Scheduling/Leveling Report - 20-Jun-16 - PM.

exe
===============================================
Default Project..................................................UP#152
Projects:
UP#152..........................................................
.Completion Plan 5 August 2015 Rev 02 (Update -17 June 2016)
Scheduling/Leveling Settings:
----------------------------General
------Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retaine
d Logic
Calculate start-to-start lag from ...............................Early S
tart
Define critical activities as ...................................Longest
Path
Compute Total Float As ..........................................Finish
Float
Calculate float based on finish date of .........................Each pr
oject
Calendar for scheduling Relationship Lag ........................Predece
ssor Activity Calendar
Advanced
-------Calculate multiple float paths...................................Yes
Calculate multiple float paths using.............................Free Fl
oat
Number of paths to calculate.....................................10
Statistics:
----------# Projects.......................................................1
# Activities.....................................................833
# Not Started....................................................250
# In Progress....................................................81
# Completed......................................................502
# Relationships..................................................1197
# Activities with Constraint.....................................27
Project:
UP#152 Activity:
GEN0001020
Receive
Instruction from ADAC to procure additional MJF Pipe fittings & Valves
Project:
UP#152 Activity:
GEN0001030
Stage 1
Completion
Project:
UP#152 Activity:
GEN0001040
Stage 2
Completion
Project:
UP#152 Activity:
GEN0001050
Stage 3
Completion
Project:
UP#152 Activity:
GEN0001060
Stage 4
Completion

Project:
UP#152 Activity:
o Area (For Remaining Fire Fighting Work)
Project:
UP#152 Activity:
n Fuel Farm Control Room
Project:
UP#152 Activity:
of VO 37
Project:
UP#152 Activity:
ersion by HLG to its final position
Project:
UP#152 Activity:
lity of Fuel Farm (Installation of instruments)
Project:
UP#152 Activity:
lity of Fuel in Fuel Farm
Project:
UP#152 Activity:
o Runways
Project:
UP#152 Activity:
o SS 1164
Project:
UP#152 Activity:
ct Civil Work Completion Section 2
Project:
UP#152 Activity:
ct Civil Works Completion Section 3
Project:
UP#152 Activity:
ct Civil Works Completion Section 4
Project:
UP#152 Activity:
ct Civil Work Completion (New Aprons)
Project:
UP#152 Activity:
ct Civil Work Completion Section 1
Project:
UP#152 Activity:
ct Civil Work Completion (VO)
Project:
UP#152 Activity:
ct Civil Work Completion Section 5
Project:
UP#152 Activity:
ct Civil Work Completion Section 6
Project:
UP#152 Activity:
ct Civil Work Completion Section 7
Project:
UP#152 Activity:
Trench Civil Work Completion
Project:
UP#152 Activity:
Trench Civil Work Completion
Project:
UP#152 Activity:
Trench Civil Work Completion
Project:
UP#152 Activity:
m and Control Room Availability
Project:
UP#152 Activity:
m Availability

GEN0001110

Access t

GEN0001120

Access i

GEN0001160

Approval

GEN0001180

Road div

GEN0001200

Availabi

GEN0001210

Availabi

SEC2S11620

Access t

SEC2S22420

Access t

SEC2S22430

Cable Du

SEC2S22460

Cable Du

SEC2S22490

Cable Du

SEC2S22510

Cable Du

SEC2S22540

Cable Du

SEC2S22560

Cable Du

SEC2S22590

Cable Du

SEC2S22620

Cable Du

SEC2S22640

Cable Du

SEC2S31000

CH101A -

SEC2S31250

CH156 -

SEC2S31550

CH155 -

SEC2S32430

Fuel Far

SEC2S41000

Fuel Far

Errors:
------Warnings:
--------Activities without predecessors..................................1
Project:
UP#152 Activity:
GEN0001000
Project
Start
Activities without successors....................................1
Project:
UP#152 Activity:
GEN0001060
Stage 4
Completion
Out-of-sequence activities.......................................75
Project:
UP#152 Activity:
ASBULT1000
Submissi
on of As Built Drawing for Storm water works

Project:
UP#152 Activity:
ASBULT1020
on of As Built Drawing for Electrical works
Project:
UP#152 Activity:
ASBULT1040
on of As Built Drawing for Fire Fighting works
Project:
UP#152 Activity:
ASBULT1060
on of As Built Drawing for AGL works
Project:
UP#152 Activity:
ASBULT1120
on of As Built Drawing for Aprons - Concrete Pavement
Project:
UP#152 Activity:
ASBULT1140
on of As Built Drawing for Substations
Project:
UP#152 Activity:
ASBULT1150
of As Built Drawing for Substations
Project:
UP#152 Activity:
ASBULT1160
on of As Built Drawing for Air Side Road A3
Project:
UP#152 Activity:
ASBULT1170
of As Built Drawing for Air Side Road A3
Project:
UP#152 Activity:
ASBULT1200
on of As Built Drawing for Taxi ways - Asphalt works
Project:
UP#152 Activity:
ASBULT1210
of As Built Drawing for Taxi ways - Asphalt works
Project:
UP#152 Activity:
GEN0001220
NOCs
Project:
UP#152 Activity:
O&MMNL1000
n and Maintanance Manual for AGL Network - Submission
Project:
UP#152 Activity:
O&MMNL1010
n and Maintanance Manual for AGL Network - Approval
Project:
UP#152 Activity:
O&MMNL1050
n and Maintanance Manual for Telecommunication Network - Approval
Project:
UP#152 Activity:
SEC2S11310
Inspection and Handoover -AGL SS
Project:
UP#152 Activity:
SEC2S11580
tion of Traffic Signal System
Project:
UP#152 Activity:
SEC2S11890
and Desnagging - Taxiway D (West of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S12020
and Desnagging - Connecting Taxiway
Project:
UP#152 Activity:
SEC2S21090
round - New Apron Loop
Project:
UP#152 Activity:
SEC2S21120
ckfilling - New Apron Loop
Project:
UP#152 Activity:
SEC2S21630
Top slab installation
Project:
UP#152 Activity:
SEC2S21780
Internal finishing
Project:
UP#152 Activity:
SEC2S21900
ection pipe installation - West End (CH101A)
Project:
UP#152 Activity:
SEC2S22150
Torquing of Bolts/Nuts
Project:
UP#152 Activity:
SEC2S22500
e Laying in Section 4 (Main Cables)
Project:
UP#152 Activity:
SEC2S22630
e Laying in Section 6 (Main Cables)
Project:
UP#152 Activity:
SEC2S22640
ct Civil Work Completion Section 7
Project:
UP#152 Activity:
SEC2S22980
Purging Loop 2.1 & 2.2 - CH-133 T&C Spools Instln RRC
Project:
UP#152 Activity:
SEC2S22990
Purging Loop 2.1 & 2.2 - Pneumatic, Air Blowing & Drying - Loop 2.1
Project:
UP#152 Activity:
SEC2S23010
Purging Loop 2.1 & 2.2 - Pneumatic, Air Blowing & Drying - Loop 2.2

Submissi
Submissi
Submissi
Submissi
Submissi
Approval
Submissi
Approval
Submissi
Approval
Project
Opeartio
Opeartio
Operatio
ADAC AGL
Installa
Snagging
Snagging
Sand sur
Final ba
CH155 CH101A Leak det
CH-143 E&I Cabl
E&I Cabl
Cable Du
Nitrogen
Nitrogen
Nitrogen

Project:
UP#152 Activity:
24" Spool Preparation
Project:
UP#152 Activity:
RT Works
Project:
UP#152 Activity:
Drain & Vent Installation
Project:
UP#152 Activity:
Platform Installation
Project:
UP#152 Activity:
Cable Tray & Support Installation
Project:
UP#152 Activity:
Installation of Earthling Material
Project:
UP#152 Activity:
24" Pipe Welding
Project:
UP#152 Activity:
24" Spool Preparation
Project:
UP#152 Activity:
RT Works
Project:
UP#152 Activity:
Drain & Vent Installation
Project:
UP#152 Activity:
Platform Installation
Project:
UP#152 Activity:
Cable Tray & Support Installation
Project:
UP#152 Activity:
Installation of Earthling Material
Project:
UP#152 Activity:
Assembly of Flanges with DBB Valves
Project:
UP#152 Activity:
24" Welding Works
Project:
UP#152 Activity:
Installation of Earthling Material
Project:
UP#152 Activity:
n Loop - Cathodic Protection System Works
Project:
UP#152 Activity:
n Loop - FDB & SDB Installation
Project:
UP#152 Activity:
n Loop - Power Cable Laying
Project:
UP#152 Activity:
n Loop - Earth Cable Laying
Project:
UP#152 Activity:
- Fuel Filling in Loop 1B & Loop 1A
Project:
UP#152 Activity:
Project:
UP#152 Activity:
l Differences
Project:
UP#152 Activity:
n
Project:
UP#152 Activity:
Project:
UP#152 Activity:
enna Relocation
Project:
UP#152 Activity:
D4
Project:
UP#152 Activity:
ate Obstruction
Project:
UP#152 Activity:
Cable Joints
Project:
UP#152 Activity:
e
Project:
UP#152 Activity:
rol Work Pk. 1

SEC2S31400

CH156 -

SEC2S31420

CH156 -

SEC2S31430

CH156 -

SEC2S31470

CH156 -

SEC2S31500

CH156 -

SEC2S31530

CH156 -

SEC2S31590

CH155 -

SEC2S31680

CH155 -

SEC2S31700

CH155 -

SEC2S31710

CH155 -

SEC2S31750

CH155 -

SEC2S31780

CH155 -

SEC2S31810

CH155 -

SEC2S31940

CH154 -

SEC2S32010

CH154 -

SEC2S32100

CH154 -

SEC2S32140

New Apro

SEC2S32150

New Apro

SEC2S32230

New Apro

SEC2S32240

New Apro

SEC2S41060

Loop 1B

VO06-1 FATO Relocation


VO07
Zones 1 & 2 Leve
VO14-2 MART MJF Redesig
VO15
VO20

AOA Gate House


DVOR Monitor Ant

VO29

Fire Fighting at

VO33

MJF - Security G

VO35

MART AGL Primary

VO37

AJF/MJF Interfac

VO38

MJF Hydrant Cont

Project:

UP#152 Activity:

VO40

B2 Road Underpas

Project:

UP#152 Activity:

VO43

Surface Protecti

Project:

UP#152 Activity:

VO48

MV & FOC Modific

Project:

UP#152 Activity:

VO50

Taxiway F4 Remar

Project:

UP#152 Activity:

VO53

Cargo Stands Bar

Project:
Project:

UP#152 Activity:
UP#152 Activity:

VO55
VO63

Foreman Dayworks
Barrier Preparat

Project:

UP#152 Activity:

VO69

Stop Bar TWY C (

Project:

UP#152 Activity:

VO76

FATO Additional

Project:
e Laying Constraints
Project:
erouting
Project:
escope
Project:
way D

UP#152 Activity:

VO85

AGL Primary Cabl

UP#152 Activity:

VO87

Taxiway D6 AGL R

UP#152 Activity:

VO90-1 Optional Items D

UP#152 Activity:

VO92

s Fence Removal
on Omission
ations
king
riers
ion for HLG
Near TWY H)
Design

Stop bar at Taxi

Activities with Actual Dates > Data Date.........................0


Milestone Activities with invalid relationships..................0
Finish milestone and predecessors have different calendars.......43
Project:
UP#152 Activity:
GEN0001030
Stage
Completion
Project:
UP#152 Activity:
GEN0001030
Stage
Completion
Project:
UP#152 Activity:
GEN0001030
Stage
Completion
Project:
UP#152 Activity:
GEN0001030
Stage
Completion
Project:
UP#152 Activity:
GEN0001030
Stage
Completion
Project:
UP#152 Activity:
GEN0001030
Stage
Completion
Project:
UP#152 Activity:
GEN0001030
Stage
Completion
Project:
UP#152 Activity:
GEN0001030
Stage
Completion
Project:
UP#152 Activity:
GEN0001030
Stage
Completion
Project:
UP#152 Activity:
GEN0001030
Stage
Completion
Project:
UP#152 Activity:
GEN0001030
Stage
Completion
Project:
UP#152 Activity:
GEN0001030
Stage
Completion
Project:
UP#152 Activity:
GEN0001030
Stage
Completion
Project:
UP#152 Activity:
GEN0001030
Stage
Completion
Project:
UP#152 Activity:
GEN0001030
Stage

