Default Project..................................................UP#152
Projects:
UP#152..........................................................
.Completion Plan 5 August 2015 Rev 02 (Update -17 June 2016)
Scheduling/Leveling Settings:
----------------------------General
------Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retaine
d Logic
Calculate start-to-start lag from ...............................Early S
tart
Define critical activities as ...................................Longest
Path
Compute Total Float As ..........................................Finish
Float
Calculate float based on finish date of .........................Each pr
oject
Calendar for scheduling Relationship Lag ........................Predece
ssor Activity Calendar
Advanced
-------Calculate multiple float paths...................................Yes
Calculate multiple float paths using.............................Free Fl
oat
Number of paths to calculate.....................................10
Statistics:
----------# Projects.......................................................1
# Activities.....................................................833
# Not Started....................................................250
# In Progress....................................................81
# Completed......................................................502
# Relationships..................................................1197
# Activities with Constraint.....................................27
Project:
UP#152 Activity:
GEN0001020
Receive
Instruction from ADAC to procure additional MJF Pipe fittings & Valves
Project:
UP#152 Activity:
GEN0001030
Stage 1
Completion
Project:
UP#152 Activity:
GEN0001040
Stage 2
Completion
Project:
UP#152 Activity:
GEN0001050
Stage 3
Completion
Project:
UP#152 Activity:
GEN0001060
Stage 4
Completion
Project:
UP#152 Activity:
o Area (For Remaining Fire Fighting Work)
Project:
UP#152 Activity:
n Fuel Farm Control Room
Project:
UP#152 Activity:
of VO 37
Project:
UP#152 Activity:
ersion by HLG to its final position
Project:
UP#152 Activity:
lity of Fuel Farm (Installation of instruments)
Project:
UP#152 Activity:
lity of Fuel in Fuel Farm
Project:
UP#152 Activity:
o Runways
Project:
UP#152 Activity:
o SS 1164
Project:
UP#152 Activity:
ct Civil Work Completion Section 2
Project:
UP#152 Activity:
ct Civil Works Completion Section 3
Project:
UP#152 Activity:
ct Civil Works Completion Section 4
Project:
UP#152 Activity:
ct Civil Work Completion (New Aprons)
Project:
UP#152 Activity:
ct Civil Work Completion Section 1
Project:
UP#152 Activity:
ct Civil Work Completion (VO)
Project:
UP#152 Activity:
ct Civil Work Completion Section 5
Project:
UP#152 Activity:
ct Civil Work Completion Section 6
Project:
UP#152 Activity:
ct Civil Work Completion Section 7
Project:
UP#152 Activity:
Trench Civil Work Completion
Project:
UP#152 Activity:
Trench Civil Work Completion
Project:
UP#152 Activity:
Trench Civil Work Completion
Project:
UP#152 Activity:
m and Control Room Availability
Project:
UP#152 Activity:
m Availability
GEN0001110
Access t
GEN0001120
Access i
GEN0001160
Approval
GEN0001180
Road div
GEN0001200
Availabi
GEN0001210
Availabi
SEC2S11620
Access t
SEC2S22420
Access t
SEC2S22430
Cable Du
SEC2S22460
Cable Du
SEC2S22490
Cable Du
SEC2S22510
Cable Du
SEC2S22540
Cable Du
SEC2S22560
Cable Du
SEC2S22590
Cable Du
SEC2S22620
Cable Du
SEC2S22640
Cable Du
SEC2S31000
CH101A -
SEC2S31250
CH156 -
SEC2S31550
CH155 -
SEC2S32430
Fuel Far
SEC2S41000
Fuel Far
Errors:
------Warnings:
--------Activities without predecessors..................................1
Project:
UP#152 Activity:
GEN0001000
Project
Start
Activities without successors....................................1
Project:
UP#152 Activity:
GEN0001060
Stage 4
Completion
Out-of-sequence activities.......................................75
Project:
UP#152 Activity:
ASBULT1000
Submissi
on of As Built Drawing for Storm water works
Project:
UP#152 Activity:
ASBULT1020
on of As Built Drawing for Electrical works
Project:
UP#152 Activity:
ASBULT1040
on of As Built Drawing for Fire Fighting works
Project:
UP#152 Activity:
ASBULT1060
on of As Built Drawing for AGL works
Project:
UP#152 Activity:
ASBULT1120
on of As Built Drawing for Aprons - Concrete Pavement
Project:
UP#152 Activity:
ASBULT1140
on of As Built Drawing for Substations
Project:
UP#152 Activity:
ASBULT1150
of As Built Drawing for Substations
Project:
UP#152 Activity:
ASBULT1160
on of As Built Drawing for Air Side Road A3
Project:
UP#152 Activity:
ASBULT1170
of As Built Drawing for Air Side Road A3
Project:
UP#152 Activity:
ASBULT1200
on of As Built Drawing for Taxi ways - Asphalt works
Project:
UP#152 Activity:
ASBULT1210
of As Built Drawing for Taxi ways - Asphalt works
Project:
UP#152 Activity:
GEN0001220
NOCs
Project:
UP#152 Activity:
O&MMNL1000
n and Maintanance Manual for AGL Network - Submission
Project:
UP#152 Activity:
O&MMNL1010
n and Maintanance Manual for AGL Network - Approval
Project:
UP#152 Activity:
O&MMNL1050
n and Maintanance Manual for Telecommunication Network - Approval
Project:
UP#152 Activity:
SEC2S11310
Inspection and Handoover -AGL SS
Project:
UP#152 Activity:
SEC2S11580
tion of Traffic Signal System
Project:
UP#152 Activity:
SEC2S11890
and Desnagging - Taxiway D (West of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S12020
and Desnagging - Connecting Taxiway
Project:
UP#152 Activity:
SEC2S21090
round - New Apron Loop
Project:
UP#152 Activity:
SEC2S21120
ckfilling - New Apron Loop
Project:
UP#152 Activity:
