PART 1
The pipeline is broken, and the flow is out of control.
This is the current situation. The broken end must be
cut so it is smooth and then a plate is welded over the
smoothed end. The flow gets in the way. The
estimated production from this pipe was at least
50,000 barrels per day when BP was raising money to
do this project. Far larger than what they have
admitted is flowing today from the same pipe.
PART 2
This is a valve. It is as strong as the original pipe,
and equipped with a cut-off valve sufficient to stop
the flow. It is also shaped at one end to fit over the
out of control pipe behind the break.
STEP 1
The valve section is attached to the broken section
behind the break by welding it in place.
MOKENERGY
C O R P O R A T I O N
1000 Titus Road, Springfield OH 45501 Power from the Clear Blue Sky
STEP 2
The section of pipe that is now interior to the
valve section is cut away with shaped
explosives, while the valve is open.
STEP 3
STEP 4
1000 Titus Road, Springfield OH 45501 Power from the Clear Blue Sky
CHECK VALVE
Hyundai Heavy Industries Check Valve that’s
designed to go on an 18.75 inch inner diameter
pipe of sufficient thickness to close off the oil
flow.
WHY?
Could it be that Hyundai fears bad publicity will
adversely affect their car sales in the US? Just as
bad publicity surrounding Toyota and GM might
had an adverse affect on their sales?