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Completion
Project:

UP#152 Activity:

GEN0001030

Stage 1

Project:

UP#152 Activity:

GEN0001030

Stage 1

Project:

UP#152 Activity:

GEN0001030

Stage 1

Project:

UP#152 Activity:

GEN0001030

Stage 1

Project:

UP#152 Activity:

GEN0001030

Stage 1

Project:

UP#152 Activity:

GEN0001040

Stage 2

Project:

UP#152 Activity:

GEN0001040

Stage 2

Project:

UP#152 Activity:

GEN0001040

Stage 2

Project:

UP#152 Activity:

GEN0001040

Stage 2

Project:

UP#152 Activity:

GEN0001040

Stage 2

Project:

UP#152 Activity:

GEN0001040

Stage 2

Project:

UP#152 Activity:

GEN0001040

Stage 2

Project:

UP#152 Activity:

GEN0001040

Stage 2

Project:

UP#152 Activity:

GEN0001040

Stage 2

Project:

UP#152 Activity:

GEN0001040

Stage 2

Project:

UP#152 Activity:

GEN0001050

Stage 3

Project:

UP#152 Activity:

GEN0001050

Stage 3

Project:

UP#152 Activity:

GEN0001060

Stage 4

Project:

UP#152 Activity:

GEN0001060

Stage 4

Project:

UP#152 Activity:

GEN0001060

Stage 4

Project:

UP#152 Activity:

GEN0001060

Stage 4

Project:

UP#152 Activity:

GEN0001060

Stage 4

Project:

UP#152 Activity:

GEN0001060

Stage 4

Project:

UP#152 Activity:

GEN0001060

Stage 4

Project:

UP#152 Activity:

GEN0001060

Stage 4

Project:

UP#152 Activity:

GEN0001060

Stage 4

Project:

UP#152 Activity:

SEC2S22420

Access t

Project:

UP#152 Activity:

SEC2S41000

Fuel Far

Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
o SS 1164
m Availability
Scheduling/Leveling Results:
----------------------------

# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................833
# Relationships with other projects..............................0
Data Date........................................................17-Jun16
Earliest Early Start Date........................................17-Jun16
Latest Early Finish Date.........................................16-Feb17
Number of float paths............................................10
Exceptions:
----------Critical Activities..............................................65
Project:
UP#152 Activity:
GEN0001060
Stage 4
Completion
Project:
UP#152 Activity:
PRCMTSD1170
Site Del
ivery 36" DBB valves
Project:
UP#152 Activity:
PRCMTSD1175
Site Del
ivery 24" DBB valves
Project:
UP#152 Activity:
SEC2S31410
CH156 Piping Installation with DBB valves
Project:
UP#152 Activity:
SEC2S31460
CH156 Insulation Gasket Kit Installation & Tourquing
Project:
UP#152 Activity:
SEC2S31690
CH155 Piping Installation with DBB valves
Project:
UP#152 Activity:
SEC2S31740
CH155 Insulation Gasket Kit Installation & Tourquing
Project:
UP#152 Activity:
SEC2S32290
CH-133 t
o CH-135 Nitrogen Purging - Setting-up & Preparation
Project:
UP#152 Activity:
SEC2S32300
CH-133 t
o CH-135 Nitrogen Purging - Pneumatic Testing
Project:
UP#152 Activity:
SEC2S32310
CH-133 t
o CH-135 Nitrogen Purging - Air Blowing
Project:
UP#152 Activity:
SEC2S32320
CH-133 t
o CH-135 Nitrogen Purging - Drying
Project:
UP#152 Activity:
SEC2S32330
CH-133 t
o CH-135 Nitrogen Purging - Nitrogen Purging
Project:
UP#152 Activity:
SEC2S41010
Loop 1B
- Preparation & Set-up
Project:
UP#152 Activity:
SEC2S41020
Loop 1B
- Installation of Temporary Flushing Loops in CH-133 & CH-151
Project:
UP#152 Activity:
SEC2S41030
Loop 1B
- Installation of BFs & Fuel Filling Loop in CH-139
Project:
UP#152 Activity:
SEC2S41040
Loop 1B
- Installation of Christmas Trees on HPs & LPs
Project:
UP#152 Activity:
SEC2S41050
Loop 1B
- Installation of Blind Flanges with Goose Neck Connection on HRs
Project:
UP#152 Activity:
SEC2S41060
Loop 1B
- Fuel Filling in Loop 1B & Loop 1A
Project:
UP#152 Activity:
SEC2S41070
Loop 1B
- Soak Testing of Loop 1B & Loop 1A
Project:
UP#152 Activity:
SEC2S41090
Loop 1B
- Soak Test Sample & Approval
Project:
UP#152 Activity:
SEC2S41120
Loop 1B
- Flushing & Filtration for Mainline & Millipore Test
Project:
UP#152 Activity:
SEC2S41130
Loop 1B
- Flushing & Filtration of Risers & Millipore Test
Project:
UP#152 Activity:
SEC2S41140
Loop 1B
- API Filtration
Project:
UP#152 Activity:
SEC2S41270
Loop 1A

- Flushing & Filtration for Mainline & Millipore Test


Project:
UP#152 Activity:
SEC2S41280
Loop 1A
- Flushing & Filtration of Risers & Millipore Test
Project:
UP#152 Activity:
SEC2S41290
Loop 1A
- API Filtration
Project:
UP#152 Activity:
SEC2S41330
Loop 2A
- Preparation & Set-up
Project:
UP#152 Activity:
SEC2S41340
Loop 2A
- Installation of Temporary Flushing Loop in CH-110 & CH-113
Project:
UP#152 Activity:
SEC2S41350
Loop 2A
- Installation of BFs in CH-112
Project:
UP#152 Activity:
SEC2S41360
Loop 2A
- Installation of Christmas Trees on HPs & LPs
Project:
UP#152 Activity:
SEC2S41370
Loop 2A
- Transfer of Fuel from Section Between CH-133 & CH-154 to Loop 2A
Project:
UP#152 Activity:
SEC2S41380
Loop 2A
- Removal of Temporary Flushing Loop in CH-133 and Installation of BFs
Project:
UP#152 Activity:
SEC2S41390
Loop 2A
- Installation of Temporary Flushing Loop in CH-133
Project:
UP#152 Activity:
SEC2S41400
Loop 2A
- Fuel Filling in Loop 2A through Loop 1A
Project:
UP#152 Activity:
SEC2S41410
Loop 2A
- Soak Testing of Loop 2A
Project:
UP#152 Activity:
SEC2S41440
Loop 2A
- Soak Test Sample & Approval
Project:
UP#152 Activity:
SEC2S41450
Loop 2A
- Flushing & Filtration for Mainline & Millipore Test
Project:
UP#152 Activity:
SEC2S41460
Loop 2A
- Flushing & Filtration of Risers & Millipore Test
Project:
UP#152 Activity:
SEC2S41470
Loop 2A
- API Filtration
Project:
UP#152 Activity:
SEC2S41480
Loop 2A
- Partial Draining of Sections Between CH-111 & CH-133
Project:
UP#152 Activity:
SEC2S41490
Loop 2A
- Removal of Christmas Trees Between CH-111 & CH-133
Project:
UP#152 Activity:
SEC2S41500
Loop 2A
- Installation of HP/LP Assemblies Between CH-111 & CH-133
Project:
UP#152 Activity:
SEC2S41870
Loop 3A
- Fuel Filling
Project:
UP#152 Activity:
SEC2S41880
Loop 3A
- Soak Testing
Project:
UP#152 Activity:
SEC2S41890
Loop 3A
- Pressure Testing
Project:
UP#152 Activity:
SEC2S41900
Loop 3A
- Soak Test Sample Approval
Project:
UP#152 Activity:
SEC2S41910
Loop 3A
- Draining of Line 1
Project:
UP#152 Activity:
SEC2S41920
Loop 3A
- Flip Spectacle Blind and Install Flushing Manifold
Project:
UP#152 Activity:
SEC2S41930
Loop 3A
- Flushing of Mainline & Millipore Test of Line 1
Project:
UP#152 Activity:
SEC2S41940
Loop 3A
- Draining of Line 1
Project:
UP#152 Activity:
SEC2S41950
Loop 3A
- Flip Spectacle Blind and Remove Flushing Manifold
Project:
UP#152 Activity:
SEC2S41960
Loop 3A
- Install Permanent Piping
Project:
UP#152 Activity:
SEC2S41970
Loop 3A
- Draining of Line 2
Project:
UP#152 Activity:
SEC2S41980
Loop 3A

- Flip Spectacle Blind and Install Flushing Manifold


Project:
UP#152 Activity:
- Flushing of Mainline & Millipore Test of Line 2
Project:
UP#152 Activity:
- Draining of Line 2
Project:
UP#152 Activity:
- Flip Spectacle Blind and Remove Flushing Manifold
Project:
UP#152 Activity:
- Install Permanent Piping
Project:
UP#152 Activity:
- Re-Pressurizing to System Pressure
Project:
UP#152 Activity:
and Commissioning - PAKSCAN/EFSD Software calibration
Project:
UP#152 Activity:
and Commissioning - Automation of valves
Project:
UP#152 Activity:
and Commissioning - Emergency fuel shutdown
Project:
UP#152 Activity:
and Commissioning - LDS software set-up
Project:
UP#152 Activity:
and Commissioning - Calibration of TCS and LDS
Project:
UP#152 Activity:
Desnagging of MJF line

SEC2S41990

Loop 3A

SEC2S42000

Loop 3A

SEC2S42010

Loop 3A

SEC2S42020

Loop 3A

SEC2S42030

Loop 3A

SEC2S42040

Testing

SEC2S42050

Testing

SEC2S42060

Testing

SEC2S42070

Testing

SEC2S42080

Testing

SEC2S42090

Snag and

Activities with unsatisfied constraints..........................9


Project:
UP#152 Activity:
GEN0001030
Stage 1
Completion
Project:
UP#152 Activity:
GEN0001040
Stage 2
Completion
Project:
UP#152 Activity:
GEN0001050
Stage 3
Completion
Project:
UP#152 Activity:
GEN0001060
Stage 4
Completion
Project:
UP#152 Activity:
GEN0001210
Availabi
lity of Fuel in Fuel Farm
Project:
UP#152 Activity:
SEC2S22420
Access t
o SS 1164
Project:
UP#152 Activity:
SEC2S22560
Cable Du
ct Civil Work Completion (VO)
Project:
UP#152 Activity:
SEC2S31000
CH101A Trench Civil Work Completion
Project:
UP#152 Activity:
SEC2S41000
Fuel Far
m Availability
Activities with unsatisfied relationships........................0

e
e
e
e
e
e

Activities with external dates...................................7


Project:
UP#152 Activity:
SEC2S22410
E&I
laying in Section2 - Cables connected to SS 1164
Project:
UP#152 Activity:
SEC2S22450
E&I
Laying in Section 3 (Except Main Cables)
Project:
UP#152 Activity:
SEC2S22480
E&I
Laying in Section 4 (except new Apron chambers)
Project:
UP#152 Activity:
SEC2S22530
E&I
Laying in Section 1 (Except Main Cables)
Project:
UP#152 Activity:
SEC2S22580
E&I
Laying in Section 5 (Except Fuel Farm Control Room)
Project:
UP#152 Activity:
SEC2S22650
E&I
Laying in Section 7
Project:
UP#152 Activity:
SEC2S32120
New