SEC2S21630
Top slab installation
Project:
UP#152 Activity:
SEC2S21780
Internal finishing
Project:
UP#152 Activity:
SEC2S21900
ection pipe installation - West End (CH101A)
Project:
UP#152 Activity:
SEC2S22150
Torquing of Bolts/Nuts
Project:
UP#152 Activity:
SEC2S22500
e Laying in Section 4 (Main Cables)
Project:
UP#152 Activity:
SEC2S22630
e Laying in Section 6 (Main Cables)
Project:
UP#152 Activity:
SEC2S22640
ct Civil Work Completion Section 7
Project:
UP#152 Activity:
SEC2S22980
Purging Loop 2.1 & 2.2 - CH-133 T&C Spools Instln RRC
Project:
UP#152 Activity:
SEC2S22990
Purging Loop 2.1 & 2.2 - Pneumatic, Air Blowing & Drying - Loop 2.1
Project:
UP#152 Activity:
SEC2S23010
Purging Loop 2.1 & 2.2 - Pneumatic, Air Blowing & Drying - Loop 2.2
Submissi
Submissi
Submissi
Submissi
Submissi
Approval
Submissi
Approval
Submissi
Approval
Project
Opeartio
Opeartio
Operatio
ADAC AGL
Installa
Snagging
Snagging
Sand sur
Final ba
CH155 CH101A Leak det
CH-143 E&I Cabl
E&I Cabl
Cable Du
Nitrogen
Nitrogen
Nitrogen
Project:
UP#152 Activity:
24" Spool Preparation
Project:
UP#152 Activity:
RT Works
Project:
UP#152 Activity:
Drain & Vent Installation
Project:
UP#152 Activity:
Platform Installation
Project:
UP#152 Activity:
Cable Tray & Support Installation
Project:
UP#152 Activity:
Installation of Earthling Material
Project:
UP#152 Activity:
24" Pipe Welding
Project:
UP#152 Activity:
24" Spool Preparation
Project:
UP#152 Activity:
RT Works
Project:
UP#152 Activity:
Drain & Vent Installation
Project:
UP#152 Activity:
Platform Installation
Project:
UP#152 Activity:
Cable Tray & Support Installation
Project:
UP#152 Activity:
Installation of Earthling Material
Project:
UP#152 Activity:
Assembly of Flanges with DBB Valves
Project:
UP#152 Activity:
24" Welding Works
Project:
UP#152 Activity:
Installation of Earthling Material
Project:
UP#152 Activity:
n Loop - Cathodic Protection System Works
Project:
UP#152 Activity:
n Loop - FDB & SDB Installation
Project:
UP#152 Activity:
n Loop - Power Cable Laying
Project:
UP#152 Activity:
n Loop - Earth Cable Laying
Project:
UP#152 Activity:
- Fuel Filling in Loop 1B & Loop 1A
Project:
UP#152 Activity:
Project:
UP#152 Activity:
l Differences
Project:
UP#152 Activity:
n
Project:
UP#152 Activity:
Project:
UP#152 Activity:
enna Relocation
Project:
UP#152 Activity:
D4
Project:
UP#152 Activity:
ate Obstruction
Project:
UP#152 Activity:
Cable Joints
Project:
UP#152 Activity:
e
Project:
UP#152 Activity:
rol Work Pk. 1
SEC2S31400
CH156 -
SEC2S31420
CH156 -
SEC2S31430
CH156 -
SEC2S31470
CH156 -
SEC2S31500
CH156 -
SEC2S31530
CH156 -
SEC2S31590
CH155 -
SEC2S31680
CH155 -
SEC2S31700
CH155 -
SEC2S31710
CH155 -
SEC2S31750
CH155 -
SEC2S31780
CH155 -
SEC2S31810
CH155 -
SEC2S31940
CH154 -
SEC2S32010
CH154 -
SEC2S32100
CH154 -
SEC2S32140
New Apro
SEC2S32150
New Apro
SEC2S32230
New Apro
SEC2S32240
New Apro
SEC2S41060
Loop 1B
VO29
Fire Fighting at
VO33
MJF - Security G
VO35
VO37
AJF/MJF Interfac
VO38
Project:
UP#152 Activity:
VO40
B2 Road Underpas
Project:
UP#152 Activity:
VO43
Surface Protecti
Project:
UP#152 Activity:
VO48
Project:
UP#152 Activity:
VO50
Taxiway F4 Remar
Project:
UP#152 Activity:
VO53
Project:
Project:
UP#152 Activity:
UP#152 Activity:
VO55
VO63
Foreman Dayworks
Barrier Preparat
Project:
UP#152 Activity:
VO69
Project:
UP#152 Activity:
VO76
FATO Additional
Project:
e Laying Constraints
Project:
erouting
Project:
escope
Project:
way D
UP#152 Activity:
VO85
UP#152 Activity:
VO87
Taxiway D6 AGL R
UP#152 Activity:
UP#152 Activity:
VO92
s Fence Removal
on Omission
ations
king
riers
ion for HLG
Near TWY H)
Design
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Completion
Project:
UP#152 Activity:
GEN0001030
Stage 1
Project:
UP#152 Activity:
GEN0001030
Stage 1
Project:
UP#152 Activity:
GEN0001030
Stage 1
Project:
UP#152 Activity:
GEN0001030
Stage 1
Project:
UP#152 Activity:
GEN0001030
Stage 1
Project:
UP#152 Activity:
GEN0001040
Stage 2
Project:
UP#152 Activity:
GEN0001040
Stage 2
Project:
UP#152 Activity:
GEN0001040
Stage 2
Project:
UP#152 Activity:
GEN0001040
Stage 2
Project:
UP#152 Activity:
GEN0001040
Stage 2
Project:
UP#152 Activity:
GEN0001040
Stage 2
Project:
UP#152 Activity:
GEN0001040
Stage 2
Project:
UP#152 Activity:
GEN0001040
Stage 2
Project:
UP#152 Activity:
GEN0001040
Stage 2
Project:
UP#152 Activity:
GEN0001040
Stage 2
Project:
UP#152 Activity:
GEN0001050
Stage 3
Project:
UP#152 Activity:
GEN0001050
Stage 3
Project:
UP#152 Activity:
GEN0001060
Stage 4
Project:
UP#152 Activity:
GEN0001060
Stage 4
Project:
UP#152 Activity:
GEN0001060
Stage 4
Project:
UP#152 Activity:
GEN0001060
Stage 4
Project:
UP#152 Activity:
GEN0001060
Stage 4
Project:
UP#152 Activity:
GEN0001060
Stage 4
Project:
UP#152 Activity:
GEN0001060
Stage 4
Project:
UP#152 Activity:
GEN0001060
Stage 4
Project:
UP#152 Activity:
GEN0001060
Stage 4
Project:
UP#152 Activity:
SEC2S22420
Access t
Project:
UP#152 Activity:
SEC2S41000
Fuel Far
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
o SS 1164
m Availability
Scheduling/Leveling Results:
----------------------------
# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................833
# Relationships with other projects..............................0
Data Date........................................................17-Jun16
Earliest Early Start Date........................................17-Jun16
Latest Early Finish Date.........................................16-Feb17
Number of float paths............................................10
Exceptions:
----------Critical Activities..............................................65
