11.92

6,504.20
47,333.19
36,229.05

6,078.69
2,000.00
2,435.10

6504.20
33480.00
29026.39

100.00%
70.73%
80.12%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

6,078.69
2,000.00
2,435.10

6,504.20
33,480.00
29,026.39

m
m
m
m
m
m
m
m
m
m
m3
m3
m3

180.00
4,263.90
986.78
350.11
217.90
80.00
6,078.69
6,078.69
6,078.69
6,078.69
269.51
3,505.89
3,505.89

5.83
5.95
6.06
6.20
6.30
6.44
2.61
6.90
17.70
21.01
33.56
19.96
24.54

1,049.40
25,370.21
5,979.89
2,170.68
1,372.77
515.20
15,865.38
41,942.96
107,592.81
127,713.28
9,044.76
69,977.56
86,034.54

180.00
3,411.12
789.42
350.11
217.90
80.00
5,028.55
5,028.55
5,028.55
5,028.55
220.33
2,950.10
2,950.10

1049.40
20296.16
4783.91
2170.68
1372.77
515.20
13124.52
34697.00
89005.34
105649.84
7394.27
58884.00
72395.45

100.00%
80.00%
80.00%
100.00%
100.00%
100.00%
82.72%
82.72%
82.72%
82.72%
81.75%
84.15%
84.15%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

180.00
3,411.12
789.42
350.11
217.90
80.00
5,028.55
5,028.55
5,028.55
5,028.55
220.33
2,950.10
2,950.10

1,049.40
20,296.16
4,783.91
2,170.68
1,372.77
515.20
13,124.52
34,697.00
89,005.34
105,649.84
7,394.27
58,884.00
72,395.45

m
m

6,078.69
6,078.69

42.87
5.52

260,593.44
33,554.37

5,028.55
4,114.88

215573.94
22714.14

82.72%
67.69%

0.00
592.30

0.00
3,269.50

0.00%
9.74%

5,028.55
4,707.18

215,573.94
25,983.63

und
und
und
und
und
und
und

7.00
64.00
3.00
6.00
4.00
2.00
4.00

1,329.66
1,400.43
1,505.58
1,575.88
1,771.08
1,946.90
226.84

9,307.62
89,627.52
4,516.74
9,455.28
7,084.32
3,893.80
907.36

3.00
52.00
3.00
6.00
4.00
2.00
4.00

3988.98
72822.36
4516.74
9455.28
7084.32
3893.80
907.36

42.86%
81.25%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

3.00
52.00
3.00
6.00
4.00
2.00
4.00

3,988.98
72,822.36
4,516.74
9,455.28
7,084.32
3,893.80
907.36

m3
m
m
m
m
m3
m3
und
m

626.35
626.35
626.35
626.35
626.35
180.39
180.39
92.00
626.35

29.94
2.61
6.90
22.17
21.01
19.96
24.54
189.81
25.92

18,752.92
1,634.77
4,321.82
13,886.18
13,159.61
3,600.58
4,426.77
17,462.52
16,234.99

419.40
419.40
419.40
419.40
419.40
120.79
120.79
69.00
419.40

12556.84
1094.63
2893.86
9298.10
8811.59
2410.91
2964.19
13096.89
10870.85

66.96%
66.96%
66.96%
66.96%
66.96%
66.96%
66.96%
75.00%
66.96%

40.30
40.30
40.30
40.30
40.30
11.61
11.61
0.00
40.30

1,206.58
105.18
278.07
893.45
846.70
231.66
284.91
0.00
1,044.58

6.43%
6.43%
6.43%
6.43%
6.43%
6.43%
6.44%
0.00%
6.43%

459.70
459.70
459.70
459.70
459.70
132.39
132.40
69.00
459.70

13,763.42
1,199.82
3,171.93
10,191.55
9,658.30
2,642.58
3,249.10
13,096.89
11,915.42

m2
m2
m2

2,827.55
2,827.55
2,827.55

20.52
12.82
41.91

58,021.33
36,249.19
118,502.62

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

1,024.00
1,024.00
1,024.00

21,012.48
13,127.68
42,915.84

36.22%
36.22%
36.22%

1,024.00
1,024.00
1,024.00

21,012.48
13,127.68
42,915.84

m3
m3

52.62
52.62

9.98
24.54

525.15
1,291.29

0.00
0.00

0.00
0.00

0.00%
0.00%

52.62
52.62

525.15
1,291.29

100.00%
100.00%

52.62
52.62

525.15
1,291.29

m3
kg
m2

52.62
1,847.61
252.01

489.38
4.29
38.78

25,751.18
7,926.25
9,772.95

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

52.62
1,847.61
252.01

25,751.18
7,926.25
9,772.95

100.00%
100.00%
100.00%

52.62
1,847.61
252.01

25,751.18
7,926.25
9,772.95

MET.