Cabl
Cabl
Cabl
Cabl
Cabl
Cabl
Apro

n Loop - Continuity & Loop Checking


Activities that are not on any float paths.......................743
Project:
UP#152 Activity:
ASBULT1000
Submissi
on of As Built Drawing for Storm water works
Project:
UP#152 Activity:
ASBULT1010
Approval
of As Built Drawing for Storm water works
Project:
UP#152 Activity:
ASBULT1020
Submissi
on of As Built Drawing for Electrical works
Project:
UP#152 Activity:
ASBULT1030
Approval
of As Built Drawing for Electrical works
Project:
UP#152 Activity:
ASBULT1040
Submissi
on of As Built Drawing for Fire Fighting works
Project:
UP#152 Activity:
ASBULT1050
Approval
of As Built Drawing for Fire Fighting works
Project:
UP#152 Activity:
ASBULT1060
Submissi
on of As Built Drawing for AGL works
Project:
UP#152 Activity:
ASBULT1070
Approval
of As Built Drawing for AGL works
Project:
UP#152 Activity:
ASBULT1080
Submissi
on of As Built Drawing for S1 - Section 1
Project:
UP#152 Activity:
ASBULT1090
Approval
of As Built Drawing for S1 - Section 1
Project:
UP#152 Activity:
ASBULT1100
Submissi
on of As Built Drawing for MS1 - Milestone 1
Project:
UP#152 Activity:
ASBULT1110
Approval
of As Built Drawing for MS1 - Milestone 1
Project:
UP#152 Activity:
ASBULT1120
Submissi
on of As Built Drawing for Aprons - Concrete Pavement
Project:
UP#152 Activity:
ASBULT1130
Approval
of As Built Drawing for Aprons - Concrete Pavement
Project:
UP#152 Activity:
ASBULT1140
Submissi
on of As Built Drawing for Substations
Project:
UP#152 Activity:
ASBULT1150
Approval
of As Built Drawing for Substations
Project:
UP#152 Activity:
ASBULT1160
Submissi
on of As Built Drawing for Air Side Road A3
Project:
UP#152 Activity:
ASBULT1170
Approval
of As Built Drawing for Air Side Road A3
Project:
UP#152 Activity:
ASBULT1180
Submissi
on of As Built Drawing for Temporary Road R3
Project:
UP#152 Activity:
ASBULT1190
Approval
of As Built Drawing for Temporary Road R3
Project:
UP#152 Activity:
ASBULT1200
Submissi
on of As Built Drawing for Taxi ways - Asphalt works
Project:
UP#152 Activity:
ASBULT1210
Approval
of As Built Drawing for Taxi ways - Asphalt works
Project:
UP#152 Activity:
EN00001000
Design C
oncept - VO37 (AJF/MJF INterface)
Project:
UP#152 Activity:
EN00001010
QA/QC Do
cuments - VO37 (AJF/MJF INterface)
Project:
UP#152 Activity:
ENMTAP1000
Material
Approval of Insulation Gasket kit
Project:
UP#152 Activity:
ENMTAP1010
Material
Approval of 24" Ball Valves
Project:
UP#152 Activity:
ENMTAP1020
Material
Approval of CNAF Gasket
Project:
UP#152 Activity:
ENMTAP1030
Material
Approval of CS Spectacle Blind
Project:
UP#152 Activity:
ENMTAP1040
Material

Approval - VO37 (AJF/MJF INterface)


Project:
UP#152 Activity:
ENMTSB1000
Submittal of Insulation Gasket kit
Project:
UP#152 Activity:
ENMTSB1010
Submittal of 24" Ball Valves
Project:
UP#152 Activity:
ENMTSB1020
Submittal of CNAF Gasket
Project:
UP#152 Activity:
ENMTSB1030
Submittal of CS Spectacle Blind
Project:
UP#152 Activity:
ENMTSB1040
Submittal- VO37 (AJF/MJF INterface)
Project:
UP#152 Activity:
ENSD001000
wings Submitted and Approved till 5th August
Project:
UP#152 Activity:
ENSDAP1000
wign Approval - Parking & Fencing
Project:
UP#152 Activity:
ENSDAP1010
al Design Specification (FDS) Approval - VO37 (AJF/MJF Interface)
Project:
UP#152 Activity:
ENSDAP1020
rawings - VO37 (AJF/MJF Interface) - Approval
Project:
UP#152 Activity:
ENSDSB1000
wing Submission - Parking & Fencing
Project:
UP#152 Activity:
ENSDSB1010
al Design Specification (FDS) Submission
Project:
UP#152 Activity:
ENSDSB1020
rawings - VO37 (AJF/MJF Interface) - Submission
Project:
UP#152 Activity:
GEN0001000
Start
Project:
UP#152 Activity:
GEN0001010
final MJF IFC-06 from ADAC
Project:
UP#152 Activity:
GEN0001020
Instruction from ADAC to procure additional MJF Pipe fittings & Valves
Project:
UP#152 Activity:
GEN0001030
Completion
Project:
UP#152 Activity:
GEN0001040
Completion
Project:
UP#152 Activity:
GEN0001050
Completion
Project:
UP#152 Activity:
GEN0001070
o F3 in the GCAA Area
Project:
UP#152 Activity:
GEN0001080
o CH147 - East end in the GCAA Area
Project:
UP#152 Activity:
GEN0001090
o West end
Project:
UP#152 Activity:
GEN0001100
o Presidential Flight area
Project:
UP#152 Activity:
GEN0001110
o Area (For Remaining Fire Fighting Work)
Project:
UP#152 Activity:
GEN0001120
n Fuel Farm Control Room
Project:
UP#152 Activity:
GEN0001130
of NTP with Procurement (VO38)
Project:
UP#152 Activity:
GEN0001140
l of VO 072 - IFC 33 Cost Proposal
Project:
UP#152 Activity:
GEN0001150
of VO 072 - IFC 33 Cost Proposal
Project:
UP#152 Activity:
GEN0001160
of VO 37
Project:
UP#152 Activity:
GEN0001170
Meeting - VO37 (AJF/MJF INterface)
Project:
UP#152 Activity:
GEN0001180

Material
Material
Material
Material
Material
Shop Dra
Shop Dra
Function
Design D
Shop Dra
Function
Design D
Project
Receive
Receive
Stage 1
Stage 2
Stage 3
Access t
Access t
Access t
Access t
Access t
Access i
Receipt
Submitta
Approval
Approval
Kick-off
Road div

ersion by HLG to its final position


Project:
UP#152 Activity:
on of Substation 1164 by Other Contractor
Project:
UP#152 Activity:
lity of Fuel Farm (Installation of instruments)
Project:
UP#152 Activity:
lity of Fuel in Fuel Farm
Project:
UP#152 Activity:
NOCs
Project:
UP#152 Activity:
ual Submission
Project:
UP#152 Activity:
tion and Demobilisation
Project:
UP#152 Activity:
e 1
Project:
UP#152 Activity:
n and Maintanance Manual for AGL Network - Submission
Project:
UP#152 Activity:
n and Maintanance Manual for AGL Network - Approval
Project:
UP#152 Activity:
n and Maintanance Manual for MJF Network - Submission
Project:
UP#152 Activity:
n and Maintanance Manual for MJF Network - Approval
Project:
UP#152 Activity:
n and Maintanance Manual for Telecommunication Network
Project:
UP#152 Activity:
n and Maintanance Manual for Telecommunication Network
Project:
UP#152 Activity:
ent Stud Bolts
Project:
UP#152 Activity:
ent Heat Shrink Sleeve
Project:
UP#152 Activity:
ent Link Seal
Project:
UP#152 Activity:
ent End Seal
Project:
UP#152 Activity:
ent CS Pipes
Project:
UP#152 Activity:
ent CS Fittings
Project:
UP#152 Activity:
ent CS WNR Flanges
Project:
UP#152 Activity:
ent CS Blind Flanges
Project:
UP#152 Activity:
ent HP Vent Assembly
Project:
UP#152 Activity:
ent Puddle Flanges
Project:
UP#152 Activity:
ent Pipe Supports
Project:
UP#152 Activity:
ent Valve Operating Platforms
Project:
UP#152 Activity:
ent Manhole Cover
Project:
UP#152 Activity:
ent 36" DBB Valves
Project:
UP#152 Activity:
ent Insulation Gasket Kits
Project:
UP#152 Activity:
ent CNAF Gasket
Project:
UP#152 Activity:

GEN0001190

Completi

GEN0001200

Availabi

GEN0001210

Availabi

GEN0001220

Project

GEN0001230

Contarct

GEN0001240

Mobilisa

MS10001000

Mileston

O&MMNL1000

Opeartio

O&MMNL1010

Opeartio

O&MMNL1020

Opeartio

O&MMNL1030

Opeartio

O&MMNL1040
- Submission
O&MMNL1050
- Approval
PRCMT1000

Operatio

PRCMT1010

Procurem

PRCMT1020

Procurem

PRCMT1030

Procurem

PRCMT1040

Procurem

PRCMT1050

Procurem

PRCMT1060

Procurem

PRCMT1070

Procurem

PRCMT1080

Procurem

PRCMT1090

Procurem

PRCMT1100

Procurem

PRCMT1110

Procurem

PRCMT1120

Procurem

PRCMT1130

Procurem

PRCMT1140

Procurem

PRCMT1150

Procurem

PRCMT1160

Procurem

Operatio
Procurem

ent Ball Valves


Project:
ent CS Spectacle Blind
Project:
ent 24" DBB Valves
Project:
ent of additional Pipe Fittings
Project:
ent Leak Detection System
Project:
ent Instruments Cables
Project:
ent Earthing Material
Project:
ent Power Cables
Project:
ent Earth Cables
Project:
ent Junction Box
Project:
ent SDB & FDB
Project:
ent Tightness Control System
Project:
ent Temperature Transmitter
Project:
ent Thermowells
Project:
ent Pressure Transmitter
Project:
ent Pressure Gauge
Project:
ent Level Transmitter
Project:
ent MOV Isolator Switch
Project:
ent Cathodic Protection System
Project:
ent Cable Trays & Accessories
Project:
ent Cable Glands, Glands & Ties
Project:
ivery Stud Bolts
Project:
ivery Heat Shrink Sleeve
Project:
ivery Insulation Gasket Kit
Project:
ivery Link Seal
Project:
ivery End Seal
Project:
ivery CNAF Gasket
Project:
ivery CS Pipes
Project:
ivery CS Fittings
Project:
ivery CS WNR Flanges
Project:

UP#152 Activity:

PRCMT1170

Procurem

UP#152 Activity:

PRCMT1175

Procurem

UP#152 Activity:
(VO-38)
UP#152 Activity:

PRCMT1180

Procurem

PRCMT1185

Procurem

UP#152 Activity:

PRCMT1190

Procurem

UP#152 Activity:

PRCMT1200

Procurem

UP#152 Activity:

PRCMT1210

Procurem

UP#152 Activity:

PRCMT1220

Procurem

UP#152 Activity:

PRCMT1230

Procurem

UP#152 Activity:

PRCMT1240

Procurem

UP#152 Activity:

PRCMT1250

Procurem

UP#152 Activity:

PRCMT1260

Procurem

UP#152 Activity:

PRCMT1270

Procurem

UP#152 Activity:

PRCMT1280

Procurem

UP#152 Activity:

PRCMT1290

Procurem

UP#152 Activity:

PRCMT1300

Procurem

UP#152 Activity:

PRCMT1310

Procurem

UP#152 Activity:

PRCMT1320

Procurem

UP#152 Activity:

PRCMT1330

Procurem

UP#152 Activity:

PRCMT1340

Procurem

UP#152 Activity:

PRCMTSD1000

Site Del

UP#152 Activity:

PRCMTSD1010

Site Del

UP#152 Activity:

PRCMTSD1020

Site Del

UP#152 Activity:

PRCMTSD1030

Site Del

UP#152 Activity:

PRCMTSD1040

Site Del

UP#152 Activity:

PRCMTSD1050

Site Del

UP#152 Activity:

PRCMTSD1060

Site Del

UP#152 Activity:

PRCMTSD1070

Site Del

UP#152 Activity:

PRCMTSD1080

Site Del

UP#152 Activity:

PRCMTSD1090

Site Del

ivery CS Blind Flanges


Project:
UP#152 Activity:
PRCMTSD1100
ivery HP Vent Assembly
Project:
UP#152 Activity:
PRCMTSD1110
ivery Puddle Flanges
Project:
UP#152 Activity:
PRCMTSD1120
ivery Pipe Supports
Project:
UP#152 Activity:
PRCMTSD1130
ivery Valve Operating Platforms
Project:
UP#152 Activity:
PRCMTSD1140
ivery CS Spectacle Blind
Project:
UP#152 Activity:
PRCMTSD1150
ivery Manhole Cover
Project:
UP#152 Activity:
PRCMTSD1160
ivery Ball Valves
Project:
UP#152 Activity:
PRCMTSD1180
ivery Cable Trays & Accessories
Project:
UP#152 Activity:
PRCMTSD1190
ivery Cable Glands, Glands & Ties
Project:
UP#152 Activity:
PRCMTSD1200
ivery Leak Detection System
Project:
UP#152 Activity:
PRCMTSD1210
ivery Instruments Cables
Project:
UP#152 Activity:
PRCMTSD1220
ivery Earthing Material
Project:
UP#152 Activity:
PRCMTSD1230
ivery Power Cables
Project:
UP#152 Activity:
PRCMTSD1240
ivery Earth Cables
Project:
UP#152 Activity:
PRCMTSD1250
ivery Junction Box
Project:
UP#152 Activity:
PRCMTSD1260
ivery SDB & FDB
Project:
UP#152 Activity:
PRCMTSD1270
ivery Cathodic Protection System
Project:
UP#152 Activity:
PRCMTSD1280
ivery Tightness Control System
Project:
UP#152 Activity:
PRCMTSD1290
ivery Temperature Transmitter
Project:
UP#152 Activity:
PRCMTSD1300
ivery Pressure Transmitter
Project:
UP#152 Activity:
PRCMTSD1310
ivery Pressure Gauge
Project:
UP#152 Activity:
PRCMTSD1320
ivery Level Transmitter
Project:
UP#152 Activity:
PRCMTSD1330
ivery MOV Isolator Switch
Project:
UP#152 Activity:
PRCMTSD1340
ivery Thermowells
Project:
UP#152 Activity:
PRCMTSD1345
ent and Site Delivery- Required for LV Panel Modification
Project:
UP#152 Activity:
PRCMTSD1350
ent and Site Delivery Addtionaol Work - 400Hz Cable
Project:
UP#152 Activity:
PRCMTSD1360
ent and Site Delivery Bollard
Project:
UP#152 Activity:
PRCMTSD1370
ent and Site Delivery Generators for MV Substations
Project:
UP#152 Activity:
PRCMTSD1380
ent and Site Delivery Doors for AGL Substation
Project:
UP#152 Activity:
PRCMTSD1390

Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Site Del
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem

ent and Site Delivery Windows for AGL Substation


Project:
UP#152 Activity:
PRCMTSD1400
ent and Site Delivery Crash Gate - A3 Road
Project:
UP#152 Activity:
PRCMTSD1410
ent and Site Delivery Stop Bar Light - A3 Link Road
Project:
UP#152 Activity:
PRCMTSD1420
ent and Site Delivery CCTV System - A3 link Road
Project:
UP#152 Activity:
PRCMTSD1430
ent and Site Delivery Traffic Signal System - A3 Link Road
Project:
UP#152 Activity:
PRCMTSD1440
ent and Site Delivery Guard Rail - A3 Link Road
Project:
UP#152 Activity:
PRCMTSD1450
ent and Site Delivery Additional SIgns - Taxiway C
Project:
UP#152 Activity:
PRCMTSD1460
ent and Site Delivery Roman Numerals
Project:
UP#152 Activity:
PRCMTSD1490
ent and Site Delivery of Fire Extinguishers for Cargo Apron (VO-65)
Project:
UP#152 Activity:
PRCMTSD1500
ent and Site Delivery RVR Gantries and Field box (VO-61)
Project:
UP#152 Activity:
PRCMTSD1520
ent and Site Delivery (AJF/MJF Interface)
Project:
UP#152 Activity:
PRCMTSD1530
ent and Site Delivery of SCADA System (VO-32)
Project:
UP#152 Activity:
SEC1001000
1
Project:
UP#152 Activity:
SEC2001000
nway And Taxiways (Package 2) as on 5th August 2015
Project:
UP#152 Activity:
SEC2001020
Hydrant System
Project:
UP#152 Activity:
SEC2001030
meter Fence
Project:
UP#152 Activity:
SEC2S11000
Installation -EMCA
Project:
UP#152 Activity:
SEC2S11010
and Desnagging -EMCA
Project:
UP#152 Activity:
SEC2S11020
o Work - ATCT Connection
Project:
UP#152 Activity:
SEC2S11030
tic Cabling - EMCA
Project:
UP#152 Activity:
SEC2S11040
ons and Termination with ATCT
Project:
UP#152 Activity:
SEC2S11050
ble Installation - EMCA
Project:
UP#152 Activity:
SEC2S11060
and Commissioning of VDGS
Project:
UP#152 Activity:
SEC2S11070
and Commissioning of CCTVs
Project:
UP#152 Activity:
SEC2S11080
and Commissioning - EMCA
Project:
UP#152 Activity:
SEC2S11090
ergisation
Project:
UP#152 Activity:
SEC2S11100
g Civil Works - MV SS
Project:
UP#152 Activity:
SEC2S11110
and Desnagging - MV SS
Project:
UP#152 Activity:
SEC2S11120
r Installation - MV SS
Project:
UP#152 Activity:
SEC2S11130
Modification - MV SS
Project:
UP#152 Activity:
SEC2S11140

Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Procurem
Section
South Ru
New Fuel
AOA Peri
Bollard
Snagging
Permit t
Fiber Op
Connecti
400Hz Ca
Testing
Testing
Testing
Stand En
Remainin
Snagging
Generato
LV Panel
Fiber Op

tic Panel Installation - MV SS


Project:
UP#152 Activity:
tic Connection to ATCT
Project:
UP#152 Activity:
hting System - Testing and Commissioning - MV SS
Project:
UP#152 Activity:
Inspection - MV SS
Project:
UP#152 Activity:
Inspection - MV SS
Project:
UP#152 Activity:
pection and Handover - MV SS
Project:
UP#152 Activity:
tion of Door (Remaining) - AGL SS
Project:
UP#152 Activity:
tion of Window (Remaining) - AGL SS
Project:
UP#152 Activity:
and Desnagging - AGL SS
Project:
UP#152 Activity:
r Installation - AGL SS
Project:
UP#152 Activity:
Unit Installation - AGL SS
Project:
UP#152 Activity:
tenuator Installation - AGL SS
Project:
UP#152 Activity:
tic Connection to ATCT
Project:
UP#152 Activity:
hting System - Testing and Commissioning - AGL SS
Project:
UP#152 Activity:
r Testing and Commissioning - AGL SS
Project:
UP#152 Activity:
Modification - AGL SS
Project:
UP#152 Activity:
g from Temporary to Permanent A/C - AGL SS
Project:
UP#152 Activity:
and Commissioning of Fire Alarm
Project:
UP#152 Activity:
Inspection and Handoover -AGL SS
Project:
UP#152 Activity:
pection and Handoover - AGL SS
Project:
UP#152 Activity:
Storm Water Chamber - East End - A3 Road
Project:
UP#152 Activity:
e East End
Project:
UP#152 Activity:
on of Work by HLG
Project:
UP#152 Activity:
Bank North of EMCA
Project:
UP#152 Activity:
Bank Landside to SS PU-3
Project:
UP#152 Activity:
Road Studs
Project:
UP#152 Activity:
Parking & Fencing (SS1205)
Project:
UP#152 Activity:
te Installation
Project:
UP#152 Activity:
Parking & Fencing (SS1204)
Project:
UP#152 Activity:
e SS PU-4 to HLG Underpass
Project:
UP#152 Activity:

SEC2S11150

Fiber Op

SEC2S11160

Fire Fig

SEC2S11170

ADDC LV

SEC2S11180

ADDC MV

SEC2S11190

ADAC Ins

SEC2S11200

Installa

SEC2S11210

Installa

SEC2S11220

Snagging

SEC2S11230

Generato

SEC2S11240

Chiller

SEC2S11250

Sound At

SEC2S11260

Fiber Op

SEC2S11270

Fire Fig

SEC2S11280

Generato

SEC2S11290

Software

SEC2S11300

Switchin

SEC2S11305

Testing

SEC2S11310

ADAC AGL

SEC2S11320

GCAA Ins

SEC2S11330

Complete

SEC2S11340

AOA Fenc

SEC2S11350

Completi

SEC2S11360

SL Duct

SEC2S11370

SL Duct

SEC2S11380

Install

SEC2S11390

SS PU-5

SEC2S11400

Crash Ga

SEC2S11410

SS PU-4

SEC2S11420

AOA Fenc

SEC2S11430

SS PU-3

Parking & Fencing (SS1206)


Project:
UP#152 Activity:
SEC2S11440
Gate A2 (by others)
Project:
UP#152 Activity:
SEC2S11450
and Desangging - A3 Road
Project:
UP#152 Activity:
SEC2S11460
pproval of New Insatlled Fence
Project:
UP#152 Activity:
SEC2S11470
into SS PU-5
Project:
UP#152 Activity:
SEC2S11480
into SS PU-4
Project:
UP#152 Activity:
SEC2S11490
ight Cabling - North of EMCA
Project:
UP#152 Activity:
SEC2S11500
illar Installation
Project:
UP#152 Activity:
SEC2S11510
into SS PU-3
Project:
UP#152 Activity:
SEC2S11520
ter Chamber Internal Finishing - A3 Link Road
Project:
UP#152 Activity:
SEC2S11530
il Installation - A3 Link Road
Project:
UP#152 Activity:
SEC2S11540
ing Work Completion in Aviation Area
Project:
UP#152 Activity:
SEC2S11550
Widening @ Stand 222
Project:
UP#152 Activity:
SEC2S11560
ubmission - Traffic Signal System
Project:
UP#152 Activity:
SEC2S11570
pproval - Traffic Signal System
Project:
UP#152 Activity:
SEC2S11580
tion of Traffic Signal System
Project:
UP#152 Activity:
SEC2S11590
tion of Stop Bars F3 - F5
Project:
UP#152 Activity:
SEC2S11600
tion of CCTV to F3 & F5
Project:
UP#152 Activity:
SEC2S11610
and Commissioning
Project:
UP#152 Activity:
SEC2S11620
o Runways
Project:
UP#152 Activity:
SEC2S11630
ber Stencilling (Ch 4+100 - Ch2+810) - Taxiway C (East of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11640
merals Installation - Taxiway C (East of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11650
and Desnagging - Taxiway C (East of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11660
pection - Taxiway C (East of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11670
Over - Taxiway C (East of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11680
rea Fence
Project:
UP#152 Activity:
SEC2S11690
& Secondary Cabling - West of Taxiway G&H
Project:
UP#152 Activity:
SEC2S11700
st Installation - West of Taxiway G&H
Project:
UP#152 Activity:
SEC2S11710
ber Stencilling (Ch 2+810 - Ch1+460) - Taxiway C
Project:
UP#152 Activity:
SEC2S11720
al Signs Installation - Taxiway C (West of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11730

Relocate
Snagging
Police A
LV Cable
LV Cable
Street L
Fedder P
LV Cable
Storm Wa
Guard Ra
Backfill
A3 Road
Design S
Design A
Installa
Installa
Installa
Testing
Access t
AGL Cham
Roman Nu
Snagging
GCAA Ins
Handing
Tunnel A
Primary
AGL Ligh
AGL Chma
Addition
Roman Nu

merals Installation - Taxiway C (West of Taxiway G&H)


Project:
UP#152 Activity:
SEC2S11740
and Commissioning - Taxiway C (West of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11750
and Desnagging - Taxiway C (West of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11760
pection - Taxiway C (West of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11770
Over - Taxiway C (West of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11780
ber Stencilling (Ch 4+100 - Ch2+810) - Taxiway D (East of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11790
merals Installation - Taxiway D (East of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11800
and Desnagging - Taxiway D (East of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11810
pection - Taxiway D (East of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11820
Over - Taxiway D (East of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11830
g Work - Fire Fighting Duct Constrcution
Project:
UP#152 Activity:
SEC2S11840
and Commissioning - Fire Fighting Network
Project:
UP#152 Activity:
SEC2S11850
ber Stencilling (Ch 2+810 - Ch1+460) - Taxiway D (West of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11860
Lights Installation - Taxiway D
Project:
UP#152 Activity:
SEC2S11870
merals Installation -Taxiway D (West of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11880
and Commissioning -Taxiway D (West of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11890
and Desnagging - Taxiway D (West of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11900
pection -Taxiway D (West of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11910
Over - Taxiway D (West of Taxiway G&H)
Project:
UP#152 Activity:
SEC2S11920
Lights and Transformer Installation- Connecting Taxiway D1
Project:
UP#152 Activity:
SEC2S11930
Lights and Transformer Installation- Connecting Taxiway D2
Project:
UP#152 Activity:
SEC2S11940
and Commissioning - Taxiway D1
Project:
UP#152 Activity:
SEC2S11950
Lights and Transformer Installation- Connecting Taxiway D3
Project:
UP#152 Activity:
SEC2S11960
and Commissioning - Taxiway D2
Project:
UP#152 Activity:
SEC2S11970
Lights and Transformer Installation- Connecting Taxiway D4
Project:
UP#152 Activity:
SEC2S11980
and Commissioning - Taxiway D3
Project:
UP#152 Activity:
SEC2S11990
Lights and Transformer Installation- Connecting Taxiway D5
Project:
UP#152 Activity:
SEC2S12000
and Commissioning - Taxiway D4
Project:
UP#152 Activity:
SEC2S12010
and Commissioning - Taxiway D5
Project:
UP#152 Activity:
SEC2S12020
and Desnagging - Connecting Taxiway
Project:
UP#152 Activity:
SEC2S12030