Project:
UP#152 Activity:
GEN0001060
Stage 4
Completion
Project:
UP#152 Activity:
PRCMTSD1170
Site Del
ivery 36" DBB valves
Project:
UP#152 Activity:
PRCMTSD1175
Site Del
ivery 24" DBB valves
Project:
UP#152 Activity:
SEC2S31410
CH156 Piping Installation with DBB valves
Project:
UP#152 Activity:
SEC2S31460
CH156 Insulation Gasket Kit Installation & Tourquing
Project:
UP#152 Activity:
SEC2S31690
CH155 Piping Installation with DBB valves
Project:
UP#152 Activity:
SEC2S31740
CH155 Insulation Gasket Kit Installation & Tourquing
Project:
UP#152 Activity:
SEC2S32290
CH-133 t
o CH-135 Nitrogen Purging - Setting-up & Preparation
Project:
UP#152 Activity:
SEC2S32300
CH-133 t
o CH-135 Nitrogen Purging - Pneumatic Testing
Project:
UP#152 Activity:
SEC2S32310
CH-133 t
o CH-135 Nitrogen Purging - Air Blowing
Project:
UP#152 Activity:
SEC2S32320
CH-133 t
o CH-135 Nitrogen Purging - Drying
Project:
UP#152 Activity:
SEC2S32330
CH-133 t
o CH-135 Nitrogen Purging - Nitrogen Purging
Project:
UP#152 Activity:
SEC2S41010
Loop 1B
- Preparation & Set-up
Project:
UP#152 Activity:
SEC2S41020
Loop 1B
- Installation of Temporary Flushing Loops in CH-133 & CH-151
Project:
UP#152 Activity:
SEC2S41030
Loop 1B
- Installation of BFs & Fuel Filling Loop in CH-139
Project:
UP#152 Activity:
SEC2S41040
Loop 1B
- Installation of Christmas Trees on HPs & LPs
Project:
UP#152 Activity:
SEC2S41050
Loop 1B
- Installation of Blind Flanges with Goose Neck Connection on HRs
Project:
UP#152 Activity:
SEC2S41060
Loop 1B
- Fuel Filling in Loop 1B & Loop 1A
Project:
UP#152 Activity:
SEC2S41070
Loop 1B
- Soak Testing of Loop 1B & Loop 1A
Project:
UP#152 Activity:
SEC2S41090
Loop 1B
- Soak Test Sample & Approval
Project:
UP#152 Activity:
SEC2S41120
Loop 1B
- Flushing & Filtration for Mainline & Millipore Test
Project:
UP#152 Activity:
SEC2S41130
Loop 1B
- Flushing & Filtration of Risers & Millipore Test
Project:
UP#152 Activity:
SEC2S41140
Loop 1B
- API Filtration
Project:
UP#152 Activity:
SEC2S41270
Loop 1A
SEC2S41990
Loop 3A
SEC2S42000
Loop 3A
SEC2S42010
Loop 3A
SEC2S42020
Loop 3A
SEC2S42030
Loop 3A
SEC2S42040
Testing
SEC2S42050
Testing
SEC2S42060
Testing
SEC2S42070
Testing
SEC2S42080
Testing
SEC2S42090
Snag and
e
e
e
e
e
e
Cabl
Cabl
Cabl
Cabl
Cabl
Cabl
Apro
Material
Material
Material
Material
Material
Shop Dra
Shop Dra
Function
Design D
Shop Dra
Function
Design D
Project
Receive
Receive
Stage 1
Stage 2
Stage 3
Access t
Access t
Access t
Access t
Access t
Access i
Receipt
Submitta
Approval
Approval
Kick-off
Road div
GEN0001190
Completi
GEN0001200
Availabi
GEN0001210
Availabi
GEN0001220
Project
GEN0001230
Contarct
GEN0001240
Mobilisa
MS10001000
Mileston
O&MMNL1000
Opeartio
O&MMNL1010
Opeartio
O&MMNL1020
Opeartio
O&MMNL1030
Opeartio
O&MMNL1040
- Submission
O&MMNL1050
- Approval
PRCMT1000
Operatio
PRCMT1010
Procurem
PRCMT1020
Procurem
PRCMT1030
Procurem
PRCMT1040
Procurem
PRCMT1050
Procurem
PRCMT1060
Procurem
PRCMT1070
Procurem
PRCMT1080
Procurem
PRCMT1090
Procurem
PRCMT1100
Procurem
PRCMT1110
Procurem
PRCMT1120
Procurem
PRCMT1130
Procurem
PRCMT1140
Procurem
PRCMT1150
Procurem
PRCMT1160
Procurem
Operatio
Procurem
UP#152 Activity:
PRCMT1170
Procurem
UP#152 Activity:
PRCMT1175
Procurem
UP#152 Activity:
(VO-38)
UP#152 Activity:
PRCMT1180
Procurem
PRCMT1185
Procurem
UP#152 Activity:
PRCMT1190
Procurem
UP#152 Activity:
PRCMT1200
Procurem
UP#152 Activity:
PRCMT1210
Procurem
UP#152 Activity:
PRCMT1220
Procurem
UP#152 Activity:
PRCMT1230
Procurem
UP#152 Activity:
PRCMT1240
Procurem
UP#152 Activity:
PRCMT1250
Procurem
UP#152 Activity:
PRCMT1260
Procurem
UP#152 Activity:
PRCMT1270
Procurem
UP#152 Activity:
PRCMT1280
Procurem
UP#152 Activity:
PRCMT1290
Procurem
UP#152 Activity:
PRCMT1300
Procurem
UP#152 Activity:
PRCMT1310
Procurem
UP#152 Activity:
PRCMT1320
Procurem
UP#152 Activity:
PRCMT1330
Procurem
UP#152 Activity:
PRCMT1340
Procurem
UP#152 Activity:
PRCMTSD1000
Site Del
UP#152 Activity:
PRCMTSD1010
Site Del
UP#152 Activity:
PRCMTSD1020
Site Del
UP#152 Activity:
PRCMTSD1030
Site Del
UP#152 Activity:
PRCMTSD1040
Site Del
UP#152 Activity:
PRCMTSD1050
Site Del
UP#152 Activity:
PRCMTSD1060
Site Del
UP#152 Activity:
PRCMTSD1070
Site Del
UP#152 Activity:
PRCMTSD1080
Site Del
UP#152 Activity:
PRCMTSD1090
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Section
South Ru
New Fuel
AOA Peri
Bollard
Snagging
Permit t
Fiber Op
Connecti
400Hz Ca
Testing
Testing
Testing
Stand En
Remainin
Snagging
Generato
LV Panel
Fiber Op
SEC2S11150
Fiber Op
SEC2S11160
Fire Fig
SEC2S11170
ADDC LV
SEC2S11180
ADDC MV
SEC2S11190
ADAC Ins
SEC2S11200
Installa
SEC2S11210
Installa
SEC2S11220
Snagging
SEC2S11230
Generato
SEC2S11240
Chiller
SEC2S11250
Sound At
SEC2S11260
Fiber Op
SEC2S11270
Fire Fig
SEC2S11280
Generato
SEC2S11290
Software
SEC2S11300
Switchin
SEC2S11305
Testing
SEC2S11310
ADAC AGL
SEC2S11320
GCAA Ins
SEC2S11330
Complete
SEC2S11340
AOA Fenc
SEC2S11350
Completi
SEC2S11360
SL Duct
SEC2S11370
SL Duct
SEC2S11380
Install
SEC2S11390
SS PU-5
SEC2S11400
Crash Ga
SEC2S11410
SS PU-4
SEC2S11420
AOA Fenc
SEC2S11430
SS PU-3
Relocate
Snagging
Police A
LV Cable
LV Cable
Street L
Fedder P
LV Cable
Storm Wa
Guard Ra
Backfill
A3 Road
Design S
Design A
Installa
Installa
Installa
Testing
Access t
AGL Cham
Roman Nu
Snagging
GCAA Ins
Handing
Tunnel A
Primary
AGL Ligh
AGL Chma
Addition
Roman Nu
Testing
Snagging
GCAA Ins
Handing
AGL Chma
Roman Nu
Snagging
GCAA Ins
Handing
Remainin
Testing
AGL Chma
Stop Bar
Roman Nu
Testing
Snagging
GCAA Ins
Handing
Cabling,
Cabling,
Testing
Cabling,
Testing