AVANCE ACUM. ANTERIOR


METRADO
VALORIZ.
%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%

EJECUTADO
AVANCE ACTUAL
METRADO
VALORIZ.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

DESCRIPCION

%
0.00%
0.00%
0.00%
0.00%
0.00%

AVANCE ACUMULADO
METRADO
VALORIZ.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

VALORIZACION DE OBRA N 03 MES DICIEMBRE DEL 2014


OBRA
PROPIETARIO
CONTRATISTA
INSPECTOR
RESIDENTE
P. DE EJECUCION

PARTIDA
05.00.00
05.01.00
06.00.00
06.01.00
07.00.00
07.01.00

: INST. DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA CALLA STA ROSA, CALLE LIBERTAD, PROLG. Av. JORGE BASADRE TRAMO OVALO Av. JORGE BASADRE Y LA ASOC. EL COCO DISTRITO DE POCOLLAY - TACNA - TACNA
: MUNICIPALIDAD DISTRITAL DE POCOLLAY
: CONSORCIO SANEAMIENTO TACNA I
: ING.VICTOR VELASQUEZ YUPANQUI
: ING. ULISES E. FRANCO SOTO
: 180 DIAS CALENDARIOS

DESCRIPCION
VARIOS
CONCRETO F'C= 140KG/CM2 EN CAJA DOMIICILIARIA DE AGUA Y
DESAGUE
EDUCACION SANITARIA
EDUCACION SANITARIA
IMPACTO AMBIENTAL
MITIGACION DEL IMPACTO AMBIENTAL
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUB TOTAL
SUB TOTAL*F.RELACION (FR=1.00000)
IGV (18%)
SUB TOTAL DE PRESUPUESTO

UND
m3

MET.
7.06

PRESUPUESTO
PRECIO
PRECIO
UNITARIO
PARCIAL
306.68

2,165.16

AVANCE ACUM. ANTERIOR


METRADO
VALORIZ.
%
0.00

0.00

METRADO
0.00%

EJECUTADO
AVANCE ACTUAL
VALORIZ.

0.00

0.00

METRADO

AVANCE ACUMULADO
VALORIZ.

0.00%

0.00

0.00
10,664.99
5,148.00

glb

1.00

15,799.98

15,799.98

0.55

8689.99

55.00%

0.13

1,975.00

12.50%

0.68

glb

1.00

7,626.67

7,626.67

0.55

4194.67

55.00%

0.13

953.33

12.50%

0.68

10.00%
5.00%

2,133,578.78
213,357.88
106,678.94
2,453,615.60
2,453,615.60
441,650.81
2,895,266.41

1,077,294.37
107,729.44
53,864.72
1,238,888.53
1,238,888.53
222,999.94
1,461,888.47

50.49%

483,738.62
48,373.86
24,186.93
556,299.41
556,299.41
100,133.89
656,433.30

22.6726391%

1,561,032.99
156,103.30
78,051.65
1,795,187.94
1,795,187.94
323,133.83
2,118,321.77

OBRA N 03 MES DICIEMBRE DEL 2014

EJECUTADO

SALDO

AVANCE ACUMULADO
%

METRADO

VALORIZ.

100.00%
100.00%
100.00%
75.00%
91.94%
72.50%
72.50%

0.00
0.00
0.00
1.00
291.15
0.28
0.28

0.00
0.00
0.00
22.89
1,085.99
1,155.00
2,062.50

100.00%
100.00%

0.00
0.00

0.00
0.00

100.00%
100.00%

0.00
0.00

0.00
0.00

78.67%
78.67%
78.67%
78.67%
78.67%
78.67%
78.67%

1,366.81
1,366.81
1,366.81
1,366.81
1,366.81
344.43
344.43

7,654.14
3,212.00
6,916.06
26,256.42
14,242.16
6,874.89
8,452.31

100.00%
64.56%
78.67%

0.00
1,366.81
1,366.81

0.00
30,821.57
4,073.09

100.00%
69.57%
100.00%
75.00%
100.00%
60.00%
50.00%
26.67%
87.50%
68.75%
50.00%
100.00%
55.56%
100.00%
0.00%
0.00%

0.00
7.00
0.00
3.00
0.00
2.00
1.00
11.00
1.00
25.00
5.00
0.00
4.00
0.00
2.00
2.00

0.00
4,336.78
0.00
591.33
0.00
401.46
614.97
5,568.42
265.01
3,058.50
7,626.15
0.00
540.24
0.00
12,773.82
4,082.16

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

418.20
418.20
418.20
418.20
418.20
90.33
90.33
19.00
60.00
418.20

7,151.22
982.77
2,116.09
8,033.62
4,357.64
1,802.99
2,216.70
6,574.00
20,236.80
1,463.70

0.00%

72.00

1,231.20

OBRA N 03 MES DICIEMBRE DEL 2014

EJECUTADO

SALDO

AVANCE ACUMULADO
%

METRADO
0.00%
72.00
0.00%
72.00

VALORIZ.
169.20
364.32

OBRA N 03 MES DICIEMBRE DEL 2014

EJECUTADO

SALDO

AVANCE ACUMULADO
%

0.00%
0.00%
0.00%
0.00%
0.00%

METRADO
72.00
72.00
5.00
2.00
2.00

VALORIZ.
1,379.52
750.24
2,426.20
388.92
3,327.80

0.00%
0.00%
0.00%

76.24
76.24
76.24

1,564.44
977.40
3,195.22

100.00%
70.73%
80.12%

0.00
827.55
604.25

0.00
13,853.19
7,202.66

100.00%
80.00%
80.00%
100.00%
100.00%
100.00%
82.72%
82.72%
82.72%
82.72%
81.75%
84.15%
84.15%

