Académique Documents
Professionnel Documents
Culture Documents
J E N I S
Batu belah
Batu pecah 0,2-1 cm (pecah mesin)
Batu pecah 1-2 cm (pecah mesin)
Batu pecah 2-3 cm (pecah mesin)
Batu pecah 3-5 cm (pecah mesin)
Batu pecah 5-7 cm
Pasir beton
Pasir urug
Sirtu
Tanah urug
Batu bata
Semen PC (40 kg/zak)
Semen warna
Pipa galvanis dia. 2"
Besi beton polos
Besi dia. 14 mm
Besi dia. 12 mm
Besi dia. 10 mm
Besi dia. 8 mm
Besi dia. 6 mm
Bendrat
Paku
Cat besi
Cat meny besi
Paving stone polos abu-abu K 175
Paving stone polos abu-abu K 225
Stoper / Topi Uskup K 175
Stoper / Topi Uskup K 225
Kanstin (40 : 15 : 25)
Papan bekisting (kayu tahun)
Kayu usuk (kayu tahun)
Kayu reng (kayu tahun)
Kayu bakar
Aspal (1 drum = 155 kg)
Besi plat strip tebal 5 mm
Plamir kayu
Cat dasaran kayu
Cat many
Cat kayu (emco)
Bak Mandi Fiberglass
234,000.00
(Rp)
354,000.00
342,000.00
330,000.00
318,000.00
252,000.00
300,000.00
84,000.00
104,400.00
67,200.00
900.00
75,000.00
3,728.75
90,000.00
18,750.00
114,873.00
81,736.00
9,319.00
9,810.00
10,511.00
21,900.00
21,250.00
49,500.00
49,500.00
1,900.00
2,100.00
5,250.00
6,000.00
16,000.00
5,156,800.00
5,156,800.00
5,156,800.00
122,400.00
13,930.00
22,000.00
30,000.00
74,400.00
38,750.00
74,400.00
448,500.00
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
B UPAH
1 Kepala Tukang
2 Tukang
bh
m2
m2
bh
unit
bh
bh
ljr
bh
set
m3
m3
m3
m3
m3
biji
biji
kg
bh
bh
bh
bh
roll
bh
bh
m'
m2
bh
bh
bh
m'
bh
bh
unit/hr
unit
jam
unit
oh
oh
192,900.00
76,900.00
68,150.00
815,650.00
5,937,500.00
41,500.00
6,900.00
16,500.00
7,500.00
656,500.00
7,200,000.00
7,200,000.00
7,200,000.00
10,200,000.00
6,120,000.00
2,000.00
7,750.00
28,750.00
29,550.00
75,000.00
45,000.00
12,150.00
3,500.00
21,800.00
22,500.00
3,150.00
21,900.00
21,900.00
500,000.00
7,500.00
1,100.00
290,000.00
550,000.00
140,000.00
400,000.00
175,000.00
1,500,000.00
81,000.00
78,000.00
3 Pekerja
4 Operator terlatih
oh
oh
60,000.00
87,000.00
N - ALAT - UPAH
Pembulatan
Pengurang
(Rp)
4,000.00
2,000.00
5,000.00
3,000.00
7,000.00
20,400.00
2,200.00
200.00
5,000.00
228.75
6,000.00
4,250.00
73.00
36.00
19.00
10.00
11.00
5,900.00
6,750.00
150.00
200.00
250.00
250.00
1,000.00
2,656,800.00
2,656,800.00
2,656,800.00
2,400.00
1,930.00
400.00
400.00
-
(Rp)
234,000.00
350,000.00
340,000.00
325,000.00
315,000.00
245,000.00
300,000.00
84,000.00
84,000.00
65,000.00
700.00
70,000.00
3,500.00
84,000.00
14,500.00
114,800.00
81,700.00
9,500.00
9,800.00
10,500.00
16,000.00
14,500.00
49,500.00
49,500.00
2,000.00
2,200.00
5,000.00
6,500.00
17,000.00
2,500,000.00
2,500,000.00
2,500,000.00
120,000.00
12,000.00
22,000.00
30,000.00
74,000.00
38,750.00
74,000.00
448,500.00
400.00
400.00
1,150.00
650.00
37,500.00
1,250.00
192,500.00
76,500.00
67,000.00
815,000.00
5,900,000.00
41,500.00
6,900.00
16,500.00