Testing
Snagging
GCAA Ins
Handing
AGL Chma
Roman Nu
Snagging
GCAA Ins
Handing
Remainin
Testing
AGL Chma
Stop Bar
Roman Nu
Testing
Snagging
GCAA Ins
Handing
Cabling,
Cabling,
Testing
Cabling,
Testing
Cabling,
Testing
Cabling,
Testing
Testing
Snagging
GCAA Ins

pection - Connecting Taxiways


Project:
UP#152 Activity:
SEC2S12040
Over - Connecting Taxiways
Project:
UP#152 Activity:
SEC2S21000
s Installation (MART)
Project:
UP#152 Activity:
SEC2S21010
tion of SDB and FDB
Project:
UP#152 Activity:
SEC2S21030
ing - West End (CH101A)
Project:
UP#152 Activity:
SEC2S21040
P&I Duct banks and EDP chambers installation - West End (CH101A)
Project:
UP#152 Activity:
SEC2S21050
ckfilling - West End (CH101A)
Project:
UP#152 Activity:
SEC2S21060
P&I Duct banks and EDP chambers installation - Additional Cable Ducts
Depot
Project:
UP#152 Activity:
SEC2S21070
ckfilling - Additional Cable Ducts Near Fuel Depot
Project:
UP#152 Activity:
SEC2S21080
on - New Apron Loop
Project:
UP#152 Activity:
SEC2S21090
round - New Apron Loop
Project:
UP#152 Activity:
SEC2S21100
ing - New Apron Loop
Project:
UP#152 Activity:
SEC2S21110
P&I Duct banks and EDP chambers installation - New Apron Loop
Project:
UP#152 Activity:
SEC2S21120
ckfilling - New Apron Loop
Project:
UP#152 Activity:
SEC2S21130
on - CH147 - East End
Project:
UP#152 Activity:
SEC2S21140
round - CH147 - East End
Project:
UP#152 Activity:
SEC2S21150
ing - CH147 - East End
Project:
UP#152 Activity:
SEC2S21160
P&I Duct banks and EDP chambers installation - CH147 - East End
Project:
UP#152 Activity:
SEC2S21170
ckfilling - CH147 - East End
Project:
UP#152 Activity:
SEC2S21180
reinstatement - CH147 - East End
Project:
UP#152 Activity:
SEC2S21190
on - F3 to CH148
Project:
UP#152 Activity:
SEC2S21200
round- F3 to CH148
Project:
UP#152 Activity:
SEC2S21210
ing - F3 to CH148
Project:
UP#152 Activity:
SEC2S21220
P&I Duct banks and EDP chambers installation - F3 to CH148
Project:
UP#152 Activity:
SEC2S21230
ckfilling - F3 to CH148
Project:
UP#152 Activity:
SEC2S21240
Excavation
Project:
UP#152 Activity:
SEC2S21250
Base concreting
Project:
UP#152 Activity:
SEC2S21260
Wall -1st Lift concreting
Project:
UP#152 Activity:
SEC2S21270
Wall - 2nd Lift concreting
Project:
UP#152 Activity:
SEC2S21280
Water proofing

Handing
E&I Duct
Modifica
Backfill
Concrete
Final ba
Concrete
Near Fuel
Final ba
Excavati
Sand sur
Backfill
Concrete
Final ba
Excavati
Sand sur
Backfill
Concrete
Final ba
Pavement
Excavati
Sand sur
Backfill
Concrete
Final ba
CH147 CH147 CH147 CH147 CH147 -

Project:

UP#152 Activity:

SEC2S21290

CH147 -

UP#152 Activity:

SEC2S21300

CH147 -

UP#152 Activity:

SEC2S21310

CH147 -

UP#152 Activity:

SEC2S21320

CH148 -

UP#152 Activity:

SEC2S21330

CH148 -

UP#152 Activity:

SEC2S21340

CH148 -

UP#152 Activity:

SEC2S21350

CH148 -

UP#152 Activity:

SEC2S21360

CH148 -

UP#152 Activity:

SEC2S21370

CH148 -

UP#152 Activity:

SEC2S21380

CH148 -

UP#152 Activity:

SEC2S21390

CH148 -

UP#152 Activity:

SEC2S21400

CH149 -

UP#152 Activity:

SEC2S21410

CH149 -

UP#152 Activity:

SEC2S21420

CH149 -

UP#152 Activity:

SEC2S21430

CH149 -

UP#152 Activity:

SEC2S21440

CH149 -

UP#152 Activity:

SEC2S21450

CH149 -

UP#152 Activity:

SEC2S21460

CH149 -

UP#152 Activity:

SEC2S21470

CH149 -

UP#152 Activity:

SEC2S21480

CH154 -

UP#152 Activity:

SEC2S21490

CH154 -

UP#152 Activity:

SEC2S21500

CH154 -

UP#152 Activity:

SEC2S21510

CH154 -

UP#152 Activity:

SEC2S21520

CH154 -

UP#152 Activity:

SEC2S21530

CH154 -

UP#152 Activity:

SEC2S21540

CH154 -

UP#152 Activity:

SEC2S21550

CH154 -

UP#152 Activity:

SEC2S21560

CH155 -

UP#152 Activity:

SEC2S21570

CH155 -

UP#152 Activity:

SEC2S21580

CH155 -

Backfilling
Project:
Internal finishing
Project:
Top slab installation
Project:
Excavation
Project:
Base concreting
Project:
Wall -1st Lift concreting
Project:
Wall - 2nd Lift concreting
Project:
Water proofing
Project:
Backfilling
Project:
Internal finishing
Project:
Top slab installation
Project:
Excavation
Project:
Base concreting
Project:
Wall -1st Lift concreting
Project:
Wall - 2nd Lift concreting
Project:
Water proofing
Project:
Backfilling
Project:
Internal finishing
Project:
Top slab installation
Project:
Excavation
Project:
Base concreting
Project:
Wall -1st Lift concreting
Project:
Wall - 2nd Lift concreting
Project:
Water proofing
Project:
Backfilling
Project:
Internal finishing
Project:
Top slab installation
Project:
Excavation
Project:
Base concreting
Project:
Wall -1st Lift concreting

Project:
UP#152 Activity:
Wall - 2nd Lift concreting
Project:
UP#152 Activity:
Water proofing
Project:
UP#152 Activity:
Backfilling
Project:
UP#152 Activity:
Internal finishing
Project:
UP#152 Activity:
Top slab installation
Project:
UP#152 Activity:
Excavation
Project:
UP#152 Activity:
Base concreting
Project:
UP#152 Activity:
Wall -1st Lift concreting
Project:
UP#152 Activity:
Wall - 2nd Lift concreting
Project:
UP#152 Activity:
Water proofing
Project:
UP#152 Activity:
Backfilling
Project:
UP#152 Activity:
Internal finishing
Project:
UP#152 Activity:
Top slab installation
Project:
UP#152 Activity:
Excavation
Project:
UP#152 Activity:
Base concreting
Project:
UP#152 Activity:
Wall -1st Lift concreting
Project:
UP#152 Activity:
Wall - 2nd Lift concreting
Project:
UP#152 Activity:
Water proofing
Project:
UP#152 Activity:
Backfilling
Project:
UP#152 Activity:
Internal finishing
Project:
UP#152 Activity:
Top slab installation
Project:
UP#152 Activity:
O46) - Additional Wall concreting
Project:
UP#152 Activity:
O46) - Water proofing
Project:
UP#152 Activity:
O46) - Backfilling
Project:
UP#152 Activity:
O46) - Internal finishing
Project:
UP#152 Activity:
O46) - Top slab installation
Project:
UP#152 Activity:
tion of Fire Extinguishers
Project:
UP#152 Activity:
Commissioning and hand over of Fire Extinguishers
Project:
UP#152 Activity:
tion of Gantries
Project:
UP#152 Activity:
r of Gantries

SEC2S21590

CH155 -

SEC2S21600

CH155 -

SEC2S21610

CH155 -

SEC2S21620

CH155 -

SEC2S21630

CH155 -

SEC2S21640

CH156 -

SEC2S21650

CH156 -

SEC2S21660

CH156 -

SEC2S21670

CH156 -

SEC2S21680

CH156 -

SEC2S21690

CH156 -

SEC2S21700

CH156 -

SEC2S21710

CH156 -

SEC2S21720

CH101A -

SEC2S21730

CH101A -

SEC2S21740

CH101A -

SEC2S21750

CH101A -

SEC2S21760

CH101A -

SEC2S21770

CH101A -

SEC2S21780

CH101A -

SEC2S21790

CH101A -

SEC2S21800

CH138 (V

SEC2S21810

CH138 (V

SEC2S21820

CH138 (V

SEC2S21830

CH138 (V

SEC2S21840

CH138 (V

SEC2S21850

Installa

SEC2S21860

Testing/

SEC2S21870

Installa

SEC2S21880

Hand ove

Project:
UP#152 Activity:
SEC2S21890
pe/fittings installation and welding - West End (CH101A)
Project:
UP#152 Activity:
SEC2S21900
ection pipe installation - West End (CH101A)
Project:
UP#152 Activity:
SEC2S21910
n Loop - Steel pipe/fittings installation and welding - New Apron Loop
Project:
UP#152 Activity:
SEC2S21920
n Loop - Leak detection pipe installation - New Apron Loop
Project:
UP#152 Activity:
SEC2S21930
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S21940
Torquing & Platform Works
Project:
UP#152 Activity:
SEC2S21950
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S21960
Mechanical Installation Works
Project:
UP#152 Activity:
SEC2S21970
orquing, Support & Platform Works
Project:
UP#152 Activity:
SEC2S21980
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S21990
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S22000
LPD-27 Installation
Project:
UP#152 Activity:
SEC2S22010
Insulation Gaskets & Touruing
Project:
UP#152 Activity:
SEC2S22020
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S22030
- Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S22040
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S22050
Insulation Gaskets & Torquing & Platform Works
Project:
UP#152 Activity:
SEC2S22060
Torquing & Platform Reinstallation Works
Project:
UP#152 Activity:
SEC2S22070
HPV-10 & HPV-11 - Installation
Project:
UP#152 Activity:
SEC2S22080
LPD-10 - Installation
Project:
UP#152 Activity:
SEC2S22090
LPD-12 - Installation
Project:
UP#152 Activity:
SEC2S22100
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S22110
- MOV installation, Insulation Gaskets & Tourquing
Project:
UP#152 Activity:
SEC2S22120
LPD-35 - Installation
Project:
UP#152 Activity:
SEC2S22130
MOV installation, Insulation Gaskets & Tourquing
Project:
UP#152 Activity:
SEC2S22140
8+705 to 8+805 - Pipe Laying and Fitting Installation
Project:
UP#152 Activity:
SEC2S22150
Torquing of Bolts/Nuts
Project:
UP#152 Activity:
SEC2S22160
Torquing of Bolts/Nuts
Project:
UP#152 Activity:
SEC2S22170
8+805 to 8+905 Pipe Laying and Fitting Installation
Project:
UP#152 Activity:
SEC2S22180
9+105 to 9+205 Pipe Laying and Fitting Installation