0.00
852.78
197.36
0.00
0.00
0.00
1,050.14
1,050.14
1,050.14
1,050.14
49.18
555.79
555.79

0.00
5,074.04
1,195.98
0.00
0.00
0.00
2,740.87
7,245.97
18,587.48
22,063.44
1,650.48
11,093.57
13,639.09

82.72%
77.44%

1,050.14
1,371.51

45,019.50
7,570.74

42.86%
81.25%
100.00%
100.00%
100.00%
100.00%
100.00%

4.00
12.00
0.00
0.00
0.00
0.00
0.00

5,318.64
16,805.16
0.00
0.00
0.00
0.00
0.00

73.39%
73.39%
73.39%
73.39%
73.39%
73.39%
73.40%
75.00%
73.39%

166.65
166.65
166.65
166.65
166.65
48.00
47.99
23.00
166.65

4,989.50
434.96
1,149.89
3,694.63
3,501.32
958.01
1,177.67
4,365.63
4,319.57

36.22%
36.22%
36.22%

1,803.55
1,803.55
1,803.55

37,008.85
23,121.51
75,586.78

100.00%
100.00%

0.00
0.00

0.00
0.00

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

OBRA N 03 MES DICIEMBRE DEL 2014

EJECUTADO

SALDO

AVANCE ACUMULADO
%

METRADO

VALORIZ.

0.00%

7.06

2,165.16

67.50%

0.33

5,134.99

67.50%

0.33

2,478.67

73.17%

572,545.80
57,254.58
28,627.29
658,427.67
658,427.67
118,516.98
776,944.65

PLANILLA DE METRADOS DEL MES


OBRA
PROPIETARIO
CONTRATISTA
INSPECTOR
RESIDENTE
P. DE EJECUCION

ITEM
01.00.00
01.04.00

: INST. DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA CALLA STA ROSA, CALLE LIBERTAD, PROLG. Av. JORGE BASADRE TRAMO OVALO Av. JORGE
BASADRE Y LA ASOC. EL COCO DISTRITO DE POCOLLAY - TACNA - TACNA
: MUNICIPALIDAD DISTRITAL DE POCOLLAY
: CONSORCIO SANEAMIENTO TACNA I
: ING.VICTOR VELASQUEZ YUPANQUI
: ING. ULISES E. FRANCO SOTO
: 180 DIAS CALENDARIOS

N DE
VECES

DESCRIPCIN / DETALLE

LARGO

DIMENSIONES
ANCHO
ALTURA

OBRAS PROVISIONALES
PROTECCION EN CRUCE CON RED EXISTENTE DE AGUA POTABLE

01.07.00

02.00.00
02.02.00
02.02.01

02.02.02

02.02.03

02.02.04

02.02.05

02.02.06

02.02.07

02.03.00
02.03.01

02.03.02

02.03.03

02.04.00
02.04.01

02.04.02

02.04.03

02.04.04

02.04.05

02.04.06

02.04.07

02.04.08

02.04.09

2.00

CERCO PROVISIONAL DE MALLA HDPE DE 1M DE ALTURA

310.33
1.00

01.06.00

310.33

310.33

MANTENIMIENTO DE TRANSITO DURANTE LA EJECUCION DE LA OBRA

0.13
0.13

0.13

0.13

0.13

SEALIZACIONES PARA DESVIOS EN VIA

0.13

RED DE AGUA
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA A MAQUINARIA DN 110 MM - 160MM HASTA 1.50m
prolong. av. jorge basadre grohmann

2,058.36
1.00

2,058.36

2,058.36

prolong. av. jorge basadre grohmann

1.00

2,058.36

2,058.36

PREPARACION DE CAMA DE APOYO MAT PRESTAMO DE 0.60X0.10


prolong. av. jorge basadre grohmann

1.00

2,058.36

2,058.36

Tuberia P.V.C. 4"


Tuberia P.V.C. 6"

1.00
1.00

2,490.01
2,550.89

2,490.01
2,550.89

Tuberia P.V.C. 4"


Tuberia P.V.C. 6"

1.00
1.00

2,490.01
2,550.89

2,490.01
2,550.89

Volumen de acarreo

1.20

2,058.36

0.35

0.60

518.71

Volumen de eliminacion

1.20

2,058.36

0.35

0.60

518.71

prolong. av. jorge basadre grohmann

1.00

1,822.68

1,822.68

asoc. viv. el coco


av. jorge basadre grohmann

1.00
1.00

504.20
665.76

504.20
665.76

PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS DE PVC DE 110mm Y 160mm


Tuberia P.V.C. 4"
Tuberia P.V.C. 6"

