Vous êtes sur la page 1sur 4

HSE INSPECTION REPORT

Contractor M/S PETRON CIVIL ENGG.LTD Inspection By & Date


Site Training, Bank, Health centre, Lab -Buildings Contractors Representative
No Hazard/Non-coformance Recommendations
1 Naked wire inserted into DB for power construction Plug top to be provided.
supply ,near lab building.
2 Three workmen without safety shoes at site. Bank refinery Wearing of Required PPE's is mandatory at
building. site.
3 Drill machine power connection with twisted joint. Plug top to be provided. Don't allowed
Bank building. twisted joint.
4 Use of domestic PVC electrical single core wire for electrical Only 3 core (P+N+E) overall sheated
portable power tools. Bank refinery building. flexible cables with minimum conductor
size of 1.5 mm2 copper shoulde be used
for all single phase hand tools.

5 Marble stone cutting machine connection without plug top. Plug top to be provided.
Health centre.
6 More than 8 nos Workmen observed working without safety Use of reqired PPE's need to be provided &
helmet ,hand gloves ,safety goggles & nose mask during used.
marble stone cutting activity in health centre. M/s
Bharati sub contractor.

7 Work at height- No safe access/ ladder .scaffolding Safe access/ladder & scaffolding with
without providing hand/guard rail. Workmen observed at hand/guard rail to be provided.
height without anchored safety belt engaged in electrical
fitting activity. Lab building

Received By-

Name and Designation


Y.Sharma ,23-07-2010
No HSE
Compliance date Close out date Remarks
7/23/2010 Power supply
cut off.
7/23/2010

7/23/2010 Power supply


cut off.
7/23/2010

7/23/2010 Power supply


cut off.
7/23/2010 Supervisor was
instructed to
rectify
immediately.

7/23/2010

Observed By

Y.Sharma,HSE Dept ,HMEL


manikanthakumar@pe
lalits@petroncivil.com
anikanthakumar@petroncivil.com
lits@petroncivil.com