Cabling,
Testing
Cabling,
Testing
Testing
Snagging
GCAA Ins
Handing
E&I Duct
Modifica
Backfill
Concrete
Final ba
Concrete
Near Fuel
Final ba
Excavati
Sand sur
Backfill
Concrete
Final ba
Excavati
Sand sur
Backfill
Concrete
Final ba
Pavement
Excavati
Sand sur
Backfill
Concrete
Final ba
CH147 CH147 CH147 CH147 CH147 -
Project:
UP#152 Activity:
SEC2S21290
CH147 -
UP#152 Activity:
SEC2S21300
CH147 -
UP#152 Activity:
SEC2S21310
CH147 -
UP#152 Activity:
SEC2S21320
CH148 -
UP#152 Activity:
SEC2S21330
CH148 -
UP#152 Activity:
SEC2S21340
CH148 -
UP#152 Activity:
SEC2S21350
CH148 -
UP#152 Activity:
SEC2S21360
CH148 -
UP#152 Activity:
SEC2S21370
CH148 -
UP#152 Activity:
SEC2S21380
CH148 -
UP#152 Activity:
SEC2S21390
CH148 -
UP#152 Activity:
SEC2S21400
CH149 -
UP#152 Activity:
SEC2S21410
CH149 -
UP#152 Activity:
SEC2S21420
CH149 -
UP#152 Activity:
SEC2S21430
CH149 -
UP#152 Activity:
SEC2S21440
CH149 -
UP#152 Activity:
SEC2S21450
CH149 -
UP#152 Activity:
SEC2S21460
CH149 -
UP#152 Activity:
SEC2S21470
CH149 -
UP#152 Activity:
SEC2S21480
CH154 -
UP#152 Activity:
SEC2S21490
CH154 -
UP#152 Activity:
SEC2S21500
CH154 -
UP#152 Activity:
SEC2S21510
CH154 -
UP#152 Activity:
SEC2S21520
CH154 -
UP#152 Activity:
SEC2S21530
CH154 -
UP#152 Activity:
SEC2S21540
CH154 -
UP#152 Activity:
SEC2S21550
CH154 -
UP#152 Activity:
SEC2S21560
CH155 -
UP#152 Activity:
SEC2S21570
CH155 -
UP#152 Activity:
SEC2S21580
CH155 -
Backfilling
Project:
Internal finishing
Project:
Top slab installation
Project:
Excavation
Project:
Base concreting
Project:
Wall -1st Lift concreting
Project:
Wall - 2nd Lift concreting
Project:
Water proofing
Project:
Backfilling
Project:
Internal finishing
Project:
Top slab installation
Project:
Excavation
Project:
Base concreting
Project:
Wall -1st Lift concreting
Project:
Wall - 2nd Lift concreting
Project:
Water proofing
Project:
Backfilling
Project:
Internal finishing
Project:
Top slab installation
Project:
Excavation
Project:
Base concreting
Project:
Wall -1st Lift concreting
Project:
Wall - 2nd Lift concreting
Project:
Water proofing
Project:
Backfilling
Project:
Internal finishing
Project:
Top slab installation
Project:
Excavation
Project:
Base concreting
Project:
Wall -1st Lift concreting
Project:
UP#152 Activity:
Wall - 2nd Lift concreting
Project:
UP#152 Activity:
Water proofing
Project:
UP#152 Activity:
Backfilling
Project:
UP#152 Activity:
Internal finishing
Project:
UP#152 Activity:
Top slab installation
Project:
UP#152 Activity:
Excavation
Project:
UP#152 Activity:
Base concreting
Project:
UP#152 Activity:
Wall -1st Lift concreting
Project:
UP#152 Activity:
Wall - 2nd Lift concreting
Project:
UP#152 Activity:
Water proofing
Project:
UP#152 Activity:
Backfilling
Project:
UP#152 Activity:
Internal finishing
Project:
UP#152 Activity:
Top slab installation
Project:
UP#152 Activity:
Excavation
Project:
UP#152 Activity:
Base concreting
Project:
UP#152 Activity:
Wall -1st Lift concreting
Project:
UP#152 Activity:
Wall - 2nd Lift concreting
Project:
UP#152 Activity:
Water proofing
Project:
UP#152 Activity:
Backfilling
Project:
UP#152 Activity:
Internal finishing
Project:
UP#152 Activity:
Top slab installation
Project:
UP#152 Activity:
O46) - Additional Wall concreting
Project:
UP#152 Activity:
O46) - Water proofing
Project:
UP#152 Activity:
O46) - Backfilling
Project:
UP#152 Activity:
O46) - Internal finishing
Project:
UP#152 Activity:
O46) - Top slab installation
Project:
UP#152 Activity:
tion of Fire Extinguishers
Project:
UP#152 Activity:
Commissioning and hand over of Fire Extinguishers
Project:
UP#152 Activity:
tion of Gantries
Project:
UP#152 Activity:
r of Gantries
SEC2S21590
CH155 -
SEC2S21600
CH155 -
SEC2S21610
CH155 -
SEC2S21620
CH155 -
SEC2S21630
CH155 -
SEC2S21640
CH156 -
SEC2S21650
CH156 -
SEC2S21660
CH156 -
SEC2S21670
CH156 -
SEC2S21680
CH156 -
SEC2S21690
CH156 -
SEC2S21700
CH156 -
SEC2S21710
CH156 -
SEC2S21720
CH101A -
SEC2S21730
CH101A -
SEC2S21740
CH101A -
SEC2S21750
CH101A -
SEC2S21760
CH101A -
SEC2S21770
CH101A -
SEC2S21780
CH101A -
SEC2S21790
CH101A -
SEC2S21800
CH138 (V
SEC2S21810
CH138 (V
SEC2S21820
CH138 (V
SEC2S21830
CH138 (V
SEC2S21840
CH138 (V
SEC2S21850
Installa
SEC2S21860
Testing/
SEC2S21870
Installa
SEC2S21880
Hand ove
Project:
UP#152 Activity:
SEC2S21890
pe/fittings installation and welding - West End (CH101A)
Project:
UP#152 Activity:
SEC2S21900
ection pipe installation - West End (CH101A)
Project:
UP#152 Activity:
SEC2S21910
n Loop - Steel pipe/fittings installation and welding - New Apron Loop
Project:
UP#152 Activity:
SEC2S21920
n Loop - Leak detection pipe installation - New Apron Loop
Project:
UP#152 Activity:
SEC2S21930
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S21940
Torquing & Platform Works
Project:
UP#152 Activity:
SEC2S21950
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S21960
Mechanical Installation Works
Project:
UP#152 Activity:
SEC2S21970
orquing, Support & Platform Works
Project:
UP#152 Activity:
SEC2S21980
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S21990
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S22000
LPD-27 Installation
Project:
UP#152 Activity:
SEC2S22010
Insulation Gaskets & Touruing
Project:
UP#152 Activity:
SEC2S22020
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S22030
- Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S22040
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S22050
Insulation Gaskets & Torquing & Platform Works
Project:
UP#152 Activity:
SEC2S22060
Torquing & Platform Reinstallation Works
Project:
UP#152 Activity:
SEC2S22070
HPV-10 & HPV-11 - Installation
Project:
UP#152 Activity:
SEC2S22080
LPD-10 - Installation
Project:
UP#152 Activity:
SEC2S22090
LPD-12 - Installation
Project:
UP#152 Activity:
SEC2S22100
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S22110
- MOV installation, Insulation Gaskets & Tourquing
Project:
UP#152 Activity:
SEC2S22120
LPD-35 - Installation
Project:
UP#152 Activity:
SEC2S22130
MOV installation, Insulation Gaskets & Tourquing
Project:
UP#152 Activity:
SEC2S22140
8+705 to 8+805 - Pipe Laying and Fitting Installation
Project:
UP#152 Activity:
SEC2S22150
Torquing of Bolts/Nuts
Project:
UP#152 Activity:
SEC2S22160
Torquing of Bolts/Nuts
Project:
UP#152 Activity:
SEC2S22170
8+805 to 8+905 Pipe Laying and Fitting Installation
Project:
UP#152 Activity:
SEC2S22180
9+105 to 9+205 Pipe Laying and Fitting Installation
Steel pi
Leak det
New Apro
New Apro
CH-107 CH-110 CH-108 CH-150 CH-151 T
CH-134 CH-135 LPD-26 &
CH-140 CH-137 CH-135A
CH-136 CH-138 CH-139 HPV-09,
LPD-09 &
LPD-11 &
CH-113 CH-146
LPD-34 &
CH-145 Chainage
CH-143 CH-144 Chainage
Chainage
Project:
UP#152 Activity:
SEC2S22190
8+905 to 9+005 Pipe Laying and Fitting Installation
Project:
UP#152 Activity:
SEC2S22200
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S22210
9+205 to 9+250 Pipe Laying and Fitting Installation
Project:
UP#152 Activity:
SEC2S22220
- MOV installation, Insulation Gaskets & Tourquing
Project:
UP#152 Activity:
SEC2S22230
- MOV installation, Insulation Gaskets & Tourquing
Project:
UP#152 Activity:
SEC2S22240
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S22250
9+005 to 9+105 Pipe Laying and Fitting Installation
Project:
UP#152 Activity:
SEC2S22260
LPD-37 - Installation
Project:
UP#152 Activity:
SEC2S22270
HPV-37 & HPV-38 - Installation
Project:
UP#152 Activity:
SEC2S22280
orks to CH-21
Project:
UP#152 Activity:
SEC2S22290
orks to CH-22
Project:
UP#152 Activity:
SEC2S22300
- MOV installation, Insulation Gaskets & Tourquing
Project:
UP#152 Activity:
SEC2S22310
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S22320
LPD-02 - Mechanical Installation Works
Project:
UP#152 Activity:
SEC2S22330
Insulating Gasket, Torquing & Platform Works
Project:
UP#152 Activity:
SEC2S22340
at Chainage 0+040
Project:
UP#152 Activity:
SEC2S22350
HPV-04 - Mechanical Installation Works
Project:
UP#152 Activity:
SEC2S22360
l DBB Valves
Project:
UP#152 Activity:
SEC2S22370
ation Establishment (SCADA System)
Project:
UP#152 Activity:
SEC2S22380
esting, Integration and Modification Works of Existing SCADA System
Project:
UP#152 Activity:
SEC2S22390
PTP TEST (SCADA System)
Project:
UP#152 Activity:
SEC2S22400
e Laying in Section 2 (except Cables connected to SS 1164)
Project:
UP#152 Activity:
SEC2S22410
e laying in Section2 - Cables connected to SS 1164
Project:
UP#152 Activity:
SEC2S22420
o SS 1164
Project:
UP#152 Activity:
SEC2S22430
ct Civil Work Completion Section 2
Project:
UP#152 Activity:
SEC2S22440
e laying in Section 2 - Main Cables
Project:
UP#152 Activity:
SEC2S22450
e Laying in Section 3 (Except Main Cables)
Project:
UP#152 Activity:
SEC2S22460
ct Civil Works Completion Section 3
Project:
UP#152 Activity:
SEC2S22470
e Laying in Section 3 (Main Cables)
Project:
UP#152 Activity:
SEC2S22480
e Laying in Section 4 (except new Apron chambers)
Chainage
CH-141 Chainage
CH-147
CH-148
CH-142 Chainage
LPD-36 &
HPV-36,
Tie-In W
Tie-In W
CH-149
CH-102 LPD-01 &
CH-104 Blanking
HPV-03 &
Reinstal
Communic
Signal T
SAT and
E&I Cabl
E&I Cabl
Access t
Cable Du
E&I Cabl
E&I Cabl
Cable Du
E&I Cabl
E&I Cabl
Project:
UP#152 Activity:
SEC2S22490
ct Civil Works Completion Section 4
Project:
UP#152 Activity:
SEC2S22500
e Laying in Section 4 (Main Cables)
Project:
UP#152 Activity:
SEC2S22510
ct Civil Work Completion (New Aprons)
Project:
UP#152 Activity:
SEC2S22520
e Laying in Section 4 - New Apron Chambers
Project:
UP#152 Activity:
SEC2S22530
e Laying in Section 1 (Except Main Cables)
Project:
UP#152 Activity:
SEC2S22540
ct Civil Work Completion Section 1
Project:
UP#152 Activity:
SEC2S22550
e Laying in Section 1 (Main Cables)
Project:
UP#152 Activity:
SEC2S22560
ct Civil Work Completion (VO)
Project:
UP#152 Activity:
SEC2S22570
e Laying in Section 1 (VO)
Project:
UP#152 Activity:
SEC2S22580
e Laying in Section 5 (Except Fuel Farm Control Room)
Project:
UP#152 Activity:
SEC2S22590
ct Civil Work Completion Section 5
Project:
UP#152 Activity:
SEC2S22600
e Laying in Section 5 (Fuel Farm Control Room)
Project:
UP#152 Activity:
SEC2S22610
e Laying in Section 6
Project:
UP#152 Activity:
SEC2S22620
ct Civil Work Completion Section 6
Project:
UP#152 Activity:
SEC2S22630
e Laying in Section 6 (Main Cables)
Project:
UP#152 Activity:
SEC2S22640
ct Civil Work Completion Section 7
Project:
UP#152 Activity:
SEC2S22650
e Laying in Section 7
Project:
UP#152 Activity:
SEC2S22660
e Laying in Section 7 (Main Cables)
Project:
UP#152 Activity:
SEC2S22670
Purging Loop 4.1 & 4.2 - T&C Preparation All HPs/LPs/VCs
Project:
UP#152 Activity:
SEC2S22680
Purging Loop 4.1 & 4.2 - CH-103 T&C Spools Instln RRC
Project:
UP#152 Activity:
SEC2S22690
Purging Loop 4.1 & 4.2 - Pneumatic, Air Blowing & Drying - Loop 4.1
Project:
UP#152 Activity:
SEC2S22700
Purging Loop 4.1 & 4.2 - Nitrogen Filling - Loop 4.1
Project:
UP#152 Activity:
SEC2S22710
Purging Loop 4.1 & 4.2 - Pneumatic, Air Blowing & Drying - Loop 4.2
Project:
UP#152 Activity:
SEC2S22720
Purging Loop 4.1 & 4.2 - Nitrogen Filling - Loop 4.2
Project:
UP#152 Activity:
SEC2S22730
Purging Loop 3.1 & 3.2 -T&C Preparation All HPs/LPs
Project:
UP#152 Activity:
SEC2S22740
Purging Loop 3.1 & 3.2 - CH-103 T&C Spools Instln RRC
Project:
UP#152 Activity:
SEC2S22750
Purging Loop 3.1 & 3.2 - Pneumatic, Air Blowing & Drying - Loop 3.1
Project:
UP#152 Activity:
SEC2S22760
Purging Loop 3.1 & 3.2 - Nitrogen Filling - Loop 3.1
Project:
UP#152 Activity:
SEC2S22770
Purging Loop 3.1 & 3.2 - Pneumatic, Air Blowing & Drying - Loop 3.2
Project:
UP#152 Activity:
SEC2S22780
Purging Loop 3.1 & 3.2 - Nitrogen Filling - Loop 3.2
Cable Du
E&I Cabl
Cable Du
E&I Cabl
E&I Cabl
Cable Du
E&I Cabl
Cable Du
E&I Cabl
E&I Cabl
Cable Du
E&I Cabl
E&I Cabl
Cable Du
E&I Cabl
Cable Du
E&I Cabl
E&I Cabl
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Project:
UP#152 Activity:
SEC2S22790
Purging Loop 1.3 & 1.4 - T&C Preparation All HPs/LPs
Project:
UP#152 Activity:
SEC2S22800
Purging Loop 1.3 & 1.4 - CH-133 T&C Spools Instln RRC
Project:
UP#152 Activity:
SEC2S22810
Purging Loop 1.3 & 1.4 - Pneumatic, Air Blowing & Drying - Loop 1.3
Project:
UP#152 Activity:
SEC2S22820
Purging Loop 1.3 & 1.4 - Nitrogen Filling - Loop 1.3
Project:
UP#152 Activity:
SEC2S22830
Purging Loop 1.3 & 1.4 - Pneumatic, Air Blowing & Drying - Loop 1.4
Project:
UP#152 Activity:
SEC2S22840
Purging Loop 1.3 & 1.4 - Nitrogen Filling - Loop 1.4
Project:
UP#152 Activity:
SEC2S22850
Purging Loop 1.1 & 1.2 - T&C Preparation All HPs/LPs/VCs
Project:
UP#152 Activity:
SEC2S22860
Purging Loop 1.1 & 1.2 - CH-139 T&C Spools Instln RRC
Project:
UP#152 Activity:
SEC2S22870
Purging Loop 1.1 & 1.2 - Pneumatic, Air Blowing & Drying - Loop 1.1
Project:
UP#152 Activity:
SEC2S22880
Purging Loop 1.1 & 1.2 - Nitrogen Filling - Loop 1.1
Project:
UP#152 Activity:
SEC2S22890
Purging Loop 1.1 & 1.2 - Pneumatic, Air Blowing & Drying - Loop 1.2
Project:
UP#152 Activity:
SEC2S22900
Purging Loop 1.1 & 1.2 - Nitrogen Filling - Loop 1.2
Project:
UP#152 Activity:
SEC2S22910
Purging Loop 5.1 & 5.2 - T&C Preparation All HPs/LPs
Project:
UP#152 Activity:
SEC2S22920
Purging Loop 5.1 & 5.2 - CH-140 T&C Spools Instln RRC
Project:
UP#152 Activity:
SEC2S22930
Purging Loop 5.1 & 5.2 - Pneumatic, Air Blowing & Drying - Loop 5.1
Project:
UP#152 Activity:
SEC2S22940
Purging Loop 5.1 & 5.2 - Nitrogen Filling - Loop 5.1
Project:
UP#152 Activity:
SEC2S22950
Purging Loop 5.1 & 5.2 - Pneumatic, Air Blowing & Drying - Loop 5.2
Project:
UP#152 Activity:
SEC2S22960
Purging Loop 5.1 & 5.2 - Nitrogen Filling - Loop 5.2
Project:
UP#152 Activity:
SEC2S22970
Purging Loop 2.1 & 2.2 - T&C Preparation All HPs/LPs
Project:
UP#152 Activity:
SEC2S22980
Purging Loop 2.1 & 2.2 - CH-133 T&C Spools Instln RRC
Project:
UP#152 Activity:
SEC2S22990
Purging Loop 2.1 & 2.2 - Pneumatic, Air Blowing & Drying - Loop 2.1
Project:
UP#152 Activity:
SEC2S23000
Purging Loop 2.1 & 2.2 - Nitrogen Filling - Loop 2.1
Project:
UP#152 Activity:
SEC2S23010
Purging Loop 2.1 & 2.2 - Pneumatic, Air Blowing & Drying - Loop 2.2
Project:
UP#152 Activity:
SEC2S23020
Purging Loop 2.1 & 2.2 - Nitrogen Filling - Loop 2.2
Project:
UP#152 Activity:
SEC2S31000
Trench Civil Work Completion
Project:
UP#152 Activity:
SEC2S31010
Main Pipe Line Laying & Fit Up
Project:
UP#152 Activity:
SEC2S31020
Main Pipe Line Welding
Project:
UP#152 Activity:
SEC2S31030
RT Works / Painting/Wrap
Project:
UP#152 Activity:
SEC2S31040
Puddle Flange & Link Seal Insulation
Project:
UP#152 Activity:
SEC2S31050
Concrete Casting Surrounding the Puddle Flange
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
CH101A CH101A CH101A CH101A CH101A CH101A -
Project:
UP#152 Activity:
LDS conduit Installation
Project:
UP#152 Activity:
Installation of End Seal
Project:
UP#152 Activity:
Chamber Backfilling
Project:
UP#152 Activity:
Chamber Handover for Mechanical Work
Project:
UP#152 Activity:
Pipe Fabrication & Installation of DBB Valves
Project:
UP#152 Activity:
Pipe Welding
Project:
UP#152 Activity:
RT Works
Project:
UP#152 Activity:
Drain / Vent Installation
Project:
UP#152 Activity:
Painting/Wrap
Project:
UP#152 Activity:
Pipe Support Installation & Anchor Bolts
Project:
UP#152 Activity:
Insulation Gasket Kit Installation & Tourquing
Project:
UP#152 Activity:
Platform Installation
Project:
UP#152 Activity:
Grating Installation
Project:
UP#152 Activity:
Manhole Cover installation with Top Slab Cover
Project:
UP#152 Activity:
Cable Tray & Support Installation
Project:
UP#152 Activity:
Installation of Junction Boxes
Project:
UP#152 Activity:
Instruments Installation
Project:
UP#152 Activity:
Installation of Earthling Material
Project:
UP#152 Activity:
MOV Isolator Installation
Project:
UP#152 Activity:
Trench Civil Work Completion
Project:
UP#152 Activity:
36" Tee Installation
Project:
UP#152 Activity:
36" Tee Welding
Project:
UP#152 Activity:
24" Pipe Fit-up
Project:
UP#152 Activity:
6" Weldolet Joints Fit-up
Project:
UP#152 Activity:
24" Pipe Welding
Project:
UP#152 Activity:
RT Works
Project:
UP#152 Activity:
6" Weldolet Joints Welding
Project:
UP#152 Activity:
Painting/Wrap
Project:
UP#152 Activity:
Puddle Flange & Link Seal Insulation
Project:
UP#152 Activity:
Concrete Casting Surrounding the Puddle Flange
SEC2S31060
CH101A -
SEC2S31070
CH101A -
SEC2S31080
CH101A -
SEC2S31090
CH101A -
SEC2S31100
CH101A -
SEC2S31110
CH101A -
SEC2S31120
CH101A -
SEC2S31130
CH101A -
SEC2S31140
CH101A -
SEC2S31150
CH101A -
SEC2S31160
CH101A -
SEC2S31170
CH101A -
SEC2S31180
CH101A -
SEC2S31190
CH101A -
SEC2S31200
CH101A -
SEC2S31210
CH101A -
SEC2S31220
CH101A -
SEC2S31230
CH101A -
SEC2S31240
CH101A -
SEC2S31250
CH156 -
SEC2S31260
CH156 -
SEC2S31270
CH156 -
SEC2S31280
CH156 -