1.00
1.00

2,490.01
2,550.89

2,490.01
2,550.89

REFINE Y NIVELACION DE ZANJA A=0.60M

RELLENO Y COMPACTADO DE ZANJA C/MAT. SELECCIONADO

RELLENO COMPACTADO DE ZANJA C/MAT PROPIO

2,058.36

2,058.36

5,040.90

5,040.90

ACARREO DE MATERIAL EXCEDENTE D=30

518.71

ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA

SUMINISTRO E INSTALACION DE TUBERIAS


SUM E INST TUBERIA 160MM UF PVC CLASE 7.5

SUM E INST TUBERIA 110MM UF PVC CLASE 7.5

518.71

1,822.68

1,169.96

5,040.90

SUMINISTRO E INSTALACION DE ACCESORIOS


SUMINISTRO E INSTALACION DE VALVULA 6''

3.00
3.00

3.00

16.00

16.00

11.00

11.00

9.00

9.00

1.00

1.00

3.00

3.00

1.00

1.00

4.00

4.00

SUMINISTRO E INSTALACION VALVULA DE 4''

16.00

SUMINISTRO E INSTALACION DE CODO DE 6'' X 22.5

11.00

SUMINISTRO E INSTALACION DE CODO DE 4'' X 22.5

9.00

SUMINISTRO E INSTALACION DE CODO HD 6'' X 90

1.00

SUMINISTRO E INSTALACION DE CODO HD 4'' X 90

3.00

SUMINISTRO E INSTALACION DE TEE HD 8'' X 6''

1.00

SUMINISTRO E INSTALACION DE TEE HD 6'' X 4''

SUMINISTRO E INSTALACION TEE HD 4''X4''

TOTAL

2.00
2.00

01.05.00

PARCIAL

4.00

7.00

PLANILLA DE METRADOS DEL MES


OBRA
PROPIETARIO
CONTRATISTA
INSPECTOR
RESIDENTE
P. DE EJECUCION

ITEM
02.04.10

02.04.11

02.04.12

02.04.13

02.04.14

03.00.00
03.03.00
03.03.02

03.05.00
03.05.01

03.05.02

03.05.03

03.05.04

03.05.05

03.05.06

03.05.07

03.05.09

03.06.00
03.06.01

03.06.02

03.06.03

04.00.00
04.01.00

04.02.00

04.03.00
04.03.01

: INST. DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA CALLA STA ROSA, CALLE LIBERTAD, PROLG. Av. JORGE BASADRE TRAMO OVALO Av. JORGE
BASADRE Y LA ASOC. EL COCO DISTRITO DE POCOLLAY - TACNA - TACNA
: MUNICIPALIDAD DISTRITAL DE POCOLLAY
: CONSORCIO SANEAMIENTO TACNA I
: ING.VICTOR VELASQUEZ YUPANQUI
: ING. ULISES E. FRANCO SOTO
: 180 DIAS CALENDARIOS

N DE
7.00

DESCRIPCIN / DETALLE

DIMENSIONES

PARCIAL
7.00

DADO DE CONCRETO F'C=140 KG/CM2 P/ACC TUBERIA DN 4'' Y DN 6"

TOTAL
55.00

55.00

55.00

5.00

5.00

1.00

1.00

5.00

5.00

3.00

3.00

GRIFO CONTRA INCENDIO TIPO POSTE DE 2 BOCAS

5.00

SUMINISTRO E INSTALACION DE CRUZ HD 6'' X 6''

1.00

SUMINISTRO E INSTALACION DE TAPON

5.00

SUMINISTRO E INSTALACION REDUCCION 160MM a 110MM FF

3.00

RED DE DESAGUE
SUMINISTRO E INSTALACION DE TUBERIAS
PRUEBA HIDRAULICA+DESINFECCION DE TUBERIA 200MM
prolong. av. jorge basadre grohmann

592.30
1.00

592.30

592.30

1.00

40.30

40.30

1.00

40.30

40.30

1.00

40.30

40.30

1.00

40.30

40.30

1.00

40.30

40.30
0.00

Volumen de acarreo

1.00

Volumen=
11.61

11.61

Volumen de acarreo

1.00

Volumen=
11.61

11.61

prolong. av. jorge basadre grohmann

1.00

40.30

40.30

REPOSICION DE PAVIMENTO FLEXIBLE EN FORMA MANUAL


BASE GRANULAR e=0.20m
prolong. av. jorge basadre grohmann
av. jorge basadre grohmann - ovalo

1.00
1.00

740.00
540.00

0.80
0.80

592.00
432.00

prolong. av. jorge basadre grohmann


av. jorge basadre grohmann - ovalo

1.00
1.00

740.00
540.00

0.80
0.80

592.00
432.00

prolong. av. jorge basadre grohmann


av. jorge basadre grohmann - ovalo

1.00
1.00

740.00
540.00

0.80
0.80

592.00
432.00

1.00

Volumen=
52.62

52.62

1.00

Volumen=
52.62

52.62

CONEXIONES DOMICILIARIAS
EXCAVACION DE ZANJA PARA DESAGUE

40.30

REFINE Y NIVELACION FONDO ZANJA ALCANT. A=0.80

40.30

PREPARACION CAMA DE APOYO C/MAT. DE PRESTAMO 0.80X0.10M

40.30

RELLENO COMPACTADO DE ZANJA C/MAT PRESTADO 0.80X0.30

40.30

RELLENO CON MATERIAL PROPIO ZARANDEADO

40.30

ACARREO DE MATERIAL EXCEDENTE D=30

ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA

SUMINISTRO E INSTALACION DE TUBERIA PVC 6''