Steel pi
Leak det
New Apro
New Apro
CH-107 CH-110 CH-108 CH-150 CH-151 T
CH-134 CH-135 LPD-26 &
CH-140 CH-137 CH-135A
CH-136 CH-138 CH-139 HPV-09,
LPD-09 &
LPD-11 &
CH-113 CH-146
LPD-34 &
CH-145 Chainage
CH-143 CH-144 Chainage
Chainage

Project:
UP#152 Activity:
SEC2S22190
8+905 to 9+005 Pipe Laying and Fitting Installation
Project:
UP#152 Activity:
SEC2S22200
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S22210
9+205 to 9+250 Pipe Laying and Fitting Installation
Project:
UP#152 Activity:
SEC2S22220
- MOV installation, Insulation Gaskets & Tourquing
Project:
UP#152 Activity:
SEC2S22230
- MOV installation, Insulation Gaskets & Tourquing
Project:
UP#152 Activity:
SEC2S22240
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S22250
9+005 to 9+105 Pipe Laying and Fitting Installation
Project:
UP#152 Activity:
SEC2S22260
LPD-37 - Installation
Project:
UP#152 Activity:
SEC2S22270
HPV-37 & HPV-38 - Installation
Project:
UP#152 Activity:
SEC2S22280
orks to CH-21
Project:
UP#152 Activity:
SEC2S22290
orks to CH-22
Project:
UP#152 Activity:
SEC2S22300
- MOV installation, Insulation Gaskets & Tourquing
Project:
UP#152 Activity:
SEC2S22310
Insulation Gaskets & Torquing
Project:
UP#152 Activity:
SEC2S22320
LPD-02 - Mechanical Installation Works
Project:
UP#152 Activity:
SEC2S22330
Insulating Gasket, Torquing & Platform Works
Project:
UP#152 Activity:
SEC2S22340
at Chainage 0+040
Project:
UP#152 Activity:
SEC2S22350
HPV-04 - Mechanical Installation Works
Project:
UP#152 Activity:
SEC2S22360
l DBB Valves
Project:
UP#152 Activity:
SEC2S22370
ation Establishment (SCADA System)
Project:
UP#152 Activity:
SEC2S22380
esting, Integration and Modification Works of Existing SCADA System
Project:
UP#152 Activity:
SEC2S22390
PTP TEST (SCADA System)
Project:
UP#152 Activity:
SEC2S22400
e Laying in Section 2 (except Cables connected to SS 1164)
Project:
UP#152 Activity:
SEC2S22410
e laying in Section2 - Cables connected to SS 1164
Project:
UP#152 Activity:
SEC2S22420
o SS 1164
Project:
UP#152 Activity:
SEC2S22430
ct Civil Work Completion Section 2
Project:
UP#152 Activity:
SEC2S22440
e laying in Section 2 - Main Cables
Project:
UP#152 Activity:
SEC2S22450
e Laying in Section 3 (Except Main Cables)
Project:
UP#152 Activity:
SEC2S22460
ct Civil Works Completion Section 3
Project:
UP#152 Activity:
SEC2S22470
e Laying in Section 3 (Main Cables)
Project:
UP#152 Activity:
SEC2S22480
e Laying in Section 4 (except new Apron chambers)

Chainage
CH-141 Chainage
CH-147
CH-148
CH-142 Chainage
LPD-36 &
HPV-36,
Tie-In W
Tie-In W
CH-149
CH-102 LPD-01 &
CH-104 Blanking
HPV-03 &
Reinstal
Communic
Signal T
SAT and
E&I Cabl
E&I Cabl
Access t
Cable Du
E&I Cabl
E&I Cabl
Cable Du
E&I Cabl
E&I Cabl

Project:
UP#152 Activity:
SEC2S22490
ct Civil Works Completion Section 4
Project:
UP#152 Activity:
SEC2S22500
e Laying in Section 4 (Main Cables)
Project:
UP#152 Activity:
SEC2S22510
ct Civil Work Completion (New Aprons)
Project:
UP#152 Activity:
SEC2S22520
e Laying in Section 4 - New Apron Chambers
Project:
UP#152 Activity:
SEC2S22530
e Laying in Section 1 (Except Main Cables)
Project:
UP#152 Activity:
SEC2S22540
ct Civil Work Completion Section 1
Project:
UP#152 Activity:
SEC2S22550
e Laying in Section 1 (Main Cables)
Project:
UP#152 Activity:
SEC2S22560
ct Civil Work Completion (VO)
Project:
UP#152 Activity:
SEC2S22570
e Laying in Section 1 (VO)
Project:
UP#152 Activity:
SEC2S22580
e Laying in Section 5 (Except Fuel Farm Control Room)
Project:
UP#152 Activity:
SEC2S22590
ct Civil Work Completion Section 5
Project:
UP#152 Activity:
SEC2S22600
e Laying in Section 5 (Fuel Farm Control Room)
Project:
UP#152 Activity:
SEC2S22610
e Laying in Section 6
Project:
UP#152 Activity:
SEC2S22620
ct Civil Work Completion Section 6
Project:
UP#152 Activity:
SEC2S22630
e Laying in Section 6 (Main Cables)
Project:
UP#152 Activity:
SEC2S22640
ct Civil Work Completion Section 7
Project:
UP#152 Activity:
SEC2S22650
e Laying in Section 7
Project:
UP#152 Activity:
SEC2S22660
e Laying in Section 7 (Main Cables)
Project:
UP#152 Activity:
SEC2S22670
Purging Loop 4.1 & 4.2 - T&C Preparation All HPs/LPs/VCs
Project:
UP#152 Activity:
SEC2S22680
Purging Loop 4.1 & 4.2 - CH-103 T&C Spools Instln RRC
Project:
UP#152 Activity:
SEC2S22690
Purging Loop 4.1 & 4.2 - Pneumatic, Air Blowing & Drying - Loop 4.1
Project:
UP#152 Activity:
SEC2S22700
Purging Loop 4.1 & 4.2 - Nitrogen Filling - Loop 4.1
Project:
UP#152 Activity:
SEC2S22710
Purging Loop 4.1 & 4.2 - Pneumatic, Air Blowing & Drying - Loop 4.2
Project:
UP#152 Activity:
SEC2S22720
Purging Loop 4.1 & 4.2 - Nitrogen Filling - Loop 4.2
Project:
UP#152 Activity:
SEC2S22730
Purging Loop 3.1 & 3.2 -T&C Preparation All HPs/LPs
Project:
UP#152 Activity:
SEC2S22740
Purging Loop 3.1 & 3.2 - CH-103 T&C Spools Instln RRC
Project:
UP#152 Activity:
SEC2S22750
Purging Loop 3.1 & 3.2 - Pneumatic, Air Blowing & Drying - Loop 3.1
Project:
UP#152 Activity:
SEC2S22760
Purging Loop 3.1 & 3.2 - Nitrogen Filling - Loop 3.1
Project:
UP#152 Activity:
SEC2S22770
Purging Loop 3.1 & 3.2 - Pneumatic, Air Blowing & Drying - Loop 3.2
Project:
UP#152 Activity:
SEC2S22780
Purging Loop 3.1 & 3.2 - Nitrogen Filling - Loop 3.2

Cable Du
E&I Cabl
Cable Du
E&I Cabl
E&I Cabl
Cable Du
E&I Cabl
Cable Du
E&I Cabl
E&I Cabl
Cable Du
E&I Cabl
E&I Cabl
Cable Du
E&I Cabl
Cable Du
E&I Cabl
E&I Cabl
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen

Project:
UP#152 Activity:
SEC2S22790
Purging Loop 1.3 & 1.4 - T&C Preparation All HPs/LPs
Project:
UP#152 Activity:
SEC2S22800
Purging Loop 1.3 & 1.4 - CH-133 T&C Spools Instln RRC
Project:
UP#152 Activity:
SEC2S22810
Purging Loop 1.3 & 1.4 - Pneumatic, Air Blowing & Drying - Loop 1.3
Project:
UP#152 Activity:
SEC2S22820
Purging Loop 1.3 & 1.4 - Nitrogen Filling - Loop 1.3
Project:
UP#152 Activity:
SEC2S22830
Purging Loop 1.3 & 1.4 - Pneumatic, Air Blowing & Drying - Loop 1.4
Project:
UP#152 Activity:
SEC2S22840
Purging Loop 1.3 & 1.4 - Nitrogen Filling - Loop 1.4
Project:
UP#152 Activity:
SEC2S22850
Purging Loop 1.1 & 1.2 - T&C Preparation All HPs/LPs/VCs
Project:
UP#152 Activity:
SEC2S22860
Purging Loop 1.1 & 1.2 - CH-139 T&C Spools Instln RRC
Project:
UP#152 Activity:
SEC2S22870
Purging Loop 1.1 & 1.2 - Pneumatic, Air Blowing & Drying - Loop 1.1
Project:
UP#152 Activity:
SEC2S22880
Purging Loop 1.1 & 1.2 - Nitrogen Filling - Loop 1.1
Project:
UP#152 Activity:
SEC2S22890
Purging Loop 1.1 & 1.2 - Pneumatic, Air Blowing & Drying - Loop 1.2
Project:
UP#152 Activity:
SEC2S22900
Purging Loop 1.1 & 1.2 - Nitrogen Filling - Loop 1.2
Project:
UP#152 Activity:
SEC2S22910
Purging Loop 5.1 & 5.2 - T&C Preparation All HPs/LPs
Project:
UP#152 Activity:
SEC2S22920
Purging Loop 5.1 & 5.2 - CH-140 T&C Spools Instln RRC
Project:
UP#152 Activity:
SEC2S22930
Purging Loop 5.1 & 5.2 - Pneumatic, Air Blowing & Drying - Loop 5.1
Project:
UP#152 Activity:
SEC2S22940
Purging Loop 5.1 & 5.2 - Nitrogen Filling - Loop 5.1
Project:
UP#152 Activity:
SEC2S22950
Purging Loop 5.1 & 5.2 - Pneumatic, Air Blowing & Drying - Loop 5.2
Project:
UP#152 Activity:
SEC2S22960
Purging Loop 5.1 & 5.2 - Nitrogen Filling - Loop 5.2
Project:
UP#152 Activity:
SEC2S22970
Purging Loop 2.1 & 2.2 - T&C Preparation All HPs/LPs
Project:
UP#152 Activity:
SEC2S22980
Purging Loop 2.1 & 2.2 - CH-133 T&C Spools Instln RRC
Project:
UP#152 Activity:
SEC2S22990
Purging Loop 2.1 & 2.2 - Pneumatic, Air Blowing & Drying - Loop 2.1
Project:
UP#152 Activity:
SEC2S23000
Purging Loop 2.1 & 2.2 - Nitrogen Filling - Loop 2.1
Project:
UP#152 Activity:
SEC2S23010
Purging Loop 2.1 & 2.2 - Pneumatic, Air Blowing & Drying - Loop 2.2
Project:
UP#152 Activity:
SEC2S23020
Purging Loop 2.1 & 2.2 - Nitrogen Filling - Loop 2.2
Project:
UP#152 Activity:
SEC2S31000
Trench Civil Work Completion
Project:
UP#152 Activity:
SEC2S31010
Main Pipe Line Laying & Fit Up
Project:
UP#152 Activity:
SEC2S31020
Main Pipe Line Welding
Project:
UP#152 Activity:
SEC2S31030
RT Works / Painting/Wrap
Project:
UP#152 Activity:
SEC2S31040
Puddle Flange & Link Seal Insulation
Project:
UP#152 Activity:
SEC2S31050
Concrete Casting Surrounding the Puddle Flange

Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
Nitrogen
CH101A CH101A CH101A CH101A CH101A CH101A -