SEC2S31290
CH156 -
SEC2S31300
CH156 -
SEC2S31310
CH156 -
SEC2S31320
CH156 -
SEC2S31330
CH156 -
SEC2S31340
CH156 -
SEC2S31350
CH156 -
Project:
UP#152 Activity:
LDS conduit Installation
Project:
UP#152 Activity:
Installation of End Seal
Project:
UP#152 Activity:
Chamber FInal Backfilling
Project:
UP#152 Activity:
Chamber Handover for Mechanical Works
Project:
UP#152 Activity:
RT Works
Project:
UP#152 Activity:
Painting/Wrap
Project:
UP#152 Activity:
Pipe Support Installation & Anchor Bolts
Project:
UP#152 Activity:
Platform Installation
Project:
UP#152 Activity:
Grating Installation
Project:
UP#152 Activity:
Manhole Cover installation with Top Slab Cover
Project:
UP#152 Activity:
Cable Tray & Support Installation
Project:
UP#152 Activity:
Installation of Junction Boxes
Project:
UP#152 Activity:
Instruments Installation
Project:
UP#152 Activity:
Installation of Earthling Material
Project:
UP#152 Activity:
MOV Isolator Installation
Project:
UP#152 Activity:
Trench Civil Work Completion
Project:
UP#152 Activity:
36" Tee Installation
Project:
UP#152 Activity:
24" Pipe Fit-up
Project:
UP#152 Activity:
36" Tee Welding
Project:
UP#152 Activity:
24" Pipe Welding
Project:
UP#152 Activity:
RT Works
Project:
UP#152 Activity:
Painting/Wrap
Project:
UP#152 Activity:
Puddle Flange & Link Seal Insulation
Project:
UP#152 Activity:
Concrete Casting Surrounding the Puddle Flange
Project:
UP#152 Activity:
LDS conduit Installation
Project:
UP#152 Activity:
Installation of End Seal
Project:
UP#152 Activity:
Chamber Final Backfilling
Project:
UP#152 Activity:
Chamber Handover for Mechanical Work
Project:
UP#152 Activity:
RT Works
Project:
UP#152 Activity:
Painting/Wrap
SEC2S31360
CH156 -
SEC2S31370
CH156 -
SEC2S31380
CH156 -
SEC2S31390
CH156 -
SEC2S31420
CH156 -
SEC2S31440
CH156 -
SEC2S31450
CH156 -
SEC2S31470
CH156 -
SEC2S31480
CH156 -
SEC2S31490
CH156 -
SEC2S31500
CH156 -
SEC2S31510
CH156 -
SEC2S31520
CH156 -
SEC2S31530
CH156 -
SEC2S31540
CH156 -
SEC2S31550
CH155 -
SEC2S31560
CH155 -
SEC2S31570
CH155 -
SEC2S31580
CH155 -
SEC2S31590
CH155 -
SEC2S31600
CH155 -
SEC2S31610
CH155 -
SEC2S31620
CH155 -
SEC2S31630
CH155 -
SEC2S31640
CH155 -
SEC2S31650
CH155 -
SEC2S31660
CH155 -
SEC2S31670
CH155 -
SEC2S31700
CH155 -
SEC2S31720
CH155 -
Project:
UP#152 Activity:
Pipe Support Installation & Anchor Bolts
Project:
UP#152 Activity:
Platform Installation
Project:
UP#152 Activity:
Grating Installation
Project:
UP#152 Activity:
Manhole Cover installation with Top Slab Cover
Project:
UP#152 Activity:
Cable Tray & Support Installation
Project:
UP#152 Activity:
Installation of Junction Boxes
Project:
UP#152 Activity:
Instruments Installation
Project:
UP#152 Activity:
Installation of Earthling Material
Project:
UP#152 Activity:
MOV Isolator Installation
Project:
UP#152 Activity:
Chamber Handover for Mechanical Work
Project:
UP#152 Activity:
Cutting of Pipes
Project:
UP#152 Activity:
Installation of Link Seal
Project:
UP#152 Activity:
Puddle Flange Installation
Project:
UP#152 Activity:
Tempoaray Installation of Spool Piece
Project:
UP#152 Activity:
Concrete Casting Surrounding the Puddle Flange
Project:
UP#152 Activity:
Installation of End Seal
Project:
UP#152 Activity:
Anchor Bolts for Pipe Support
Project:
UP#152 Activity:
Final Backfilling
Project:
UP#152 Activity:
Pipe Support Installation
Project:
UP#152 Activity:
PIpe Spool Preparation
Project:
UP#152 Activity:
Assembly of Flanges with DBB Valves
Project:
UP#152 Activity:
36" Piping Installation with DBB Valves Installation
Project:
UP#152 Activity:
36" Welding Works
Project:
UP#152 Activity:
Radiography Testing
Project:
UP#152 Activity:
Installation of Ball Valve With Flanges
Project:
UP#152 Activity:
Drain/Vent Installation
Project:
UP#152 Activity:
24" Pipe Installation
Project:
UP#152 Activity:
24" Welding Works
Project:
UP#152 Activity:
Painting/Wrap
Project:
UP#152 Activity:
Insulation Gasket Kit Installation
SEC2S31730
CH155 -
SEC2S31750
CH155 -
SEC2S31760
CH155 -
SEC2S31770
CH155 -
SEC2S31780
CH155 -
SEC2S31790
CH155 -
SEC2S31800
CH155 -
SEC2S31810
CH155 -
SEC2S31820
CH155 -
SEC2S31830
CH154 -
SEC2S31840
CH154 -
SEC2S31850
CH154 -
SEC2S31860
CH154 -
SEC2S31870
CH154 -
SEC2S31880
CH154 -
SEC2S31890
CH154 -
SEC2S31900
CH154 -
SEC2S31910
CH154 -
SEC2S31920
CH154 -
SEC2S31930
CH154 -
SEC2S31940
CH154 -
SEC2S31950
CH154 -
SEC2S31960
CH154 -
SEC2S31970
CH154 -
SEC2S31980
CH154 -
SEC2S31990
CH154 -
SEC2S32000
CH154 -
SEC2S32010
CH154 -
SEC2S32020
CH154 -
SEC2S32030
CH154 -
Project:
UP#152 Activity:
SEC2S32040
CH154 -
Torquing
Project:
UP#152 Activity:
SEC2S32050
CH154 Platform Installation
Project:
UP#152 Activity:
SEC2S32060
CH154 Manhole Cover installation with Top Slab Cover
Project:
UP#152 Activity:
SEC2S32070
CH154 Cable Tray & Support Installation
Project:
UP#152 Activity:
SEC2S32080
CH154 Installation of Junction Boxes
Project:
UP#152 Activity:
SEC2S32090
CH154 Instruments Installation
Project:
UP#152 Activity:
SEC2S32100
CH154 Installation of Earthling Material
Project:
UP#152 Activity:
SEC2S32110
CH154 MOV Isolator Installation
Project:
UP#152 Activity:
SEC2S32120
New Apro
n Loop - Continuity & Loop Checking
Project:
UP#152 Activity:
SEC2S32130
New Apro
n Loop - Installation of Earthing Material
Project:
UP#152 Activity:
SEC2S32140
New Apro
n Loop - Cathodic Protection System Works
Project:
UP#152 Activity:
SEC2S32150
New Apro
n Loop - FDB & SDB Installation
Project:
UP#152 Activity:
SEC2S32160
New Apro
n Loop - Cable Ducts Civil Work Completion
Project:
UP#152 Activity:
SEC2S32170
New Apro