IMPRIMACION ASFALTICA

CARPETA ASFALTICA DE 2"

11.61

11.61

40.30

1,024.00

1,024.00

1,024.00

OBRAS DE ARTE
DEMOLICION DECANAL EXISTENTE

ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA

52.62

52.62

REPOSICION DE CANAL EXISTENTE


CONCRETO f'c=210 kg/cm2 CANAL

52.62
CALLE SANTA ROSA
TIPO 5 - base
TIPO 5 - paredes
TIPO 5 - tapa
TIPO 6 - AGUA - base
TIPO 6 - AGUA - paredes
TIPO 6 - AGUA - tapa
TIPO 6 - DESAGE - base
TIPO 6 - DESAGE - paredes
TIPO 6 - DESAGE - tapa
PROLONG. AV. JORGE BASADRE GROHMANN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.00
2.00
1.00
1.00
2.00
1.00
1.00
2.00
1.00

8.70
8.70
8.70
1.75
1.75
1.75
1.75
1.75
1.75

1.30
0.20
1.30
1.10
0.20
1.10
1.10
0.20
1.10

0.20
0.50
0.20
0.20
0.55
0.20
0.20
0.55
0.20

2.26
1.74
2.26
0.39
0.39
0.39
0.39
0.39
0.39

PLANILLA DE METRADOS DEL MES


OBRA
PROPIETARIO
CONTRATISTA
INSPECTOR
RESIDENTE
P. DE EJECUCION

ITEM

04.03.02

: INST. DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA CALLA STA ROSA, CALLE LIBERTAD, PROLG. Av. JORGE BASADRE TRAMO OVALO Av. JORGE
BASADRE Y LA ASOC. EL COCO DISTRITO DE POCOLLAY - TACNA - TACNA
: MUNICIPALIDAD DISTRITAL DE POCOLLAY
: CONSORCIO SANEAMIENTO TACNA I
: ING.VICTOR VELASQUEZ YUPANQUI
: ING. ULISES E. FRANCO SOTO
: 180 DIAS CALENDARIOS

DESCRIPCIN / DETALLE

TIPO 4 - AGUA - base


TIPO 4 - AGUA - paredes
TIPO 4 - AGUA - tapa
TIPO 4 -DESAGE - base
TIPO 4 -DESAGE - paredes
TIPO 4 -DESAGE - tapa
TIPO 3 - AGUA - base
TIPO 3 - AGUA - paredes
TIPO 3 - AGUA - tapa
TIPO 3 - DESAGE - base
TIPO 3 - DESAGE - paredes
TIPO 3 - DESAGE - tapa
AV. JORGE BASADRE GROHMANN
TIPO 1 - AGUA - base
TIPO 1 - AGUA - paredes
TIPO 1 - AGUA - tapa
TIPO 1 - DESAGE - base
TIPO 1 - DESAGE - paredes
TIPO 1 - DESAGE - tapa
AV. JORGE BASADRE GROHMANN (OVALO - AV. JORGE BASADRE)
TIPO 2 - AGUA - base
TIPO 2 - AGUA - paredes
TIPO 2 - AGUA - tapa
TIPO 2 - DESAGE - base
TIPO 2 - DESAGE - paredes
TIPO 2 - DESAGE - tapa

N DE
1.00
1.00
1.00
1.00
1.00
1.00
8.00
8.00
8.00
8.00
8.00
8.00

1.00
2.00
1.00
1.00
2.00
1.00
1.00
2.00
1.00
1.00
2.00
1.00

DIMENSIONES
1.75
1.50
1.75
0.20
1.75
1.50
1.75
1.50
1.75
0.20
1.75
1.50
1.75
1.15
1.75
0.15
1.75
1.15
1.75
1.15
1.75
0.15
1.75
1.15