Project:
UP#152 Activity:
LDS conduit Installation
Project:
UP#152 Activity:
Installation of End Seal
Project:
UP#152 Activity:
Chamber Backfilling
Project:
UP#152 Activity:
Chamber Handover for Mechanical Work
Project:
UP#152 Activity:
Pipe Fabrication & Installation of DBB Valves
Project:
UP#152 Activity:
Pipe Welding
Project:
UP#152 Activity:
RT Works
Project:
UP#152 Activity:
Drain / Vent Installation
Project:
UP#152 Activity:
Painting/Wrap
Project:
UP#152 Activity:
Pipe Support Installation & Anchor Bolts
Project:
UP#152 Activity:
Insulation Gasket Kit Installation & Tourquing
Project:
UP#152 Activity:
Platform Installation
Project:
UP#152 Activity:
Grating Installation
Project:
UP#152 Activity:
Manhole Cover installation with Top Slab Cover
Project:
UP#152 Activity:
Cable Tray & Support Installation
Project:
UP#152 Activity:
Installation of Junction Boxes
Project:
UP#152 Activity:
Instruments Installation
Project:
UP#152 Activity:
Installation of Earthling Material
Project:
UP#152 Activity:
MOV Isolator Installation
Project:
UP#152 Activity:
Trench Civil Work Completion
Project:
UP#152 Activity:
36" Tee Installation
Project:
UP#152 Activity:
36" Tee Welding
Project:
UP#152 Activity:
24" Pipe Fit-up
Project:
UP#152 Activity:
6" Weldolet Joints Fit-up
Project:
UP#152 Activity:
24" Pipe Welding
Project:
UP#152 Activity:
RT Works
Project:
UP#152 Activity:
6" Weldolet Joints Welding
Project:
UP#152 Activity:
Painting/Wrap
Project:
UP#152 Activity:
Puddle Flange & Link Seal Insulation
Project:
UP#152 Activity:
Concrete Casting Surrounding the Puddle Flange

SEC2S31060

CH101A -

SEC2S31070

CH101A -

SEC2S31080

CH101A -

SEC2S31090

CH101A -

SEC2S31100

CH101A -

SEC2S31110

CH101A -

SEC2S31120

CH101A -

SEC2S31130

CH101A -

SEC2S31140

CH101A -

SEC2S31150

CH101A -

SEC2S31160

CH101A -

SEC2S31170

CH101A -

SEC2S31180

CH101A -

SEC2S31190

CH101A -

SEC2S31200

CH101A -

SEC2S31210

CH101A -

SEC2S31220

CH101A -

SEC2S31230

CH101A -

SEC2S31240

CH101A -

SEC2S31250

CH156 -

SEC2S31260

CH156 -

SEC2S31270

CH156 -

SEC2S31280

CH156 -

SEC2S31290

CH156 -

SEC2S31300

CH156 -

SEC2S31310

CH156 -

SEC2S31320

CH156 -

SEC2S31330

CH156 -

SEC2S31340

CH156 -

SEC2S31350

CH156 -

Project:
UP#152 Activity:
LDS conduit Installation
Project:
UP#152 Activity:
Installation of End Seal
Project:
UP#152 Activity:
Chamber FInal Backfilling
Project:
UP#152 Activity:
Chamber Handover for Mechanical Works
Project:
UP#152 Activity:
RT Works
Project:
UP#152 Activity:
Painting/Wrap
Project:
UP#152 Activity:
Pipe Support Installation & Anchor Bolts
Project:
UP#152 Activity:
Platform Installation
Project:
UP#152 Activity:
Grating Installation
Project:
UP#152 Activity:
Manhole Cover installation with Top Slab Cover
Project:
UP#152 Activity:
Cable Tray & Support Installation
Project:
UP#152 Activity:
Installation of Junction Boxes
Project:
UP#152 Activity:
Instruments Installation
Project:
UP#152 Activity:
Installation of Earthling Material
Project:
UP#152 Activity:
MOV Isolator Installation
Project:
UP#152 Activity:
Trench Civil Work Completion
Project:
UP#152 Activity:
36" Tee Installation
Project:
UP#152 Activity:
24" Pipe Fit-up
Project:
UP#152 Activity:
36" Tee Welding
Project:
UP#152 Activity:
24" Pipe Welding
Project:
UP#152 Activity:
RT Works
Project:
UP#152 Activity:
Painting/Wrap
Project:
UP#152 Activity:
Puddle Flange & Link Seal Insulation
Project:
UP#152 Activity:
Concrete Casting Surrounding the Puddle Flange
Project:
UP#152 Activity:
LDS conduit Installation
Project:
UP#152 Activity:
Installation of End Seal
Project:
UP#152 Activity:
Chamber Final Backfilling
Project:
UP#152 Activity:
Chamber Handover for Mechanical Work
Project:
UP#152 Activity:
RT Works
Project:
UP#152 Activity:
Painting/Wrap

SEC2S31360

CH156 -

SEC2S31370

CH156 -

SEC2S31380

CH156 -

SEC2S31390

CH156 -

SEC2S31420

CH156 -

SEC2S31440

CH156 -

SEC2S31450

CH156 -

SEC2S31470

CH156 -

SEC2S31480

CH156 -

SEC2S31490

CH156 -

SEC2S31500

CH156 -

SEC2S31510

CH156 -

SEC2S31520

CH156 -

SEC2S31530

CH156 -

SEC2S31540

CH156 -

SEC2S31550

CH155 -

SEC2S31560

CH155 -

SEC2S31570

CH155 -

SEC2S31580

CH155 -

SEC2S31590

CH155 -

SEC2S31600

CH155 -

SEC2S31610

CH155 -

SEC2S31620

CH155 -

SEC2S31630

CH155 -

SEC2S31640

CH155 -

SEC2S31650

CH155 -

SEC2S31660

CH155 -

SEC2S31670

CH155 -

SEC2S31700

CH155 -

SEC2S31720

CH155 -

Project:
UP#152 Activity:
Pipe Support Installation & Anchor Bolts
Project:
UP#152 Activity:
Platform Installation
Project:
UP#152 Activity:
Grating Installation
Project:
UP#152 Activity:
Manhole Cover installation with Top Slab Cover
Project:
UP#152 Activity:
Cable Tray & Support Installation
Project:
UP#152 Activity:
Installation of Junction Boxes
Project:
UP#152 Activity:
Instruments Installation
Project:
UP#152 Activity:
Installation of Earthling Material
Project:
UP#152 Activity:
MOV Isolator Installation
Project:
UP#152 Activity:
Chamber Handover for Mechanical Work
Project:
UP#152 Activity:
Cutting of Pipes
Project:
UP#152 Activity:
Installation of Link Seal
Project:
UP#152 Activity:
Puddle Flange Installation
Project:
UP#152 Activity:
Tempoaray Installation of Spool Piece
Project:
UP#152 Activity:
Concrete Casting Surrounding the Puddle Flange
Project:
UP#152 Activity:
Installation of End Seal
Project:
UP#152 Activity:
Anchor Bolts for Pipe Support
Project:
UP#152 Activity:
Final Backfilling
Project:
UP#152 Activity:
Pipe Support Installation
Project:
UP#152 Activity:
PIpe Spool Preparation
Project:
UP#152 Activity:
Assembly of Flanges with DBB Valves
Project:
UP#152 Activity:
36" Piping Installation with DBB Valves Installation
Project:
UP#152 Activity:
36" Welding Works
Project:
UP#152 Activity:
Radiography Testing
Project:
UP#152 Activity:
Installation of Ball Valve With Flanges
Project:
UP#152 Activity:
Drain/Vent Installation
Project:
UP#152 Activity:
24" Pipe Installation
Project:
UP#152 Activity:
24" Welding Works
Project:
UP#152 Activity:
Painting/Wrap
Project:
UP#152 Activity:
Insulation Gasket Kit Installation

SEC2S31730

CH155 -

SEC2S31750

CH155 -

SEC2S31760

CH155 -

SEC2S31770

CH155 -

SEC2S31780

CH155 -

SEC2S31790

CH155 -

SEC2S31800

CH155 -

SEC2S31810

CH155 -

SEC2S31820

CH155 -

SEC2S31830

CH154 -

SEC2S31840

CH154 -

SEC2S31850

CH154 -

SEC2S31860

CH154 -

SEC2S31870

CH154 -

SEC2S31880

CH154 -

SEC2S31890

CH154 -

SEC2S31900

CH154 -

SEC2S31910

CH154 -

SEC2S31920

CH154 -

SEC2S31930

CH154 -

SEC2S31940

CH154 -

SEC2S31950

CH154 -

SEC2S31960

CH154 -

SEC2S31970

CH154 -

SEC2S31980

CH154 -

SEC2S31990

CH154 -

SEC2S32000

CH154 -

SEC2S32010

CH154 -

SEC2S32020

CH154 -

SEC2S32030

CH154 -

Project:

UP#152 Activity:

SEC2S32040

CH154 -

Torquing
Project:
UP#152 Activity:
SEC2S32050
CH154 Platform Installation
Project:
UP#152 Activity:
SEC2S32060
CH154 Manhole Cover installation with Top Slab Cover
Project:
UP#152 Activity:
SEC2S32070
CH154 Cable Tray & Support Installation
Project:
UP#152 Activity:
SEC2S32080
CH154 Installation of Junction Boxes
Project:
UP#152 Activity:
SEC2S32090
CH154 Instruments Installation
Project:
UP#152 Activity:
SEC2S32100
CH154 Installation of Earthling Material
Project:
UP#152 Activity:
SEC2S32110
CH154 MOV Isolator Installation
Project:
UP#152 Activity:
SEC2S32120
New Apro
n Loop - Continuity & Loop Checking
Project:
UP#152 Activity:
SEC2S32130
New Apro
n Loop - Installation of Earthing Material
Project:
UP#152 Activity:
SEC2S32140
New Apro
n Loop - Cathodic Protection System Works
Project:
UP#152 Activity:
SEC2S32150
New Apro
n Loop - FDB & SDB Installation
Project:
UP#152 Activity:
SEC2S32160
New Apro
n Loop - Cable Ducts Civil Work Completion
Project:
UP#152 Activity:
SEC2S32170
New Apro
n Loop - LD Sensor Cable Laying
Project:
UP#152 Activity:
SEC2S32180
New Apro
n Loop - LDS Sensor Cable termination
Project:
UP#152 Activity:
SEC2S32190
New Apro
n Loop - LD Jumper Cable Laying
Project:
UP#152 Activity:
SEC2S32200
New Apro
n Loop - LDS Jumper Cable termination
Project:
UP#152 Activity:
SEC2S32210
New Apro
n Loop - Instrument & Control Cable Laying
Project:
UP#152 Activity:
SEC2S32220
New Apro
n Loop - Instrument & Control Cable Termination
Project:
UP#152 Activity:
SEC2S32230
New Apro
n Loop - Power Cable Laying
Project:
UP#152 Activity:
SEC2S32240
New Apro
n Loop - Earth Cable Laying
Project:
UP#152 Activity:
SEC2S32250
New Apro
n Loop - Power Cable Termination
Project:
UP#152 Activity:
SEC2S32260
New Apro
n Loop - Earth Cable Termination
Project:
UP#152 Activity:
SEC2S32270
New Apro
n Loop - Instrument & Control Cable Loop Testing
Project:
UP#152 Activity:
SEC2S32280
New Apro
n Loop - Testing and Commissioning of Field Instruments, ESD and MOV after Fiel
d Modification
Project:
UP#152 Activity:
SEC2S32340
CH-102 t
o CH-101 Nitrogen Purging - Setting-up & Preparation
Project:
UP#152 Activity:
SEC2S32350
CH-102 t
o CH-101 Nitrogen Purging - Pneumatic Testing
Project:
UP#152 Activity:
SEC2S32360
CH-102 t
o CH-101 Nitrogen Purging - Air Blowing
Project:
UP#152 Activity:
SEC2S32370
CH-102 t
o CH-101 Nitrogen Purging - Drying
Project:
UP#152 Activity:
SEC2S32380
CH-102 t