7,500.00
656,500.00
7,200,000.00
7,200,000.00
7,200,000.00
10,200,000.00
6,120,000.00
2,000.00
7,750.00
27,500.00
550.00
150.00
1,800.00
1,500.00
150.00
5,400.00
900.00
40,000.00
100,000.00
15,000.00
100,000.00
-
35,000.00
82,500.00
55,000.00
12,000.00
5,500.00
27,500.00
25,000.00
5,500.00
16,500.00
21,000.00
500,000.00
10,000.00
1,100.00
250,000.00
450,000.00
150,000.00
300,000.00
180,000.00
1,500,000.00
1,000.00
-
80,000.00
78,000.00
2,000.00
60,000.00
85,000.00
Kabupaten :
Kecamatan :
Desa
:
0.50
3.00
Trenggalek
Pogalan
Ngetal
tebal 5 cm
0.50
Take Of Sheet
VOLUME
V Perkerasan Jalan =
=
3.00 x
725
108.75 m3
0.05
Lebar Perkerasan =
Tebal Perkerasan =
Lebar Bahu Jalan =
Panjang Jalan =
3.00
0.05
0.50
725
m
m
m
m
kg
m3
m3
m3
m3
m3
lt
oh
oh
oh
Kabupaten :
Kecamatan :
Desa
:
Trenggalek
Pogalan
Ngetal
Take Of Sheet
0.15
0.1
Volume Galian :
P
5
x
x
L
1
x
x
T
0.25
0.2
0.25
1.25
m3
0.25
0.5
m3
0.75
m3
0.2
tulangandia 12-20
bh balok :
bh balok :
0.15
0.1
0.2
0.15
49.12
0.17
0.026
0.005
Uraian
Panjang Lebar
Tinggi
Luas
Galian tanah
Lebar :
1
5
0.25
0.2
0.25
0.15
0.1
2.
0.15
0.1
0.2
3.
Volume
1.25 m3
0.25 m3
:
:
:
:
Jawa Timur
Trenggalek
Pogalan
Ngetal
No
URAIAN
I.
BAHAN
Batu pecah 3-5 cm (pecah mesin)
Batu pecah 2-3 cm (pecah mesin)
Batu pecah 1-2 cm (pecah mesin)
Batu pecah 0,2-1 cm (pecah mesin)
Aspal (1 drum = 155 kg)
Kayu bakar
Minyak bakar (solar)
1
2
3
4
5
6
6
II.
1
2
3
4
5
6
7
8
9
III.
1
2
3
4
ALAT
Mesin gilas tiga roda 8-10 ton (1 hr
Mobilisasi mesin gilas (PP)
Timba sprayer aspal
Kereta dorong
Cangkul
Sekop
Meteran
Cikrak seng
Sapu lidi
Volume Satuan
(Rp)
87.00
48.30
24.00
11.00
###
9.00
350.00
m3
m3
m3
m3
kg
m3
ltr
11.00
1.00
2.00
2.00
4.00
2.00
1.00
10.00
4.00
jam
unit
bh
bh
bh
bh
bh
bh
bh
369.00
84.00
17.00
11.00
oh
oh
oh
oh
(Rp)
315,000
325,000
340,000
350,000
12,000
120,000
7,500
Sub Total 1)
27,405,000
15,697,500
8,160,000
3,850,000
91,356,000
1,080,000
2,625,000
150,173,500
180,000
1,500,000
75,000
500,000
82,500
55,000
21,000
15,000
10,000
Sub Total 2)
1,980,000
1,500,000
150,000
1,000,000
330,000
110,000
21,000
150,000
40,000
5,281,000
UPAH
Pekerja
Tukang
Kepala Tukang
Operator Terlatih
60,000
22,140,000
78,000
6,552,000
80,000
1,360,000
85,000
935,000
Sub Total 3) 30,987,000
Jumlah (1 + 2 + 3) 186,441,500
Biaya Fisik
94.00%
Biaya Umum (maksimal) 6.00% =
###
Jumlah Total
100.00%
186,441,500
11,385,700
197,827,200
Trenggalek, 11 - 01 - 2016
Disetujui,
Kepala Desa Ngetal
Pelaksana Kegiatan
###
SUMANI
HARIYANTO
Jawa Timur
Trenggalek
Pogalan
Ngetal
No
URAIAN
a
1
1.1
1.2
1.3
1.4
1.5
b
BIAYA UMUM
Honorarium Panitia Pembangunan
Penanggung Jawab
Ketua
Sekretaris
Bendahara
Anggota
2
2.1
2.2
2.3
g
(Rp)
i=e x(Rp)
g
3.00
3.00
3.00
3.00
12.00
OB
OB
OB
OB
OB
450,000
350,000
300,000
250,000
200,000
1,350,000
1,050,000
900,000
750,000
2,400,000