0.20
0.45
0.15
0.20
0.45
0.15
0.15
0.45
0.15
0.15
0.45
0.15

PARCIAL
0.53
0.32
0.39
0.53
0.32
0.39
2.42
1.89
2.42
2.42
1.89
2.42

2.00
2.00
2.00
2.00
2.00
2.00

1.00
2.00
1.00
1.00
2.00
1.00

1.75
1.75
1.75
1.75
1.75
1.75

1.25
0.20
1.25
1.25
0.20
1.25

0.20
0.55
0.20
0.20
0.55
0.20

0.88
0.77
0.88
0.88
0.77
0.88

10.00
10.00
10.00
10.00
10.00
10.00

1.00
2.00
1.00
1.00
2.00
1.00

1.75
1.75
1.75
1.75
1.75
1.75

1.10
0.20
1.10
1.10
0.20
1.10

0.20
0.55
0.20
0.20
0.55
0.20

3.85
3.85
3.85
3.85
3.85
3.85

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

1,847.61
1.00

04.03.03

06.00.00
06.01.00

07.00.00
07.01.00

1,847.61

1,847.61

ENCOFRADO Y DESENCOFRADO DE CANAL


CALLE SANTA ROSA
TIPO 5 - paredes
TIPO 5 - tapa
TIPO 6 - AGUA - paredes
TIPO 6 - AGUA - tapa
TIPO 6 - DESAGE - paredes
TIPO 6 - DESAGE - tapa
PROLONG. AV. JORGE BASADRE GROHMANN
TIPO 4 - AGUA - paredes
TIPO 4 - AGUA - tapa
TIPO 4 -DESAGE - paredes
TIPO 4 -DESAGE - tapa
TIPO 3 - AGUA - paredes
TIPO 3 - AGUA - tapa
TIPO 3 - DESAGE - paredes
TIPO 3 - DESAGE - tapa
AV. JORGE BASADRE GROHMANN
TIPO 1 - AGUA - paredes
TIPO 1 - AGUA - tapa
TIPO 1 - DESAGE - paredes
TIPO 1 - DESAGE - tapa
AV. JORGE BASADRE GROHMANN (OVALO - AV. JORGE BASADRE)
TIPO 2 - AGUA - paredes
TIPO 2 - AGUA - tapa
TIPO 2 - DESAGE - paredes
TIPO 2 - DESAGE - tapa

TOTAL

252.01
2.00
1.00
2.00
1.00
2.00
1.00

2.00
1.00
2.00
1.00
2.00
1.00

8.70
8.70
1.75
1.75
1.75
1.75

2.00
1.00
2.00
1.00
2.00
8.00
16.00
8.00

2.00
1.00
2.00
1.00
2.00
1.00
2.00
1.00

1.75
1.75
1.75
1.75
1.75
1.75
1.75
1.75

4.00
2.00
4.00
2.00

2.00
1.00
2.00
1.00

1.75
1.75
1.75
1.75

20.00
10.00
20.00
10.00

2.00
1.00
2.00
1.00

1.75
1.75
1.75
1.75

0.50
1.30
0.55
1.10
0.55
1.10
0.45
1.50
0.45
1.50
0.45
1.15
0.45
1.15
0.55
1.25
0.55
1.25
0.55
1.10
0.55
1.10

17.40
11.31
3.85
1.93
3.85
1.93
3.15
2.63
3.15
2.63
3.15
16.10
25.20
16.10
7.70
4.38
7.70
4.38
38.50
19.25
38.50
19.25

EDUCACION SANITARIA
EDUCACION SANITARIA

0.13
0.13

0.13

0.13

0.13

IMPACTO AMBIENTAL
MITIGACION DEL IMPACTO AMBIENTAL

0.13

UNID

und

glb

glb

m3

m3

und

und

und

und

und

und

und

und

und

UNID
und

und

und

und

und

m3

m3

m3

m2

m2

m2

m3

m3

m3

UNID

kg

m2

glb

glb

CALCULO DE REAJUSTES
OBRA
PROPIETARIO
CONTRATISTA
PPTO CONTRATO
FECHA PPTO. BASE
MONTO ADELANTO
DIRECTO
FECHA DE ADELANTO
DIRECTO
F. POLINOMICA:

: INST. DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA CALLA STA ROSA, CALLE LIBERTAD, PROLG. Av. JORGE BASADRE TRAMO OV
: MUNICIPALIDAD DISTRITAL DE POCOLLAY
: CONSORCIO SANEAMIENTO TACNA I
S/. 2,453,615.60
sin IGV
#REF! con IGV
: 05/04/2014
: S/. 829,183.48

sin IGV

S/.978,436.50 con IGV

8/13/2014
K = 0.274*(Mr / Mo) + 0.098*(Isr / Iso) + 0.117*(Asr / Aso) + 0.058*(Agr / Ago) + 0.072*(Matr / Mato) + 0.173*(Er / Eo) + 0.252*(GUr / GUo)

CALCULO DEL "K" PARA REAJUSTE

Area Geografica

MONOMIO

Mano de obra

Tuberias pvc

Asfalto

Agregado fino

Dlar

M
47
0.05200
100.00%

Is
72
0.10700
100.00%

As
13
0.10900
100.00%

Ag
4
0.15200
100.00%

Mat
30
0.22200
100.00%

6
Maquinari y
Equipo
E
49
0.35800
100.00%

Io
Apr-13
Ir

600.36
600.36
601.88

338.15
338.15
337.96

428.12
428.12
423.83

391.59
391.59
402.72

626.25
626.25
621.61

497.55
497.55
523.70

Oct-14
Ir/Io

601.88
1.00253
0.05213

337.96
0.99944
0.10694

423.83
0.98998
0.10791

402.72
1.02842
0.15632
1.02048

621.61
0.99259
0.22036

523.70
1.05256
0.37682

Avance
Programado

Avance
Ejecutado

K-1

DESCRIPCION
SIMBOLO
INDICE
FACTOR
PORCENTAJE (%)
I. BASE (Marz 2014)
I. REAJUSTE (Set-14)

K set 2014

CALCULO DE REAJUSTES

Valoriz. N

Fecha

01
02
03
04
05
06
07
08
09

Ocutbre 2014
Noviembre 2014
Diciembre 2014
Enero 2015
Febrero 2015
Marzo 2015
Abril 2016
Mayo 2017
Junio 2018

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

(1)
41,359.03
196,000.30
438,571.59
425,737.83
301,318.38
75,771.61
75,772.61
75,773.61
75,774.61
1,478,758.74

S/.