o CH-101 Nitrogen Purging - Nitrogen Purging


Project:
UP#152 Activity:
SEC2S32390
Software
Development - VO37 (AJF/MJF INterface)
Project:
UP#152 Activity:
SEC2S32400
System B
uilt - VO37 (AJF/MJF INterface)
Project:
UP#152 Activity:
SEC2S32410
Sytem Te
sting - VO37 (AJF/MJF INterface)
Project:
UP#152 Activity:
SEC2S32420
Integrat
ed FAT- VO37 (AJF/MJF INterface)
Project:
UP#152 Activity:
SEC2S32430
Fuel Far
m and Control Room Availability
Project:
UP#152 Activity:
SEC2S32440
Installa
tion and Testing Works Related to AJF/MJF Interface
Project:
UP#152 Activity:
SEC2S32450
Pre-Comm
issioning - VO37 (AJF/MJF INterface)
Project:
UP#152 Activity:
SEC2S32460
Commissi
oning - VO37 (AJF/MJF INterface)
Project:
UP#152 Activity:
SEC2S41000
Fuel Far
m Availability
Project:
UP#152 Activity:
SEC2S41080
Loop 1B
- Pressure Testing of Loop 1B & Loop 1A
Project:
UP#152 Activity:
SEC2S41100
Loop 1B
- Removal of BFs from DBB in CH-139 & Connection to Pump Skid
Project:
UP#152 Activity:
SEC2S41110
Loop 1B
- Rearrangements as part of 1B Flushing Commencement
Project:
UP#152 Activity:
SEC2S41150
Loop 1B
- Draining of Sections Between VCs & Installation of HP/LP Assemblies
Project:
UP#152 Activity:
SEC2S41160
Loop 1A
- Preparation & Set-up
Project:
UP#152 Activity:
SEC2S41170
Loop 1A
- Installation of Christmas Trees on HPs & LPs
Project:
UP#152 Activity:
SEC2S41180
Loop 1A
- Fuel Filling in Loop 1B & Loop 1A
Project:
UP#152 Activity:
SEC2S41190
Loop 1A
- Soak Testing of Loop 1B & Loop 1A
Project:
UP#152 Activity:
SEC2S41200
Loop 1A
- Pressure Testing of Loop 1B & Loop 1A
Project:
UP#152 Activity:
SEC2S41210
Loop 1A
- Soak Test Sample & Approval
Project:
UP#152 Activity:
SEC2S41220
Loop 1A
- Partial Draining between CH-134 & CH135A
Project:
UP#152 Activity:
SEC2S41230
Loop 1A
- Removal of BFs from Hydrant Risers & Installation of 6x4 Isolation Valve
Project:
UP#152 Activity:
SEC2S41240
Loop 1A
- Partial Draining between CH-136 & CH137
Project:
UP#152 Activity:
SEC2S41250
Loop 1A
- Removal of BFs from Hydrant Risers & Installation of 6x4 Isolation Valve
Project:
UP#152 Activity:
SEC2S41260
Loop 1A
- Installation Christmas Trees on All HRs at 2 Cargo Loops
Project:
UP#152 Activity:
SEC2S41310
Loop 1A
- Removal & Relocation of Flushing Equipments from CH-139 to CH-112
Project:
UP#152 Activity:
SEC2S41420
Loop 2A
- Pressure Testing of Loop 2A
Project:
UP#152 Activity:
SEC2S41430
Loop 2A
- Removal of Blind Flanges in DBB from CH-112 & Connection to Pump Skid
Project:
UP#152 Activity:
SEC2S41600
Loop 2B
- Flushing & Filtration of Risers & Millipore Test
Project:
UP#152 Activity:
SEC2S41610
Loop 2B
- API Filtration
Project:
UP#152 Activity:
SEC2S41620
Loop 2B

- Partial Draining of Sections Between CH-111 & CH-133


Project:
UP#152 Activity:
SEC2S41630
Loop 2B
- Removal of Christmas Trees Between CH-111 & CH-133
Project:
UP#152 Activity:
SEC2S41640
Loop 2B
- Installation of HP/LP Assemblies Between CH-111 & CH-133
Project:
UP#152 Activity:
SEC2S41650
Loop 2C
- Preparation & Set-up
Project:
UP#152 Activity:
SEC2S41660
Loop 2C
- Installation of Christmas Trees on HPs & LPs
Project:
UP#152 Activity:
SEC2S41670
Loop 2C
- Fuel Filling in Loop 2B & 2C through Loop 2A
Project:
UP#152 Activity:
SEC2S41680
Loop 2C
- Soak Testing of Loop 2B & 2C
Project:
UP#152 Activity:
SEC2S41690
Loop 2C
- Pressure Testing of Loop 2B & 2C
Project:
UP#152 Activity:
SEC2S41700
Loop 2C
- Soak Test Sample & Approval
Project:
UP#152 Activity:
SEC2S41710
Loop 2C
- Flushing & Filtration for Mainline & Millipore Test
Project:
UP#152 Activity:
SEC2S41720
Loop 2C
- Flushing & Filtration of Risers & Millipore Test
Project:
UP#152 Activity:
SEC2S41730
Loop 2C
- API Filtration
Project:
UP#152 Activity:
SEC2S41740
Loop 2C
- Partial Draining of Sections
Project:
UP#152 Activity:
SEC2S41750
Loop 2C
- Removal of Christmas Trees
Project:
UP#152 Activity:
SEC2S41760
Loop 2C
- Installation of HP/LP Assemblies
Project:
UP#152 Activity:
SEC2S41790
Loop 3B
- Pressure Testing
Project:
UP#152 Activity:
VO01
Backfill Trenche
s MV & FO East & West LinesNew Activity
Project:
UP#152 Activity:
VO02
Code E Islands D
escope
Project:
UP#152 Activity:
VO03
Hydrant Fuel Cas
ings
Project:
UP#152 Activity:
VO04
AGL Transformers
Project:
UP#152 Activity:
VO05
MV substations R
esize
Project:
UP#152 Activity:
VO06
FATO Relocation
Project:
UP#152 Activity:
VO06-1 FATO Relocation
Project:
UP#152 Activity:
VO07
Zones 1 & 2 Leve
l Differences
Project:
UP#152 Activity:
VO08
Fire Hydrant Pit
s
Project:
UP#152 Activity:
VO09
EMCA - RC Pipe C
oncrete Surround Reinforcement
Project:
UP#152 Activity:
VO10
Primary Cable Co
nnectors
Project:
UP#152 Activity:
VO11
2 Additional CCR
rated 30kW
Project:
UP#152 Activity:
VO12
AGL F900 Chamber
s
Project:
UP#152 Activity:
VO13
AGL Pits Type 1
- 1000x1000mm
Project:
UP#152 Activity:
VO14-1 MART MJF Redesig
n
Project:
UP#152 Activity:
VO14-2 MART MJF Redesig
n

Project:
Project:
Project:
Project:
Project:

UP#152
UP#152
UP#152
UP#152
UP#152

Project:
Project:
Project:

Activity:
Activity:
Activity:
Activity:
Activity:

VO15
VO15-1
VO16
VO17
VO18

AOA Gate House


AOA Gate House
AGL CATIIIB
Site Ambulances
MJF Control Room

UP#152 Activity:
UP#152 Activity:

VO19
VO20

Not Used
DVOR Monitor Ant

UP#152 Activity:

VO21

Presidential Fli

UP#152 Activity:

VO22

MART Stormwater

UP#152 Activity:
UP#152 Activity:

VO23
VO24

Flush Kerb
MJF Concrete Col

UP#152 Activity:

VO25

AOA Temp Fence -

UP#152 Activity:

VO26

Taxiway F - AGL

UP#152 Activity:
UP#152 Activity:

VO27
VO28

A-SMGCS Descope
Fire Main Tie -

UP#152 Activity:

VO29

Fire Fighting at

UP#152 Activity:

VO30

MV Network & Sta

UP#152 Activity:

VO31

Optional Item -

UP#152 Activity:

VO32-1 SCADA System - A

UP#152 Activity:

VO32-2 SCADA System - A

UP#152 Activity:

VO33

MJF - Security G

UP#152 Activity:

VO34

External Access

UP#152 Activity:

VO35

MART AGL Primary

UP#152 Activity:
UP#152 Activity:

VO36
VO37

Not Used
AJF/MJF Interfac

UP#152 Activity:

VO38

MJF Hydrant Cont

UP#152 Activity:
UP#152 Activity:

VO39
VO40

Not Used
B2 Road Underpas

UP#152 Activity:

VO41

Pavement Marking

UP#152 Activity:
UP#152 Activity:

VO42
VO43

Not Used
Surface Protecti

UP#152 Activity:

VO44

Step Irons AGL C

UP#152 Activity:

VO45

Generators 4 Sta

UP#152 Activity:

VO46

MJF CH-0138 Wall

UP#152 Activity:
UP#152 Activity:

VO47
VO48

Not Used
MV & FOC Modific

& TMS
enna Relocation
ght
Project:
& Firefighting Lines
Project:
Project:
lars
Project:
Patrol Road
Project:
Lights Replacement
Project:
Project:
in Points
Project:
D4
Project:
ndby Power
Project:
Bill 3 - Fencing Barriers
Project:
dditional Budget
Project:
dditional Budget
Project:
ate Obstruction
Project:
Roads - Substations
Project:
Cable Joints
Project:
Project:
e
Project:
rol Work Pk. 1
Project:
Project:
s Fence Removal
Project:
s - Thermoplastic
Project:
Project:
on Omission
Project:
hambers
Project:
nds
Project:
Modifications
Project:
Project:

ations
Project:
Project:

UP#152 Activity:
UP#152 Activity:

VO49
VO50

Not Used
Taxiway F4 Remar

Project:
Project:
Project:

UP#152 Activity:
UP#152 Activity:
UP#152 Activity:

VO51
VO52
VO53

Earthworks - 31L
Not Used
Cargo Stands Bar

Project:
UP#152 Activity:
able Redundancy Works
Project:
UP#152 Activity:
Project:
UP#152 Activity:
New Fuel Depot
Project:
UP#152 Activity:
s
Project:
UP#152 Activity:
al
Project:
UP#152 Activity:
ts
Project:
UP#152 Activity:
xiways E13 & E14
Project:
UP#152 Activity:
Project:
UP#152 Activity:
Project:
UP#152 Activity:
ion for HLG
Project:
UP#152 Activity:
nds
Project:
UP#152 Activity:
rs for Cargo Apron Stands
Project:
UP#152 Activity:
Project:
UP#152 Activity:
Project:
UP#152 Activity:
Project:
UP#152 Activity:
Near TWY H)
Project:
UP#152 Activity:
er line realignment
Project:
UP#152 Activity:
Project:
UP#152 Activity:
rol Work CH101, CH21, CH22 & 700 Stands
Project:
UP#152 Activity:
Project:
UP#152 Activity:
Project:
UP#152 Activity:
Project:
UP#152 Activity:
Design
Project:
UP#152 Activity:
s 12 Stands (MAY - AUG)
Project:
UP#152 Activity:
Crossing
Project:
UP#152 Activity:
Work
Project:
UP#152 Activity:
Taxiway D9
Project:
UP#152 Activity:
Project:
UP#152 Activity:
s
Project:
UP#152 Activity:
n
Project:
UP#152 Activity:
Project:
UP#152 Activity:
e Laying Constraints

VO54

Leak Detection C

VO55
VO56

Foreman Dayworks
Cable Ducts Near

VO57

Pavement Marking

VO58

Signage Addition

VO59

Signage Amendmen

VO60

Earthworks at Ta

VO61
VO62
VO63

RVR Gantry Tower


Not Used
Barrier Preparat

VO64

Generators 9 Sta

VO65

Fire Extinguishe

VO66
VO67
VO68
VO69

Not Used
Not Used
Not Used
Stop Bar TWY C (

VO70

A3 Road Stormwat

VO71
VO72

Not Used
MJF Hydrant Cont

VO73
VO74
VO75
VO76

Not Used
Not Used
Not Used
FATO Additional

VO77

EMCA - Generator

VO78

TWY G&H AGL Duct

VO79

ADAC Stoppage of

VO80

Lead-on Lighting

VO81
VO82

TWY H AGL
TWY H CL Marking

VO83

A3 Road Formatio

VO84
VO85

Not Used
AGL Primary Cabl

king

riers

Project:
Project:

UP#152 Activity:
UP#152 Activity:

VO86
VO87

Not Used
Taxiway D6 AGL R

Project:

UP#152 Activity:

VO88

11kV Cable Ident

Project:

UP#152 Activity:

VO89

Distribution Box

Project:

UP#152 Activity:

VO90-1 Optional Items D

Project:

UP#152 Activity:

VO90-2 Optional Items D

Project:

UP#152 Activity:

VO90-3 Optional Items D

Project:
Project:

UP#152 Activity:
UP#152 Activity:

VO91
VO92

Not Used
Stop bar at Taxi

Project:
e Duct Rerouting
Project:

UP#152 Activity:

VO93

AGL Primary Cabl

UP#152 Activity:

VO94

400 Hz Cable

erouting
ification
es Relocation
escope
escope
escope
way D