n Loop - LD Sensor Cable Laying
Project:
UP#152 Activity:
SEC2S32180
New Apro
n Loop - LDS Sensor Cable termination
Project:
UP#152 Activity:
SEC2S32190
New Apro
n Loop - LD Jumper Cable Laying
Project:
UP#152 Activity:
SEC2S32200
New Apro
n Loop - LDS Jumper Cable termination
Project:
UP#152 Activity:
SEC2S32210
New Apro
n Loop - Instrument & Control Cable Laying
Project:
UP#152 Activity:
SEC2S32220
New Apro
n Loop - Instrument & Control Cable Termination
Project:
UP#152 Activity:
SEC2S32230
New Apro
n Loop - Power Cable Laying
Project:
UP#152 Activity:
SEC2S32240
New Apro
n Loop - Earth Cable Laying
Project:
UP#152 Activity:
SEC2S32250
New Apro
n Loop - Power Cable Termination
Project:
UP#152 Activity:
SEC2S32260
New Apro
n Loop - Earth Cable Termination
Project:
UP#152 Activity:
SEC2S32270
New Apro
n Loop - Instrument & Control Cable Loop Testing
Project:
UP#152 Activity:
SEC2S32280
New Apro
n Loop - Testing and Commissioning of Field Instruments, ESD and MOV after Fiel
d Modification
Project:
UP#152 Activity:
SEC2S32340
CH-102 t
o CH-101 Nitrogen Purging - Setting-up & Preparation
Project:
UP#152 Activity:
SEC2S32350
CH-102 t
o CH-101 Nitrogen Purging - Pneumatic Testing
Project:
UP#152 Activity:
SEC2S32360
CH-102 t
o CH-101 Nitrogen Purging - Air Blowing
Project:
UP#152 Activity:
SEC2S32370
CH-102 t
o CH-101 Nitrogen Purging - Drying
Project:
UP#152 Activity:
SEC2S32380
CH-102 t
Project:
Project:
Project:
Project:
Project:
UP#152
UP#152
UP#152
UP#152
UP#152
Project:
Project:
Project:
Activity:
Activity:
Activity:
Activity:
Activity:
VO15
VO15-1
VO16
VO17
VO18
UP#152 Activity:
UP#152 Activity:
VO19
VO20
Not Used
DVOR Monitor Ant
UP#152 Activity:
VO21
Presidential Fli
UP#152 Activity:
VO22
MART Stormwater
UP#152 Activity:
UP#152 Activity:
VO23
VO24
Flush Kerb
MJF Concrete Col
UP#152 Activity:
VO25
UP#152 Activity:
VO26
Taxiway F - AGL
UP#152 Activity:
UP#152 Activity:
VO27
VO28
A-SMGCS Descope
Fire Main Tie -
UP#152 Activity:
VO29
Fire Fighting at
UP#152 Activity:
VO30
UP#152 Activity:
VO31
Optional Item -
UP#152 Activity:
UP#152 Activity:
UP#152 Activity:
VO33
MJF - Security G
UP#152 Activity:
VO34
External Access
UP#152 Activity:
VO35
UP#152 Activity:
UP#152 Activity:
VO36
VO37
Not Used
AJF/MJF Interfac
UP#152 Activity:
VO38
UP#152 Activity:
UP#152 Activity:
VO39
VO40
Not Used
B2 Road Underpas
UP#152 Activity:
VO41
Pavement Marking
UP#152 Activity:
UP#152 Activity:
VO42
VO43
Not Used
Surface Protecti
UP#152 Activity:
VO44
UP#152 Activity:
VO45
Generators 4 Sta
UP#152 Activity:
VO46
UP#152 Activity:
UP#152 Activity:
VO47
VO48
Not Used
MV & FOC Modific
& TMS
enna Relocation
ght
Project:
& Firefighting Lines
Project:
Project:
lars
Project:
Patrol Road
Project:
Lights Replacement
Project:
Project:
in Points
Project:
D4
Project:
ndby Power
Project:
Bill 3 - Fencing Barriers
Project:
dditional Budget
Project:
dditional Budget
Project:
ate Obstruction
Project:
Roads - Substations
Project:
Cable Joints
Project:
Project:
e
Project:
rol Work Pk. 1
Project:
Project:
s Fence Removal
Project:
s - Thermoplastic
Project:
Project:
on Omission
Project:
hambers
Project:
nds
Project:
Modifications
Project:
Project:
ations
Project:
Project:
UP#152 Activity:
UP#152 Activity:
VO49
VO50
Not Used
Taxiway F4 Remar
Project:
Project:
Project:
UP#152 Activity:
UP#152 Activity:
UP#152 Activity:
VO51
VO52
VO53
Earthworks - 31L
Not Used
Cargo Stands Bar
Project:
UP#152 Activity:
able Redundancy Works
Project:
UP#152 Activity:
Project:
UP#152 Activity:
New Fuel Depot
Project:
UP#152 Activity:
s
Project:
UP#152 Activity:
al
Project:
UP#152 Activity:
ts
Project:
UP#152 Activity:
xiways E13 & E14
Project:
UP#152 Activity:
Project:
UP#152 Activity:
Project:
UP#152 Activity:
ion for HLG
Project:
UP#152 Activity:
nds
Project:
UP#152 Activity:
rs for Cargo Apron Stands
Project:
UP#152 Activity:
Project:
UP#152 Activity:
Project:
UP#152 Activity:
Project:
UP#152 Activity:
Near TWY H)
Project:
UP#152 Activity:
er line realignment
Project:
UP#152 Activity:
Project:
UP#152 Activity:
rol Work CH101, CH21, CH22 & 700 Stands
Project:
UP#152 Activity:
Project:
UP#152 Activity:
Project:
UP#152 Activity:
Project:
UP#152 Activity:
Design
Project:
UP#152 Activity:
s 12 Stands (MAY - AUG)
Project:
UP#152 Activity:
Crossing
Project:
UP#152 Activity:
Work
Project:
UP#152 Activity:
Taxiway D9
Project:
UP#152 Activity:
Project:
UP#152 Activity:
s
Project:
UP#152 Activity:
n
Project:
UP#152 Activity:
Project:
UP#152 Activity:
e Laying Constraints
VO54
Leak Detection C
VO55
VO56
Foreman Dayworks
Cable Ducts Near
VO57
Pavement Marking
VO58
Signage Addition
VO59
Signage Amendmen
VO60
Earthworks at Ta
VO61
VO62
VO63
VO64
Generators 9 Sta
VO65
Fire Extinguishe
VO66
VO67
VO68
VO69
Not Used
Not Used
Not Used
Stop Bar TWY C (
VO70
A3 Road Stormwat
VO71
VO72
Not Used
MJF Hydrant Cont
VO73
VO74
VO75
VO76
Not Used
Not Used
Not Used
FATO Additional
VO77
EMCA - Generator
VO78
VO79
ADAC Stoppage of
VO80
Lead-on Lighting
VO81
VO82
TWY H AGL
TWY H CL Marking
VO83
A3 Road Formatio
VO84
VO85
Not Used
AGL Primary Cabl
king
riers
Project:
Project:
UP#152 Activity:
UP#152 Activity:
VO86
VO87
Not Used
Taxiway D6 AGL R
Project:
UP#152 Activity:
VO88
Project:
UP#152 Activity:
VO89
Distribution Box
Project:
UP#152 Activity:
Project:
UP#152 Activity:
Project:
UP#152 Activity:
Project:
Project:
UP#152 Activity:
UP#152 Activity:
VO91
VO92
Not Used
Stop bar at Taxi
Project:
e Duct Rerouting
Project:
UP#152 Activity:
VO93
UP#152 Activity:
VO94
400 Hz Cable
erouting
ification
es Relocation
escope
escope
escope
way D