(2)
556,299.41

S/.

556,299.41

(3)
0.02048

S/.
S/.
S/.
S/.
S/.
S/.

Reajuste
Programado
Ejecutado
(1)x(3)
(2)x(3)
847.03 S/.
11,393.01
S/.
S/.
S/.
S/.
S/.
-

S/.

847.03

S/.

11,393.01

Reajuste
Bruto
Reconocido
S/.

11,393.01

S/.

11,393.01

DEDUCCION DE REAJUSTE POR ADELANTO DIRECTO


Donde: A.D. = Adelanto directo otorgado sin IGV
C = Monto del contrato principal sin IGV
V = Valorizacin Ejecutada, incl. F.R.

Valoriz. N

Fecha

01
02
03
04
05
06

Agosto 2014
Setiembre 2014
Octubre 2014
Noviembre 2014
Diciembre 2014
Enero 2015

Valorizacin de Avance Fisico


Del mes
Acumulado
(1)
(2)
S/.
556,299.41 S/. 556,299.41

Ka = Coef. de reajuste del mes en que se otorg


K = Coeficiente de reajuste de valorizacin
Ka = K julio2014
= 1.02048

Amortizaciones realizadas
Del mes
Acumulado
(3) = AD x V / C
(4)
S/.
14,164.54 S/.
14,164.54

(5)
1.02048

MONTOS RECALCULADOS
Reajuste Reconocido
Valoriz. N

Fecha

01
02
03
04
05
06

Agosto 2014
Setiembre 2014
Octubre 2014
Noviembre 2014
Diciembre 2014
Enero 2015
Total

Bruto reconocido
S/.
S/.
S/.
S/.
S/.
S/.
S/.

11,393.01
11,393.01

I.G.V.

Que no
Neto a reconocer
corresponde A.D.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

S/.
S/.
S/.
S/.
S/.
S/.
S/.

11,393.01
11,393.01

S/.
S/.
S/.
S/.
S/.
S/.
S/.

2,050.74
2,050.74

Acumulado
S/.
S/.
S/.
S/.
S/.
S/.
S/.

13,443.75
13,443.75

Del mes
(6)
S/.

CALCULO DE REAJUSTES
ALCANTARILLADO EN LA CALLA STA ROSA, CALLE LIBERTAD, PROLG. Av. JORGE BASADRE TRAMO OVALO Av. JORGE BASADRE Y LA ASOC. EL COCO DISTRITO DE POCOLLAY - TACNA - TACNA

Area Geografica (4)


7
Indice General
Gu
39
0.35800
100.00%
498.55
498.55
524.70
524.70
1.05245
0.37678
1.02048

Ka = Coef. de reajuste del mes en que se otorgo el A.directo


K = Coeficiente de reajuste de valorizacin

D
Acumulado
(7)
S/.

CUADRO COMPARATIVO DE AVANCE DE OBRA


OBRA

: MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CIRCA, DISTRITO DE ESTIQUE, PROVINC
TARATA, DEPARTAMENTO DE TACNA

PROPIETARIO

: PROGRAMA DE DESARROLLO PRODUCTIVO AGRARIO RURAL - AGRO RURAL

CONTRATISTA

: CONSORCIO HUANUARA

INSPECTOR

: ING. LUIS EFRAIN QUISPE JIMENEZ

RESIDENTE

: ING. VICTOR ANDRES IRIARTE PAREDES

P. DE EJECUCION

: 150 DIAS CALENDARIOS

VAL
NRO.

01

PERIODO

AGOSTO 2014

VALORIZACION

VALORIZACION

REAL

PROGRAMADA

EJECUTADO

(1)

(2)

Acum. Anterior

#REF!

50.49%

MES

#REF!

48,803.66

22.67%

Acum. Actual

#REF!

48,803.66

73.17%

PROGRAMADO GENERAL VS EJECUTADO GENERAL

2,000,000.00
1,800,000.00
1,655,524.83

1,600,000.00
1,400,000.00
1,299,969.14
1,200,000.00
1,000,000.00

P ROGRAMADO AC U MUL

800,000.00

EJEC UTADO AC UMULAD

797,598.50

600,000.00
400,000.00
280,084.01

200,000.00
0.00 0.00
Inicio obra

48,803.66
31-Aug-14

30-Sep-14

31-Oct-14

30-Nov-14

31-Dec-14

COMPARATIVO DE AVANCE DE OBRA

RVICIO DE AGUA DEL SISTEMA DE RIEGO CIRCA, DISTRITO DE ESTIQUE, PROVINCIA DE

%
PROGRAMADO

0.00%
#REF!
#REF!

