Approved corridors, and its width, for 132kV & 11kV cables outside the substation plot to be shown

132kV Duct bank 2x24 Nos. to be shown, indicating main dimensions, as 2 layers x 4 No. sleeves in
6 group for 6 No. of circuits = Total 48 Nos. (with sleeves 200 ) with a clearance not less than
300mm between groups of every 8 openings/sleeves to accommodate wall thickness of two troughs
(300mm) and to prevent blockage of opening.
11kV Duct bank maximum of 2x10 Nos. in 4 groups in tow layers with nimum distance of 2000mm
between to groups to be shown, indicating main dimensions (Total 80 Nos. of sleeves, 150 )
(new arrangemntd of 71 feeders to be discsuued and confrimed with DP)
132kV cable shall not pass through the floor of 11kV basement.
11kV cable shall not pass through the floor of 132kV basement.
11kV cables intended to terminate in adjusent basement(s) shall not be exposed in a basement floor;
instead which shall be routed through sleeves under the screed.
11 kV cable route from ET to IDT to be shown
Clearance of 132kV cable chamber of IDTs and Reactors to GIS building wall shall be 2000mm
(minimum).
Routing of 11kV cables from IDTs to 11kV switchgear to be shown
Section drawings for cable routing to be included wherever necessray; in which bending radius of
132kV and 11kV cables shall be indicated, and which shall not be less than 20 times of outer
diameter of the respective cable.
LV Cable route from ET to LVAC panel through cable shaft to be shown.
LV Cable route from other external locations to cable shaft to be shown (section view in case of
cable/sleeve crossings to be provided)
All future 132kV incoming cable routing to be shown in the 132kV basement.
Obstruction/ obstacle, if any, from other services (power lines, water, sewage, communication, gas
etc) for incoming/ outgoing cables (132kV and 11kV) outside the compound walls, in the approved
corridors, for a minimum distance/width of 5000mm to be shown.
Column and Beam shall not obstruct Termination of 132kV cable.
Column and Beam shall not obstruct Termination of 11kV cable .
Slope/ Level of Cable duct between basement wall and trough /Trench located outside the boundary
wall shall be indicated.
11kV power cables from ET & capacitor bank shall be preferably be laid on the floor and not on tray
in the basement
Proposed spacing, segregation+ protection and identification of MV, LV and control cables in all
cable risers shall be shown
The size of each cable riser shall be minimum 2000mm X 2000mm or 1500mm x3000mm or
equavlant and minimum number of riser shall be 2.
No cable shall pass exposed on the basement floor of cable riser room, instead which shall be routed
through sleeves/duct under the screed.
11kV cable from IDT to SWGR ,ET and 11kV Capacitor bank shall not be obracted the routing of
outgoing 11kV feeders.
Top and bottom levels of proposed concrete cable ducts inside the substation to be shown .
Communication
Panel arrangements in Telecommunication room shall follow following order FDP,MUX, two Future
MUX panels and CCTV panel.