2.00
OK
OK
OK
350,000
250,000
200,000
400,000
3
3.1
3.2
3.3
HR PPHP :
Ketua
Sekretaris
Anggota
1.00
-
OK
OK
OK
125,000
100,000
100,000
125,000
-
4
5
6
6.1
6.2
HR Pengawas Lapangan
HR Perencana Teknis Konstruksi
Honorarium rapat
Pimpinan
Peserta
6.00
1.00
OB
OK
100,000
250,000
600,000
250,000
4.00
36.00
OP
OP
100,000
50,000
400,000
1,800,000
7
7.1
7.2
7.3
7.4
7.5
7.6
7.7
ATK
Buku folio
Bollpoint
Kertas HVS
Stopmap kertas
Map plastik
Tinta printer
Catridge
1.00
2.00
1.00
4.00
4.00
-
bh
bh
rim
bh
bh
botol
bh
15,000
4,000
42,500
1,000
4,000
42,500
140,000
15,000
8,000
42,500
4,000
16,000
-
8
8.1
8.2
8.3
2.00
5.00
1.00
lbr
lbr
dos
3,250
6,500
12,500
6,500
32,500
12,500
9
10
11
Penggandaan
Makanan dan minuman rapat
Papan nama kegiatan
158.00
40.00
1.00
lbr
kotak
bh
150
23,700
22,500
900,000
300,000
300,000
JUMLAH 11,385,700
Trenggalek, 11 - 01 - 2016
Disetujui,
Kepala Desa Ngetal
Pelaksana Kegiatan
SUMANI
HARIYANTO
DETAIL PERKERASAN
Lapis Penetrasi
Batu Kunci 1/2
Batu Pecah 2/3- 3/5
KABUPATEN TRENGGALE
KECAMATAN POGALAN
DESA NGETAL
50
Jenis Prasarana :
3
30
ASPAL LAPEN
Lokasi
POTONGAN MELINTANG
RT. 12 , 14 & 23
Judul Gambar
7. Hamparkan agregat 1/2 -1 m2/m3
POTONGAN MELINTAN
Dibuat Oleh,
Pelaksana Kegiatan
Diketahui Oleh
Kepala Desa Ngetal
DETAIL PERKERASAN
SUMANI
DESA NGETAL
Jenis Prasarana :
ASPAL LAPEN
Lokasi
RT. 12 , 14 & 23
Judul Gambar
POTONGAN MELINTANG
Dibuat Oleh,
Pelaksana Kegiatan
HARIYANTO
Diketahui Oleh
Kepala Desa Ngetal
SUMANI
PNPM-MP 2011
JADWAL PELAKSANAAN
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERDESAAN (PNPM-MP)
TAHUN ANGGARAN 2011
Propinsi
: Jawa Timur
Desa : #REF!
Kabupaten
: Trenggalek
Lokasi : #REF!
Kecamatan
: Pogalan
NO
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
1.1
Pemasangan Patok
1.2
Pembersihan
1.3
Suply Material
PEKERJAAN KONSTRUKSI
2.1
Pelaksanaan pekerjaan
FINISHING
3.1
Pressing/Pemadatan
Pekerjaan : #REF!
Juni
BULAN
MINGGU
II
Juli
III
IV
II
Agustus
III
IV
II
III
IV
PNPM-MP 2011
DOKUMENTASI FOTO
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT
MANDIRI PEDESAAN
DESA NGETAL KECAMATAN POGALAN KABUPATEN TRENGGALEK
Keterangan :
ASPAL LAPEN
Desa :
NGETAL
Kondisi :
0%
Lokasi :
Dusun Duwet
Keterangan :
ASPAL LAPEN
Desa :
NGETAL
Kondisi :
0%
Lokasi :
Dusun Duwet
Keterangan :
ASPAL LAPEN
Desa :
NGETAL
Kondisi :
0%
Lokasi :
Dusun Duwet
DESA NGETAL
Jenis Prasarana :
ASPAL LAPEN
Lokasi
0
Dusun Duwet
Judul Gambar
POTONGAN MELINTANG
Dibuat Oleh,
Kader Teknik
SUBANDIR
Diketahui Oleh
TPK
..
1 Penanggung Jawab
Sumani
400,000
1,200,000
2 Ketua
Hariyanto
300,000
900,000
3 Sekretaris
Imam Mahfud
250,000
750,000
4 Bendahara
Edi S.
200,000
600,000
5 Anggota
Nur Sembilan
150,000
450,000
6 Anggota
Subandir
150,000
450,000
7 Anggota
Waras
150,000
450,000
8 Anggota
Badri
150,000
450,000
Jumlah
5,250,000