DO GENERAL VS EJECUTADO GENERAL

1,744,935.31

1,655,524.83

1,299,969.14

P ROGRAMADO AC U MULADO
EJEC UTADO AC UMULADO

797,598.50

280,084.01

30-Sep-14

31-Oct-14

30-Nov-14

31-Dec-14

15-Jan-15

PARTIDA

DESCRIPCION

UND

METRADO

01 OBRAS PROVISIONALES
01.01

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M

und

1.00

01.02

CASETA DE ALMACEN Y GUARDIANIA

m2

32.00

01.03

TRANSPORTE DE MATERIALES DE OBRA

kg

88,589.66

01.04

ACARREO DE AGREGADOS A PIE DE OBRA

m3

90.00

01.05

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS

GLB

0.50

02 DEMOLICIONES
02.01

DEMOLICION MANUAL DE OBRAS DE CONCRETO

m3

152.06

02.02

ACARREO DE MATERIAL DE DEMOLICION

m3

74.88

02.03

ELIMINACION DE MATERIAL EXCEDENTE

m3

74.88

03 CANAL DE CONCRETO (3058.00 ml)


03.01

TRABAJOS PRELIMINARES

03.01.01

LIMPIEZA DE TERRENO MANUAL

m2

3,058.00

03.01.02

CONTROL TOPOGRAFICO

m2

1,840.00

m2

432.00

03.02
03.02.01

MOVIMIENTO DE TIERRAS
PERFILADO DE SUPERFICIE

03.06 OTROS
03.06.01
DESVIO DE CAUCE CANAL EN TRAMO DE CONSTRUCCION
11 IMPACTO AMBIENTAL
11.01 PROGRAMA DE PREVENCION Y/O MITIGACION
11.01.01
SEALIZACION AMBIENTAL

und

1,000.00

2.00

CUADRO COMPARATIVO DE AVANCE DE OBRA


OBRA

: REHABILITACION DE LA CARRETERA EMPALME PE-38 TARATA CANDARAVE EMP. PE-36A (BINACIONAL), TRAMO CANDARAVE EMP. CARRETERA BINA
KM 143+500
: GOBIERNO REGIONAL DE TACNA
: CONSORCIO CANDARAVE
: ING.VICTOR VELASQUEZ YUPANQUI
: ING. ELMER MATHIAS AGUILAR ALVA
: 240 DIAS CALENDARIOS
FECHA DE REPORTE
: JUNIO 2015

PROPIETARIO
CONTRATISTA
INSPECTOR
RESIDENTE
P. DE EJECUCION

VALORIZACION PROGRAMADO

MES
8 7 6 5 4 3 2 1 0

INICIO DE OBRA
VALORIZACION 01
VALORIZACION 02
VALORIZACION 03
VALORIZACION 04
VALORIZACION 05
VALORIZACION 06
VALORIZACION 07
VALORIZACION 08

ACUMUL.

203,277.29
142,113.82
1,281,465.53
1,556,661.77
1,340,393.46
819,349.64
749,572.48
287,956.69

###
203,277.29
345,391.11
1,626,856.64
3,183,518.41
4,523,911.87
5,343,261.51
6,092,833.99
6,380,790.68

6,380,790.68

PORCENTAJE DE AVANCE

TOTAL

PARCIAL

VALORIZACION EJECUTADA

% PARC.

% ACUM.

PARCIAL

0.00%
3.19%
2.23%
20.08%
24.40%
21.01%
12.84%
11.75%
4.51%

0.00%
3.19%
5.41%
25.50%
49.89%
70.90%
83.74%
95.49%
100.00%

3,955,307.33
433,582.44
243,978.17

PRESUP. TOTAL

4,632,867.94

ACUMUL.
3,955,307.33
3,955,307.33
3,955,307.33
3,955,307.33
3,955,307.33
4,388,889.77
4,388,889.77
4,632,867.94

% PARC.

% ACUM.

0.00%
61.99%
0.00%
0.00%
0.00%
0.00%
6.80%
0.00%
3.82%

0.00%
61.99%
61.99%
61.99%
61.99%
61.99%
68.78%
68.78%
72.61%

VALOR. EJECUTADO

CUADRO COMPARATIVO DE AVANCE DE OBRA

120.00%

100.00%

95.49%
83.74%

80.00%

70.90%
60.00%

100.00%

61.99%

61.99%

61.99%

61.99%

68.78%

68.78%

72.61%

61.99%

49.89%
40.00%

25.50%

20.00%

TIEMPO DE EJECUCION

VALORIZACION 08

VALORIZACION 07

VALORIZACION 06

VALORIZACION 05

VALORIZ ACION 04

VALORIZACION 03

5.41%
VALORIZACION 02

3.19%
VALORIZACION 01

INICIO DE OBRA

0.00% 0.00%

ANDARAVE EMP. CARRETERA BINACIONAL

: JUNIO 2015

8.78%

100.00%

72.61%

VALORIZACION 08

5.49%

Vous aimerez peut-être aussi