Vous êtes sur la page 1sur 1

Name

IRRIGATION CALCULATIONS
0
0
0
or

(Trees) x (2gph x1hr x 2days week x 32 weeks year/ 325851 ) =


(Shrubs) x (3gph x1hr x 2days week x 32 weeks year/ 325851 )=
(Turf Heads) x (55.1gpm x 20min x 2days week x 32 weeks year/ 325851 )=
TOTAL REQUIRED FROM LS PLAN BY LANDSCAPE ARCHITECT

0.000
0.000
0.000
0.000

A=

acre-ft
acre-ft
acre-ft
acre-ft

FIXTURE UNIT BREAKDOWN


Table a-2 and 7-3 upc
Num
Type of Fixture
A
0
Drinking Fountain
0
Bar Sink
0
Lavatory Sink, single
0
Lavatory Sink, in sets
0
Laundry Tubs
0
Shower, single stall
0
Shower, gang (one per head)
0
Clotheswashers
0
Service Sink or dishwasher
0
Water closet, tank
0
Urinal - valve
0
Water closet, valve
0
Floor Drains
0
Receptors floor sinks, all
0
Interceptors for grease, oil, solids, auto wash ect
0
0
Hose Bibb
0
3/8 inch supply line
0
1/2 inch supply line
0
3/4 inch supply line
0
1 inch supply line
TOTAL SS FIXTURES USED IN CALCULATING SEWER FEES
TOTAL WATER FIXTURES USED IN CALCULATING WATER FEES
Sewer GPD = SS Fixture units x 15 gal per day per fu
Water GPD = Wtr Fixture units x 15 gal per day per fu
GPD x 365 days per year x 1 acre-ft per 325,851 gal
= wtr acre-ft =

Sewer
Fu per
B
1
2
2
2
2
2
3
3
3
4
4
6
1
1
3

Water
Fu per
C
1
2
1
2
2
2
2
4
3
3
3
10

3
2
4
6
10

D1 =
B=

Total Fixture Units


= SS
= WATER
AXB
AXC
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0
NA
0.00

PROCESS WATER
Provided by building owner. No standard form exists.
0

Gallons per work day x 365 days per year (MORE IF APPLICABLE) x 1acre-ft per 325851 gal = acre-ft =

DAY/YR
365

Water
Acre feet % TO SEWER =
0.0000
100%

SEWER
Acre feet
0.0000

TOTALS
Total
Total
Total
Total
Total
Total

Acre feet
0.0000
0.0000
0.0000

irrigation water amount


potable water amount
process water amount
SEWER amount
process SEWER amount
Water rights dedication required from PUD Water agreement (potable + process)

gpd
0.00
0.00
0.00
0.00
0.00

0.0000

A
B
C
D2
E

FEES
Sewer Connection Fees - ($9.57 / GPD)

PAYABLE TO TRI-GID

$0 D2+D1 * 9.57

Water Connection Fees (potable and process) - ($4.91 / GPD)

PAYABLE TO TRI-GID

$0 B+C * 4.91

Irrigation Connection Fees - ($4.91 / GPD)

PAYABLE TO TRI-GID

$0 A * 4.91

Water Sewer plan review fee.

PAYABLE TO TRI-WATER AND SEWER COMPANY

$500

Water Sewer inspection deposit.

PAYABLE TO TRI-WATER AND SEWER COMPANY

$1,000

Water Rights ( TBD )

PAYABLE TO TRI-LLC

TOTAL'S

Total Due =

322461726.xls

call rec
$1,500

E-0.5 * SITE*

Vous aimerez peut-être aussi